KONRADBONCZ API ORO MAL A S i l ver t ownQuays-Mi nocoWhar f MAPROJ ECT
GI SANAL YSI S
Si l ver t ownQuaysandMi nocoWhar f havebeennegl ect edf orover 30year s . Atpr es entt hes i t ei sder el i ctand under goescol oni z at i onoff i r s ts t age veget at i onandi sahavenf orf ox es . Peakofi ndus t r i al act i vi t ycame i n1958 wi t hf ul l yoper at i onal pet r ochemi cal i ndus t r yi nMi nocoWhar f andMi l l eni um Mi l l si nS i l ver t ownQuays Maj or i t yofl andi sr el at i vel yf l atwi t h hi ghes tpoi ntof5m. S i t ei sopent oel ement s :r ai n,s unand wi nd. S ur f acewat erhydr ol ogyi ndi cat es wat erf l ow,t owar dsGr avi ngDock, Nor t hWool wi chr dandT hamesr i ver .
Si l ver t ownQuaysandMi nocoWhar fDEVEL OPERS’PROPOSALASSESSMENT Ar upandCl ear s t or m havepr opos ednew s chemesf ort hes es i t eswhi ch havebeenanal yz edt hr oughEnvi r onment al I mpactAs s es s ment andl eadmet oal t er nat i vedes i gn.
Konr adBoncz aPi or oMAL A
Mi nocoWhar fI NT ERT I DALVEGET AT I ONPI ER Woodenboar dwal kcr eat esapat hs pace r el at i ons hi pwi t hmul t i pl echoi cesof ex pl or at i onoft her i verbankandveget at i on. I ti sanel evat edmaz e.I tes t abl i s hespoi nt sof movementaboves ur f aceoft her i ver andpr ovi desoppor t uni t i esf orpaus e,r es t ,and r eor i ent at i onbutal s oal l owsonet of eel ‘ s us pended’i ns pace. . .
Mi nocoWhar fWETWOODL AND Woodenboar dwal kcons t r uct edi nas hapeofa cor al cr eat esapat hs pacer el at i ons hi pwi t h mul t i pl echoi s esofex pl or at i onoft hewoodl and. I ti samaz ewi t hnodespunct uat i ngt hepat hsof movementt hr ought hewoodl andandpr ovi di ng oppor t uni t i esf orpaus e,r es t ,andr eor i ent at i on. Event ual l yas pect at ori sl eadt owar dst her i ver bankwher ewoodl andpat hsl i nkswi t h i nt er t i dal veget at i onpi er .
ATTENUATI ON POND
S us t ai nabl eUr banDr ai nageS ys t emsS t r at egy
Pavi ng pl an
Pl ant i ng pl an
Konrad Boncza-Pioro MA LA
CUBE GARDEN
2458x1464x2634x708mm raised bed made with 100mm wide x 300mm tall sawn finish timber PRODUCT CODE:171500.
Diagonal wire system stretched between four 3500mm tall 60.3mm dia (or wider) galvanized tubular posts driven through timber sleepers and footed in concrete reinforcement Amalfi high power LED PRODUCT CODES:309661/ gard3 e n s p o t light 7640 2 10 0 0 .
450x450x2004mm
150mm x 50mm timber slats with chamfered edges bolted to metal frames welded to 60.3mm dia (or wider) galvanized tubular posts at 225mm centres. Bench to be 100mm above raised bed.PRODUCT CODE:309661
1869x2004x395x2782mm raised bed made with 100mm wide x 300mm tall sawn finish timber PRODUCT CODE:171500.
2391x2180x659x2983mm raised bed made with 100mm wide x 300mm tall sawn finish timber PRODUCT CODE:171500.
PRODUCT CODE: 60015
918x1647x1967mm raised bed made with 100mm wide x 300mm tall sawn finish timber PRODUCT CODE:171500. 25x100x4200mm natural decking board to be 200mm below raised bed level. PRODUCT CODE:755610.
