PORTFOLIO ARQ. LAURA ALEJANDRA PACHÓN

Page 1

Architecture Portfolio Laura Alejandra Pachรณn Alfonso


Laura Alejandra Pachón Alfonso Graduated from “De la Salle University” in Colombia with 5 years of experience in: • Design of Urban-Architectural projects generating integral solutions taking into account social and cultural factors guaranteeing favorable conditions for habitability • Development of projects for the design of basic and detailed engineering for the implementation of related project infrastructural • Ability to prepare budgets and work schedule; expertise of in various architectural finishes; ability to coordinate project completion from design through construction Always excited to learn more about the architectural field and further strengthen my skills. Among my strengths are a commitment to fulfill tasks according to the needs of the Client, a history of good interdisciplinary relationships with everyone involved in my past projects, and my ability to adapt to various work environments

1


Personal Information Date of Birth

2

April 26th 1991 (Bogotรก, Colombia)

Address

171 Street No. 48-34 Bogotรก, Colombia

Contact

Mobile Phone +57 3058105345 Home Phone +576793810

Email

lapa126@hotmail.com

Professional Registration Number:

A39012014-1026273577


Education Bachelor of Science Attendance: January 2009 - February 2014 Thesis

Architecture Program La Salle University Bogotรก, Colombia Vulnerable Habitats Transformation Associative housing project for increasing and recomposing popular Habits.

Software Skills

AutoCAD 2D, 3D. Revit. 3DMax. Illustrator. Photoshop.

Other Skills

Creativity, Responsibility, TeamWork, organizational and planning Capacity.

Languages

English B1 Level Italian B2 Level

3


Professional Experience

4

Softtek Colombia April- September 2020 119 Street No. 13-45 Bogotá, Colombia

Infrastructure Design Architect. Detail Engineering development and design of Architectural component of Data Center No. 1 and 2 located at “Center Technologique de Boutilliers Laboulle”, Haiti. Technical and construction recommendations for the improvement of the space of Telecommunications rooms, Haiti.

2600 AUT April- August 2017 30 A Street No. 3-26 308 Office Bogotá, Colombia

Architect Detail Engineering development and design of Architectural component of Palmira Student Health Building project. Detail Engineering development and design of Architectural component of Immaculate Health Center project.

German Samper Architects Jan- Aug 2018 111 Street No. 2-53 Interior 5 Bogotá, Colombia

Architect Development and coordination of the Architectural component during the technical coordination and detailed design stages of the project “Detailed design of the architectural, urban and landscape components of the northern edge of the Wetland “Juan Amarillo” with a participatory approach”.

Cemosa Colombia Aug 2015-April 2017 26 Street No. 69D-91 Tower 2 504 Office Bogotá, Colombia

Auxiliary Architect Development of the Urban and Landscape Designs of the Magdalena high road concession. Support for the development of the design and technical documentation to support the reconfiguration of accesses of gate 6, 7 and 8 of the El Dorado International Airport. Engineering development support Construction Phase of the Hydraulic system for the expansion of the El Dorado International Airport platform (Phases I and II).


Professional Experience Consortium “Eléctricas Reyes” Engineering Investigation and Development. Feb 2015-Jul 2015 Bogotá, Colombia

Design Engineer Leading architect for the development of the basic engineering of the project: “Intervention of the physical infrastructure and improvement of the operational areas of the services of Ecopetrol S.A. information”

Hewlett Packard Colombia Mar 2014-Jan 2015 7 Career No. 99-53 Bogotá, Colombia

Architect Support in the development of design and flow diagrams for the realization of electrical, mechanical and architectural support plans for the presentation of proposals of Data Center in the different Hewlett Packard projects.

5


I want to be an Agent of Change, to foster and raise awareness of the way in which we take advantage of resources and how we can contribute to meet our needs without harming our environment.

Content 6


Kindergarten Usaquén locality Bogotá D.C. 8 Academic Project Jorge Eliecer Gaitán Cultural Center. 12 Academic Project Final Project Bachelor Degree. Academic Project 16 Recovery, Rehabilitation, Ecological and Landscape 23 restoration Design for “Juan Amarillo” Wetland Professional Project German Samper Architects Data Center No. 1 Haití and Data Center in 5 Bucaramanga Colombia Professional Project Softtek Colombia 7


Kindergarten “Caritas Felices” Educational Institution Usaquén Locality, Bogota D.C.

