A2M's minibook March 2018

Page 1


A2M.be

architectural firm + high design + cost control + sustainable expertise

BRU chaussĂŠe de Boondael 6 bte13 1050 Brussels - Belgium NYC 110 East 25th street 10010 NY New York - USA LIS Rua do Mar Vermelho n.Âş 2 - 1990-152 Lisboa - Portugal


2 175

397 032m²

41 153m²

19

Exemplary Buildings awards

1MIPIM award

6BREEAM

18office

20schools

9kindergardens 7hotels

passive house dwellings 246 completed or in construction

buildings

passive house [ 4 273 616 ft² ] 62 573 completed or in construction

zero energy 442 967 ft²

52 876 m² / 569 152 ft² completed or under construction Rate: 2 Very Good, 4 Excellent

projects from passivehouse to CO2 neutral and beyond We are Sebastian Grégory Julie Aline Marieke Angélique Siegfried Johanna Paolo Geoffrey Sandrine Manu Alice Laura Claire Antoine Cécile Romaric Marie Olivier

We do high design architecture cost efficient projects sustainable expertise make dreams come true PEB, PHPP, Wufi passive... lots of simulations ... dynamic, lighting, LCA... ... parametric design Net Zero Energy Buildings CO2 neutral developments Climat Neutral Districts believe in building physics … and teach it work like hell

We don’t overcharge outsource building physics restrain our diverse activities understand chaos theory

We will make you smile work for right cause value your projects increase your ambitions build a better world

We’re not "bio" extremist close minded only architects aliens neither wise in the ways of kung fu


can we regenerate the environment?

"the Reinvent Paris" project The first Climate Neutral District in France, a complete CO2 neutral development in Paris



can parametric design inspire building?

the "ONE center" project Envelop rendering generated with Rhino and grasshopper algorythm




can natural lighting shape a design? the "Prague" project Solar radiation impact to finetune the facade layout

the "Belval" project Frame composition based on solar radiation intensity


can sustainable be high-design?




passivehouse at no extra cost?


be.kinshasa

Program Belgian & Netherland embassy Client Foreign affairs minstry of Belgium Collaboration Contractor Willemen groep, Dematco, Jean-Louis Paquet architect (local architecte), Stubeco, CES, Crea-Tec Surface 5 769 m² / 32 097 ft² Performance Passivehouse - BREEAM excellent Situation Kinshasa (DRC) Year 2014-17 Status finished



be.rabat

Program Belgian embassy Client Foreign affairs ministry of Belgium Collaboration Contractor Willemen groep Cosimco, Still architect (local architecte), Crea-Tec Surface 1 700 m² / 18 298 ft² Performance Passivehouse Net Zero Energy Building Situation Rabat (Morocco) Year 2017-18 Status building permit



reinvent Paris

Program Urban renewal, housing, offices, urban farm, retail, hotel Client MGP Collaboration ATENOR, Eai, OXO, Agence Babylone, FAAST Surface 340 000 m² / 3 400 000 ft² Performance Passivehouse Net Zero Energy Building, Climate Neutral District, CO2 neutral Situation Paris (France) Year 2018Status Competition



paradis express

Program ECO neighborhood: 171 housing, stores, office building Client Befimmo Collaboration Jaspers-Eyers, BAGreisch, TPF, Lemaire, Heinz Winter Surface 40 000 m² / 430 556 ft² Performance Passivehouse - Breeam exellent Situation Liège (BE) Year 2014 - 2019 Status Building permit



0Box

Program micro modular concept for housing, Hotel room, shop, stores, classroom... passivehsoue, ZERO-energy and completely self-sufficient Client FAAST think tank Collaboration Michel Penneman, Crea-Tec, Stubeco Surface 18 to 27 m² / 193 - 290 ft² Performance Passivehouse – Breeam - zero CO2 Situation Belgium / USA / Singapor Year 2015-17 Status under construction



the twisted

Program office, housing, retail Collaboration MMA (A2M+FNA), Stubeco, Crea-Tec, FAAST Surface 55 000 m² / 550 000 ft² Performance CO2 neutral, Passivehouse, BREEAM excellent Situation Central Park NYC (USA) Year 2017 Status idea and feasability study



one center

Program office, housing, retail, congress center, Hotel Collaboration A2M , Crea-Tec, FAAST, Stubeco Surface 220 000 m² / 2 200 000 ft² Performance Permacity, CO2 neutral District , Net zero energy, Passivehouse, BREEAM excellent Situation Brussels (BE) Year 2017 Status idea and feasability study



bellevue hotel meininger

Program Hotel 170 rooms / 600 beds Client Nelson Canal Collaboration Arcadis, Stubeco, Crea-Tec, contractor Democo Surface 8 714 m² / 93 796 ft² Performance very low energy Exemplary Building award in 2009 Situation Molenbeek-Saint-Jean, Brussels (BE) Year 2010 Status completed 2013



kanaal bellevue

Program 14 apartments Client Hamilton Canal Collaboration Stubeco, contractor Democo Surface 2 117 m² / 22 787 ft² Performance Passivehouse Exemplary Building award in 2011 Situation Molenbeek-Saint-Jean, Brussels (BE) Year 2010 Status completed 2013



sport hall

Program sporthall Client Brussels Municipality Collaboration Createc, P Stoffel Surface 2 600 m² / 27 986 ft² Performance Passivehouse Situation Brussels (BE) Year 2016 Status competition



the genesis

Program office building Client Parc de l’Alliance (AXA Belgium, AG Real Estate Development) Collaboration Arcadis, Stubeco, JNC, AIB, SECO, D2S int’l, contractor Franki Surface 6 058 m² HS , 9 124 m² / 98 209 ft² Performance Passivehouse, BREEAM excellent Situation Braine-L’Alleud (BE) Year 2010 Status completed 2015



peterbos

Program Social housing renovation Client Beliris Collaboration Createc, Tractebel Surface 8 000 m² / 86 111 ft² Performance Passivehouse Situation Brussels (BE) Year 2016 Status competition



ixelles emploi

Program office building for job seekers, Actiris outlet Client Commune d’Ixelles Collaboration Createc, Stubeco, Securisan, Contractor Democo Surface 2 451 m² / 26 382 ft² Performance Passivehouse, Exemplary Building award in 2013 Situation Ixelles (BE) Year 2011 Status completed 2015



MT200

Program renovation 92 housing Passivehouses Client MT200 bvba Collaboration ELD, NicoTerijn, BuroGroen Surface 12 524 m² / 134 807 ft² Performance Passivehouse, Exemplary Building award in 2012 Situation Brussels (BE) Year 2012-17 Status under construction



VDBD

Program 17 apartments Client IMMOBILIERE COMTE DE FLANDRE Collaboration Nelson Canal, Crea-Tec, G. Paelinck, Contractor Democo Surface 1 488 m² / 16 016 ft² Performance Passivehouse, ZERO-energy, Exemplary Building award in 2013 Situation Brussels (BE) Year 2013-15 Status completed 2015



bara

Program Hotel 150 rooms Client NELSON midi Collaboration Crea-Tec, Stedec, contractor Democo Surface 6 033 m² / 64 938 ft² Performance Passivehouse ZERO energy Situation Brussels (BE) Year 2015-18 Status in construction



ardea

Program 78 appartments Client Etterbeek Collaboration Willemen, Infrabo, Istema Surface 7 230 m² / 77 823 ft² Performance Passivehouse Situation Brussels (BE) Year 2014-2017 Status under construction



nairobe EU

Program EU HQ Client EU Collaboration Createc, Stubeco, Franki Surface 10 000 m² / 100 000 ft² Performance passivehouse, selsuficcient, parmacity Situation Nairobe (KEN) Year 2017-18 Status feasibility study



anverssimons

Program 51 housing, school for 490 ch., Chidlcare Client Régie Foncière de la Ville de Bruxelles (BE) Collaboration Stubeco, Crea-Tec, contractor Democo Surface 10 779 m² HS, 13 369 m² / 143 902 ft² Performance Passivehouse Exemplary Building award in 2011, Passreg beacon project Situation Brussels (BE) Year 2011 Status completed 2015



victoria apex site

Program office, housing, retail Collaboration A2M , HCMA, Willemen Canada Surface 16 000 m² / 160 000 ft² Performance Permacity, CO2 neutral Net zero energy, Passivehouse, BREEAM excellent Situation Vistoria (CA) Year 2017 Status idea and feasability study



