Kristy Carmody Architectural Portfolio

Page 1

KRISTY CARMODY architectural design portfolio


contents PROFESSIONAL WORK INDEPENDENT WORK GRADUATE STUDENT WORK HAND DRAWING



HUDSON HIGH SCHOOL, Hudson Wisconsin Renovation & Additions Bray Architects 2017


STRIVE ENGLISH / MATH

STRIVE SCIENCE / ART SCENE SHOP / STORAGE

STRIVE SOCIAL STUDIES F&CE

CID SEVERE

CID SEVERE

MECHANICAL

GREEN ROOM

GREEN ROOM

AUTOS SHOP

WOODS SHOP

STAGE

STRIVE ENGLISH

KITCHEN STORAGE

STORAGE

BAND

ORCHESTRA

STEM LAB

METALS SHOP

WOODS SHOP

2D ART

KITCHEN

CERAMICS LAB

DANCE

AUDITORIUM STORAGE

STORAGE

STEAM PLANNING

OPEN TO GYMNASIUM

SCULPTURE STORAGE

FAB LAB

OPEN TO FORUM BELOW

F&CE MECH

HEALTHCARE CLINIC

CD MILD

FORUM

SCIENCE LECTURE

BIOLOGY

DATA

LD

LANGUAGE ARTS

CID

COURTYARD 5

MATH

GIRLS TEAM LOCKERS

EAST GYMNASIUM

PLANNING

LANGUAGE LANGUAGE ARTS ARTS

PREP

COURTYARD 7

ADMINISTRATION COURTYARD 6

MATH COURTYARD 4

LD

BUSINESS ED

MATH

PHYSICS

PHYSICS PREP

GIRLS LOCKER

WORLD LANGUAGE BUSINESS ED

LANGUAGE LANGUAGE ARTS ARTS

COURTYARD 4

LD

CHEMISTRY

PLANNING

WORLD LANGUAGE

WORLD LANGUAGE

LD/CD

WORLD LANGUAGE

BOYS LOCKER

SOCIAL STUDIES

LD

SOCIAL STUDIES

LANGUAGE LANGUAGE ARTS ARTS

SOCIAL STUDIES

SOCIAL STUDIES

LIBRARY

SOCIAL STUDIES

SOCIAL STUDIES

SOCIAL WORLD STUDIES LANGUAGE

SOCIAL STUDIES

SOCIAL STUDIES

SOCIAL STUDIES

PLANNING

FRESHMAN SCIENCE

OPEN TO BELOW

COURTYARD 3

GYM STORAGE

TEACHER PLANNING

FRESHMAN SCIENCE

FRESHMAN SCIENCE

OPEN TO CORRIDOR BELOW

?

BIOLOGY

CHEMISTRY COURTYARD 3

SCIENCE

COURTYARD 1

TEACHER PLANNING

COURTYARD 1

? BIOLOGY

OPEN TO COMMONS BELOW

COURTYARD 2

?

COURTYARD 2

EBD

COURTYARD 5

AP CHEMISTRY / AP PHYSICS LAB

CHEMISTRY

OPEN TO OPEN TO METALS PLTW BELOW BELOW

MECHANICAL

SCULPTURE LAB

GENERAL SCIENCE

OPEN TO WOODS BELOW

CERAMICS STORAGE

FREEZER

WEST GYM

F&CE

LANGUAGE LANGUAGE ARTS ARTS

OPEN TO AUDITORIUM BELOW

OPEN TO STORAGE

MECHANICAL

FREEZER

FOODS

OPEN TO AUTOS BELOW

OPEN TO STAGE BELOW

AUTOS CLASSROOM

RECEIVING

MECHANICAL

WORLD LANGUAGE

OPEN TO GYMNASIUM BELOW

PLANNING

SOCIAL STUDIES

SOCIAL STUDIES

WORLD WORLD LANGUAGE LANGUAGE

SOCIAL STUDIES

SOCIAL STUDIES

WORLD LANGUAGE

FITNESS

OPEN TO WEIGHTS BELOW

TRACK

LD

LEGEND AGRICULTURE MATH

MATH

MATH

EBD

Addition

TEACHER PLANNING (MATH)

Renovation

LEGEND

GREENHOUSE

Addition Renovation FIRST FLOOR PLAN Scale: 1" = 30'-0"

Project #:3210

SECOND FLOOR PLAN Scale: 1/64" = 1'-0"

HUDSON HIGH SCHOOL 1501 VINE STREET

JANUARY 6, 2017

© 2017 Bray Associates Architects, Inc.

HUDSON HIGH SCHOOL 1501 VINE STREET, HUDSON, WI 54016


BELLEVILLE INTERMEDIATE SCHOOL, Belleville Wisconsin Renovation & Additions Bray Architects 2017



FOND DU LAC HIGH SCHOOL, Fond du Lac Wisconsin Architecture Construction Engineering Academy (ACE) Renovation & Additions Bray Architects 2018


ALUMINUM STOREFRONT FRAMING & ENTRY DOOR

SF-1 52' - 6" 1' - 3"

50' - 0" CROSSHATCH INDICATES EXPOSED RADIANT FLOOR W/ PLEXI GLASS 2'X4'

G8

T.O. MASONRY 121'-4"

TOILET 102

3' - 4" 8" 3' - 8" 2' - 4"

3' - 3"

Mezzanine 110' - 10"

G8

BL-1

2' - 0"

8' - 0"

2' - 0"

A101

A103B

16' - 0"

A103D

NOTE: VERIFY ALL FINISHES WITH OWNER

FE

8' - 0"

2' - 0"

ROOFING & SIDING 105

CONSTRUCTION SHOP 103 85 OCC.

