Lalitphan Pongpornprot - Work Samples 2020

Page 1

L A L I T P H A N PONGPORNPROT

(917)

941

-

7133

LALITPHAN@GMAIL.COM WWW.LALITPHAN.COM

A R C H I T E C T U R A L D E S I G N E R PURSUING ARCHITECT LICENSE IN NEW YORK.

PROFESSIONAL WORK MARK VETTER ARCHITECTURE

Sep 2018 - Feb 2020 (New York, USA)

Architectural Designer l Mark Vetter, Principal EXHALE - NOMAD: Tenant Fitout for Yoga and Barre Studio (Manhattan, New York) SOULCYCLE - HYPE PARK VILLAGE : Tenant Fitout for Cycling Studio (Tampa, Florida) SOULCYCLE - PONCE CITY MARKET : Tenant Fitout for Cycling Studio (Atlanta, Georgia) SOULCYCLE - BLOOMFIELD TOWNSHIP : Tenant Fitout for Cycling Studio (Bloomfield Hills, Michigan) BARRY’S BOOTCAMP - ROSLYN HEIGHTS : Tenant Fitout for Workout Studio (Roslyn Heights, New York) -

Project Planning - Coordinated with expertises involved from Due Diligence Report toward Construction Completion. - Conducted space planning to facilitate its program and circulation regarding codes and egress requirements.

-

Project Development - Established the standard construction documentation including specifications and millwork details. - Reconciled changes and input from all experts involved into Construction Drawing set. - Assisted principal with providing responses and drawings when receiving feedback from DOB.

-

Construction Administration - Reviewed and maintained submittal, RFI, and shop drawing in record with 5-day turnaround reviews. - Attended site-meeting and prepared meeting minutes. - Assisted principal in preparation for punch-list.

CAZA ARCHITECTS

Sep 2017 - Nov 2017 (New York, USA)

Architectural Intern l Laura Del Pino, Supervisor BALER OCEAN CITY PROJECT : Convention center with accommodation and communal space (Philippines) DERLAGO MAUSOLEM : Stand-alone Spiritual building serves as a monument housing tombs (Philippines) -

Fabricated physical model of shell structure.

INTEGRATED FIELD

Jun 2016 - Aug 2016

Architectural Intern l Supakrit Kitcharoenroj, Supervisor

(Bangkok, Thailand)

EUROSTAR HOTEL LAB : Design competition for a hotel room prototype (Barcelona,Spain) -

Won a first runner prize for a prototype hotel room with specific furnitures for bed,working area,closet,and resting area.

UDOMSUK 34 COMMUNITY MALL : Small-scaled shopping mall reflecting specific character of the community. -

Designed a schematic design for Udomsuk 34 community mall and conducted a research + presentation to clients.

EDUCATION PRATT INSTITUTE

Sep 2015 - May 2018 (New York, USA)

Master of Architecture (First-Professional)

THAMMASAT UNIVERSITY

Sep 2008-Dec 2011

Bachelor of Business Administrative (Finance)

(Bangkok, Thailand)

RECOGNITIONS Architecture Merit Scholarship

Aug 2015 - May 2018

Pratt Institute Featured on Pratt GAUD “InProcess Archived2019”

May 2018

Professor Bruce Mau and Joseph Giampietro Featured on Pratt GAUD “InProcess Archived2018”

May 2017

Professor Jonas Coersimeier Assisted teaching for Structure 1 : Structure and Medium and Structure 2 : Materialities and Qualities

Fall 2016 - Spring 2017

Teaching Assistant l Professor Cristobal Correa and Professor Radhi Majmudar

PROFICIENCY Rhinoceros

Adobe Illustrator

Vray

English

Autocad

Adobe Photoshop

Maxwell

Thai

Maya

Adobe Indesign

Lazer Cutting + CNC

Chinese (Mandarin)

