1 minute read

YES NO

Improve access to natural spaces and cultural amenities.

Bring much needed jobs and economic diversity to SWLA.

None of

In which of the following ways do you think that this project would positively impact the region? (Select all that apply)

Increase walkability, create more destinations, and/or promote a better quality of life for residents of SWLA.

Promote a more resilient SWLA, with improved infrastructure and drainage.

Provide needed housing — increasing choices and making housing more resilient and affordable. Provide needed housing — increasing choices and making housing more resilient and affordable.

Improve access to natural spaces and cultural amenities.

Exit

Hello Lamp Post

Ambassadors

WHAT WE HEARD I STEP 3 — FEASIBILITY & DECIDING

During the Feasibility & Deciding Step, residents, local leadership, and the advisory committee identified support and priority for the 10 Catalytic Projects in preparation for implementation.

In the final phase of engagement, the focus was on refining the 10 catalytic projects, identifying support for each project, and determining the level of priority for implementation.

The breakdown of comments and participation by engagement methods is as follows:

Guiding Group

• 55 Guiding Group members

In-Person Public Meetings

• 175 In-Person Meeting attendees

Online Idea Wall

• 40 Idea Wall participants

Exit Survey

• 70 survey forms submitted

Hello Lamp Post

• 133 interactions with Hello Lamp Post

• 274 comments received through text

Ambassadors

• Used their network to provide information and gather survey responses

Across all engagement methods in the Feasibility & Deciding Step, there were over comments and ideas

2,000

Results from the Catalytic Project Prioritization

The Advisory Committee, Local Leadership Group, and General Public all voted on the priority for the catalytic projects. The “Resulting Priority” indicates a weighted averages of the responses across all three groups, with some preference given to the Advisory Committee and Leadership Group responses, which indicate knowledge about strategic implementation and capacity for completion in the first 10 years of the plan.

Indicating Support for the Catalytic Projects

As a part of the Exit Survey, residents and stakeholders were asked to highlight their support for each of the catalytic projects.

This article is from: