Downloaded from: justpaste.it/bjk76
The Advanced Guide to BIM Coordination Model
What is BIM coordination? The process of BIM coordination is a part of Building Information Modeling(BIM) that makes it easier for architectural, structural, mechanical, electrical, and plumbing services to work together. The primary objective of a BIM coordination model is to achieve a building design that is both effective and does not include any clashes between the various services. The multidisciplinary BIM coordination process also includes verifying the validity of the information that is represented by the models, delivering collision reports, compiling element lists for the models, and conducting BIM coordination meetings. Benefits of BIM coordination Model: A BIM coordination model provides various benefits in the architecture, engineering, and construction (AEC) industry. Let us look at the benefits of BIM model coordination in detail: Easier clash detection. It would cost a lot of money to fix these clashes in the final project state. Best utilization of the building space.
Clash detection within Revit using Navisworks is capable of greatly reducing change orders considerably 3D BIM coordination produces real-time construction scheduling. Additional design modifications are possible BIM coordination makes it easier to collaborate between different departments such as engineers, architects, and contractors Improving the accuracy of the building design Resolving issues before they become much bigger down the road. Multiple architects and engineers can work on a unified model also known as Common Data Environment (CDE) simultaneously, that would reflect changes from every service.
The goals of a BIM coordinator The BIM coordinator is responsible for the effective management of the design and data associated with the BIM process. A BIM coordinator is accountable for coordinating with structural engineers, MEP engineers, and architects, as well as providing them with their respective roles and responsibilities. It is possible for more than one BIM Coordinator to be involved in a project if it is very complex and involves a wide variety of disciplines. Tools for BIM coordination Digital tools that are able to manage Building Information Models (BIM) and assure that workflows and information are optimized provide support for the BIM coordination procedures. The merging of a wide range of skills and capabilities necessitates the existence of interactive coordination software. Let us look at some tools for BIM coordination BIM 360: Autodesk's BIM 360 is an advanced Common Data Environment that runs in the cloud. It is a unified platform that connects your project teams and data in real-time, from design to construction, facilitating informed decision-making and leading to outcomes that are more predictable and lucrative. Navisworks: By facilitating 4D BIM and 5D BIM simulation, clash coordination, analysis, and communication of design intent and constructability, Navisworks provides a complete solution for building project reviews. Bexel Manager: Bexel is a comprehensive coordination tool that allows users to create 4D simulations in addition to performing collision checks. Autodesk Revit: It is one of the BIM modeling software that is utilized most frequently in the AEC industry. It is used for architectural design, MEP design, structural design, engineering details, and construction.
BIM coordination process It is important for the BIM coordinator to go through a step-by-step process to attain a BIM 360 model coordination after detecting and resolving clashes. Let us look at the ten steps required to create a BIM coordination model. Step 1: Proper placement of models of different services (architectural, structural, MEP) in relation to each other Step 2: Selection of coordination tools Step 3: Proper export of multiple service models to IFC format Step 4: Combining multiple models into a single multidisciplinary model Step 5: Defining the scope of model checking Step 6: Setting the criteria for clash checking in model Step 7: Carrying out a model checking for clashes Step 8: Assigning the results of the model check to the relevant professionals Step 9: Sending coordination reports Step 10: Results analysis and creation of BIM coordination model BIM Collaboration Format The BIM Collaboration Format or BCF for short is a structured file format designed specifically for the purpose of monitoring issues related to BIM Models. The BCF was primarily developed for the purpose of establishing views of a building model and the related information on collisions and errors connected with certain items in the view. Users of various BIM software, as well as users from other disciplines, are able to work together on issues related to the project with the help of the BCF file format. Even between multiple versions of the same software, the BCF is an asset that can be relied upon for accurate forecasting, the making of decisions, and the resolution of interoperability and coordination issues. Conclusion A BIM coordination model is significant for smooth and streamlined building construction, and facility management of a building. A BIM coordinator must coordinate with architects, engineers, and BIM modelers to create a clash coordinated services for the BIM model. Tejjy Inc. provides the best BIM coordination services in the USA. Contact us for qualityassured BIM coordination models and BIM coordination drawings by our expert architects and engineers.