PROFESSIONAL WORK MARK VETTER ARCHITECTURE
Sep 2018 - Feb 2020 (New York, USA)
Architectural Designer l Mark Vetter, Principal EXHALE - NOMAD: Tenant Fitout for Yoga and Barre Studio (Manhattan, New York) SOULCYCLE - HYPE PARK VILLAGE : Tenant Fitout for Cycling Studio (Tampa, Florida) SOULCYCLE - PONCE CITY MARKET : Tenant Fitout for Cycling Studio (Atlanta, Georgia) SOULCYCLE - BLOOMFIELD TOWNSHIP : Tenant Fitout for Cycling Studio (Bloomfield Hills, Michigan) BARRY’S BOOTCAMP - ROSLYN HEIGHTS : Tenant Fitout for Workout Studio (Roslyn Heights, New York) -
Project Planning - Coordinated with expertises involved from Due Diligence Report toward Construction Completion. - Conducted space planning to facilitate its program and circulation regarding codes and egress requirements.
-
Project Development - Established the standard construction documentation including specifications and millwork details. - Reconciled changes and input from all experts involved into Construction Drawing set. - Assisted principal with providing responses and drawings when receiving feedback from DOB.
-
Construction Administration - Reviewed and maintained submittal, RFI, and shop drawing in record with 5-day turnaround reviews. - Attended site-meeting and prepared meeting minutes. - Assisted principal in preparation for punch-list.
CAZA ARCHITECTS
Sep 2017 - Nov 2017 (New York, USA)
Architectural Intern l Laura Del Pino, Supervisor BALER OCEAN CITY PROJECT : Convention center with accommodation and communal space (Philippines) DERLAGO MAUSOLEM : Stand-alone Spiritual building serves as a monument housing tombs (Philippines) -
Fabricated physical model of shell structure.
INTEGRATED FIELD
Jun 2016 - Aug 2016
Architectural Intern l Supakrit Kitcharoenroj, Supervisor
(Bangkok, Thailand)
EUROSTAR HOTEL LAB : Design competition for a hotel room prototype (Barcelona,Spain) -
Won a first runner prize for a prototype hotel room with specific furnitures for bed,working area,closet,and resting area.
UDOMSUK 34 COMMUNITY MALL : Small-scaled shopping mall reflecting specific character of the community. -
Designed a schematic design for Udomsuk 34 community mall and conducted a research + presentation to clients.
EDUCATION PRATT INSTITUTE
Sep 2015 - May 2018 (New York, USA)
Master of Architecture (First-Professional)
THAMMASAT UNIVERSITY
Sep 2008-Dec 2011
Bachelor of Business Administrative (Finance)
(Bangkok, Thailand)
RECOGNITIONS Architecture Merit Scholarship
Aug 2015 - May 2018
Pratt Institute Featured on Pratt GAUD “InProcess Archived2019”
May 2018
Professor Bruce Mau and Joseph Giampietro Featured on Pratt GAUD “InProcess Archived2018”
May 2017
Professor Jonas Coersimeier Assisted teaching for Structure 1 : Structure and Medium and Structure 2 : Materialities and Qualities
Fall 2016 - Spring 2017
Teaching Assistant l Professor Cristobal Correa and Professor Radhi Majmudar
PROFICIENCY Rhinoceros
Adobe Illustrator
Vray
English
Autocad
Adobe Photoshop
Maxwell
Thai
Maya
Adobe Indesign
