Portfolio 2019 | Samantha Leung

Page 1

SAMANTHA LEUNG

PORTFOLIO



TABLE OF CONTENTS

NIKE FLAGSHIP STORES - NY & CHICAGO CRTKL KUNMING SPRING CITY 66 KPF DONGJIADU KPF PING AN TIANJIN KPF RUBBISH RECHARGED Published in Abstract POINTY-ISM Advanced Studio VI URBAN LICHE Advanced Studio V VISUAL ARTS Collection of other works



NIKE FLAGSHIP - NEW YORK

LOCATION: TYPE: PROGRAM: GROSS AREA:

650 5th Avenue New York, NY Retail 6 Floors of Retail 1 Floor of Offices & Employee Facilities 70,000 ft2

1


NIKE FLAGSHIP - NEW YORK

Nike 650 5th Avenue, NYC

Core & Shell + Tenant Improvement (FF&E)

Contributions Exterior Facade Detailed and coordinated, with the glass consultant, the innovative slump and etched glass curtain wall. Vertical Transportation Designed, detailed, and coordinated all cantilevered feature stairs from cellar floor through the 5th floor, the convenience stairs on all BOH spaces, and the details for passenger and service elevators.

Interior Tenant Improvement Documented and executed drawings from the demolition phase through construction administration for vestibule detailing, glass guardrail details, floor finish and transition details, ceiling transition and partition details, and door and hardware details plus schedules. Weekly Coordination Led weekly design coordination calls with client, consultants, and team.

2

Building Code, Fire Protection, and Life Safety Researched, documented, and executed the design for fire shutters required in atrium conditions, the slab edge conditions requiring smoke baffles with respect to the approved CCD1, the code required fireproofing of existing and new structural members, and coordinated the sprinkler layouts for atrium and stairs.


3


NIKE FLAGSHIP - NEW YORK

G-1 (SLUMPED GLASS PANEL)

G-1 (SLUMPED GLASS PANEL)

1 TYPE 1

G-1 (SLUMPED GLASS PANEL)

2 TYPE 2

SCALE: 1/2" = 1'-0"

3 TYPE 3

SCALE: 1/2" = 1'-0"

SCALE: 1/2" = 1'-0"

SLUMP "VALLEY" (OFFSET FROM "PEA IN DEVELOPMENT) FLAT REGION SLUMP "PEAK"

MICRO PATTERN REG (REGION AND PATTE DEVELOPMENT)

INSIDE EDGE OF FLAT REGION EDGE OF ALUMINUM FRAMING BEYOND

12/15/2017 A-203.00 GLASS PANEL DETAILS.DWG

BACKER ROD AND SEALANT PROTRUDING STAINLESS STEEL NIB WEATHER SEALING

G-1 (SLUMPED GLASS PANEL)

G-1 (SLUMPED GLASS PANEL)

A ENLARGED ELEVATION

B PERSPECTIVE

SCALE: 3" = 1'-0"

Nike House of Innovation 000 My journey with Nike began with the CD documentation for the Core & Shell of the 650 5th Avenue, New York Flagship Store. The late nights of iterative detailing, weekly deadlines, and coordination between various consultants and Nike Design blurred together, but these were all crucial steps that led to one of the projects I am most proud to have been involved with. I use to think modeling, rendering, and the documentation of a project was the most thrilling part of architecture. Putting ideas onto paper was a step towards making a project real. Little did I know the excitement was just beginning. This project became more exciting when construction began.

NTS

Our first task was the construction of a 6-storey beast of a barricade, constructed along 5th Avenue and 52nd Street. A plywood encased, structurally sound barricade was required of any construction along 5th Avenue. What made this unique was the struggles we had documenting and constructing all of this by mid-November, before the Holiday Embargo which prevented any construction to occur outside of a barricade. This enormous, time sensitive, and costly task foreshadowed the great undertaking ahead to create Nike’s new House of Innovation 000. For the next year and change, Nike produced various innovative designs behind this forest green barricade before it was revealed to the public.

4

Nike’s innovation can be first experienced by the newly invented slumped and etched glass facade which hung from the 7th floor of an existing building and supported by a solid steel mullion systems. The glass facade was etched and slumped at a 23.50, the angle of the Nike Swoosh. This combination of slumped and etched glass had not been done before, thus it was tricky to meet the tight deadline of realizing this, while performing all the necessary tests to guarantee the performance and stability of this facade. But with just one panel produced, all tests were conducted and it performed better than we all could have imagined. With this, the production of all 71 standard slumped and etch panels and 4 angled panels took shape.


5


NIKE FLAGSHIP - NEW YORK

1

2

3

3

1

2

-

A-406

A-406

A-406

CL

1

CL

THIRD FLOOR T.O.F.F 17'-2 7/8" A.F.F. B.O. DECK 16'-6 3/8" A.F.F.

7'-0" HEADROOM CLEARANCE CL

CL

CL

CL

CL 9 A-414 TYP

1/2" STEEL GUARDRAIL MT-102 METAL PIPE HANDRAIL MT-102

7

TERRAZZO TREADS, RISERS AND LANDINGS FL-103

A-414 TYP

7'-0" HEADROOM CLEARANCE

SECOND FLOOR T.O.F.F 0'-0" A.F.F.

PIN MOUNTED GLASS GUARDRAIL GL-101

PAINT EXISTING STAIR STRUCTURE P-106

METAL PIPE HANDRAIL MT-102

THIRD FLOOR T.O.F.F 17'-2 7/8" A.F.F.

2ND TO 3RD FLOOR DECORATIVE STAIR 03

1 ELEVATION

B.O. DECK 16'-6 3/8" A.F.F.

SCALE: 3/8" = 1'-0"

1/2" STEEL GUARDRAIL MT-102

2

3

3

1

2

-

A-406

A-406

A-406

CL

THIRD FLOOR T.O.F.F While theA.F.F. facade was in production, the 17'-2 7/8" B.O. DECK demolition process began. First with the existing 16'-6 3/8" A.F.F. facade, in conjunction with the existing interiors, and7'-0" the partial removal of the existing slabs. All HEADROOM CLEARANCE this paved way for phase 2 ofC the project, which CL L was the creation of a store featuring a new customer experience in retail. PIN MOUNTED GLASS

esday, 06/06/2018 .00 DECORATIVE STAIRS 03.DWG

GUARDRAIL In the interior, a grand atrium was introduced GL-101 METALproudly PIPE HANDRAIL which showcases 9 and 10 feet wide, MT-102 terrazzo grand staircases. The stairs cantilevered off each floor with only a hanger supporting the entire systems across 5 floors. Glass guardrails flanked one side to allow for a continuous view SECOND FLOOR T.O.F.F in and0'-0" outA.F.F. of the slumped glass facade, which captured the motion of people as they traversed each floor. The blurring of motion reflected

Nike’s saying that, “Everyone is an athlete.” Steel guardrails flanked the other side of the stairs, illustrating the raw and industrial look Nike favored. CL

CL

CL

A fun innovative and sustainable design introduced by Nike was the incorporation of recycled Nike shoe soles, coined “the Nike grind”, into the terrazzo floor tiles throughout the store. Flecks of neon rubber highlight the black, gray, and white terrazzo within the store and long the grand stairs. So how did Nike plan to achieve the new experience of Nike retail? It is all about the unique, customized user experience.

TERRAZZO TREADS, RISERS AND LANDINGS FL-103 1 PAINT EXISTING STAIR STRUCTURE P-106

CL

In the front of house spaces, ceiling, floor, and power and data systems were set up so that it allowed for the most flexibility. For instance, a unistrut ceiling grid allowed for Nike to change their store layout easily, furniture and fixtures floated as needed, and the first floor included a raised floor system that allowed for an endless configuration of space with ease. This allows Nike to change the user experience as frequent as they wanted, presenting as many stories as they please, which trust me, Nike does frequently update their spaces-- as frequent as every 2 weeks.

SECOND FLOOR T.O.F.F 0'-0" A.F.F.

6

2ND TO 3RD FLOOR DECORATIVE STAIR 03

2 ELEVATION

2ND TO 3RD FLOOR DECORATIVE

3 ELEVATION


7


NIKE FLAGSHIP - NEW YORK

A

C

E

J

G

A

1

8

2



1

TYP



A



A

48"x15"

406 415



B A-241

1 1 A

A-411

UP

1

2





TEL/COMMS



48"x30"



ELEC ROOM

48"x15" 48"x15"

1

416

48"x15"

STOCK ROOM

1

VAULT 

48"x15"



B A-240

1



DN

1

A A-340

48"x15"

2



UP

A

A-314

1 48"x30"

36"x15"



1

1

2 48"x15"

402

TRIALING AREA

1

48"x15"



1

48"x15"

2 

RETAIL

A-241

1



36"x15"



 

48"x30"

 

2



48"x30"

1



48"x30"

 

6



48"x30"

A-240

48"x15"

401

3

48"x15"





IT CLOSET IDF 403

DN

A-302

1 1

48"x30"





48"x30"

48"x30"

48"x30" 48"x30" 48"x30" 48"x30" 48"x30" 48"x30" 48"x30"





48"x30"

48"x30"





48"x30"

48"x30"





48"x30"

48"x30"



48"x30"

48"x30"

 



48"x30"

48"x30"





48"x30"

48"x30"





      

48"x30" 48"x30" 48"x30" 48"x30" 48"x30" 48"x30"

405

404

A-409

A

HALLWAY

2

A

1 1

48"x30"



48"x30"

48"x30"

48"x30" 48"x30"

 

48"x30" 48"x30"

 

48"x30" 48"x30"

 

48"x30"



48"x30"

48"x30"

 

48"x30"

48"x30"

 

48"x30"

48"x30"

 

48"x30"

 

48"x30"

 







48"x30" 48"x30"





48"x30"

48"x30"

48"x30" 48"x30"





48"x30"

48"x30"

48"x30"

48"x30"

 48"x15"

48"x30"



 48"x15"

48"x30"



 48"x15"

2

1

A-306

1

A-166

48"x30"



1



48"x15"



48"x30"

1

1

48"x15"



1

1

48"x15"

48"x30"





48"x30"

48"x15"

1 36"x15"







48"x30"





48"x30"



48"x30"



48"x30"



48"x30"



48"x30"

48"x30"





48"x18"

48"x30"

48"x15" 36"x15"



48"x18"



A-370

6

TYP.

2

411

A-307



48"x18"



2 STOCK ROOM



2

412





HALLWAY

8"



48"x15"

"x1



48"x15"

48





UTILITY CLOSET 413

2 48"x15"

B





48"x15"





8"

42"x30"

48"x15"

"x1





48"x30"



48

2



1

1

48"x30"



42"x30"

4

48"x15"



2

42"x30"

42"x30"

2

4

48"x18"



 48"x18"

48"x18"





1 A-308

ELEC ROOM 414

A

B

D

F

J

G

NEW YORK CITY ENERGY CODE: TO THE BEST OF MY KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGEMENT, THESE PLANS AND SPECIFICATIONS ARE IN COMPLIANCE WITH THE 2016 NEW YORK CITY ENERGY CONSERVATION CODE.

5

IT IS A VIOLATION OF LAW FOR ANY PERSON UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ARCHITECT, TO ALTER AN ITEM IN ANY WAY ON THIS DRAWING OR SPECIFICATION (DOCUMENT). IF A DOCUMENT BEARING THE SEAL OF AN ARCHITECT IS ALTERED THE ALTERING ARCHITECT SHALL AFFIX TO THE DOCUMENT THEIR SEAL AND THE NOTIFICATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE AND THE DATE OF SUCH ALTERATION AND A SPECIFIC DESCRIPTION OF THE ALTERATION.

K

N

1 FOURTH FLOOR FIXTURE PLAN

ISSUED / REVISED REV. DATE

SCALE: 3/16" = 1'-0"

PARTITION LEGEND SYMBOL

DESCRIPTION

Monday, 08/27/2018 A-104.00 FOURTH FLOOR FIXTURE PLAN.DWG

AREA NOT IN CONTRACT (N.I.C.)

EXISTING WALL CONSTRUCTION TO REMAIN

FIXTURE PLAN NOTES 1

ALL FOH FIXTURES PROVIDED BY NIKE AND INSTALLED BY NIKE'S VENDOR. G.C. TO INSTALL MTL. STRAP BLOCKING WHERE INDICATED

2. FLOOR AND WALL FIXTURES SUPPLIED BY NIKE AND INSTALLED BY GC. REFER TO FIXTURE CUT SHEETS FOR MORE INFORMATION.

2

PIPP SHELVING PROVIDED BY NIKE AND INSTALLED BY VENDOR. LAYOUT SHOWN FOR REFERENCE ONLY.

3

LOCKERS PROVIDED BY NIKE AND INSTALLED BY G.C. G.C. TO INSTALL MTL. STRAP BLOCKING AS REQUIRED.

3. NIKE TO PROVIDE HANGING ELEMENT. SHOWN FOR REFERENCE ONLY. 4. HANGING FIXTURES TO BE SUPPORTED BY UNISTRUT. REFER TO RCP FOR LAYOUT. GC TO PROVIDE ADDITIONAL SUPPORT AS REQUIRED.

NEW WALL CONSTRUCTION; REFERENCE WALL TAG AND SHEET G-025.00-G-026.00 FOR WALL CONSTRUCTION INFORMATION NEW WALL CONSTRUCTION WITH FULL HEIGHT 3/4" FRT PLYWOOD BLOCKING; REFERENCE WALL TAG AND SHEET G-025.00 - G-026.00 FOR WALL CONSTRUCTION INFORMATION

5. PIPP SHELVING SUPPLIED BY NIKE AND INSTALLED BY GC. GC TO COORDINATE INSTALLATION REQUIREMENTS WITH PIPP.

Fitting rooms were designed to provide the customers with ample space and a lighting system that adjusted to various conditions through the touch of a button. For the convenience of customers, the cellar floor featured a new concept for Nike, known as the Speedshop, where customers can quickly browse and purchase the hottest trending items or pick up items purchased online stored in the Nike lockers.

9 2

11

ALL FITTING ROOM FIXTURES PROVIDED BY NIKE. GC TO PROVIDE AND INSTALL MIRROR AND ANCHOR ADA BENCH TO FLOOR.

5

GC TO PROVIDE CHANNEL MTD. TO UNDERSIDE OF DECK TO SUPPORT FUTURE TRIALING AREA SCRIM

6

SHIPPING AND RECEIVING DESK/ OPS CABINET PROVIDED AND INSTALLED BY G.C. WHERE INDICATED.

7

14 RECYCLING STORAGE & COLLECTION BY NIKE. DEDICATED AREA FOR STORAGE AND COLLECTION IS REQUIRED FOR AT LEAST 4 STREAMS SUCH AS: MIXED PAPER, CORRUGATED CARDBOARD, GLASS, PLASTICS, AND METALS. DEDICATED STORAGE IS REQUIRED FOR HARD-TO-RECYCLE MATERIALS SUCH AS BATTERIES, MERCURY-CONTAINING LAMPS, AND ELECTRONIC WASTE. 15

8

MPOS DESK PROVIDED AND INSTALLED BY NIKE

2

Back of house supporting spaces were just as important, allowing for ample storage of all their products and convenience stairs were designed for the ease of employees accessing each floor. Hidden within one of the floor’s back of house lies the rumor room, a room for VIP guests only that housed the latest and greatest. Through 2 years of hard work designing, detailing, and constructing, through collaboration with a series of trusted consultants and contractors, with a design team that had a passion to experiment with innovative design, this project is one I can proudly present, which opened on November 15th, 2018 -- just in time for the holidays.

8

2018.02.16

G.C. TO PROVIDE AND INSTALL DRINKING FOUNTAIN WHERE INDICATED - ELKAY ENHANCED EZH2O BOTTLE FILLING STATION & VERSATILE BI-LEVEL ADA COOLER, FILTERED 8 GPH STAINLESS (LZSTL8WSSP)

10 NIKE TO PROVIDE WATER COOLER AND G.C. TO INSTALL WHERE INDICATED - PURE WATER TECHNOLOGY 3I WATER COOLER

4

6. ALL FOH FIXTURES ALONG 52ND STREET WILL BE TEMPORARY/MOVABLE TO ACCOMODATE EXISTING WINDOW OPERATION

The experience of the store is enhanced through the Nike app, which allowed customers to scan products to learn more about them and, if desired, customers could instantly purchase items through the app for ease of check out.

2018.01.19

KEY NOTES

1. SEE SHEET G-025.00-G-026.00 FOR PARTITION TYPES, AND SHEET G-022.00 / G-023.00 FOR DOOR SCHEDULE.

1 2 1

G.C. TO PROVIDE AND INSTALL BOH MILLWORK WHERE INDICATED - REFER TO INTERIOR ELEVATIONS FOR MORE INFORMATION.

1 2 2

12

2018.03.16 2018.04.04 2018.05.11 2018.06.08 2018.06.29 2018.08.17 2018.08.27

ALL BOH FURNITURE/MILLWORK PROVIDED AND INSTALLED BY NIKE.

13 NIKE TO FURNISH AND INSTALL CURTAIN ALL TOILET AND PANTRY FIXTURES PROVIDED AND INSTALLED BY G.C. U.O.N.; REFER TO INTERIOR ELEVATIONS FOR MORE INFORMATION G.C. TO PROVIDE AND INSTALL TOILET PARTITION; REFER TO INTERIOR ELEVATIONS FOR MORE INFORMATION

2

16 EXISTING FIRE HOSE CABINET TO REMAIN P:\Retail\NYC\Nike\650 5th Ave\D-Drawings\3-CDs\02_Tenant Improvements\3.2-Sheets\A-104.00 FOURTH FLOOR FIXTURE PLAN.dwg

1/11/19

6:19 PM

COPYRIGHT c 2017 CALLISONRTKL ARCHITECTS P.C.