INSULATED SECTIONAL GARAGE DOOR W/ WINDOWS

Wall Finish Base Finish Floor Finish PT-1 VB-1 CT -VB-1 S. CONC. EP-1 VB-1 S. CONC. PT-1 -S. CONC. PT-1 -S. CONC. PT-1 -S. CONC. PT-1 -S. CONC. PT-1 -S. CONC. PT-1 -S. CONC. PT-1 -S. CONC. PT-1 -S. CONC. T.O. MASONRY 121'-4"

INSULATED SECTIONAL GARAGE DOOR W/ WINDOWS

A103E

5" CONCRETE SLAB-ON-GRADE OVER 15 MIL. VAPOR BARRIER OVER 6" COMPACTED BASE MAT'L.

ASPHALT PAVING

APPLIED INSULATION FACE BRICK SS FLASHING

A

8' - 0"

B

SF-2

1 A2.0

G8

A103A

13' - 5"

SAND FILL (SEE CIVIL)

4 A2.0

12 T.O. BRICK 4' - 9"

FACE BRICK

1' - 8"

CL

6' - 7"

Sheboygan 1202A North 8th Street PO Box 955 Sheboygan, Wisconsin 530 T: 920.459.4200 F: 920.459.4205

3 7 A8.0

5 A2.0

14' - 2"

4

HEAD 107'-4"

EXISTING ROOF

ALUMINUM STOREFRONT FRAMING

4

CASE STONE CORNICE

14' - 2"

7' - 4"

11' - 7 1/8"

REMOVE EXISTING STONE BAND

1"

T.O. EXIST. WALL 112'-0"

CANOPY

6" METAL STUDS W/ MINIMUM 3" SPRAY APPLIED INSULATION AND VAPOR BARRIER 5/8" EXTERIOR TYP. SHEATHING

EXISTING ROOF EXISTING WALL

1' - 11 3/8"

11

SF-3

6 7

A001

3 A2.0

Project Number:

EXISTING WALL

ELECTRICAL 108

6" MIN COMPACTED FREE DRAINING FILL

5 A6.0

5 A6.0

15 MIL VAPOR BARRIERCONSTRUCTION Sim

2" PERIMETER INSULATION

Issue Dates:

01-30-2018 Progress to EXCEL 01/16/2017

2" PERIMETER INSULATION CONCRETE FOOTING & FOUNDATION WALL

Sheet Title:

Floor Plan

B

Wall Section FIRST FLOOR PLAN @ South Door Scale: 1/8"Scale: = 1'-0" 3/8" = 1'-0"

DOCUMENTS

6" MIN COMPACTED FREE DRAINING FILL FIN. FLOOR 100'-0"

CONCRETE FOOTING & FOUNDATION WALL

A

Issued For:

5" CONCRETE SLAB

FIN. FLOOR 100'-0" CONCRETE PIERS & FOOTINGS

3215

ELECTRICAL 108

5" CONCRETE SLAB 15 MIL VAPOR BARRIER

CONCRETE FOOTING & FOUNDATION WALL

4

EXISTING WOODS SHOP

7 A6.0

APPLIED INSULATION

8 A8.0

A2.0

REMOVE EXISTING COPING

8" CMU 8 A6.0

4" CONCRETE SLAB

2" PERIMETER INSULATION

8" CMU MIN. 2 1/4" SPRAY APPLIED INSULATION FACE BRICK SS FLASHING

8" BOND BEAM 2 HOUR FIRE WALL

5

6" MIN COMPACTED FREE DRAINING FILL

North

12" BOND BEAM

1"

FE

4" STEEL COLUMN SEE STRUCTURE

15 MIL VAPOR BARRIER

6 7

T.O. MASONRY 121'-4"

10" BOND BEAM

ALUMINUM STOREFRONT FRAMING

PASSAGE 106

1 A1.0

PREFINISHED METAL ROOF EDGE 1 A6.1

T.O. MASONRY 121'-4" ROOF DECK

5"

HEAD EXISTING 107'-4" METALS SHOPMIN. 1 1/2" SPRAY

5" CONCRETE SLAB

5

SINGLE MEMBRANE ROOFING W/ STONE BALLAST OVER 5" RIGID INSULATION OVER , STAGGER JOINTS.

FACE BRICK

CL 9"

CANOPY

3

4" CONCRETE SLAB

Scale: 1/4" = 1'-0"

T: 414.226.0200 F: 414.226.0224

POURED-IN-PLACE CONCRETE FOOTINGS & FOUNDATION WALLS

SINGLE MEMBRANE ROOFING W/ STONE BALLAST OVER 5" RIGID INSULATION OVER , STAGGER JOINTS.