linnéplantes

Program 50 social appartments, childcare, renovation of a landmark building from the 60’s Client Service public fédéral Mobilité et Transports Collaboration Stubeco, Stockman, H Meunier, dB Mute Surface 6 506 m² / 70 030 ft² Performance Passivehouse et ZERO energy Situation Saint-Josse (BE) Year 2012-2017 Status under construction



lisbon meininger hotel

Program Hotel 120 rooms / 350 beds Client Nelson Canal Portugal Collaboration Enter architects, Termifrio, ETU, Renew, Acusticprojecto, Stubeco, PPE, Crea-Tec, contractor Democo lisbon Surface 6 200 m² / 62 000 ft² Performance Passivehouse Situation Lisbon (PO) Year 2016-18 Status Tender call



city center

Program housing, shops, childcare Client Drogenbos Municipality Collaboration Democo, Arcadis Surface 6 800 m² / 73 194 ft² Performance Passivehouse Situation Drogenbos (BE) Year 2016 Status competition



haren02

Program 30 housing in neighborhood Client Régie Foncière de la Ville de Bruxelles (BE) Collaboration Stubeco, Stockman, contractor Democo Surface 3 377 m² / 36 349 ft² Performance Passivehouse - Exemplary Building award in 2011, incl. 5 ZERO-energy housing, PassReg beacon project Situation Brussels (BE) Year 2010 Status completed 2013



ICEChallenge

Program installation Client PMP Collaboration contractor Batisam Surface 16 m² / 172 ft² Performance Passivehouse Situation Brussels (BE) Year 2007, 2009 Status completed 2007, 2009



m2e

masui

Nemo33

BXL01

Program office building for job seekers, childcare Actiris outlet Client Forest Municipality Collaboration JZH, TPF, contractor M&M Sitty Surface 1 731 m² / 18 632 ft² Performance Passivehouse Exemplary Building award in 2009 Situation Forest (BE) Year 2008 Status completed 2012

Program school , sport facilities and community center Client Commune de Brussels (BE)-Ville Collaboration Sodeg Groupe Artelia Surface 4 345 m² / 43 450 ft² Performance Passivehouse Situation Brussels (BE) Year 2011 Status competition, 2nd price

Program cdiving center , the deepest swimming pool in the world (Guinness World Record) Client Spirifer Collaboration Solyremy, Papegnies, Contractor iBens and Denys Surface 2 630 m² / 26 300 ft² Performance Situation Uccle (BE) Year 2000 Status completed 2003

Program 28 appartments, landmark from 1850 renovation Client Ville de Brussels (BE) Collaboration Cenergie, Stockman, Evico, contractor M&M Sitty Surface 4 247 m² / 42 470 ft² Performance low energy Situation Brussels (BE) Year 2002 Status completed 2009


Hotel on water

IPFC

passivehouse highrise

hop

Program floating Hotel, ZERO energy and self-sufficient Client Biloral Collaboration Arcadis, Createc, Stubeco, Securisan, Surface 2 600 m² / 26 000 ft² Performance Passivehouse et ZERO energy, Exemplary Building award in 2009 Situation Brussels (BE) Year 2008 Status idea

Program school IPFC Client Province du Braban Wallon Collaboration Cenergie, NEY, Solyremy, contractor TWT-Rogiers Surface 2 580 m² / 25 800 ft² Performance Passivehouse Situation Nivelles (BE) Year 2003 Status completed 2008

Program european commission passivehosue highrise Client PMP-PHP, IBGE Collaboration Arcadis, Stubeco, Widnell, DTZ, Democo Surface 220 500 m² / 2 205 000 ft² Performance Passivehouse Situation Brussels (BE) Year 2011 Status study

Program school, sport facilities and 76 housing Client Régie Foncière de la Ville de Bruxelles (BE) Collaboration Stubeco, Sofia eng, JNC, contractors Pelikaan Surface 16 657 m² / 166 570 ft² Performance Passivehouse Situation Brussels (BE) Year 2013 Status competition


mariemont

mariemont

verdun potager

delta

Program 15 apparrtments, childcare, renovation Client Ville de Brussels (BE) Collaboration JZH, Contractor In-Advance Surface 3 828 m² / 41 204 ft² Performance Passivehouse, Exemplary Building award in 2008 Situation Brussels (BE) Year 2006 Status completed 2013

