1 minute read

PARTI + FLOOR PLAN

Next Article
THESIS STATEMENT

THESIS STATEMENT

FINAL PARTI

Breaking down the historical process of drydocking, used for construction, repairs, and maintenance of vessels.

Advertisement

This process relies on the same basic steps, some even with the same built drydock, but with new technologies to make the process more efficient and successful.

5 NEIGHBORHOODS

[SPORTS + REC]

+ GYM + CONCESSIONS + WEIGHT TRAINING + TRAINER’S ROOM + GYM LOCKER ROOMS + CAFETERIA

[SUPPORT SPACES]

+ ADMIN + FRONT LOBBY / RECEPTION + MAIN OFFICES + NURSE’S OFFICE + MEDIA CENTER

FLOOR PLAN: LEVEL 1 NTS (160,000 SF)

[FINE ARTS] [TRADE SPACES] [GENERAL ED]

+ AUDITORIUM + CHORUS + BAND + ART + RECORDING ROOMS + DETACHED CAR GARAGE + WELDING + WOOD SHOP + GREENHOUSE + SCIENCE LABS + GENERAL CLASSROOMS + MAKERSPACES

This article is from: