LAM NGUYEN PERSONAL SUMARY With more than six years in the profession, I have demonstrated my extensive experiences of completing project delivery, from initial concept to detailed design, tender, and construction phase with highly successful management skills in a wide range of projects from small to big scale such as residential buildings, commercial and hospitalities.
Beyond that, I maintain a particular interest in BIM’s integration and finding possible solutions in architecture an learning new knowledge.
INFO & CONTACT Year of Birth: 1992 Phone number: (+84) 938 44 66 25 Email: lam.nn@outlook.com Portfolio: Link
EDUCATION 2010 - 2015 I BACHELOR OF ARCHITECTURE HONG BANG INTERNATIONAL UNIVERSITY Graduated and received the top score among approximately 150 students. (highest 2/150) Practiced how to be capable of critical thinking, emphasizing professional ethics and values within the context of social, environmental, and Vietnamese design practice.
ACHIEVEMENTS & QUALIFICATIONS SKILLS 2021 I Autodesk Vietnam Innovation Awards 2021 Innovator of the Year Award - TOP 3 2021 I LEED Green Associate l Cert Prep LinkedinLearningCertificate 2021 I Project Management Professional Atoha Center l Finishing PMP course 2020 I Navisworks Clash Detection LinkedinLearningCertificate 2019 I Practising License of Architecture Viet Nam 2019 I Exellence Employee Award l 2019 TTT Corporation 2018 I Exellence Employee Award l 2018 TTT Architect
Management and Leadership Problem-solving Time management Task organization Interpersonal skills Presentation Design and Creativity Conceptual Design(Architecture / Interior) Documentation Analysis Hand sketching Design software skillset Rendering (3DsMax, Vray, Enscape...) Adobe Suites (Photoshop, Indesign, Premiere...) MS-Project
Building Information Modelling (BIM) AEC Software (Revit, Naviswork, Dynamo...) CDE Platform (BIM 360, Procore...) AR/VR Application (Dalux, Unity, Irish...) 2016 I RevitArchitectureCertifiedProfessional Autodesk 360 Application (HoloBuilder, Matterport ...) 2017 I Fundamental Course on Energy Simulation & Building Performance Analysis
WORK EXPERIENCES
TTT CORPORATION l Jan 2020 - Now BIM MANAGER l SERNIOR ARCHITECT - Partner with Board of Director/Chairman/ Department Managers to create and maintain BIM content to maximizeinteroperabilityandBIMworkflowsthroughoutTTT’sprojectdeliveryframework - Coordinate with Tender Department at Bidding Stage of BIM Projects to win the projects. - Interface with clients, design teams, and contractors implementing BIM methodologies and best practices from strategy level to project delivery. Lead orparticipateinBIM-specificresearchortechnology-relatedR+De»ortandspecialproj organization apprised and prepared for next generation solutions. - Self-manage and report directly to Design Principal in some architecture design projects. + BIM projects in charge: - Hong Ngoc Private Hospital - 500 beds l Ha Noi; - Porsche Showroom - 4000 m2 l Ho Chi Minh; - Others Revit Projects not require BIM (~30 projects);
+ Architecture projects: - SeaStars Hotels - Facade Design l Ha Long; + R&D projects: - Twin BIM, Cupix, 360 camera, Point cloud, VR/AR...;
