PDF: C2010-825 IBM Rational Team Concert V6 Exam Questions

Page 1

PDF: C2010-825 IBM RATIONAL TEAM CONCERT V6 EXAM QUESTIONS IBM C2010-825 Exam

EDUSUM.COM Get complete detail on C2010-825 exam guide to crack IBM Rational Team Concert V6. You can collect all information on C2010-825 tutorial, practice test, books, study material, exam questions, and syllabus. Firm your knowledge on IBM Rational Team Concert V6 and get ready to crack C2010-825 certification. Explore all information on C2010-825 exam with number of questions, passing percentage and time duration to complete test.


WWW.EDUSUM.COM

PDF

Introduction to IBM Certified Solutions Specialist - Rational Team Concert V6 Exam The IBM C2010-825 Exam is challenging and thorough preparation is essential for success. This exam study guide is designed to help you prepare for the Rational Team Concert certification exam. It contains a detailed list of the topics covered on the Professional exam, as well as a detailed list of preparation resources. These study guides for the IBM Rational Team Concert V6 will help guide you through the study process for your certification.

C2010-825 IBM Rational Team Concert V6 Exam Summary ● Exam Name: IBM Rational Team Concert V6 ● Exam Code: C2010-825 ● Exam Price: $200 (USD)

C2010-825: IBM Rational Team Concert V6

1


WWW.EDUSUM.COM

PDF

● ● ● ●

Duration: 105 mins Number of Questions: 60 Passing Score: 63% Books / Training: ○ Rational Team Concert Knowledge Center ○ Jazz.net library ● Schedule Exam: Training OR Pearson VUE ● Sample Questions: IBM Rational Team Concert Sample Questions ● Recommended Practice: IBM C2010-825 Certification Practice Exam

Exam Syllabus: C2010-825 IBM Certified Solutions Specialist - Rational Team Concert V6 1. Application Administration (10%) -

Describe the Jazz platform and architecture Describe planning a Jazz Team Server deployment Demonstrate an understanding of installing the Jazz Team Server and applications Describe managing users, licenses, and projects Demonstrate knowledge of troubleshooting techniques

2. Project/Team Configuration (15%) - Describe the project and team area structure and hierarchy - Describe teams, categories, releases, timelines, and iterations - Demonstrate an understanding of managing project and team members - Describe using roles and permissions - Describe how to use preconditions and follow up actions - Describe how to manage project area process and process templates 3. Work Items (20%) - Describe work item features (types, attributes, links) - Describe creating and running queries - Describe how to import and export work items - Describe how to use reviews and approvals - Demonstrate an understanding of configuring work items - Explain the differences between RTC clients 4. Project Planning (20%) - Identify RTC agile and traditional planning concepts - Demonstrate an understanding of Quick Planner

C2010-825: IBM Rational Team Concert V6

2


WWW.EDUSUM.COM

PDF

- Describe RTC planning and execution - Describe usage of project timelines and iterations - Describe usage of plan editor features such as views and filters - Demonstrate an understanding of monitoring workload and progress 5. Source Control (15%) - Describe the RTC SCM concepts - Describe working with repositories and workspaces - Describe using streams and components - Describe using change sets, change flow, and conflict resolution - Describe using snapshots and baselines - Explain the differences between RTC clients 6. Build (10%) - Identify the build system architecture - Describe using build scripts and definitions - Describe using build requests, monitoring status, and results - Explain the differences between RTC clients 7. Reports and Dashboards (10%) - Describe working with RTC dashboards (personal, project and team) - Describe working with Report Builder to create and modify reports - Identify Jazz Reporting Service and Data Collection Component capabilities

IBM C2010-825 Certification Sample Questions and Answers To make you familiar with IBM Rational Team Concert V6 (C2010-825) certification exam structure, we have prepared this sample question set. We suggest you to try our Sample Questions for Rational Team Concert C2010-825 Certification to test your understanding of IBM C2010-825 process with real IBM certification exam environment. C2010-825 IBM Rational Team Concert V6 Sample Questions:01. A development team is using the RTC web interface to update plans and work items. One user notices that recent work item changes are not rendered in the web browser. What is the reason for this? a) The data warehouse has not yet been updated

C2010-825: IBM Rational Team Concert V6

3


WWW.EDUSUM.COM

PDF

b) The web browser is caching the work items c) The web browser version is no longer supported d) User does not have permission to view the work item 02. A user has a project with many build definitions and wants them to be easy to find. How can these be organized? a) Create tags and apply to appropriate build definitions b) Create labels and apply to appropriate build definitions c) Create folders and move appropriate build definitions into the folders. d) Create collections and add appropriate build definitions into the collections 03. A user would like to set up mandatory attributes. How can this be accomplished? a) Set a work item precondition b) Update the work item type's workflow c) Update the permissions for a specific role d) Change a setting on the attribute definition 04. Where would one determine how often the data warehouse is updated? a) The CCM advanced properties pages b) On the Data Warehouse properties page c) On the Report Builder administration page d) On the Data Collection Component configuration and administration page 05. The scrum master moves a story in the Quick Planner from the backlog to a sprint plan. Which attribute on the story was automatically updated by this action? a) Release b) Owned by c) Planned for d) Filed Against 06. An RTC administrator has installed JTS and CCM using a departmental server topology and completed the Jazz Team Server and Application Setup process. How many Public URIs (context root) exist for this topology? a) Zero b) 1 for JTS c) 1 for JTS and 1 for CCM d) 1 for CCM 07. A developer has created a repository workspace on the server and wants to be able to access the files locally via installedtools such as editors and compilers. What action must the developer take to accomplish this? a) Modify the stream's flow target to match the repository workspace b) Load the contents of the repository workspace

C2010-825: IBM Rational Team Concert V6

4


WWW.EDUSUM.COM

PDF

c) Check out the files and save copies to the file system d) Take a baseline of the components 08. A user wants to add widgets from external sources to a RTC Dashboard. Which type can be added? a) Apache Widget b) Open Social Gadget c) Google Open Gadget d) External Content Widget 09. A project manager determines the current iteration is complete and decides that the nextiteration should be started. How is this done? a) Set the current iteration's status to complete b) Set the next iteration as the current iteration c) Specify that a release is scheduled with the next iteration d) The start and end dates will automatically start the next iteration 10. Management has requested that two RTC evaluation servers and two RTC departmental servers be deployed. Each RTC server will have a firewall blocking access to jazz.net and requires different installation packages. What is the correct installation option? a) use the Web Installer b) use Enterprise Platform Installer c) use IBM Installation Manager Repositories d) use plain .zip files for the JTS and CCM Application

Answers:Answer 1:- b Answer 2:- b Answer 3:- a Answer 4:- c Answer 5:- d Answer 6:- d Answer 7:- d Answer 8:- a Answer 9:- b Answer 10:- c

C2010-825: IBM Rational Team Concert V6

5


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.