Kevin Plath - Portfolio

Page 1

Kevin Plath AIA, LEED AP BD+C

Portfolio


00 |

Contents & Curriculum Vitae | Kevin Plath | AIA, LEED AP BD+C

Contents

Disclaimer: The instruments of service represented

02


00 |

Contents & CV

01 |

Mike Johnston Field at Legacy Stadium

02 |

Amon G. Carter Stadium Expansion

03 |

Princeton Municipal Center

04 |

Brian Patterson Sports Performance Center

05 |

Anthony Field at Wildcat Stadium

06 |

4525 Lemmon Ave.

07 |

Rice Stadium Renovation

|

01 - 05

|

10 |

06 - 19

20 - 31

32 - 45

|

|

46 - 53

54 - 61

62 - 67

08 | 09 |

|

|

|

|

|

Pierce Family Lake House

|

68 - 71

72 - 75

|

76 - 79

80 - 83

03


Kevin Plath | AIA, LEED AP BD+C

CV Summary Registered Architect in the state of Texas with over eight years of professional experience exposure is across a variety of types and scales throughout the Sports & Entertainment, Corporate, Commercial, Civic, K-12, Religious, and Single Family Residential sectors.

completion, and has been the primary contact with Clients, Consultants, and Contractors, as wide range of experience in various roles on a

While always looking to learn additional software throughout the design process with documentation.

Bachelor of Architecture Louisiana State University Baton Rouge, LA | 2013 Interim Study Virginia Polytechnic Institute & State University, Washington Alexandria Architecture Center (WAAC) Campus Alexandria, VA | 2011-2012 Registered Architect National Council of Architectural Registration Boards | 2021 LEED AP Building Design + Construction U.S. Green Building Council | 2019 04


Experience 06.2021 - Present

+ Stephen Zepeda Architecture, LLC. + Project Architect | Single Family Residential, Religious Projects + Church of the Presentation Phase I Renovation & Master Plan + Pierce Family Lake House + Arnold Residence Renovation + Sheerin Ranch House

08.2018 - 06.2021

+ Perkins&Will + Designer III | Technical Coordinator | Corporate, Civic, Commercial + Princeton Municipal Center + + + + Komodo Restaurant Dallas

08.2013 - 08.2018

+ HKS, Inc. + Associate | Designer | Sports & Entertainment + + Katy Independent School District Legacy Stadium + + + + Rice Stadium Redevelopment + Joker Marchant Stadium Renovation + + Comerica Park Pepsi Porch + + + +

2021

+ Perkins&Will Promotions

+ Revit

+ Perkins&Will Performance Award + Adobe Creative Suite

2020 + Perkins&Will Performance Award 2019 2018 2017 2016 2015

+ Grasshopper + Sketchup + Vray + Enscape + Unreal Engine + Twinmotion + Lumion + Bluebeam Revu

05


01

MIKE JOHNSTON FIELD AT LEGACY STADIUM Katy, TX | 2017

06


07


01 |

Mike Johnston Field at Legacy Stadium | Katy, TX

Project Information Summary

eight high schools, games were booked Thursday - Saturday, and required home football stadium into an athletic complex master plan, with a new multi-purpose band competitions, graduation, concerts, and many other events to be used in stadium. Featured program includes 12,000 seats, Press Box, Suites, Concessions,

08


FIRM

HKS, Inc.