4500x7740mm Timber frame made with 200 wide x 100mm tall sawn finish timber laid in three layers reaching 300mm above ground PRODUCT CODE:171500. 3935x646x2869x1914mm raised bed made with 100mm wide x 300mm tall sawn finish timber PRODUCT CODE:171500.
1818x805x2788x2757mm raised bed made with 100mm wide x 300mm tall sawn finish timber PRODUCT CODE:171500.
450x450x918mm bench made with: 150mm x 50mm timber slats with chamfered edges bolted to metal frames welded to 60.3mm dia (or wider) galvanized tubular posts at 225mm centres. Bench to be 100mm above raised bed.PRODUCT CODE:309661
934x1134x1555x1470 x200mm deep pond with spot led lights on edges.
Luminis warm LED
450x450p x1 1 4m m B e nch o9 n d l ig h t
made with: PRODUCT CODE:11979 150mm x 50mm timber slats with chamfered edges bolted to metal frames welded to 60.3mm dia (or wider) galvanized tubular posts at 225mm centres. Bench to be 100mm above raised bed.PRODUCT CODE:309661
Plan
Design idea:
Philosophy:
Tubular banner stretched between two circles. One at the top one at the bottom of the staircase.
Banner is an allegorical representation of a connection between heaven and earth.
Two sources of light one at the top one at the bottom illuminate the banner from within.
A column in the temple represents this concept in an architectural form. It is also a metaphor of a meditator’s way towards the absolute.
By incorporation of images and sentences from Meditatio work and events meditators from around the world may explore the essence of a community as a spiritual journey.
Konrad Boncza-Pioro MA LA
Banner concept - ELEV
Design / Philosophy: Stairs accomodate a change in level and viewpoint, reinforce the path of upward movement. A column placed in the middle of the stairway allows us to explore The Centre and its spiritual tradition. This Stairway and a column is a three dimensional experience. This three dimensional quality can be exploited when we treat it as a sculpture, freestanding within a space but also conveying an important message. While the act of traversing up the stairway may convey privacy, aloofness, detachment, and focus on the way to the unknown. Going down is a step into reality with new consciousness. Walking up the stairs is an act of symbolic pilgrimage, collective or individual, towards the ABSOLUTE.
Konrad Boncza-Pioro MA LA
Banner concept - AXO
INTERNATIONAL FLAG ROSETTE: illuminated from glass rosette on north elevation.
Workshop space - PLAN
Personal belongings/ meditation ccessories storage for 80 chairs and foldable partitions.
Workshop space - ELEV
Konrad Boncza-Pioro MA LA
North elev -ALTERNATIVE
Konrad Boncza-Pioro MA LA
Meditation space - VIEW
Konrad Boncza-Pioro MA LA
Meditation space - PROPOSED LIGHT EFFECT
KONRAD BONCZA-PIORO ‘URBAN GENERATOR’
PROJECT NAME URBAN GENERATOR SITE SURVEY In 2014 Silvertown flyoverparagraph will celebrate Enter your site summary here70 years of operation (and spell check): since construction in 1934. It is the fifeugiam rst everdunt elevated Ibh euis digna iureetroadway ullan in England that created precedent to exerilit alit laor suscinis nonsequip euisim other kind dipsumsan in the country. iustiniprojects scincilla of feuthis faccum velit utem nonulput ad do conulpute tie Silvertown flyoverduipit is located next susto The vel enim velesse wis nullaor Crystal Centre and in between the tin river trud eugait lut lan verat, quatuer iliqui Thames and Royal Dock. ut illute vent vullanVictoria eum enit, con eugait nisit, conulluptat, volenis cincilis nullaore Silvertown flyover was dolortis conceived magna facipis nim nosto nibhaseril-a solution congestion caused by combined lam, quattoad et, quamet nos exer in el et car, raileaand shipincillam traffic alit clashing at the accum feugait lor accumwestern entrance from the rivernostinisto Royal molore conulla amconse feugait Victoria Dock. Construction of the fldoyover sit ad elesequatem dolor susciliquis involved scale