Portfolio Laura García

Page 1

Laura GarcĂ­a Carbajosa.


“Choose a job you love, and you will never have to work a day in your life.” ― Confucius

PERSONAL PORTFOLIO


PERSONAL INFO

4

PREVIOUS WORK IN SPAIN

6

MULTI-STOREY BUILDING

8

REFURBISHMENT OF THE OLD HORSENS PRISON 9


WORKSHOPS, CONFERENCES, COURSES

PERSONAL INFORMATION

SOFTWARE SKILLS Course on Computer-Aided Design with AutoCAD2010 Valladolid University. Spain Basic Course on Accessibility for Disabled People. Accessibility to physical security, removal of architectural barriers, urban and transport European University Miguel de Cervantes. Spain Participating at the Intensive Erasmus IP Project. Erasmus RenoPassCoDe 2013 “Passive House Design and Construction– Renovation” Instituto Politécnico de Leiria. Portugal Course on Photography Youth Association “El Parque”. Spain

LANGUAGE SKILLS

Official Qualification as Animator YMCA School Leisure. Spain

Mother tongue

Professional working profiency

Elementary profiency

In learning process

Technical Architecture

2007

2008

2009

2010

2011


JOBS, VOLUNTEERING, COLLABORATIONS

Name: Laura García Carbajosa Date of birth: 26th April 1989 6 years volunteering at “NGO Entreculturas” including a month in a developing country (Nicaragua). 2007-2012 4 years as Animator in summer camps. 2007-2010 2 years as Primary Education private teacher. 2011/12

Nationality: Spanish Current Address: Kollegievænget 24– 232. 8700 Horsens (Denmark) Email: lauragcarbajosa@gmail.com

Shop assistant in a toyshop. 2009

185112@viauc.dk Blog: http://dilosindecirlo.tumblr.com/

Labor camp in Germany. 2010

Mobile:

Schwarzkopf model. 2009

(0045) 91 19 53 86 (0034) 652 19 81 70

Stewardess. 2011/12 Collaboration in the organization of events. UEMC, 2011

FUTURE PLANS Architectural Technology and Construction Management

Laura García Carbajosa

My main goal for the near future is to gain as much knowledge and experience as possible from my constructing architect degree and also from the other projects I am involved. Also I expect to find a practical placement where I can implement everything I have learnt so far while also I improve my skills and know the way in which architecture firms work. In the long term I wish to finish my education at VIA University College and continue with a master program.

2012

2013

2014


PREVIOUS WORK IN S PAIN Family Housing in Hungary. Subject: Projects


Final Project. Single dwelling in Escalona, Toledo. Spain


MATERIALS

Ă˜stergade 120, 8700 Horsens

Standard approved materials are used when designing the buildings. The outer layer of the exterior wall is made out of a clay bricks, which makes the buildings well appearing in the neighbourhood and gives almost free of maintainance facade. The common access route for each building consists of a staircase and elevator. We choose white plaster for wall finish of the common access route in order to create a warm and attractive atmosphere. When designing the prefabricated cocnrete staircase we took in consideration the standart staircase measurements so that the construction costs would be reduced.

MULTI-STOREY BUILDING



Refurbishment of the old Horsens Prison CONCEPT/ IDEA STEP 1: The old building The main requirements: 

   

The establishment of a new main entrance, including reception, ticket sale, souvenir shop, administration, tourist information, café, depots . Administration and offices at 1. Floor. Energy optimization and sustainable solutions An elevator must be incorporated into the project with access to all floors. The connected parking areas must be arranged with parking areas for bus and for disabled people.

STEP 2: The courtyards One of these courtyards will be used to develop the cafe. This place can be accessible by the outside (accessibility for disabled peoples) or by the reception (visitors) For the second courtyard the client have the choice and can think to create a playground, some temporary exhibitions or an outdoor cinema for the visitors. STEP 3: The towers The main particularity of this building is the two towers overlooking the main entrance of the prison. They will be transforming with big windows to give a better luminosity in the 1st floor. STEP 4: Accessibility One elevator can be used by the disabled peoples to have access on the shop, museum or the internal bar. The cafe, the shop, the tourist information will be with free access.


Basement

First floor

Groundfloor

DESIGN COMPETITION 2013 2ND PRIZE


Laura GarcĂ­a Carbajosa +45 91 19 53 86 lauragcarbajosa@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.