Lazer Cutting + CNC
Chinese (Mandarin)
Revit
Adobe After Effect
Grasshopper
3Ds Max
Adobe Premiere
3D Printing
Mark Vetter
Mark Vetter Architecture
mvetter@vetterarchitecture.com
(347) 513-7381
Jonathan Bucholtz
Mark Vetter Architecture
jbucholtz@vetterarchitecture.com
(262) 893-4111
Tyler Johnson
Henderson Engineers Inc
tyler.johnson@hendersonengineers.com
(913) 742-5537
Alyssa Case
Soulcycle
alyssa.case@soul-cycle.com
(646) 755-6861
Kevin Klein
Agile Networks
kevin@agilenet.works
(678) 386-9030
REFERENCE CONTACTS
E X H A L E
-
N O M A D
Professional Work: Tenant Fit out for Yoga and Barre studio and Spa 31 East 32nd St. New York, NY 10016 (3,622 SQ.FT.) - Lead Designer - Site Survey - Managed Project from Preliminary design to completion - Produced SD/DD/CD drawing set - Produced Bidding and Approval drawing set - Coordinated with clients,vendors,MEPF engineers, consultants - Reviewed CA documents
DISPENSARY MECHANICAL 111 112 131 SF 43 SF
09
STORAGE
31 30
31 30
12 30 31
30 31
A B
2 A311
104B 28
31 30
30 31
AUDIO
94
WOMEN BATHROOM 103 299 SF
D
C
82
30
1 A305
B 3 A305
A
B
103B
29
06
04 05 21 14
85
D
32
28
26 96
1 A302
B
A 1 A303
B
26
A
28
27
86
32 31
31
C
102C
103A
26 28
2 A304
31 30
50
14 04 05 21
103C
A
A
10
10
06
C
12
12
102A
28
1 A304
D
28
1 A311
103D
A
112
RETAIL 100 199 SF
06
STUDIO 104 1085 SF
01 02 33
31
MEN BATHROOM 102 269 SF
14
D
28
50 100
D 16
C
26
14
C 104A
A
29
D
1 A307
B
C 110
111
26
C
109
2 A309
B
23
28
28 22
23 28 28
27
RECEPTION 101 125 SF
C
26 28
07 A
A
1 A308
B
D
26 28
2 A308
B
C
POS
D
C
27
26 28
POS
12
101A
106
27
14 POS
2 A310
C
TREATMENT 4 107 81 SF
23
14 A
105
108
107
23
D
1 A306
D
C
A
CORRIDOR 120 188 SF
1 A301
B
C
28
D
23
28
2 A305
B
26 28
A
2 A307
B
TREATMENT 2 109 103 SF
A 23
A
26 28
TREATMENT 1 110 103 SF
27
23
27
92
18
A
D
101B
1 A309
B
C
D
FEC
AED
ZEN LOUNGE 105 117 SF
TREATMENT 5 106 94 SF
03
CORRIDOR 125 417 SF
C
TREATMENT 3 108 94 SF
Construction Plan
DISPENSARY MECHANICAL 111 112 131 SF 43 SF 02
EQ.
L3 1'-4" 10'-321"
25
L3
EQ.I
L6
EQ 3'-0"
EQ
25 12
L3
SPK EQ EQ 3'-0"
C-1 (PT-101) 7'-6" AFF
L3
L3
1'-10" EQ 31 27
EQ
EQ 3'-0"
L6
EQ
L3
L6
SPK EQ EQ 3'-0"
28
EQ
L3 EQ
C-1 (PT-101) 7'-6" AFF
2'-8" 31
27
L6
CYL6
02 24 CYL6
CYL6 X1/C EQ
03
EQ
CYL6
EQ EQ
1'-5"
UT
X2
EQ.H
e ected
eiling lan
EQ
1'-8" CYL6 SPK
L7
EQ
24
1'-8" 1'-7" CYL6 CYL6 SPK
1'-8" CYL6 11" 11"
EQ
02 03 01
16
X2
1'-8" CYL6
12 EQ
EQ
EQ EQ
L5 L5
L5 1'-841"
3'-421"
L5 EQ.N
09
X1/W
B.O. BEAM 16 (PT-101) 15'-6" AFF EXPOSED DECK (PT-101) 16'-3 3/4" AFF
℄
℄
℄
POS = PENDANT POS = PENDANT POS = PENDANT
96
EQ EQ
EQ EQ
EQ EQ
EXPOSED GIRDER (PT-101) 14'-6 1/2" AFF 27
L6
RECEPTION 101 125 SF
CORRIDOR 125 417 SF
L5 L5
WAP
32
EQ.N
12 SPK
LTGH-107 LTGH-107 LTGH-107 POS POS POS
SPK
ZEN LOUNGE 105 117 SF
L5
7'-0" L5
L5
L7
L1
08 12
L5
C-1 (PT-101) 10'-4" AFF
EQ.D
12
7"
EQ.D L1
LTGH 203 LTGH 203
SPK
L4
SPK
3'-4"
L1
21 12
EQ
MATCH 'C'
EQ
L1
L7
L1
3'-5" VIF
1'-6"
L5
L5
L2 EQ
L5
EQ
81
1 1'-1" 1'-62"
09
3'-2"
L5
12
EQ 24
L5 LTGH-101
81
L5
CYL6 12
TREATMENT 5 106 94 SF
L7 B.O. CAB.