Gait, urbanconumsan redevelopment lore minitlarge aut autpat. ulla and relocation localodolore residents new conumsa ndipit,ofquatio vel to exer quarters thefaccumm northern odolore part of Royal Docks. sit la feuin feu ver ipit loSilvertown Flyoverate enabled borer atin utatisit cor si. smooth flow of traffic, goods and people within the area. Enter full existing site description here (and It hascheck): also created vacant volobor space underneath spell Agna faccum sis nit the flyover interesting structural dolorper sequisiwith blandion hent ad modignim character which being terediscovered dolenit irit endre consiserostrud do dit utpatoday as local residents parts of the tio od ercilit nis am, commyclaim nostrud modions Tidal for variety activities ecte tisBasin aute tem veliquatofeuguer sentsuch wisi. as watersports, skating, running, cycling and outdoor Space underneath Silvertown Vulla conbars. ent am, consequ ametumsandre Flyover challenging yet at the same can diam, corissequis erosto corperosting ectem offer variety of experience both individual iure faci eraestrud ero etum iure do conse and feuiscollective. am dolore velenim in ex ero et ulla consequ issequam venim nissisi tat lum eraeseq Being uatisi. on site is an extraordinary experience as the structure itselfdolorero forms conseniam a series of An utatum in ut vullaore multiplicated threedipsust dimensional spaces. vel ullandre dolum isisis euis dolorAt si a fibla rstconsent glance vullan it resembles temple like interior ullaore feu feuissequat. but contextullum makes oneconsenibh also thinkeugait about it Nibhitseraessit nosto as urban park.exWe think about it as lam an quisse dolore ea also corercilisis doluptat. a place high energy that psustrud is why wemonamed Em zzritof alis nonsed deliqui itdolorem Urbanipit Generator human activity accumsanwhere veliquatum venisse could a sustainable way. vulput bloom nim adintinciduisl exero do do ectem dolore tis adit lan eum quisit eniam nonsed Through observation we have exeros noson enimsite ea aliscincil digna feuisim identifi ed two needs of volutat local residents dignis nis ad tionullum praessi. that our proposal could fulfill: need for sport/leisure facilities for nulla socialaliquat. interaction. Put landipand eseneed commy Od ex exeraesto do odolore dio eugiamconum veRoyal Docksconsed have been developed lismo dolore tion gradually erit, commodo lupsince 17thnullandipit century ipbut the tetue zenith of its tatuer sim eu faci magnit expansion came with Victorian era, Industrial in hendreros eril ut nonsenim dolutpat, sumRevolution Empire’s san hent alit,and qui British enissecte vullam,exploration sequis eu of world markets. Royal have operated facidunt lum augiam, simDocks in ut vel ut augiam continuosly untilipsuscilisl final closure 1981. qui eum nulland iure in velisit nonullaorem aut dolobore modiam ipsusci duipsuWe of the strud acknowledge te tin vendignibhtransformation etum quisissim ipsum Victoria Dock commolo and its newest developments ad te molesto reetueros nit wis of The Crystal Centre and deliquisit ipit nonsed magna coreEmirates magna alitAir Line. We would our proposal provoke et, veliquis nonselike conullandit ea feutofacidunt discussion between professionals and the dunt nit vel dunt aliquam, quismod oluptation local the future site volorecommunity magna feu about feu faccum venisof amthis quat. and wider area between the dock and the Nonsequisi ecte modipit ulluptat, 390 wordsriver.
LOCATION: SILVERTOWN WAY FLYOVER (A1011) POSTCODE: E16 1AH BOROUGH: NEWHAM LANDOWNER: LONDON BOROUGH OF NEWHAM 1.
1.
3.
2.
SITE LOCATION:
4.
EXISTING SITE USE:
EXISTING ACCESS:
EXISTING LAND USE:
Royal Victoria
Canning Town
Residential Leisure Industrial North Greenwich
Silvertown Flyover is located between Royal Victoria Dock and The River Thames next to The Crystal Centre. The site lies underneath Silvertown flyover (A1011) leading From Silvertown Way to North Woolwich Rd.
