Participatory Sustainable Infrastructure Planning for Favela Pica-Pau in Rio de Janeiro

Page 1

FROM OPEN SEWER TO OPEN (RE)SOURCE PARTICIPATORY SUSTAINABLE INFRASTRUCTURE PLANNING: PICA-PAU FAVELA IN RIO DE JANEIRO

+

=

LEONEL LIMA PONCE Pratt Institute PSPD MS in Urban Environmental Systems Management Demonstration of Professional Competency Advisors: Jaime Stein . Alec Appelbaum . Evren Uzer . David Seiter Final Presentation - 26 April 2013


PRESENTATION AGENDA: INFRASTRUCTURAL ISSUES

PARTICIPATORY SUSTAINABLE INFRASTRUCTURES

FAVELA PICA PAU: CLIENT + SITE + COMMUNITY PARTICIPATORY PROCESS (FIELD WORK)

RESULTS + REASSESSMENTS

CONTINUATION + REPLICABILITY

02


INFRASTRUCTURAL ISSUES URBAN MIGRATION + INFORMAL SETTLEMENTS over

50%

of population in cities a

GLOBAL URBAN MIGRATION

800 MILLION

in informal housing b

INFORMAL COMMUNITIES

61%

of population w/improved sewage c

03

STRAINED INFRASTRUCTURE a: Grimm, N. et al. “Global Change and the Ecology of Cities.” Science; vol.319, Feb. 2008: 756-759. b: United Nations Millenium Development goals: 2011 update. (2010 statistics) c: United Nations Millenium Development goals: 2011 update. (2008 statistics)


INFRASTRUCTURAL ISSUES SANITATION INFRASTRUCTURAL DEFICIT: RIO DE JANEIRO

76% of population has treated sewage a,b c

d

SEWAGE TREATMENT GOALS (RJ STATE) b *over R$ 135B cost (SE Region of Brazil)

04

2015: 86% 2020: 89% 2030: 96%

a: Cavallieri, F.; S. Oliveira. “A melhoria das condições de vida de habitantes de assentamentos precários no Rio de Janeiro.” IPP (RIo de Janeiro City Planning Dept.). Rio de Janeiro, Brazil; December 2006. b: “Plano Nacional de Saneamento Básico (National Basic Sanitation Plan).” SNSA (National Secretariat of Environmental Sanitation of Brazil). Brasília, Brazil: April 2011. c: Open sewer in a favela in Rio de Janeiro. http://oglobo.globo.com/participe/mat/2010/11/10/rio-salgado-na-zona-norte-do-rio-sofre-com-acumulo-de-lixo-falta-de-cuidado-922995860.asp; by Sizenaldo Marinho do Nascimento d: Effluent reaching the Guanabara Bay. http://www.ambientalsustentavel.org/2011/bid-vai-emprestar-us-452-milhoes-para-melhorar-esgoto-na-baia-de-guanabara/


INFRASTRUCTURAL ISSUES SOCIOPOLITICAL INFRASTRUCTURAL DEFICIT: FAVELAS

R$ 8 BILLION

investment in development of favelas c

BY

2020

a

b

current favela redevelopment program

NO participation c

05

a: A Morar Carioca community facility project in Rio de Janeiro. http://www.uppsocial.org/acao-prefeitura/programa-morar-carioca-secretaria-municipal-de-habitacao/ b: Removals at a favela in the Jacarepaguá neighborhood. http://comitepopulario.wordpress.com/2013/02/22/graves-violacoes-de-direitos-humanos-no-largo-do-tanque-em-jacarepagua/# c: Municipal Housing Secretariat of Rio de Janeiro. “Conheça o Programa.” Morar Carioca summary. http://www.rio.rj.gov.br/web/smh/exibeconteudo?article-id=1451251 d: Morar Carioca logo. http://www.cidadeolimpica.com/en/morar-carioca-en/


HOW CAN WE PROPERLY LEVERAGE THE SOCIAL AND ENVIRONMENTAL ASSETS OF OUR CURRENT URBAN CONDITION, SO AS TO IMPROVE THE QUALITY OF LIFE OF ITS RESIDENTS?