L2
02
C
1'-2"
EQ EQ
L5
EQ
4'-621"
CYL6 SPK
4'-6"
'C'
C-1 (PT-101) 9'-4" AFF
08
EXPOSED GIRDER (PT-101) 15'-1 3/4" AFF
X1/W
L1
EQ.E EQ.E EQ EQ L1
L1
10"
EQ 01 03
L3 C-1 (PT-101) 10'-0" AFF
EX. CEILING (PT-101) 7'-6" AFF 27
EQ.E
L1
08
08
1'-9"
80 21
L1
C-1 (PT-101) 9'-4" AFF
L7
L1 SPK EQ.D EQ.D
CYL6
EQ 12
CYL6
X1/C EQ.L 09
95
EQ 1'-6"
EQ
L3
SPK 12
L1
26 2'-9"
1'-2" L6
10'-1"
SPK 12
12
EQ
25 2'-021"
CYL6
EQ
1'-8"
EQ
2'-921" 1'-9"
L3 02
10'-321"
C-1 (PT-101) 7'-6" AFF EQ
31
3'-3"
SPK 1'-2" 12
12
2'-0" SPK
EQ.H
3'-10"
80
X2
CYL6
C-1 (PT-101) 10'-0" AFF L6
'X'
3'-7"
L3
3'-121" V.I.F.
C-1 28 (PT-101) 10'-0" AFF L3
L3
MATCH 'X'
EQ.I
12
EQ
2'-0"
25
25
27
EQ
5'-0"
12
EQ
L6
EQ
EQ
EQ.E EQ EQ
1'-0"
L7
SPK
5" EQ
10'-321"
EQ
5'-0"
CYL6
12
9" L2
12 L7
L3
L7 B.O. CAB.
SPK
L3 EQ
L3
EQ X1/W
2'-0"
SPK
L3
EQ
2'-6"
1'-11" V.I.F.
EQ
EQ.L
TREATMENT 4 107 81 SF
L3 EQ
2'-5"
7"
SPK
L3
25
L3
02
SPK
2'-6"
1'-9"
31
2'-0"
EQ
2'-0"
X1/W
2'-3"
TREATMENT 3 108 94 SF
L3
12
L7 B.O. CAB.
L6 T.O. CAB.
L7 B.O. CAB.
1'-8" EQ
1'-8"
TREATMENT 2 109 103 SF
CORRIDOR 120 188 SF
L3
31 8"
TREATMENT 1 110 103 SF
L3
12
1'-1121"
EQ
L3
24
C-1 (PT-101) 10'-0" AFF
L6 T.O. CAB.
C-1 (PT-101) 10'-0" AFF
L7 B.O. CAB.
EQ
EQ
80
3'-1"
EQ EQ
21 LTGH 203
SPK
9"
EQ.B L1
L4
25
EQ.B 82
6'-0"
421"
82
EQ.A L2
SPK
09
L1
3'-7"
08
2'-5"
12
12
4'-0"
2'-7"
K
L15 1'-8"
1'-5"
SP
L15C-2 (PT-101) 13'-0" AFF
1'-8"
4'-0"
L1
1'-221"
L15
1'-934"
X2
1'-8"
2'-3"
LTGH 203
WAP
L9A-8 ACT 9'-0" AFF
3'-5" V.I.F.