FOURTH FLOOR FIXTURE PLAN

A-104.00 SHEET 46 OF 29


9


NIKE FLAGSHIP - NEW YORK

1

PIN MOUNTED GLASS GUARDRAIL GL-101

PAINTED EXISTING W14 X 109 STRUCTURE P-106

K

PIN MOUNTED GLASS GUARDRAIL GL-101 ATRIUM GLASS GUARDRAIL GL-102

METAL PIPE HANDRAIL; POST AT ENDS, BRACKETS IN BETWEEN CENTERED ON PANEL MT-102

NEW GYP. BD. CLADDING; PAINTED P-106

2" TERRAZZO FL-103 3/16" MASTIC

LIGHT COVE; REFER TO VESTIBULE DWGS; A-341

2" TERRAZZO FL-103

EXISTING CURTAIN WALL

3/16" MASTIC 1/8" EXISTING METAL PAN EXISTING STAIR STRUCTURE P-106

1/8" EXISTING METAL PAN EXISTING STAIR STRUCTURE P-106

1/4" PAINTED STEEL PLATE PROVIDED AND INSTALLED BY G.C. P-106

1/4" PAINTED STEEL PLATE PROVIDED AND INSTALLED BY G.C. P-106 T.O. LANDING REFER TO STAIR DETAILS

PIN MOUNTS MT-102 T.O. LANDING

T.O. LANDING REFER TO STAIR DETAILS

REFER TO STAIR DETAILS ATRIUM GUARDRAIL SHOE; FASCIA MOUNTED C.R. LAURENCE L56S BASE; PAINTED P-106

PIN MOUNTS MT-102

MTL ANGLE SUPPORTING GUARDRAIL SHOE; PAINTED P-106 1/4" STEEL PLATE PROVIDED AND INSTALLED BY G.C. P-106

ALIGN

EXISTING X 109 PIN MOUNT @ LOWER LANDING DS W14 02 GLASS URE

1 DETAIL

1/4" STEEL PLATE PROVIDED AND INSTALLED BY G.C. P-106

PLAN : GLASS GUARDRAIL GL-101

1 8"

3 DETAIL

SAW CUT TRACTION STRIP STAINLESS STEEL INLAY STRIP

REVEAL

TYPICAL PIN MOUNT MEETING ATRIUM GUARDRAIL

5 DETAIL

2" TERRAZZO

SCALE: 1/2" = 1'-0"

METAL PIPE HANDRAIL; POST AT ENDS, BRACKETS IN BETWEEN CENTERED ON PANEL MT-102

P. BD. CLADDING;

TERRAZZO TREAD FL-103

EXISTING HSS 6 STRUCTURE; PAINTED AT LOCATIONS WHERE NOT CLADDED P-106

PIN MOUNTED GLASS GUARDRAIL DS 02 CLADDING AROUND BEAM GL-101 ATRIUM GLASS GUARDRAIL GL-102

SCALE: 1 1/2" = 1'-0"

GLASS GUARDRAIL; GUARDRAIL SHOE ONLY EXISTS BEHIND CLADDING ALONG 52ND STREET

METAL PIPE HANDRAIL; POST AT ENDS, BRACKETS IN BETWEEN CENTERED ON PANEL MT-102 PIN MOUNTED GLASS GUARDRAIL MT-102 2" TERRAZZO FL-103

SCALE: 1/2" = 1'-0"

TYPICAL STAIR TRE

7 DETAIL

SCALE: 1/2" = 1'-0"

2" TERRAZZO FL-103 3/16" MASTIC

OVE; REFER TO LE DWGS; A-341

TERRAZZO METAL 2" PIPE HANDRAIL; POST AT FL-103 ENDS, BRACKETS IN BETWEEN CENTERED PANEL 3/16"ON MASTIC

G CURTAIN WALL

1/8" EXISTING METAL PAN EXISTING STAIR STRUCTURE T.O. LANDING REFER TO STAIR DETAILS

MT-102 1/8" EXISTING METAL PAN EXISTING STAIR STRUCTURE 1/2" STEEL GUARDRAIL P-106 MT-102 1/4" PAINTED STEEL PLATE PROVIDED AND INSTALLED BY G.C. 2" TERRAZZO FL-103P-106

1/2" METAL CONTRAST STRIP 1/8" MASTIC

T.O. LANDING REFER TO STAIR DETAILS

GUARDRAIL SHOE; PAINTED PAINT EXISTING STAIR P-106WHEN EXPOSED STRUCTURE 1/4" STEEL PLATE PROVIDED AND FL-103 INSTALLED BY G.C. NEW GYP. BD. CLADDING; P-106 PAINTED

P-106 J-TRIM PAINTED TO MATCH ADJACENT SURFACES

P-106

P-106

3 1/4" RAISED FLOOR SYSTEM

P-106 TERRAZZO TREAD PAINT BREAK FL-103MTL CLADDING P-106

TERRAZZO TREAD FL-103

SAW CUT TRACTION T.O. FIRST FLOOR FINISH STRIP STAINLESS STEEL INLAY STRIP 69'-11 5/8"

1/2" STEEL GUARDRAIL MT-102 TYPICAL PIN MOUNT MEETING ATRIUM GUARDRAIL METAL PIPE HANDRAIL; POST AT ENDS, BRACKETS IN BETWEEN CENTERED ON PANEL SCALE: 1/2" = 1'-0" MT-102 2" TERRAZZO FL-103

TYPICAL STAIR TREAD & RISER

5 DETAIL

FL-101 PAINTED MTL REVEAL P-106

PLAN : STEEL GUARDRAIL

2-HOUR RATED TYPE X GYP WALL; PAINTED P-101

RAISED FLOOR SYSTEM FL-101

7 DETAIL

EXISTING FLOOR SLAB SAW CUT TRACTION STRIP STAINLESS STEEL INLAY STRIP

Page 3, 5, 7, 9, & 11 (Lower Left) by Field Conditions

DS 02 CLADDING BELOW LOWER LANDING

SCALE: 1/2" = 1'-0"

M-102 TERRAZZO TREAD FL-103

Photo Credits

SCALE: 1/2" = 1'-0"

4 DETAIL

SCALE: 1/2" = 1'-0"

ANGLES FOR STEEL GUARDRAIL ATTACHMENT; PAINTED P-106

PAINTED BREAK MTL STAINLESS STEEL INLAY STRIP CLADDING SAW CUT TRACTIONMT-104 STRIP P-106

J-TRIM;GLASS PAINTED TO MATCH GUARDRAIL ADJACENT SURFACES GL-101

DS 02 STEEL GUARDRAIL @ LOWER LANDING

PAINTED EXISTING STAIR STRUCTURE P-106

5/8" PAINTED GYP. BD. CLADDING

MTL STUD FRAMING; G.C. TO CONFIRM FEASIBILITY

2 DETAIL

2" TERRAZZO FL-103 3/16" MASTIC 1/8" EXISTING METAL PAN

PAINT EXISTING STAIR STRUCTURE P-106

P-106FOR STEEL MTL ANGLE GUARDRAIL ATTACHMENT MTL ANGLE SUPPORTING

ZZO

1/2" STEEL GUARDRAIL MT-102

1/8" EXISTING METAL PAN MTL FRAMING; G.C. TO CONFIRM EXISTING PITCH BLOCK FEASIBILITY

ATRIUM GUARDRAIL SHOE; T.O. LANDING FASCIA MOUNTED C.R. LAURENCE REFER TO BASE; STAIR PAINTED DETAILS L56S

PLAN :

P-106 MTL ANGLE SUPPORTING GUARDRAIL SHOE; PAINTED P-106

2" TERRAZZO FL-103

3/16" MASTIC PIN MOUNTS MT-102 T.O. LANDING 1/8" EXISTING PANDETAILS REFERMETAL TO STAIR

T.O. LANDING STAIR DETAILS

ATRIUM GUARDRAIL SHOE; FASCIA MOUNTED C.R. LAURENCE L56S BASE;PAINTED

TYPICAL STEEL GUARDRAIL DETAIL MEETING ATRIUM GUARDRAIL

6 DETAIL

SCALE: 1/2" = 1'-0"

TIC

ING N STAIR RE T.O. LANDING STAIR DETAILS

MING; G.C. TO CONFIRM TY

TYPICAL STEEL GUA

8 DETAIL

SCALE: 1/2" = 1'-0"

P:�R�tail�NYC�Nik��650 5t� A���D-Drawin�s�3-CDs�02�T�nant Im�ro��m�nts�3.2-S��

ATRIUM GUARDRAIL SHOE; FASCIA MOUNTED C.R. LAURENCE L56S BASE;PAINTED

Page 11 (Top & Lower Right), 12, & 13 by Nike, Inc.

P-106 MTL ANGLE SUPPORTING GUARDRAIL SHOE; PAINTED P-106 1/2" STEEL GUARDRAIL MT-102 2" TERRAZZO FL-103 3/16" MASTIC 1/8" EXISTING METAL PAN

10

1/2" STEEL GUARDRAIL MT-102

PIN MOUNTED GLASS GUARDRAIL GL-101

2" TERRAZZO FL-103 3/16" MASTIC 1/8" EXISTING METAL PAN 1/8" REVEAL

2" TERRAZZO FL-103 3/16" MASTIC 1/8" EXISTING METAL PAN

NEW YORK CITY ENERGY CODE: TO THE BEST OF MY KNOWLEDGE, BELIEF AND


11


12


13



NIKE FLAGSHIP - CHICAGO

LOCATION: TYPE: PROGRAM: GROSS AREA:

669 N. Michigan Avenue Chicago, IL Retail 5 Floors of Retail 1 Floor of Offices & Employee Facilities 51,766 ft2

15


NIKE FLAGSHIP - CHICAGO

Nike 669 N. Michigan Ave

Flagship Renovation

Contributions Coordination, Documentation, Construction Administration Execute all coordination between Nike Design, the G.C., the structural engineer, and the MEPF engineers, detailed all documentation sets for both Phase 1 and Phase 2, reviewed all shop submittals and RFI, filled and obtained building permits for both phases, and completed construction administration for phase 1. Vertical Transportation Designed, detailed, and coordinated all cantilevered feature stairs on 1st to 2nd floor and 3rd to 4th floor.

Nike Chicago Flagship Store Among the crazy deadlines of Nike 650, I solely worked on the documentation, coordination, and construction administration of the Nike Chicago Flagship Store renovation. Phase 1, completed on December 12, 2018 included the introduction of 2 new feature stairs made of steel and wood. This aided customers through the store, since the original layout had hidden escalators located differently on each floor. Since the competion of the stairs, the usage of the stairs outnumbers that of the escalator and elevator combined.

16

Phase 2, with construction scheduled to begin mid January of 2019 and completion by March, includes the refinishing of floors, updates to all interior fixtures, introduction of new fitting rooms, and the highly needed expansion of stockrooms. More to come on this phase soon.


17



KUNMING SPRING CITY 66

LOCATION: Kunming, China TYPE: Mixed-Use PROGRAM: North Plot: Office Tower & Retail Podium South Plot: Service Apartments & Retail Podium GROSS AREA: 396,000m2 PRINCIPAL: Jamie von Kemplerer

1


KUNMING SPRING CITY 66

North Plot

Retail Podium & Office Tower

Design and Coordination Contributions Retail Podium: Main entry designs and canopies West terrace roof design Sunken garden facade Display box architectural elements Connection between retail and office tower fold Office Tower: BMU Screen

2


KUNMING SPRING CITY 66

RENDERING BY MIR.

3


KUNMING SPRING CITY 66

North Plot | Retail Podium North Entry Study

4


KUNMING SPRING CITY 66

5


KUNMING SPRING CITY 66

a

e f

c

d

North Plot | Retail Podium 3D Studies a. Bridge b. Sunken Garden c. Northeast Entry d. West Terrace Roof e. Rooftop Skylight F. Display Box & Stone Wall

6

b


KUNMING SPRING CITY 66

a

d

b

e

c

f

7


KUNMING SPRING CITY 66

• • • • • • • • • • •

• • • •

• • • •

ARCHITECTURE DESIGN UNIT

1 A-1201

• • • •

• • • •

• • • •

• • • •

1 A-2101.1

1 A-1212

• • • • • • • • • •

YNDI PROJECT SEAL

• • • •

• • • •

• • • • • • • • • • •

REGISTERED SEAL

• • • • • • • •

• • • • • •

• • • •

• • • •

• • • •

• • • • • • • •

• • • RETAIL • • • • • • • • • • • • JOINTLY DESIGNED WITH

• • • • • • PROJECT • • • • • • • • • •ARCHITECT •••••••••••••

• • • • • • • • • • • • • •

1 A-2101.2

+1893.00M • • • • • • • • • • • • +0.00M• • • • • • • • • • • • • •

• • • • • • DRAWING No.

• • • •

• • • • • •• • • • • • • • • • • • AUTHORIZED BY

• • • • • •

FENCE 200

FENCE

• • • • • •

• • • • • •

GAS HOSUE GAS HOSUE

DESIGNED BY

CHECKED BY

1 A-1211

• • • • • • • • •PROJECT • • • • • • • • • STRUCTU •••••••••

• • • • • •

• • • • • • • • • •

• • • • • •

AUTHORIZED BY

• • • •

200 150

• • • • RT

• • • •

• • • RETAIL •

DESIGNED BY

• • • •

1 A-3101

• • • • • • • • •PROJECT • • • • • • • • •M&E • • • • •ENGI ••••

OT

1 A-1204

• • •

AUTHORIZED BY

+1893.00M [• • • • •] • • • +0.00M [• • • • •] • • •

DESIGNED BY

• • • • • • • • • PLANNING • • • • • &• DESIG •

• • • • • • OT 1 A-1202

• • • • • • • • • • • • • • • • • • • • • •

DISCIPLINE RESPONSIBLE BY

• • • RETAIL •

• • • •

DISCIPLINE RESPONSIBLE BY

RT

• • • • • • • • • TRAFFIC • • • • CONSULT • • •

SURVEYOR • • • • • QUANTITY • • •

1 A-1211

• • • • RK6 RK7

RT TENDER SE

00

• • • • • • • • • • • REVISION

RK8

• • • • • • •

RT

RK9

• • • • • • • • • •

OT

CLIENT

RK10

• • • • • • • •

1 A-4101

CAUSE

• • • • • • • • • • •

• • • • • • • +1893.00M • • • • • • • • • • • • +00.00M • • • • • • • • • • • • • • •• • • • • • • ( • • •#1)•

• • • •

RK11

• • • • • • • • • • PROJECT NAME

• • • • •・ • • •

• • •• • • • • • • ( • • #2) • •

• • • • • • • • • • DRAWING TITLE

• • • • • • • •

• • • • • • •PLA ••

• • • • SA

• • • • • • • • • • • •

• • • • • • • •

• • • • • • • •

• • • • • • • • • • • •

• • • • • • • •

PROJECT No.

209I546

• •

PROJ

• • • • • • • • • •• • STATUS

• /• • • • • • • • • • • • •• /• • • • • • • • • • • • •

• ••• • • • • • •

FENCE

SCALE

GAS HOUSE HOSUE

• • • • • • • •

1:500

DISC

• •

DATE

• • • • • • • • • • +1888.33

DRAWING No.

• • • • • • • • • •

• • • • • • • • • •

A-1101

• • • • • •• • NAME

+1889.58

SIG

• ••• • • • • AUTHORIZED BY

• ••• • • •

• ••• • • • •

FENCE

GAS HOSUE

1 A-1212

CHECKED BY

• • • • • • • • • •

• • • •

1 A-1203

• • • • • •

• ••• • • • •

N

CHECKED BY

• • • • • •

• • • • • • •• •• •• ••

DISCIPLINE RESP. BY

• • • • • • • •• DESIGNED BY

• •

••• • • •

• ••• • • • • DRAWN BY

一. 本图版权为云南省设计院所有,不得翻印。 二. 未盖云南省设计院出图专用章无效。 • • • • • • • • • • • • • • • • • •

North Plot | Retail Podium Construction Documentation Overall ground floor plan

8


• • • • • • • • F.O.S

KUNMING SPRING CITY 66

• • • • • •

ST-01 TYP

3 A-2302.3

MT-12

5650

625

425 OPP

• • • • • •

REGISTERED SEAL

MT-12

TYP

MT-12

• • • • • •

100

1 A-2402.11

1492

• • • •

• • • • • •

2 A2302.2

YNDI PROJECT SEA

MT-11

100

600

• • • • • •

• • • • LEVEL 4 18.25 M

200

• • • •

• • • •

OPP

313

1100

1 A-2402.12

1100

• • • •

• • • •

OPP

1770

• • • • • • GUTTER & PIPE

3 A-2401.1.10

ARCHITECTURE D

10

313

4000

600

• • • •

• • • •

Y 1300

JOINTLY DESIGNE

• • • • • • PROJ •••••

2 A2302.2

1492

• • • •

GL-11

• • • • LEVEL 3 12.60 M

℄ GL-15A 2 A-2402.10 OPP

DRAWING No.

• • • • • •• • • AUTHORIZED BY

• • • • • • CHECKED BY

• • • • • • • • •P

MT-12

8955

• • • • • • 2 A-2302.3

3 A-2402.10

OPP

OPP

AUTHORIZED BY

• • • • • •

DISCIPLINE RESP

1 -

• • • • • • DESIGNED BY

• • • • • • • • •P

GL-11

1492

1 A-2402.10

6300

1492

1 -

• • • • • •

MT-12 MT-12

1492

• • • • • •

• • • • • •

GL-11

AUTHORIZED BY

• • • • • •

MT-12

DISCIPLINE RESPO

• • • • • •

1492

DESIGNED BY

• • • • • • • •

100

2 A-2402.11

400

600 100

1 A-2302.3

100

F.O.G

200 1000

• • • • LEVEL 2 6.30 M

600

OPP

• • • • • • • •

MT-12

MT-12

MT-12

2 A-2402.15

GL-21A MT-13

OPP

MT-12

6300

••••••• • ••••••••••••••••••••

5100

5000

MT-02C

• • • • • QUANT • • •

MT-12

MT-12

GL-01A

GL-01A

00 • • • • • REVISION

CAU

• • • • • • 5 A-2405.10

• • • • LEVEL 1 0.00 M

• • • GL-21A MT-13 3 A-2302.2

• • • • • • SECTION

2

3 -

• • • • • • ELEVATION

• • • • • • PROJECT NAME

Scale: 1:50

• • • • • • DRAWING TITLE

Scale: 1:50

• • •• TYPE_RT

10 3 A-2402.03

5 A-2402.03

4 A-2402.03

OPP

OPP

GL-14A

2 A-2402.02

2 A-2402.02

2 A-2402.01

1 A-2402.02

3 A-2402.01

OPP

2 A-2305.18

• • • • • • PROJECT No.

• • • • • • STATUS

• ••• • • • SCALE

21

00

TY

P

6 A-2402.03

1679

2100 TYP

5 A-2402.01

VARIES

MT-11

2800

DRAWING No.

3 A-2302.2

• ••• • • •

VARIES

2100 TYP

℄ 2 -

• • • • • •

405

1200

3

ST-03

1095

CLIENT

670

OPP

• • • • • •

1 A-2302.2

1500

1 A-2302.2

150

• • • •

MT-11 3 -

VARIES

4 A-2402.02

AUTHORIZED BY

• ••• • • • CHECKED BY

• ••• • • •

CHECKED BY

• • • • • •

• • • • • • • • • • • • •• • ••• • •• DESIGNED BY L2 DISPLAY BOX PLAN

DISCIPLINE RESP. BY

1

Scale: 1:50

North Plot | Retail Podium Construction Documentation Display box walltype sheet

9

• ••• • • • DRAWN BY

一. 本图版权为云南省设计院所有,不得翻印。 二. 未盖云南省设计院出图专用章无效。 • • • • • •


KUNMING SPRING CITY 66

• • • • • • • • • • • •

15360 870

765

1970

1325

• • • • • • • • • • • •

REGISTERED SEAL

2920

6620

• • • •

855

2100 TYP

• • • • • • • • • • • • • • PAVERS BY OTHERS. REFER TO LANDSCAPE DRAWINGS.

2 A-2413.13

• • • • • • • • • • • • JOINTLY DESIGNED WITH

• • • • • • PROJECT • • • • • • • • • •ARCHITECT ••••••••••••••••

850

500

• • • •

MT-01E

4 A-2413.12

420

5

• • • • • •

880

• • • • • • • • • •

YNDI PROJECT SEAL

187

• • • •

1015

ARCHITECTURE DESIGN UNIT

1895

500

• • • •

• • • •

610

1 A-2313.3

3948

• • • • • • • •

1 A-2416.10

1 A-2416.18

2100 TYP

• • • • • • • • • • T.O. ROOF 36.17 M

1435

• • • • • • • •

M1-01E

450

• • • • LEVEL 6 29.55 M

• • • • • •

• • • • • •

DRAWING No.

