![](https://assets.isu.pub/document-structure/230403075401-e318f1440d14b3e280080d801bd665eb/v1/5f0e755652026d89c081d6d25a71cf27.jpeg)
![](https://assets.isu.pub/document-structure/230403075401-e318f1440d14b3e280080d801bd665eb/v1/242d90ec96ccb015e817a61f23a58253.jpeg)
• Perform enough practice with ISC2 system with related ISC2 CGRC certification subjects
• Identify the key configuration, workflow and data flow
• Understand the all Syllabus Topics of Exam which are Given in Description.
• Identify your weak areas from practice test and do more practice with system
• Repeat practice exams and try to score 100% on www.edusum.com
Q 1) According to the Risk Management Framework (RMF), which role has a primary responsibility to report the security status of the information system to the authorizing official (AO) and other appropriate organizational officials on an ongoing basis in accordance with the monitoring strategy?
Option.
a) Information system security officer (ISSO)
b) Common control provider
c) Independent assessor
d) Senior information assurance officer (SIAO)
Q 2) Which authorization approach considers time elapsed since the authorization results were produced, the environment of operation, the criticality/sensitivity of the information, and the risk tolerance of the other organization?
Option.
a) Leveraged
b) Single
c) Joint
d) Site specific
Q 3) When should the information system owner document the information system and authorization boundary description in the security plan?
Option.
a) After security controls are implemented
b) While assembling the authorization package
c) After security categorization
d) When reviewing the security control assessment plan
Q 4) Information developed from Federal Information Processing Standard (FIPS) 199 may be used as an input to which authorization package document?
Option.
a) Security assessment report (SAR)
b) System security plan (SSP)
c) Plan of actions and milestones (POA&M)
d) Authorization decision document
Q 5) Why is security control volatility an important consideration in the development of a security control monitoring strategy? Option.
a) It identifies needed security control monitoring exceptions.
b) It indicates a need for compensating controls.
c) It establishes priority for security control monitoring.
d) It provides justification for revisions to the configuration management and control plan.
c) It establishes priority for security control monitoring.
• For more information on CGRC Certification please refer to FAQs.
• The CGRC certification is increasingly becoming important for the career of employees.
• The fees information are for the informative purposes and do not serve as an official offering and are subject to change
• Focus on the guide for online registration and you will find it out.