TTT ARCHITECTS l Jan 2018 - Jan 2020 SERNIOR ARCHITECT l PROJECT LEADER - Self-managed and reported directly to Design Manager/ Director; closely assisted them in designing to meet the aestheticism & standard. - Liaised with clients and consultants (structure, MEP, .) to find creative architectural s project conditions and deadlines. - Managed sub-consultants works (modeling, sub-contractors, etc) and members; assigned individual responsibilities. - Responsible for on-site measurements, construction inspection that relied on RFI/RFA and compliance warrantwiththedesignspecifications. - Monitored training and supervised junior designers to provide good design and standard detailing. + Architect projects in charge: - Asiana Capella - 45,000 sqm l Ho Chi Minh; - Diamond Central Townhouse - 68 units l Bien Hoa;
+ Preliminary / Concept projects: - Genimex Apartment - 50,000 sqm l Binh Duong; - Tan Uyen Commerciall Mall - 20,000 sqm l Binh Duong; - DGL Resort l Phu Quoc;
SICART & SMITH ARCHITECTS l Apr 2016 - Dec 2017 ARCHITECT / PROJECT LEADER - Partnered directly with two Design Directors, assisted them in small-scale and some medium-scale projects. - Collaborated with colleagues from the initial phases (preliminary study, concept) to completion (basic design, detail design). - Coordinated with other sectors/studio such as planning, electrical, mechanical, supplier…etc. - Managed the drawing design, drawing control works. + From Concept to Development / Detail design: - Holiday Inn - Republic plaza l Ho Chi Minh; - Ariyana Hotel l Nha Trang; - Palm Palisade l Kosamui ThaiLan;
+ From Concept to Development / Detail design: - Holiday Inn - Republic plaza l Ho Chi Minh; - Ariyana Hotel l Nha Trang; - Palm Palisade l Kosamui ThaiLan;
REFERENCES DOAN TRUNG KIEN R & D DIRECTOR l TTT CORPORATION kien.dt@ttt.vn
TRAN KHANH TRUNG CO-FOUNDER l TTT CORPORATION trung@ttt.vn
CONTENTS
SELECTIVE WORKS 2015-2021
BIM MANAGER
MANAGEMENT / SITE COORDINATE CONSTRUCTION DRAWING SHOPDRAWING /AS-BUILT DRAWING
.1
HONG NGOC HOSPITAL GFA 78,000 sqm I 500 beds INTERIOR CONTRACTOR HA NOI I 2020-2021
.7
.6
COMPUTATIONAL APPLICATION
BAN ANG WELCOME CENTER
SOFWARE I HARDWARE
PROJECT PARTNER
ARCHITECTURE I INTERIOR MANUFACTURING REVIT I DYNAMO I PYTHON I INVENTOR I WOODWORK I HOMAG CNC
ARCHITECTURE MOC CHAU l 2022
CONCEPT - SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DRAWING
PROJECT LEAD
DESIGN ARCHITECT
CONCEPT DESIGN COMPETITION PROJECT
.2
GENIMEX APART GFA 57,000 sqm I 2619 units ARCHITECTURE BINH DUONG I 2018
CONCEPT - SCHEMATIC DESIGN DESIGN DEVELOPMENT
.3
PACIFIC PALISADE 26 VILLAS ARCHITECTURE THAILAND I 2017
HƯƠNG MẠI - DỊCH VỤ - VĂN PHÒNG ASIANA CAPELLA
uận 6, TP.HCM
PACIFIC - PALISADES
KOH SAMUI - BANG PO, SOI 4 21st - APRIL - 2017
.5
.4
ASIANA CAPELLA GFA 45,000sqm I 391 units
CENTRE MEDICAL INTERNATIONAL
ARCHITECTURE HCM l 2018-NOW
PROJECT LEAD
CONCEPT - SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DRAWING
ARCHITECTURE HO CHI MINH I 2017
PHỐI CẢNH MẶT ĐỨNG
PROJECT LEAD
CONCEPT - SCHEMATIC DESIGN DESIGN DEVELOPMENT
.1
HONG NGOC
HEALTHCARE I BIM PROJECT INFORMATION LOCATION : HA NOI REPUTATION: GFA 78,000 sqm l 500 beds DATE : 2020-2021 SOW : BIM MANAGER, MANAGEMENT, SITE COORDINATE, CONSTRUCTION DRAWING, SHOPDRAWING, AS-BUILT DRAWING
ABOUT THE PROJECT.
Scale: 16 levels with 2 basements, covering a 2.5 hectare area. First hospital in Vietnam to be designed according to the UK Government’s Health Building Notes. Approximately 100 million USD in total. The interior work is about 8 million USD. Unique large-scale project to apply BIM for entire interior design, manufacture, and installation.
ASEAN INNOVATION AWARDS 2021 (VN)
TOP 3 IN VIETNAM YOUTUBE NEWSPAPER
ACCURATE A QU NTITY TAKE-OFF A
M T O . T
IRISHVR SIMULATION.
INVENTOR FOR FURNITUR
INVENTOR FOR FURNITUR.
n20categories, Applysuch Inventor as: in replacement of 2D Auto CAD drawings in Furniture Design to combine with BIM model.