5

4 A-2413.11

• • • • • • SECTION

3

Scale: 1:50

ST-03

MT-12

MT-12

GL-01

2 A-2411.10

Scale: 1:50

4 A-2413.10

AUTHORIZED BY

• • • • • •

• • • • • •

DESIGNED BY

CHECKED BY

• • • • • • • • •PROJECT • • • • • • • • • STRUCTURA ••••••••••••

• • • • • •

• •

• • • • • • • • • •

• •

• • • • • •

• •

DISCIPLINE RESPONSIBLE BY

DESIGNED BY

820 100 600

1 A-2313.3

• • • • • •• • • • • • • • • • • •

AUTHORIZED BY

500

• • • • • • • • • • T.O. ROOF 36.17 M

• • • • • • SECTION

• • • • • • • • •PROJECT • • • • • • • • •M&E • • • • •ENGINE ••••••

3 A-2413.13

• • • • • •

• •

• • • • • • • • • •

• •

• • • • • •

• •

AUTHORIZED BY

DISCIPLINE RESPONSIBLE BY

DESIGNED BY

6620

• • • • • • • • • PLANNING • • • • • &• DESIGN •

4600

• • • • • • • • • TRAFFIC • • • • CONSULTA • • •

SURVEYOR • • • • • QUANTITY • • •

450

• • • • LEVEL 6 29.55 M

4 A-2413.11

1320

• • • • • • SECTION Scale: 1:50

RT TENDER SET

00

• • • • • • • • • • • • REVISION

CAUSE

• • • • • • • • • • • • MT-01E

805

4 A-2413.10

MT-01E MT-12

GL-01

• • • • • • • • • •

• • • • • • • • • • T.O. ROOF 36.17 M

CLIENT

500

MT-51

• • • • • • • 1420

MT-01E 1 A-2416.10

1 A-2313.3

SIM

• • • • • • • • • • PROJECT NAME

• • • • ・ • • • • •

100

100 600

2

• • • • • • • • • • DRAWING TITLE

1 A-2413.10

2 A-2413.13

4600

4600

6620

• • ••• • •• • WALL TYPE_RT13_ TERRACE ENTRY

3 A-2413.10

• • • • • • • • PROJECT No.

SIM

209I546

• • • • LEVEL 6 29.55 M

• • • • • • • 1:100 • • @• A1 • • • SCALE

DATE

• • • • • • • • • • DRAWING No.

A-2313.6

• • • • • •• •• NAME

SIGN

• ••• • • • • AUTHORIZED BY

• ••• • • •

• ••• • • • •

450

450

• • • • • • • • • • • • • • PAVERS BY OTHERS. REFER TO LANDSCAPE DRAWINGS.

• • • • • • • • • • • • • • PAVERS BY OTHERS. REFER TO LANDSCAPE DRAWINGS.

PROJE

DISCIP

STATUS

MT-01E

• •

• • • • • • • • • • • ••

CHECKED BY

• • • • • •

• ••• • • • •

4

• • • • • • SECTION

4 A-2413.11

Scale: 1:50

1

• • • • • • SECTION Scale: 1:50

CHECKED BY

• • • • • •

• • • • • • •• •• •• ••

DISCIPLINE RESP. BY

• • • • • • • •• DESIGNED BY

• •

••• • • •

• ••• • • • • DRAWN BY

一. 本图版权为云南省设计院所有,不得翻印。 二. 未盖云南省设计院出图专用章无效。 • • • • • • • • • • • • • • • • • • •

North Plot | Retail Podium Construction Documentation West terrace roof walltype sheet

10


KUNMING SPRING CITY 66

• • • • •

• • • •

• • • •

ARCHITECTURE

5

208

35

65 • • • • •

• • • •

4775

0 75

• • • • •

1

5850

REGISTERED SE

45

22

• • • •

00

• • • • • • PRO •••

28

10

4940

WMU 13

13

JOINTLY DESIGN

2000

• • • •

2950

• • • • •

20

• • • • • •

12

Scale: N/A

WMU 12

11

Scale: N/A

WMU 11

• • • • • •

WMU 10

10

Scale: N/A

DRAWING No.

• • • • • •• • AUTHORIZED BY

Scale: N/A

• • • • • • CHECKED BY

• • • • • • •

• • • • •

AUTHORIZED BY

• • • • •

DISCIPLINE RES

• • • • • DESIGNED BY

• • • • • • •

• • • • •

AUTHORIZED BY

• • • • •

246

DISCIPLINE RES

345

0

• • • • • DESIGNED BY

2065

45

33

• • • • • • •

94 0

512

00 2000

WMU 09

9

• • • • • QUAN • •

0

1590

2000

1670

2500

15

50

• • • • • • •

2815

20

8

Scale: N/A

WMU 08

7

Scale: N/A

WMU 07

6

Scale: N/A

WMU 06 Scale: N/A

00

• • • • • REVISION

C

• • • • • • • • • • CLIENT

• • • • • • •

PROJECT NAME

5310

3970

4620

• • • • •

DRAWING TITLE

26

• • • MOCK-U

30

0

650

0

0

• • • • • PROJECT No.

2500

2370

625

2250

397 250

• • • • • STATUS

• ••• • • SCALE

• • • • •

1735

2500

4800

1825

• • • •

• • • • • •

3150

• • • •

• • • •

• • • •

YNDI PROJECT S

DRAWING No.

354

0

• ••• • •

AUTHORIZED BY

• ••• • • CHECKED BY

5

WMU 05 Scale: N/A

4

WMU 04

3

Scale: N/A

WMU 03 Scale: N/A

2

WMU 02 Scale: N/A

1

WMU 01 Scale: N/A

• ••• • • CHECKED BY

• • • • •

DISCIPLINE RESP.

• ••• • • DESIGNED BY

• ••• • • DRAWN BY

一. 本图版权为云南省设计院所有,不得翻印。 二. 未盖云南省设计院出图专用章无效。 • • • • • •

North Plot | Retail Podium Construction Documentation Workmanship mock-up axonometric views

11


KUNMING SPRING CITY 66

South Plot

Service Apartment & Retail Podium

Design and Coordination Contributions Service Podium: Curtain wall and massing design Main and residential garden entrances Bridge with supporting pier connecting service apartments to north plot retail podium Tower top terrace design Retail Podium: Curtain wall and overall massing design

12


13


KUNMING SPRING CITY 66

14


KUNMING SPRING CITY 66

15


KUNMING SPRING CITY 66

South Plot | Service Apartment & Retail Podium Typical Low Zone Study

16


KUNMING SPRING CITY 66

17


KUNMING SPRING CITY 66

a

b c

South Plot | Service Apartment & Retail Podium 3D Studies a. Tower Top b. Typical East/West Facade c. South Podium Garden

18


KUNMING SPRING CITY 66

a

b

c

19


KUNMING SPRING CITY 66

South Plot | Service Apartment Main lobby entrance (top) Private garden entrance (bottom)

20


KUNMING SPRING CITY 66

21


KUNMING SPRING CITY 66

North Plot & South Plot | Bridge Connection between retail podiums

22


KUNMING SPRING CITY 66

23


KUNMING SPRING CITY 66

建筑设计单位:

SJ

SH

SG

SF 110 1130

SE

SD

SC

SA

110 1145

765

1175

1200

1125

470

710

885

865

1595

470

1120

1200

1175

760

1115

1095 院出图章:

2000 2400

BEAM COVER BY OTHERS - TYP. 梁覆盖由其他顾问

400

注册执业章:

合作设计单位:

2600

1

项目建筑师 PROJECT ARCHITECT

S1

1175

560 450

395

2

1175

2990

4000

项目结构工程师 PROJECT STRUCTURA

130 TYP

审定人 专业负责人 设计人

项目机电工程师 PROJECT M&E ENGINE

1075

700

1075

1075

700

1175

700

1210

1210

1210

700

1175

1175

1175

1175

700 1145

EXIT SIGN BY OTHERS - TYP 出口指示牌 由其他顾问 .

SG

SF

1175

1175

700

1175

1175

1175

1175

700

1175

1175

1075

TIE BACK ANCHOR - TYP. REFERS TO BMU DRAWINGS 安全定位销参考擦窗机布置图

LINE OF PARAPET ABOVE. 上层女儿墙

SE

800

800 审定人

二层平面 PLAN L2

3

SD

800

专业负责人 设计人

Scale: 1:50

项目规划设计顾问 PLANNING & DESIGN

SC

项目交通没计顾问 TRAFFIC CONSULTA

2600

OPEN 开口

OPEN 开口

OPEN 开口

OPEN 开口

LINE OF RING BEAM ABOVE. 上层圈梁线

OPEN 开口

700

1210

1130

1210

700

SH

1175

1175

1145

470

1595

865

1595

470

1145

1175

1175

380

SG 1

SF

SE

SD

2

5

1175

1095

1175

700

80

135

SC

旋转门顶端 TOP OF REVOLVING DOOR

2

Scale: 1:50

440

SA

版本

1

3

本图升版后,以最高版本为

4

FLOOR MAT BY CWC 地板垫由幕墙顾问 2

1

3

1

4

4

OPP

2

COLUMN COVER BY OTHERS.

SIM

OPP

建设单位:

LINE OF ENTRY CANOPY ABOVE. 上层雨蓬

1

TYP.

SIM

OPP

昆明恒颖地产有

柱覆盖由其他顾问

项目名称:

LINE OF RING BEAM ABOVE.

恒隆广场�

公寓地下部分及公寓

上层圈梁线

图纸名称:

公寓2墙型_塔楼_大堂 WALL TYPE_SA3_TOWER_L

2995

S1

395

1

5

1075

1075

700

1175

1175

1180

700

1210

4

2

OPP

1075

工程

档案号:

2

700

升版原因

3 1

4

700

710

80

SJ

工料测量 QUANTITY SURVEYOR

S1

395

2995

COLUMN COVER BY OTHERS. 柱覆盖由其他顾问

1140 3120

700 62.5

2

1

1

4

设计阶段:

1 2

5

2

例:

图纸编号:

OPP

OPP

1140 80

3

专 1:50

1050 1175

1175

90

535

1465

1680

995

1465

535

3925 645

1050 1680

90

1175

1175

700 62.5

1105 3055

1105 80

1175

700

1075

1

1

800

标准平面 PLAN L1 Scale: 1:50

700

专业负责人 设

版权所有,翻印必究.

South Plot | Service Apartment Construction Documentation Main lobby entrance walltype plans

24

A-4303.3 签


KUNMING SPRING CITY 66

建筑设计单位

S1

S1

S1

未来公寓幕墙承建商工程范围 40

40

40

FUTURE SA CWC SCOPE LEVEL 5 +23.90 M (T.O.F.F.)

LEVEL 5 +23.90 M (T.O.F.F.)

院出图章:

SA CWC SCOPE 1360

1400

1400

公寓幕墙承建商工程范围

1

2490

100 600

300

5% SLOPE

300 200

1500

1460

895

1

项目建筑师 PROJ

LEVEL 4 +18.25 M (T.O.F.F.)

500

635

900

900

75

750

1460

2200

490 1460

合作设计单位

5% SLOPE

900

50

1160

2

1

1700

100

100

6060 1

200 500

3750

1

5650

2490

注册执业章:

项目结构工程师 P

2650

3990

3930

2

5650

6190

3 2

审定人 专业负责人

1

设计人

项目机电工程师 P

3000 100

500 200 100

工料测量 QUANT

400

6300 3700

3700

3725

105

4000

TO BE CONFIRMED BY MEP ENGINEER 由机电顾问待定

BEAM COVER BY OTHERS 梁覆盖由其他顾问 4000

项目交通没计顾问

200

600

450 500 375

500

1300 100

500

400

专业负责人 LEVEL 3 +12.60 M (T.O.F.F.) 设计人

项目规划设计顾问

200

105 3725

3700

TO BE CONFIRMED BY MEP ENGINEER 由机电顾问待定

BEAM COVER BY OTHERS 梁覆盖由其他顾问 4000

BEAM COVER BY OTHERS 梁覆盖由其他顾问 4000 版本

1

O.C.

O.C.

750

昆明恒

2200

公寓地下 6300

6300

玻璃顶

EXIT SIGN BY OTHERS 出口指示牌 由其他顾问

本图升版后, 建设单位:

项目名称:

1

1

2200

1

GLASS TOP

LEVEL 2 +6.30 M (T.O.F.F.)

100 450

100 450

550

100 450 1

1

2200

550

1

2400

750

2400

750

2400

550

400

图纸名称:

公寓2墙型 WALL TYPE_SA

SIM 2

2

2800

2800

1

2800

1

2000

1200 2500

2000 1750

2600

2000 500 85

TO BE CONFIRMED BY MEP ENGINEER 由机电顾问待定

300

1500

3

审定人

75

75

75

MT-51

750

75

75

1

3

2

档案号:

1

设计阶段:

SIM

比 LEVEL 1 +0.00 M (T.O.F.F.)

3

剖面_塔楼大堂 SECTION - TOWER LOBBY Scale: 1:50

2

剖面_塔楼大堂 SECTION - TOWER LOBBY Scale: 1:50

1

剖面_塔楼大堂 SECTION - TOWER LOBBY Scale: 1:50

例:

图纸编号:

专业负责人 设

版权所有,翻

South Plot | Service Apartment Construction Documentation Main lobby entrance walltype sections

25


KUNMING SPRING CITY 66

• • • • • • • • • • •

S1

S1

SE

SD

SB

GL-04

SA GL-04

40 1

1000

2

GL-04

TYP. APT. FL. T.O.F.F.

1000

40

• • • • • • • • • •

40

3500

1400

MT-12

GL-04 3 -

1100

3500

• • • • • • • • • • •

TYP. APT. FL. T.O.F.F.

• • • • • • •PROJECT • • • • • • • • •ARCHITECT ••••••••••••••

1000

℄ 1000

40

1

1100

1400

• • • • • • • • • • • 2

3500

1400

3500

1400

GL-04

1 -

1100

40

1100

TYP. APT. FL. T.O.F.F.

1000

℄ 1000

40

张志华

• • • • • • • • •PROJECT • • • • • • • • • •STRUCTUR •••••••••

• • • • • • • • • • • • • • • • • • • • • •

• • • • • • • • •PROJECT • • • • • • • • • M&E • • • • •ENGI •••••

7

TYPICAL SECTION @ OP. WINDOW

6

Scale: 1:50

5 -

TYPICAL SECTION @ BALCONY

7 -

GL-25

8 -

6 -

GL-25

GL-25

SHADOW BOX

SHADOW BOX

Scale: 1:50

SHADOW BOX

S1

• • • • • •

S1

• • • • • • • • • •

TYPICAL ELEVATION

4

2

Scale: 1:50

• • • • • •

TYPICAL ELEVATION

• • • • • • • • • PLANNING • • • • • &• DESIG •

Scale: 1:50

40

1000

1

TYP. APT. FL. T.O.F.F.

1000

40

• • • • • • • • • TRAFFIC • • • • CONSULT • • •

℄ 2

• • • • • QUANTITY • • • SURVEYOR

3500

150

40

• • • • • • • • • • •

℄ 3500

1

2

• • • • • • •

• • • • • • • • • •

• • • •

TYP. APT. FL. T.O.F.F.

(KC2008-32-

1000

• • • • • • • • • • 5 -

9 3

3

TYPICAL SECTION @ UTILITY PLATFORM Scale: 1:50

450

GL-22

GL-22

MT-12

S1 F.O.G.

F.O.G.

4

9

公寓1墙型_塔楼_东西 TYPE_SA1_TOWER_

1

400

5

X

X

700

1175

1175

1175

700

1175

1175

1175

• • • • • • • •

• •

• • • • • • • • • • • •

900

℄ 2950

Scale: 1:50

2350

TYPICAL SECTION

1145

1145

700

1075

1075

1075

2400

F.O.G.

1

• • • • • • • • 1:50 • •

• •

• • • • • • • • • • A-4301.1

• • • • • •• • • ••• • • • •

4 -

150

8

1

705

450

40

850

850

• • • • • • • • • • •

• • • • • • • • • •

1000

SA

TYP. APT. FL. T.O.F.F.

2500

850

400

1000 2500

40 3

SB

1000

40

SD

2

4

1

SE

2500

2500

2500

3

5 -

7 -

6 -

2 -

• ••• • • • • • ••• • • • •

TYP. APT. FL. T.O.F.F.

• • • • • • • • • •

INTERIOR ELEVATION

3

Scale: 1:50

TYPICAL PLAN Scale: 1:50

1

TYPICAL PLAN Scale: 1:50

• ••• • • • • • ••• • • • •

• • • • •• • • • •••••••••

South Plot | Service Apartment Construction Documentation Typical East/West walltype sheet

26


KUNMING SPRING CITY 66

建筑设计单位

RK5

3

RK6 11750

RK7

RK8

8400

8400

RK9 8400

RK10 8400

RK11 8400

RK12 10330

栏杆 RAILING

栏杆 RAILING

院出图章:

450

2

3

3600

5650

1600

四層 LEVEL 4 + 18.25 M

注册执业章:

三层 LEVEL 3 +12.60 M

1500

1

3

6300

合作设计单位

项目建筑师 PROJ

6300

11100

二层 LEVEL 2 +6.30 M

首层 LEVEL 1 +0.00 M 2

RK11

RK12

3

5

13205

RK10 8400

RK9 8400

3

2

RK8 8400

RK7 8400

RK6

剖面图 SECTION

8400

项目结构工程师 P

Scale: 1:150

RK5

审定人

11220

专业负责人

商场裙房幕墙承建商 工程范围 RAILING 栏杆

2

4 A-4032

2

设计人

RT CWC SCOPE

栏杆 RAILING

项目机电工程师 P

公寓幕墙承建商 工程范围

SA CWC SCOPE

WMU

1500

四層 LEVEL 4 + 18.25 M

5650

4150

GL-01

项目规划设计顾问

三层 LEVEL 3 +12.60 M

1500

1

3

SEISMIC JOINT • • • • • •

工料测量 QUANT

SA CWC SCOPE

二层 LEVEL 2 +6.30 M

商场裙房幕墙承建商 工程范围

11100

RT CWC SCOPE 6300

MT-13 GL-21

SEISMIC JOINT

公寓幕墙承建商 工程范围 GL-26

项目交通没计顾问

6300

3 MT-12

审定人 专业负责人 设计人

首层 LEVEL 1 +0.00 M

3

RK5

6 A-4032 WMU

RK7

RK6 11750

8400

8400

商场裙房幕墙承建商 工程范围

RT CWC SCOPE MT-12

1

RK9 8400

RK10 8400

3 A-4031 VMU

公寓幕墙承建商 工程范围

RK11 8400

栏杆 RAILING

昆明恒 项目名称:

公寓地下 图纸名称:

5650

• • •• TYPE_S

1500

三层 LEVEL 3 +12.60 M

档案号:

WMU

7 A-4032

WMU

首层 LEVEL 1 +0.00 M

例:

图纸编号:

二层 LEVEL 2 +6.30 M

5 A-4032

GL-26

6300

SEISMIC JOINT • • • • • •

设计阶段:

6300

SEISMIC JOINT • • • • • •

商场裙房幕墙承建商 工程范围 11100

四層 LEVEL 4 + 18.25 M

RT CWC SCOPE

ST-01

本图升版后,

RAILING 栏杆

SA CWC SCOPE

SA CWC SCOPE

MT-12

版本

3

10330

公寓幕墙承建商 工程范围

3

Scale: 1:150

建设单位:

4150

MT-11 1

立面图 ELEVATION

RK12

1500

3880

2

RK8

2

1

立面图 ELEVATION Scale: 1:150

专业负责人 设

版权所有,翻

North Plot & South Plot | Bridge Construction Documentation Enlarged partial elevations and section

27


RENDERING BY ATCHAIN

28


29


30


DONGJIADU

LOCATION: Shanghai, China TYPE: Mixed-Use PROGRAM: Office Tower Headquarter buildings Retail Podium GROSS AREA: 700,700m2 PRINCIPAL: Robert Whitlock

31


DONGJIADU

Lots H, J & L

Office Towers

Design and Coordination Contributions Curtain wall pier, mullion, and spandrel design Rooftop terrace and structure Mid-jacket terraces

32


DONGJIADU

RENDERING BY PLOMPMOZES

33


DONGJIADU

Typical Tower Tops MEP volume enclosure, parapet structural studies, and public garden space

34


DONGJIADU

35


36


37


DONGJIADU

Typical Tower Terraces Balustrade design studies to meet code requirements, planters, floor finish material, lighting and canopy design studies for typcial 1.75m-3.5m wide terraces

38


DONGJIADU

39


DONGJIADU

PLEAT - ZONE 1

PLEAT - ZONE 2

PLEAT - ZONE 3

Typical Tower Pier Profiles Pier profile studies. Illustrated is the selected option, “pleat” from a series of 50+ pier iterations. Piers depth and width vary dependent per zone.