2'-10"
01
EQ.A
80
C-1 (PT-101) 10'-4" AFF 3'-021" VIF 'C'
MATCH 'C'
82
SPK
L1
LTGH 203
EQ.A L2
12 21
L15 08
EQ.A
82
199 SF
EQ
3'-2"
13'-3"
9"
EQ.B L1
C-1 RETAIL (PT-101) 9 TILES AFF 100 TYP. AT ALL SHOWER
L5
81
EQ.B
MEN BATHROOM 102 269 SF
L5
15
L15
9"
L2 7'-3"
91
L2 81
11 02
EQ
WOMEN BATHROOM 103 299 SF
EQ.H L1
EQ
STUDIO 104 1085 SF
℄
EQ
1'-8"
4'-721"
1'-8"
1'-2"
EQ
EQ.H
L5
21
UT
EQ.G
L2
X2
91
9" 8" L5
EQ.G L15
EQ EQ
c
EQ
L12
c
9"
L12
c
EQ
L12
c
EQ
L12
c
9"
L12
b
EQ
L12
b
EQ
L12
b
EQ
L12
b
EQ
L12
b
EQ
L12
a
2'-11"
L12
a
2'-7"
L12
a
2'-0" V.I.F.
L12
a
3'-0"
L12
a
EQ
1'-0"
EQ
2'-521"
EQ
2'-521"
EQ
2'-521"
EQ
2'-521"
EQ
2'-521"
1'-4"
2'-521"
1'-2"
2'-521"
1'-10"
2'-521"
EQ
2'-521"
EQ
2'-521"
1'-8"
2'-521"
K
841" L15 2'-521"
7'-3"
5'-4"
2'-521"
L15
L12 L15
3'-3"
L15
SP
12
90
EQ
2'-521"
EQ
02
℄
12
EQ
K
SP
2'-3"
UT
1'-2"
1'-841"
EQ.
4'-721"
3'-2"
EQ
2'-10"
02 EQ
13
WD - 100 WOOD STRIPES ON WD-101 WOOD PANELS, EACH AS SCHEDULED
WATER DISPENSER BY OWNER NIC.
B.O. DECK +16'-3 3/4" AFF B.O. BEAM +15'-6" AFF
CYL-6 CABLE MOUNT FIXTURE AS SCHEDULED
PAINT PT-101 TYP. B.O. FIN. CEILING +10'-0" AFF
B.O. EGRESS BRIDGE +7'-6" AFF
PF-100, DRINKING FOUNTAIN AS SCHEDULED
B.O. FIN. FLOOR +0'-0" AFF
OPENING FOR TRASH SHELF
COFFEE STATION MILLWORK, SEE DETAILS A-507
4" PAINTED BASE AS SCHEDULED, TYP
BENCH WITH SHOE CUBBIES MILLWORK SEE DETAILS A508
Hallway West Elevation
PAINT PT-100 AS SCHEDULED
B.O. DECK +16'-3 3/4" AFF B.O. BEAM +15'-6" AFF
LGTH-101 PENDENT LIGHT FIXTURES AS SCHEDULED
B.O. GIRDER +14'-5 1/2" AFF
WD - 100 WOOD STRIPES AS SCHEDULED
OPEN TO BEYOND
6'-8"
B.O. FIXTURE +10'-0" AFF
B.O. FIN. FLOOR +0'-0" AFF
4" PAINTED BASE AS SCHEDULED, TYP
CG-108, RETAILS WALL SHELVES AS SCHEDULED
Reception North Elevation (before entering Hallway)
B.O. CEILING FINISH
SEE ELEVATION
SEE ELEVATION 1 4"
1 4"
B.O. CEILING FINISH
CORNER BEAD AT GWB REVEAL EDGES, TYP.
CORNER BEAD AT GWB REVEAL EDGES, TYP.
(1) LAYER GWB LAMINATED, ABOVE MIRRORS. FINISH PAINT PT-100 AS SCHEDULED
(1) LAYER GWB LAMINATED, ABOVE PLYWOOD. FINISH PAINT PT-100 AS SCHEDULED
FURROUT OR PARTITION AS SCHEDULED
FURROUT OR PARTITION AS SCHEDULED
1 4"
09
℄
CL. OF TRX
T.O. MIRROR
1 4"
SEE ELEVATION
10
PLYWOOD TO MATCH FINISH AE - F -101 -APPLIED
SEE ELEVATION NEOPRENE OR SILICONE SETTING BLOCKS AT BOTTOM CHANNEL AS REQ.
