The Gardens will be built in 3 phases and each phase consists of constructing two buildings. In phase one, two buildings will be demolished from the old Faneuil Gardens site and two new buildings will replace it. In phase 2 and 3, four buildings from the old Faneuil Gardens site will be demolished in each phase and two denser buildings will replace them. Residents will be relocated from the first buildings that will be demolished but will be given first priority to return once the first pair of buildings are constructed.