EXISTING ENCLOSED YARD

EXISTING NORTH WALL OF CORRIDOR

114'-0" A2.0

4" STEEL COLUMN SEE STRUCTURE

1

EYEWASH STATION

www.brayarch.com

2-HR. FIRE RATED WALLS

2 A2.0

EXTERIOR CANOPY ABOVE

DEMO PLAN

Office Locations:

ASPHALT PAVING Milwaukee 215 North Water Street Suite 250 Milwaukee, Wisconsin 532

BL-1

Scale: 1/8" = 1'-0"

2 A6.1

14' - 2"

EXIST. SILL 110'-0"

ILING

FIRST Scale: 3/8" =FLOOR 1'-0"

BL-1

REMOVE EXISTING COPING PREFINISHED METAL ROOF EDGE NEOPRENE EXPANSION FLASHING

2

C CHANNEL - SEE STRUCTURE

Covered Walkway Section

BL-1

A100

1

2

5

SECTIONAL OVERHEAD DOOR

CONSTRUCTION SHOP 103

East-West Building Section (north end)

G8

ELEC. BREAKER BOX

CASE STONE CORNICE

STANDING SEAM METAL CANOPY

CONCRETE PIERS & FOOTINGS

7 A2.0

SWINGING PIPE RAIL GATE

(1)EWC

4' - 0"

8" CMU

23' - 7"

REMOVE WINDOW, TRIM AND STOOL. REMOVE PORTION OF WALL BELOW WINDOW AND PREPARE FOR NEW DOOR AND FRAME.

SF-1

ROOFING & SIDING MIN. 2105 1/4" SPRAY

9"

1' - 3"

1

1 A6.1

ELECTRICAL 108

9 A2.0

10 A2.0

METAL SOFFIT

SINGLE MEMBRANE ROOFING W/ STONE BALLAST OVER 5" RIGID INSULATION OVER 1/2" THERMAL BARRIER, STAGGER JOINTS Paint Guardrail PT-2 36LH DEEP DOUBLE PITCHED TOP CHORD JOISTS

8' - 0" F.D.

T.O. MASONRY 121'-4"

SF-1

SF-1

PLUMBING/HVAC 107

PREFINISHED METAL ROOF EDGE

FE

3 A6.0

A102

ROUGH IN FOR TOILET AND SINK

FRAMING & FINISHES 104

6' - 0" 17' - 6"

EXISTING WEST WALL OF METALS SHOP

A201

6' - 0"

SINGLE MEMBRANE ROOFING W/ STONE BALLAST OVER 5" RIGID INSULATION OVER , STAGGER JOINTS.

PASSAGE 106

EXISTING SCIENCE WING

8

EXISTING ASPHALT PAVING

13 A2.0

8' - 0"

SF-1

8' - 0"

4 A2.0

OOF EDGE

6' - 0"

Scale: 1/8" = 1'-0"

Paint Pipe Bollards PT-2

5 A2.1

6 A2.1 FIN. FLOOR 100'-0"

7' - 3"

6' - 0"

OFING ER VER

11

5" CONCRETE SLAB-ON-GRADE OVER 15 MIL. VAPOR BARRIER OVER 6" COMPACTED BASE MAT'L.

East-West Building Section (south end) SF-1

8' - 0"

9

4' X 8' SHEET MATERIAL

S Comments

ASPHALT PAVING

6' - 0"

8' - 0"

110' - 0"

112' - 6"

6' - 0"

F.D.

Ceiling Height 10'-0" 10'-0" 8'-0" VARIES VARIES VARIES VARIES VARIES VARIES VARIES VARIES

Partial North Existing Building

SECTIONAL OVERHEAD DOOR

ELECTRICAL 108

POURED-IN-PLACE CONCRETE FOOTINGS & FOUNDATION WALLS

PROVIDE AREAS OF FLOOR, WALLS AND CEILINGS TO BE

4' X 8' SHEET MATERIAL

Ceiling Finish AT-1 AT-1 Scale: 1/8" = 1'-0" AT-2 EXPOSED STRUCTURE PT-3 EXPOSED STRUCTURE PT-3 EXPOSED STRUCTURE PT-3 EXPOSED STRUCTURE PT-3 EXPOSED STRUCTURE PT-3 EXPOSED STRUCTURE PT-3 10 EXPOSED STRUCTURE A2.0 PT-3 EXPOSED STRUCTURE PT-3

T.O. BRICK 114'-0"

OF OPENINGS WITH OWNER.

SF-1

PT-2

NEW CONCRETE SLAB (SEE CIVIL)

FIN. FLOOR EXPOSED WITH PLEXIGLASS. VERIFY LOCATIONS AND SIZE 100'-0"

A2.0 15

Frame Finish PT-2 PT-2 PT-2 PT-2 -----2 A2.1 --

Addition to Fond du Lac High School Career Construction Academy Fond du Lac School District 801 Campus Dr., Fond du Lac, WI 54935

A103D

CLASSROOM 100

EYE WASH STATION

A103C

8' - 0"

8 A2.0

N SHOP

BL-1

(1) EWC

T.O. BRICK 114'-0"

A103B

10' - 0"

SF-1

BL-1

A100

2' - 8"

MEZZANINE 200

3' - 8"

NEW CONCRETE DRIVEWAY (SEE CIVIL)

8 A2.1

A102

Room Name CLASSROOM STORAGE TOILET CONSTRUCTION SHOP FRAMING & FINISHES ROOFING & SIDING PASSAGE PLUMBING/HVAC ELECTRICAL MEZZANINE STAIR

Project Title:

4' - 0"

1 A2.1 A201

D -0"

10 A2.0

A101

F.D.