40


41


DONGJIADU

CHINA MINSHENG DONGJIADU PROJ 小东门616、 735街坊地块项目 Dongjiadu, Shanghai, PRC

Owner

中民外滩房地产开发有限公司

COL-A

上海市黄浦区中山南路100号金外滩国 Tel: 33355333 Fax: 33355566

COL-A

EQ

EQ

1595

94751

1 A-6523.21

300 300

1450

8450

1595 300 500 1740 1450 300 EQ

F.O.G.

8450

800 1350 500

23630

1250

F.O.G.

1100

650

F.O.G.

MVA 香港港岛东英皇道979号 太古坊和域大厦西翼14楼 Tel: 852 2529 7037 Fax: 852 25

5 A-6020

℄ 3500

1 A-6513.01 1 A-6513.02

1150 EQ

1200

EQ

COL-2

1150 1150

1100 TYP.

6550

1200

1 A-6020

02 01

CURTAIN WALL VMU TEN CURTAIN WALL VMU TEN

NO.

ISSUANCE

1100

1100 TYP.

650

COL-1

2250

1 A-6513.04

1150

IMT-11A 1300 TYP.

PLOT J

PLOT L

COL-1

T2

T1

F.O.G.

500

1200

600

℄ IMT-11C

1200

℄ 1150

Traffic Consultant

2175 3400

4150

Landscape Consultant

DLC Unit 304, Building 28, Xin Tian Di 119 Ma Dang Rd., Shanghai, 200 Tel: 021 6386 7426 Fax: 021 63

2 A-6020

3500

EQ

1300 TYP.

EQ

UP TO L3

UP FROM L1

1300 TYP.

800 TYP. 3550

600

Lighting Consultant

Brandston Partnership Inc. 上海市淮海东路99号14楼K室 Tel: 021-5396 0327 Fax: 021-53

COL-3

℄ IMT-11B 1 A-6020

1150

ALT Curtain Wall Consultants 上海市浦东新区张杨路838号华都 Tel: +021 5835 8870 Fax: +021

950 600

COL-1

Tel: - Fax: Curtainwall Consultant

1300 TYP.

1150

1150

1200

1150

5250

F.O.G.

1250

3700

800

950

F.O.G.

Quantity Surveyor

450

300

1 A-6512.10

Mechanical-Electrical-Plumbing Engin

3 A-6020

1 A-6512.03

IMT-11A

F.O.G.

400

℄ ℄

EQ EQ

IMT-11C

300 300 1350

600

IMT-11B

F.O.G.

400

1450

IMT-11C

1300

1000

1 A-6511.03

600

1200 4000

℄ ℄ ℄

℄ ℄

1 A-6020

1250

1 A-6511.01

800 TYP.

GOA Tel: - Fax: -

1450

300 500

1 A-6513.03

T3 T4

PLOT H

2350 F.O.G.

400

IMT-11A

F.O.G.

Filename: Z:\2386_Dongjiadu\Drawings\CAD\Sheet\VMU\V-6010 PLOTS HJL VMU PLANS_HJL地块平面图.dwg Plotted by: Blachet Sacaan, Fernanda Plot Time: 5/17/2016 6:43 PM

IMT-11C

IMT-11D 5 A-6020

COL-2

IMT-11C

℄ ℄

1350

IMT-11B

1750

Residential Design Consultant

Parsons Brinckerhoff 上海市 新华路668号甲1楼 Tel: 021 6113 3000 Fax: 021 61

1300 TYP.

400

IMT-11C

COL-2

3500

200 400 400

F.O.G.

1200

1150

1150

600

F.O.G.

800 TYP.

1300 TYP.

3425

1450

800 TYP.

400 300

600

2 A-6020

23630

850

300

500 1250

F.O.G.

1400

5 A-6020

IMT-11A

5250

1750

COL-3

IMT-11B

℄ IMT-11A

9130

1895 1895 800

1 1 A-6512.04 A-6512.05

1350

EQ EQ

800 TYP.

6550

950

23630

UP FROM L2

2 A-6020

UP TO L4

800 TYP.

EQ

EQ 400

800 660 685 690 660

COL-3

1350

800

Commercial Design Consultant

Aedas 31/F One Island East, 18 Westlan Quarry Bay, Hong Kong Tel: +852 2861 1728 Fax: +852

3 A-6020

3000

1750

1 1 A-6512.02 A-6512.01

7000

800 TYP. 900 TYP.

1 A-6512.11

IMT-11B

1 A-6523.21

3 A-6020

1300 TYP.

UP FROM L3

UP TO ROOF

MT-35B

F.O.G.

1895

1750 8730

1750

1 A-6521.01

MT-35A

410 500

1 A-6523.01

ECADI - East China Architectural Design & Engineering Institute Co A131004031 151 Hankou Road Shanghai, PRC Tel: +86 21 63217420 Fax: +86

4 A-6020

9130

4 A-6020

1 A-6523.25

Kohn Pedersen Fox Associates P Architects & Planning Consultants 11 West 42nd Street New York, NY 10036 Tel: 1-212-977-6500 Fax: 1-212 Local Architect & Structural Engineer

4 A-6020

800 TYP.

Architectural Design Consultant

2350

1750

EQ

600

300

COL-A

8450

PLOT

C2 KEY PLAN 6 A-6020

6 A-6020

看台地板颜色/完成面根据业主和建筑师要求确定。 THE COLOR/FINISH OF TERRACE FLOOR TO FOLLOW CLIENT'S AND ARCHITECT'S CHOICE.

6 A-6020

CURTAIN WALL V TENDER 幕墙视觉样板招标 DATE SCALE

3

三层平面图 L3 PLAN

2

SCALE: 1:50

二层平面图 L2 PLAN SCALE: 1:50

1

一层平面图 L1 PLAN SCALE: 1:50

PROJECT NUMBER DRAWING TITLE

PLOTS HJL VMU PLANS_HJL地块平

DRAWING NO.

V-6010

• •••2016 KOHN PEDERSEN FO

Lot H | Visual Mock-up Unit Construction Documentation Plans of the three-story visual mock-up unit encompassing all typical conditions of Lot H retail podium and office towers

42


DONGJIADU

COL-A

COL-1

COL-2

MT-21A

MT-21C

MT-21B

MT-21B

MT-21B

MT-21B

CHINA M DONGJI 小东门61 735街坊

COL-3

MT-29A

SS-26A MT-24B

MT-23B

MT-26B

SS-22D 2 -

3 -

MT-29A SS-23D

SS-22A

SS-22D

SS-22E

SS-23A

SS-23D

SS-23E

SS-22D 4 -

Dongjiadu, Shan

SS-23D 350

1 -

ROOF T.O.F.F. +16.00M

1 A-6512.101 MT-28B

MT-28A

MT-28B

Owner

中民外滩房地产

上海市黄浦区中 Tel: 33355333 F

MT-28B Architectural

MT-29A

MT-22A

MT-29A

MT-29A

Local Archite

3 V-6010

GL-21B

GL-21A

GL-21A

MT-21B

MT-26A

GL-21A

MT-26A

Kohn Peder Architects & 11 West 42 New York, N Tel: 1-212-9

MT-23B 4500

MT-29C

GL-21B

MT-21B

GL-21C

GL-21D

MT-21B

GL-21E

GL-21F

GL-23A

MT-21B

ECADI - Ea Design & E A13100403 151 Hankou Shanghai, P Tel: +86 21

3 V-6010

GL-23B

Commercial D

L3 T.O.F.F. +11.50M

MT-26A

Aedas 31/F One Is Quarry Bay Tel: +852 2

Residential D

MT-23B

GOA Tel: - Fax:

4500

MT-29A

Mechanical-E

Parsons Bri 上海市 新华 Tel: 021 61

GL-27 MT-29A

MT-29C

2 V-6010

MT-29B

16350

GL-27

MT-29B

MT-29B

2 V-6010

MT-29B

Quantity Surv

1 A-6512.102 MT-27A

MT-27A MT-29A

MT-22C

MT-29A

MT-27A

MT-27A

GL-21C

GL-21B

ALT Curtain 上海市浦东 Tel: +021 5

MT-29A SS-27A GL-25A

Lighting Cons

GL-25B

GL-21A

GL-21A

GL-21B

GL-21C

GL-21D

GL-21E

Landscape Co

DLC Unit 304, Bu 119 Ma Dan Tel: 021 63

GL-21F SS-25B

L0 T.O.F.F. +0.00M

立面图

MT-23A

MT-21C

MT-23C

MT-21B

6

ELEVATION

MT-21B

MT-23B

MT-21B

MT-23B

MT-21B

MT-23B

MT-21B MT-24A

MT-29B MT-27A

SS-24A

SS-27A

SS-24B

SS-24C

ST-11A

ST-13B

ST-11B

ST-12A

SS-27B

SS-24D

ST-13A

ST-12B

立面图

SCALE: 1:50

COL-A

COL-A

COL-A

MVA 香港港岛东 太古坊和域 Tel: 852 25

400

1000

2100

SS-25A

2 A-6512.104

2500

MT-26B

Traffic Consu

L1 T.O.F.F. +2.50M

1 A-6512.103 MT-26A

MT-21A

Brandston P 上海市淮海 Tel: 021-53

1 V-6010

1 V-6010

GL-21D

Curtainwall C

4500

MT-27B MT-29C

Tel: - Fax:

L2 T.O.F.F. +7.00M

SS-27B

COL-A

5

ELEVATION SCALE: 1:50

1450

2000 1250

3050

4500 3050

T1

P

SIM.

剖面图

SCALE: 1:50

4500

1 A-6511.06

剖面图

SECTION

2

SCALE: 1:50

Lot H | Visual Mock-up Unit Construction Documentation Elevations and sections through mock-up

43

SECTION SCALE: 1:50

L1 T.O.F.F. +2.50M

剖面图

1

SECTION SCALE: 1:50

PROJECT NUMB

DRAWING TITLE

PLOTS H ELEVATI 立面图

1 A-6511.07 SIM.

剖面图

3

DATE SCALE

SIM.

SIM.

SECTION

CURTA TENDE 幕墙视觉

3050

SIM.

1 A-6512.108

150

150

SIM.

4

1 A-6512.108

1450

1 A-6523.24

KEY PLAN

1450

SIM. 1 A-6523.24

1 A-6511.13

1 A-6512.107

5920

5570

3050

SIM.

6930

6530

SIM.

4500

1 A-6511.07

L2 T.O.F.F. +7.00M

200

1 A-6512.09

1450

1 A-6521.05

CURT CURT

ISSUA

1 A-6511.07

1450

250

1000

350

SIM.

SIM.

02 01 NO.

PLOT L

1 A-6511.06

1 A-6523.22

L3 T.O.F.F. +11.50M

1 A-6511.06

4500

1 A-6512.13

1 A-6523.22 250

350 1450 4500 3050

1450

1 A-6512.17

EQ

EQ

1 1 A-6512.14 A-6512.18

1 A-6512.106

℄ 1 A-6521.02

ROOF T.O.F.F. +16.00M

4500

EQ 9400

9400

℄ 1 A-6521.02

1 A-6512.19 1 A-6512.15

350

350

SIM.

1 1 A-6512.16 A-6512.20

3050

1 A-6521.03

EQ

1 A-6521.03

350

Filename: Z:\2386_Dongjiadu\Drawings\CAD\Sheet\VMU\V-6020 PLOTS HJL VMU SECTIONS ELEVATIONS_HJL地块剖面及立面图.dwg Plotted by: Blachet Sacaan, Fernanda Plot Time: 5/17/2016 6:47 PM

1 A-6511.06

1450

350

400

350

350

400

1 A-6512.105

L0 T.O.F.F. +0.00M

DRAWING NO.

V-60


DONGJIADU

Lots H

Retail Podium

Design and Coordination Contributions Overall massing design strategy Curtain wall design Bridge and ballroom design Terrace design

44


DONGJIADU

45


DONGJIADU

Lot H Retail Podium Walltype Studies Walltype A Retail storefront modulation and pier profile and material studies

46


DONGJIADU

47


DONGJIADU

Lot H Retail Podium Walltype Studies Walltype B Retail storefront modulation and pier profile and material studies

48


DONGJIADU

49


DONGJIADU

Lot H Retail Podium Walltype Studies Walltype C Bridge, housing ballroom, connecting Tower 3 and Tower 4 at retail podium

50


51


52


53


DONGJIADU

Lot H | Retail Podium Construction Documentation Ground floor plan

54


DONGJIADU

Lot H | Retail Podium Construction Documentation Level 02 plan

55


DONGJIADU

CHINA MINSHENG DONGJIADU PROJEC 小东门616、 735街坊地块项目

H-15

1 A-6521.44

Owner

4500

中民外滩房地产开发有限公司

上海市黄浦区中山南路100号金外滩国际广场 Tel: 33355333 Fax: 33355566

3000

PLANTER BOX BY OTHER

Kohn Pedersen Fox Associates PC Architects & Planning Consultants 11 West 42nd Street New York, NY 10036 Tel: 1-212-977-6500 Fax: 1-212-956-25

ABSEIL RESTRAINTS MOUNTED BEHIND PARAPET

2055

1655

REFER TO LIGHTING DESIGN DOCUMENTS FOR LIGHTING SPECIFICATIONS-TYP.

4500

400

1650

350

405

1250

Architectural Design Consultant

L4 (OFFICE) R.L. +16.50 T.O.F.F.

H-15

Local Architect & Structural Engineer

ECADI - East China Architectural Design & Engineering Institute Co., Ltd. A131004031 151 Hankou Road Shanghai, PRC Tel: +86 21 63217420 Fax: +86 21 632

H-14 9800

Commercial Design Consultant

Aedas 31/F One Island East, 18 Westlands Roa Quarry Bay, Hong Kong Tel: +852 2861 1728 Fax: +852 2529 6

2850

Residential Design Consultant

L3 (OFFICE) R.L. +12.00 T.O.F.F.

1412

650

A-XXXX

1412

A-XXXX

Landscape Consultant

DLC Unit 304, Building 28, Xin Tian Di 119 Ma Dang Rd., Shanghai, 200021, PR Tel: 021 6386 7426 Fax: 021 6386 7425

4805

1910

520

1450

Brandston Partnership Inc. 上海市淮海东路99号14楼K室 Tel: 021-5396 0327 Fax: 021-5396 108

MOVEMENT JOINT-TYP.

MT-47

Traffic Consultant

MVA 香港港岛东英皇道979号 太古坊和域大厦西翼14楼 -

1750

1750

4500

1750

1750

1750

2050

Tel: 852 2529 7037 Fax: 852 2527 8490

1750

1750

1750

1750

1750

1750

425 530

SS-26

1950

1750 1950

1750

6500

6950

150

E.O. COPING

2030

1750

1750

ST-24

H-L

SS-44

3000

2850 4 EQ

Tel: - Fax: -

ALT Curtain Wall Consultants 上海市浦东新区张杨路838号华都大厦12 Tel: +021 5835 8870 Fax: +021 5836 0 Lighting Consultant

ST-21

150

SS-26 L1 (LOBBY/RETAIL) R.L. +0.00 T.O.F.F.

ROOF PARAPET RL + 15.10

局部剖面图 PARTIAL SECTION

2

2 A-6022.1A

SCALE 比例: 1:50

H-15

1 A-6521.41

四层局部平面图 L4 PARTIAL PLAN SCALE 比例: 1:50

H-14 9800

A-XXXX

MOVEMENT JOINT-TYP.

1750 TYP

1150

A-XXXX

600

SS-25

1 A-6511.30 SIM

SS-42

1 A-6511.29 SIM

1400 TYP 1750 TYP

590

1090

350 TYP

100% DD REVISION #1 100% DESIGN DEVELOPMENT 75% DESIGN DEVELOPMENT 50% DESIGN DEVELOPMENT 25% DESIGN DEVELOPMENT 75% SCHEMATIC DESIGN

NO.

ISSUANCE

T2

F.O.G.

H-L

T1 PLOT L

ST-25 1750 TYP

PLO

2025

1275

105

800

06 05 04 03 02 01

1 A-6522.01

835

T3 T4

875

A-XXXX

A-XXXX

1750 TYP

KEY PLAN

6400

3

Quantity Surveyor

Curtainwall Consultant

8200

875

F.O.G.

L2 (RETAIL) R.L. +6.50 T.O.F.F.

3700 5 EQ

750

1412

150 1150

250

1250

1425

3500 TYP

PLANTER BOX BY OTHER

1 A-6523.22

1425

650

Parsons Brinckerhoff 上海市 新华路668号甲1楼 Tel: 021 6113 3000 Fax: 021 6113 3100

885

1425

1750

1425

650

5500

5500 3350 1380

1 A-6523.23

1 A-6523.24

100% D DEVELOP 100% 幕

2125

1450

1700

600

F.O.G.

DATE SCALE

E.O. COPING

250

Filename: Z:\2386_Dongjiadu\Drawings\CAD\Sheet\LOT_HJL\A-6022.1B WALL TYPE 22_PLOT H_BRIDGE 22号墙型图_H地块连桥.dwg Plotted by: Gerrity, Kevin Plot Time: 8/11/2016 7:35 PM

Mechanical-Electrical-Plumbing Engineer

H-K

750

ST-25

A-XXXX

BRIDGE GREEN ROOF BY OTHERS

1460

8350

6570 5 EQ 7500

1 A-6512.03

1 A-6512.01

GOA Tel: - Fax: -

1750

℄ 1 A-6512.04

1750

4600

1412

SS-43

1750

A-XXXX

PROJECT NUMBER

1750

SS-29

1750

1750

1750

1750

1750

150

1600

1750

1750

1750

1750

DRAWING TITLE

2250

WALL TYPE 22_PLOT H_BRIDGE 22号墙型图 地块连桥

SS-26

SS-27

450

2 A-6022.1A

1800

1

二层局部平面图 L2 PARTIAL PLAN SCALE 比例: 1:50

DRAWING NO.

