PORTFOLIO
PERSONAL DETAIL
name
Kosciak Paulina
EMPLOYMENT HISTORY
14.08.1988
date of birth current address
contact
59 B Childeric Road, New Cross, London SE14 6DQ e-mail: paulina.kosciak@gmail.com
tel.: 07476887413
2015
February - March
Architect assistant (Part 2); Short Term Contract as a self employed person // London (full-time) // McDowell+Benedetti // London (full-time)
2014
August - January
Architect assistant (Part 2); Short Term Contract at AWW Inspired Environments // London (full-time) // Stages A-G; Residential Projects; Masterplans; Landscape Design
EDUCATION 2011 – 2013 The Cracow University of Technology, Faculty of Architecture and Urban Design // Cracow, Poland // M.Arch; graduated with a first degree; RIBA - Part 2 Qualified
Preparation of: Design Brief (Feasibility studies) Concepts (Sketches to projects, Schemes) Design Development Technical Design Tender Documentation
2012 The University of Tennessee – College of Architecture and Design // Faculty of Architecture and Landscape Architecture // Knoxville, TN, USA //
Luxury Residential Projects
Student scholarship programme
2014
6 months of constant Revit training; Photoshop; InDesign
Interior Design Internship at the Caballero design office // London (full-time)
from May
The responsibilities included:
AutoCAD; SketchUp+Vray
2007 – 2011 The Cracow University of Technology, Faculty of Architecture and Urban Design // Interior design Photoshop; InDesign Cracow, Poland // Visualizations
2001 – 2007
B.Arch; graduated with a first degree; RIBA - Part 1 Qualified
The Art Comprehensive School, specialization in Commercial Art // Rzeszow, Poland //
Award for the best diploma; graduated with a first degree
October 2013
September 2011
May 2011
September 2010
Sketches to projects
2014
Collaboration with ARUP, SketchUp, London Councils & Miastotwórcze Foundation
Ecoweek Polska // Cracow, Poland
Snappy Snaps: Photo and Digital Specialists // London (part-time)
International Design Workshop // Canzo, Italy
2013 January - December
Building with Bamboo - light flexible solutions for the cityscape The Square Project for Piazza della Chiesa in the city center
‘‘Architecture for All’’ // Wroclaw, Poland
Designing appropriately for disabled people
International Design Workshop // Fez, Marocco
2014
Architect assistant – Podczaszy Pracownia Architektury // Cracow, Poland (full-time)
Housing (construction, superstructure and extension) Public facilities – Private dental clinic, Nurseries, Conference & Gastronomic hotels complex Gardens – Arrangement of single family houses garden Public spaces - Revitalization and redevelopment of existing market squares Interiors - Restaurants, Houses, Offices
The Square Project for Ruine Farran Dwiw in the city center
August 2010 The project implementation ’’Survey of Fredra’s Palace and Park‘’, organized by the Villa Decius Association // Benkowa Wisznia, Ukraine ACHIEVEMENTS 2012 Recieved First Place in the contest for the implementation of spatial form, organized by the Marek Maria Pienkowski Foundation // Knoxville, USA 2009 Recieved an honorary award in the contest ‘‘Concrete Architecture’’,
organized by The Cracow University of Technology // Cracow, Poland
2008 – 2012
Organizer the ECOWEEK International Conference and Workshops for Sustainable Design & Green Architecture (14-20 Sept. 2014) // London
from January
WORKSHOPS
Academic scholarship for outstanding achievements // Cracow, Poland
LANGUAGES
2009 – 2013
2008 – 2013
English // Fluent (speech and writing) Spanish // Basic (speech and writing) Polish // Native INTERESTS Horsemanship // Travel // Photography // Architecture PORTFOLIO
http://issuu.com/kosciakpaulina/docs/paulina_kosciak_portfolio
Implementation of architectural models
Freelance teacher of freehand drawing // Rzeszow, Poland
Classes directed to prospective students of architecture
2009 – 2012
Architect assistant – Up Studio // Cracow, Poland (part-time)
1 year of constant AutoCAD training; SketchUp+Vray; Photoshop; InDesign
Creator of architectural models // Cracow, Poland
The responsibilities included: Construction, development and executive projects Interior design Visualizations Development of land Implementation of architectural and urban models Preparation of construction documents Building surveyor Realistic visualizations Preparation sketches to projects
SOFTWARE Adobe Creative Suite Software CS5: Photoshop, InDesign, Illustrator, Bridge // AutoCAD // Revit // Google SketchUp + Vray // Vectorworks // Rhino // Grasshopper ADDITIONAL SKILLS AND ATTRIBUTES Communicative // Ability to work under pressure // Sense of humor // Fast learner // Driving license
name of project: Lower Marsh Lane type of building: residential complex project: group, AWW Inspired Environments location: Lower Marsh Lane // Kingston Upon Thames // Surrey year of realization concept: 2014 The existing site, which sits at the junction of Lowers Marsh Lane and Villiers Avenue, houses a now derelict milk processing factory and associated office buildings and out houses. The total area of the site is 6230m2 and can currently only be accessed from Lower Marsh Lane. The site is tightly bounded on 3 sides and sits in a predominantly residential area, formed primarily of 2 storey houses + roof space. The topography of the site dramatically builds in height as you move fur ther South, Creating an opportunity to add greater mass at the back of the site, with a more respectful building line along Lower Marsh Lane. Initial Design Response The initial response has been to create 5 distinct blocks throughout the site. The intention has been to break down the overall massing and create a generous shared central amenity space. A ramp goes down to the basmement level which will house parking/plant/refuse facilities. The overall programme contains a mix of 1, 2 and 3 bed housing, roughly split 10%, 60% and 30% respectively. Developed Design Response O p t i m i s a t i o n of t h e s i te a n d massing has led to developing 4 distinct blocks instead of 5, with the intention of creating a contemporary facade treatment along Lower Marsh Lane. Internally, the distances between b l o c k s h a s b e e n i n c re a s e d t o a compliant 21m distance, allowing a greater freedom in the placement of fenestration. To allow this the distance from the perimeter boundar y has been decreased to a minimum of 3 - 5m. As no adjacent properties lay on the site boundary this is considered acceptable. The overall size of the Retail unit has increased to 4,400ft2. With an additional 1,400ft2 unit along the junction of Lower Marsh Lane and Villiers Point.