5.
Commercial
Flyover surface: wasted solar and kinetic energy Vacant space
At present the site is surrounded by predominant residential and industrial zones. Commercial zone is located in front of Excel exhibtion centre. Land use dedicated to leisure activities is limited to a green square in commercial zone and southern part of the Tidal Basin.
6.
7.
At present the site is partly accessible from The Crystal Centre. Acces is restricted by industarial zone and a car park.
At present the site is vacant and underused. The site provides shelter for outdoor activities but also has potential for sustainable energy generation.
8.
10.
9.
Location Map
1. 1.Site Siteplan location, axonometric view Scale Scale1:500/1:1250 1:15000, CAD base plan purchased from Emapsite.com, invoice nr: 204298
2. Existing land use diagram.
3. Existing access diagram.
4. Existing site use diagram.
6,7,8 Site users
5. Silvertown Way Flyover built in 1934, 9. Under construction Source: Heritage Scoping Study of the Royal Docks Masterplan Area London Development Agency
10. Site survey photo.
PROJECT NAME URBAN GENERATOR PROPOSAL Silvertown flyover is one of the most common features of contemporary engineering infrastructure. We would like to prove it could become transformed into a space for the people but also into a sustainable power generating site. We would like to source concrete for construction from the adjacent batching plant and other materials such as metal, wood and rubber from nearby recycling facilities. Solar panels installed on top of the flyover perfectly alinged to the south combined with kinetic energy harvesters would provide electricity for the site with the potential of exporting excess power to the grid. Our approach is to retain the character of the site and to provide opportunity for human expression. Urban Generator in social context entails education and variety of play for different age groups. It is a sustainable urban park under the roadway which will provide sport facilities, outdoor cinema and a water feature symbolising the historic connection between Victoria Dock and river Thames. It would be simplistic to focus only on the site itself and ignore the context. Therefore we believe it is necessary to look outside its boundaries. Reason is to create wider landscape framework. We believe that Urban Generator could be a starting point for creation of Industrial Heritage Park that would connect dock area to the river in the future. 6.
outdoor cinema
SUSTAINABLE ENERGY CONCEPT:
EDUCATION CONCEPT:
Energy of the place through activity in space! Sun and kinetics act as sources of sustainable energy for the site.
Education in Sustainabilty + Sustainability in practice = Creation of education through play within the industrial heritage.
reflection of history/symbolic dock river link
rope slide
solar panels
light columns powered by solar & kinetic energy
4.
PROPOSED LAND USE:
Residential Leisure Industrial
7.
1. Education concept diagram.
3.
2.
1.
Commercial
Solar panels Kinetic harvesters Outdoor cinema
Our proposal would go further than the site itself and offer the potential for radical change of land use in the future. Historically The Royal Victoria Dock and The River Thames were connected. We would re-connect them again by creating a physical link carved out of the industrial zone thus re-establishing public access to the river in a form of a Industrial Heritage Park.
3. Proposed land use diagram.
Our aim is to make the site accessible by incorporation of space under the flyover into public zone surrounding The Crystal Centre and relocation of an adjacent car park.
skate/bmx park with kinetic energy harvesters
4. Proposed site access diagram.
5. Proposed site use diagram.
6. Sectional elevation view.
7. Rope slide.
suspended walkways
8. Skate/BMX/Rope park.
Symbolic dock river link Skate park
We propose to turn the site into a vibrant place being able to generate part of its electricity sourced from the sun, car traffic and human activity in the park underneath. Also an outdoor cinema would be open to the public. We would comemorate the history of the site by re-creating a symbolic link to The River Thames.
9.
8.
2. Sustainable energy concept diagram.
5.
PROPOSED SITE USE:
PROPOSED ACCESS:
9. Evening view.
KONRAD BONCZA-PIORO PROFESSIONAL PORTFOLIO CAPITA SYMONDS BSkyB CAMPUS DEVELOPMENT
BOSTON MANOR
M4
BRENTFORD
A4
SYON LANE O OSTERLEY
Aerial Context
Planning | Environment | Design incorporating Lovejoy and Andrew Martin Associates
ND AR Y
N.
VI
SU AL
E.
N.
EN
/N
A
MO
OI
SE
HP
BUILDING 02
B
BUILDING 02
WIND TURBINE
RETAIN TREES
C D
G
EN
ER
AT O
RS
PARCEL E1
PLANT
PROPOSED SCULPTURE 5-8M
PARCEL E2 2
PARCEL C
WA Y RAN T GG
DEVELOPMENT
PARCEL H
C
EN
ER
AT O
ER
AT O
RS
DEVELOPMENT
RS
DEVELOPMENT PARCEL E1
PLANT
PARCEL E2 2
PLANT
PARCEL C
SKY STUDIO
PARCEL C
DEVELOPMENT
DEVELOPMENT DE DEVELOPMENT T P2 PARCEL D
PARCEL E2 2
MEETING CENTRE
DEVELOPMENT
PARCEL E2 2
SKY STUDIOS
SKY STUDIOS
G
DEVELOPMENT
DEVELOPMENT
PARCEL F
PARCEL H
PLANT
DEEEVELOPMENT
DEE DEVELOPMENT D MEETING CENTRE
DEVELOPMENT
RS
DEVELOPMENT PARCEL E1
DE DEVELOPMENT
PARCEL F
F
G EN
AT O
DEVELOPMENT
HP
G
ER
PARCEL E1
CC
BUILDING 02
HP
PARCEL F
PARCEL H
D DEVELOPMENT T
D DEVELOPMENT T PARCEL D
PARCEL D
PARCEL G
A. PARKLAND STRIP / BIODIVERSITY CORRIDOR
DEVELOPMENT
VIS TA TO W
DEVELOPMENT
IND
TUR BIN E
PARCEL D
CC
BUILDING 02 EN
E
DEVELOPMENT DEVELOPMENTT D
HP
G
ENTRANCE
PARCEL F
E.
C
CC
BUILDING 01 [MC]
DEVELOPMENT
SKY STUDIOS
VIS TA ALO N
PARCEL H
D DEVELOPMENT DE
MEETING CENTRE
PARCEL C
DEVELOPMENT
N.
E.
C
RE
CC
DEVELOPMENT
N.
E.
SC
LB
OU
C
PARCEL G
OPEN SPACE (SOFT + HARD STAND)
DEVELOPMENT
DEVELOPMENT PARCEL G
PARCEL G
HARD LANDSCAPE
DEVELOPMENT PARCELS
CENTRAL PLAZA
PUBLIC REALM
B. TRANSITION ZONE C. CENTRAL ZONE/ OUTDOOR ROOMS/ EVENT SPACE
HEA T BIRD HROW F STR IKE LIGHT PAT H
D. APPROACH PLAZA
GILLETTE BUILDING
E. ARRIVAL PLAZA
G
KEY:
F. GRANT WAY
VISUAL SCREEN/NOISE
G. ENTRANCE ZONES
MOL BOUNDARY
IMPROVED ENTRANCE
HEATHROW FLIGHT PATH BIRD STRIKE IMPROVED ENTRANCE PROPOSED SCULPTURE
NOTE ;
RETAINED TREES
* RED LINE AREA : * OPEN SPACE AREA : * OPEN SPACE RATIO :
ICONIC BUILDING
VARIETY OF OPEN SPACES
ANALYSIS
N.
N.
E.
N.