Program 13 appartments, school Client Commune de molenbeek Collaboration Surface 5 622 m² / 56 220 ft² Performance Passivehouse Situation Molenbeek-Saint-Jean (BE) Year 2011 Status competition

Program 78 apparments Client Fond du logement de la Région Bruxelloise Collaboration Thomas et Piron Surface 8 749 m² / 87 490 ft² Performance Passivehouse Situation Brussels (BE) Year 2013 Status competition 2nd price

Program appartments Client Fond du logement Région Bruxelloise Collaboration Createc, Stubeco, Securisan, contractor Democo Surface 7 862 m² / 78 620 ft² Performance Passivehouse Situation Brussels (BE) Year 2013 Status competition 2nd price


T&T

Namur09

BYHHR

Maison du Port

Program 126 appartments Client Tour & Taxis Collaboration Surface 17 500 m² / 175 000 ft² Performance Passivehouse Situation Brussels (BE) Year 2010 Status idea

Program office building, renovation fromer post office Client IRET Collaboration Contractors BAGECI Surface 6 384 m² / 63 840 ft² Performance Passivehouse Situation Namur (BE) Year 2009-10 Status idea

Program small and medium-sized busines cnter and childcare, landmark renovation Client CPAS de Bruxelles Collaboration Neo construct , Suède 36 Surface 9 280 m² / 92 800 ft² Performance Passivehouse Situation Brussels (BE) Year 2009 Status competition, 2nd price

Program office building, HQ Brussels Client Port de Bruxelles Collaboration PPP Contractor Norpac, Arcadis Surface 7 500 m² / 75 000 ft² Performance Passivehouse Situation Brussels (BE) Year 2008-09 Status competition


villers les sables

Haren II phase 2

MOL 04

evere destrier

Program eco-neighbohood, , 220 housing,childcares, eldery persons housing, stores Client Thoumpsin Collaboration CREAT, Igretec, Giria, Epuvaleau Surface 38 876 m² / 388 760 ft² Performance Passivehouse et ZERO energy Situation Villers-La-Ville (BE) Year 2008-... Status in progress

Program 32 housing in eco-neighborhood Client Régie Foncière de la Ville de Brussels (BE) Collaboration Stedec, Createc, contractor Democo Surface 3 582 m² / 35 820 ft² Performance Passivehouse Situation Brussels (BE) Year 2015-16 Status tender call

Program childcare Client Commune de Molenbeek-Saint-jean Collaboration JZH, CreaTec, Matriciel, contractors Gillion Surface 634 m² / 63 400 ft² Performance Passivehouse, exemplary building award in 2010 Situation Molenbeek-Saint-jean (BE) Year 2006 Status completed 2014

Program social housing Client SLRB Collaboration BLAF architecten Surface 12 500 m² / 125 000 ft² Performance Passivehouse Situation Evere (BE) Year 2016 Status competition


Haren 03

White Hotel

l’île aux oiseaux

côte à côte

Program 110 housing in eco-neighborhood, childcare, shop Client EuroBeauty (BE) Collaboration Surface 24 526 m² / 245 260 ft² Performance Passivehouse Situation Brussels (BE) Year 2010-2015 Status building permit

Program Hotel 53 rooms, renovation Client Newquay Properties sa Collaboration Michel Penneman Surface 4 222 m² / 42 220 ft² Performance Situation Brussels (BE) Year 2006 Status completed in 2007

Program 354 housing, childcare, stores, eco-neighborhood Client Thomas & Piron, Toit et Moi Collaboration Arcadis, SIA, Sixco Surface 33 400 m² / 334 00 ft² Performance Passivehouse, low energy Situation Mons (BE) Year 2005 Status completed 2012

Program apartments for people with cerebral-motor disability (IMC) Client Côte à côte asbl Collaboration Stubeco, Contractor Democo Surface 1 347 m² / 13 470 ft² Performance Passivehouse, Exemplary Building award in 2013 Situation Louvain-La-Neuve (BE) Year 2010 Status completed 2014


Ekla

Program housing & kindergarden Client CityDev Collaboration Democo Surface 5 200 m² / 55 972 ft² Performance Passivehouse Situation Brussels (BE) Year 2016 Status building permit

gryson

Program 277 student rooms, 80 appt and retail Client CityDev Collaboration BAEB, ADE, TPF, Democo, Willemen, InAdvance Surface 23 200 m² / 249 722 ft² Performance Passivehouse Situation Brussels (BE) Year 2015 Status competition

rockaway

mima

Program Hotel Client Collaboration MMA (FNA + A2M) Surface 5 500 m² / 59 201 ft² Performance Passivehouse Situation NYC (USA) Year 2016 Status Idea