in the top: Aerial View - South // in the bottom: Aerial View - North
in the top: Initial Design Response // in the bottom: Developed Design Response
in the top: Existing Site Plan
in the top: Proposed Basement Plan // in the bottom: Proposed Landscape Design
Birds Eye view from the South
Birds Eye view from the East
Birds Eye view from the North
Birds Eye view from the West
in the top: Proposed First Floor Plan // in the bottom: Proposed Third Floor Plan
in the top: Proposed Second Floor Plan // in the bottom: Proposed Fourth Floor Plan
in the top: Proposed North Elevation // in the bottom: 3D Views
name of project: Bishop’s Stortford type of building: master plan // mix use project: group, AWW Inspired Environments location: Bishop’s Stortford // Hertfordshire year of realization concept: competition - November 2014 B i s h o p’s Sto r t f o rd i s l o c a te d in Her tfordshire on the Her ts/ Essex boundary, within the district of East Hertfordshire. The town is approximately 48 km Nor th East of London and has a population of 39,000. The site totals approximately 5 ha of brownfield land. The Option 1 Guidelines: - 7 0 0 s pa c e m u l t i - s to re y c a r park for use by the Train Operating Company. - New transport-interchange for buses, taxis and a passenger pick-up/ drop-off zone. - Public realm space including a central square. - Access road linking the North of the site to the South, utilising existing connections into the surrounding road network at the Northern and Southern e n d s of t h e s i t e . T h e S o u t h e r n access will need to be suitable to accommodate HGV access. - 450 Residential flats plus car parking provision. - 20 Residential houses plus car parking. - 4180 SQM (GEA) Food Store with 200 car parking spaces either at Grade or above/below the store. - 1860 SQM (GEA) Retail uses, with ability to be devisable into 3 units.
Development Envelope
Concept Proposal
Core Strategy
proceeding. All drawings are to be read in conjunction with the specification and all works to be carried out in accordance with latest British Standards / Codes of Practice.
proceeding. All drawings are to be read in conjunction with the specification and all works to be carried out in accordance with latest British Standards / Codes of Practice.
proceeding. All drawings are to be read in conjunction with the specification and all works to be carried out in accordance with latest British Standards / Codes of Practice.
name of project: 82 Guilford Street type of building: By Room Name Legend refurbishment and conversion of an Legend By Room Name existing residential house Cupboard Cupboard
By Room Name Legend
Hall
Shower
Hall
Shower
Shower
Hall
Hall
Hall
Landing
Hall
Landing
Kitchen
Hall Landing
Kitchen
Kitchen
Landing
Store (Vaulted)
Landing
Shower Landing
Shower
Landing
Shower
Living
Living
Shower
Studio
Living
Shower
Studio Shower
Studio
Shower
Studio
Shower
Shower
Shower
Studio
Studio
Toilet Studio
Toilet
Studio
Toilet
1 0400
Toilet
Studio
Studio
location: 82 Guilford Street // Bloomsbury // London
1 0400
year of realization concept: 2014 1
Planning permission for the refurbishment and conversion of an existing residential house converted into studio flats to provide five apartments, one as two levels B.05 B.05 Studio combined. Studio 9.9 m²
G.04 Kitchen
The approach has been to create high quality, sympathetic 2 and 1 Bed apartments which will contribute to the Bloomsbur y area. This new B.03 B.04 B.03 Shower Shower residential development aims to Shower revitalise and restore the property to regulation standards of living B.01 Lobby and drastically improve upon the quality of accommodation provided by the previous owner. In addition B.02 the development seeks to positively B.02 Studio Studio e nhanc e t h e loca l a re a t h ro u gh restoring the grade II listed building. 2.2 m²
2.4 m²
2 0400
G.04 Kitchen
G.04 Kitchen
G.05 Shower
2.7 m²
3.1 m²
2 0400
Toilet
1 0400
1 0400
1 0400
B.04 Shower
B.03 Shower
2.2 m²
B.04 Shower
2.4 m²
G.02 Hall
2 0400 G.02
G.02 Hall
Hall By Room Name Legend 2.6 m²
-
2 0400
2 0400
1.05 Studio
Landing Shower
Studio
G.01 Hall
11.7 m²
G.01 Hall
G.03 Living
1.01 Hall
1.04 Toilet
1.7 m²
11.7 m²
18.8 m²
1.01 Hall
2 m²
1 0400 1.03 2.03 ShowerShower 1.9 m²
1.03 Shower 1.9 m² G.03 Living
G.01 Hall
G.03 Living
11.7 m²
12 m²
11.3 m²
2 0400
-
-
-
1.7 m²
-
3.01 Hall
Toilet 2.01 Hall
1.04 Toilet
1.7 m²
2 m²
2.04 2.01 Toilet Hall
2.03 Shower
2 m²
2 m²
2 m²
1.7 m²
1.01 Hall
1.04 Toilet
2.04 Toilet
1.7 m²
3.4 m²
3.04 Toilet
1 0400 3.03 Shower
2 m²
2 m²
1.03 Shower 1.9 m²
-
3.01 Hall
3.4 m²
3.04 Toilet
2.3 m²
2.3 m²
3.03 Shower
2 m²
2 m²
18.8 m²
1.02 Studio
B.02 Studio
1.02 Studio
14.8 m²
13.3 m²
14.8 m²
1.02 Studio
3.02 Studio
14.8 m²
2.02 Studio
3.02 Studio
14.8 m²
2.02 Studio
14.8 m²
14.8 m²
Brick Parapet with concrete coping
14.8 m²
RW Hopper
Rev Date
Init
Chkd Rev Date
Notes
Init
Chkd
Notes
Rev Date
Init
3.05 Studio 2.05 Studio
2 0400
11.3 m²
2 0400
12 m²
B.07 B.06 Store (Vaulted) Store (Vaulted) 9.1 m²
8.9 m²
-
B.07 Store (Vaulted)
Client
Hall
Landing
Landing
-
Shower
3.4 m²
Toilet
-
3.04 Toilet
2 m²
1 : 50
1 0400
2 m²
isting - Basement-01 Level 00 Existing - Ground Floor 01 Floor Existing - First Floor01 Existing - First Floor 2.02 Existing - Basement Level 00 Existing - Ground Floor -01 Existing - Basement Level 00 Existing - Ground Studio 14.8 m²
1 : 50
1 : 50
1 : 50
14.8 m²
1 : 50
1 : 50
1:50
1 : 50
1:50
2.05 Studio
2 0400
12 m²
82 Guilford Street Bloomsbury, London. WC1N 1DF
01 Existing - First Floor 1 : 50
1:50
11.3 m²
1m
2.01 Hall
1m
2.03 Shower
Sheet
A1
1 : 50 2.04 Toilet
5m
2 m²
1m
2 m²
Brick Parapet with concrete coping
www.aww-uk.com
RW Hopper
Project Title
5m
82 Guilford Street Bloomsbury, London. WC1N 1DF
Drawing Title
Drawing Title
Checked
Date
-
JB
15/07/2014 1 : 50
Project No.
Drawing Reference
3317 3.04 Toilet 2.3 m²
3.03 Shower 2 m²
AWW-3317-A-DB-Planning
Scale
Sheet
A1
Drawn
Checked
Date
DB
JB
15/07/2014
Status
Planning
5m
AWW-3317-A-DB-Planning
-
Scale
1 : 50
1 : 50
02 Existing - Second Floor 1 : 50
1 : 50
Date
JB
15/07/201
Planning
3317
Drawing Reference
Drawing No. Revision
0200
AWW-3317-A-DB-Planning
0200
Wide Gutter Approx 300/350 wide
1 : 50
03 Existing - Third Floor
Checked
3317
04 Existing - Roof View
1 : 50
Drawn
DB
Drawing No. Revision
14.8 m²
03 Existing - Third Floor
A1
Project No.
14.8 m²
02 Existing - Second Floor
Sheet
Status
Project No.
Drawing No. Revision Drawing Reference
0200
Exisitng Basement, Ground and 1st Plans
2 0400
3.02 Studio
2.02 Studio
Wide Gutter Approx 300/350 wide
82 Guilford Street Bloomsbury, London. WC1N 1DF
Drawn
Planning
020 7160 600 0117 923 253 01752 261 28
www.aww-uk.co
RIBA Chartered Practice
Project Title
DB
3.01 Hall
3.4 m²
inspired environments
London - 7 Birchin Lane, London, EC3V 3BW Bristol - Rivergate House, Bristol, BS1 6LS Plymouth - East Quay House, Plymouth, PL4 0HN
Exisitng Basement, Ground and 1st Exisitng Basement, Ground and 1st Plans Plans
2 0400
Status
1.7 m²
020 7160 6000 0117 923 2535 01752 261 282
Approximate location of Existing Velux Rooflights
3.05 Studio
Drawing Title
Scale -
inspired environments
www.aww-uk.com RIBA Chartered Practice
RIBA Chartered Practice
1 : 50
1 0400
020 7160 6000 London - 7 Birchin Lane, London, EC3V 3BW 0117 923 2535 Bristol - Rivergate House, Bristol, BS1 6LS 01752 261 282 Plymouth - East Quay House, Plymouth, PL4 0HN
Project Title
3.02 Studio
Drawing Originator
1 : 50
inspired environments
London - 7 Birchin Lane, London, EC3V 3BW Bristol - Rivergate House, Bristol, BS1 6LS Plymouth - East Quay House, Plymouth, PL4 0HN
3.03 Shower
2 m²
Drawing Originator
Toilet
2.3 m²
2.03 Shower
03 Existing - Third03 Floor Existing - Third Floo
Studio
Drawing Originator
1 0400
Chk
Client
Shower
Studio
1 : 50
2.04 Toilet
1.7 m²
Client
By Room Name Legend
Hall
3.01
Approximate location of Notes Existing Velux Rooflights
2 0400
02HallExisting - Second Floor - Second Floor 02 Existing
9.1 m²
2.01 Hall
1 : 50
3.05 Studio
11.3 m²
2 0400
12 m²
Studio
1 0400
18.8 m²
12 m²
3.05 Studio
1.05 Studio
2.05 Studio
By Room Name Legend
8.9 m²
1 0400
Hall -
Toilet 11.1 m²
12 m²
2.05 Studio
By Room Name Legend
-
Shower
2.2 m²
1.05 Studio
2 0400
2 0400
12 m²
2.6 m²
Landing
-
B.01 Lobby
13.3 m²
B.07 B.06 Store (Vaulted) Store (Vaulted) 9.1 m²
Toilet
1 0400
3.1 m²
Hall
82 Guilford Street is currently a 4 storey traditionally constructed Georgian former townhouse. The townhouse is arranged over lower ground, ground and 3 upper floors providing a total of 208m2. The Ground Floor of the existing building is above street level with steps to gain access from the street. B.06 Store (Vaulted)
Toilet
G.05 Shower
2.7 m²
3.1 m²
2 0400
2.6 m²
11.1 m²
13.3 m²
1 0400
9.9 m²
2 0400
2.4 m²
1 0400
G.05 Shower
2.7 m²
B.05 Studio
9.9 m²
2 0400
1 0400
1 0400
0400
8.9 m²
rth
Hall
Lobby
Store (Vaulted) group, AWW Inspired Environments
11.1 m²
Hall
NBy By Room Name Legend o Room Name Leg
Lobby
Store (Vaulted)
B.01 Lobby
Nor th
Lobby
project:
1 400
Nor Legend By Room Name Legend By Room Name th Name Legend By Room Name By Legend Room Name Legend By Room Name Legend By Room Hall
By Room Name Legend By Room Name Legend
Cupboard
04 Existing - Roof View 1 : 50
Notes
This dra Registry that the construc Always Discrep elsewhe proceed all works Practice
The building will be divided into the following: Basement - 1no. 3Bed, 5 person apartment + private amenit access
Courtyard Below
Ground Floor - Living space First Floor - 1no. 1Bed, 2Person apartment Second Floor - 1no. 1Bed, 2Person apartment Third Floor - 1no. 1Bed, 2Person apartment The main living spaces have been placed at the front of the property to allow for glimpses of the large open living from the street.
Flat Roof No Access
Fixed Window Pane
The legibility of the proper ty from Guilford Street is very clear. The property will have its main entrance at Ground floor level with a private access door at Basement level. The frontages along Guilford Street are repetitive and will remain unchanged as no external works are to be done to the front of the property. Basement & Ground
Existing Door Frame retained and infilled
There will be a rear extension at basement level which will be the full width of the property leaving an area of private amenity accessible from the basement apartment. Combined with the ground floor this is a 3 Bed residence with living kitchen and dining on the ground floor. A communal vault extending below the street will provide a refuse and cycle store area for the building. There is provision for at least 5 bicycles. Ground Floor The staircases in the building will be refurbished where necessary as wear and tear is evident in some locations however they will remain in their current locations. The existing natural light entering the stairwell will be retained as the rear extension does not extend the full width of the property from ground floor upwards so that light can penetrate into the plan. First, Second & Third Floors The First, Second & Third Floor apartments maximise the available natural light with the Kitchen/ Living Room positioned to the south of the property and the bedroom to the rear looking over the amenity space. The apartments are 1 Bedroom selfcontained, units with the main open living space positioned on the Guilford Street side.