06


PARTICIPATORY SUSTAINABLE INFRASTRUCTURES

+ COMMUNITY PARTICIPATION

07

= NATURAL SYSTEMS

SUSTAINABLE INFRASTRUCTURES


COMMUNITY PARTICIPATION

LEADERSHIP COLLABORATION KNOWLEDGE

TRUST

08

ACCOUNTABILITY ENGAGEMENT SOLUTIONS

TRANSPARENCY


NATURAL SYSTEMS

HABITATS PERFORMANCE SYSTEMS

PROCESSES

09

BIODIVERSITY PUBLIC HEALTH OPEN SPACES

PRODUCTS


DEFINING A CLIENT

COMMUNITY

CLIENT

ECOSYSTEM (SITE) 10


DEFINING A CLIENT: SELECTION CRITERIA

PARTNERSHIPS INFRASTRUCTURAL NEED POTENTIAL IMPACT OPPORTUNITY COMMUNITY BUY-IN + ORGANIZATION 11


PARTNERSHIPS

RESEARCHER

LEONEL LIMA PONCE

12

a, photo by Christina Park b. Catalytic Communities logo. courtesy of Catalytic Communities c, Irenaldo Honório da Silva. courtesy of Catalytic Communities

FAVELA ADVOCACY NGO

CATALYTIC COMMUNITIES

COMMUNITY LEADERSHIP

PICA-PAU RESIDENTS’ ASSOCIATION


SITE: RIO DE JANEIRO

Guanabara Bay PICA-PAU Niterói

Rio de Janeiro

13

map: Google/ NOAA. “Rio de Janeiro.” Google Maps (Orthographic photography).


INFRASTRUCTURAL NEED RIO DE JANEIRO >>> CORDOVIL

sewage treatment plant

Governor’s Island (airport)

PICA-PAU

Guanabara Bay

Cordovil

~3 km

14

sewage treatment plant

map: Instituto Pereira Passos (IPP). “Mapas Digitais do Rio de Janeiro.” (digital interactive maps). http://portalgeo.rio.rj.gov.br/ipp_viewer/?config=config/ipp/cadlog.xml


INFRASTRUCTURAL NEED RIO DE JANEIRO >>> CORDOVIL >>> PICA-PAU

AREAS OF RISK

15

FAILING COMBINED SEWER

INFORMAL WATER PUMPS + SEWERS

images: Infrastructural issues, favela Pica-Pau. photos by Leonel Lima Ponce

OPEN SEWAGE DITCHES + FLOODING

WASTE DUMPING + CANAL CSO’S


POTENTIAL IMPACT: MORAR CARIOCA RIO DE JANEIRO >>> CORDOVIL >>> PICA-PAU Pica Pau (official boundaries): Est. Area a: 3,8000 m2 Est. Population (2010) b: 2,300 Estimated Cordovil favela complex (subject to Morar Carioca project) Est. Area a: 235,000 m2 Est. Population (2010) b: 12,000

16

2,300-12,000 PEOPLE AFFECTED a: Instituto Pereira Passos (IPP). “Mapas Digitais do Rio de Janeiro.” (digital interactive maps). http://portalgeo.rio.rj.gov.br/ipp_viewer/?config=config/ipp/cadlog.xml b: IBGE (Brazilian Institute of Geography and Statistics). “Censo Demográfico 2010: Aglomerados Subnormais.” Rio de Janeiro, Brazil: 2010.

a


OPPORTUNITY: MORAR CARIOCA

MAR./APR. 2013 RFP + BIDS

DESIGN TEAMS CHOSEN

SITE SURVEY + DIAGNOSIS

PROJECT DESIGN

CONSTRUCTION

* ARCHITECTS FOR CORDOVIL PROJECT CHOSE TO

17

HOST A COMMUNITY MEETING.


OPPORTUNITY: MORAR CARIOCA

MAR./APR. 2013 RFP + BIDS

DESIGN TEAMS CHOSEN

SITE SURVEY + DIAGNOSIS

PARTICIPATORY PLANNING WORKSHOPS

18

PROJECT DESIGN

CONSTRUCTION

NATURAL SYSTEMS INCORPORATION


COMMUNITY BUY-IN + ORGANIZATION a

b

c

19

ENVIRONMENTAL EDUCATION

POLITICAL ADVOCACY

a, b, c: Favela Pica-Pau in Cordovil; Irenaldo Hon贸rio da Silva. courtesy of Catalytic Communities