O
D
R A
COMBINATION
.2
CAPELLA CAPELLA RESIDENTIAL I ARCHITECTURE INFORMATION LOCATION : DISTRIC 8 - HCM CITY REPUTATION: GFA 45,000 sqm l 391 units DATE : 2018-NOW SOW : PROJECT LEAD, CONCEPT DESIGN, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, CONSTRUCTION DRAWING
ABOUT THE PROJECT. Asiana Capella owns a strategic
location right in front of Tran Van Kieu street, which is the center of the modern and bustling Binh Phu residential area. This project was formed with the mission of creating a new future for Sai Gon – Cho Lon area. It is not only a luxury apartment combined with high quality of commercial and service, but also a new and outstanding highlight in District 6 with its breakthrough architectural design.
NG CƯ KẾT HỢP THƯƠNG MẠI - DỊCH VỤ - VĂN PHÒNG ASIANA CAPELLA
n Văn Kiểu, Phường 10, Quận 6, TP.HCM
CHUNG CƯ KẾT HỢP THƯƠNG MẠI - DỊCH VỤ - VĂN PHÒNG ASIANA CAPELLA 184 Trần Văn Kiểu, Phường 10, Quận 6, TP.HCM
MẶT BẰNG TỔNG THỂ
PHỐI CẢNH TỔNG THỂ
PHỐI CẢNH MẶT ĐỨNG
lected Projects using Revit
c dự án sử dụng Revit án: Asiana Capella điểm: Quận 6, TP.HCM
h trạng: Đang hoàn thiện
2018
e w eks devlopmnt phase.
.
Submited orem than to ensur the dealins wer met during the design
40 A0 drawings in 3
2019
.
Sale galery opend.
.3
GENIMX
RESIDENTIAL I COMPETITION PROJECT TION FRMA OVINET:BHDUGPR CA L A45,0sqml391unit TION:GF A REPUT TE:2018 AD ONCEPTDSIG, JLAW:R
PHỐI CẢNH 3D
PHỐI CẢNH 3D PHƯƠNG ÁN 2
PHƯƠNG ÁN 2
T R U N G S
Â
N
G
O
L
F
T
W
I
N
T Â M D
O
9,478m2 LÔ C2
H À N H V
Q H E S
C H Í N H T Ổ N G
T Ỉ N H T H Ể
S
MB TOÀN KHU
Â
N
G
O
L
F
T
W
I
N
D
O
D
O
9,478m2 LÔ C2
LÔ C1 7,022m2 Hướng nhìn đẹp
KHU THƯƠNG MẠI
KHU THƯƠNG MẠI
T H Ị S
Â
N
G
X Ã O
T H Ủ L
F
D Ầ U T
W
I
VIEW ANLSIY S
LOTICA ON ANLSIY S
Khu vực Giáo dục đa chức năng
M Ộ T N
D
O
9,478m2 LÔ C2
V
Q H E S
T Ổ N G
T H Ể
S
MB TOÀN KHU
Â
N
G
O
L
F
T
W
I
N
9,478m2 LÔ C2
LÔ C1 7,022m2
2020 KHU THƯƠNG MẠI
KHU THƯƠNG MẠI
Công viên + sân chơi trẻ em
CES A ANLSIY S THÁP C1-I (8 CH/tầng)
THÁP C1-L (17 CH/tầng)
K H U
Khu vực bố trí shophouse
GREN ARE ANLSIY S
C 2
M B TẦ N G 3 - 1 2
D 1
THÁP C2-A (12 CH/tầng)
CH TẦNG ĐIỂN HÌNH KHU C1
ố DT ợng GROSS
TỔNG DT GROSS
4 3 1
m2 48.2 62.9 78.2
m2 192.8 188.8 78.2
8 8 1
45.4 63.4 78.3
363.5 507.4 78.3
2 1 2
46.4 63.3 78.2
556.3 696.1 156.5
m2 459.8 567.9 949.2 1,140.9 1,408.9
Tỉ Lệ Căn Hộ % 50.00 37.50 12.50
Tỉ Lệ DT NET/ DTXD
5
%
NỘI DUNG
Đ ƯỜ N G
THỐNG KÊ DIỆN TÍCH KHU C2 STT
Căn hộ STUDIO (CH. A) Căn hộ 1 PN (CH. B) Tầng 3-12 Căn hộ 2 PN (CH. C) KT - Phụ Trợ
ĐVị m2 m2 m2 m2
Số Lượng 18 12 6
DT 725.4 607.2 372.0 305.7
Tổng DT
2010
THÁP C2-B (12 CH/tầng)
74.77
47.06 47.06 5.88
76.85
48.00 44.00 8.00
76.16
1,708.8
PHƯƠNG ÁN 1
Đ ƯỜ N G
C H Í N H
TYPICAL BLOCK C1
N 1
Đ ƯỜ N G
C H Í N H
N 1
TYPICAL BLOCK C2
K H U V
E
C 1
Chỗ giặt phơi và đặt dàn nóng máy lạnh
S
MẪU CĂN HỘ
LÔ C1 7,022m2
KHU THƯƠNG MẠI
KHU THƯƠNG MẠI
Chỗ giặt phơi và đặt dàn nóng máy lạnh
ON ANALYSIS V
E
S
K H U
C 1
MẪU CĂN HỘ LÔ C1 7,022m2 PHƯƠNG ÁN 1
WC2
KHU THƯƠNG MẠI
WC1
KHU THƯƠNG MẠI
Chỗ giặt phơi và đặt dàn nóng máy lạnh
/officetel
EA ANALYSIS K H U C 1 MẪU CĂN HỘ
PHƯƠNG ÁN 1
WC2 THÁP C2-C (12 CH/tầng)
AL BLOCK C2 PHƯƠNG ÁN 1
WC1
DESIGN CHALENG naturlyshoedvi.Lmpwg,-facing -windoaNrth Southrienaspfd.
. Thelivngrom,bdacs
.4
CENTRMDIAL’
HEALTHCARE I ARCHITECTURE TION FRMA TION: CA L TE: AD SOW:
HO CHI MINH 2017 PROJECT LEAD, CONCEP, DESIGN DEVELOPMENT
EXISTING BUILDING. Passing the gate, one
reaches the land - very enclaved - and the building by a long alley. Vegetation has developed strongly, invading the site and degrading facilities. The sports ground is no longer in a state of repair and the roots of the trees damage the facilities. The electrical installation (cables, switches) and part of the door frames have been degraded or even vandalized.
PAST
FRENCH PRE-SCHOOL
PRESENT
NON-PROFIT CENTRE MEDICAL INT’L CMI were created by the
Prof. Carpentier Foundation. CMI is a non-profit organization whoseprofitsareusedexclusive tofinanceoperationsattheHea Institute for the benefit - of Vi namese children from low-income families. In 25 years, humanitarian action carried out thanks to the CMI has saved 4,000 children.
.5
ALISDEV CFP
26 VILLAS I ARCHITECTURE
TION FRMA TION: CA L TE: AD
KOH SAMUI, THAILAND 2017 - NOW SOW: DESIGN ARCHITECT, CONCEPT , SCHEMATIC DESIGN, DESIGN DEVELOPMENT
KOH SAMUI - PROJECT LOCATION
ABOUT THE PROJECT. PACIFIC PALISADES (PAL)
project is the unique and cosy “boutique” villas on the Koh Samui Island in Chaweng Noi, Thailand. The project, that contains 26 villas, is located on a hill with a breath-taking view and with very strong constraints: a slope under 35%, large and numerous granite rocks, and lush vegetation. We developed the project around these constraints, taking advantage of each.
