lindsey m. newman internship with Intec Group, Inc. Fairfax, Va March 2011 - September 2011
table of contents
Color Boards Turner Construction Office Renovation Bethesda ADA Bathrooms Renovation Standards Test Fits Braddock Place Collin’s Engineering Fulcrum GovPlace Catalyst Orlando NOVA Women’s Center Catalyst Chicago Construction Documents Catalyst - Chicago Fulcrum IT
color boards
Turner Construction Office Renovation Bethesda ADA Bathrooms Renovation
Accent Paint 1
Accent Paint 2 Restroom Countertops
Ceiling Tile
Millwork Countertops Field Paint M illwor k Cabinet Face
To i l e t P a r t i t i o n
Grout Stone Tile I N T E C G R O U P, I N C 1 0 2 0 1 FA I R FA X B LV D S U I T E 4 7 0 FA I R FAX , VA 2 2 0 3 0 tel: 703.359.9737 www.intecgroup.net architecture & design
Vinyl Composition Tile
Wall Base
To m p k i n s B u i l d e r s
2220 25th Place, N.E., Washington DC
Warehouse Renovation
Field Carpet
Turner
Wet Wall Elevation
Ceiling Mounted Stall Partitions
Field Paint
To u c h l e s s Flushometer
Wall Mounted To i l e t F i x t u r e
Accent Paint 1
Wall Mounted Urinal
Recessed Light Fixture
Accent Paint 2
To u c h l e s s Fa u c e t
To u c h l e s s S o a p Dispenser
Under Counter Sink
Grout
Main Floor Tile
I N T E C G R O U P, I N C 1 0 2 0 1 FA I R FA X B LV D S U I T E 4 7 0 FA I R FAX , VA 2 2 0 3 0 tel: 703.359.9737 www.intecgroup.net architecture & design
Accent Floor Tile
Main Wall Tile
Accent Wall Tile
Woodmont 4 & 5 2nd & 3rd Floor ADA Bathroom Renovation 4825 & 4833 Bethesda Ave., MD
Countertop
Stainless Steel Accessories
standards
Compiled and created a new set of standards for the office. Helped to merge standards between North Carolina office and Virginia office to make collaboration easier.
test fits
Braddock Place Fulcrum IT GovPlace Collin’s Engineering Catalyst Orlando NOVA Women’s Center Catalyst Chicago
braddock place These test fits were done for Cassidy Turley Real Estate They are potential building arrangements, each with a different employee capacity.
1330 Braddock Place F l o o r 3 - Te s t F i t O l d To w n , A l e x a n d r i a Virginia September 2, 2011 25400
1330 Braddock Place F l o o r 3 - Te s t F i t O l d To w n , A l e x a n d r i a Virginia September 2, 2011 25400
1330 Braddock Place F l o o r 2 - Te s t F i t O l d To w n , A l e x a n d r i a Virginia September 2, 2011 25400
fulcrum it This test fit for Fulcrum IT was one of three potential office sites.
govplace This test fit was a sketch for the collaborative office area. The constraints were as much seating and table space as possible, make a lunch room without walls that can look nice and be walk through, and not moving the wet wall.
client approved
collins engineering This test fit was for an office currently in the space looking to expand the office. Objectives were to create a conference room, three offices, and seven workstations.
final test fit
catalyst orlando This charette was a test fit for a large office, this is a relaxation area for employees to take a break. The third charette was chosen. I was brought into this project to help with a significant amount of red lines for 50 and 90 percent construction documents, in preparation for me to take on the the Catalyst Chicago project.
breakroom rendering
nova womens center This project was given to me just before I left, Intec is not familiar with designing outpatient clinics so there was a significant amount of research, code work and adjacency studies that needed to be done. I worked directly with the client to layout adjacencies and space requirements based on patient numbers.
