2022 Campaign for Landon - Naming Opportunities

Page 1

Naming Opportunities LOCATION KEYS May 6, 2022


Table of Contents 1. Naming Opportunities 2. Map and Key

05/06/2022

3-07 8-19

2


Landon School Campaign Naming Opportunities 1.1 Perimeter Road

Reconfigured Road Entry to Exit

1

$1,000,000

1.2 Welcome Center

Main Entrance

1

Named

2.1 Future Lower School 2.2 Main Commons 2.3 Second Floor Commons 2.4 Third Floor Commons 2.8 Maker Space 2.9 Art Classrooms 2.10 Music Classroom 2.11 Classrooms 2.12 Breakout Learning Space 2.13 Kiln Room 2.14 Library 2.15 Large Science Classroom 2.16 LS Admin Suite 2.17 5th Grade Science Classroom 2.18 6th Grade Science Classroom 2.19 Lower School Reception 2.20 Landow Gallery

Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School Future Lower School

1 1 1 1 1 2 1 16 4 1 1 1 1 1 1 1 1

Named Named $250,000 $250,000 $350,000 $100,000 $350,000 $50,000 $25,000 $20,000 Named $250,000 $250,000 $ 100,000 $100,000 Named Named

05/06/2022

*The Lower School will move to the current Middle School BLDG

3


3.1 US/MS Academic Center 3.2 Courtyard Entrance 3.3 Middle School Commons 3.4 MS Library 3.5 US Library 3.6 A US Library Reading Room 3.7 MS/US Academic Center Lobby 3.8 Maker Space 3.9 US Learning Center 3.10 MS Science Center 3.11 College Counseling Center 3.12 MS Admin Suite 3.13 Health Center 3.14 IT Helpdesk 3.15 Art Room 3.16 MS Learning Center 3.17 Senior Admin Suite 3.18 Deans Offices 3.19 Classrooms 3.19 (A) Large Tiered Classroom 3.19 (B) Small Tiered Classroom 3.20 Faculty Room - US 3.21 Faculty Room - MS 3.22 Breakout Learning Spaces 3.23 Collaborative Work Area

05/06/2022

Landon School Campaign Naming Opportunities Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center Renovated Academic Center

*The Middle School will move to the Renovated Academic Center

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 25 1 1 1 1 10 1

4

$5,000,000 $2,000,000 $500,000 $1,000,000 Named Named $250,000 $500,000 $500,000 $500,000 Named $250,000 $ 250,000 $25,000 $100,000 $50,000 $200,000 $50,000 $50,000 Named Named $50,000 $50,000 $25,000 $50,000


Landon School Campaign Naming Opportunities 3.24 Conference Room 3.25 Educational Technology Office

Renovated Academic Center Renovated Academic Center

4.1 A Upper School 4.1 B Stem Center 4.2 Student Commons (Lower) 4.3 Sitting Steps 4.4 Roof Top Terrace 4.5 Main Entrance (South) 4.9 Steam Laboratory 4.10 Deans Offices 4.11 Science Laboratories 4.12 A US Admin Suite 4.12 B US Registrar Office 4.12 C US Reception 4.13 Senior Lounge 4.14 Faculty Suite 4.15 General Classrooms 4.16 Technology Center 4.17 Student Commons (Upper) 4.18 Lobby / Reception 4.19 Collaborative Offices 4.20 School Store

New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School New Upper School

05/06/2022

*The Upper School/Stem Center will be new construction

5

1 1

$50,000 $25,000

1 1 1 1 1 1 1 3 7 1 1 1 1 1 12 1 1 1 2 1

Named Named Named Named $750,000 $250,000 Named $100,000 $150,000 Named $100,000 $100,000 Named Named $50,000 $150,000 $500,000 $500,000 $50,000 $250,000


Landon School Campaign Naming Opportunities 5.0 Andrews Building 5.1/5.2 Head of School Suite/Reception 5.3 Head of School Conference Room 5.4 Admissions Suite

Andrews House Andrews House Andrews House Andrews House

1 1 1 1

$3,500,000 Named Named $500,000

6.1 Studio Arts Center 6.2 Drawing Studio 6.3 Painting Studio 6.4 Sculpture Studio 6.5 Woodworking Studio 6.6 Ceramics Studio 6.7 Meeting Room 6.8 Photography Lab 6.9 Yearbook Studio 6.10 Kiln Room

Wilson Hall Wilson Hall Wilson Hall Wilson Hall Wilson Hall Wilson Hall Wilson Hall Wilson Hall Wilson Hall Wilson Hall

1 2 1 1 1 1 1 1 1 1

$1,500,000 $100,000 $150,000 $100,000 $250,000 $150,000 $100,000 $50,000 $50,000 $25,000

* Andrews Hall will be moved and renovated for administration *Wilson Hall will be repurposed as the Studio Arts Center 05/06/2022

6


Landon School Campaign Naming Opportunities 7.1 Academic Quadrangle 7.2 Bear Circle 7.4 Veteran’s Memorial

05/06/2022

Academic Quadrangle Academic Quadrangle Hill Overlooking Bordley Stadium

1 1 1

Named Named Named

7


1.1

2.1 3.1 7.1 4.1

7.2

7.4 5.0 6.1

1.2

Campus Master Plan


2.7 2.11

2.11

2.11

2.11

2.11 2.2

2.11 2.20

2.12 2.10 2.12

2.8

2.0 Future Lower School Lower Level


2.17

2.18

2.11

2.15

2.11

2.3 2.11

2.19

2.11

2.16

2.0 Future Lower School Main Level


2.9

2.9

2.13

2.11

2.11 2.11

2.11

2.4

2.12

2.11

2.14

2.11

2.12

2.0 Future Lower School Upper Level


3.19

3.19

3.19

3.19

3.22

3.22

3.10

3.10 3.18 3.18 3.3 3.21

3.4

3.2

3.8

3.22 3.19

3.22 3.19 3.19 3.15

3.19

3.0 MS / US School Lower Level


3.6

3.17 3.5

3.13 3.18

3.19A

3.7 3.12

3.25 3.16 3.14 3.22 3.19 3.22 3.15

3.19B

3.19

3.19

3.19

3.0 MS / US School Main Level


3.19

3.19

3.19

3.5

3.22 3.18

3.19

3.19

3.19 3.24

3.23 3.19

3.19 3.19

3.20 3.18 3.22

3.22

3.19 3.22 3.11

3.19 3.9

3.19 3.19

3.0 MS / US School Upper Level


4.9 4.5

4.16

4.20

4.10

4.3

4.19

4.2 4.12B

4.11

4.11 4.11 4.18

4.11

4.12C

4.12A

4.11 4.11

4.11

4.0 Upper School Main Level


4.14

4.15

4.15

4.15

4.15

4.15 4.19

4.16

4.10

4.4

4.15

4.3

4.10

4.17

4.13

4.15 4.15 4.15

4.15

4.15

4.15

4.0 Upper School Upper Level


5.1 5.4

5.2

5.3

5.0 Andrews House Main Level


6.5

6.4

6.0 Studio Arts Center Lower Level


6.2

6.6 6.10

6.7

6.3 6.9

6.8 6.2

6.0 Studio Arts Center Main Level


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.