01 New Construction - First Floor
02 New Construction - Second Floor
03 New Construction - Third Floor
1 : 50
1 : 50
1 : 50
00 New Construction - Ground Floor 1 : 50
FALL
-01 New Construction - Basement Level 1 : 50
1:50
1:100 1m
5m
1m
5m
04 New Construction - Roof Plan 1 : 100
Kitchen
4.8 m²
1 0411
0310
2
0310
Cupboard
Courtyard Below
Courtyard
Below 2 0310
Kitchen
Lobby
1 0411 Store (Vaulted)
2
Hall
Living
Storage
6 m²
Courtyard
Kitchen
B.07 Living Kitchen 4.8 m² Lobby
G.08 Kitchen
6 m²
Courtyard Below
Living
Storage Store (Vaulted) 1 0411
Dining
Dining
Hall
Hall
Kitchen
G.08 Kitchen Kitchen / Dining / Living 6 m²
Kitchen
Lobby
Lobby
By Room Name Legend
Bedroom
Dining Hall
0310 2 Kitchen / Dining / Living
Storage
Storage
Utility
Utility
0310
2
Kitchen
5.5 m²
Lobby
Lobby 1 0411
Storage Store (Vaulted)
Wardrobe
Utility
1 0411
1 0411 1.07 Wardrobe
1.3 m²
1.3 m²
1 0411
1 0411
No
Flat Roof with No Access
1.7 m²
Fixed Window Pane
G.07 Dining
1.6 m²
1.04 Bedroom
G.07 Dining
1.6 m²
3.02 3.02 Bedroom Bedroom 7.5 m² SLOPED CEILING
1.04 Bedroom
12.4 m²
SLOPED CEILING
12.4 m²
12.2 m²
2
12.2 m²
G.09 Storage
2.4 m²
1.04 Bedroom 12.4 m² 2.04 2.04 Bedroom Bedroom 12.4 m²
G.09 Storage
B.05 Bathroom
1.6 m²
4.5 m²
B.05 Bathroom
G.04 Lobby
4.5 m²
1.8 m²
By G.06 Room Name Legend G.06 G.04 Utility
1 m²
1.8 m²
Hall
1 0410
G.02 Hall 4.3 m²
1 0410
2.8 m²
G.01 Lobby
10.6 m²
7.9 m²
G.01 Lobby
3.4 m²
1.4 m²
1 0410
Wardrobe
Studio Toilet
1.02 Lobby 1.4 m² 1.03 Landing
Cup'd
1 0400
1 2.02 Lobby 0410 1.2 m²
Wardrobe
2.02 Lobby
Wardrobe
1.2 m² Cup'd
2.8 m²
1 0410 Wardrobe
Cup'd
Cup'd
CEILING SLOPED
1 1 0410 0410
Cup'd
1 0400
2
G.01 Lobby
EXISTING OAK BEAM EXISTINGREVEALED OAK BEAM ROOFLIGHT REVEALED
ROOFLIGHT ROOFLIGHT
ROOFLIGHT
2
2
CEILING FLAT
1 0410
2.01 2.01 Kitchen / Dining / Living Kitchen / Dining / Living 18.9 m²
18.9 m²
VAULTED CEILINGS VAULTED CEILINGS
ROOFLIGHT
18.9 m²
3.4 m²
ROOFLIGHT
ROOFLIGHT
ROOFLIGHT ROOFLIGHT
ROOFLIGHT
Brick Parapet with concrete coping RW Hopper
ROOFLIGH
3.01 Kitchen 3.01 / Dining / Living 17 m² Kitchen / Dining / Living
2
Notes
B.01 Lobby
2.2 m²
2.05 Studio
2 0400
Approximate location of Existing Velux Rooflights
1 : 50
1 : 50
1 : 50
00 Proposed 2.04 Planning - Ground Floor
2.01 Hall
1 : 50
1.7 m²
2 0410
3.4 m²
Toilet
Bedroom
1 : 50
2 m²
Cupboard
Toilet 2.3 m²
Kitchen / Dining / Living
2.05 Bathroom
Landing
5.5 m²
2.03 Shower
3.03 Shower
2 m²
Lobby Wardrobe
2 m²
Wardrobe
1 0411
ing - Basement Level roposed Planning - Basement Level
1:50
-01 Proposed Planning - Basement Level
3.02 Studio
1:50
2.02 Studio
14.8 m²
1:50
14.8 m²
1 : 50
Bathroom
Bathroom
01 Proposed Planning - First Floor 3.04
- By Room Name Legend
2 0410
By Room Name Legend
FLAT CEILING
7.5 m²
2
5m 2.04 Bedroom 12.4 m²
1m
5m
ROOFLIGHT
A1
? ?
Wardrobe
1 0410
Cup'd
ROOFLIGHT
2
EXISTING OAK BEAM REVEALED
CUPBOARD ABOVE SINK BUILT IN TO STUDWORK
CEILING SLOPED
1.2 m²
600mm WIDE GUTTER NEW VELUX ROOFLIGHTS
? 2.02 Lobby
Wide Gutter Approx 300/350 wide EXISTING HOPPER REFITTED A1 A1 3.02 Bedroom
5m
1m
Landing
Lobby Roof Terrace
1 0411
SLOPED CEILING
1m
Cupboard
Kitchen / Dining / Living
3.06 Roof Terrace 12.6 m²
Bedroom
1
0410
ROOFLIGHT
FALL
FALL
Rev
2
CEILING FLAT
VAULTED CEILINGS
2.01 Kitchen / Dining / Living
ROOFLIGHT
ROOFLIGHT
SLATE AS EXISTING WELSH GREY REINSTATED FIREPLACE
18.9 m²
2
CEILING FLAT
02 Existing - Second Floor 1 : 50
03 Existing - Third Floor 1 : 50
04 Existing - Roof View 17 m²
Cli
3.01 Kitchen / Dining / Living 2
1 : 50
-
3.01 01 Proposed Planning -HallFirstPlanning Floor - First Floor 01 Proposed
ROOF SCREEN - OPAQUE
Refuse Store & Meter Cupboards
-
00 Proposed Planning - Ground Floor- Ground Floor 00 Proposed Planning
1 : 50
1 : 50
2
5.5 m²
03 Proposed Planning - Third Floor Planning 03 Proposed Plannin03 Proposed 03 Proposed Planning - Third Floor N 1 : 50 1 : 50
2 0411
2
Refuse Store & Meter Cupboards
7.4 m²
S
B.12 Store (Vaulted) B.11 Store (Vaulted)
1 : 50
2 0411
1 : 50
5.5 m²
7.4 m²
2 0400
02 Proposed Planning - Second Floor 02 Proposed Planning - Second Floor 02 Proposed Planning - Second Floor 02 Proposed Planning - Second Floor 1 : 50 1 : 50
B.12 Store (Vaulted)
5.5 m²
Refuse Store & Meter Cupboards
OBSCURED WALL - OPAQUE
B.12 Store (Vaulted)
11.3 m²
2 0400
12 m²
This drawing may be sca Registry and for Legal pl that the drawing is an or construction purposes. Always refer to figured d Discrepancies and/or am elsewhere must be repo proceeding. All drawings all works to be carried ou Practice.
