1 minute read

North End Zone Project

north end zone

PROJECT

Advertisement

(set to be completed by Fall 2025)

The two-story facility will house the academic arm of Louisiana Tech’s Athletics department. The facility will include 14,300-square feet of conditioned space and an additional 8,000-square feet of nonconditional usable space that includes first- and second-floor balconies, food-service locations and restrooms.

Plans are for the first floor to be designed to be a multi-functional space for personal-growth and career-development programming. It will also include a food-prep station and a large open multipurpose area. The second floor will hold office space and state-of-the-art study environments including a computer lab.

Plans are also in place for areas of the facility to be utilized on home football game days as an area for former student-athletes to gather and socialize before games. It will also serve as an opportunity for additional revenue generation with premium game-day space.

Sarah and A.L. Williams Champions Plaza

(set to be completed by Fall 2023)

Entryway into the new Student-Athlete Success Center. Named in honor of former Louisiana Tech student-athlete and football coach A.L. Williams and his wife Sarah, the plaza will include recognition of the most highlydecorated student-athletes and teams in the University’s history.

Daktronics Video Scoreboards

(set to be completed by Fall 2024)

A pair of new Daktronics video scoreboards will be installed, one on the northwest corner and one on the northeast corner of the end zone. The new boards will measure 30-feet tall by 49-feet6-inches wide.

This article is from: