![](https://assets.isu.pub/document-structure/230523202845-e1c48ff4c712ad399e12128124ee1a57/v1/c9026b9588cf82b10796b8b91ad97c70.jpeg?width=720&quality=85%2C50)
1 minute read
LBC Campus Progresses
"What's the big announcement going to be" asked LBC students as chapel began. They were soon to find out that God had laid iton the heart ofone ofhisservants todonate a building to the school
During "Miracle Month", February 1977, this was one of the many miraclesthatoccurred.God's people gave over two million dollars above operating costs
Because of this,construction began on Liberty Mountain in March on the new buildings. With the intent of completing seven buildings by September, construction continued at a rapid pace throughout the summer.
ABOVE: BillMeengy presents a check to Dr Jerry Falwell in the amount of $500,000 The money was given by Mr. Meengy's mother-in-law. RIGHT: Bulldozers move dirt in preparation for the erection of another building