COMPLETION

2017

CLIENT

Katy ISD

BUDGET

$72 million

CAPACITY

12,000 Seats

ROLES

Project Designer Job Captain BIM Manager

INVOLVEMENT

Programming Concept Design Schematic Design Design Development Construction Documents Construction Administration 09


01 |

Mike Johnston Field at Legacy Stadium | Katy, TX

Process

1918

Katy Independent School District (KISD) was established

1982

Katy ISD Stadium opened. Currently known as Jack Rhodes Memorial Stadium

2007

Katy High School wins FIFTH State Championship

1939

1942

First football team established at Katy High School

Mascot was changed from Kangaroos to the Tigers

1997

2000

Katy High School wins SECOND State Championship

Katy High School wins THIRD State Championship

2008

2012

Katy High School wins SIXTH State Championship

Katy High School wins SEVENTH State Championship

2017

Mike Johnston Field at Legacy Stadium Opens

10

1959

Katy High School wins FIRST State Championship

2003

Katy High School wins FOURTH State Championship

2015

Katy High School wins EIGHTH State Championship


11


01 |

Mike Johnston Field at Legacy Stadium | Katy, TX

Site

8

9

4

1

3

6

2 7

5

12

1 2 3 4 5 6 7 8 9

Katy High Cinco Ranch High Mayde Creek High Morton Ranch High Seven Lakes High

Site / Rhodes Stadium


N

Master Plan

13


01 |

Mike Johnston Field at Legacy Stadium | Katy, TX

Plan & Renderings 5

5 6 7

8

8

3

3

1

2

4

4 3

3

9

10 11

N

Main Concourse Plan 14


LEGEND 1 2 3 4 5 6 7 8 9 10 11

Presentation Renderings (Rhino, 3dsMAX, Vray, Photoshop)

Home Concourse Concessions

Fine Arts Seating Premium Seating Multipurpose Room

Revit Model 15


01 |

Mike Johnston Field at Legacy Stadium | Katy, TX

Documentation

16


17


01 |

18

Mike Johnston Field at Legacy Stadium | Katy, TX


19


02

AMON G. CARTER STADIUM EXPANSION Fort Worth, TX | 2020

20


21


02 |

Amon G. Carter Stadium Expansion | Fort Worth, TX

Project Information Summary the existing east upper seating bowl. The client approached us with a need for additional premium suites and seating, and a multi-purpose club space for a luxury game day experience that can be used for banquets, events, and lunches seven days a week. An additional tier of premium product was provided by the incorporation of 48 loge boxes which provided those patrons with exclusive access into their own private club within the main club space. The exterior the existing phases of the stadium as well as the recently renovated basketball the issue of the late afternoon sun during typical game times. 22


FIRM

HKS, Inc.

COMPLETION

2020

CLIENT

Texas Christian University

BUDGET

$100 million

SIZE

88,000 sf

CAPACITY

1100 Seats, 48 Loge, 22 Suites

ROLES

Project Designer Job Captain

INVOLVEMENT

Programming Concept Design Schematic Design Design Development Construction Documents 23


02 |

Amon G. Carter Stadium Expansion | Fort Worth, TX

Process

N

24


East Elevation

West Elevation (Existing) 25


02 |

Amon G. Carter Stadium Expansion | Fort Worth, TX

Plans & Renderings

1 2

3

Concourse Level

6

6 7

5 8

5

4

9 Club Level

10

11

Suite Level 26

11

N


LEGEND 1 2 3 4 5 6 7 8 9 10 11

Presentation Renderings (Rhino, 3dsMAX, Vray, Photoshop)

Main Kitchen Suite Dining / Lounge

Revit Model 27


02 |

Amon G. Carter Stadium Expansion | Fort Worth, TX

Documentation

28


29


02 |

30

Amon G. Carter Stadium Expansion | Fort Worth, TX


31


03

PRINCETON MUNICIPAL CENTER Princeton, TX | 2022

32


33


03 |

Princeton Municipal Center | Princeton, TX

Project Information Summary

as the building sweeps across the land. This change in level allowed for us to carve out openings and overhangs, allowing pedestrians to walk through and employees with the citizens while maximizing views and natural light.

34


FIRM

Perkins&Will

COMPLETION

2022

CLIENT

City of Princeton

BUDGET

$18 million

SIZE

40,000 sf

ROLES

Project Architect Designer (Concept-SD) BIM Manager

INVOLVEMENT

Programming Concept Design Schematic Design Design Development Construction Documents Construction Administration 35


03 |

Princeton Municipal Center | Princeton, TX

Process

36


eA

e

01 placed on site

02 Minimize adjacent park and landscape

03 the volumetric hierarchy for and City Hall

04 Carve out volumes to connections to nature and added daylight

05 Introduce pedestrian circulation to park

06 to park

37


03 |

Princeton Municipal Center | Princeton, TX

Site

38


osphere which emphasizes a correlation between its staff, vironment, the Princeton Municipal Center will be a facility ntegrity of Princeton’s unique character and inherent values, ty on its path to progress. N

PRINCETON

39


03 |

Princeton Municipal Center | Princeton, TX

Plans & Renderings 8

20 7

9

4 1

5

6

3 2

11

10 19

22

12

21 17

14

13

23

Plaza Level (Below) 18

15

16 Main Level N

Section Perspective at Pass-through 40

LEGEND 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Main Street Parks & Rec / Marketing Planning & Development Fire Department Fitness Center Police Department Locker Rooms Quartermaster

Criminal Investigation Department Police Department Administration Municipal Courts

Accounting Department Human Resources City Hall Administration


Presentation Renderings (By other)

North Elevation

South Elevation 41


03 |

Princeton Municipal Center | Princeton, TX

Documentation

42


43


03 |

44

Princeton Municipal Center | Princeton, TX


45


04

BRIAN PATTERSON SPORTS PERFORMANCE CENTER Houston, TX | 2017

46


47


04 |

Brian Patterson Sports Performance Center | Houston, TX

Project Information Summary Looking to provide an updated facility for their athletes, Rice Athletics tasked our team to build a new home for their football program in the north end zone of their historic stadium. The primary spaces include a 10,000 sf weight room

is primarily for the football team, it serves all of Rice Athletics for training and physical therapy. The design maximizes views and pedestrian connectivity by allowing students to circulate through the north end of the stadium on their

48


FIRM

HKS, Inc.

COMPLETION

2017

CLIENT

Rice University

BUDGET

$32 million

SIZE

40,000 sf

ROLES

Junior Designer Job Captain BIM Manager

INVOLVEMENT

Schematic Design Design Development Construction Documents Construction Administration 49


04 |

Brian Patterson Sports Performance Center | Houston, TX

Plans 6 5

7

2

4

1

8 3

Players Level

12

2 13 9

11 10

N

Coaches Level 50


N

Site Plan

LEGEND 1 2 3 4 5 6 7 8 9 10 11 12 13

Weight Room Elevation Study

Auditorium Weight Room Hydrotherapy Pools Players Lounge Recruitment Lounge Position Rooms Coaches Locker Room

Physical Model 51


04 |

52

Brian Patterson Sports Performance Center | Houston, TX


53


05

ANTHONY FIELD AT WILDCAT STADIUM Abilene, TX | 2017

54


55


05 |

Anthony Field at Wildcat Stadium | Abilene, TX

Project Information Summary New construction of a 9,000 seat football stadium for Abilene Christian University with a split level precast concrete seating bowl, a press box, 10 luxury suites, a premium club, and a new video board.

56


FIRM

HKS, Inc.

COMPLETION

2017

CLIENT

Abilene Christian University

BUDGET

$43 million

CAPACITY

9,000 Seats

ROLES

Junior Designer (Exterior) Production Team

INVOLVEMENT

Design Development Construction Documents 57


05 |

Anthony Field at Wildcat Stadium | Abilene, TX

Process & Documentation

58


59


05 |

60

Anthony Field at Wildcat Stadium | Abilene, TX


61


ADDITIONAL WORKS

62


63


06 |

4525 Lemmon Ave. | Dallas, TX

4525 Lemmon Ave. FIRM

Perkins&Will

EST. COMPLETION

N/A

CLIENT

Oxford Capital Partners

BUDGET

$4.5 million

SIZE

40,000 sf

ROLES

Project Designer, Project Architect, BIM Manager

INVOLVEMENT

Programming, Concept Design, Schematic Design, Design Development, Construction Documents, Bidding & Negotiations