N

1250

1500

Dongjiadu, Shanghai, PRC

A-XXXX

N

250

L5 (OFFICE) R.L. +21.00 T.O.F.F.

A-6022.1B

© 2016 KOHN PEDERSEN FOX ASSOCIA

Lot H | Retail Podium Construction Documentation Typical plans and section through the podium at Tower 4

56


DONGJIADU

2 A-6021.1B

4 A-6022.3C

H-E

H-G

3 A-6022.3C

H-J

2 A-6022.3C

H-L

1 A-6022.3C

CHINA M DONGJIA 小东门61 735街坊地

3 A-6023.4A

SIM

SIM

Dongjiadu, Shang

MT-21

Owner

中民外滩房地产开

上海市黄浦区中山 Tel: 33355333 F

GL-21 MOVEMENT JOINT-TYP.

MT-23

Architectural D

SS-26

SS-26

Kohn Peder Architects & 11 West 42n New York, N Tel: 1-212-9

3 A-6022.3B

GL-27 SS-21

LEVEL 04 (OFFICE) R.L. +16.500 T.O.F.F.

Local Architec

ECADI - Eas Design & En A131004031 151 Hankou Shanghai, P Tel: +86 21

A-XXXX

SS-22

Commercial D

MT-44

Aedas 31/F One Isl Quarry Bay, Tel: +852 28

4500

GL-23

2 A-6022.3B

ST-25

A-XXXX

A-XXXX

GOA Tel: - Fax:

SIM

GL-23

MT-29

Residential De

Mechanical-E

LEVEL 03 (OFFICE) R.L. +12.000 T.O.F.F.

Parsons Brin 上海市 新华 Tel: 021 611

SS-22

ST-24

Quantity Surve

Tel: - Fax:

ST-24 1 A-6522.02

Curtainwall C

1 A-6522.04

ALT Curtain 上海市浦东新 Tel: +021 58

5500

MT-29

Lighting Cons

GL-27 SS-21

Brandston P 上海市淮海东 Tel: 021-539

2 A-6022.3B

SS-27

1 A-6522.04

Landscape Co

DLC Unit 304, Bu 119 Ma Dan Tel: 021 638

LEVEL 02 (RETAIL) R.L. +6.500 T.O.F.F.

Traffic Consul

MVA 香港港岛东英 太古坊和域大 Tel: 852 252

ST-21

6500

GL-25 ST-22 SS-25 1 -

LEVEL 01 (LOBBY/RETAIL) R.L. +0.000 T.O.F.F.

ST-22

SS-27

ST-23

MT-25

GL-25 MT-26

SS-28

ST-24

SS-28

SS-27

ST-23

A-XXXX

H-G

H-E

6400

11700

F.O.G.

4780

1593

275

A-XXXX

1 A-6523.01 SIM

A-XXXX

1 A-6523.21

1 A-6523.25

NO.

ISSUA

PLOT L

815

1175

H-11

1593

100% D 100% D 75% D 50% D 25% D 75% S

1325

F.O.G. KEY PLAN

E.O. COPING

4790

310 TYP

310 TYP

4950 300 TYP

300 815

4785

4950

5250

300 50

5250

1400

725

2425

200

300 150

4950

1566

1566

5250

1566

50

5250

300

5000

1511 300 TYP

1511

A-XXXX

1511

℄ 4835

815

DATE

F.O.G.

3150

1750 TYP

310 TYP

310 TYP

1750 TYP

815

06 05 04 03 02 01

300 TYP

1593

5250

10500

SCALE 比例: 1:50

H-L

H-J

SCALE

PROJECT NUMBE DRAWING TITLE

WALL TY H_BRIDG 地块连桥

2 -

Lot H | Retail Podium Construction Documentation Plan and Section through the bridge connecting Tower 3 and Tower 4

57

1

一层局部平面图 L1 PARTIAL PLAN SCALE 比例: 1:50

DRAWING NO.

N

Filename: Z:\2386_Dongjiadu\Drawings\CAD\Sheet\LOT_HJL\A-6022.3A WALL TYPE 22_PLOT H_BRIDGE 22号墙型图_H地块连桥.dwg Plotted by: Gerrity, Kevin Plot Time: 8/11/2016 6:16 PM

2

1 A-6521.01

局部立面图 PARTIAL ELEVATION

A-60


RENDERING BY ATCHAIN

58


59


60


Ping An Tianjin

LOCATION: Tianjin, China TYPE: Mixed-Use PROGRAM: Office Tower Service Apartment Retail Podium GROSS AREA: 233,636m2 PRINCIPAL: David Malott Bill Louie

61


PING AN TIANJIN

Tianjin

Service Apartments

Design and Coordination Contributions Service apartment curtain wall modulation and pier profiles

62


63


PING AN TIANJIN

Service Apartment Walltype Studies Walltype modulation, pier profile and material studies

64


PING AN TIANJIN

65


PING AN TIANJIN

Service Apartment Walltype Studies Walltype modulation, pier profile and material studies

66


PING AN TIANJIN

67


PING AN TIANJIN

Service Apartment Walltype Studies Walltype modulation from the interior

68


PING AN TIANJIN

69


PING AN TIANJIN

Service Apartment Walltype Studies Walltype modulation, pier profile and material studies

70


PING AN TIANJIN

71


PING AN TIANJIN

Service Apartment Walltype Studies Walltype modulation, pier profile and material studies

72


PING AN TIANJIN

73


PING AN TIANJIN

天天天天天天天际天 Tianjin PingAn - TE International Finance

马马道马马A地块 Site A, Machang Road E

63387

LIVING LIVINGRM RM

起居散

DINING RM

1875

卧散 卧散

BEDRM

MASTER BEDRM 烤信

酒酒酒天公 油排

DINING

R

油排

R

DINING

酒酒酒天公 油排 W BATH RM R

R BATH RM

W

BATH RM

BATH RM

W

BATH RM

BATH RM

W

W

新战

卫水

BATH RM

KTD-5

KTG-6

KTD-6

卫水

新战

卫水

新战

KTG-5

人战

MASTER BEDRM

BATH RM

烤信 油排

AC

HM1524

AC

净水防

新战

起居散

FM0924乙

卧散 卧散

LIVING RM BEDRM

SA

废 冷

600

AC

1850

Kohn Pedersen Fox Associates PC Architects & Planning Consultant 11 West 42nd Street New York, New York 10036 TEL: +1 212 977 6500 FAX: +1 212 956 2526

SB

9000

FM1021丙

HM1524 卫水

FM0924乙

AC

建建设结 / Architect

FM0924乙

起居散

水/ 集

AC

酒酒酒天公

分集水防

卫水

油排

MASTER BEDRM

垃垃 处 表防

HM1224 分集水防

卫水

FM0924乙

卧散

LIVING RM 净 水

水/ 集 防

BEDRM

HM1224

酒酒酒天公 起居散

LIVING RM

分集水防 净 水 垃垃处表防 防

R

卫水

100

KITCHEN

卧散

起居散

垃垃 处 表防

SC

水/ 集

DINING RM

LIVING RM

净 水

卫水

烤信

KITCHEN

烤信

水/ 集 防

R

卧散

MASTER BEDRM

水集 列/

KITCHEN

卧散

MASTER BEDRM 微微微

净 水防 垃垃 处 表防

DINING

卧散洞地顶 100mm

烤信

KITCHEN

LIVING RM

BATH RM

酒酒酒天公

洞人 300mm*300mm

起居散

MASTER BEDRM

洞地顶 100mm

MASTER BEDRM

卧散

洞人 300mm*300mm R

卫水

BATH RM

W

水 W

DINING

洞地顶 100mm

酒酒酒天公

PDAC

分集水防

洞人 300mm*300mm R

BEDRM

FM1021丙 HM1524

W

R

酒酒酒天公 卧散

起居散

强电战(天公) DINING RM

新战

BATH RM

油排

DINING RM

LIVING RM

BATH RM

PDAC 油排

BATH RM

酒酒酒天公

新战

垃垃处表防

AC

W

ENTRANCE

FM1021丙 水

油排

新战

新战 水

结构设结 / Structure Design THORNTON-TOMASETTI 51 MADISON AVENUE NEW YORK, NY 10010 TEL: +1 917 661 7800 FAX: +1 917 661 7801

SD

BATH RM

卫水

FM0924乙

HM1524

450

FM1224乙

卫水

BATH RM

FM1021丙

PDAC

1510 500

卧散

加压

净水防

弱电

FM1224乙

卫水

水/ 集 冷

合公前散

AFF-1

R

FM0924乙

KTG-4

460

KTG-3

KTD-4

MASTER BEDRM

加压

新战

KITCHEN

DINING RM

8310

KTD-3

天天天天银天地银天银天天天天 Tianjin Meiyin Real Estate Devel TEL: 022-85581742

SE

卧散

FM1021丙

水水

强电

加压

W

油排

HM1524

HM1524 卫水

KTG-2

FM1021丙

油排

FM0924乙

卫水

KTG-1

KTD-2

FM1021丙

建设设建 / Client

SF

KITCHEN

净 水防

集水 /列

KTD-1

前散 BATH RM

HM1224

FM1021丙

FM1224乙 FM1021丙

卧散

PDAC

HM1224

FM1021丙

DINING RM

500 1500

PDAC

HM1224

FM1224乙

BATH RM

MASTER BEDRM

HM1224

FM1021丙

新战

PDAC

HM1224

新战

新战

FM0924乙

2100

W

KITCHEN

卧散

SG

起居散

LIVING RM

KITCHEN

烤信

油排

R

DINING

12375

R

垃垃 处 表防

KITCHEN

酒酒酒天公

FM0924乙

卫水

LIVING RM

MASTER BEDRM 烤信

酒酒酒天公 FM0924乙

FM0924乙

垃垃 处 表防

起居散

卧散

KITCHEN

分集水防

净 水 防

油排

21700

垃垃 处 表防

LIVING RM

水/ 集

雨 废

水/ 集

卫水

11300

女洗机

列 水/ 集

起居散

卧散 MASTER BEDRM

MASTER BEDRM

酒酒酒天公

净 水 防

FM0924乙

卧散

LIVING RM

DINING

油排

分集水防

卫水

起居散

烤信

油排

R

DINING

水/ 集

FM0924乙

垃垃 处 表防

KITCHEN

烤信

净 水 防

卫水

AC

KITCHEN

酒酒酒天公

新战

雨 废

分集水防

MASTER BEDRM

酒酒酒天公

雨 废

分集水防

1000

AC

800

AC

垃垃 处 表防

LIVING RM

净 水 防

起居散

水/ 集

卧散

卧散

水/ 集 列

起居散

LIVING RM

1860

净 水 防

AC

雨 废

分集水防

2090

33762

AC

雨 废

AC

AC

净水防

3450

机电设结/ MEP Design

1925

42850

WSP | PARSONS BRINCKERHO 1/F, 668A Xin Hua Road, Shanghai 200052, China TEL: +86 21 6113 3000 FAX: +86 21 6113 3100

21625 64475

S1

2

S2

S3

S4

S5

S6

S7

S8

S9

S10

TADI

天天天建建设结天 TAINJIN ARCHITECTURE DES 工工设结设设工设 A112002106 FIRST-CLASS DESIGN CERTIF

塔塔2 - 天公3区- 高电 - 图准电天商图 T2 - TYPICAL HIGH ZONE 3 PLAN (L32-35) SCALE: 1 : 200

Revision

63412 27800

1850

水/ 集 净

列 水/ 集

垃垃 处 表防

LIVING LIVINGRM RM KITCHEN

烤信

R

油排

DINING

BATH RM

W

BATH RM

BATH RM

W

新战

BATH RM

BATH RM

W

HM1524

HM1224

FM1021丙

新战

PDAC

卫水

卫水

PDAC

HM1224

新战

HM1224

FM1021丙

新战

PDAC

HM1224

新战

新战

FM1021丙

HM1524

旅馆地水馆水旅

KTD-3

KTG-3

KTD-4

KTG-4

合公前散

弱电

KTG-5

KTD-5

旅馆弱电战

KTD-6

AC

SC

HM1524

AC

旅馆

净水防

9000

FM0924乙

净水防

卫水

FM0924乙

HM1224 废

卫水

卫水

油排

MASTER BEDRM

垃垃 处 表防

DINING RM

FM0924乙

SB

旅馆

分集水防

Issue Date:

LIVING RM 列

AC

FM0924乙

卧散

起居散 净 水

水/ 集 防 燃

HM1224

酒酒酒天公 LIVING RM

BEDRM

水/ 集

R

卫水

100

洞地顶 100mm KITCHEN

卧散

LIVING RM

分集水防

AC

起居散

垃垃 处 表防

净 水

KITCHEN

烤信

水/ 集 防

BATH RM W

BEDRM

卧散

PDAC

KITCHEN

MASTER BEDRM

分集水防 净 水 垃垃处表防 防

卧散

MASTER BEDRM

水集 列/

水 W

SD

水/ 集

LIVING RM

卧散 洞地顶 100mm

烤信

烤信

净 水防 垃垃 处 表防

卫水

酒酒酒天公

洞人 300mm*300mm KITCHEN

微微微

LIVING RM

HM1524

卫水

R

起居散

天公强电旅人

W

洞人 300mm*300mm

R

DINING

MASTER BEDRM

DINING RM

新战 油排

新战

卧散

BEDRM

PDAC

DINING

洞地顶 100mm

R

酒酒酒天公 卧散

起居散

新战

BATH RM

洞人 300mm*300mm R

DINING RM

酒酒酒天公 LIVING RM

油排

油排

烤信 油排

R

BATH RM

AC

FM1021丙

垃垃处表防

新战 W BATH RM

旅馆强电战

BATH RM

新战

HM1524

ENTRANCE

FM1021丙

卫水

FM0924乙

卫水

水/ 集

PDAC

BATH RM

BATH RM

FM1021丙

HM1524

FM0924乙

MASTER BEDRM

新战

FM1021丙

FM1021丙 W

KITCHEN

1510 500

MASTER BEDRM

2100

KTG-6

加压

分集水防

1850

600

AC

2090

上 AFF-1

460

人战

卫水

上 下

加压

23475

加压

强电 前散

BATH RM

SE

MASTER BEDRM

450

卫水

KTG-2

卫水

21700

KTG-1

KTD-2

社务人务卫服战 (易毒战) 卫水

BATH RM

水水 KTD-1

卧散

DINING RM

8310

1875

FM1021丙 M0824

MASTER BEDRM

油排

SF

FM0924乙 水

HM1224

卧散

C:\KPF\Revit\2587_ARCH_KPF_CORE_tjin02.rvt

DINING RM

W

卫水

W

FM0924乙

500 1500

旅馆

油排

12375

R

R

旅馆 油排

DINING

FM0924乙

油排

卫水

FM0924乙

酒酒酒天公 R

DINING

KITCHEN

烤信

R

KITCHEN

Description

Key Plan

女洗机

MASTER BEDRM 烤信

油排

No.

SG

分集水防

水 防

KITCHEN

酒酒酒天公 FM0924乙

R

DINING RM

雨 废

水/ 集

MASTER BEDRM

FM0924乙

卫水

女洗机

FM0924乙

酒酒酒天公 DINING

油排

净 水 防

LIVING RM

烤信

油排

R

LIVING RM

分集水防 垃垃 处 表防

起居散

卧散

MASTER BEDRM

MASTER BEDRM

DINING

水/ 集

卫水

AC

净 水 防

KITCHEN

KITCHEN

烤信

酒酒酒天公

新战

雨 废

垃垃 处 表防

LIVING RM

1000

AC

800

AC

酒酒酒天公 列 水/ 集

起居散

卧散

卫水

卧散

LIVING RM

MASTER BEDRM 烤信

AC

起居散

雨 废

分集水防

垃垃 处 表防

KITCHEN

分集水防

水 防

AC

水/ 集 净

LIVING RM

水/ 集

净 水 防

垃垃 处 表防

LIVING RM

1860

分集水防

起居散

AC

雨 废

卧散

卧散

AC

雨 废

净水防

起居散

11300

33762

1300

850

净水防

4/28/2017 9:04:24 PM

1850 1300

23475

27800 850

3450

SA

42850

11/30/16

Scale

1 : 200

Project No.

1925 21625

2587

Drawn By

Author

64475

S1

1

S2

S3

S4

S5

S6

S7

S8

S9

塔塔2 - 天公3区- 低电 - 图准电天商图 T2 - TYPICAL LOW ZONE 3 PLAN (L23-31)

S10

N

SCALE: 1 : 200

塔塔2 天公3区 图 天商图 T2 TYP. ZONE

A-153

© 2015 KOHN PEDERSEN FO

Service Apartment | Revit Documentation Construction Documentation Typical floor plan, Zone 3

74


PING AN TIANJIN

天天天 Tianji Intern

2

A-1501

A-1501

3500 TYP

3500 TYP

3500 TYP

3500 TYP

马马道 Site A, 3

SA L27

100.25 M

?

?

3400

3400

3400

3400

3400

MT-1

建设设建

天天天天 Tianjin M TEL: 022

MT-2

? ? ?

?

SA L26 5

?

96.85 M

A-1501

结构设结 THORNT 51 MADI NEW YO TEL: +1 9 FAX: +1

3400

3400

3400

3400

3400

建建设结

Kohn Ped Architect 11 West 4 New York TEL: +1 2 FAX: +1

? 4 A-1501

3500 TYP

3500 TYP

3500 TYP

3500 TYP

机电设结 SA L25

?

93.45 M

WSP | PA 1/F, 668A Shanghai TEL: +86 FAX: +86 TADI

天天天建 TAINJIN 工工设结 FIRST-C

?

SECTION - WT 1 SCALE: 1 : 50

2

SECTION - WT 1

1

SCALE: 1 : 50

EOS FOG

北商商图 ELEVATION - WT 1 SCALE: 1 : 50

300

3

No.