NOVA Women's Clinic 10721 Main Street Program of Requirements September 6, 2011
Position/Auxiliary PERSONNEL Waiting Room Water Closets
Floor
Front Office Workstations Supplies/Storage Large Office Small Office
2ND
VPAT Side Consulation Room
2ND
2ND
# WKST Type Space Std. SF Rooms Code
Total SF
Notes 25 X 25 Education Racks on walls Space for 30 patients, child area, front desk length of room 3 windows (bulletproof) w/ 3 dividers Aquarium behind check-in person
Room WC
625 47
1 2
625 94
W/S Closet Office Office
36 16 120 100
9 1 1 1
324 16 120 100
Small office within large office for 3 workstations and office equipment, glass so mgmt can oversee
Office
64
3
192
Exam Room
Exam
100
1
100
Water Closet Lab
WC LAB
47 120
1 1
47 120
Nook LAB WC
50 120 47
2 1 1
100 120 47
Essentially Cubicles Large Urine receptacle attached to Lab
Closet WC Closet
80 16 75 16
1 1 1 1
80 16 75 16
20 Large staff lockers with Shower Industrial sink, cleaning supply storage, shelves, mops
Room
300
1
300
fits 20 People, also functions as conference room
Office
70
4
280
Workstation inside
Exam
120
4
480
10X12 GYN Table, SONO Machine, 2 Chairs
W/S W/S WC
1000 100 47
1 1 1
1000 100 47
NOVA Blood Blood Nook Lab Water Closet
2ND
Staff Changing Room Lockers Storage Room Water Closet Janitor Closet
2ND
Kitchen Kitchen
2ND
Consulation Consultation
3RD
SONO Rooms SONO
3RD
Patient Holding Area (PreOp) Pre-Op Room "Cubicles" Nurse Island Water Closet
Also function as doctor's offices Sink, Larger, solid core doors, partition to slab, insulation, door must open to shield patient Urine receptacle in attached to VPAT Lab Storage, Cabinet and Counter Space **All labs must be at least 10x12, Not sure if this is floor space or dimensions
3RD One large room with curtain partitions to separate areas Sink, Speakers
Storage Closet Medicine Room Medicine Storage
3RD
OR Rooms
3RD
Class A OR Room Class B OR Room
Closet
16
1
16
Medical Supplies in locked cabinets
Room
16
1
16
Check codes and hospital regulations, needs to be double locked
OR
168
1
168
OR
256
1
256
Gurney Room Lab
Room LAB
300 120
1 1
300 120
Sterile/Dirty
Room
100
1
100
Biohazard Closet Autoclave Area
Closet Nook
50 40
1 1
50 40
Room W/S WC
1700 100 47
1 1 1
1700 100 47
W/S Office W/S
36 100 16
3 1 1
108 100 16
Recovery Room Recovery Room "Cubicles" Nurse Island Water Closet
3RD
Doctor's Office Workstations Office Medicine Room
3RD
SUBTOTAL: 15% Contingency: 20 % CIRCULATION
6,381 957 1,276
TOTAL:
SECURITY REQUIREMENTS Access Badge Security: General building access Special elevator Locked filing cabinets Locked Doors
12X14, 14X16 Codes need to be met Needs access to Gurney room, have sink, counter, cabinets, operating table, equipment storage, sterilization/dirty, prep workroom, A - 120SF Clear Area, B - 250SF Clear Area, Minimum Clear Dimensions A-10ft. , B-15ft. B must be in a restricted corridor. Finished ceiling must be 10'-0" plus 2'-0" above ceiling 1 metal swinging doors, medical equipment, 2 gurneys Sink, cabinets, counter, equipment. Must be in restricted corridor Separate areas for sterile and dirty seperated by door refer to codes. Must be in restricted corridor Store waste, Refrigerator 4 autoclave machines space for 15 Cubicles, oxygen line for each cubicle counter, storage space
Sink, counter, fridge, functions as lounge as well‌ locked, refer to special codes SF SF SF
8,614 SF Need to ask Kay about Requirements
COMMUNICATION REQUIREMENTS Need to ask Kay about Requirements Video Conferencing in large conference room ???? LED screen for all conference rooms/Waiting room/admin ???? ADJACENCIES
Refer to Bubble diagram in program of requirements folder for better understanding
Waiting room adjacent to front office, VPAT offices and Lab, and NOVA Blood area SONO Rooms and Consultation Rooms Near waiting room and Pre-Op area Pre-Op Room near OR Rooms, Gurney Room OR Rooms near Gurney room, Pre-Op Room, Sterile/Dirty, Recovery Room and Autoclave Area, Medicine Room
catalyst chicago This test fit was one of three buildings the client was looking to expand to. Various adjacencies and program requirements led this building to not be chosen.
Account Management Client Services Implementation Medmonitor Clinical Care
construction documents Catalyst - Chicago Fulcrum
catalyst chicago Completed a complete survey of the building and built an entire set of as built drawings in AutoCad.
fulcrum
For this project I built the as built drawings in AutoCad and completed all the construction documents up to 65% design intent.