9 20 9 3
14
8
9
22
16 20 21
+EX 1.27
+RL 1.05
S
B
A
T
T
7
4
H
6 +6. 2
+5. 15
5 +4. 1
+2. 05 +3. 05
11
10
7
+RL 1.20
11
12
5
+RL 1.40
+RL 1.60
+TOW2.00
+TOW2.00
18
+RL 1.02
19
+EX 1.02
+EX 1.80
+RL 1.78
+EX 1.04
+RL 1.80
+RL 1.80
+TOW2.00 +RL 1.80
15
13
+RL 1.50
17
+RL 2.00
+RL 1.80
+EX 2.40
+RL 1.80
7
+RL 1.50
+EX 1.80
+RL 2.0 +RL 2.5 +RL 1.6
+RL 3.0
+RL 1.6
+7. 25
2
+EX 2.20
17
+EX 2.40
+EX 3.00 +EX 2.40
+7. 4
+RL 3.0
+EX 2.60
5
1:
29 +7. 95
+8. 2
D
+EX 2.18
+RL 3.00 +RL 3.10
A R F W H
+EX 2.00
1
D D
TORONTO STATION
+RL 2.90
+EX 3.00
+RL 3.00
5
+RL 3.45 +EX 3.20
+RL 3.00
+EX 2.80
+RL 3.40 +EX 2.60
+EX 3.30
+9. 7
+RL 3.55 +RL 4.00 +RL 3.00
+EX 3.60 +EX 3.4
B U S
D
+EX 3.40
Z O N E
T
+EX 3.8
P A R A D E
+EX 3.8
D R O A
V I C T O R Y
TEL HO TO
ON
TOR +EX 5.32
5
23
B T
H
O
U
L
E
V
A
R
D
E
G O F F E T T PA R K
E
A
B
1 2
Potential New Cafe Potential New Bike Hub
7 8
New Public Shade Pavilion + BBQ Facilities Foreshore Inlet
3
Bath Street re-made
9
Waters Edge Lookout
4
Bath Street Terraces
10 New Fig Tree Wild Play
13 New Water Square with parking 14 Boardwalk and Accessible Boat Ramp
19 Expanded Amenities + New Canopy 20 New boardwalk connection
R
I
G
H
T
O
V
E
N
U
N
Existing Trees
New Trees
Private Property
Existing Built Form
New Footpath
New Sharedway
Existing Heritage Buildings
New Garden Bed
Exist. Connection Critical New Connection
15 Town Green - Terraced Amphitheatre
21 Existing Boat ramp removed
Existing Built Form - to be removed
New Boardwalk
16 Floating Stage
22 Public Pier - Water Access
Existing Kerb - retained
New Feature Paving
23 Upgraded car park and paths to memorial in Goffet Park
Existing Kerb - removed
New Kerb
5
New Public Stairs
11 Treehouse Lookouts
17 Expanded Playground
6
Existing Pumping Station
12 Existing Sailing Club (Potential expanded footprint shown dotted - outside of this master plan)
18 Expanded Cafe/Kitchen
E
0
10
30
50
100
200
18th November 2020 1:1200 @ A1
Hill Thalis Architecture & Urban Projects and Gallagher Studio
DRAFT TORONTO FORESHORE MASTERPLAN
BATH STREET PRECINCT
5
4
S
B
A
T
T
6
H
3
D 1
2
D
7
1
New Public Square + Parking
2
New Bike hub (75sqm)
3
New Cafe (225sqm)
4
New Landscaped Terraces
5
Existing Wharf (private)
6
Heritage Pump Station
7
Belvedere and New Stair Connection - roundabout removed to allow for widened footpaths and access, subject to traffic analysis.