UP

CLASSROOM 100 44 OCC.

24' - 8"

16' - 6"

27' - 7"

5 A1.1

6 A2.0

Scale: 1/8" = 1'-0"

6' - 0"

SF-1

STORAGE 101

8 A2.0

12

8' MARKER BOARD, VERIFY LOCATION W/ OWNER

8"

6' - 0"

PORTABLE SMART BOARD 36' - 0"

8' MARKER BOARD, VERIFY LOCATION W/ OWNER

G8 8' - 0"

8"

Room Number 100 101 102 103 104 105 SINGLE MEMBRANE ROOFING 106 W/ STONE BALLAST OVER 107 5" RIGID INSULATION OVER 1/2" THERMAL BARRIER, STAGGER JOINTS 108 200 36LH DEEP DOUBLE PITCHED TOP CHORD JOISTS 201 bottom chord of joist (roughly)

South Exterior Elevation

6' - 0"

4' - 2"

G8

4' - 8"

14

6' - 0"

1' - 3"

STAIR 201

A2.0

SF-3

FIN. FLOOR 100'-0" Room Finish Schedule

3' - 8"

2 A2.1 EXISTING PARKING LOT (SEE CIVIL)

1' - 3"

17' - 4"

HOSE BIB

16' - 0"

ROOF CONDUCTOR OUTLET PIPE BOLLARD - PAINT TYPICAL OF 8 TOTAL

SF-2

FIN. FLOOR 100'-0"

2' - 0"

A103C

4' - 2"

SF-1

SILL 103'-4" A103E

3

Covered Walkway @ Storefront Door Scale: 3/8" = 1'-0"

2

Wall Section @ Exist. High Wall Scale: 3/8" = 1'-0"

1

Wall Section @ Exist. Low Wall Scale: 3/8" = 1'-0"

Sheet Number:

A1.0 © 2014 Bray Associates Architects, Inc.

B


EDISON MIDDLE SCHOOL, Green Bay Wisconsin Renovation & Additions Bray Architects 2017


6 6.00° CLASSROOM EX.

6° 00' 00"

6° 00' 00"

COMMONS EX.

6.00°

6.00°

STORAGE EX.

CORRIDOR EX.

EX.

STORAGE EX.

OFFICE EX. EX. EX.

EX.

1'-8"

3'-0" 7 1/4"

1' - 0"

6' - 0"

G12 4' - 0"

A106A

3' - 8"

G12

1' - 4 1/4"

G12

11'-6"

A106B

G8

" 7' - 4

G12

14'-0" WIDE MOTORIZED WALL MOUNTED PROJECTION SCREEN. VERIFY LOCATION W/ 4 OWNER - SEE DETAIL A6.5

A6.5

ENCLOSE UNDER STAIR STRINGER W/ 6" CMU

10" 2' 0" 1' -

8"

4"

3"

3"

6' - 0 3/8"

ALIGN NEW WALL WITH EXISTING WALL BUMP OUT. CONCRETE FILLED BOLLARDS- SEE DETAIL

) IFY X1A ER 2" (V 9' -

16

2

X1B

17' - 6 3/8"

368 SEAT CAPACITY

3 A3.0

CROSS HATCH INDICATES AREA TO RECEIVE 2" RIGID INSULATION BELOW CONCRETE SLAB FOR RADIANT HEATING- COORDINATE W/ MECHANICAL CONTRACTOR.

CW-2

0"

R-A 4' 0"

G8

A6.5

20

8"

10' - 0" 1' - 6"

WIRED PUSH VESTIBULE A100 PAD LOCATION

SF-3

1' - 4"

A100A

A100B

X1A

A100C

A100D

SF-2

A100E

X1A

A100F

X1A

ADA DOOR OPERATOR

6' - 8" 2' - 8"

2 A3.0

2' - 8"

32.1

R-1

4' - 9 7/8" X1A

ELECT. STRIKE & CARD READER WIRED PUSH PAD LOCATION

CW-1

1 A3.0

R-3 A2.0

10 A6.1

R-5

6 A3.0

EX.

1

11" 83' -

2' - 8"

CONCRETE STOOP, SEE STRUCT. DWGS.

R-2 PLANTER WITH

LINE OF ROOF ABOVE 4 A3.0

A6.5

2' - 8"

X1A 17' - 8 3/4"

1-HR RATED FIRE BARRIER WALLS FOR 4'-0" EACH DIRECTION

18

CONCRETE STOOP, SEE STRUCT. DWGS.

17

PAINTED STEEL COLUMN

6' - 8"

R-B

G8

G8

ELECT. STRIKE

4' - 0"

G6

A100J

3' - 4 1/8"

G6

R-A

A100H

6' - 8"

G6 1' - 10"

6 A6.0

SF-1

A100G

0" 5' -

A6.5 11 1/2"

3' - 6 1/8"

2' - 4 3/4"

GIRLS' TLT. A101

R-B 8" 2' -

19 ADA DOOR OPERATOR 20' - 8"

G8

8" 6' -

WIRED PUSH PAD LOCATION

G12

G8

A104A

0" 5' -

A6.5

G8

A101A

11" 4' X1A

PAINTED STEEL COLUMN

ALCOVE A103

G8

12' - 0"

A2.0

8' -

ELECTRIC HI/LO WATER COOLER W/ BOTTLE FILLER

R-4

6' HIGH CHAIN LINK FENCE W/ PRIVACY SLATS

VV

A2.0

0" 4' -

CAFETERIA A104

ELECTRIC WATER COOLER

CONCRETE FILLED BOLLARDS, TYP.SEE DETAIL 10 A6.0

9' - 0 3/8"

3

- 0"

CW-2

MOTORIZED SHADES

BOYS' TLT. A102 G12

G8

10 A6.0

54' 0" 8' -

G12

A102A

2' - 9 1/4"

CW-2 A6.5

FEC

GYMNASIUM B EX.

3' - 6"

- 0" 10'

8" 2' ELECT. STRIKE & 10" CARD READER 3' - ' - 0" 5 4" ' 3 CONCRETE STOOP, SEE STRUCT. DWGS. A105A

0" 4' -

G8

A105B

3' - 6"

0" 8' -

14 1 A1.7

A6.5

2-HR RATED FIRE WALL W/ 90 MIN. RATED DOORS

G8

4" 7' -

G12 0" 4' -

7' - 4" 15

G12 7/8" 4' - 11

A105C

8"

10'-0"

MAG. HOLD OPEN

G8

G8

KEY SWITCH

G8

1'-0"

A106C

FEC /8" 21

4' - 0"

11' - 6"

4' - 4"

13'-5 1/2"

A104C

5' -

7 A3.0 3' - 2 1/8" 3' - 6" 7 3/8" 3" 1' -

8"

G12

G4 G4

A106D

6" 1' -

G8

4 A2.0

8' -

A104B

G6

19'-10"

9 A6.1

A/V CLOSET A104A

X1A

1-HR RATED FIRE BARRIER WALL W/ 60 MIN. RATED DOORS

G12

1-HR RATED FIRE BARRIER WALLS W/ 60 MIN. RATED DOORS

G8

ELECTRIC HI/LO WATER COOLER

2' - 8"

G4

G8 5 A3.0

1'-8" G4

1-HR RATED WALLS AND CEILING @ STORAGE UNDER STAIR

1-HR RATED FIRE BARRIER WALLS FOR 4'-0" EACH DIRECTION

1' - 4"

RECEIVING A105

0" 5' -

G8

EX.

3'-8" 1'-4"

6 A6.0

MOP SINK- SEE PLUMBING DWGS.

2 A6.0

G12 SERVERY A106

G8

33' - 5 1/2"

FLOOR EXPANSION JOINT - SEE DETAIL

MAG. HOLD OPEN

MAG. HOLD OPEN G12

A108B

3'-8" 1'-4"

2 A6.0

6' - 4"

G8

1-HR RATED FIRE BARRIER WALLS W/ 60 MIN. RATED DOORS

FLOOR EXPANSION JOINT - SEE DETAIL

A105D H

4''-0" HIGH WALL W/ BULLNOSE CAP

A108A

2-HR RATED FIRE WALL W/ 90 MIN. RATED DOORS

H

6" 1' -

G8 1" 8"

VV

G12

1'-6 3/8" 10'-8 5/8" 8"

5' - 4"

G8

G8 G8

G12

4" 1' -

ALIGN

8"

H

8" 8' -

CORRIDOR EX.

G8 G8

12 A6.1

4' - 0"

4" 6' -

8" 1"

C

1' - 4"

G8

G8

EX.

8"

H

EX. EX.

4' - 2"

8"

11' - 0"

8"

CMU INFILL. MATCH EXISTING COURSING AND FINISH JAN. EX.

9' - 4"

H

EX.

6" CMU INFILL UNDER STAIR STRINGERS

G6

1' - 0"

BOILERS EX.

1' - 6" EXIST.

3"

KITCHEN A108

UP

METAL GUARDRAIL, PAINT

2-HR RATED FIRE WALL W/ 90 MIN. RATED DOORS

7"

G8 MAG. HOLD OPEN

G8 DISHWASHING

1"

STORAGE A107

2 A6.0

METAL PAN STAIR W/ CONC. TREADS 5 T @ 11" = 4'-7" 6 R @ 6" = 3'-0"

14 A6.1

1"

G8

8"

A108C

FE-K

G8

FLOOR EXPANSION JOINT - SEE DETAIL

3' - 0"

G6

METAL GUARDRAIL, PAINT METAL STAIR GUARDRAIL AND HANDRAIL, PAINT

4" CONC. SLAB OVER GEO-FOAM FILL- SEE STRUCT. DWGS.

TIE NEW WALL BACK TO EXISTING WALL

1' - 0"

GYM STORAGE EX.

24X60

7' - 4"

LOCKER EX.

24X60

A104AA

24X60

12 A6.1

F

R

6' - 4"

G6

7' - 4"

EX.

G8

5' - 0 1/4" 8"

1' - 0" 8"

R

7' - 3"

F

EX.

9"

ALCOVE EX.

CONCRETE CURB

CMU INFILL. MATCH EXISTING COURSING G12 AND FINISH

G6

13' - 3"

KITCHEN A109

G8

COOKLINE

EX.

EX.

8"

10' - 1 5/8" 8"

STORAGE EX. EX.

2' - 8"

PREP

SHOWER EX.