HP
CC
HP
BUILDING 02
PARCEL E1
PLANT
PARCEL E2 2
PARCEL C
PARCEL C
SKY STUDIOS
DEVELOPMENT
DEVELOPMENT
PARCEL F
PARCEL H
DEVELOPMENT PARCEL G
SOFT LANDSCAPE
SOFT LANDSCAPE STRATEGY
PARCEL E2 2
PARCEL F
DEVELOPMENT PARCEL G
PARCEL F
DEVELOPMENT EV NTT
DEVELOPMENT PARCEL H
D DE DEVELOPMENT T
PARCEL G
SOFT LANDSCAPE
SOFT LANDSCAPE STRATEGY
PARCEL EL E2 CLF
PARCEL C
PARCEL D
DEVELOPMENT
PUBLIC ART STRATEGY
PLANT
MEETING CENTRE
DEVELOPMENT
SKY STUDIOS
PARCEL H
PUBLIC ART FEATURES
PARCEL E2 2
DEVELOPMENT
DEVELOPMENT PARCEL D
PARCEL E1 DE DE DEVELOPMENT
PARCEL C
DEVELOPMENT D EVELOPMENTT
DEVELOPMENT
PLANT
MEETING CENTRE
DEVELOPMENT
SKY STUDIOS
PARCEL H
PARCEL D
PARCEL E1
RS
RS
DEVELOPMENT
DEVELOPMENT
DEVELOPMENT
D DE DEVELOPMENT T
AT O
AT O
D DE DEVELOPMENT MEETING CENTRE
DEVELOPMENT
ER
ER
PLANT
DE DE DEVELOPMENT MEETING CENTRE
EN
EN
RS
DEVELOPMENT
G
G AT O
RS
HP
BUILDING 02
ER
AT O
DEVELOPMENT
HP
EN
ER
C
CC
CC
G
EN
PARCEL E1
E.
C
BUILDING 02
G
DEVELOPMENT
N.
E.
C
CC
BUILDING 02
OPEN SPACE RATIO
HARD LANDSCAPE STRATEGY
E.
C
132,800 m2 52,130 m2 39.25 %
SKY STUDIOS
DEVELOPMENT BUILDING 04 PARCEL F
D DEVELOPMENT T PARCEL D
DEVELOPMENT PARCEL G
SPACE COMPARISON
sport and wellbeing character green lungs calming and relaxing - place to unwind sense of openness but with secluded areas natural and soft reflective green gym
function
biodiversity connecting people with nature space for quiet contemplation increase
space to walk or jog at lunchtime
informal meetings
play tennis or chat with friends
form
organic forms meadows with wildflowers formal and informal sport and play facilities undulating
landforms
native species
sinuous waterways
Character / Function / Form
Planning | Environment | Design incorporating Lovejoy and Andrew Martin Associates
art and culture character dynamic and vibrant at the heart of the action sence of ‘work hard and play hard’ contemporary creating sense of civic identity destination
function
place to meet and greet hub allowing sharing of ideas
Hi-tech place to grab a coffee and make a call flexible landscape - 24hr landscape event and party space demonstrate brand indentity
form
robust hard landscape with soft edges bringing nature into the civic heart Large structual trees for shade and greening interactive and intutative art and sculpture installations lighting and colour
Character / Function / Form
Planning | Environment | Design incorporating Lovejoy and Andrew Martin Associates
education and technology character creative and collaborative intriguing and fun providing intimate working envionments Landscape Lab constantly evolving Technology Lab
function
space to share
ideas transfering of knowledge encouraging exploration benefit employees and the public demonstrations break-out space, outdoor working
form informal and formal
seating spaces
shelter and shading pioneering technology outdoor meeting room innovative and exciting materials
teaching spaces
Character / Function / Form
Planning | Environment | Design incorporating Lovejoy and Andrew Martin Associates