2
2.2 m²
B.11 Store (Vaulted)
3.05 Studio
B.01 Lobby
1
2
2
17 m²
3 Kitch Kitchen /D
CEILING FLAT CEILING FLAT
2
2
2
CEILING FLAT CEILING FLAT
ROOFLIGH
CEILING FLAT
VAULTED CEILINGS
2.01 1.01 Kitchen / Dining / Living 2.01 / Dining Kitchen / Living 18.9 Kitchen / Dining /19Living m² m²
1 0410
CEILING FLAT
VAULTED CEILINGS
19 m²
?
CUPBOARD ABOVE SINK CEILING SLOPED BUILT IN TO STUDWORK CUPBOARD ABOVE SINK BUILT IN TO STUDWORK
CEILING FLAT
1.01 Kitchen / Dining / Living
19 m²
3.4 m²
EXISTING OAK BEAM REVEALED EXISTING OAK BEAM ROOFLIGHT REVEALED
ROOFLIGHT
2
1.01 Kitchen / Dining / Living
? ?
?
Wardrobe Wardrobe
2.02 2.02 Lobby Lobby 1 1.2 m² 1.2 m² 0410 1 0410
1 0410
Cup'd
1.02 Cup'd Lobby 1.4 m²
REINSTATED FIREPLACE
B.04 Bedroom
1.03 1.02 Landing Lobby 2.8 m²
? ?
?
Wardrobe
REINSTATED FIREPLACE
10.6 m²
B.03 Bedroom2
1.03 Landing
1 0410
G.02 Toilet Hall G.05 G.05 4.3 m² Kitchen / Dining / Living Kitchen / Dining / Living 18.2 m² 1 18.2 m² Existing 0400 Existing G.05 Doorframe Doorframe Kitchen / Dining / Living 18.2 m² retained and retained and infilled Existing infilled Doorframe retained and infilled
B.04 Bedroom
7.9 m²
1 0410
REINSTATED FIREPLACE
4.9 m²
Studio
4.3 m²
ROOFLIGHT
? ?
Shower
REINSTATED FIREPLACE
B.02 Hall
Shower
G.02 Hall
ROOFLIGHT ROOFLIGHT
Landing
1 m²
1.8 m²
SLOPED CE
12.4 m²
Hall
G.06 Utility
G.04 Lobby
FLAT CEILING
FLAT CEILING
7.5 m²
2.04 2.04 Bedroom Bedroom 12.4 m²
12.4 m²
By Room Name Legend
Utility
Lobby
1 m²
Landing 1 0410
Thi Re tha con Alw Dis els pro all Pra
Fixed Window Pane
2
Flat Roof with No Access
REINSTATED FIREPLACE
Fixed Window Pane
2
B.09 Cupboard
Flat Roof with No Access
G.11 Lobby
12.2 m²
10.6 m²
1 1 0411 0411
12
2
1.7 m²
G.09 Storage
B.04 Bedroom
12.6 m²
REINSTATED FIREPLACE
1.7 m²
2.4 m²
4.9 m²
1 0411
3.06 3.06Roof Terrace Roof Terrace12.6 m²
2
G.11 Lobby
B.09 Cupboard
B.02 Hall
Wardrobe 1 0411
REINSTATED FIREPLACE
13.5 m²
G.11 Lobby
G.07 Dining
4.5 m²
1 0411
Lobby Lobby Wardrobe Wardrobe
1.3 m²
B.06 Living
0.9 m²
B.05 Bathroom
1 0411
Kitchen / Dining Kitchen / Dining / Living/ Living Landing Landing
1.07 Wardrobe
13.5 m²
B.10 Storage
B.03 Bedroom2
1.07 Wardrobe
B.06 Living
0.9 m²
Nor th
Bedroom Bedroom Cupboard Cupboard
Cupboard Bedroom Kitchen / Dining / Living Kitchen / Dining / Living Kitchen /Cupboard Dining / Living 2.05 2.05 Landing LandingBathroom Bathroom 5.5 m² Landing Kitchen / Dining 5.5 m² / Living Lobby Lobby Lobby Landing 1.06 Wardrobe Wardrobe Bathroom Wardrobe Lobby 5.5 m²
Storage
1 0411 B.06 B.10 Living Storage13.5 m²
Cupboard
Kitchen / Dining / Living 2.05 2.05 Bathroom 1.06 Landing Bathroom 5.5 m² Bathroom Lobby 5.5 m² 5.5 m²
1.06 2 Bathroom 0310
Kitchen / Dining / Living
Bedroom BedroomBathroom Cupboard
Bedroom
Cupboard
Bathroo Bathroom Bedroo Bedroom Cupboa Cupboard Kitchen Kitchen / Dining Landing Landing Lobby Lobby Roof Te 3 Roof Terrace Roof T OBSCURED WALL - OPAQUE
Hall
G.08 Kitchen
Bedroom2
OBSCURED WALL - OPAQUE
Hall
Bedroom
2 2 0410 0410
ROOF SCREEN - OPAQUE
Cupboard
2 2 By Room NameBy Legend ByLegend Room Name LegendBy By 2 Room Name Room Name Legend Room Name Legend 0410 0410 By Room Name Legend 0410 N N Bathroom o Bathroom Bathroom o Bathroom By Room Name Legend r rth Bathroom Bathroom th
2
4.8 m²
Courtyard
Cupboard
2 0410
2 0410
ROOF SCREEN - OPAQUE
B.07 Kitchen
Courtyard
By Room NameBy Legend Room Name Legend
Bathroom
By Roo By Room Na
1
OBSCURED WALL - OPAQUE
12.2 m²
B.07 Kitchen
Bedroom2
2 04
2 0411
0310
2 0410
2 0411
2 0411
OBSCURED WALL - OPAQUE
B.08 Courtyard
Bedroom
Bedroom2
1
2 2 0411 0411
S
12.2 m²
Bedroom
2 0410
1
2 0411
2 0411
REINSTATED FIREPLACE
d
By Room Name Legend
Bathroom
1
0310
2 0411
S
1
2 0411 0310
2 0410
0310
Wardrobe
1
2 0410
2 0411
2 0410
Wardrobe
0310
Wardrobe
B.08 Courtyard