Program Street Art Museum Client NELSON midi Collaboration Crea-Tec, Stedec, contractor Democo Surface 1 269 m² / 13 659 ft² Performance Situation Brussels (BE) Year 2015-16 Status completed 2016


praha

Program office & Housing Client Karling Group Surface 15 262 m² / 164 278 ft² Performance Passivehouse Situation Praha (Cz) Year 2016 Status competition

Belval

Program office, housing, retail Collaboration A2M , Moreno architecture & associés, Tralux Surface 16 000 m² / 160 000 ft² Performance CO2 neutral Net zero energy, Passivehouse, BREEAM exellent Situation Belval (LU) Year 2017 Status idea and feasability study

Cit-Blaton

louise 120

Program office building, HQ CIT-Blaton, PH renovation Client CIT-Blaton Collaboration Arcadis, Ney, Surface 4 247 m² / 42 470 ft² Performance Passivehouse (the 1st in Brussels Region) Situation Schaerbeeck (BE) Year 2004 Status completed 2008

Program office building, renovation Client Gilt investment Collaboration Moreno-Lux, CES, Widnell , contractor Democo Surface 2 948 m² / 31 732 ft² Performance Passivehouse and BREEAM very good Situation Brussels (BE) Year 2010 Status completed 2012


haren III

FBZ

les grands moulins

Holcim Lafarge

Program 44 housing and community center Client Régie Foncière de la Ville de Brussels (BE) Collaboration Technum Surface 5 170 m²/ 55 649 ft² Performance Passivehouse Situation Brussels (BE) Year 2015 Status competition

Program office building, HQ Belgian Electicians Federation Client FBZ Collaboration Cenergie, NEY, contractor M&M Sitty Surface 2 145 m² / 23 088 ft² Performance Passivehouse Exemplary Building award in 2008 Situation Brussels (BE) Year 2008 Status completed 2011

Program Apartments, office building and museum Client SCI de la Haute-Saône Collaboration HDM, Energelio Surface 7 920 m² / 85 250 ft² Performance Passivehouse Situation Péronne (FR) Year 2010 Status building permit

Program office building, Holcim Lafarge Client Thomas & Piron Collaboration Architecture et Climat, CSTC, Matriciel, Sixco, contractor Thomas & Piron Surface 4 107 m² / 44 207 ft² Performance Passivehouse BREEAM very good Situation Nivelles (BE) Year 2010 Status completed 2013


tivoli

CPAS forest

jette

Program 374 apartments, 2 childcares, stores Client CITYDEV Collaboration AA, JDS, Stubeco, Istema, contractor Democo Surface 44 321 m² / 477 067 ft² Performance Passivehouse ZERO energy Situation Brussels (BE) Year 2012 Status competition

Program office building, social welfare center- listed bullding renovation (1932) Client CPAS de Forest Collaboration JZH, Matriciel, contractor Dherte Surface 1 017 m² / 10 946 ft² Performance very low energy Exemplary Building award in 2008 Situation Forest (BE)

Program 2 social housing - full zero energy Client Foyer Jettois Collaboration Ecorce, Falco Surface 286 m² / 3 078 ft² Performance Passivehouse Exemplary Building award in 2009 ZERO energy Situation Jette (BE) Year 2006 Status completed 2011

newark

Program Hotel 220 rooms, stores, student housing Client R.B. Collaboration MMA + M. Penneman Surface 15 699 m² / 168 982 ft² Performance passivehouse Situation Newark (USA) Year 2015 Status feasibility study



faster, stronger, further ...


