Latest Lifting Africa Jan-Feb 2022

Page 12

TOWER CRANES

Comansa helps join together two Philippine Island

Two Comansa 21LC660 tower cranes are working on the construction of the cable-stayed bridge which will join Cebu City and Mactan Island in the Philippines, a location repleted with logistical challenges. Comansa tower cranes ensure that even the most complex bridge construction projects are a resounding success. On this occasion, thanks to the tower crane manufacturer’s vast experience and the commitment of its technical team, the Cebu-Cordova Link Expressway bridge will soon become a reality. Two Comansa 21LC660 tower cranes (36-tonne

version) are currently being used to build the bridge that will join Cebu City, the second largest city in the country, and Mactan Island, where the international airport that serves the city is located, a significant structure which will help to alleviate the heavy traffic that currently travels through the two existing bridges. Thanks to this new bridge, the journey time will be

reduced by up to 40 minutes. This will help streamline commercial and industrial travel and facilitate the transportation of tourists landing at the international airport of Mactan, which is the main touristic hub of the country. This is a key project for the region, awarded by CCLEC (Cebu Cordova Link Expressway Corporation), a subsidiary of MPTC (Metro Pacific Tollways Corporation), to Cebu Link Joint Venture (CLJV), a joint venture between ACCIONA, First Balfour and DMCI. In order to meet the specific requirements of the project, two Comansa 21LC660 flat-top cranes from the 2100 series have been selected, the perfect choice for maximum performance in projects involving particularly heavy loads, such as bridge construction. Furthermore, the use of 80-metre long booms has made possible to provide a wide and accessible perimeter on-site surrounding the two main pylons on which the bridge was built.

12

Lifting Africa - Jan/Feb 2022


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Everything is under control with My Magni

11min
pages 42-48

Masslift Africa achieves B-BBEE Level 1 and continues its commitment to transformation

2min
pages 40-41

How access control systems enhance operator safety

6min
pages 38-39

Equipment rigging defined

3min
pages 36-37

Pioneers of braking systems expand & enhance product portfolio

2min
pages 34-35

In our 21st Century lifestyle we regularly upgrade our mobile phones to new more ad-vanced models

2min
pages 32-33

A look at compact telehandlers

5min
pages 28-29

How to turn your telescopic handler into a real crusher

2min
pages 30-31

Enerpac EVO-P Pump Per-Point Synchronous Lift System

1min
page 27

Load Monitoring direct to smartphones

2min
pages 24-25

Superior lifting safety for South African mining powerhouse

2min
page 26

Hiab, part of Cargotec, introduces the MOFFETT E5 NX all-electric truck mounted forklifts

2min
pages 22-23

The importance of professional load testing and regular safety checks of forklift trucks

2min
pages 16-17

Multi-brand approach better serves Kemach Equipment customers

4min
pages 20-21

Economical, efficient and reliable

4min
page 5

Comansa helps join together two Philippine Island

4min
pages 12-13

Very compact crane delivers higher than normal lifting height

2min
pages 14-15

Lifting to new heights

4min
pages 10-11

Chairman’s desk

4min
pages 6-7

Safe and efficient multi-purpose handling

3min
pages 8-9
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.