2350

EOS FOG

2150

2350

2150

2350

D

Key Plan

PLAN - WT 1 SPANDREL SCALE: 1 : 50

Issue Date:

300

T2_WALLTYPE-1/2 C:\KPF\Revit\2587_ARCH_KPF_CORE_tjin02.rvt

5

2150

Scale

2350

2150

Project No. Drawn By

4

PLAN - WT 1 SCALE: 1 : 50

A-1501 4/28/2017 9:24:48 PM

T2_W

A-1

Service Apartment | Revit Documentation Construction Documentation Typical walltype

75


PING AN TIANJIN

Art Gallery + Boutique Stores

Retail Podium

Design and Coordination Contributions Podium massing, curtain wall design, cores, and egress, and interior shop and gallery spaces layouts

76


PING AN TIANJIN

77


PING AN TIANJIN

Retail Podium Option 01 Massing and curtain wall studies Brick screens

78


PING AN TIANJIN

79


PING AN TIANJIN

Retail Podium Option 01 Massing and curtain wall studies Brick screens

80


PING AN TIANJIN

81


PING AN TIANJIN

Retail Podium Option 01 Balcony study Brick screens

82


PING AN TIANJIN

83


PING AN TIANJIN

Retail Podium Option 01 Interior study of the integration of art and shopping

84


PING AN TIANJIN

85


PING AN TIANJIN

Retail Podium Option 01 Interior study of the central atrium

86


PING AN TIANJIN

87


PING AN TIANJIN

Retail Podium Option 01 Interior study of bridge looking into central atrium

88


PING AN TIANJIN

89


PING AN TIANJIN

Retail Podium Option 02 Massing and curtain wall studies Vertical fins on protruding volumes

90


PING AN TIANJIN

91


PING AN TIANJIN

Retail Podium Option 02 Rooftop study Beer garden

92


PING AN TIANJIN

93


PING AN TIANJIN

Retail Podium Option 02 Typical walltype study

94


PING AN TIANJIN

95


PING AN TIANJIN

Retail Podium Option 02 Walltype 02 as solid stone wall with fins or LED screen

96


PING AN TIANJIN

97


PING AN TIANJIN

B1 1

B2

3

B3

6

B4

B5

8

7

11

10

12

13

450 4300

9800

3525 5025

20

16 1/17

22

21

850 750

950

4500 4050 2425 6125 2050 5350

12050

天天天天天天天际天天天天 Tianjin PingAn - TEDA International Finance Center

B1

19 23

1

25

B2

3

B3

6850 1350 2650

B5

11

19

12

13

450 4300

8600

9800

3525 5025

马马道

AD ANG RO MACH

B4

马马道7马马A地块 8 10 Site A, Machang Road E.

6

900 8550

20

16 1/17

12050

22

21

850 750

950

2425 6125 2050 5350

1

1

A-213

A-214

23

25

900

6850 1350 2650

8600

EVA STAGING AREA

RESI DROP AREA

8200

1200 7350

2

4

5

S1

S2

6 S3

7 S4

2050 6750

8

9 S5

10

11 S6

13

SA

A

S7

C B

1200 2050 6500

15

16 S8

17 S9 S10

18

23

24

25

1500 200

2900

KTD-2

4300 7700 DN UP

7500

UP DN

6503850 4500

UP

12000 7500 3450 1000 8800 8950

DN

UP 200

3800

KTG-2

加压

800

水水

强电

2600

200

7900 UP

DN 3000

KTD-3

200

2600

800

KTG-3

8200 1350 8800 2100 6700

ACPD

J H

9750

弱电人 (旅馆)

PD

合公前散

600 200 200

5200

加压

FM1021丙

2400

800

弱电

2600

200

3000

200

2600

800

F&B 餐饮

KTG-6

KTG-5

KTD-4

2050

KTG-4

AFF-1

200

17200

200 200 800

加压

200

2600

FM1021丙

FM1021丙

FM1021丙

6350

KTD-6

KTD-5

FM1021丙

FM1021丙

11/30/16

强电 人 (旅馆 / 天公)

PD

Scale

PD

FM1524丙

D

顶 地天洞

加压机房

2587

Drawn By

B

2 A-204

天商图_L01 PLAN_L01 8200

C

A

Author

1200 500 350 3150 3250 3600 8550

E

FM1021丙

强电(商业)

1 : 400

Project No.

1200 7350

2050 6750

2650

9400

3250 3600

0 6500

3100 5500

N

1

天商图 - L01 PLAN - L01

1

2

4

5

S1

S2

6 S3

7

A-101 S4

8

9 S5

10

11 S6

13

14 S7

SCALE:1 : 400 © 2015 KOHN PEDERSEN FOX ASSOCIATES PC. All rights reserved.

Retail Podium | Revit Documentation Construction Documentation Ground floor plan and Level 02

98

8250

SPD SPD

FAD

DN

200

KTG-1

FM1524丙

加压机房

2400

SITE BOUNDARY 基地红红 ROAD PROPERTY LINES 道路红红

3000

前散

A

3100 5500

200

FM1021丙

Issue Date:

GAS PIPE 燃集

BUILDING BOUNDARY 建建红红 13000

2600

PD

KTD-1

PROPERTY LINES 公地红红

合合路 14

D

L M

F

800

SPD LPD

FM1021丙

FM1021丙

FM1021丙

加压

4600

SB

B

R Q

G

人排人

LPD

SC

C

PAU RM ABOVE

EL RM

S T

K

GAS PIPE 燃集

F&B 餐饮

18

RESTROOM ELV RM

ACPD

4000mm VRV 内机,洞地

SPD

SED

UP

D

PD

HOTEL _

E

SD

FM1021乙

2650

HEIFEI ROAD

EVA STAGING AREA

1

SE

E

YX

W

UP LPD

PDFS

G F

DN

SPD

DN

SPD/LPD

2 A-204

1

KTD-6

KTG-6

下 FM1224乙

RETAIL 商业

ACPD SED

DN

ELV RM

FM1021乙

强电 人 (旅馆 / 天公)

1050 500 350 3150 3400 3600 8550

SF

LPD

RETAIL 商业

UP

AFF-1 FM1224乙

FM1021乙

UP DN

150 200

KTG-4

A

2400

KTD-5

KTG-5

Date

SED

1950

弱电

DN

TOFF 12300

200 1350 200

KTD-4 FM1224乙

RETAIL 商业

RETAIL 商业

SG

FM1224乙 上

KTG-2 加压

RETAIL 商业

加压

前散

KTG-3

17200

KTD-3

弱电 人 (旅馆)

FM1021乙

UP

UP

F&B 餐饮

Key Plan

aA

P N

F&B 餐饮

LPD

DN

150 200

前散

PD FM1224乙

水水

强电

KTG-1

KTD-2

FM1021乙

4600

KTD-1

FM1021乙

RETAIL 商业

FM1021乙

FM1021乙 加压

FM1224乙

LPD

UP

M0924

庆上府

Description

LPD SPD

2 A-222

F 理上府

FM1021乙

UP

2550 3450 4500 3450 2550

DN

J H

VRV 内机,洞地 4000mm

大堂 PD

GAS PIPE 燃集

2975

3450 1000 8800

RETAIL 商业

±0.000

PLAN_L03 C:\KPF\Revit\2587_ARCH_KPF_CORE_tjin02.rvt

B

前台

A-103 4/28/2017 8:58:23 PM

C

No.

K

J

1 A-202

GAS PIPE 燃集

KEDACPD

SPD

L

H

SEE A-103.A SEE A-103.B

RETAIL 商业

GAS PIPE 燃集

DN

ELV RM

景观 水池

UP

SA

D

M

L M

A-212

TOFF 12300

1 A-204

9750

18

社区社务社

2 A-222

睦上府

信报 信

RESI DROP AREA

SB

1 A-203

aB

V

OPEN TO BELOW 挑空

P N

G

4600

SC

R

R

1/AC

U

1

RETAIL 商业

1 A-201

2550 3450 4500

PDFS

ELV RM SED

Revision

SEE A-103.A SEE A-103.B

Q

K

GAS PIPE 燃集

SED

±0.000

EL RM

公寓 出入口

T

DN

EL RM

F&B 餐饮

S

aF aE

LPD SPD

天天天建建设结天 TAINJIN ARCHITECTURE DESIGN INSTITUTE RETAIL 工工设结设设工设 A112002106 商业 FIRST-CLASS DESIGN CERTIFICATE NO. A112002106

3450 2550

RETAIL 商业

警务散

M1221

G

SD

BA

S T

UP

UP

LPD

TADI

BB

4500

M1221 上

SED ACPD

M1221

L01M ABOVE

1

E

W

7900

体昌路

UP

ACPD

SE

BC

P N

LPD SPD LPD SPD

F

W

UP

L02 ABOVE

LPD

ACPD

UP

TRUCK / RESI RAMP EXPLOSION HATCH

J

SF

WSP | PARSONS BRINCKERHOFF 1/F, 668A Xin Hua Road, PDFS Shanghai 200052, China TEL: +86 21 6113 3000 FAX: +86 21 6113 3100

GAS PIPE 燃集

LPD LPD SPD SPD SPD LPD

DN

SPD/LPD

12000 ACPD

OPEN TO BELOW 挑空

A-211

aG

aD

1

KED

F&B 餐饮

机电设结/ MEP Design

64725

RETAIL 商业

UP

H

SG

BD

7500

RETAIL CAR RAMP

SPD LPD

UP

公寓 地库出入口

SEE A-101.A SEE A-101.B

UP

SPD LPD

M1221

K

GAS PIPE 燃集

GAS PIPE 燃集

OFFICE / RETAIL RAMP

UP 上

L

YX

KED

SPD LPD

UP

RETAIL 商业

UP 上

DN 下

64725

M

RESIDENTIAL / TRUCK

N

UP 上

DN 下

P

SCALE:1 : 400

A-212

1 A-202

RETAIL 商业

1 A-204

DN 下

1 A-203

EXPLOSION HATCH

天商图 - L01M PLAN - L01M

BE

U

1

8950

OFFICE DROP AREA 1 办天散落客区 A-201

SEE A-101.A SEE A-101.B

OFFICE / RETAIL

R

G F

2

6503850 4500

UP

S

50㎡

BF

aA

8200

T

商业散落客区

BA

RETAIL 商业

UP

居居会办天

社区社务社 100㎡

aC

aB

V RETAIL 商业

BB 2975

J

ELV RM SED

SED

Kohn Pedersen Fox Associates PC Architects & Planning Consultants 11 West 42nd Street New York, New York 10036 PDFS TEL: +1 212 977 6500 FAX: +1 212 956 2526

KED

EL RM

1350

28㎡

ACPD SED

EL RM (office)

ELV RM (office)

F&B 餐饮

建建设结 / Architect EL RM

LPD SPD

PAU ABOVE

ACPD

NANCHANG ROAD

天战社务公天 3.000

UP

LPD

PDFS

LPD

ELV RM EL RM

(office)

8800

150㎡

50㎡

VIP Lobby VIP 大堂

结构设结 / Structure Design THORNTON-TOMASETTI RETAIL 51 MADISON AVENUE NEW YORK,商业 NY 10010 TEL: +1 917 661 7800 FAX: +1 917 661 7801

BG

1/AC

2100 6700

文防文动散

居居会办天

K

UP

DROP AREA COMMERCIAL

BC

W

GAS PIPE 燃集

R-1

FM1224乙

L

九江路

13

24000

11

BD

SPD SPD SPD

JIUJIANG ROAD

10

SPD

OPEN TO BELOW 挑空

SED ACPD

DN

aE

aJ

F&B 餐饮

DN

2250

UP

RETAIL 商业 PDFS

BE 8

A-211

UP

12725

aC

J.C.

OP-1

DN

UP

天天天天银天地银天银天天天天 DN UP Tianjin Meiyin Real Estate Development Co., Ltd00 DN TEL: 022-85581742

BH

aF aE aD

1

aH

1050

OP-2

BF

RETAIL 商业

EL RM ELV RM (office) (office)

7500

ELV RM (office)

7700

11275

BH aE

aG

4300

ELV RM EL RM

BJ

1925 6325

UP

BG

aJ

aJ F&B 餐饮

LPDSPD

11275

LPD SPD SPD

UP

24000

LPD

12725

UP

OPEN TO BELOW 挑空

8250

LANDSCAPE FEATURE

1925 6325

aH

建设设建 / Client SPDSPD

aJ BJ

2 A-201

1 A-214

UP

DN

KED

2 A-201

1 A-213

15

16 S8

17 S9 S10

18

23

24

25

1

天商图 - L03 PLAN - L03 SCALE:1 : 400


PING AN TIANJIN

B1 1

B2

3

B3

6

B4

B5

8

7

11

10

19

12

13

450 4300

9800

3525 5025

8550

20

16 1/17

12050

22

21

850 750

950

2425 6125 2050 5350

天天天天天天天际天天天天 Tianjin PingAn - TEDA International Finance Center

B1 23

1

25

B2

B3

B4

马马 8 6 道马马A7地块 Site A, Machang Road E.

3

B5 11

10

6850 1350 2650

19

12

900

13

450 4300

8600

9800

3525 5025

8550

22

21

850 750

950

2425 6125 2050 5350

12050

1

1

1

1

A-214

A-213

A-214

23

25

900

6850 1350 2650

A-213

2 A-201

20

16 1/17

8600

2 A-201 TOFF 17700

合公前散

加压

2050

KTG-4

AFF-1

200

6350

4

5

S1

S2

6 S3

8200

7 S4

8

1200 7350

9 S5

10

2050 6750

11

13

S6

200

3000

200

2600

DN

800

F&B 餐饮

KTG-6

KTD-6

2650

14

S7

0 6500

8250 4300 12000

FAD

7700 7500 6503850 4500

DN

UP

UP

DN

1925 6325

SPD SPD

SEDACPD

DN

SG SF SE

E

E

SD SC

C

SB

B

SA

D C B

7500 8950

P N 8200 1350

SED

ACPD SED

LPD

OPEN TO 18 BELOW 挑空

ELV RM

K

SPD

RETAIL 商业

PAU RM ABOVE 人排人

L M

DN SPD

SED

PDFS

EL RM

UP

UP LPD

R Q

8800

DN

RETAIL 商业

S T

7900

2975

3450 1000 8800

UP

Date

Key Plan

J H

G

设设 人

F FM1021丙 健健会会

弱电战

FM1021丙

FM1021丙

PD

KTD-1

KTD-2

FM1021丙

水水

KTD-3

前散

KTG-3

KTD-4

KTG-4

AFF-1

加压

11/30/16

PD

KTD-5

KTG-6

KTD-6

FM1021丙

物业

物业

D

PD

2587

Drawn By

RETAIL 商业

TOFF 17700

C B A

Author

2 A-204

天商图_L03 PLAN_L03

1200 500 350 3150 3250 3600 8550

E

FM1021丙

AC

强电 人 ( 旅馆 / 天公)

1 : 400

健健会会

Project No.

KTG-5

FM1224乙 FM1021丙

FM1021丙

Scale

弱电

KTG-2

Issue Date:

加压

FM1224乙

FM1224乙

GAS PIPE 燃集

2400

FM1021丙

强电

KTG-1 前散

SPD LPD

(旅馆)

PD

加压

FM1021丙

A

3100 5500

YX

W

DN

SPD LPD SPD LPD

UP

Description

G F

DN

DN

UP

No.

2 A-222

A

3250 3600

UP

2100 6700

J H

TOFF 17700

RETAIL 商业

LPD

K

J

D

加压机房

9400

LPD SPD

DN

L

H

1 A-202

GAS PIPE 燃集

KED ACPD

SPD

aA

9750

M

L M

顶 地天洞

4600

FM1524丙

LPD

PD

GAS PIPE 燃集

TOFF 17700

ACPD

8950

1 A-204

RETAIL 商业

FM1021丙

强电(商业)

2 A-204

2

2600

KTG-5

KTD-5

FM1021丙

FM1021丙

DN

FM1021丙

强电 人 (旅馆 / 天公)

1200 500 350 3150 3250 3600 8550

800

ACPD

KTD-4 下

PD

A

1

2400

弱电

FM1021丙 FM1524丙

600 200 200

5200

SEE A-104.A SEE A-104.B

17200

800

F&B 餐饮

OPEN TO BELOW 挑空

P N

aB

U

1 A-212

1 A-203

1/AC

V RETAIL 商业

4600

2600

KTG-3

TOFF 17700

SED

LPD

200

DN

ELV RM EL RM

DN

3000

加压机房

2400

R

aF aE

LPD SPD

ACPD

DN

200

UP

SPD

PDFS

1 A-201

FM1224乙

2600

KTD-3

UP

加压

1050

KTG-2

800

KED

UP

Revision

SEE A-104.A SEE A-104.B

DN

3800

水水

17200

200

150 200

KTD-2

2900

强电

前散

PLAN_L04 C:\KPF\Revit\2587_ARCH_KPF_CORE_tjin02.rvt

1500 200

A-104 4/28/2017 8:58:57 PM

200 200 800

弱电人 (旅馆)

PD FM1021丙

200

2600

KTG-1

加压

2250

200

FM1021丙

150 200

3000

1950

200

200 1350 200

UP

2600

KTD-1

FM1021丙

FM1021丙 FM1021丙

DN

7900

DN

2550 3450 4500 3450 2550

800

SPD LPD

GAS PIPE 燃集

R

G

FM1021丙

PD

T

Q

F 加压

R-1

9750

18

GAS PIPE 燃集

LPD LPD SPD SPD SPD LPD

AHU 天 PAU PAU 天天天建建设结 TAINJIN ARCHITECTURE DESIGN INSTITUTE 工工设结设设工设 A112002106 FIRST-CLASS DESIGN CERTIFICATE NO. A112002106

S

K

GAS PIPE 燃集

F&B 餐饮

PAU RM ABOVE

SPD/LPD

B

SPD

人排人

DN

C

LPD

SED

RESTROOM ELV RM EL RM

UP

UP SPD

PDFS

UP

SA

D

LPD

RETAIL 商业

ACPD SED

4500

PLAN_L03 C:\KPF\Revit\2587_ARCH_KPF_CORE_tjin02.rvt

SB

DN

DN

OPEN TO BELOW 挑空

PDFS

旅馆地水馆 水旅人

A-103 4/28/2017 8:58:23 PM

SC

ACPD

UP

SED

G

SD

1350

F&B 餐饮 TOFF 12300

BA

S T

8200

DN

F&B 餐饮

PDFS

aG

aD

1 A-211

TADI

8800

UP

2100 6700

UP

F&B 餐饮 SED KED

RETAIL 商业

DN

UP DN

2 A-222

E

F&B 餐饮

LPD

RETAIL 商业

AHU WITH PLATFORM AT 2.8M

EL RM (office)

WSP | PARSONS BRINCKERHOFF 1/F, 668A Xin Hua Road, Shanghai 200052, China TEL: +86 21 6113 3000 FAX: +86 21 6113 3100

BB

P N

UP

DN LPD SPD

J

SE

BC

W

F&B 餐饮

LPD

机电设结/ MEP Design

TOFF 17700

KEDACPD

SPD

K

F

1 A-202

GAS PIPE 燃集

RETAIL 商业

GAS PIPE 燃集

H

SF

SEE A-103.A SEE A-103.B

1 A-204

L

SG

8800

TOFF 12300 OPEN TO BELOW 挑空

64725

M

W

7500 A-212

3450 1000

2975

RETAIL 商业

1 A-201

P N

BD

U

1

1 A-203

YX

V

KED

R

BE

DN

PAU

F&B 餐饮

S SEE A-103.A SEE A-103.B

BF

aA

64725

24000

ELV RM

RETAIL 商业

T

aC

aB

aJ

LPD

EL RM ELV RM

Kohn Pedersen Fox Associates PC Architects & Planning Consultants 11 West 42nd Street New York, New York 10036 TEL: +1 212 977 6500 FAX: +1 212 956 2526

24000

EL RM

SED

BB

1/AC

SPD

ELV RM (office)

建建设结 / Architect

LPD SPD

ACPD

BA

DN

商业

UP

LPD

SPD/LPD

UP

LPD

PDFS

W

UP

aE BG

2550 3450 4500

LPD

DN

BH

aF aE

SPD

DN

结构设结 / Structure Design THORNTON-TOMASETTI 51 MADISON AVENUE NEW YORK, NY 10010 TEL: +1 917 661 7800 RETAIL FAX: +1 917 661 7801

4500 34502550

KED

GAS PIPE 燃集

LPD LPD SPD SPD SPD LPD

12000

DN

BD

6503850 4500

OPEN TO BELOW 挑空

SPD LPD

aH

LPD

11275

7700

F&B 餐饮

A-211

PDFS

BE

BC

KED

DN

KED

12725

aC BF

SED

UP

EL RM (office)

BJ

aG

aD

1

UP

11275

FAD

ACPD SED

EL RM (office)

ELV RM (office)

7500

RETAIL 商业

BG

F&B 餐饮

4300

LPD

ELV RM EL RM

DN

UP

天天天天银天地银天银天天天天 DN Tianjin Meiyin Real Estate Development Co., Ltd00 TEL: 022-85581742

12725

F&B 餐饮

DN

aJ

8250

SPD SPD

aJ DN

BH aE

UP

DN

aH

DN

建设设建 / Client

UP

BJ

DN

1925 6325

aJ

UP

8200

1200 7350

2050 6750

2650

9400

3250 3600

0 6500

3100 5500

N

15

16 S8

17

18

23

24

25

S9 S10

1

天商图 - L03 PLAN - L03

1

2

4

5

S1

S2

6

7

A-103 S3 S4

8

9 S5

10

11 S6

SCALE:1 : 400 © 2015 KOHN PEDERSEN FOX ASSOCIATES PC. All rights reserved.

