Melbourne Water's Mornington Peninsula Shire waterways update

Page 1

Mornington Peninsula Shire

The Tanti Creek Wetland in Mornington was constructed to increase flood protection and naturally treat and reduce the pollutants in stormwater entering Tanti Creek and Port Phillip Bay

Waterways local update 2009 / 2010 THIS UPDATE INCLUDES: • what we’ve done or started in 2009/10 • what’s coming up

Melbourne Water is actively working with Council and the local community to achieve healthy waterways and provide flood protection for people and property.

We’re responsible for approximately 8,400 kilometres of rivers and creeks and over 1,400 kilometres of drains in the main drainage system within the Port Phillip and Westernport region. We also manage over 200 flood retarding basins, 100 urban lakes and 300 waterways treatment systems, including wetlands. Significant waterways in the Mornington Peninsula Shire region include the Merricks, Main, Balcombe, Dunns, Manton, Stony, Watsons, Warringine, Drum Drum Alloc, Chinamans, Kackeraboite and Tanti Creeks and the new Tanti Wetland. We care for waterways and drainage systems through an ongoing program of works and community grants. We care for waterways and drainage systems through an ongoing program of works and community grants.

MORNINGTON PENINSULA KEY Wetland

Major waterway

Swale

Municipal boundary

Town

Waterbody

MELBOURNE WATER’S WATERWAYS MANAGEMENT DISTRICT

Mornington TANTI CREEK HOPETOUN CREEK

Moorooduc HARRAP CREEK

Hastings

Portsea

LANG LANG CREEK

Red Hill

Rye

MERRICKS CREEK DRUM DRUM CREEK

Flinders Cape Schank N

Somers


What we’ve done or started Tanti Creek Wetland in Mornington

Managing waterways In 2009/10 we undertook a range of works, focused mainly on weed control, bank stabilisation and revegetation. WHERE

WATERWAYS

WHAT WE’VE DONE

Dunns Creek Road, Dromana

Dunns Creek

Carried out works to remove weeds. We also worked to stabilise existing rock structures and establish a fish passageway.

Merricks Creek (downstream) from Stanleys Road, Red Hill South

Merricks Creek

Carried out works to remove weeds and revegetate the area.

Peninsula Gardens Reserve, Rosebud

Drum Drum Alloc Creek

We’ve constructed a rock control structure to help prevent erosion. Revegetation will take place to stabilise the channel and its surrounds. This will also encourage the re-colonisation of native vegetation to provide important habitat for the native Swamp Skink.

Hopetoun Creek, downstream of Uralla Road, Mount Martha

Hopetoun Creek

We’ve removed pine trees to allow the establishment of native vegetation which will provide habitat and stabilise the creek banks.

Managing our assets We’re responsible for natural and constructed rivers, creeks and wetlands, underground drains, pump stations, retarding basins and traps that prevent litter and other items from polluting waterways. We are also the caretakers of sites of biological significance, many of which are home to endangered plant and animal species.

Throughout the year we remove litter, debris and excess sediment from your waterways. We install fences for protection, remove and spray weeds, cut grass, plant native trees, plants and grasses and provide solutions to erosion problems. We also respond to events that may cause risk to the public, our assets or our environment.

Waterways local update 2009/10 | Mornington Peninsula Shire | 2


Managing environmental flows In 2009/10 we undertook a range of works to ensure sufficient environmental flows. (‘Environmental flow’ refers to the volume of water that needs to flow through a waterway to keep it healthy.) WATERWAYS

WHO WE’VE WORKED WITH

WHAT WE’VE BEEN WORKING ON

WHY

Mornington Peninsula Shire region

Southern Rural Water

Managed surface water and ground water extractions.

To improve environmental flow outcomes.

Managing water quality In 2009/10 we worked to improve the quality of stormwater and catchment runoff entering rivers, creeks and bays. Where

What we've done

WHY

Balcombe Estuary sediment hot spots, Mount Martha, Mornington Peninsula

Assisted Mornington Peninsula Shire Council with identifying 4 sites for sediment generation. These sites are considered to have an impact on sediment in the estuary.

Sediment has been identified as a key issue in the estuary. This will reduce sediment load to the Balcombe Estuary.