N.E.C CCH
P GEN
ERA TO
NG
DI UIL
B
02
ENT PM ELO E1 V E D CEL PAR
G TIN
RE
NT
CE
E ME
Location plan
ENT PM ELO H V E L D CE PAR ENT PM ELO G V E L D CE PAR
Events space
D
TU
YS
SK
NT ME LOP C E V DE CEL PAR ENT PM ELO F DEV RCEL PA
Stepped terraces, rasied planters, seating area
T
AN
PL
Seating area, planters
E PM ELO L E C PAR
DEV
N.E.C CCH
P GEN
ERA TO
NG
DI UIL
B
02
ENT PM ELO E1 V E D CEL PAR
G TIN
RE
NT
CE
E ME
Location plan
ENT PM ELO H V E L D CE PAR ENT PM ELO G V E L D CE PAR
Attenuation pond, marginal wetland planting
D
TU
YS
SK
NT ME LOP C E V DE CEL PAR ENT PM ELO F DEV RCEL PA
Seating area, planters
T
AN
PL
E PM ELO L E C PAR
DEV
N.E.C CCH
P GEN
ERA TO
NG
DI UIL
B
02
ENT PM ELO E1 V E D CEL PAR
G TIN
RE
NT
CE
E ME
Location plan
ENT PM ELO H V E L D CE PAR ENT PM ELO G V E L D CE PAR
Allotments
Event space link
Amenity lawn
D
TU
YS
SK
NT ME LOP C E V DE CEL PAR ENT PM ELO F DEV RCEL PA
Shelterbelt
T
AN
PL
Orchard
E PM ELO L E C PAR
DEV
N.E.C CCH
P GEN
ERA TO
NG
DI UIL
B
02
ENT PM ELO E1 V E D CEL PAR
G TIN
RE
NT
CE
E ME
Location plan
ENT PM ELO H V E L D CE PAR ENT PM ELO G V E L D CE PAR
Orchard
Amenity lawn
Basketball pitch
Sports pitch
D
TU
YS
SK
NT ME LOP C E V DE CEL PAR ENT PM ELO F DEV RCEL PA
Event space link
T
AN
PL
E PM ELO L E C PAR
DEV
N.E.C CCH
P GEN
ERA TO
NG
DI UIL
B
02
ENT PM ELO E1 V E D CEL PAR
G TIN
RE
NT
CE
E ME
Location plan
ENT PM ELO H V E L D CE PAR ENT PM ELO G V E L D CE PAR
Wildflower meadow
Wetland planting, attenuation pond
D
TU
YS
SK
NT ME LOP C E V DE CEL PAR ENT PM ELO F DEV RCEL PA
Footbal pitch
T
AN
PL
Wetland planting, wildflower meadow
E PM ELO L E C PAR
DEV
Phase 2 Aerial View
KONRAD BONCZA-PIORO PROFESSIONAL PORTFOLIO CAPITA SYMONDS Mumbai Personal Rapid Transport Stations Landscape Layout
KONRAD BONCZA-PIORO PROFESSIONAL PORTFOLIO CAPITA SYMONDS LVIA
LEGEND Application Site Boundary Location of Photographic Viewpoints (Site Context Photographs)
Gree
nhurs
Northl ands L ane
Chilterns Farm
We st Ch i La lting ne ton
4
8 7 Fryern Home Farm
Poultry Farm
3
2
e
4 5
1
ad
Freyrn Ro
6
t Lan
Water Lane Industrial Estate
Melton Drive
0
80m
160m
240m
320m
400m
FIGURE 2 Project
Land North of Melton Drive, Storrington, West Sussex Client
Wates Developments Ltd Drawing Status
For illustrative purposes only Drawing Title
Aerial Photograph of The Study Area Drawing No
824/L2
Scale
1:10,000 @ A3
Date
Feb 2013
Catherine Shelton Associates Limited Landscape Architects & Environmental Consultants The Old Vicarage Mayland Hill Mayland Essex CM3 6DZ T: 01621 774465 E: catherine@catherineshelton.co.uk
LEGEND Application Site Boundary
Poultry Farm
H1
West Wantley OldďŹ eld Cottage
4 West Wantley
2 Miramar
4
3 Freyrn Road
1
C
East Wantley House
Location of Photographic Viewpoints (Site Context Photographs) Location of Photographic Viewpoints (Site Appraisal Photographs)
The Granary
East Wantley Barn
Path
H2a
Field Boundary/Hedgerow Numbers
H2b
E C
D
H1 H3
A
0
40m
80m
Path
Freyrn Road
B H4
FIGURE 4 Project
White Cottage
Brambledown Southwood
Thyme Cottage
Leyeshurst
16
Melton Drive
12
F
Brackenhurst Consley
West Woods
Shutters
Tillingdon
Roke
Finnart House
32
13
11
9
Site Appraisal Plan
1
e
The Lea
nu
Tresvale
Winnerfold
Gar 15
5 3
den
s
24
1
11 6
Drawing No
824/L4
Scale
1:2,500 @ A3
Date
Feb 2013
Catherine Shelton Associates Limited
16
ter
ve nA
Merckx House
10
21
7
nis
Downscote
For illustrative purposes only Drawing Title
16
lto
Stonehurst
29
27
Me
Lane End House
Drawing Status
rive
Miniterne
Emily Cottage
Gables
Melton D
Ban
Oakwood
Wates Developments Ltd
33
ue
6
Client
or Aven
Spilsby
Aldemo
Broadoaks
Land North of Melton Drive, Storrington, West Sussex
Linden Lea
1
Landscape Architects & Environmental Consultants The Old Vicarage Mayland Hill Mayland Essex CM3 6DZ T: 01621 774465 E: catherine@catherineshelton.co.uk
LEGEND Application Site Boundary Contours/Spot heights (metres AOD)
2463/1
2639
2791
Ancient Woodlands
2641
2640
2463/1
South Downs National Park*
2488
2645
Public Rights of Way
2438
8
Footpath
7
Bridleway
2646
2438
2
2442
2645
3
1 2647
2637
Location of Photographic Viewpoints (Site Context Photographs)
4
4
*Source - Proposals Map Development Plan Document (December 2007)
5 0
6
2625
2438
2625
80m
160m
240m
320m
400m
FIGURE 1 Project
Land North of Melton Drive, Storrington, West Sussex
3644
2649
Client
Wates Developments Ltd
2635 3671
Drawing Status
For illustrative purposes only
2638
2648
2626
2650
2649/1
Drawing Title
Site Context Plan Drawing No
2653
2651
2651 2657
2972
2654
2662
2685
Feb 2013
Landscape Architects & Environmental Consultants
2656
2659/1
Date
Catherine Shelton Associates Limited
2655
2664 2659
1:10,000 @ A3
2653
2661/1 2661
824/L1
Scale
The Old Vicarage Mayland Hill Mayland Essex CM3 6DZ T: 01621 774465 E: catherine@catherineshelton.co.uk
LEGEND Application Site Boundary Contours/Spot heights (metres AOD) Ridgelines 80m AOD 70-75m AOD 65-70m AOD 60-65m AOD 55-60m AOD 50-55m AOD 45-50m AOD 40-45m AOD 35-40m AOD 30-35m AOD 25-30m AOD 20-25m AOD 15-20m AOD 10-15m AOD 10m AOD 0
80m
160m
240m
320m
400m
FIGURE 3 Project
Land North of Melton Drive, Storrington, West Sussex Client
Wates Developments Ltd Drawing Status
For illustrative purposes only Drawing Title
Topography Plan Drawing No
824/L3
Scale
1:10,000 @ A3
Date
Feb 2013
Catherine Shelton Associates Limited Landscape Architects & Environmental Consultants The Old Vicarage Mayland Hill Mayland Essex CM3 6DZ T: 01621 774465 E: catherine@catherineshelton.co.uk
Konrad Boncza-Pioro MA LA Technical Skills: •AutoCad 2D/3D: plans, construction drawings, 3D modelling: •Adobe CS5: Photoshop, In Design, Illustrator; •ArcGIS (working knowledge) •Sketch Up: 3D modelling; •MS Office: Excel, PowerPoint, Word; •Hand drawing, model making and photography.
Areas of Expertise: •Site analysis & evaluation; •Landscape & Urban design; •3D CAD space representations; •Photoshop visualisations.
Email me:konradboncza@gmail.com Call me:07557115996