PARTICIPATORY SUSTAINABLE INFRASTRUCTURES


PARTICIPATON STRATEGIES OPEN ENDED ACTIVITIES

RESULT ORIENTED ACTIVITIES

FAMILIAR TOOLS + SETTINGS

NOVEL TOOLS + SETTINGS

DIAGNOSTIC EXPLORATIONS

20

SOLUTIONS


PARTICIPATON STRATEGIES: TIMELINE

MAR./APR. 2013 MORAR CARIOCA TIMELINE

SITE VISIT + WORKSHOPS MAR

18

MAR

23

ORGANIZING MEETINGS

MAR

APR

30

06

TRANSECT WALKS

COMMUNITY VISIONING WORKSHOPS

PARTICIPATORY + SUSTAINABLE TIMELINE PRE-RESEARCH

21

RESEARCH


COLLABORATIVE ORGANIZING MEETINGS PICA-PAU RESIDENTS’ ASSOCIATION (MAR. 23) COMMUNITY PRIORITIES AVAILABILITY a

CAPACITY PREFERRED SCOPE INITIAL VISIT: SYSTEMS DIAGNOSIS CATALYTIC COMMUNITIES (MAR./APR.) PROJECT TEAM AVAILABILITY

b

22

a, Irenaldo Honório da Silva. courtesy of Catalytic Communities b. Catalytic Communities logo. courtesy of Catalytic Communities

CAPACITY


MARCH 30: TRANSECT WALKS COMMUNITY GUIDES

13 4

AGE TENURE

F

M

GENDER

COMMUNITY ICONOGRAPHY

23

58 44


MARCH 30: TRANSECT WALKS PROCESS: THE WALK

24

DIAGNOSE INFRASTRUCTURAL ISSUES

GROUP WALK

images: Transect Walks in Pica-Pau favela. 30 March 2013. photo by Leonel Lima Ponce.

MAP COMMUNITY INPUT


MARCH 30: TRANSECT WALKS PRODUCT: TRANSECT MAPS

GROUP OBSERVATIONS

ADAPTATIONS EXPLAINED

25

images: Transect map of Aricambú Street, in Pica-Pau favela. 30 March 2013. photo by Leonel Lima Ponce.

RESIDENT DIAGNOSIS

RESIDENT INTERVIEWS


MARCH 30: TRANSECT WALKS PRODUCT: TRANSECT DIAGRAM

PRIORITY AREAS

PRIORITY ISSUES PRIORITY CATEGORIES

26

images: Transect Diagram of Pica-Pau favela. 30 March 2013. photo by Leonel Lima Ponce.


APRIL 06: COMMUNITY VISIONING WORKSHOP PROCESS: “CITY AS PLAY”

FREE PLAY

Q: 27

FOUND OBJECTS

COMMUNITY BUILDING

How can Pica-Pau resolve its problems, especially water, sewage, and waste?

images: Favela Pica-Pau community visioning workshop, 06 April 2013. courtesy of Catalytic Communities.


APRIL 06: COMMUNITY VISIONING WORKSHOP PRODUCT: “CITY AS PLAY” - PHYSICAL MODELS

CONNECTING PROBLEMS + SOLUTIONS

28

image: Favela Pica-Pau community visioning workshop, 06 April 2013. courtesy of Catalytic Communities.


APRIL 06: COMMUNITY VISIONING WORKSHOP PROCESS: REVIEW OF TRANSECT WALKS

BROADER PARTICIPATION TRANSPARENCY 29

images: Favela Pica-Pau community visioning workshop, 06 April 2013. courtesy of Catalytic Communities.

COMMUNITY PRIORITY RE-EVALUATION


APRIL 06: COMMUNITY VISIONING WORKSHOP PROCESS: SUSTAINABLE INFRASTRUCTURE CATALOG

NATURAL SYSTEMS 30

OBSTACLES TO IMPLEMENTATION

PRIORITIES ADDRESSED images: Sustainable Infrastructure Matrix, by Leonel Lima Ponce. photo by Leonel Lima Ponce.

POTENTIALS + VISIONS


APRIL 06: COMMUNITY VISIONING WORKSHOP PROCESS: COMMUNITY VISIONING SESSION

RESIDENTS GROUPED BY AREA 31

DISCUSSION BASED ON PRECEDING INFO (VISIONS)

images: Favela Pica-Pau community visioning workshop, 06 April 2013. courtesy of Catalytic Communities.

