lindsey m. newman internship with Intec Group, Inc. Fairfax, Va March 2011 - September 2011



table of contents

Color Boards Turner Construction Office Renovation Bethesda ADA Bathrooms Renovation Standards Test Fits Braddock Place Collin’s Engineering Fulcrum GovPlace Catalyst Orlando NOVA Women’s Center Catalyst Chicago Construction Documents Catalyst - Chicago Fulcrum IT



color boards

Turner Construction Office Renovation Bethesda ADA Bathrooms Renovation


Accent Paint 1

Accent Paint 2 Restroom Countertops

Ceiling Tile

Millwork Countertops Field Paint M illwor k Cabinet Face

To i l e t P a r t i t i o n

Grout Stone Tile I N T E C G R O U P, I N C 1 0 2 0 1 FA I R FA X B LV D S U I T E 4 7 0 FA I R FAX , VA 2 2 0 3 0 tel: 703.359.9737 www.intecgroup.net architecture & design

Vinyl Composition Tile

Wall Base

To m p k i n s B u i l d e r s

2220 25th Place, N.E., Washington DC

Warehouse Renovation

Field Carpet

Turner


Wet Wall Elevation

Ceiling Mounted Stall Partitions

Field Paint

To u c h l e s s Flushometer

Wall Mounted To i l e t F i x t u r e

Accent Paint 1

Wall Mounted Urinal

Recessed Light Fixture

Accent Paint 2

To u c h l e s s Fa u c e t

To u c h l e s s S o a p Dispenser

Under Counter Sink

Grout

Main Floor Tile

I N T E C G R O U P, I N C 1 0 2 0 1 FA I R FA X B LV D S U I T E 4 7 0 FA I R FAX , VA 2 2 0 3 0 tel: 703.359.9737 www.intecgroup.net architecture & design

Accent Floor Tile

Main Wall Tile

Accent Wall Tile

Woodmont 4 & 5 2nd & 3rd Floor ADA Bathroom Renovation 4825 & 4833 Bethesda Ave., MD

Countertop

Stainless Steel Accessories



standards

Compiled and created a new set of standards for the office. Helped to merge standards between North Carolina office and Virginia office to make collaboration easier.







test fits

Braddock Place Fulcrum IT GovPlace Collin’s Engineering Catalyst Orlando NOVA Women’s Center Catalyst Chicago



braddock place These test fits were done for Cassidy Turley Real Estate They are potential building arrangements, each with a different employee capacity.

1330 Braddock Place F l o o r 3 - Te s t F i t O l d To w n , A l e x a n d r i a Virginia September 2, 2011 25400

1330 Braddock Place F l o o r 3 - Te s t F i t O l d To w n , A l e x a n d r i a Virginia September 2, 2011 25400

1330 Braddock Place F l o o r 2 - Te s t F i t O l d To w n , A l e x a n d r i a Virginia September 2, 2011 25400



fulcrum it This test fit for Fulcrum IT was one of three potential office sites.


govplace This test fit was a sketch for the collaborative office area. The constraints were as much seating and table space as possible, make a lunch room without walls that can look nice and be walk through, and not moving the wet wall.


client approved


collins engineering This test fit was for an office currently in the space looking to expand the office. Objectives were to create a conference room, three offices, and seven workstations.


final test fit


catalyst orlando This charette was a test fit for a large office, this is a relaxation area for employees to take a break. The third charette was chosen. I was brought into this project to help with a significant amount of red lines for 50 and 90 percent construction documents, in preparation for me to take on the the Catalyst Chicago project.


breakroom rendering


nova womens center This project was given to me just before I left, Intec is not familiar with designing outpatient clinics so there was a significant amount of research, code work and adjacency studies that needed to be done. I worked directly with the client to layout adjacencies and space requirements based on patient numbers.