A109A

6' - 4" 10' - 2"

8"

8"

AS PART OF ALTERNATE BID E-1 THIS CMU WALL MAY NEED TO BE DEMO'D AND REBUILT TO PROVIDE 7'-0" OF CLEARANCE TO NEW SWITCH GEAR. VERIFY REQUIRED LOCATION W/ ELECTRICAL CONTRACTOR

120 ° 00 ' 00 " 120 .00 °

G6

FE-K TLT. EX.

EX.

1"

G6

A107A

G6

1' - 0"

DEAD END CORRIDOR

CMU INFILL. MATCH EXISTING COURSING AND FINISH ALIGN G6 ALIGN

24X48

CORRIDOR A110

A110A

25' - 0" MAX.

TLT. EX.

EX.

STORAGE EX.

STORAGE EX.

EX.

B

1-HR RATED FIRE PARTITION WALL W/ 20 MIN. RATED DOORS

EX.

ELECT. VAULT EX.

EX.

EX.

EX.

12' - 3"

EX.

PLANTER WITH SEAT WALL- SEE CIVIL DWGS.

R-6


EISENHOWER EISENHOWER ELEMENTARY MIDDLE SCHOOL, Green Bay Wisconsin Renovation & Additions Bray Architects 2017


FIRST FLOOR PLAN / PLAN DEL PRIMER PISO

STAFF ROOM/ CUARTO PARA MAESTROS

EXISTING BUILDING/ EDIFICIO EXISTENTE

CLASSROOM RENOVATION/ RENOVACIÓN DE SALÓN DE CLASE

CLASSROOM ADDITION/ ADICIÓN DE SALÓN DE CLASE

N


FROEDTERT HOSPITAL, Milwaukee Wisconsin Renovation to North Tower HGA Architects 2014



RATHKEPRODUCT RESIDENCE, PRODUCED BY AN AUTODESK EDUCATIONAL

Newburg Wisconsin Kitchan and Bathroom Renovation & Remodel Independent Design 2013 4'-11"

3'-2"

4'-4"

1'-5"

DEMO BASE CAB AT WINDOW

EXISTING WALL LOCATION - VERIFY NEW STAIR LOCATION WITH CONTRACTOR

1'-0" 1'-4"

0'-6"

4'-0"

REF'R

1'-5" 2'-0"

2'-11 1 2"

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

FREE STANDING DESK (FUTURE)

TALL CAB W/ UPPER CABINETS OVER REF'R.

4'-0"

1'-2"

UP DEMO BASE CAB AT WINDOW

BAR HEIGHT (42"H)

5'-8"

KITCHEN (210 SF)

11'-0"

DINING ROOM (263 SF) PANTRY LINEN

MICRO 14"D TALL CAB

1'-7" 0'-6"

24"X71" LAB TABLE

BASE CABINETS (36"H) ACCESS FROM 1 SIDE

DW HOOD ABOVE

DN

4'-

SILL FOR HERBS NEW BASE

0"

50"X36" ANTIQUE TABLE

SHELVING UNIT

TOILET ROOM (37 SF)

32" DOOR (NEW)

KITCHEN FLOOR PLAN RATHKE RESIDENCE - 310 KNOLLWOOD ROAD, WEST BEND, WISCONSIN 53095

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

E2

SHOWER



4' - 9 1/2"

1' - 8"

15' - 11"

3"

ELDERBERRY MANOR, West Bend Wisconsin EXISTING STONE FOUNDATION WALL TO REMAIN - PATCH AND REMOVE EXISTING PLASTER Bridal Suite Renovation &PATCH Remodel REPAIR AS NECESSARY WALLS - REPAIR AND AS NECESSARY. PREPARE

FOR NEW FURRED WALLS. Independent Design 2016

16' - 6"

EXISTING COLUMN TO BE REMOVED. BRACE AS NECESSARY DURING CONSTRUCTION REMOVE ENTIRE EXISTING FIRST FLOOR ABOVE STONE FOUNDATION

DEMO EVERYTHING EXCEPT EXISTING STONE FOUNDATION

REMOVE AND REPAIR EXISTING OPENING FOR NEW WINDOW. PREPARE EXISTING FOUNDATION FOR INFILL OF OPENING.

BASEMENT DEMO FLOOR PLAN Scale: 1/4" = 1'-0"

REMOVE EXISTING LEAN-TO STRUCTURE

7 1/4"

6' - 0"

1' - 6" 2' - 6"

4 1/4"

DEMO EVERYTHING EXCEPT EXISTING STONE FOUNDATION

6' - 0 1/2"

1' - 8"

4 1/4"

EXISTING OPENING IN FOUNDATION WALL TO BE PATCHED TO MATCH FURRED OUT INSULATED WALLS

PATCH AND REPAIR EXISTING STONE FOUNDATION AS NEEDED

3' - 2"

COMPLETE NEW ELECTRICAL IS REQUIRED. HVAC AND PLUMBING WILL BE ALL NEW.

NEW WINDOW IN EXISTING OPENING VERIFY SIZE

LEVEL POLISHED CONCRETE FLOOR

EAST WALL OF EXISTING STONE FOUNDATION HAD PREVIOUSLY BEEN DEMOLISHED. WILL REQUIRE NEW WALL HERE

REMOVE EXISTING PLASTER. PATCH AND REPAIR AS NECESSARY. PREPARE FOR NEW FURRED OUT INTERIOR WALL.