64


CONCRETE UNIT MASONRY

Northeast Elevation

ADHERED TPO MEMBRANE ROOFING SYSTEM

FLUID-APPLIED MEMBRANE AIR BARRIER

OOD BLOCKING D MTL - XPT-01

6

2" PREPUNCHED HORIZONTAL Z FURRING

6' - 6 3/4"

2218 Bry D

POLYISOCYANURATE FOAM-PLASTIC BOARD

ASHING

O MEMBRANE STEM

www.

3' - 9 1/2"

FIBER CEMENT PANEL (FCP-01)

CON

1 1/2" VERTICAL HAT CHANNEL ADHERED TPO MEMBRANE ROOFING SYSTEM

CONCRETE MASONRY UNIT BOND BEAM, REF STRUCTURAL

2 7/8"

METAL FLASHING, FINISH TO BE XPT-01

1/4" / 12"

CLICK

325 N SAINT PA DA

/ 12"

2928 STOR LAS COL

JOINT SEALANTS GLAZED ALUMINUM CURTAIN WALL SYSTEM

" 2' - 7 1/2

2 HR RATED CEILING AS SCHEDULED

6T 0' - 6 1/2" F.O. GLASS

Hakr

9

ROOF CRICKET AT HATCH, REF ROOF PLAN

SECTION AT STAIR GLAZING HEAD

COLLINSVILL

PREFINISHED ALUMINUM PROFILE - XPT-01

WINDWARD PAR

FIBER CEMENT PANEL SOFFIT - FCP-01

2' - 4"

2100 MCKINNEY AVEN DA

3' - 4 3/4"

FIBER CEMENT PANEL FASCIA - FCP-01 POLYISOCYANURATE FOAM-PLASTIC BOARD FLUID-APPLIED MEMBRANE AIR BARRIER

1 1/2" = 1'-0"

REGLET AND COUNTERFLASHING - XPT-01 1' - 0"

ADHERED TPO MEMBRANE ROOFING SYSTEM GLAZED ALUMINUM CURTAIN WALL SYSTEM LOW ROOF LEVEL 147' - 2"

ALUMINUM SILL EXTENSION - AL-01

JOINT SEALANTS

STAIR

METAL FLASHING, FINISH TO BE XPT-01

5/8" EXTERIOR GYP BD SHEATHING GLASS FIBER BLANKET

SHEET METAL COPING, FINISH TO MATCH AL-01

1/4" / 12"

LOW ROOF LEVEL 147' - 2"

LEVEL 03 124' - 0"

0' - 4"

1/4" / 12"

1' - 1"

1' - 0 1/8" B.O. SOFFIT

1' - 0"

L

13.42°

ALUMINUM MULLION EXTENSION - AL-01

REGLET AND COUNTERFLASHING

LONDON

1' - 0"

ROOF ACCESS HATCH

0' - 2"

POLYISOCYANURATE FOAM-PLASTIC BOARD

2 HR RATED WALL

H

FRAMING AS REQUIRED FLUID-APPLIED MEMBRANE AIR BARRIER

2 HR RATED CEILING AS SCHEDULED VP1

1' - 9" B.O. CEILING

FIBER CEMENT PANEL (FCP-01) ALIGN

GLAZED ALUMINUM CURTAIN WALL SYSTEM

JOINT SEALANTS

8

STRUCTURAL STL, REF. STRUCTURAL

2 HR RATED CEILING AS SCHEDULED

GLAZED ALUMINUM CURTAIN WALL SYSTEM

CH

PROGRESS SET FOR REV THESE DOCUMENTS AR DESIGN REVIEW AND INTENDED FOR CONSTR BIDDING, OR PERMIT PU THEY WERE PREPARED UNDER SUPERVISION PHILLIP CALLISO LICENSE NO: 131

