TOWER CRANES
Comansa helps join together two Philippine Island
Two Comansa 21LC660 tower cranes are working on the construction of the cable-stayed bridge which will join Cebu City and Mactan Island in the Philippines, a location repleted with logistical challenges. Comansa tower cranes ensure that even the most complex bridge construction projects are a resounding success. On this occasion, thanks to the tower crane manufacturer’s vast experience and the commitment of its technical team, the Cebu-Cordova Link Expressway bridge will soon become a reality. Two Comansa 21LC660 tower cranes (36-tonne
version) are currently being used to build the bridge that will join Cebu City, the second largest city in the country, and Mactan Island, where the international airport that serves the city is located, a significant structure which will help to alleviate the heavy traffic that currently travels through the two existing bridges. Thanks to this new bridge, the journey time will be
reduced by up to 40 minutes. This will help streamline commercial and industrial travel and facilitate the transportation of tourists landing at the international airport of Mactan, which is the main touristic hub of the country. This is a key project for the region, awarded by CCLEC (Cebu Cordova Link Expressway Corporation), a subsidiary of MPTC (Metro Pacific Tollways Corporation), to Cebu Link Joint Venture (CLJV), a joint venture between ACCIONA, First Balfour and DMCI. In order to meet the specific requirements of the project, two Comansa 21LC660 flat-top cranes from the 2100 series have been selected, the perfect choice for maximum performance in projects involving particularly heavy loads, such as bridge construction. Furthermore, the use of 80-metre long booms has made possible to provide a wide and accessible perimeter on-site surrounding the two main pylons on which the bridge was built.
12
Lifting Africa - Jan/Feb 2022