WALL MOUNTED TRX, EQ-106
1/2" X 1/2" X 12GA ALUM. J-CHANNELS AT BOTTOM - W/ MIRRORED FINISH TAPE OVER FASTENERS AND WALL EDGE OF J-CHANNELS AT TOP AND BOTTOM, TYP.
CL. OF TRX
℄
ADHERE MIRROR TO WALL USING COMBINATION OF SILICONE AND 'CRL' HEAVY BODIED MIRROR MASTIC OR APPROVED EQUAL. ALLOW 24 HOURS DRYING TIME BEFORE ROOM IS IN USE.
SEE ELEVATION
T.O. ACOUSTIC PANEL
1 4"
MR-100 MIRROR AS INDICATED IN ELEVATIONS
SEE ELEVATION
AE-F-101 - ACOUSTICAL WALL PANEL FABRIC TO WRAP AE-101 ACOUSTIC WALL PANEL AS SCHEDULED
1 4" T.O. WOOD PANEL PLYWOOD PANEL, WITH LAMINATE FINISH: LAM-104
SEE ELEVATION
4-HOLE UPSIDE-DOWN MOUNTING, HD-102 BALLET BARRE BRACKET AS SCHEDULED CL. OF BARRE
CL. OF BARRE
SEE ELEVATION
SEE ELEVATION
T.O. MIRROR
B.O. WOOD PANEL
SEE ELEVATION
SEE ELEVATION
1 4"
PLYWOOD PANEL, WITH LAMINATE FINISH: LAM-104
SEE ELEVATION
4-HOLE UPSIDE-DOWN MOUNTING, HD-102 BALLET BARRE BRACKET AS SCHEDULED
1 4"
B.O. MIRROR
1 4"
AE-101 ACOUSTIC PANEL AS SCHEDULED
WD-105 BARRE RAIL AS SCHEDULED
WD-105 BARRE RAIL AS SCHEDULED
TAPE OVER FASTENERS AND WALL EDGE OF J-CHANNELS AT TOP AND BOTTOM, TYP.
AE-101 ACOUSTIC PANEL AS SCHEDULED
NEOPRENE OR SILICONE SETTING BLOCKS AT BOTTOM CHANNEL AS REQ.
AE-F-101 - ACOUSTICAL WALL PANEL FABRIC TO WRAP ACOUSTIC WALL PANEL AS SCHEDULED
STUDIO FINISHED FLOOR AS SCHEDULED
4"
4" SEE ELEVATION
WD-104/PT-102 AS SCHEDULED
SEE ELEVATION
STUDIO FINISHED FLOOR AS SCHEDULED
1 4"
T.O. FINISH FLOOR
T.O. BASE WD-104/PT-102 AS SCHEDULED
T.O. FLOOR FINISH
1 4"
B.O. MIRROR SEE ELEVATION
1 4"
1 4"
1/2" X 1/2" X 12GA ALUM. J-CHANNELS AT TOP AND BOTTOM - W/ MIRRORED FINISH
SEE ELEVATION
Studio Wall Details With Mirror and Barre
Studio Wall Details With TRX and Barre
11
COUNTER TOP AT HIGH COUNTER AS SCHEDULED, ST-100
A PROVIDE FOLD UP ADA SHELF.
1/4" CONTINUOUS REVEAL, TYP.