2 0411
0310
By Room NameBy Legend Room Name Legend Bathroom
2 0411
2 0410
S
2 0410
2 0411
2 0410
S
2 0411
Wardrobe
2 0411
2 0410
proceeding. All drawings are to be read in conjunction with the specification that thewith drawing is an original or an accurate copy. It may not be scaled for proceeding. All drawings and are to be read in conjunction the specification and all works to be carried out in accordance with latestall British / Codes construction purposes./ Codes of worksStandards to be carried out inofaccordance with latest British Standards Practice. Always refer to figured dimensions. All dimensions are to be checked on site. Practice. Discrepancies and/or ambiguities between this drawing and information given elsewhere must be reported immediately to this office for clarification before proceeding. All drawings are to be read in conjunction with the specification and all works to be carried out in accordance with latest British Standards / Codes of Practice.
1 : 50
Dra
02 Proposed Planning - Second Floor
03 Proposed Planning - Third Floor
04 Proposed Planning - Roof Plan
084 Dorsal Bridge
A sensuously engaging sculptural bridge, providing enjoyment and shelter for individuals and an appropriately distinctive urban landmark, while touching lightly on each bank.
3. PHASED CONSTRUCTION TO ENSURE RIVER TRAFFIC CONTINUES:
LOCATION:
Our process minimises impact on river navigation and properties near site. The structure would be detailed to utilise prefabrication and delivery of large pieces by barge.
Site Option 1 illustrates our proposal, but our robust design concept and solutions to the Challenges retain flexibility for any site chosen.
Landing piers constructed in-situ with bored piles due to high tensile demand. River piers also founded on bored piles for reasons of structural and ship impact demand. In-situ pile-cap built within a cofferdam is most suitable method to achieve a buried foundation with only the pier shaft protruding from the river bed. Sculpted shafts of the river piers benefit from off site precasting, either as an external shell completed with an in-situ core or whole sections stitched together. Material delivery by river is feasible for land structures and those in the river.
Inherent stability of the primary deck structure lends itself to installation in three large units: two end units spanning from each landing pier to the point of contraflexure, and a drop-in span. The spine beam’s height and navigational clearance of existing Thames bridges preclude delivery of the end units with the spine assembled.
0
1
2
Pimlico station ST. GEO R SQUAR GE’S E
Three barges coupled together would deliver the spine deck units with the spine laid flat on the bridge deck. Spine is then reared vertically with jacks and connected to the deck. The link barges would be ballasted down and removed to allow the units to be jacked up to higher than the piers on the remaining barges and moved into position. The central piece can be delivered by barge and lifted by strand jacks mounted on the ends of the cantilevers.
GROSV
ENOR R
OAD
cycIist
PIMLIC
pedestrian
O GAR
DENS
Westminster Boating Base deliver and lift spine deck unit north
deliver and jack up central piece
RIVER OP
EN
2. HEIGHT ACROSS RIVER AND INHERENT ACCESS ISSUES:
Elegant efficient structure suits the sensuous curves in plan & elevation. A haunched beam spanning between banks is shaped into a dorsal spine above deck for maximum clearance at the river pier pinch-points. End spans are tied down with land piers (at lifts), giving positive pre-stress to reduce main span sagging, resulting in an exceptionally slender structure in elevation. Box girder deck with curved soffit is torsionally stiff, rigid and robust.