Sector (UPZ) Verbenal covered a variety of land uses and several architectural typologies, therefore a very varied stratification, even in sectors that are close to each other. The majority of the land is urbanized, however it is mainly informal architecture, which generates a physical and social disengagement, from the moment in which an inequality is perceived between these sectors where there is no public space treated the image projected to the City is chaotic.

8 Academic Project

Team-Work

Fifth period / Third Year

April 2011


Location

Bogota D.C.

Sector (UPZ) Verbenal Design Concept (Grids)

The project is developed that understands the sector in its formal and social aspect and responds to the needs. The disintegration of the place is an obvious problem, a network is taken as a concept, which links the equipment to each other and to the sector. A relationship of the concept with the formal sector is established, this network is the result of the geometrization and reinterpretation of the road axes of the area with respect to the points where the project will intervene.

Functional development Recreation and Sport Area Open Ground Closed Ground

Area of the lot: 9,200m² Occupation Area: 2,083m² Building Area: 3,301m²

Community Support Area Kindergarten Games Area Community Service Area Pocket Parks Small Squares and Plazas

Children's Capacity:150 Nursery:25 Kids Walkers: 25 Kindergarten:50 Pre-Kindergarten:50

9


Kids 0-4 Years old Kids 5-6 Years old Kids 6-12 Years old Sport Area Pocket Park Management Area Green Area and Small Squares

Tree Structure

1

The project will be implemented in an area where certain institutional facilities are already established, but are not related to each other and lack green areas and integration with the context. This will be developed as a network that establishes relationships between facilities, through public space, land use, as a space organizer and that is also able to provide green areas for people in the sector. A project is proposed, which promotes both the development of children and young people at an intellectual and motor level, but also functions as a place of social and sports integration.

2

3

1. It is part of the support of the structure. 2. They transmit loads to the bars. 3. They are the support of the whole tree. 4. The bars have different diameters depending on their structural calculations.

Green Roof The roof will be an intensive walkable landscaped with thermal insulator.

10 https://www.bobvila.com/articles/green-roofs/


11


Jorge Eliécer Gaitán Cultural Center Teusaquillo Locality, Bogota D.C.

12 Academic Project

Individual-Work

Seventh period / Forty Year

May 2012


National Exploratory

Jorge Eliécer Gaitán Museum house is located in the town of Teusaquillo in the Santa Teresita neighborhood, it is a National monument in memory of the Political Leader Jorge Eliécer Gaitán. Next to the house is the National Exploratory whose purpose was to be a cultural center.

Bogotá D.C.

Teusaquillo Locality

Property of Cultural Interest Jorge Eliécer Gaitán

Santa Teresita Neighborhood

CONSERVATION STATUS OF CULTURAL INTEREST GOODS The House, corresponds to a language of the transition, very characteristic in this area of the city, where white color predominates and the iron forge that can be identified in the balcony railings. We can also see it in the window frames. The general state of the building is conditioned by the high level of water in the area, which causes leaks and moisture in various parts of the house, this affects both structurally and aesthetically, in addition to affecting all objects of symbolic value.

Main Centrality

Government ordered its construction

Law 34-1979 Remains of Jorge Eliécer Gaitán Prayer for peace

Inicio Beginning of final works of early 80s

National Exploratory Competitive Examinations

Salmona wins the contest and performs the design of the National Exploratory

Declared building Symbol of Latin American Architecture

Following Gaitan's death, he raised among his family the idea of generating a space for the "people" in which everyone identifies and remains in the memory of the generations, that a man existed, who woke up in Colombian society, feelings of struggle and freedom, that one wanted respect for freedom and peace. Now, after 32 years of the construction of the Jorge Eliécer Gaitán Cultural Center, a project by Rogelio Salmona and Jorge Venegas, which unfortunately was not completed, it is currently in ruins and is not in operation. That is why we want to build a new cultural center, which is for “the people” and that freely participate in the activities that are generated in it, in addition to its important symbolic sense that Jorge Eliécer Gaitán house museum has.

Why?

It is a cultural center in memory of the popular Leader Jorge Eliécer Gaitán, also paying homage to his struggle for the rights of the "people." From its original idea, raised by Gloria Gaitán, Leader daughter, the fundamental premise was the criterion that “the people are bearers of an immense spiritual wealth and that they have the necessary values to decide their own destiny and transform the country into a nation thrives and fruitful for all.”

What for?

What?

CULTURAL INTEREST GOODS INTERVENTION AND NEW BUILDING

The intention is to awaken in the people, the awareness of their own value, thus achieving the emergence of individual enthusiasm and collective mysticism, was the key to “gaitanismo“. Activities will be generated so that people who enter the cultural center or its surroundings are aware of both the historical events that marked the country and the new movements that have been generated, also the participation in cultural events, musical concerts, artistic exhibitions, theater, linking a library, workshops, among others.

13


DESIGN PROCESS Open Areas Conservation Exploratory Center

1

2

Plazas and Public Spaces A A From the beginning the idea was based on the importance of

the "people" (public space) in the development of the project.

3

Then the gaps and green areas were generated to make the project fully accessible.

CULTURAL INTEREST GOODS AND NEW BUILDING INTEGRATION

What will be integrated? Free Areas Conservation

Pedestrian ramp What will be demolish?

Bathroom wall without structural involvement Spaces integration where all project areas are connected through free areas and vegetation (interior courtyards)

14

What will be conserved?

All the original structure of the house with all its spaces and furniture

The integration is done through a platform, which is accessed from 16th Street. Through this platform you can enter the BIC, which is a Museum Currently. Next to the BIC is the historical museum of Jorge Eliécer Gaitán, where you can show the historical facts and everything that happened before and after Gaitán's death.


DESIGN PROCESS Walking Connection

Green Roof and Spaces

Functional Spaces

Urban void Walking Connection Central Area Green Area Ecological Integration with the main structure of the Neighborhood (Rio Arzobispo) Meet The Heritage

Circulations and Principal Access

Workshops

Library

Museum

Exhibitions Rooms Management Theatre Diagram Plaza Playground

350 m² 330 m²

Green Area

2500 m²

Museum 167 m² Museum House BIC 125 m² Library 180 m²

Exhibitions Rooms 530 m² 300 m² Rooms 400 m² Theatre

Private Area

Public Area

Central Courtyards

Semi-Public Area

Pedestrianization

Coffee Shop Basement

Management 165m² Files Area 115 m² 100 m² Storages

Green Roof

15


NEIGHBORHOOD IMPROVEMENT PROJECT

Vulnerable Habits Transformation

Associative housing project for increasing and recomposing popular Habits. Ciudad BolĂ­var Locality, Altos de la Estancia Sector. Bogota D.C.

The following undergraduate work develops his research on the vulnerability of informal settlements according to their occupation processes in areas of threat or risk in BogotĂĄ DC. Under the overall improvement of neighborhood, a partnership housing project will be developed in the San Rafael area called Altos de La Estancia in Ciudad Bolivar, characterized by the presence of landslide risk, so you know it a housing solution for families who have precarious living conditions and that there are no processes of articulation and urban integration.

Urban Scale

16 Academic Project

Individual-Work

Tenth Period/ Fifth Year

December 2014


SE=Ecological Security SS=Social Security SEC=Economic Security

COHESION HABITS

SA=Food Security

SI=Institutional Security

Take Part Make decisions Manage Form dynamic systems

Fortresses and capacity Communities

TERRITORIAL SECURITY

SAFETY HABITS

Resulting in SAFETY HABITS

Multi-dimensional capacity building Dynamic of Nature

Best practice Acknowledge

interaction

Sustain Protected and preserved territories through best practice

DIGNIFIED HABITS Take care Appropriate Identify Fortresses and capacity Territories

SUSTAINABLE HABITS

Dynamic of Communities

Territorial security is the ability of a territory to offer its inhabitants certain conditions of stability, which prevent threats of different origin (natural, socionatural, anthropic) originating from the territory itself or from abroad, can become disasters.