Reception Desk Elevation
COUNTER-TOP MATERIAL AS SCHEDULED, ST-100
POINT OF SALES 1 4"
CONTINUOUS REVEALS, SEE ELEVATION
FOLD UP ADA SHELF
LAM-103 AS SCHEDULED ON PLYWOOD SUBSTRATE
ACCESS PANEL FOR WIRE WAY ACCESS 2" PLYWOOD AT BOTTOM SHELF
SCRIBE TO FLOOR
Reception Desk Section A
BACKLIT MIRROR MR103 WITH LED LTGH-203 AS SCHEDULED
B.O. FIN. CEILING +10'-4" AFF
℄
1'-8"
℄
℄
1'-8"
1'-8"
PAINT PT-104 AT CURVED WALL AS SCHEDULED
GRAB BARS AS SCHEDULED
B.O. FIN. FLOOR +0'-0" AFF
SHOWER DOOR AND HAND PULL AS SCHEDULED
4" PAINTED BASE AS SCHEDULED, TYP
Women Bathroom Elevation
℄ CONTROLS B.O. FIN. CLNG. VARIES, SEE RCP
SHOWER FIXTURES AS SCHEDULED
SHOWER FIXTURES AS SCHEDULED
EQ.
6"
EQ.
EQ.
GLASS SHOWER DOOR AND SIDELIGHT AS SCHEDULED, SEE DOOR DETAILS
6'-8"
SHOWER SHELF AS SCHEDULED
EQ.
WALL TILE AS SCHEDULED, TYP. 3'-6"
4'-0"
GLASS SHOWER DOOR AS SCHEDULED, SEE DOOR DETAILS SHOWER SADDLE, SEE DETAILS
SADDLE ON CURB, SEE SHOWER DETAILS T.O. FIN. FLOOR +0'-0" AFF
EQ.
PULL HANDLE SCHEDULED, SEE DOOR DETAILS
SHOWER FIXTURES AS SCHEDULED
GLASS SHOWER DOOR AS SCHEDULED, SEE DOOR DETAILS
EQ.
A
ALIGN T.O. BASE TILE WITH TILET OUTSIDE SHOWER, TYP.
B Shower Stall Detail Elevations
SADDLE ON CURB, SEE SHOWER DETAILS
C
D
TWO-WALL GRAB BAR AS SCHEDULED, PROVIDE BLOCKING
+/- 621"
PLUMBING FIXTURES AS SCHEDULED
EQ.
EQ.
1 8" GAP
DRAIN TYPICALLY CENTERED U.N.O., SEE PLANS
1178"
SHOWER DOOR AS SCHEDULED, SEE DOOR DETAILS
D
℄
OPENING, DRAIN
3'-0" HOLD (FINISH FACE)
A
3 8"
GLASS
B
C
6" SADDLE
2'-0"
4 -
℄
CONTROLS, SHOWER HEAD, DRAIN
SHOWER SADDLE ON CURB AS SCHEDULED, SEE SHOWER DETAIL AND FINISH SCHEDULE
3'-0" FINISHED FACE (HOLD)
FULL HEIGHT BLOCKING AT SHOWER JAMBS, TYP. CORNER TRIM PER DETAILS
Shower Stall Detail Plan
(SHOWER INTERIOR)
BUILT-UP END POST W/ CONTINUOUS WOOD BLOCKING AS SHOWN
HARDWARE AS SCHEDULED SEE DETAILS FOR WALL ASSEMBLY
LINE OF CURB BELOW
1 8"
ALIGN SCHLUTER-JOLLY, IN BRUSHED STAINLESS STEEL. TYP. AT OUTSIDE CORNERS
03B
LINE OF CURB BELOW HARDWARE AS SCHEDULED BA-109 TOWEL HOOK
Shower Frameless Glass Door Jamb Detail
K-364 FINIAL TRADITIONAL ACCESSORY BRASS
02B
B A R R Y ’ S B O O T C A M P - R O S LY N H E I G H T S Professional Work: Tenant Fit out for Bootcamp Studio 385 Willis Avenue Roslyn Heights, NY 11577 (4,494 SQ.FT.) - Managed Project from Preliminary design to completion - Produced LOD drawing set - Produced SD/DD/CD drawing set - Produced Bidding and Approval drawing set - Coordinated with clients,vendors,MEPF engineers, consultants - Reviewed CA documents
Exterior Elevation
-0'-3 1/2"
22
3 A300
22
21 32
30
32
30
32
21 +0'-4 1/2"
30
1
120B 15 2 20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
30
33 +0'-4 1/2"
35
STUDIO 120 1618 SF
1.5 34
A
32 D
30
35
1 A303
C 2
B
08 11
35
03 32
11 E
SIM.1 A303
1 A303
29
2
E
30
RECEPTION 102 162 SF
50
CS
120A
DS
+0'-4 1/2"
14
09
P2
P3
CP
RP
8
04
19
25 D
2
36
12 11
8
115
1:12
31
P1
1 A400
99
32
PP
11
2
1 A300
120C
MATS
32
36
A
721"
1 A304
B
AV RACK SEC. SRVR
06
HWH
50
HWH
2
2.2
1:12
1 A304
E
16
36 18
C
+0'-4 1/2"
13 07
ET
18
LOBBY 101 207 SF
UTILITY/ STORAGE 115 289 SF
FEC
+0'-4 1/2"
05
2.5
2'-11"
MENS LOCKER RM 110 431 SF
11
10
A 1 A305
D
11
110A
+0'-0" 1 A302
25
11
11 A
11
2 A305
C 110B
B 100A
10
25 17
9
1 A301
C
B
C
A
1
TYP.