COLLABORATIVE PROCESS


APRIL 06: COMMUNITY VISIONING WORKSHOP PRODUCT: COMMUNITY VISIONING SESSION

PRIORITIZED SOLUTIONS

INCORPORATED SUSTAINABLE SOLUTIONS

ADDITIONAL DIAGNOSES

32

image: Community vision exercise, Pica-Pau community workshop, 06 April 2013. photo by Leonel Lima Ponce


INITIAL RESULTS TRANSECT WALKS: TAKEAWAYS

DIAGNOSIS: RESIDENTS VS. OFFICIAL GROUP: DREW BYSTANDERS’ ATTENTION GROUP: ENRICHED DISCUSSION

SEVERE INFRASTRUCTURE FAILURE COMPLEX MIX: FORMAL + INFORMAL LACK OF SPACE FOR LARGE PROPOSALS 33


INITIAL RESULTS TRANSECT WALKS: PRIORITY ISSUES

FLOODING (ARICAMBU / ALLEYS) WATER SUPPLY: PUMPS + RAINWATER COLLECTION COMBINED SEWER SIPLLS OVER AT CATCHBASINS OPEN SEWERS + BROKEN PIPES = CONTAMINATION COMBINED SEWER OUTFALLS AT IRAJA RIVER WASTE DUMPED AT IRAJA RIVER DISEASES: INCIDENCES OF DENGUE, TB, OTHERS 34

PUBLIC WORKS EXACERBATE AREAS OF RISK


INITIAL RESULTS COMMUNITY VISIONING WORKSHOP: TAKEAWAYS

RESIDENT COLLABORATION RESIDENT LEADERSHIP +ACCOUNTABILITY

RESIDENTS: HOLISTIC SOLUTIONS BUY-IN: PROCESS + POSSIBILITIES

SMALL SCALE, PERSONAL SOLUTIONS LARGE SCALE, UTOPIAN SOLUTIONS 35

FEW NATURAL SYSTEMS IN SOLUTIONS


INITIAL RESULTS COMMUNITY VISIONING WORKSHOP: MAJOR VISIONS

BUILD OVER THE RIVER: SPACE GENERATION CISTERN UNDER SOCCER COURT: WATER SUPPLY + FLOOD REDUCTION RECYCLING PROGRAMS, STREET LEADERS: SUSTAINABLE MANAGEMENT DAYCARE > PRESCHOOLS >> TECHNICAL SCHOOLS CHILD + YOUTH DEVELOPMENT

36

GREEN SPACES AT DITCHES + EMPTY LOTS NATURAL SYSTEMS


REASSESSMENTS

EXPAND TIMELINE ENGAGE EVEN BROADER DEMOGRAPHIC ADVOCACY + SOCIAL INFRASTRUCTURE JOB CREATION POSSIBILIIES SEPARATE DESIGN WORKSHOP MONITORING + MAINTENANCE WKSHOP 37

FEASIBILITY: TECHNICAL EXPERTS


“WE WANT THIS TO CONTINUE BEYOND APRIL 6, 2013. WE WANT TO GO BEYOND PAPER, BEYOND PROJECTS. WE WANT SOLUTIONS.” - Kelly Cristina Tavares de Jesus resident, Pica-Pau favela 38


CONTINUATION POSSIBLE PARTNERSHIPS RFP + BIDS

DESIGN TEAMS CHOSEN

SITE SURVEY + DIAGNOSIS

CATCOMM PUBLIC DEFENDERS STUDIO X IBASE 39

PROJECT DESIGN

CONST.

TIBA INSTITUTE UFRJ / PUC ARQHOS BOTANIC GARDENS


CONTINUATION FLEXIBILITY

MORAR CARIOCA PROCESS INCORPORATION

PARTICIPATORY + SUSTAINABLE PROCESS PARALLEL PLAN 40

COMMUNITY-BUILT INDIVIDUAL PROJECTS


CONTINUATION TIMELINE

MORAR CARIOCA TIMELINE

FUTURE WORKSHOPS MAY

MID

LATE

EARLY

2013

2013

2013

2014

REMOVALS + HOUSING RIGHTS

NATURAL SYSTEMS DESIGN

SUSTAINABLE PICA-PAU PLAN

MAINTENANCE + MONITORING

PARTICIPATORY + SUSTAINABLE TIMELINE 41


REPLICABILITY

=

SIMILAR TRENDS

PICA-PAU: PARTICIPATORY EXAMPLE

42

INFRASTRUCTURAL DEFICIT SOLUTIONS


+

=

THANK YOU! MUITO OBRIGADO! 43


ACKNOWLEDGEMENTS Pica-Pau Community (clients) Irenaldo Honório da Silva Resident Guides: Geraldo, Natalia, Paulo, Sebastião, Karolayne, Marissa, Zilá; interviewees Residents / Workshop Participants Catalytic Communities (project team) Theresa Williamson Catherine Osborn, Gloria Jimenez, Sarah De Rose Ministério Semear Church, Brás de Pina (workshop hosts) ARQHOS (survey/technical support) family + friends