NOVA Women's Clinic 10721 Main Street Program of Requirements September 6, 2011

Position/Auxiliary PERSONNEL Waiting Room Water Closets

Floor

Front Office Workstations Supplies/Storage Large Office Small Office

2ND

VPAT Side Consulation Room

2ND

2ND

# WKST Type Space Std. SF Rooms Code

Total SF

Notes 25 X 25 Education Racks on walls Space for 30 patients, child area, front desk length of room 3 windows (bulletproof) w/ 3 dividers Aquarium behind check-in person

Room WC

625 47

1 2

625 94

W/S Closet Office Office

36 16 120 100

9 1 1 1

324 16 120 100

Small office within large office for 3 workstations and office equipment, glass so mgmt can oversee

Office

64

3

192

Exam Room

Exam

100

1

100

Water Closet Lab

WC LAB

47 120

1 1

47 120

Nook LAB WC

50 120 47

2 1 1

100 120 47

Essentially Cubicles Large Urine receptacle attached to Lab

Closet WC Closet

80 16 75 16

1 1 1 1

80 16 75 16

20 Large staff lockers with Shower Industrial sink, cleaning supply storage, shelves, mops

Room

300

1

300

fits 20 People, also functions as conference room

Office

70

4

280

Workstation inside

Exam

120

4

480

10X12 GYN Table, SONO Machine, 2 Chairs

W/S W/S WC

1000 100 47

1 1 1

1000 100 47

NOVA Blood Blood Nook Lab Water Closet

2ND

Staff Changing Room Lockers Storage Room Water Closet Janitor Closet

2ND

Kitchen Kitchen

2ND

Consulation Consultation

3RD

SONO Rooms SONO

3RD

Patient Holding Area (PreOp) Pre-Op Room "Cubicles" Nurse Island Water Closet

Also function as doctor's offices Sink, Larger, solid core doors, partition to slab, insulation, door must open to shield patient Urine receptacle in attached to VPAT Lab Storage, Cabinet and Counter Space **All labs must be at least 10x12, Not sure if this is floor space or dimensions

3RD One large room with curtain partitions to separate areas Sink, Speakers


Storage Closet Medicine Room Medicine Storage

3RD

OR Rooms

3RD

Class A OR Room Class B OR Room

Closet

16

1

16

Medical Supplies in locked cabinets

Room

16

1

16

Check codes and hospital regulations, needs to be double locked

OR

168

1

168

OR

256

1

256

Gurney Room Lab

Room LAB

300 120

1 1

300 120

Sterile/Dirty

Room

100

1

100

Biohazard Closet Autoclave Area

Closet Nook

50 40

1 1

50 40

Room W/S WC

1700 100 47

1 1 1

1700 100 47

W/S Office W/S

36 100 16

3 1 1

108 100 16

Recovery Room Recovery Room "Cubicles" Nurse Island Water Closet

3RD

Doctor's Office Workstations Office Medicine Room

3RD

SUBTOTAL: 15% Contingency: 20 % CIRCULATION

6,381 957 1,276

TOTAL:

SECURITY REQUIREMENTS Access Badge Security: General building access Special elevator Locked filing cabinets Locked Doors

12X14, 14X16 Codes need to be met Needs access to Gurney room, have sink, counter, cabinets, operating table, equipment storage, sterilization/dirty, prep workroom, A - 120SF Clear Area, B - 250SF Clear Area, Minimum Clear Dimensions A-10ft. , B-15ft. B must be in a restricted corridor. Finished ceiling must be 10'-0" plus 2'-0" above ceiling 1 metal swinging doors, medical equipment, 2 gurneys Sink, cabinets, counter, equipment. Must be in restricted corridor Separate areas for sterile and dirty seperated by door refer to codes. Must be in restricted corridor Store waste, Refrigerator 4 autoclave machines space for 15 Cubicles, oxygen line for each cubicle counter, storage space

Sink, counter, fridge, functions as lounge as well‌ locked, refer to special codes SF SF SF

8,614 SF Need to ask Kay about Requirements

COMMUNICATION REQUIREMENTS Need to ask Kay about Requirements Video Conferencing in large conference room ???? LED screen for all conference rooms/Waiting room/admin ???? ADJACENCIES

Refer to Bubble diagram in program of requirements folder for better understanding

Waiting room adjacent to front office, VPAT offices and Lab, and NOVA Blood area SONO Rooms and Consultation Rooms Near waiting room and Pre-Op area Pre-Op Room near OR Rooms, Gurney Room OR Rooms near Gurney room, Pre-Op Room, Sterile/Dirty, Recovery Room and Autoclave Area, Medicine Room


catalyst chicago This test fit was one of three buildings the client was looking to expand to. Various adjacencies and program requirements led this building to not be chosen.



Account Management Client Services Implementation Medmonitor Clinical Care




construction documents Catalyst - Chicago Fulcrum



catalyst chicago Completed a complete survey of the building and built an entire set of as built drawings in AutoCad.


fulcrum

For this project I built the as built drawings in AutoCad and completed all the construction documents up to 65% design intent.