Revit

Adobe After Effect

Grasshopper

3Ds Max

Adobe Premiere

3D Printing

Mark Vetter

Mark Vetter Architecture

mvetter@vetterarchitecture.com

(347) 513-7381

Jonathan Bucholtz

Mark Vetter Architecture

jbucholtz@vetterarchitecture.com

(262) 893-4111

Tyler Johnson

Henderson Engineers Inc

tyler.johnson@hendersonengineers.com

(913) 742-5537

Alyssa Case

Soulcycle

alyssa.case@soul-cycle.com

(646) 755-6861

Kevin Klein

Agile Networks

kevin@agilenet.works

(678) 386-9030

REFERENCE CONTACTS


E X H A L E

-

N O M A D

Professional Work: Tenant Fit out for Yoga and Barre studio and Spa 31 East 32nd St. New York, NY 10016 (3,622 SQ.FT.) - Lead Designer - Site Survey - Managed Project from Preliminary design to completion - Produced SD/DD/CD drawing set - Produced Bidding and Approval drawing set - Coordinated with clients,vendors,MEPF engineers, consultants - Reviewed CA documents

DISPENSARY MECHANICAL 111 112 131 SF 43 SF

09

STORAGE

31 30

31 30

12 30 31

30 31

A B

2 A311

104B 28

31 30

30 31

AUDIO

94

WOMEN BATHROOM 103 299 SF

D

C

82

30

1 A305

B 3 A305

A

B

103B

29

06

04 05 21 14

85

D

32

28

26 96

1 A302

B

A 1 A303

B

26

A

28

27

86

32 31

31

C

102C

103A

26 28

2 A304

31 30

50

14 04 05 21

103C

A

A

10

10

06

C

12

12

102A

28

1 A304

D

28

1 A311

103D

A

112

RETAIL 100 199 SF

06

STUDIO 104 1085 SF

01 02 33

31

MEN BATHROOM 102 269 SF

14

D

28

50 100

D 16

C

26

14

C 104A

A

29

D

1 A307

B

C 110

111

26

C

109

2 A309

B

23

28

28 22

23 28 28

27

RECEPTION 101 125 SF

C

26 28

07 A

A

1 A308

B

D

26 28

2 A308

B

C

POS

D

C

27

26 28

POS

12

101A

106

27

14 POS

2 A310

C

TREATMENT 4 107 81 SF

23

14 A

105

108

107

23

D

1 A306

D

C

A

CORRIDOR 120 188 SF

1 A301

B

C

28

D

23

28

2 A305

B

26 28

A

2 A307

B

TREATMENT 2 109 103 SF

A 23

A

26 28

TREATMENT 1 110 103 SF

27

23

27

92

18

A

D

101B

1 A309

B

C

D

FEC

AED

ZEN LOUNGE 105 117 SF

TREATMENT 5 106 94 SF

03

CORRIDOR 125 417 SF

C

TREATMENT 3 108 94 SF

Construction Plan

DISPENSARY MECHANICAL 111 112 131 SF 43 SF 02

EQ.

L3 1'-4" 10'-321"

25

L3

EQ.I

L6

EQ 3'-0"

EQ

25 12

L3

SPK EQ EQ 3'-0"

C-1 (PT-101) 7'-6" AFF

L3

L3

1'-10" EQ 31 27

EQ

EQ 3'-0"

L6

EQ

L3

L6

SPK EQ EQ 3'-0"

28

EQ

L3 EQ

C-1 (PT-101) 7'-6" AFF

2'-8" 31

27

L6

CYL6

02 24 CYL6

CYL6 X1/C EQ

03

EQ

CYL6

EQ EQ

1'-5"

UT

X2

EQ.H

e ected

eiling lan

EQ

1'-8" CYL6 SPK

L7

EQ

24

1'-8" 1'-7" CYL6 CYL6 SPK

1'-8" CYL6 11" 11"

EQ

02 03 01

16

X2

1'-8" CYL6

12 EQ

EQ

EQ EQ

L5 L5

L5 1'-841"

3'-421"

L5 EQ.N

09

X1/W

B.O. BEAM 16 (PT-101) 15'-6" AFF EXPOSED DECK (PT-101) 16'-3 3/4" AFF

POS = PENDANT POS = PENDANT POS = PENDANT

96

EQ EQ

EQ EQ

EQ EQ

EXPOSED GIRDER (PT-101) 14'-6 1/2" AFF 27

L6

RECEPTION 101 125 SF

CORRIDOR 125 417 SF

L5 L5

WAP

32

EQ.N

12 SPK

LTGH-107 LTGH-107 LTGH-107 POS POS POS

SPK

ZEN LOUNGE 105 117 SF

L5

7'-0" L5

L5

L7

L1

08 12

L5

C-1 (PT-101) 10'-4" AFF

EQ.D

12

7"