Sculpted openings are carefully placed to carry forces in truss action, lightening the mass, and enhancing user involvement and views. Accessible stairs, ramps and lifts at each end. Cycle ramps peel-off the dorsal spine to ensure flexibility for detailed resolution in any context. Ramps define and augment public realm at each end, before returning to align with adjacent pedestrian route for efficient road crossings. Entire structure in stainless steel plate simplifies fabrication avoiding internal maintenance access (roll-bonded clad plate is more expensive). Distinctive animated profile, luminous reflectivity and humanising scale differentiates this bridge, inviting endearing nicknames, which further extend its influence in area branding, recognition and usefulness.
dorsal spine with antiscateboard nibs
EXISTING TREES RETAINED
Continuous cycle route without interruption for fast commuters. Parallel paths of different colours avoid cross-overs. Stairs and glass lifts at each end are apart from cycle traffic. Spine divides paths and provides windbreak. Pedestrians can use cycle path, not vice-versa. Where paths adjacent, separation enhanced with benches and blister/corduroy surfaces, with either a level deck or curb height difference. Deck surfaces are external grade recycled dense rubber chippings for smooth quiet atmosphere.
4. PLACE MAKING ACROSS THE BRIDGE AND AT ITS LANDING POINTS: A uniquely stimulating and memorably shimmering object encouraging people to pause and use the bridge as a place, as well as a route.
A coherent set of sinuous new riverscape spaces that join & enhance public realm each side, reflecting the ambitious transformation of Nine Elms, and sensitively augmenting the nature of Pimlico Gardens.
1. INTEGRATING CYCLE AND PEDESTRIAN TRAFFIC: We use the structure and form to safely separate pedestrians and cyclists, while retaining the liveliness of adjacent use.
Pimlico Garden & Shrubbery
Structure of minimum bulk and maximum presence, allows cycle ramps to detach with autonomous flexibility at each bank.
Cycle path 5m wide with 1 in 21 ramps intended for cyclists only (others can use but the form naturally discourages it). Walkers use stairs, wheelchairs use lifts. Cyclists unable to go up ramps can use lifts or stair cycle-troughs, walking their bikes to the centre span to join the cycle path downhill. Pedestrian path width varies 4m to 6m to encourage pausing and is gently curved with no slope more than 1 in 21.
Gently curved to enliven user experience & rationalise angle at banks. Cycle ramps sensitively embrace, define and animate landing spaces, forming a river edge canopy at each bank sheltering walkers/sitters below and framing views. Raised riverside paths improve views and anticipate higher flood defences.
PEDESTRIANS
Dorsal spine structure minimises height while achieving clearance, creating a cohesive balanced landmark, while peeled-off cycle ramps sensitively embrace public spaces at each end, with flexibility for other sites.
RIVER CL OS SHORT DU ED FOR RATION
deliver and lift spine deck unit south
repositioned hut (possible cafe)
cycle ramp forms canopy for riverside walk and benches
CYCLES
Centre span
statue
Stainless is mainly satin polished, inside holes & all underside is mirrored. Other finishes highlight details. Balustrade supports create dynamic rhythm and continue underneath in diminishing tendrils giving texture & finesse to the important underside elevation. Accessed openings are weather-protected benches divided from cycle path by glass, to windbreak prevailing westerlies, increasing walker comfort for 50% of crossing. Singular nature of welded/polished stainless steel invites people to stop/engage, sit/play. North Bank - Pimlico Garden & Shrubbery: The bridge is sensitively set to retain character and trees. Re-set statue commands the improved space. While creating an exciting memorable experience for northbound cyclists to peddle ‘into the trees’, the reflective underside of the ramp/canopy augments the gardens contemplative nature and shelters users.
Paths meet in generous public spaces with signalled junctions on Grosvenor Road and Nine Elms Lane to ensure safe efficient connection to on-going routes.
satin stainless steel main structure mirror polished stainless steel inside the openings
glazing windbreak to accessible openings
level surface shown (with optional curb height difference)
benches divide cyclists and pedestrians
cycle ramp forms canopy for riverside walk and benches
stainless steel balustrade and wide timber handrail with lighting hidden underneath
LIFT STAIRS
CONCRETE PIER 6m
5m
0.5 m
SECTION AT PIER
stainless steel balustrade continues to underside in diminishing tendril pattern
textured zone less conducive for cycles (aids pedestrian awareness of main cycle path)
Aerial view
possible cafe’ under ramp
4m
5m
0.5 m
NINE ELMS LAN
E
SECTION AT CENTRE SPAN
cyclist
US EMBASSY
pedestrian
Linear Park
bridge could be extended over road to Linear Park
South Bank - Riverwalk Given the existing space from river to road, the uneven stepped bank, and required cycle ramp length, we propose an extended simplified riverbank for a suitably generous public realm. Pending discussion, this improved bank sets the future qualitative standard of form, materials and flood defence.
Continuous lights under the wide timber handrail avoids glare for users. Subtle accent lights in the spine holes gently invigorate their lustrous character. Lights from the piers bathe the underside accentuating its delicate pattern of extended balustrade tendrils. Our track record of artist collaborations, and desire to contribute to the cultural strategy of both riversides underlies our approach.
NORTH BANK PIMLICO
LIFT
riverside walk raised to give better views
cycle ramp forms canopy for riverside walk and benches
150 m
cycle ramp forms canopy for riverside walk and benches
10.96 m
STAIRS
SOUTH BANK NINE ELMS
ORDINANCE DATUM
riverside walk raised to give better views
LIFT
STAIRS
EXTENDED / RATIONALIZED RIVER BANK