Retail Podium | Revit Documentation Construction Documentation Level 03 and Level 04

99

13

14 S7

15

16 S8

17 S9 S10

18

23

24

25

1

天商 PLA

SCALE:


PING AN TIANJIN

21

850 750

22

1

1

A-213

A-214

23

1

25

马马 8 6 道马马A 7 地块 Site A, Machang Road E.

3

9800

3525 5025

AHU

BG 12725

EL RM

A-211

PD J.C. ELV RM

PD LPDSPD

SPD

LPD

6503850 4500

BE

OPEN TO BELOW 挑空

ELEV RM

BD

ACPD

12000

W

24000

DN

PRESSURIZATION FAN ROOM

BF

aA

BE

YX

BD

W

BC

1925 6325

21

850 750

22

A-213

A-214

23

8600

2 TOFF 27850 A-201

建设设建 / Client

DN

结构设结 / Structure Design THORNTON-TOMASETTI 51 MADISON AVENUE NEW YORK, NY 10010 TEL: +1 917 661 7800 FAX: +1 917 661 7801

TOFF 52200

A-211

机电设结/ MEP Design

W

WSP | PARSONS BRINCKERHOFF 1/F, 668A Xin Hua Road, Shanghai 200052, China TEL: +86 21 6113 3000 FAX: +86 21 6113 3100

TOFF 17700

1 A-204

SEE A-105.A SEE A-105.B

KED/SED FAN ROOM

1 A-202

TOFF 25875

KED/SED FAN ROOM PRESSURIZATION FAN ROOM

OPEN TO BELOW 挑空

分集水防 垃垃处 表防

起居散

卧散 MASTER BEDRM

LIVING RM

酒酒酒天公

水/ 集

净 水 防

KITCHEN

水 /集

AC

水/集

油排

女洗机

净水防

LIVING RM

油排

DINING

R

旅馆

R

油排

烤信

J H

W

BATH RM

W

BATH RM

BATH RM

W

LIVING RM

KITCHEN

MASTER BEDRM

旅馆

SG SF

油排

DINING

新战

DINING RM

净水防

卫水

强电

KTG-1

KTD-3

合用前室

KTG-3

HM1524

旅 馆 地水 馆 水旅

HM1224

FM1021丙

FM1021丙 M0824

FM1021丙

水水 KTD-1

PDAC

FM1224乙

FM1021丙 加压

FM1224乙

17200

FM1021丙

弱电

KTD-5

KTG-5

MASTER BEDRM

社 务 人 务卫 服 战 (易毒战 ) 卫水

FM1224乙 FM1021丙

卫水

卫水

新战

HM1224

FM1021丙

FM1424工

HM1224

FM1224乙

卫水

HM1524

HM1224

FM1021丙

PDAC

新战

新战

新战

PDAC

HM1224

人战

SE

E D

油排 烤信

HM1524

水 W

PDAC

净水防

DINING RM

旅馆 LIVING RM

BEDRM

R

卫水

废 冷

2 A-204

1

1200 500 350 3150 3250 3600 8550

2

4

5

S1

S2

6 S3

8200

7 S4

8

1200 7350

9 S5

10

2050 6750

11 S6

13

2650 A-106 4/28/2017 9:00:42 PM

A

14

S7

D

W

旅馆

AC

SC

列 水/ 集

BATH RM

卫水

4600

FM1224乙

MASTER BEDRM

R

AC

FM1021丙

M1224

油排

卫水

卫水

雨 冷

HM1524

卫水

水/ 集 燃

旅 馆 弱 电战

FM1021丙

天公 强电 旅 人

油排

MASTER BEDRM

净 水 防

ROOF PLAN C:\KPF\Revit\2587_ARCH_KPF_CORE_tjin02.rvt

LIVING RM 垃垃 处 表防 分集水防

AC

M1224

卧散

酒酒酒天公 起居散

净 水 防

FM1021丙

旅馆强电战

卫水

洞地顶 100mm KITCHEN

水/ 集

分集水防

HM1524

新战 BATH RM

洞人 300mm*300mm

R

卧散

BEDRM

分集水防

垃垃处表防

起居散

垃垃 处 表防

AC

LIVING RM

4500 34502550

卫水

DINING RM

W

油排

卫水

酒酒酒天公 LIVING RM

净 水 防

KTD-6

KTG-6

加压

新战 BATH RM

KITCHEN

烤信

水 /集

烤信

卧散

BATH RM

卧散

洞地顶 100mmMASTER BEDRM

新战

MASTER BEDRM

列 水/ 集

KITCHEN

PD

DINING

洞地顶 100mm 洞人 300mm*300mm

卧散 烤信

AC

垃垃处表防 净水防

AC

洞人 300mm*300mm

R

R

垃垃处 表防

新战

油排

R

KITCHEN

R

AFF-1

ENTRANCE

FM0921丙 FM1021丙 新战

油排 新战 水 W

DINING RM

LIVING RM

BATH RM

卫水

HM1524

起居散

BATH RM

PDAC

酒酒酒天公 卧散

MASTER BEDRM

BEDRM

DINING

KTG-4

加压

FM1021丙

BATH RM

卧散

LIVING RM

MASTER BEDRM

KTD-4

KTG-2

KITCHEN

DINING RM

酒酒酒天公起居散

2400

F E

SD

分集水防

KTD-2 BATH RM

W

B

AC

C

D

前室

卧散

C

SB

B

SA

A

18

2 A-222

64725

G

W

BATH RM

新战

BATH RM

C B

WSP | PARSONS BRINCKERHOFF 1/F, 668A Xin Hua Road, Shanghai 200052, China TEL: +86 21 6113 3000 FAX: +86 21 6113 3100

V

TADI

天天天建建设结天 TAINJIN ARCHITECTURE DESIG 工工设结设设工设 A112002106 FIRST-CLASS DESIGN CERTIFIC

S T

Revision

Q

L M

No.

Description

Key Plan

K

TOFF 24950

F

垃垃处 表防

烤信

R R

卫水

R

DINING

卫水

卫水

DINING

油排

K

J H

G

分集水防

净 水 防

KITCHEN

烤信

雨 废

水 /集

净 水 防

KITCHEN

烤信

油排

R

DINING

W

TOFF 27850

DN

J H

G F 17200

列 烤信

LIVING RM

酒酒酒天公

MASTER BEDRM

TOFF 23850

2550 3450 4500

AC

2550 3450 4500

垃垃处 表防

起居散

卧散

MASTER BEDRM

卧散

酒酒酒天公

分集水防

起居散

LIVING RM

AC

雨 废

分集水防 垃垃处 表防

净 水 防

AC

水/ 集

KITCHEN

烤信

AC

水/ 集

净 水 防

KITCHEN

AC

分集水防 垃垃处 表防

起居散

LIVING RM

酒酒酒天公

MASTER BEDRM

新战

Date

TOFF 27850

DINING RM R

KITCHEN

卧散 MASTER BEDRM

水/集

SA

雨 废

卧散

卧散

油排

净水防

SB

雨 废

酒酒酒天公 水 /集 燃

BATH RM

SD SC

起居散

LIVING RM

F E

AC

G

女洗机

SF

Description

Key Plan

9750

18

2 A-222

SE

L

K

J

2100 6700

K

TOFF 17700 DN

No.

机电设结/ MEP Design

YX

W

P N

TOFF 17700

2100 6700

DN

H

SG

P N M

L M

4500 34502550

L

1 A-202

TOFF 24950 TOFF 24950

8200 OPEN TO BELOW 挑空

aA

R

TOFF 12300

1 A-204 TOFF 18800

8800

1350

DN

TOFF 13400

TOFF 18800

1 A-203

Q

Kohn Pedersen Fox Associates PC Architects & Planning Consultants 11 West 42nd Street New York, New York 10036 TEL: +1 212 977 6500 FAX: +1 212 956 2526

aB

7500

Revision

A-201 TOFF 17700

R

aF

U

1

1

R

P N 64725

P N M

TOFF 23850

A-212

TOFF 52200

S

TOFF 23850

1350

1 A-203

OPEN TO BELOW 挑空

T

建建设结 / Architect

aG

9750

1 A-201

BA

S T

aD 1/AC

TOFF 24950

天天天建建设结天 TAINJIN ARCHITECTURE DESIGN INSTITUTE 工工设结设设工设 A112002106 FIRST-CLASS DESIGN CERTIFICATE NO. A112002106

7900

SEE A-105.A SEE A-105.B

8800

S R

3450 1000

A-212

8950

T

2975

BA

结构设结 / Structure Design THORNTON-TOMASETTI 51 MADISON AVENUE NEW YORK, NY 10010 TEL: +1 917 661 7800 FAX: +1 917 661 7801

TOFF 23850

TADI

BB

U

1

2975

PAD/EAD

天天天天银天地银天银天天天天 Tianjin Meiyin Real Estate Developm TEL: 022-85581742

aE

1

TOFF 27850

Kohn Pedersen Fox Associates PC Architects & Planning Consultants 11 West 42nd Street New York, New York 10036 TEL: +1 212 977 6500 FAX: +1 212 956 2526

V

AHU

ACPD

7500

AHU PAD/EAD

aJ

TOFF 24950

TOFF 23850

PDFS

BB

马马道马马A地块 Site A, Machang Road E.

25

900

6850 1350 2650

建建设结 / Architect

aC

aB

20

16 1/17

12050

TOFF 287950

BG

aD

SED

DN

PANTRY 茶水战

1/AC

1

FS MAD

ACPD

SED

aE

13 950 1

天天天天银天地银天 银天天天天 TOFF 313000 Tianjin Meiyin Real Estate Development Co., Ltd00 TEL: 022-85581742

TOFF 52200

11275

4300

AHU

ACPD ACPD

aC BF

aE

aH

BH

aF

7700

PAD/EAD

BJ

aG

7500

11275

PAD/EAD

TOFF 282850

aJ

8250

1925 6325

KED/SED FAN ROOM

aE

BC

aJ

12725

PRESSURIZATION FAN ROOM

BH

12

2425 6125 2050 5350

建设设建 / Client

24000

DN

aJ

8550

1

TOFF 24950 OPEN TO BELOW 挑空

aH

11 450

4300

8600

2 A-201

BJ

10

900

6850 1350 2650

8250

20

16 1/17

12050

4300

13 950

天天天天天天天际天天 Tianjin PingAn - TED International Finance C

19

7700

12

2425 6125 2050 5350

B5

7500

8550

B4

6503850 4500

3525 5025

B3

12000

9800

B2

3450 1000

11

10

450 4300

天天天天天天天际天天天天 Tianjin PingAn - TEDA International Finance Center

B1

8800

8

7

19

8950

B5

7900

6

B4

8200

3

B3

8800

1

B2

Issue Date:

11/30/16

Scale

TOFF 17700

1 : 400

Project No.

2587

Drawn By

A

E D

Issue Date:

4600

B1

Author

C

Scale

B

Project No.

A

Drawn By

11/30/16 1 : 400 2587 Author

TOFF 24950

9400

3250 3600

0 6500

2400

3100 5500

2 A-204

天商图_L05 PLAN_L05

1200 500 350 3150 3250 3600 8550

8200

1200 7350

PROPERTY LINES 用地红线

2050 6750

2650

9400

3250 3600

0 6500

3100 5500

BUILDING BOUNDARY 建筑红线

23

SITE BOUNDARY 基地红线

N

15

16 S8

17 S9 S10

18

23

24

25

1

1

天商图 - L05 PLAN - L05

2

4

5

S1

S2

6

7

A-105 S3 S4

8

9 S5

10

11 S6

SCALE:1 : 400 © 2015 KOHN PEDERSEN FOX ASSOCIATES PC. All rights reserved.

Retail Podium | Revit Documentation Construction Documentation Level 05 and Podium Roof Plan

100

13

14 S7

15

16 S8

17 S9 S10

18

24

25

ROAD PROPERTY LINES 道路红线

屋顶天商图 ROOF PLAN N

1

屋顶天商图 PLAN - ROOF

A-106

SCALE:1 : 400

© 2015 KOHN PEDERSEN FOX AS


PING AN TIANJIN

23 VISION GLASS 透透玻玻

GL

SPANDREL GLASS 窗战墙玻玻

TERRACOTTA 陶陶地

M

METAL SCREEN 天金屏战

SC

LED SCREEN LED 屏屏

23.55 M

Retail Roof

17.70 M

Retail L04

12.30 M

Retail L03

6.30 M

Retail L02

B

C

D

E

F

G

H

J

K

L M

NP

Q

13

12

11

天天天 Tianji Intern

10

3.00 M

Retail L01M

0.00 M

Retail L01

建设设建

结构设结 THORNT 51 MADI NEW YO TEL: +1 9 FAX: +1

天天天天 Tianjin M TEL: 022

3

A

6 5 A-1301

5850

METAL PANEL 天金地

SINAGE BOARD 广广地

15

5400

M TC

SG

16

6000

METAL LOUVER 天金金金

1/17 191817

6300

METAL LOUVER 天金金金

20

1400

24.95 M Retail Parapet

M

21

马马道 Site A,

GL

M

22

R

TS

U

6 A-1322

V

北商商图 PODIUM ENLARGED ELEVATION - NORTH

建建设结

Kohn Ped Architect 11 West 4 New York TEL: +1 2 FAX: +1

SCALE:1 : 250

W

XY

aA

aB

aC 1/AC

aD

aE

aF

aG

aH

aJ

机电设结

WSP | PA 1/F, 668A Shanghai TEL: +86 FAX: +86

6 A-1321

TADI

Retail Roof

17.70 M

Retail L04

12.30 M

Retail L03

天天天建 TAINJIN 工工设结 FIRST-C

Retail L02

3.00 M

Retail L01M

0.00 M

Retail L01

3000

6.30 M

3300

6000

5400

5850

23.55 M

1400

24.95 M Retail Parapet

No.

体商商图 PODIUM ENLARGED ELEVATION - EAST

D

Key Plan

SCALE:1 : 250

D1

24.95 M Retail Parapet Retail Roof

17.70 M

Retail L04

12.30 M

Retail L03

6.30 M

Retail L02

3.00 M

Retail L01M

0.00 M

Retail L01

2

4

5

6

7

8

9

10

11

13

14

15 16

17181/17

23

24

25

A-221 4/28/2017 9:10:51 PM

5400

Issue Date: Scale

6000

Project No.

3300

Drawn By

3000

PODIUM ENLARGED ELEVATIONS C:\KPF\Revit\2587_ARCH_KPF_CORE_tjin02.rvt

5850

23.55 M

1

1400

2

1

体商商图 PODIUM ENLARGED ELEVATON - SOUTH SCALE:1 : 250

商马 POD ELEV

A-2

Retail Podium | Revit Documentation Construction Documentation North, West and South Elevations

101


102


RUBBISH RECHARGED

MILLENNIUM MILLS @ THE ROYAL DOCKS LOCATION: TYPE: PROGRAM: PROFESSOR: STUDIO:

Royal Docks, East London Adaptive Reuse Power a city with the city’s waste Sean Gallagher Elective

103


MAN MACHINE AND THE INDUSTRIAL LANDSCAPE

Published in Abstract

Rubbish Recharged

Millennium Mills: A site on the docks of East London, has been abandoned and unused for almost 30 years. The site is 30 acres with a large art deco building and a smaller silo. It is situated on the Royal Docks, which is connected to Thames River and is also currently unused. The original purpose of the building was for flour milling, the process of which called for a lot of vertical machinery. The gaping holes in the floor plates are the remnants of this process.

Gasification: A series of vertical processes, fitting the vertical nature of the building. The goal is to produce enough energy on the site to provide for the Docklands Light Railway and revitalize the docks. Municipal Waste: The biomass selected for the gasification process is municipal waste. The challenge is to find the area of London whose waste will size the gasification requirements on the site, and determine how much energy is possible given those limitations. With this proposal, an input and output loop is created: the waste from the city is sent to East London via the river and the docks in order to produce energy to run the passenger train that links East London to the city center.

Proposal: To re-purpose the old flour mill with a gasification process that revitalizes the site which positively affects the neighboring area. It requires access to a constant stream of biomass, which can be brought by ship directly to the site.

104


RUBBISH RECHARGED

BIOMASS GASIFICATION Process and Energy Diagram

105


MAN MACHINE AND THE INDUSTRIAL LANDSCAPE

Byproduct Potential use for byproducts: ASH

SOAP

4,250,000 metric tons 2,730,000 metric tons 1,250,000 metric tons 1,090,000 metric tons 770,000 metric tons 140,000 metric tons 130,000 metric tons 23,000 metric tons 900 metric tons 0.06 metric tons

5,000,000 metric tons

Municipal Solid

17,000,000 metric tons

Surplus Wood

4,600,000 metric tons

Energy Crop

Oilseed Rape

CONCRETE FILLER

53,846,000 MWh

38,000,000 MWh 21,000,000 MWh

15,400,000 metric tons ethanol conversion

conventional crops

Wheat

GLASS

drying process

Food Waste

2,800,000 metric tons

9,000,000 MWh 8,952,000 MWh

21,800,000 metric tons

6,900,000 MWh

Willow and Poplar 12 oven dried metric tons

1,200,000 MWh

Cereal

perennial crops

Miscanthus 180,000 oven dried metric tons

300,000 MWh Sewage Sludge 1,000,000 dried metric tons

Other Wastes Animal Manure 21,000,000 dried metric tons

drying process

PRODUCTS PRODUCED ANNUALLY (AVERAGE METRIC TON)

United Kingdom

14,000 MWh

13 MWh

Energy Loss

106

POTENTIAL ENERGY PRODUCTION (MWh OF ELECTRIVITY PER YEAR)

BIOMASS ENERGY PRODUCTION


RUBBISH RECHARGED

TRANSPORTATION & ENERGY United Kingdom to London to Royal Docks

of Municipal Waste produced per year

Average kWh of eletricity lost in the transportation of goods by truck (18-wheeler).