EQ.D L1

LTGH 203 LTGH 203

SPK

L4

SPK

3'-4"

L1

21 12

EQ

MATCH 'C'

EQ

L1

L7

L1

3'-5" VIF

1'-6"

L5

L5

L2 EQ

L5

EQ

81

1 1'-1" 1'-62"

09

3'-2"

L5

12

EQ 24

L5 LTGH-101

81

L5

CYL6 12

TREATMENT 5 106 94 SF

L7 B.O. CAB.

L2

02

C

1'-2"

EQ EQ

L5

EQ

4'-621"

CYL6 SPK

4'-6"

'C'

C-1 (PT-101) 9'-4" AFF

08

EXPOSED GIRDER (PT-101) 15'-1 3/4" AFF

X1/W

L1

EQ.E EQ.E EQ EQ L1

L1

10"

EQ 01 03

L3 C-1 (PT-101) 10'-0" AFF

EX. CEILING (PT-101) 7'-6" AFF 27

EQ.E

L1

08

08

1'-9"

80 21

L1

C-1 (PT-101) 9'-4" AFF

L7

L1 SPK EQ.D EQ.D

CYL6

EQ 12

CYL6

X1/C EQ.L 09

95

EQ 1'-6"

EQ

L3

SPK 12

L1

26 2'-9"

1'-2" L6

10'-1"

SPK 12

12

EQ

25 2'-021"

CYL6

EQ

1'-8"

EQ

2'-921" 1'-9"

L3 02

10'-321"

C-1 (PT-101) 7'-6" AFF EQ

31

3'-3"

SPK 1'-2" 12

12

2'-0" SPK

EQ.H

3'-10"

80

X2

CYL6

C-1 (PT-101) 10'-0" AFF L6

'X'

3'-7"

L3

3'-121" V.I.F.

C-1 28 (PT-101) 10'-0" AFF L3

L3

MATCH 'X'

EQ.I

12

EQ

2'-0"

25

25

27

EQ

5'-0"

12

EQ

L6

EQ

EQ

EQ.E EQ EQ

1'-0"

L7

SPK

5" EQ

10'-321"

EQ

5'-0"

CYL6

12

9" L2

12 L7

L3

L7 B.O. CAB.

SPK

L3 EQ

L3

EQ X1/W

2'-0"

SPK

L3

EQ

2'-6"

1'-11" V.I.F.

EQ

EQ.L

TREATMENT 4 107 81 SF

L3 EQ

2'-5"

7"

SPK

L3

25

L3

02

SPK

2'-6"

1'-9"

31

2'-0"

EQ

2'-0"

X1/W

2'-3"

TREATMENT 3 108 94 SF

L3

12

L7 B.O. CAB.

L6 T.O. CAB.

L7 B.O. CAB.

1'-8" EQ

1'-8"

TREATMENT 2 109 103 SF

CORRIDOR 120 188 SF

L3

31 8"

TREATMENT 1 110 103 SF

L3

12

1'-1121"

EQ

L3

24

C-1 (PT-101) 10'-0" AFF

L6 T.O. CAB.

C-1 (PT-101) 10'-0" AFF

L7 B.O. CAB.

EQ

EQ

80

3'-1"

EQ EQ

21 LTGH 203

SPK

9"

EQ.B L1

L4

25

EQ.B 82

6'-0"

421"

82

EQ.A L2

SPK

09

L1

3'-7"

08

2'-5"

12

12

4'-0"

2'-7"

K

L15 1'-8"

1'-5"

SP

L15C-2 (PT-101) 13'-0" AFF

1'-8"

4'-0"

L1

1'-221"

L15

1'-934"

X2

1'-8"

2'-3"

LTGH 203

WAP

L9A-8 ACT 9'-0" AFF

3'-5" V.I.F.