D
1'-6"
RETAIL 100 329 SF
1 A401
1 A305
D
3 110C
B
110D
E
+0'-0" 50
EQ 6" FEC
31
13 111B 9 D
19
10
FUEL BAR 103 270 SF
111C
A
25
11
1 A306
B
C
EQ EQ
111D 25
100B
26
3"
DOWN
003B
2
A.5
1 A306
1 A302
E
G
B
3.5
2
WOMENS LOCKER RM 111 538 SF
1 A306
F 17
10
F
2 A300
A
11"
EQ
C
A
111A
E
B 111E SIM.2 D A305
OPEN LOCKERS 105 218 SF
C
Construction Plan
2
C.5
D
4
1 A402
D.5
E
Project:
LAGGED PENETRATION TO ACOUSTIC CEILING AS OCCURS AT ROOF. SEE 2/A-652
RTU - 1 WITH SIDE DISCHARGE AND EXTERIOR DUCTWORK TO ATTIC AND ROOF PENETRATIONS
RTU - 2 & RTU 3 WITH VERTICAL DISCHARGE
EXISTING STEEL DUNNAGE AND RAILS, BY OTHERS N.I.C.
LAGGED PENETRATION TO ACOUSTIC CEILING AS OCCURS AT ROOF. SEE 2/A-652
1 A-650
(PORTION OF DUNNAGE REMOVED FOR CLARITY TO SHOW LAGGED DUCT BEYOND)
RTU 1
RTU 3
Architect of Record:
RTU 2
MARK VETTER
1
MARK VETTER, ARCHITECT 186 PROSPECT PARK WEST SUITE B1 BROOKLYN NY, 11215 Tel: 347.513.7381 Email: mvetter@vetterarchitec
2"
A-650
B.O. JOISTS +12'-6"
3"
3" 1'-621"
B.O. STEEL +11'-5"
STUDIO
421"
12'-0"
10'-521"
9'-10"
NOTE: ALL VERTICAL DESIGN DIMENSIONS TO BE VERIFIED IN FIELD AGAINST LOWEST POINTS OF RELEVANT BEAMS/JOISTS AT STUDIO.
T.O. FIN FL +0'-0"
Professional Seal
01 Studio Sections
Ba
thr
oo
m
RT U
-1
of
Ro RT U
-2
RT U
-3
of Ro ng ili ng Ce ili ic Ce t s h ou nis Ac Fi
l al ll r W Wa o ri te tic Ex ous c A
il A
ta
n
tio
ra
t ne
De
Pe
Re
ce
pti
on
il B
ta
n
tio
ra
t ne
De
St
ud
Pe
l al W all W r rio
ic st
ou
Ac
io
te
Ex
ductwork from RTU-1
ductwork from RTU-2
ductwork from RTU-3
08
1 1/2" = 1'-0"
09
1 1/2" = 1'-0"
1 1/2" = 1'-0"
OPEN TO BEYOND
CN-6 ACCESSIBLE COUNTER @ 34" AFF
CN-6 COUNTER @ 43" AFF
WP-5, RECLAIMED WOOD PANELS
B-2
Fuel Bar Front Elevation 2A
5A 10'-1121"
16
9 A401
2 A401 A
R
1'-10"
"
=1
2'-1"
7 A401
1'-
7"
2"2" 4'-1
"
6"
R = 1"
"
2'-6
"
5"
2"
1'-7
3 A401 S-3
GT
S-2
151°
9 A 4
C 3A
8'-1121"
A
3 A401 B
3 10 A401
1'-6" 7"
33
1
S-6
01
5
Fuel Bar Plan
2'-8"
5"
1'-0"
6"
1'-1"
7
5 A401
CN-6 COUNTER @ 43" AFF
4
GC TO PROVIDE CLEATS FOR COUNTER SUPPORT AS REQUIRED
10" CLEAR MIN
2
1'-6"
GT B-7
EQ.