NEW STONE WALL MATCH EXISTING

UP

3'-0" X 4'-0" DBL HUNG INFILL EXISTING OPENING TO MATCH STONEWORK

10" TUBE STEEL COLUMNS - VERIFY WITH STRUCTURAL ENGINEER

FIRST FLOOR ABOV

GRIND FLOOR AS NECESSARY TO PREPARE FOR NEW POURED CONCRETE FLOOR. FENCED IN CHICKEN COOP

BASEMENT FLOOR PLAN


15' - 11"

4' - 9 1/2"

1' - 8"

EXPOSED WOOD TRUSS

9 A1.1

3"

EXISTING LEAN-TO STRUCTURE TO BE REMOVED IN ITS ENTIRETY EXISTING STONE FOUNDATION WALL TO REMAIN - PATCH AND REPAIR AS NECESSARY

REMOVE EXISTING PLASTER WALLS - REPAIR AND PATCH AS NECESSARY. PREPARE FOR NEW FURRED WALLS.

Roof Bearing 116' - 3"

16' - 6"

EXISTING COLUMN TO BE REMOVED. BRACE AS NECESSARY DURING CONSTRUCTION REMOVE ENTIRE EXISTING FIRST FLOOR ABOVE STONE FOUNDATION

15' - 11" 5' - 4"

REMOVE AND REPAIR EXISTING OPENING FOR NEW WINDOW.

First Floor 108' - 3"

UP

PREPARE EXISTING FOUNDATION FOR INFILL OF OPENING.

T.O. Foundation 107' - 3"

8' - 3"

A1.1 SITE SURVEY REQUIRED FOR EXACT STAIR DIMENSIONS

2

BASEMENT DEMO FLOOR PLAN 6' - 0 1/2"

7 1/4"

6' - 0"

3'-0" X 4'-0" DBL HUNG (TYP UNO)

Basement Floor 100' - 0"

3'-4" x 7'-0" DOOR

NEW FOUNDATION & FOOTING AT NEW WALL VERIFY WITH STRUCTURAL ENGINEER

1' - 8"

4 1/4"

4' - 0"

Scale: 1/4" = 1'-0"

3' - 4"

EXISTING FOUNDATION (UNKNOWN)

6

2' - 6"

4 1/4"

1' - 6"

11 1/2"

A1.1

FURRED OUT INSULATED WALLS

NEW ASPH ROOFING

3' - 2"

A1.1 NEW STONE WALL TO MATCH EXISTING

UP

NEW BOAR BATTEN SID

10" TUBE STEEL COLUMNS VERIFY WITH STRUCTURAL ENGINEER FIRST FLOOR ABOVE

A1.1 5

FENCED IN CHICKEN COOP

3'-0" X 3'-0" DBL HUNG

BASEMENT FLOOR PLAN Scale: 1/4" = 1'-0"

A1.1

3' - 0"

3'-0" X 4'-0" DBL HUNG INFILL EXISTING OPENING TO MATCH STONEWORK

1

3

30' - 6 1/2"

NEW WINDOW IN EXISTING OPENING VERIFY SIZE

LEVEL POLISHED CONCRETE FLOOR

FIRST FLOOR PLAN Scale: 1/4" = 1'-0"

4 A1.1

NEW DECK


MEYER RESIDENCE, Cedarburg Wisconsin Basement Renovation & Remodel Independent Design 2017


17' - 8 1/8"

BOT. JOIST 7' - 1 1/2"

16' - 8 1/2"

ACOUSTICAL LAY-IN CLG.

GAS METER

DRYER

SUMP

WASHER

9' - 3 5/8"

RELOCATED ELEC. PANEL

FURR OUT WALL - BUILD AROUND EXIST. GAS METER

UP

RELOCATE SAFE

UTILITY 101

(2'-8" x 7'-0")

RELOCATE WATER METER

STORAGE UNDER STAIRS TO REMAIN

SEWER

2' - 0"

BUILT IN NIGHTSTAND COUNTERTOP

BUILT IN STORAGE SHELVING

CHIMNEY

2' - 8"

CLOSET 104

CLEAR

2' - 0" 3' - 0 7/8"

CABINET DOORS

SEWER

LAUNDRY SINK

KEEP AREA OPEN FOR ACCSS TO FURNACE

OPEN SHELF

WATER HEATER COLUMN

DUCT ABOVE

FURNACE

DRAWER 4" TOE KICK

BEAM

GUEST BEDROOM 102

4" METAL STUD FUR OUT WALL

3

LIVING ROOM 100

BUILT IN CABINET SECTION Scale: 1/2" = 1'-0"

(2'-8" x 7'-0")

6" WALL

22" x 30" VANITY

48" x 32" SHOWER 24" SHOWER DOOR

TV STAND

GAS METER CABINET

6" METAL STUD FUR OUT WALL

7' - 7" 4 1/4"

10' - 5"

2 A-1.1

8' - 1 1/8"

FLOOR PLAN - OPTION B Scale: 1/4" = 1'-0"

MEYER RESIDENCE - BASEMENT REMODEL W60 N740 JEFFERSON AVENUE, CEDARBURG, WISCONSIN 53012 JANUARY 8, 2018 KRISTY CARMODY

(262) 370-1932

kristy.bokelman@gmail.com

2' - 11 5/8"

3 A-1.1

EGRESS WINDOW IN EXIST. OPENING

3' - 8"

1' - 3 1/2"

SIDE CHAIR

5' - 9 1/4"

COFFEE TABLE

12" x 15" TALL CAB.

EXIST. GAS METER BUILT IN BOOKSHELF / NIGHTSTAND

(2'-8" x 7'-0")

TOILET ROOM 103

2' - 11 1/2"

END TABLE

15' - 6 1/4"

BUILT IN BOOKSHELF / NIGHTSTAND

2

MAX SILL HEIGHT

3 A-1.1

SOFA

1' - 6" 7' - 0"

(2'-8" x 4'-4") EGRESS WINDOW SILL @ 3'-8"

4' - 0"

QUEEN BED (60"W x 80"L)

12' - 3"

12' - 5 1/2"

4' - 10 7/8"

BUILT IN BOOKSHELF / NIGHTSTAND

COLUMN

1' - 6"

COLUMN

BUILT IN BOOKSHELF / NIGHTSTAND

NORTH ELEVATION - BEDROOM Scale: 1/4" = 1'-0"


RAINSCREEN CHURCH Building Details . Professor James Shields UWM 2012 This course focused on various building details concerning common materials such as concrete, steel, glass and wood. This particular exercise required a detailed model and supporting drawings to explore a rainscreen wall using heavy timber construction.



COURTYARD RESIDENCE Additive Process Studio . Professor James Shields UWM 2011 This comprehensive studio provided a model for the entire building design process. The program included a new dormitory adjacent to the Milwaukee School of Art and Design in Milwaukee, Wisconsin. The process involved programming, BUDGETING, schematic building design, ENVIRONMENTAL DESIGN, code review, design development and CONSTRUCTION DOCUMENTS.


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

DETAIL

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

HEADER DETAIL

4

GREEN ROOF PARAPET DETAIL

MEETS STUD WALLTO DETAIL FLOOR WALL DETAIL AT CURTAIN WALL 2

7

ROOF DETAIL AT CURTAIN WALL

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

SCALE: 1-1/2" = 1'-0"

PRODUCED BY AN AUTODESK EDUCATIO

SCALE: 1-1/2" = 1'-0"

SCALE: 1-1/2" = 1'-0"

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


farmer’s market in Milwaukee’s Inner Harbor redevelopment. PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

GERMINATE - Hydroponics Residential Community Spancrete Studio . Professor Gil Snyder PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

u r b f a r m

u r b f a r m

u r b f a r m

u r b f a r m

1'-6"

5"

7" 2'-316

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Sponsored by the pre-cast concrete manufacturer, Spancrete, the semester is designed to develop student’s conceptual and technical knowledge of this industry. Students were asked to design a multi-programmed super block in Milwaukee’s Market Glazing & Spandrel Detail Inner Harbor. Focusing on sustainable strategies, pre-cast was used to design both structural and cladding systems. PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Market Column & Beam Precast System

UWM 2011

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

N

Tower Structural Connection Detail PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Typical Housing Plan

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

1'-6" 7" 2'-316

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

5"

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Market Glazing & Spandrel Detail

Tower Structural Connection Detail PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Market Column & Beam Precast System

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


UNITY TEMPLE Addition Historic Preservation Studio . Professor Matt Jarosz UWM 2010 This project was part of the Historic Preservation Studio in which students were asked to investigate an addition design to Frank Lloyd Wright’s Unity Temple. Minimal contact and respect to the original building were top priority, while Mr. Wright’s organic architecture concept influenced the new proposal.


A.1

OFFICE

RAMP TO PARK

OFFICE

OFFICE

COPY

CONF.

OFFICE

CONF.

OFFICE

OFFICE OFFICE

OFFICE

LOBBY

CLASS.

COURTYARD GALLERY

A.2 CLASS.

STORAGE CLASS.

BATH

A.1

YOUTH CTR.

MECH.

BATH

A.2


TALIESIN HABS Survey . Professor Mark Keane UWM 2010 This study to accurately document Frank Lloyd Wright’s Taliesin has been an on-going program at SARUP in which 9 students are chosen to live and work for 3 weeks each summer. Once all the drawings are complete, they will be compiled and submitted to the Library of Congress as an official set for HABS (Historic American Buildings Survey). All drawings are hand drawn using ink and mylar.



WAUSAU WATERFRONT Community Design Solutions UWM 2011 The City of Wausau and Community Design Solutions teamed up to design an 18 acre brownfield parcel along the Wisconsin River, adjacent to downtown Wausau. The CDS team held a series of community charrettes, and worked with City officials to propose a Master Plan intended for future implementation.


ILES M 0

LE MI IL 5M E

0.

1.0

2.

3

S ILE M .5


FREEDOM PARK MEMORIAL Independent Commission 2009 Freedom Park Veterans Memorial was commissioned by the Kettle Moraine Vietnam Veteran’s Chapter 448 in 2009. The triangle shaped lot off of Hwy 33 in Newburg, Wisconsin is intended to be a permanent memorial for all veterans - past present and future. The park was constructed and dedicated October 2010.


PHOTOS DURING DEDICATION


PALMER JOHNSON YACHTS, Sturgeon Bay Wisconsin Yacht Design & Build 2006 - 2009



HAAG MULLER ARCHITECTS Various Commerical Renovations & Additions 2003-2006



DRAWING / PAINTINGS Various Independent Art 1999-2018




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.