GYPSUM BOARD

METAL FLASHING, FINISH TO BE XPT-01 0' - 4 1/2"

1' - 0"

2' - 11"

0' - 6 1/2"

ALUMINUM MULLION EXTENSION - AL-01

SECTION AT STAIR GLAZING INFILL PANEL 1 1/2" = 1'-0"

4

TYPICAL DETAIL AT CANOPY 1 1/2" = 1'-0"

GLAZED ALUMINUM CURTAIN WALL SYSTEM

GLAZED ALUMINUM CURTAIN WALL SYSTEM LEVEL 01 100' - 0"

REGLET AND COUNTER FLASHING - XPT-01 ADHERED TPO MEMBRANE ROOFING SYSTEM SYNTHETIC TURF BALLAST

ADHERED TPO MEMBRANE ROOFING SYSTEM

0' - 9 1/8"

WATERSTOP

LE, REF RAL

ED CEILING DULED

VARIES REF. PLANS

SYNTHETIC TURF BALLAST

"/ 12

1 1/2" = 1'-0"

GLASS FIBER BLANKET 5/8" PTD GYP BD

" 12

RCKW KNEEWALL CONNECTOR, REF. STRUCTURAL

VAPOR RETARDERS

LEVEL 04 136' - 0"

LEVEL 04 136' - 0"

0' - 2"

SECTION AT STAIR GLAZING SILL

PREFINISHED ALUMINUM COPING, FINISH TO MATCH AL-01

6" STL STUDS

VAPOR RETARDERS EXISTING FACADE TO REMAIN EXISTING STRUCTURE TO REMAIN

GLASS-FIBER BLANKET FLUID-APPLIED MEMBRANE AIR BARRIER POLYISOCYANURATE FOAM-PLASTIC BOARD

3

5/8" EXTERIOR GYP BD SHEATHING COLD-FORMED METAL FRAMING

TYPICAL DETAIL AT EXISTING ROOF EDGE 1 1/2" = 1'-0"

2

PRICING PACKAGE MARCH 29, 2019

0' - 9 1/8"

VAPOR RETARDERS

COMPRESSIBLE JOINT FILLER

7

FLUID-APPLIED MEMBRANE AIR BARRIER

7

LEVEL 04 136' - 0"

ALUMINUM SILL EXTENSION - AL-01

JOINT SEALANTS

VARIES REF CIVIL

ASPHALT PAVING, REF. CIVIL

1' - 9" B.O. SILL

PREFINISHED ALUMINUM SILL FLASHING ON FULL BED SEALANT - AL-01

4525 LEMMON A

4525 LEMMON DALLAS

WIN PARTNERS

2100 MCKINNEY AV 1450, DALLAS,

TYPICAL DETAIL AT GLAZING SILL 1 1/2" = 1'-0"

GYPSUM BOARD 0' - 0 3/4"

JOINT SEALANTS 0' - 0 1/2"

ALUMINUM MULLION EXTENSION, FINISH TO MATCH AL-01

GLAZED ALUMINUM CURTAIN WALL SYSTEM

6

ISS

7 EXISTING SLAB TO REMAIN

SECTION AT LOBBY GLAZING HEAD

LEVEL 02 112' - 0"

EXISTING FACADE

1 1/2" = 1'-0" MTL FLASHING ANGLE

GLAZED ALUMINUM CURTAIN WALL SYSTEM

NOTE: SLAB DEPRESSION VARIES PER FINISH, REF STRUCTURAL

STAINLESS STEEL HANDRAIL, REF PLANS FOR LOCATION PREFINISHED ALUMINUM SILL FLASHING - AL-01

SPRAY-APPLIED CELLULOSIC INSULATION, R-10 MIN.