FRP-3
3A
3'-2"
2'-10"
S-2 1'-6"
3'-7"
2 S-3
EQ
Fuel Bar Elevation 3A
CN-6 COUNTER @ 43" AFF
3'-5" 1'-6"
3'-7"
FRP-2
4
B-7
3C
4'-1134"
Fuel Bar Elevation 3C
3A 5
CONTINUOUS CN-2 STAINLESS STEEL COUNTER @ 41" AFF S-6
FRP-3
3A
3
33
1
CABINET DOOR AT DIPPERWELL
Fuel Bar Elevation 3B
T I G H T E N E D
G R O U N D
Academic Project: Spring 2017 (~ 160,000 sq.ft.) The group project was part of Kulturforum complex ; surrounded by distinguish architectures by Han Scharoun and Mies van der Rohe. - Site Analysis Diagrams - Massing + Master Plan Diagrams - Structural Studies + Diagrams - Post production rendering - Roof Plan + Elevations
Urban Context
Circulation Flows
Site
Massing with Context
Connectivity among the Complex
Proposal
Massing Alone
Underground Auditorium (Acoustic purpose)
Ground-Level Reception
3
1
2 1 St. Matthäus-Kirche Church 2 Neue Nationalgalerie 3 Berliner Philharmonie
F aFa c acaddee
J oJo i si st t
G Gl l a as ss s MMuul l lii o n WWa a l ll l PPa a nne ll S pSp a ac ce e FFr r aam me B Bo o n nee SStr t r u ctu c t ur er e
F lFlo ooorr PPll a te tes
S iSi t ete DDeessii g n RR a iani n W a tte e rr Gu G utte t t re r Wa
A Au u ddi itto o r iiuummStr S turctu u c rteu r e
A Aco c o uussti t i c Pa P anneel l
RR e teatai n W al l l i niin g Wa S uSu p p poorrttii nngg Wa W al l l( lBu( ttr B uetss) tress)
V Ve e r tr tii cca a l CC iirrcu c ul al tia ot ni o n
i nii n g Wa RR e teatai n W al l l s Wa S hSh e ea ar r W a ll l s
P aPa r kr ki i nngg
Exploded Structural System Diagram
O P E N - T O - C O N N E C T
H O U S I N G
Academic Project: Fall 2016 (~ 36,000 sq.ft.) Mixed use project for commercial space and residence units including common facility. The concept is to encourage interaction and visual connection among residents through semi-public space corridor
B
O
X
O
F
C
H
O
I
C
E
Professional Project: Summer 2016 A hotel room prototype designed for Eurostars Hotel Competition to capture corporate rebranding goal and technology advancement.
furnitures
technology
compactness
head board panel
wall interaction wallsurface surface interaction with panel
Shoe Racks
Foldable Hangers
Luggage Carrier
Back Side of Bedhead
Work Station
Top-Down Bed Light
Front Side of Bedhead
Projecting Panel
W
I
S
D
O
M
M
A
C
H
I
N
A
Academic Project: Spring 2016 (~ 20,000 sq.ft.) Elementary School at pier 11 in Financial Distrinct. Adopting Falkirk Wheel as a site precedent to developa space on water.
A D M I R A L
&
M E R I G O L D
Personal Mood board for an early 30s woman who works as a video editing artist. The color of the space keeps her energized, while the texture of the stone preserves some touch of nature