PUBLIC RECORDS REQUEST
ASU MASTER OF LANDSCAPE ARCHITECTURE JOINT STUDIO
InsidePHX
Newsfeed Customer Engagement
Fiscal
HR
SW Diversion & Disposal
PRRequests
Public Works IT
Request #: 8409d7f2-846f-4ee6-8ad0-86e9e461bd55 9/14/2020
Submi ed On: Last Name:
Kevin
Scholfield
Phone: (602) 672-2118
Company:
E-Mail:
Address:
City:
kschofie@asu.edu State:
ZIP:
Descrip on of Public Request: I am looking for informa on regarding the project for permanent post and chains that were installed on Madison from 9th Ave to 13th Ave and the total cost of this project to install these chains and post int he right of ways of the roads. Date Range Start:
Date Range End:
6/1/2020
9/14/2020
Request Purpose:
Delivery Preference:
Personal/Non-Commercial
Electronic by E-Mail
Purpose: Research from masters of landscape architecture studio project at Arizona State University for a landscape plan for the neighborhood
Review:
Admin Comments: Keyword: Post and Chains Landscaping 9th Ave & Madison FYI:
Department Staff (please put in staff ini als):
Click here to a ach a file Reviewer Comments:
Department: Street Transporta on Cost Charged:
Kristen Merser
9/16/2020 2:14:12 PM
Reassigned to Streets per PDD. Frances Griggs
Number of Pages:
9/16/2020 9:58:12 AM
Per inspec ons this needs to go to Streets
Please provide informa on in the Reviewer Comments sec on and any relevant documents prior to selec ng an op on below. Records Not Available
Records Available Online
Save Update
Completed
Sites
Director's Office
Scholfield-09/14/2020-4:22PM
Public Records Request First Name:
OneDrive
Kathy Mathiesen Fleet Services
Procurement
STREET MAINTENANCE COST DATA SUMMARY SHEET CONCRETE Date of Estimate:
September 21, 2020
Prepared By:
Project: CASS- COVID - Poles & Chain
Section:
PM
Paul Thibado Cost Summary of Case Area Phase #1 - ROW Enclosure with pipe and chain
Description:
Requesting Department Length (ft)
Street Transportation Width (ft)
Depth (in)
Sq. Footage
0
Volumne
0
0
LABOR # of Employees 1.00
Class Code/Description 7006 - Trades Helper 7012 - Worker II 7401 - Finisher 7203.5 - Equipment Operator III 7211 - Equipment Operator IV 7404 - Welder
Hours per Day 1.00
Hourly Rate: Days on Job 1080.00
Total Labor:
Type Cement - bag Concrete Sand Rock 2" SCH 10 Pipe - 7' pieces (per Foot) 2" SCH 40 weld on cap (each) 3/8" Grade 30 proof coil Chain (per Foot)
MATERIALS Amount 80.00 8.00 13.00 10,500.00 1,500.00 13,600.00
$142.00 Cost $153,360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $153,360.00
Price $14.42 $13.03 $18.57 $2.06 $1.52 $2.24
Cost $1,153.60 $104.24 $241.41 $21,630.00 $2,280.00 $30,464.00
Total Material:
$55,873.25
COMMENTS
This is a cost summary of the work preformed setting the pipe and chain around the CASS (Central Arizona Shelter Services) area during the first stage. Note: Several different employee classification types were used for many different shifts including weekend, 1 hour per day for 1080 days was just a simple way to get to the total work hours preformed which was 1080 work hours total at $142 per hour labor cost. Square Footage: 0 Cost per Square Foot: #DIV/0!
TOTAL COST OF ESTIMATE:
$209,233.25