2'-10"

01

EQ.A

80

C-1 (PT-101) 10'-4" AFF 3'-021" VIF 'C'

MATCH 'C'

82

SPK

L1

LTGH 203

EQ.A L2

12 21

L15 08

EQ.A

82

199 SF

EQ

3'-2"

13'-3"

9"

EQ.B L1

C-1 RETAIL (PT-101) 9 TILES AFF 100 TYP. AT ALL SHOWER

L5

81

EQ.B

MEN BATHROOM 102 269 SF

L5

15

L15

9"

L2 7'-3"

91

L2 81

11 02

EQ

WOMEN BATHROOM 103 299 SF

EQ.H L1

EQ

STUDIO 104 1085 SF

EQ

1'-8"

4'-721"

1'-8"

1'-2"

EQ

EQ.H

L5

21

UT

EQ.G

L2

X2

91

9" 8" L5

EQ.G L15

EQ EQ

c

EQ

L12

c

9"

L12

c

EQ

L12

c

EQ

L12

c

9"

L12

b

EQ

L12

b

EQ

L12

b

EQ

L12

b

EQ

L12

b

EQ

L12

a

2'-11"

L12

a

2'-7"

L12

a

2'-0" V.I.F.

L12

a

3'-0"

L12

a

EQ

1'-0"

EQ

2'-521"

EQ

2'-521"

EQ

2'-521"

EQ

2'-521"

EQ

2'-521"

1'-4"

2'-521"

1'-2"

2'-521"

1'-10"

2'-521"

EQ

2'-521"

EQ

2'-521"

1'-8"

2'-521"

K

841" L15 2'-521"

7'-3"

5'-4"

2'-521"

L15

L12 L15

3'-3"

L15

SP

12

90

EQ

2'-521"

EQ

02

12

EQ

K

SP

2'-3"

UT

1'-2"

1'-841"

EQ.

4'-721"

3'-2"

EQ

2'-10"

02 EQ

13


WD - 100 WOOD STRIPES ON WD-101 WOOD PANELS, EACH AS SCHEDULED

WATER DISPENSER BY OWNER NIC.

B.O. DECK +16'-3 3/4" AFF B.O. BEAM +15'-6" AFF

CYL-6 CABLE MOUNT FIXTURE AS SCHEDULED

PAINT PT-101 TYP. B.O. FIN. CEILING +10'-0" AFF

B.O. EGRESS BRIDGE +7'-6" AFF

PF-100, DRINKING FOUNTAIN AS SCHEDULED

B.O. FIN. FLOOR +0'-0" AFF

OPENING FOR TRASH SHELF

COFFEE STATION MILLWORK, SEE DETAILS A-507

4" PAINTED BASE AS SCHEDULED, TYP

BENCH WITH SHOE CUBBIES MILLWORK SEE DETAILS A508

Hallway West Elevation

PAINT PT-100 AS SCHEDULED

B.O. DECK +16'-3 3/4" AFF B.O. BEAM +15'-6" AFF

LGTH-101 PENDENT LIGHT FIXTURES AS SCHEDULED

B.O. GIRDER +14'-5 1/2" AFF

WD - 100 WOOD STRIPES AS SCHEDULED

OPEN TO BEYOND

6'-8"

B.O. FIXTURE +10'-0" AFF

B.O. FIN. FLOOR +0'-0" AFF

4" PAINTED BASE AS SCHEDULED, TYP

CG-108, RETAILS WALL SHELVES AS SCHEDULED

Reception North Elevation (before entering Hallway)


B.O. CEILING FINISH

SEE ELEVATION

SEE ELEVATION 1 4"

1 4"

B.O. CEILING FINISH

CORNER BEAD AT GWB REVEAL EDGES, TYP.

CORNER BEAD AT GWB REVEAL EDGES, TYP.