PACIFIC PALISADE FACILITIES
PLOT 13 - PERSPECTIVE COVER
PACIFIC - PALISADE
PACIFIC - PA
KOH SAMUI - BAN
21st - APRIL
KOH SAMUI - BANG PO, SOI 4
12457 7300
16200
4000
4900
12457
5th - MAY - 2017
3000
3000
OUTDOOR BATHROOM 7 m²
LAO Y
PLOT 13 - BACKFILLING NAME
VOLUME
PROPERTY LINES
BACKFILLING SOIL
403m³
10285
20% 11.52°
7% 4.10°
5760
2850
2900
3336
4451
5100
P13-L1
500
+0.000 -0.500
28016 2050
+0.700
3183
PROPERTY LINES
41% 22.1 3° 7300
4000
3000
4600
300
16200
(VARIOUS)
BACKFILLING
27251 4500
10000
3001
550
9200
Unnamed PLOT 13 - PERSPECTIVE
1.2
0
ALISADES
SCALE 1:120
NG PO, SOI 4
PACIFIC - PALISADES
KOH SAMUI - BANG PO, SOI 4
8996
8996
L - 2017
21st - APRIL - 2017 9400 1200
8200 4100
KITCHEN 19 m²
+0.000
+0.000 WC 4 m²
+0.000 STORAGE & LAUNDRY 5 m²
31% 17.37°
+0.720
POND 14 m²
1
DESK 2 m²
BACK YARD 21 m²
0
A-11-103
2100
6250
4000
11650
1000
4500
29500
1.5
SCALE 1:150
4.5
7.5 m
PL O T 13 - L A Y O U T L EV EL -1
PACIFIC - PALISADES
AYOUT LEVEL LIVING ROOM KOH SAMUI - BANG PO, SOI 4 21st - APRIL - 2017
LAYOUT LEVEL BEDROM
PACIFIC - PALISADES
KOH SAMUI - BANG PO, SOI 4 21st - APRIL - 2017
7800 3301
3301
6000
-0.020 WALK IN CLOSET 8 m²
WATER FALL AND ARTWORK
BEDROOM LANDING 10 m²
PARKING 26 m²
ENTRANCE 41 m²
BATHROOM 9 m²
21900
300 LIVING ROOM DINING +0.000 20 m² 29 m²
-0.500
1300
-0.020
MASTER BEDROOM 24 m²
STAIR 5 m²
BATHROOM 6 m²
-3.500
4000
GREEN 23 m²
DECK 52 m²
-0.500
3000
GREEN 11 m²
9850
10300
BATHROOM 6 m²
GREEN 14 m²
-0.350
BEDROOM 22 m²
-3.500
6801
+0.250
POOL 10x4m 40 m²
BEDROOM 22 m²
3000
SALA 23 m²
14451 13150
5% 3.00°
ROOF DECK 36 m²
2050
3049
GREEN ROOF 59 m²
4100
BALCONY 20 m²
3.6
6 m
DỰ ÁN RỪNG THÔN
.6
BAN ANG
WELCOME CENTER I ARCHITECTURE INFORMATION LOCATION : MOC CHAU REPUTATION: GFA 2,000 sqm DATE : 2021 SOW : PROJECT PARTNER, CONCEPT,SCHEMATIC DESIGN DESIGN DEVELOPMENT, CONSTRUCTION DRAWING
ABOUT THE PROJECT. Located at Pine Forest in
Ang Village. The people of Ang village still retain their warm and hospitable character. The traditional cultural customs are preserved with the roofs of stilts, the inviting dances, the old folk songs, the festivals “Mung com moi” “Hat Cha”... The design must combine the national identity and culture of the indigenous Thai people in harmony with nature when the building is placed in a unique position when both sides face the lake, surrounded by the lake. is a pine forest while preserving the existing landscape and pine trees.
NG BẢN ÁNG
STUDY CONCEPT
Ý TƯỞNG KIẾN TRÚC
Ý TƯỞNG KIẾN TRÚC
3
Ý TƯỞNG Ý TƯỞNG KIẾNKIẾN TRÚCTRÚC
3
PLAN DIAGRAM
3
3
KHĂN PIÊU T
ẾT KẾ
PIEU THAI SCARF .a unique cultural feature
ĐƯỜNG VÂN ĐỒI CHÈ
RỰC RỠ KHĂN PIÊU MÀU THỔ CẨM
C
MOC CHAU PLATEAU .with tea hills curve
ĐƯỜNG VÂ
PHỐI CẢNH NGOẠI THẤT THẤT
3 3
Tên dự
W
HỒ LỚN
Địa
Chủ đầu
CÔN
Chấp thuậ
Tư vấn t
Tư vấn k
Tư vấn t
Tư vấn t
Giai đoạ
LƯU Ý:
Bản vẽ nà Người thi c khi khởi cô Không theo Bản vẽ nà đồng thầu. Bản vẽ và không đượ
WARNIN
This drawi Contractor commencin Do not sca This drawi conditions This drawi without the
Chỉnh sửa Revision.
Tên bản Tên dự án / P
HỒ LỚN
WEL
BẬC NGỒI
Địa điểm: P
CNDA / Pr
VẬN THANG VÀ KHO
QUẦY BÁNH
BÀN BAR
QUẦY GỌI MÓN
TRỤ TRỒNG CÂY
HỒ NHỎ
Chủ đầu tư /
CÔNG ChủLỊC trì triể H
Thiết kế / D
Chấp thuận / App
Kiểm / Che
TRỤ TRỒNG CÂY
A
Thể hiện /
Tư vấn thiết k
Ngày Phát
ĐIỂM CHECK IN
06/20/21
Project Co
Tư vấnBAWC kết cấ
Tư vấn thiết k
Tư vấn thiết k
Giai đoạn thiế
LƯU Ý:
Bản vẽ này không Người thi công ph khi khởi công. Không theo tỷ lệ b Bản vẽ này được đồng thầu. Bản vẽ và thiết kế không được sự c
WARNING:
This drawing shal Contractor to ver commencing any Do not scale draw This drawing is to conditions of con This drawing and without the permis
Chỉnh sửa Revision.
Ng Da
Tên bản vẽ/ D
Ph
CNDA / Project m
ĐIỂM ĐẶT ĐIÊU KHẮC NGHỆ THUẬT
HỒ NHỎ
TRỤ KẾT HỢP BÀN NGỒI NHÓM
TRỤ KẾT HỢP BÀN NGỒI NHÓM
Chủ trì triển khai
Thiết kế / Designe
Kiểm / Checked b
Tên dự án /
Thể hiện / Drawn
WE
HỒ LỚN
Ngày Phát Hành /
06/12/21 Địa điểm:
Project Code Or
BAWC
Chủ đầu tư
CÔNG LỊC
VẬN THANG VÀ KHO
Chấp thuận / Ap
KHU VỰC BÁN ĐỒ ĂN UỐNG
KHU VỰC CẦU THANG VÀ TRƯNG BÀY QUANH CẦU THANG
A
Tư vấn thiết
KHU VỰC BÁN ĐỒ LƯU NIỆM VÀ CHO THUÊ TRANG PHỤC
Tư vấn kết c
Tư vấn thiết
Tư vấn thiết
Giai đoạn th
LƯU Ý:
Bản vẽ này khô Người thi công p khi khởi công. Không theo tỷ lệ Bản vẽ này đượ đồng thầu. Bản vẽ và thiết không được sự
WARNING:
This drawing sh Contractor to ve commencing an Do not scale dra This drawing is conditions of co This drawing an without the perm
Chỉnh sửa Revision.
N D
Tên bản vẽ/
Ph
CNDA / Project
KHU VỰC LOUNGE GHẾ LƯỜI & LƯỚI NGẮM HỒ NHỎ
Chủ trì triển kha
Thiết kế / Desig
HỒ NHỎ
Kiểm / Checked
Thể hiện / Draw
Ngày Phát Hành
06/20/21
Project Code O
BAWC
PHỐI CẢNH NỘI THẤT
3
PHỐI CẢNH NỘI THẤT
3
LOOSE DESK BELL DESK FOR 2 COLLEAGUES
TEXTURED BACK WALL WITH CABINET
SUSPENDED LOCAL FEATURE
SIGNAGE
WELCOME MAT BY OTHERS FLEXIBLE MODULAR SOFA SEATS AUTOMATIC SLIDING DOORS INSERT RUG GROUP CHECK IN LOUNGE
BIRD NEST.adative modeling HOLIDAY INN -- REPUBLIC PLAZA - FULL CONCEPT DESIGN HOLIDAY INN - INTERIOR DESIGN REPUBLIC PLAZA - CONCEPT DESIGN - 26th SEPTEMBER 18E CONG HOA STREET, 4 WARD, TAN BINH DISTRICT, HCMC, VIETNAM 25.11.2016
.7
RECEPTION GROUND FLOOR
LOBBY - GROUND FLOOR
2016
COMPUTATIONAL APPLICATION ARCHITECTURE I INTERIOR I MANUFACTURING SOFWARE I HARDWARE REVIT I DYNAMO I PYTHON I INVENTOR I WOODWORK I HOMAG CNC
10
FACADE DESIGN.dynamo & python study
CNC SIMULATION & MANUFACTURING.inventor & woodwork for design
REFERENCES TTT CORPORATION) TTT ARCHITECT SICART & SMITH ARCHITECTS TURNER VIET NAM BICONSI BINH DUONG HONG NGOC GENERAL HOSPITAL GOTEC VIET NAM
THANKS FOR YOUR TIME