2" PREPUNCHED HORIZONTAL Z FURRING

LEVEL 01 100' - 0" 0' - 2 1/8" RECESS REF. STRUCT

CORE DRILL, GROUT SOLID

FIBER CEMENT PANEL (FCP-02)

1 1/2" VERTICAL HAT CHANNEL 5/8" EXTERIOR GYP BD SHEATHING

VAPOR RETARDERS

FRAMING AS REQUIRED 2" PREPUNCHED HORIZONTAL Z FURRING

PREFINISHED ALUM. ANGLE, FINISH TO MATCH AL-01

SILL FLASHING - XPT-02 VARIES REF. RCP

1 1/2" = 1'-0"

PRICING PACKAGE

METAL SOFFIT PANEL - MCT-01

WATERSTOP

SECTION AT LOBBY GLAZING SILL

1

1

TYPICAL DETAIL AT GROUND LEVEL SOFFIT 1 1/2" = 1'-0"

VARIES REF. RCP

1' - 5"

0' - 2"

VARIES REF. CIVIL

RECESSED WALK OFF GRILLE, REF. FINISH PLANS FOR LOCATION

COMPRESSIBLE FILLER

5

2' - 2"

JOINT SEALANTS

LEVEL 01 100' - 0"

EXTERIOR ENV SECTION D

SHEE

METAL SOFFIT PANEL - MCT-01

65

Copyright © 2


06 |

4525 Lemmon Ave. | Dallas, TX

Plans Level 01 1 1 2 3 4 5

2

Private Secured Parking Private Courtyard

3

4

5

Level 02

1 2 3 4 5 6

Restrooms Solar Panel Carports

6 1 3

4

2 5

N

66


Level 03

1 2

1

2

Level 04

1 2 3 4

1

3

4 2

67


07 |

Rice Stadium Renovation | Houston, TX

Rice Stadium Renovation FIRM

HKS, Inc.

EST. COMPLETION

T.B.D.

CLIENT

Rice University

BUDGET

$45 million

CAPACITY

1,450 Club Seats, 7 Premium Suites, 4 Mini Suites

ROLES

Project Designer

INVOLVEMENT

Programming, Concept Design

68


69


07 |

Rice Stadium Renovation | Houston, TX

Plans

6

5 4

3

2

1 Club Level

9 7 11

12

8

8

10

7 11

12

13

Concourse / Suite Level 70

N


Section at 50 Yard Line

LEGEND 1 2 3 4 5 6 7 8 9 10 11 12 13

Loading Dock Cooking Kitchen

Concessions Suite Lounge

71


08 |

| McKinney, TX

FIRM

Perkins&Will

EST. COMPLETION

2022

CLIENT

Kaizen Development Partners

BUDGET

$80 million

SIZE

200,000 sf

ROLES

Project Architect (Exterior Skin)

INVOLVEMENT

Programming, Concept Design, Schematic Design, Design Development, Construction Documents

72


N

Site Plan

73


08 |

| McKinney, TX

Plans & Documentation

4

3

1

2 8

1

5

2 6

4 3

7

9

Level 01

Levels 02 - 08

1 2 3 4 5 6 7 8 9

1 2 3 4

74

Prefunction / Lounge

Restrooms

Fitness Room N


75


09 |

Pierce Family Lake House | Streetman, TX

Pierce Family Lake House FIRM

Stephen Zepeda Architecture, LLC

EST. COMPLETION

2022

CLIENT

Pierce Family

BUDGET

$2 million

SIZE

4,500 sf

ROLES

Project Architect, Designer

INVOLVEMENT

Programming, Concept Design, Schematic Design Design Development, Construction Documents

76


N

Site Plan

77


09 |

Pierce Family Lake House | Streetman, TX

Drawings

Level 01 Floor Plan

N

Level 02 Floor Plan 78


Presentation Rendering (Rhino, Unreal Engine 4, Photoshop)

South Elevation

North Elevation 79


10 |

Bent Plywood Chair

80


29

Initial Sketch Studies

Furniture Design - Bent Plywood Chair Process - Production

Furniture Design - Bent Plywood Chair Process - Production

Prototyping

Production 81


10 |

Final Product

82


83


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.