(1) LAYER GWB LAMINATED, ABOVE MIRRORS. FINISH PAINT PT-100 AS SCHEDULED

(1) LAYER GWB LAMINATED, ABOVE PLYWOOD. FINISH PAINT PT-100 AS SCHEDULED

FURROUT OR PARTITION AS SCHEDULED

FURROUT OR PARTITION AS SCHEDULED

1 4"

09

CL. OF TRX

T.O. MIRROR

1 4"

SEE ELEVATION

10

PLYWOOD TO MATCH FINISH AE - F -101 -APPLIED

SEE ELEVATION NEOPRENE OR SILICONE SETTING BLOCKS AT BOTTOM CHANNEL AS REQ.

WALL MOUNTED TRX, EQ-106

1/2" X 1/2" X 12GA ALUM. J-CHANNELS AT BOTTOM - W/ MIRRORED FINISH TAPE OVER FASTENERS AND WALL EDGE OF J-CHANNELS AT TOP AND BOTTOM, TYP.

CL. OF TRX

ADHERE MIRROR TO WALL USING COMBINATION OF SILICONE AND 'CRL' HEAVY BODIED MIRROR MASTIC OR APPROVED EQUAL. ALLOW 24 HOURS DRYING TIME BEFORE ROOM IS IN USE.

SEE ELEVATION

T.O. ACOUSTIC PANEL

1 4"

MR-100 MIRROR AS INDICATED IN ELEVATIONS

SEE ELEVATION

AE-F-101 - ACOUSTICAL WALL PANEL FABRIC TO WRAP AE-101 ACOUSTIC WALL PANEL AS SCHEDULED

1 4" T.O. WOOD PANEL PLYWOOD PANEL, WITH LAMINATE FINISH: LAM-104

SEE ELEVATION

4-HOLE UPSIDE-DOWN MOUNTING, HD-102 BALLET BARRE BRACKET AS SCHEDULED CL. OF BARRE

CL. OF BARRE

SEE ELEVATION

SEE ELEVATION

T.O. MIRROR

B.O. WOOD PANEL

SEE ELEVATION

SEE ELEVATION

1 4"

PLYWOOD PANEL, WITH LAMINATE FINISH: LAM-104

SEE ELEVATION

4-HOLE UPSIDE-DOWN MOUNTING, HD-102 BALLET BARRE BRACKET AS SCHEDULED

1 4"

B.O. MIRROR

1 4"

AE-101 ACOUSTIC PANEL AS SCHEDULED

WD-105 BARRE RAIL AS SCHEDULED

WD-105 BARRE RAIL AS SCHEDULED

TAPE OVER FASTENERS AND WALL EDGE OF J-CHANNELS AT TOP AND BOTTOM, TYP.

AE-101 ACOUSTIC PANEL AS SCHEDULED

NEOPRENE OR SILICONE SETTING BLOCKS AT BOTTOM CHANNEL AS REQ.

AE-F-101 - ACOUSTICAL WALL PANEL FABRIC TO WRAP ACOUSTIC WALL PANEL AS SCHEDULED

STUDIO FINISHED FLOOR AS SCHEDULED

4"

4" SEE ELEVATION

WD-104/PT-102 AS SCHEDULED

SEE ELEVATION

STUDIO FINISHED FLOOR AS SCHEDULED

1 4"

T.O. FINISH FLOOR

T.O. BASE WD-104/PT-102 AS SCHEDULED

T.O. FLOOR FINISH

1 4"

B.O. MIRROR SEE ELEVATION

1 4"

1 4"

1/2" X 1/2" X 12GA ALUM. J-CHANNELS AT TOP AND BOTTOM - W/ MIRRORED FINISH

SEE ELEVATION

Studio Wall Details With Mirror and Barre

Studio Wall Details With TRX and Barre

11


COUNTER TOP AT HIGH COUNTER AS SCHEDULED, ST-100

A PROVIDE FOLD UP ADA SHELF.

1/4" CONTINUOUS REVEAL, TYP.