D&B D&B

Design and Build

Relations and Branding

detail analysis

detail resolution

application & thermal detail verification


high design detail OUT & IN

parametric design rhino grasshoper

archicad BIM microstation excell


R&B

Relations and Branding

For 5 years, A2M published the quaterly magazine be.passive and begin 2015, the book "passive + architecture"

01

SEP OCT NOV 2009

flash 08 focus 12 humour 15 global view 16 face à face 20 parole d’image 24 le missionnaire 27 qu’en dites-vous 28 architecture partagée 35 dossier 46 portrait 50 phpp, vademecum 54 logement 60 non-résidentiel 64 rénovation 67 immobilier 70 Elisabeth's diary 81 ça bouge en ... 82

bureau de dépôt 2099 Antwerpen X P 910294

be.passive

02

trimestriel du standard passif > www.bepassive.be

DEC JAN FEV 2010

Looking forward Etat de la question

flash 08 focus 12 humour 14 global view 16 1perspective 18 carte blanche 22 le missionnaire 24 parole d’image 26 architecture partagée 29 dossier 39 phpp, vademecum 52 logement 59 rénovation 64 détail 69 tante Monique 76 Elisabeth's diary 78 ça bouge en 80

be.passive 01

be.passive trimestriel du standard passif > www.bepassive.be

Bruxelles passif en 2015

bureau de dépôt 2099 Antwerpen X P 910294

09 oct nov dec 2011

sur le vif 06 focus 12 global view 14 face à face 18 le missionnaire 20 carte blanche 24 vu et entendu 30 parole d'image 34 thema 36 architecture partagée 37 phpp 60 le mot des plateformes 62 résidentiel 67 rénovation 73 détail 78 Elisabeth's diary 80 angle droit 82 tante Monique 84 nos étudiants 90 chiffres 86 la famille carbonique 94

be.passive trimestriel du standard passif > www.bepassive.be

value for money

bureau de dépôt 2099 Antwerpen X P 910294

be.passive 09

1

15 avr mai jui 2013

flash 08 focus 14 global view 16 face à face 18 le mot des plateformes 22 vu et entendu 23 perspective 24 parole d'image 28 carte blanche 32 architecture partagée 32 passive story 34 what's up 36 non résidentiel 39 thema 50 tips & tricks 56 phpp 60 be.batex 60 nos étudiants 70 logements 73 détails 80 be.global 88 chiffres 90 angle droit 94 bureau de dépôt 2099 Antwerpen X P 910294

be.passive trimestriel du standard passif > www.bepassive.be

10 years

magazine be.passive


book architecture+passive


R&D Research and Development

4 000 000 € 3 500 000 € 3 000 000 €

end of life cost maintenance cost

2 500 000 €

operation cost construction cost

2 000 000 € 1 500 000 € light facade 1

light faacde 2

light facade 3

light facade 4

massive facade 1

massive facade 2

massive facade 3

massive facade 4

Impact budgétaire sur durée de vie LCC (30 ans) Le calcul LCC a été testé sur 8 type de composition de façade. La solution retenue est une façade de type «massive»



permacity concept Climat Neutral District CO2 neutral

passivehouse/net zero energy Is it possible to reduce the environmental impact of growth to such an extent that the project could regenerate the environment? By “permacity” we mean a systemic and global conception method that aims to create an urban system or metabolism inspired by natural ecology (biomimicry) and where each individual element contributes to the others. The term is derived from “permaculture” or “permanent agriculture”. “Permacity” enables the “permanent city” to be a sustainable ecosystem. One of the fundamental models of permaculture is that of the forest, composed of seven stratas that complement each other and maintain a dynamic and balanced relationship, sharing water and nutrients. As such, permacity would be a “piece” of the city evolving in equilibrium.



the team we use ...

we master ...

..

w

male

female

iphone

ph

80%

53%

champagne

iphone

latino

elecro

dubste p/ acid/ trans

nexus beer

jazz

franรงai s

samsung

60%

tea

pop/ rock

RNB/ rap

other

rum

coffee

47%

other

53%

comics

80% 60%

53%

20%

tea

elecro

water

soft

novels

60%

we mast w

we dance to...

73%

champagne

beer

nexus

ecotect

we drink ...

60%

dubstearch, grap, p/ acid/ art trans

RNB/ rap specialised

latino

elecro

dubste p/ acid/

trans novels

jazz

manga

73%

27%

we listen to ...

we play ..

100%

47% rum

wufi2d

ecotect

80%

60%

samsung

kobra

coffee

people

53% female

20% franรงai s

other

53%

water

jazz

male

60%

phpp

we use ...

soft

80%

pop/ rock daily paper

60%

wufi2d

we drink ... we dance to... 73% 73%

80%

47%

rock

kobra

73%

80%

comics pop/

phpp

other

iphone

we read...

we are ...