Existing Trees
New Trees
Existing Built Form
New Footpath
Existing Heritage Buildings
New Garden Bed
Existing Built Form - to be removed
New Boardwalk
Existing Kerb - retained
New Feature Paving
Existing Kerb - removed
New Kerb
0
5m
25m
50m
18th November 2020 1:750 @ A3
Hill Thalis Architecture & Urban Projects, Gallagher Studio, JOC Consulting, SHAC + Clare Design
DRAFT TORONTO FORESHORE MASTERPLAN
THE TERRACES 2
5 2
4 6 3 3
1 +6. 2
+4. 1
7
7
1
+2. 05
+5. 15
8
1
+3. 05
+7. 25
B
9
+7. 4
1
9 TORONTO STATION
+7. 95
+8. 2
6
+9. 7
1 B U S
10
10
V I C T O R Y
P A R A D E
RO
TO NTO TEL
HO
1
New Stair
7
Treehouse Lookouts
Existing Trees
New Trees
2
New Pier
8
Seating & Play under the Exist. Fig Tree
Existing Built Form
New Footpath
3
Shade Pavilion, Seating + BBQ
9
Moveable Stairs along Existing Tracks
Existing Heritage Buildings
New Garden Bed
4
Foreshore Inlet
10
Potential Crossing Improvements
Existing Built Form - to be removed
New Boardwalk
5
Lake Lookout and Seating
Existing Kerb - retained
New Feature Paving
Existing Kerb - removed
New Kerb
6
Existing Stairs
0
5m
25m
50m
18th November 2020 1:750 @ A3
Hill Thalis Architecture & Urban Projects, Gallagher Studio, JOC Consulting, SHAC + Clare Design
DRAFT TORONTO FORESHORE MASTERPLAN
TOWN GREEN AND EXPANDED SAILING CLUB
2 3
1
8
+RL 1.40
6
+RL 1.60
+TOW2.00 +RL 1.80
5
7
+RL 2.00 +RL 1.80
+EX 2.40
1:2
9
+RL 3.10
4
+EX 3.20
+EX 3.30
9 B U S
+RL 3.00
Z O N E
10
1
Water Inlet
7
Town Green - Terraced Amphitheatre
Existing Trees
New Trees
2
Accessible Ramp
8
New Timber Stage
Existing Built Form
New Footpath
3
Boardwalk at Water Level for Boat Access
9
New Bus Stop Location
Existing Heritage Buildings
New Garden Bed
4
Ramp & Stair Access to Square
10
Existing Built Form - to be removed
New Boardwalk
5
Public Square with Parking
Improved Intersection Crossings - roundabout shifted south-west to allow for widened sharedway, subject to traffic analysis.
Existing Kerb - retained
New Feature Paving
Existing Kerb - removed
New Kerb
6
Existing Sailing Club (Potential expanded footprint shown dotted - outside of this master plan)
0
5m
25m
50m
18th November 2020 1:750 @ A3
Hill Thalis Architecture & Urban Projects, Gallagher Studio, JOC Consulting, SHAC + Clare Design
DRAFT TORONTO FORESHORE MASTERPLAN
EXPANDED PLAYGROUND & COMMUNITY FACILITIES
2 2
1
(boat ramp removed)
2
+EX 1.27
+RL 1.05
D D
+RL 1.02 +EX 1.02
9
+RL 1.78 +EX 1.04 +RL 1.20 +RL 1.40
+RL 1.60
+TOW2.00
+TOW2.00 +RL 1.80
+TOW2.00
A
+RL 1.80
+RL 1.80
+RL 1.80
10
+EX 1.80
3
4
+RL 2.00
+RL 1.50
+RL 1.50
+RL 1.80
+EX 1.80
+RL 2.0
+EX 2.40
8
+RL 2.5 +RL 3.0
+RL 1.6
5
+RL 1.6
A R F W H
6
7
+EX 2.00 +EX 2.18
+RL 3.00
+RL 3.10
+EX 2.20 +EX 2.40
+EX 3.00 +EX 2.40
1:2
9
+EX 2.60
+RL 2.90 +RL 3.00
+RL 3.45 +EX 3.20
+RL 3.0
11
+EX 3.00
+EX 2.80
+RL 3.00
+RL 3.40
+EX 2.60 +EX 3.30
+RL 3.55 +RL 4.00 +RL 3.00
+EX 3.60 +EX 3.4
+EX 3.40
+EX 3.8
D R O A
+EX 3.8
(existing play)
+EX 5.32
12
1
Floating Stage
7
Slide Play
Existing Trees
New Trees
2
New boardwalk elements
8
Log Play
Existing Built Form
New Footpath
3
Train Playhouse
9
Expanded Cafe
Existing Heritage Buildings
New Garden Bed
4
Water Track Play 'Interactive elements'
10
Expanded Amenities with showers
Existing Built Form - to be removed
Crows Nest Vertical Play Elements
11
Shade Pavilion and Seating with BBQ's
New Boardwalk
5
Existing Kerb - retained
Sandpit
12
New Feature Paving
Existing Kerb - removed
New Kerb
6
New Pedestrian Crossing
0
5m
25m
50m
18th November 2020 1:750 @ A3
Hill Thalis Architecture & Urban Projects, Gallagher Studio, JOC Consulting, SHAC + Clare Design