Reception Desk Elevation

COUNTER-TOP MATERIAL AS SCHEDULED, ST-100

POINT OF SALES 1 4"

CONTINUOUS REVEALS, SEE ELEVATION

FOLD UP ADA SHELF

LAM-103 AS SCHEDULED ON PLYWOOD SUBSTRATE

ACCESS PANEL FOR WIRE WAY ACCESS 2" PLYWOOD AT BOTTOM SHELF

SCRIBE TO FLOOR

Reception Desk Section A


BACKLIT MIRROR MR103 WITH LED LTGH-203 AS SCHEDULED

B.O. FIN. CEILING +10'-4" AFF

1'-8"

1'-8"

1'-8"

PAINT PT-104 AT CURVED WALL AS SCHEDULED

GRAB BARS AS SCHEDULED

B.O. FIN. FLOOR +0'-0" AFF

SHOWER DOOR AND HAND PULL AS SCHEDULED

4" PAINTED BASE AS SCHEDULED, TYP

Women Bathroom Elevation

℄ CONTROLS B.O. FIN. CLNG. VARIES, SEE RCP

SHOWER FIXTURES AS SCHEDULED

SHOWER FIXTURES AS SCHEDULED

EQ.

6"

EQ.

EQ.

GLASS SHOWER DOOR AND SIDELIGHT AS SCHEDULED, SEE DOOR DETAILS

6'-8"

SHOWER SHELF AS SCHEDULED

EQ.

WALL TILE AS SCHEDULED, TYP. 3'-6"

4'-0"

GLASS SHOWER DOOR AS SCHEDULED, SEE DOOR DETAILS SHOWER SADDLE, SEE DETAILS

SADDLE ON CURB, SEE SHOWER DETAILS T.O. FIN. FLOOR +0'-0" AFF

EQ.

PULL HANDLE SCHEDULED, SEE DOOR DETAILS

SHOWER FIXTURES AS SCHEDULED

GLASS SHOWER DOOR AS SCHEDULED, SEE DOOR DETAILS

EQ.

A

ALIGN T.O. BASE TILE WITH TILET OUTSIDE SHOWER, TYP.

B Shower Stall Detail Elevations

SADDLE ON CURB, SEE SHOWER DETAILS

C

D


TWO-WALL GRAB BAR AS SCHEDULED, PROVIDE BLOCKING

+/- 621"

PLUMBING FIXTURES AS SCHEDULED

EQ.

EQ.

1 8" GAP

DRAIN TYPICALLY CENTERED U.N.O., SEE PLANS

1178"

SHOWER DOOR AS SCHEDULED, SEE DOOR DETAILS

D

OPENING, DRAIN

3'-0" HOLD (FINISH FACE)

A

3 8"

GLASS

B

C

6" SADDLE

2'-0"

4 -

CONTROLS, SHOWER HEAD, DRAIN

SHOWER SADDLE ON CURB AS SCHEDULED, SEE SHOWER DETAIL AND FINISH SCHEDULE

3'-0" FINISHED FACE (HOLD)

FULL HEIGHT BLOCKING AT SHOWER JAMBS, TYP. CORNER TRIM PER DETAILS

Shower Stall Detail Plan

(SHOWER INTERIOR)

BUILT-UP END POST W/ CONTINUOUS WOOD BLOCKING AS SHOWN

HARDWARE AS SCHEDULED SEE DETAILS FOR WALL ASSEMBLY

LINE OF CURB BELOW

1 8"

ALIGN SCHLUTER-JOLLY, IN BRUSHED STAINLESS STEEL. TYP. AT OUTSIDE CORNERS

03B

LINE OF CURB BELOW HARDWARE AS SCHEDULED BA-109 TOWEL HOOK

Shower Frameless Glass Door Jamb Detail

K-364 FINIAL TRADITIONAL ACCESSORY BRASS

02B


B A R R Y ’ S B O O T C A M P - R O S LY N H E I G H T S Professional Work: Tenant Fit out for Bootcamp Studio 385 Willis Avenue Roslyn Heights, NY 11577 (4,494 SQ.FT.) - Managed Project from Preliminary design to completion - Produced LOD drawing set - Produced SD/DD/CD drawing set - Produced Bidding and Approval drawing set - Coordinated with clients,vendors,MEPF engineers, consultants - Reviewed CA documents

Exterior Elevation

-0'-3 1/2"

22

3 A300

22

21 32

30

32

30

32

21 +0'-4 1/2"

30

1

120B 15 2 20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

30

33 +0'-4 1/2"