CONCEPTUAL FRAMEWORK

17


NEIGHBORHOOD IMPROVEMENT PROPOSAL

Road Profile 1

Section A-A

18


VULNERABLE TERRITORY

DIGNIFIED HABITS

INSECURE TERRITORY

SAFETY HABITS

DISARTICULATED TERRITORY

NEIGHBORHOOD SCALE Ecological Profile

Road Profile 2

COHESION HABITS

19


HOUSING ASSOCIATIVE PROJECT RELATION TO THE CONTEXT Articulated

NATURAL IMPLEMENTATION ASPECTS

Consolidate

Sunning

Urban Connectivity Generate neighborhood connectivity to integrate the project and provide accessibility

Related to the city Definition of project relations with the environment Urban Edge Metropolitan Park Border

Road Walking

Integrated

Venting

Restore

Related to the community Generate spaces that respond to relations with the environment

Public Space Public space Green Border Public Space Urban Border Modulating

CRITERIA FORM Joint Mesh Weave of Diverse

Dynamics

Module 1

Module 2

Module 3

Productive

Two-Family House

Single-Family House

PHASES OF THE PROJECT

New Housing

Two-Family House Composition Number of New 96 20 Housing: 92 Families

New Housing

Site of Lot

Progressive Module

Productive Module

Structural Strengthening

Number of Improved and Resettled Housing: 30 Families

Controlled Growth Densification

Improve Comfort Conditions


NEW HOUSING PROPOSAL

HOUSE SPACES Minimum Housing Area: 45m² Social Area Living room: 7.3m² Dining room: 7.3m² Kitchen: 3.6m² Private Area Bedroom: 7.3m² Study Service Area

Productive Two-Family House Single-Family House

Bathroom: 2.80m² Laundry Room: 1.10m²

HOUSE MODELS Productive

First Level: 42.62m²

Second Level: 51.96m²

Two-Family House

First Level: 46.26m²

Second Level

Single-Family House

Third Level

First Level: 40.73m²

Second Level

21


22


Recovery, Rehabilitation, Ecological and Landscape restoration Design for “Juan Amarillo” Wetland Bogota D.C.

23 Professional Project

GX Germán Samper Ximena Samper Arquitectos

2018


INTERVENTION CRITERIA Restoration Areas Restoration Areas

Conservation Areas Recuperation Areas Conservation Areas

Low Third

1

Conservation Areas Preservation of most ecological services

Preservation of existing species

24

Recuperation Areas

Medium Third

2

Recuperation Areas Reintegration of some ecological services Buildings Parks, Plazas, Bio Healthy

Gardens Presence of non-self-sustainable landscape elements

High Third

3

Restoration Areas Accelerated restoration of all original ecological characteristics

Foreign species replacement with native Conservation of existing native species

Kicuyo replacement by species that generate undergrowth


LANDSCAPE ELEMENTS

Forest

Environmental education Spaces

Ground Plants

Balconies

Containers

Walls

Active recreation

Architectural modules

25


ENVIRONMENTAL EDUCATION SPACES

FOREST

Palm Forest Arboretum

Hotbed

Open environmental classroom

Composting areas

Umbraculum

Ecological Stands

Oak Forest

Flood Vessel

26

Non-flooding Vessel


BALCONIES

CONTAINERS

WALLS

ACTIVE RECREATION

GROUND PLANTS

ARCHITECTURAL MODULES

Ground Plants

Grassland

Parks

Bio Healthy

Water Garden

Watcher hill

27


ARCHITECTURE ELEMENTS

Bathrooms and Security

Composting

Umbraculum

28

Pavilion Games

Watch Tower

Environmental Area

Management

Food Court


Design for Data Center No 1 Banque de la République d´Haïti (BRH) 29 Professional Project

Softtek Colombia

2019


Design for Data Center Financiera Comultrasan Bucaramanga Colombia 30


BIM Building

Information

Modeling

Methodology Operating and maintenance

Programming

Conceptual Design

Construction

Fabrication

Detailed Design

Documentation

Analysis

Collaborative work Architectural System

Electrical System

Mechanical System

Electronical System

Through BIM methodology, based on integrated and collaborative work, using different Software tools such as Revit and AutoCAD, it is possible to visualize, manage and process all the information necessary for the design and construction of a Data Center.

31


ARCHITECTURAL COMPONENT OF DATA CENTER

Telecommunications Room Fuel Tank Area Power Generators Area Panelboard Room

Current Transformer Station

Electrical Room A Electrical Room B White Room NOC Technical Hall

Transformer station

32

Data Center Area


ELECTRICAL COMPONENT OF DATA CENTER

Electric Circuits For Specially Equipment Lighting System

High Frequency Mesh Distribution System

33


MECHANICAL COMPONENT OF DATA CENTER Cooling System Plumbing System

Fuel System

34


ELECTRONICAL COMPONENT OF DATA CENTER

Closed Circuit Television Access Control System Clean Agent System Fire, Detection, Alarm System

Communications

BMS

35


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.