60%

%

iphone

nexus

manga

nexus

franรงai s

samsung

samsung

latino

other

nce to...

rap

wewe master use ... ...

we are ...

phpp

ko


female

other other

samsung samsung

other

we read... we read...

80% 80%

60% 60%60% 60%

53%

47% 47%

80%

jazz

47%

we play ..

rum

60%

elecro latino

60%

dubste p/ acid/ trans

pop/ rock pop/ rock franรงai s franรงai sjazz 53%

RNB/ rap

RNB/ rap RNB/ rap

novels novels

novels

manga

20%

other othe

53%

53%

latino

53% 53%

80%

manga manga

comics comics

comics

arch, grap, arch,art grap, art

phpp

we d

latino

73%

20% 20%

jazz dubste p/ acid/ trans dubste p/ acid/ trans elecro

73%

arch, grap, art

people people

people

daily paper paper daily

daily paper

we we play play ....

27%

kob

soft

80% 80%

franรงai s

27% 27%

60%

specialised specialised

iphone

phpp kobra

we drink .. we drink ...

we dance to... 73%

phpp

73%73%

we read...

specialised

nexus

elecro

73% 73% 60% 60%

100% 100% 90% 90% 80% 80% 70% 70% 60% 60% 100%50% 50% 40% 90%40% 30% 80%30% 20%

iphone iphone

dance wewe dance to...to... 73% 73%

73%

samsung

pop/ rock

73% 73%

nexus nexus

we listen to .. we listen

we

10% 70%20% 10% 60% 0% 0% 50%

40% 30% 20% 10%

0%

average age average age

average age

size of the agency size of the agency

size of the agency

we have we have

we ha


about High architectural design, eco sustainable developments, and Net Zero Energy feasibility studies. With its experience, PH expertise and large range of competences, A2M is the perfect partner to value your projects.

awards

Liege Paradis express Mipim award best futura poject Anvers Simons Beacon Project PassReg.EU, 2015 Exemplary building award, 2012 finalist Green Building Solutions 2015 finalist Horta's award 2016

A2M team is composed of architects, engineer architects and thermal engineers. All trained specifically in the aspects of sustainable development, passive design, and particularly in natural light analysis as well as dynamic simulation.

Haren02 Beacon Project PassReg.EU, 2015 Exemplary building award, 2011 finalist Green Building Solutions 2015

These skills gathered under one roof enable us to combine the economic with the exemplary dimensions in each of our projects.

vandenbranden Exemplary building award, 2013

Although all our projects are passive - and for some Net Zero Energy, Exemplary Buildings, or Breeam - more than 50% are priced at an equivalent or lower cost than standard market prices. A2M projects reach high standards with a pragmatical approach. A2M is specialized in feasibility studies for large scale developments. Design approach, economic feasibility, high performance : the perfect combination to make a difference. A2M offices are in Brussels and in NYC. â–

Ixelles Emploi Exemplary building award, 2013

MT200 Exemplary building award, 2012

linnĂŠ-plantes Exemplary building award, 2012


Côte-à-côte Exemplary building award, 2012

l'île aus oiseaux Public call for tender award, 2013

BTP1000 Marshall plan 2.0 green award, 2011 finalist World Efficiency Award 2015 finalist Green Building Solutions 2015

Atlantis Exemplary building award, 2009

Jette Belgian architecture award selected, 2011 Exemplary building award, 2007 Tenant gold bric award, 2006

Evere Brussels Horta award selected, 2008

BXL01 Brussels Horta award selected, 2011

FBZ Exemplary building award, 2008

Quai AA Exemplary building award, 2009

M2E Exemplary building award, 2008

locq Exemplary building award, 2009

Mol04 Exemplary building award, 2007

Bellevue Exemplary building award, 2009

CPAS Forest Exemplary building award, 2007



we share we build A2M BXL 6 chaussĂŠe de Boondael 1050 Brussels Belgium

A2M NYC 110 East 25th Street New York, NY 10010 USA

T +32 2 640 51 81 info@a2m.be

M +1917 825 1007 willem@a2m.be

A2M LIS Rua do Mar Vermelho 2 1990-152 Lisboa Portugal


high design + cost control + sustainable expertise the perfect combination to make a difference.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.