35

STUDIO 120 1618 SF

1.5 34

A

32 D

30

35

1 A303

C 2

B

08 11

35

03 32

11 E

SIM.1 A303

1 A303

29

2

E

30

RECEPTION 102 162 SF

50

CS

120A

DS

+0'-4 1/2"

14

09

P2

P3

CP

RP

8

04

19

25 D

2

36

12 11

8

115

1:12

31

P1

1 A400

99

32

PP

11

2

1 A300

120C

MATS

32

36

A

721"

1 A304

B

AV RACK SEC. SRVR

06

HWH

50

HWH

2

2.2

1:12

1 A304

E

16

36 18

C

+0'-4 1/2"

13 07

ET

18

LOBBY 101 207 SF

UTILITY/ STORAGE 115 289 SF

FEC

+0'-4 1/2"

05

2.5

2'-11"

MENS LOCKER RM 110 431 SF

11

10

A 1 A305

D

11

110A

+0'-0" 1 A302

25

11

11 A

11

2 A305

C 110B

B 100A

10

25 17

9

1 A301

C

B

C

A

1

TYP.

D

1'-6"

RETAIL 100 329 SF

1 A401

1 A305

D

3 110C

B

110D

E

+0'-0" 50

EQ 6" FEC

31

13 111B 9 D

19

10

FUEL BAR 103 270 SF

111C

A

25

11

1 A306

B

C

EQ EQ

111D 25

100B

26

3"

DOWN

003B

2

A.5

1 A306

1 A302

E

G

B

3.5

2

WOMENS LOCKER RM 111 538 SF

1 A306

F 17

10

F

2 A300

A

11"

EQ

C

A

111A

E

B 111E SIM.2 D A305

OPEN LOCKERS 105 218 SF

C

Construction Plan

2

C.5

D

4

1 A402

D.5

E


Project:

LAGGED PENETRATION TO ACOUSTIC CEILING AS OCCURS AT ROOF. SEE 2/A-652

RTU - 1 WITH SIDE DISCHARGE AND EXTERIOR DUCTWORK TO ATTIC AND ROOF PENETRATIONS

RTU - 2 & RTU 3 WITH VERTICAL DISCHARGE

EXISTING STEEL DUNNAGE AND RAILS, BY OTHERS N.I.C.

LAGGED PENETRATION TO ACOUSTIC CEILING AS OCCURS AT ROOF. SEE 2/A-652

1 A-650

(PORTION OF DUNNAGE REMOVED FOR CLARITY TO SHOW LAGGED DUCT BEYOND)

RTU 1

RTU 3

Architect of Record:

RTU 2

MARK VETTER

1

MARK VETTER, ARCHITECT 186 PROSPECT PARK WEST SUITE B1 BROOKLYN NY, 11215 Tel: 347.513.7381 Email: mvetter@vetterarchitec

2"

A-650

B.O. JOISTS +12'-6"

3"

3" 1'-621"

B.O. STEEL +11'-5"

STUDIO

421"

12'-0"

10'-521"

9'-10"

NOTE: ALL VERTICAL DESIGN DIMENSIONS TO BE VERIFIED IN FIELD AGAINST LOWEST POINTS OF RELEVANT BEAMS/JOISTS AT STUDIO.

T.O. FIN FL +0'-0"

Professional Seal

01 Studio Sections

Ba

thr

oo

m

RT U

-1

of

Ro RT U

-2

RT U

-3

of Ro ng ili ng Ce ili ic Ce t s h ou nis Ac Fi

l al ll r W Wa o ri te tic Ex ous c A

il A

ta

n

tio

ra

t ne

De

Pe

Re

ce

pti

on

il B

ta

n

tio

ra

t ne

De

St

ud

Pe

l al W all W r rio

ic st

ou

Ac

io

te

Ex

ductwork from RTU-1

ductwork from RTU-2

ductwork from RTU-3


08

1 1/2" = 1'-0"

09

1 1/2" = 1'-0"

1 1/2" = 1'-0"

OPEN TO BEYOND

CN-6 ACCESSIBLE COUNTER @ 34" AFF

CN-6 COUNTER @ 43" AFF

WP-5, RECLAIMED WOOD PANELS

B-2

Fuel Bar Front Elevation 2A

5A 10'-1121"

