Landon School Naming Opportunities Updated 11/7/2022
Table of Contents 1. Naming Opportunities 2. Map and Key
11/07/2022
3-07 8-19
2
Landon School Campaign Naming Opportunities 1.1 Perimeter Road
Reconfigured Road Entry to Exit
1
$1,000,000
1.2 Welcome Center
Main Entrance
1
Named
2.1 Future Lower School 2.2 Main Commons 2.3 Second Floor Commons 2.4 Third Floor Commons 2.8 Maker Space 2.9 Art Classrooms 2.10 Music Classroom 2.11 Classrooms 2.12 Breakout Learning Space 2.13 Kiln Room 2.14 Library 2.15 Large Science Classroom 2.16 LS Admin Suite 2.17 5th Grade Science Classroom 2.18 6th Grade Science Classroom 2.19 Lower School Reception 2.20 Landow Gallery
Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School
1 1 1 1 1 2 1 16 4 1 1 1 1 1 1 1 1
Named Named $250,000 $250,000 $350,000 $100,000 $350,000 $50,000 $25,000 $20,000 Named $250,000 $250,000 $ 100,000 $100,000 Named Named
11/07/2022
*The Lower School will move to the current Middle School BLDG
3
3.1 US/MS Academic Center 3.2 Courtyard Entrance 3.3 Middle School Commons 3.4 MS Library 3.5 US Library 3.6 A US Library Reading Room 3.7 MS/US Academic Center Lobby 3.8 Maker Space 3.9 US Learning Center 3.10 MS Science Center 3.11 College Counseling Center 3.12 MS Admin Suite 3.13 Health Center 3.14 IT Helpdesk 3.15 Art Room 3.16 MS Learning Center 3.17 Senior Admin Suite 3.18 Deans Offices 3.19 Classrooms 3.19 (A) Large Tiered Classroom 3.19 (B) Small Tiered Classroom 3.20 Faculty Room - US 3.21 Faculty Room - MS 3.22 Breakout Learning Spaces 3.23 Collaborative Work Area
11/07/2022
Landon School Campaign Naming Opportunities Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center
*The Middle School will move to the Renovated Academic Center
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 25 1 1 1 1 10 1
4
$5,000,000 $2,000,000 $500,000 $1,000,000 Named Named $250,000 $500,000 $500,000 $500,000 Named $250,000 Named $25,000 $100,000 Named $200,000 $50,000 $50,000 Named Named $50,000 $50,000 $25,000 $50,000
Landon School Campaign Naming Opportunities 3.24 Conference Room 3.25 Educational Technology Office
Renovated Academic Center Renovated Academic Center
4.1 A Upper School 4.1 B Stem Center 4.2 Student Commons (Lower) 4.3 Sitting Steps 4.4 Roof Top Terrace 4.5 Main Entrance (South) 4.9 Steam Laboratory 4.10 Deans Offices 4.11 Science Laboratories 4.12 A US Admin Suite 4.12 B US Registrar Office 4.12 C US Reception 4.13 Senior Lounge 4.14 Faculty Suite 4.15 General Classrooms 4.16 Technology Center 4.17 Student Commons (Upper) 4.18 Lobby / Reception 4.19 Collaborative Offices 4.20 School Store
New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School
11/07/2022
*The Upper School/Stem Center will be new construction
5
1 1
$50,000 $25,000
1 1 1 1 1 1 1 3 7 1 1 1 1 1 12 1 1 1 2 1
Named Named Named Named Named $250,000 Named $100,000 $150,000 Named $100,000 $100,000 Named Named $50,000 $150,000 $500,000 $500,000 $50,000 $250,000
Landon School Campaign Naming Opportunities 5.0 Andrews Building 5.1/5.2 Head of School Suite/Reception 5.3 Head of School Conference Room 5.4 Admissions Suite
Andrews House Andrews House Andrews House Andrews House
1 1 1 1
$3,500,000 Named Named $500,000
6.1 Studio Arts Center 6.2 Drawing Studio 6.3 Painting Studio 6.4 Sculpture Studio 6.5 Woodworking Studio 6.6 Ceramics Studio 6.7 Meeting Room 6.8 Photography Lab 6.9 Yearbook Studio 6.10 Kiln Room
Wilson Hall Wilson Hall Wilson Hall Wilson Hall Wilson Hall Wilson Hall Wilson Hall Wilson Hall Wilson Hall Wilson Hall
1 2 1 1 1 1 1 1 1 1
$1,500,000 $100,000 Named $100,000 $250,000 $150,000 $100,000 $50,000 $50,000 $25,000
* Andrews Hall will be moved and renovated for administration *Wilson Hall will be repurposed as the Studio Arts Center 11/07/2022
6
Landon School Campaign Naming Opportunities 7.1 Academic Quadrangle 7.2 Bear Circle 7.4 Veteran’s Memorial
11/07/2022
Academic Quadrangle Academic Quadrangle Hill Overlooking Bordley Stadium
1 1 1
Named Named Named
7
1.1
2.1 3.1 7.1 4.1
7.2
7.4 5.0 6.1
1.2
Campus Master Plan
2.7 2.11
2.11
2.11
2.11
2.11 2.2
2.11 2.20
2.12 2.10 2.12
2.8
2.0 Future Lower School Lower Level
2.17
2.18
2.11
2.15
2.11
2.3 2.11
2.19
2.11
2.16
2.0 Future Lower School Main Level
2.9
2.9
2.13
2.11
2.11 2.11
2.11
2.4
2.12
2.11
2.14
2.11
2.12
2.0 Future Lower School Upper Level
3.19
3.19
3.19
3.19
3.22
3.22
3.10
3.10 3.18 3.18 3.3 3.21
3.4
3.2
3.8
3.22 3.19
3.22 3.19 3.19 3.15
3.19
3.0 MS / US School Lower Level
3.6
3.17 3.5
3.13 3.18
3.19A
3.7 3.12
3.25 3.16 3.14 3.22 3.19 3.22 3.15
3.19B
3.19
3.19
3.19
3.0 MS / US School Main Level
3.19
3.19
3.19
3.5
3.22 3.18
3.19
3.19
3.19 3.24
3.23 3.19
3.19 3.19
3.20 3.18 3.22
3.22
3.19 3.22 3.11
3.19 3.9
3.19 3.19
3.0 MS / US School Upper Level
4.9 4.5
4.16
4.20
4.10
4.3
4.19
4.2 4.12B
4.11
4.11 4.11 4.18
4.11
4.12C
4.12A
4.11 4.11
4.11
4.0 Upper School Main Level
4.14
4.15
4.15
4.15
4.15
4.15 4.19
4.16
4.10
4.4
4.15
4.3
4.10
4.17
4.13
4.15 4.15 4.15
4.15
4.15
4.15
4.0 Upper School Upper Level
5.1 5.4
5.2
5.3
5.0 Andrews House Main Level
6.5
6.4
6.0 Studio Arts Center Lower Level
6.2
6.6 6.10
6.7
6.3 6.9
6.8 6.2
6.0 Studio Arts Center Main Level