We’ve been working with Council and the local community to raise awareness of the ways in which good management of stormwater contributes to healthy waterways. Raingardens are garden design features that help protect your local waterway. Raingardens use natural processes to filter out pollutants in stormwater. Our 10,000 Raingardens program promotes the things that you can do at home to improve stormwater quality — like building a raingarden. To find out more, please visit melbournewater.com.au/raingardens

Raingarden

We’re a key supporter of Clearwater, a not-for-profit organisation that aims to build sustainable water management knowledge and skills across Victoria. Clearwater offers training, advice, technical information and events for those who plan, design, develop and manage our cities and towns. To find out more, please visit clearwater.asn.au

Drum Drum Alloc Creek in Rosebud. We have placed rockwork in the creek for erosion control and removed weeds to protect and strengthen existing vegetation.

Waterways local update 2009/10 | Mornington Peninsula Shire City | 3


Flood management and drainage In 2009/10 we carried out studies to map floodplains and overland flow paths to assess flood risks and provide guidelines to developers. We also work with the Bureau of Meteorology and the State Emergency Service (SES) to provide flood warning services to the community. What we’ve done

Why WE’VE DONE THIS

Tanti Creek Retarding Basin within Tanti Creek Floodplain, Mornington.

Constructed a retarding basin to allow for better management of peak flows. This shall minimise nutrient loads, sediment and toxicants from entering Tanti Creek.

Undertaken Flood Mapping in Dromana, Safety Beach, Mount Eliza, Rosebud, Hastings and Mornington.

To update our knowledge on flooding, help us better manage the drains and assess flood risks in the catchment.

Council has signed up to work with Melbourne Water to develop a Flood Management Plan (programmed to be completed in 2010/11).

To better understand and manage flood risks and improve collaboration between flood management agencies.

We manage a Hydrologic Data Collection Network which monitors rainfall and flows in waterways. We also support Council and the SES in flood response plans.

Managing urban growth Melbourne Water has a statutory obligation to manage urban growth and redevelopment. Through our town planning and subdivision process we ensure that flood protection standards are met, stormwater runoff and quality meet best practice standards and the health of our waterways is protected. Referral

Number referred in 2010

WHY

Land subdivisions

272

Subdivision referrals enable Melbourne Water to set conditions that relate to drainage outfall or treatment of stormwater. Easements or reserves may also be required for floodplain, drainage or waterway management purposes.

Development applications

36

To establish whether proposed developments are compatible with flood risks. The flood risk to people and property is minimised by setting appropriate conditions on planning permits.

Flood information requests

576

To enable us to advise property owners and people interested in purchasing or redeveloping a property on flood levels and hundred-year flood events.

Waterways local update 2009/10 | Mornington Peninsula Shire | 4


Monitoring, investigations and research In 2009/10 we carried out extensive monitoring, investigations and research in order to develop a comprehensive information base to support our activities and report on progress. WhERE

WhAT

Why

Somerville

Carried out high flow event monitoring at 1 site.

To calculate pollutant loads to Port Phillip and Westernport Bays.

Around Devilbend Reservoir

Carried out an annual platypus survey

To investigate the distribution, abundance and movement of platypus in the Melbourne Water region.

Mornington Peninsula Shire region

Regularly monitored 10 longterm water quality sampling sites.

These 10 sites are part of a network of 136 sampling sites across the Port Phillip and Westernport region. The program allows us to assess long-term trends in water quality across the entire catchment.

The Melbourne Water region

Commissioned 19 new rainfall and stream level monitoring stations.

Allows us to operate an online rainfall and water level monitoring network to see what’s happening right now. This data can be used for many purposes including managing very low stream flow conditions during drought periods as well as periods of severe flooding. We also operate a flood warning service for the Port Phillip and Westernport region. Visit our webpage at the following link to view the data collected by the online system melbournewater.com.au/rainandriver

Involving community We continue to work with the community and other stakeholders in managing our waterways, drainage systems and floodplains. Through our River Health Incentives Program, we’ve provided grants to landowners and public land managers to improve the condition of waterway frontages. Funded activities have included weed control, revegetation, fencing and installing off-stream stock watering.

If you’re a landowner or land manager with waterway frontage and would like information about funding and educational opportunities, please call us on (03) 9235 2231 or email river.health@melbournewater.com.au

Grant

Who we gave grants to

Number of grants approved in the last year

Amount funded in the area (ex. GST)

Stream Frontage Management Program

Private landholders

93

$231,772

Corridors of Green

Public land managers

12

$107,331

Community Grants

Community groups working on public land

18

$107,839

Waterways local update 2009/10 | Mornington Peninsula Shire City | 5


Involving community cont. There are 106 Mornington Peninsula Shire community members in our Community Rain Reader network. We have over 500 community rain readers across the Port Phillip and Westernport area. Every day, these hardy volunteers read their rain gauge (usually located in their backyard) and record data. This data, together with data from our automated gauges, provides us with valuable rainfall information. To look at this information, please go to melbournewater.com.au/communityrainreaders

Healthy Waterways Waterwatch is a government funded, fun, hands-on river health education and engagement program hosted by Melbourne Water that supports community, schools and businesses to be actively involved in monitoring and protecting the health of our rivers and creeks. We work with local schools in the Mornington Peninsula region as part of our Healthy Waterways Waterwatch program

To learn more about your river and creek with Healthy Waterways Waterwatch, go to waterwatchmelbourne.org.au Highlights of 2009/10 include: Event/Project

Who we worked with

What we did

Waterwatch Schools Program

Tootgarook Primary School, St Macartan’s Primary School, Chisholm Institute of TAFE, Rosebud Primary School, Penbank School, Balcombe Grammar School, Baxter Primary School and Boneo Primary School

Ran a Healthy Waterways Waterwatch schools program, this included a planning session with teachers and up to five sessions with students. The aim was to connect students to their local rivers and creeks.

Waterwatch engagement sessions

Probus Club – McCrae Ladies Inc. and Melbourne Water staff

Presented on catchments, water supply and local waterway fauna.

Ongoing water quality monitoring

Friends of Chinamans Creek Inc., Balcombe Estuary Rehabilitation Group (BERG) Inc., Merricks Drainage Monitor, Manton and Stony Creek Landcare Group, Merricks-Coolart Catchment Group, Watsons Creek Catchment Landcare Group, Main Creek Catchment Landcare Group and Tanti Creek Friends

Supported Waterwatch community water quality monitoring groups with field visits, equipment maintenance and data validation exercises.

Council festivals and events

Mornington Peninsula Shire Council and local schools

Attended 4 days at the Mornington Peninsula Environment Expo.

The important work described in this report is made possible by the waterways and drainage charge that is included in water bills and collected by water retail companies on our behalf.

Waterways local update 2009/10 | Mornington Peninsula Shire | 6


What’s coming up

Drum Drum Alloc Creek in Rosebud. By stabilising the banks to control erosion and removing weeds we are protecting and enhancing the creek and the unique environment that surrounds it.

Managing waterways We’ve planned a range of works, focused mainly around weed control, bank stabilisation and revegetation. What we'll do

Why

Remove a fish barrier along Stony Creek at Byrnes Road Fishway.

To improve fish passage and allow the entire upstream reach of Stony Creek to be accessible to native migratory fish species.

Carry out weed removal works along Balcombe Harrap Creek.

Weed control work to help protect and improve river health values and natural habitat for native plants and animals and potentially threatened species within Harrap Creek.

Carry out weed control and revegetation works along Chinamans Creek, Village Glen retirement village.

The removal and eradication of high threat weeds and subsequent revegetation with native species shall provide enhanced habitat for the threatened Swamp Skink.

Investigate the removal of a fish barrier at the mouth of Main Creek.

To improve accessibility for native fish, especially Tupong, to the entire upstream reaches of Main Creek.

Carry out weed control along Balcombe Creek within Mt Eliza Regional Park in cooperation with the Mornington Peninsula Shire Council.

This is the most upstream part of Balcombe Creek that has significant remnant vegetation. Weed control in this reach will help to protect significant vegetation downstream.

Waterways local update 2009/10 | Mornington Peninsula Shire City | 7


What’s coming up cont.

Hopetoun Creek Mount Martha. Maintenance work on trees in action.

Involving community WHAT WE’LL DO

WHY

Provide a range of Healthy Waterways Waterwatch activities and programs in the Mornington Peninsula region.

Effective education programs lead to a well informed, environmentally aware and engaged community.

Support Healthy Waterways Waterwatch Community water quality monitoring groups with field visits, equipment maintenance and data validation exercises.

Biodiversity will continue to be monitored, conserved and improved.

Managing urban growth WHERE

WHAT WE’LL DO

WHY

Baxter

Construct major drainage works between the Peninsula Link and Watsons Creek to service existing development and future urban growth within the catchment.

To remove potential flood risk within the area and provide additional capacity to the existing drainage system.

Melbourne Water 100 Wellington Parade, East Melbourne PO Box 4342 Melbourne Victoria 3001 Telephone 131 722 Facsimile 03 9235 7200 melbournewater.com.au

ISSN: 1838-2185

ISSN: 1837-0276

Copyright © Melbourne Water Corporation July 2010. All rights reserved.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.