17,000,000 metric tons

840 sq km = 5,100 kWh 792 sq km = 4,800 kWh 744 sq km = 4,500 kWh 696 sq km = 4,200 kWh 648 sq km = 3,900 kWh 600 sq km = 3,600 kWh 552 sq km = 3,300 kWh 504 sq km = 3,000 kWh 456 sq km = 2,700 kWh 408 sq km = 2,400 kWh 360 sq km = 2,100 kWh 312 sq km = 1,800 kWh 264 sq km = 1,500 kWh 216 sq km = 1,200 kWh 168 sq km = 900 kWh 120 sq km = 600 kWh 72 sq km = 300 kWh

ROYAL DOCKS

0 10

50

100

200

300

400

500KM

107

100 km ra dius

LONDON

24 sq km = 100 kWh


MAN MACHINE AND THE INDUSTRIAL LANDSCAPE

MUNICIPAL WASTE & ENERGY POTENTIAL London, Essex, Kent, & Surrey

4 Counties

London, Essex, Kent, & Surrey

5,004,489 metric tons

LONDON : 2,961,808 metric tons

of Municipal Waste produced in 2010

of Municipal Waste produced per year

= 1,554,933

MWh per year

59%

16% ESSEX : 780,317 metric tons

of Municipal Waste produced per year

= 409,667

MWh per year

CITY OF LONDON ROYAL DOCKS

15%

10%

KENT : 756,206 metric tons of Municipal Waste produced per year = 397,008 MWh per year

SURREY : 506,158 metric tons of Municipal Waste produced per year = 265,733 MWh per year 0

10

50

100

200 KM

108

TOTAL ENGERY POTENTIAL: 2,627,341 MWh per year


RUBBISH RECHARGED

DOCKLAND LIGHT RAILWAY Newham Borough of London

ENGERY REQUIREMENT to power light rail : 278 MWh per hour = 2,435,280 2,435,280 MWh per year

= 4,638,629 metric tons

MWh per year

of Municipal Waste produced per year

TOWER GATEWAY

STRATFORD STRATFORD HIGH STREET

original routes

PUDDING MILL LANE

existing extensions

ABBEY ROAD WEST HAM

under construction

NEWHAM

BOW CHURCH

planned extension

STAR LANE

TOWER HAMLETS

potential extension

CITY OF LONDON BANK

DEVONS ROAD LANGDON PARK

TOWER GATEWAY

SHADWELL

LIMEHOUSE ALL SAINTS POPLAR

WESTFERRY

INDIA QUAY

CANNING TOWN CUSTOM ROYAL HOUSE FOR PRINCE VICTORIA EXCEL REGENT possible future station WEST SILVERTON

QUAYS SOUTH QUAY

BECKTON ROYAL BECKTON CYRPUS ALBERT PARK

CREEKMOUTH

GALLIONS REACH

DAGENHAM VALE BARKING RIVERSIDE

DAGENHAM DOCK

BECKTON RIVERSIDE

MILLENIUM MILLS PONTOON DOCK

LONDON CITY AIRPORT

KING GEORGE V

CROSSHARBOUR

GREATER LONDON

MUDCHUTE ISLAND GARDENS CUTTY SARK FOR MARITIME GREENWICH GREENWICH DEPTFORD BRIDGE

WOOLWICH ARSENAL

REGENERATIVE BREAKING The rains collect the energy generated by braking, convert it into electricity, and put is back into the system via the third rail. Almost 20% of the energy provided to the trains is recycled back into the system. THIRD RAIL A high conductivity steel rail is used to supply electricity to the running trains. This method is more efficient than over head lines because it reduces the amount of energy loss. DLR: GRAMS PER PASSENGER KM

ELVERSON ROAD

SMALL CAR: GRAMS PER PASSENGER KM LEWISHAM

LARGE CAR: GRAMS PER PASSENGER KM

70 100 300

STATIONS KM OF TRACK TRAINS MILLIONS OF PASSENGERS PER YEAR

0

5

10

20 KM

109

40 31 149 70


MAN MACHINE AND THE INDUSTRIAL LANDSCAPE

BIOMASS GASIFICATION Energy Inputs and Outputs

89 4,4

ons ic t

341

7, ,62

=2

ear er y

M

p Wh

tr

me

0

LONDON ESSEX KENT

SURREY

MUNICIPAL WASTE

CONSISTING OF HOUSEHOLD & OFFICEWASTE

7 ,15 506

89

4,4

0 5,0

ons ic t

tr me

TRANSPORTATION START UP

TOTAL ENERGY PRODUCTION

ons ic t etr ns m o 808 ric t s 61, 17 mettric tons 9 , 2 0,3 me ton 786,206 metric 5 8

5,0

REGENERATIVE BREAKING SYSTEM 20% Energy Recycled

LIGHT RAIL 80

,2 435

2,

110

ear er y

M

p Wh


RUBBISH RECHARGED

SITE MAP

Key Locations & Electricity Usage

NEWHAM WAY BECKTON

DOCKLANDS LIGHT RAILWAY : 278 MWh

of energy to power whole system

NEWHAM BOROUGH

92 MW

HT

LIG 4)

199

IL (

RA ROYAL VICTORIA

CUSTOM HOUSE FOR EXCEL

PRINCE REGENT

35 MW CONNAUGHT BRIDGE

BREWSTER’S WASTE MANAGEMENT LIMITED

LIGH

T RA

ROYAL ALBERT WAY

BRITANNIA VILLAGE (1994)

GALLIONS REACH

IL (1

EXCEL CONVENTION CENTER (2000)

DOCKLAND’S WASTE RECYCLING

TO LONDON

CYRPUS

BECKTON PARK

ROYAL ALBERT

994)

35 MW

LONDON CITY AIRPORT (1987) LONDON CITY AIRPORT

WEST SILVERTON

ALBE

RT RO A

SILVERTOWN WAY PONTOON DOCK

D

LIGHT RAIL

ENTRY

(2005)

TO CHANNEL

KING GEORGE V

IL (2009)

LIGHT RA

RIVER THAMES NORTH

8,000 LBS OF STEAM = 1 MWh 1 MWh = POWER FOR 1,000 HOMES 0

5 KM

111


MAN MACHINE AND THE INDUSTRIAL LANDSCAPE

SITE PHOTOS

Existing Conditions at Millennium Mills

Royal Victoria Dock Industrial rail and water tranpsortation

Grain Elevators at the Royal Victoria Dock Where imported grains are extracted from ships

112

Millenium Mills Interior slides and holes left from milling machinery


RUBBISH RECHARGED

BIOMASS GASIFICATION Scale, Output, and Precedents

1 MW

FLUIDIZED-BED GASIFIER - CHINA

8 MW

FLUIDIZED -BED GASIFIER - AUSTRIA

50 MW

50 MW POTENTIAL - MILLENNIUM MILLS

110,000 FT3

880,000 FT3

5,500,000 FT3

113


MAN MACHINE AND THE INDUSTRIAL LANDSCAPE

PEDESTRIAN WALKWAY With Electrical Cables running beneath

INFORMATION BOARDS

SEATING

RUBBISH BINS

ELECTRICAL LINES

STRUCTURAL GLASS

114


RUBBISH RECHARGED

INSERT INDUSTRY

2

N ER G

PONTOON DOCK

E 0%

Y

R EC

YC LED

LO E K SUR N SSEENTREY D X O N

Layout of Gasification Process on the Site

RENDER VIEW

115


116


POINTY-ISM

LOCATION: TYPE: PROGRAM: PROFESSOR: STUDIO:

Brooklyn, NY Master Plan Residential Jeffrey Inaba Studio VI Third Year, Final Semester

117


ADVANCED STUDIO VI

Neighborhood

Pointy-ism

What is a neighborhood and how can the architecture affect its spaces?

The Site: A highly congested area of Brooklyn, where a multitude of unpleasant vehicular thruways overlap. The Proposal: 5-600 feet tall, high density, mixed-use towers, will be proposed situate within a park to create a unique neighborhood character within this neighborhood of Brooklyn. This neighborhood will act as an icon in the skyline, will be responsive to the local conditions, and will provide for the neighborhood a much needed urban green space. The Goal: To optimize each of the five towers towards certain conditions that enhances the program within.

118


POINTY-ISM

119


ADVANCED STUDIO VI

Why the towers in the park scheme? The park would divert the high speed traffic under the park, creating a destination above ground that residents of the surrounding neighborhood can enjoy. Cars are hidden from view within this area, and are either parked below the park or driven into the towers where elevators lift them to designated areas for parking within. The towers can provide higher density, mixed-use living for this up and coming area of Brooklyn.

3. Each segment of the towers is then rotated according to the ideal view pending their location within the park and the overall program of the each segment. 4. Programs within each segment are further refined and distributed based on the optimization of the view. Typically people can see best 30 degrees to the left and right, and 15 degrees down, if they are looking straight forward. If the window panels on the structure do not fit within the field of view and if the panels are not at least 30 feet away from the core, the program behind these panels would be allocated to parking, back of house, or other core functions.

Setting the parameters: Each tower is optimized to face all residential units towards highly coveted, local views including the Brooklyn and Manhattan bridges, the Freedom tower, or views back into the park. Residential units include studio units, single bedrooms, and family units. Retail and community functions face the public spaces, where they are easily and most visible. Non-ideal views will be set for parking, back of house and core functions.

5. An additional criteria is set for the community program in these towers. In order to provide more to the neighborhood, the top and bottom floors of the top two segments are specifically reserved for community functions. These areas included additional balcony spaces, due to the odd overlaps of the segments from the rotations of each segment. As well, at these points, additional structure is needed to support the cantilevers of the segments. Heavy trusses line these floors on which the floors below were hung off of. Thus although the trusses obstruct views in all directions, these floors had the most unique conditions that cater towards the more unique community functions.

The development process: 1. Preferred views of the neighborhood is determined. 2. The tower is divided into three segments. The height of each segment is determined by surrounding local conditions with the height of the top segment set so that the lowest level of this segment starts at the top of highest tower in the field of view towards the bridge. The middle segment then is set so that the surrounding context directs the view inward towards the park. The bottom segment is set at a consistent 120 feet tall on all towers.

120


POINTY-ISM



 

  

    

      

   

 

121


ADVANCED STUDIO VI

For example, one tower may be generally programmed as follows. The top segment typically houses the prime residential program or programs that desire highly coveted views of the city and other iconic points of Brooklyn, such as the Brooklyn and Manhattan bridges. Due to the height of this segment, views from here are unobstructed. Thus this top segment rotates towards one of the iconic points of the city. The middle segment is primarily residential. It rotates towards the center of the park for a more private and peaceful view inward. The bottom segment holds the most public functions such as retail and other commercial and community programs. This segment rotates parallel to the nearest street, exposing the greatest surface area directly towards the street.

122


POINTY-ISM    



  

   

  

 

123

 


ADVANCED STUDIO VI

Towers in the Park Overall master plan

124


POINTY-ISM

125


ADVANCED STUDIO VI

126


POINTY-ISM

127


ADVANCED STUDIO VI

Tower view Tower at its widest from the neighboring context

128


POINTY-ISM

129


ADVANCED STUDIO VI

Towers in the Park Three of the five towers view from the park

130


POINTY-ISM

131


132


URBAN LICHE

LOCATION: TYPE: PROGRAM: PROFESSOR: STUDIO:

The City Cemetery To house the dead Bernard Tschumi Studio V Third Year, First Semester

133


ADVANCED STUDIO V

Cemetery

L

URBAN ICHE

Liche, a “body” either dead or alive.

75 thousand people die every year in New York City. 3 thousand bodies go unclaimed every year in New York City.

Niche, a recess particularly suitable for a person to occupy.

As population increases and the available space decreases, cities must decide how to handle the constant stream of corpses that go unclaimed every day.

Urban liche is driven by the interest not only in the concept of a cemetery, but specifically a cemetery within the city.

Because of both the limitations of space inherent to the urban context of New York City and due to the space requirements involved in the practice of traditional burial methods, cemeteries have been pushed to more rural areas and as a result to this, have been rendered vast “dead” zones. Even when few cemeteries are located within the city, the stigma attached to the concept of cemeteries creates a similar “dead” zone in the usually dense and bustling urban fabric.

134


URBAN LICHE

FINITE SPACE

NYC “DEAD” ZONES

135


ADVANCED STUDIO V

STIGMA OF CEMETERIES

GRIM CONCEPTION OF CEMETERIES

The grim conception of cemeteries attaches a stigma to these desolate, vacant, empty spaces that are an unavoidable part of the future of our cities as death is inevitable. How might the way in which we physically deal with these unclaimed dead bodies, what can we do with them where we put them how we feel about them, and potentially revitalize the current grim conceptions of cemeteries and in turn, bring a new vitality to these “dead� urban spaces? What is the future of cemeteries?

136


URBAN LICHE

POTENTIAL SPACE

HOW MANY BODIES FIT ON A 20,000 SQ. FT. PLOT OF LAND?

The goal is to de-stigmatize the physical and psychological implication of death and places of death creating a publicly used space while contributing ecologically and economically to the long existing practical problem of what happens to these unclaimed corpses in the limited urban condition of NYC.

Through the process of promession, the concept of a “cap� for the number of bodies in a cemetery is removed and is the initial catalyst that enables our proposal to move the cemetery back into the city. The question then is, how can we create a constantly living and thriving urban, public space?

Given a 20,000 sq. ft. site, the square footage is quickly filled by traditional burial and only holds a fraction more when cremation is used.

137


ADVANCED STUDIO V

POTENTIAL ENERGY

DEATH IS THE TOTAL DRAINING OF ENERGY. IS THERE A WAY TO TRANSFER ENERGY FROM THE BODY TO FUEL THE ENVIRONMENT?

Death is the total draining of energy. Is there a way to transfer energy from the body to fuel the environment?

138


URBAN LICHE

HARVEST CORPSE

THE CORPSE CAN FEED AND WATER CROPS.

The body and the site are optimized through the process of promession which transforms the body into soil rich in nutrients and recycles the extracted water, both viable for creating and sustaining life.

139


ADVANCED STUDIO V

THE BODY FEEDS...

The human body is 70% water and the nutrients of the body is equivalent to one 50-pound bag of fertilizer which can feed 10 apples, 58 grape vines, 600 plus cauliflowers, etc. In other words, the corpse can feed and water crops.

140


URBAN LICHE

OPTIMIZE SITE

HOW MUCH PRODUCE FIT ON A 20,000 SQ. FT. PLOT OF LAND?

Through promession, this plot size can sustain 18 fully grown apple trees, which produces over 5,000 apples.

141


ADVANCED STUDIO V

PRODUCTIVE SPACE

SCATTER

20,000+ SQ.FT.

FREEZE DRY

5,000 SQ.FT.

SHATTERING

1,200 SQ.FT.

LIQUID NITROGEN FREEZING

1,200 SQ.FT.

STORAGE + FREEZING

14,650 SQ.FT.

While promession is for one body at a time, we contemplated this temporal aspect and how we could optimize this existing process further through our architecture.

142


URBAN LICHE

In the initial exploration for the cemetery, an exploration of the juxtaposition of a public green space above was fueled by a private machine below.

143


ADVANCED STUDIO V

The dichotomy of life and death is further pursued through the investigation of the spatial relationship between the parts of the machine and natural conditions, such as gravity, temperature underground, and so on with the green space and public above.

144


URBAN LICHE

The following iteration pays further attention into developing a spatial quality, enclosure, and productive market and orchard program above ground. And finally, how may this be proliferated throughout the city, plugged in to create an urban network of these thriving public green spaces in the city.

145


ADVANCED STUDIO V

DE-CENTRAL PARK

Situated on the end lot of a typical Manhattan block, the site is exposed to the east. Considerations of sun exposure and wind influenced the machine to come above ground. The machine tower is justified to the north to block the wind and it exposes optimum surface area of orchard space to the sun. Thus, the horizontal, vertical, and inclined surfaces can then be treated as productive growing surfaces.

146


URBAN LICHE

DEATH IS INTERNALIZED. THROUGH THE MACHINE, THE BODY IMMORTALIZED. LIFE [ENVIRONMENTAL] IS REVITALIZED.

Death is internalized. Through the machine, the body immortalized. ENVIRONMENTAL life is revitalized. The machine is contained within the mass of the ground and the mass of the tower internalizing the process. The body as a corpse is always hidden while the mechanics of the machine at times become revealed to the public.

147


ADVANCED STUDIO V

The anatomy of the machine-- first, the corpse is delivered, hidden from the public below ground.

The water is then separated through the main body mass in the freeze dry, vacuum separation chamber.

It is refrigerated for 2 to 4 days.

The remaining mass is then sent through filters and magnets to separate metals and other impurities such as implants and fillings.

Then it is sent along a wheel and belt to freeze in liquid nitrogen for 4 to 6 hours. It is then sent up on a vibrating belt which shatters the body into tiny, unrecognizable pieces.

The remaining nutrients and the collection of water is fed through the pipes to the orchards which supply the market space below.

148


URBAN LICHE

THE BODIES HAVE BEEN IMMORTALIZED IN A WAY THAT GIVES NEW LIFE.

The bodies get immortalized in a way that gives new life.

149


ADVANCED STUDIO V

DEATH IS INTERNALIZED. THROUGH THE MACHINE, THE BODY IMMORTALIZED. LIFE [ECONOMIC] IS REVITALIZED.

Death is internalized. Through the machine, the body immortalized. ECONOMIC life is revitalized.

150


URBAN LICHE

CROPS CAN BE HARVESTED IN A MORE SUSTAINABLE MANNER IF CERTAIN SOIL AND WATER PRACTICES ARE ADHERED TO.

All aspects of the cemetery, the machine, the market, and the orchard space all work together. One cemetery houses infinite corpses, which then creates a continuous cycle of consumption. One cemetery houses infinite corpses, which then creates a continuous cycle of consumption.

151


ADVANCED STUDIO V

DEATH IS INTERNALIZED. THROUGH THE MACHINE, THE BODY IMMORTALIZED. LIFE [COMMUNITY] IS REVITALIZED.

Death is internalized. Through the machine, the body immortalized. COMMUNITY life is revitalized.

152


URBAN LICHE

BECOME A PART OF EVERYTHING:

OF THE TREES...

Become a part of everything.

153


ADVANCED STUDIO V

OF THE EARTH...

Of the trees.

154


URBAN LICHE

OF THE AIR...

Of the air.

155


ADVANCED STUDIO V

OF ALL LIVING THINGS

Of all living things. It’s public. It’s your urban backyard. It’s alive!

156


URBAN LICHE

AN APPLE A DAY...

An apple a day...

157


158


VISUAL ARTS

Various models and other works of art

159


ART

3D Model Housing model

160


ART

161


ART

3D Model Cemetery

162


ART

163


ART

3D Model Structural study model

164


ART

165


ART

Chalk Pastels Of a Tang Dynasty Sculpture

166


167


ART

Watercolor Reference of Lyonel Feininger’s Oil Painting “Barfuesserkirche I 1924”

168


169


170


SLEUNG


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.