16

9 A401

2 A401 A

R

1'-10"

"

=1

2'-1"

7 A401

1'-

7"

2"2" 4'-1

"

6"

R = 1"

"

2'-6

"

5"

2"

1'-7

3 A401 S-3

GT

S-2

151°

9 A 4

C 3A

8'-1121"

A

3 A401 B

3 10 A401

1'-6" 7"

33

1

S-6

01

5

Fuel Bar Plan

2'-8"

5"

1'-0"

6"

1'-1"

7

5 A401


CN-6 COUNTER @ 43" AFF

4

GC TO PROVIDE CLEATS FOR COUNTER SUPPORT AS REQUIRED

10" CLEAR MIN

2

1'-6"

GT B-7

EQ.

FRP-3

3A

3'-2"

2'-10"

S-2 1'-6"

3'-7"

2 S-3

EQ

Fuel Bar Elevation 3A

CN-6 COUNTER @ 43" AFF

3'-5" 1'-6"

3'-7"

FRP-2

4

B-7

3C

4'-1134"

Fuel Bar Elevation 3C

3A 5

CONTINUOUS CN-2 STAINLESS STEEL COUNTER @ 41" AFF S-6

FRP-3

3A

3

33

1

CABINET DOOR AT DIPPERWELL

Fuel Bar Elevation 3B


T I G H T E N E D

G R O U N D

Academic Project: Spring 2017 (~ 160,000 sq.ft.) The group project was part of Kulturforum complex ; surrounded by distinguish architectures by Han Scharoun and Mies van der Rohe. - Site Analysis Diagrams - Massing + Master Plan Diagrams - Structural Studies + Diagrams - Post production rendering - Roof Plan + Elevations

Urban Context

Circulation Flows

Site

Massing with Context

Connectivity among the Complex

Proposal

Massing Alone

Underground Auditorium (Acoustic purpose)

Ground-Level Reception


3

1

2 1 St. Matthäus-Kirche Church 2 Neue Nationalgalerie 3 Berliner Philharmonie


F aFa c acaddee

J oJo i si st t

G Gl l a as ss s MMuul l lii o n WWa a l ll l PPa a nne ll S pSp a ac ce e FFr r aam me B Bo o n nee SStr t r u ctu c t ur er e

F lFlo ooorr PPll a te tes

S iSi t ete DDeessii g n RR a iani n W a tte e rr Gu G utte t t re r Wa

A Au u ddi itto o r iiuummStr S turctu u c rteu r e

A Aco c o uussti t i c Pa P anneel l

RR e teatai n W al l l i niin g Wa S uSu p p poorrttii nngg Wa W al l l( lBu( ttr B uetss) tress)

V Ve e r tr tii cca a l CC iirrcu c ul al tia ot ni o n

i nii n g Wa RR e teatai n W al l l s Wa S hSh e ea ar r W a ll l s

P aPa r kr ki i nngg

Exploded Structural System Diagram


O P E N - T O - C O N N E C T

H O U S I N G

Academic Project: Fall 2016 (~ 36,000 sq.ft.) Mixed use project for commercial space and residence units including common facility. The concept is to encourage interaction and visual connection among residents through semi-public space corridor




B

O

X

O

F

C

H

O

I

C

E

Professional Project: Summer 2016 A hotel room prototype designed for Eurostars Hotel Competition to capture corporate rebranding goal and technology advancement.

furnitures

technology

compactness

head board panel

wall interaction wallsurface surface interaction with panel


Shoe Racks

Foldable Hangers

Luggage Carrier

Back Side of Bedhead

Work Station

Top-Down Bed Light

Front Side of Bedhead

Projecting Panel


W

I

S

D

O

M

M

A

C

H

I

N

A

Academic Project: Spring 2016 (~ 20,000 sq.ft.) Elementary School at pier 11 in Financial Distrinct. Adopting Falkirk Wheel as a site precedent to developa space on water.


A D M I R A L

&

M E R I G O L D

Personal Mood board for an early 30s woman who works as a video editing artist. The color of the space keeps her energized, while the texture of the stone preserves some touch of nature


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.