Railrag 2

Page 1

Proudly Brought to you by Railstream.org

 Dynon Yard - Melbourne  Fostoria goes Live Again!  Tree Scapes

February, March, April - 2012 The Rail Rag

Page | 1


Dynon Yard & Bunbury St Cam Project Letter From The

Learn More about our new live camera in Australia and about its location - Isaac Logan

Editor

Trees and Vegetation Learn about full scale railroading, and how many things on this exciting museum railway can relate to scale modelling - Dave Ruffner

Churnet Valley Railway Visit the Churnet Valley Railway, in the UK. Learn about daily operations and the challengers faced by its volunteers - Neil Higginson

Visit Fostoria Ohio & Fostoria Photography Come along, as Chris, Bill and Richard take you though one of the most amazing Railfaning locations in America in the photo story visit to Fostoria Ohio

Churnet Valley Railway Photography After reading Neil first story, 'Churnet Valley Railway' you can also view some of his photos of the railway and its working operations

'The Challenge' N scale Bridge Building Read along, as Sam Stokes takes you though how he constructed a space saving N scale bridge for his freelance SAXT railroad February, March, April - 2012 The Rail Rag

Page | 2


February, March, April - 2012 The Rail Rag

Page | 3


Letter From The Editor- Isaac Logan

Many of you know me as log0008 and some of you by my name, Isaac Logan, from the Railstream cam chat pages. I am now your editor for our own magazine 'RailRag'. Being our first issue is here, and I am sure many of you are asking, how did this come about and what will it include. Over 3 years ago, I started my own forum and had a monthly newsletter but with the forum was small and it receive a very low

amount of viewers, so I had to scrap it as it was not worth the time and effort.

more about contributing, please view the contributing information page, the last page in this issue.

So that’s where railstream came in, I decided to ask mike and post in the forums, my idea of having a magazine every 3 months or so. Everyone loved the idea, so here we are today!

Now the name, catchy isn’t it? Well, that was my work! I was just having fun with coming up with a few names and ‘The Rail Rag’ was stuck! I hope you like it! So guys, there’s my first letter I hope you enjoyed it and I can’t wait to see you all back here next time for more fun with ‘The Rail Rag’!!!

The other question I am sure some of you are asking, ‘what will it include’. Well here’s your answer! Our magazine is run by you, and in saying that I mean, most articles are written by you and then I have the job of putting them into magazine format and getting it ready to be featured on railstream. So our articles with vary depending on what our contributors submit. To find out

February, March, April - 2012 The Rail Rag

-Isaac

Page | 4


Mike Kisser - Cam & Website Updates

February, March, April - 2012 The Rail Rag

Page | 5


Dynon Yard & Bunbury St Cam Project - By Isaac Logan With our new live cam, in Australia, going live this month, I thought I would take the time to write a small article and share a few photos by me and my friends featuring Dynon Yard, which is where, the line featured in the cam runs too. Depending on how wide the view is, you may be able to see the edge of the yard within the view of the yard. I hope you enjoy, and also that the photos, help you understand the different locomotives you will see on the cam. Some interesting notes to make on the yard and the line in which the cam features is, this line is duel gauge, Australia has a poor stranded in rail, with many states having their own gauge, and here in Victoria, we have 2 gauges,

listed below. Dynon yard was constructed in an area of free land, southwest of the Melbourne CBD, in 1950. It has tracks for two gauges is stranded gauge which is 4 ft 8 ½ inch (1,435mm) and broad gauge which is 5 ft 3 inch (1,600mm). The issue was caused by the introduction, after Victoria Railways (VR) built a standard network, before a standard gauge was implemented. North Dynon yard is a general yard, which serves any railroad which requires its use, this is mostly broad gauge and South Dynon, which mostly consist of an intermodal terminal using the standard gauge. Unlike US railroads, where CSX operates one line, and NS another, our lines a government owned, and railroads require a ‘permit’ to use each line. So if you watch one line,

you may see many railroads. Dynon yard, is close to Swanston St station, the main station in Melbourne for both commuter traffic and also regional traffic. So if you watch one line, you may see many railroads. Dynon yard is close to Swanston St Station, the main station in Melbourne for both metro commuter traffic and also regional passenger traffic. The bridge featured in the rail cam is one of 2 bridges which cross the Maribymong River to enter Dynon yard from the west. I hope your enjoying the new cam like I am!

February, March, April - 2012 The Rail Rag

Page | 6


February, March, April - 2012 The Rail Rag

Page | 7


Trees and Vegetation - Dave Ruffner Isaac asked me to write an article for his newsletter about my experiences working at an operating museum railroad, which I have posted about on his online board. At first, I wasn't sure how I would do this, but since his board is focused on model railroading, both physically and electronically, I decided to write in the perspective of a model railroader. In fact, many of the people I worked with at the museum were and are model railroaders and we tended to call it modeling in the 1:1 scale since we did many of the things that model railroaders do, including laying track, repairing and in some cases rebuilding equipment and also buiding structures as necessary to improve our operations and appearance to our passengers and the public. We also dealt with trees and vegetation along the right of way. Of course the big

difference in our 1:1 scale model and the smaller scale models is that instead of having to create trees and vegetation to add to our right of way, we had to remove quite a bit of it in order to run trains. When I first joined the museum, much of the track appeared to be a pair of rails running through a sea of green. The line had been ballasted mainly with cinders from steam locomotives and over the years of deferred maintenance, the cinder ballast had become fouled with dirt and rotting ties, making it fertile ground for growing all sorts of weeds. All sorts of bushes and tree limbs brushed against the train when it ran down the track, also due to deferred maintenance, as controlling the vegetation along the right of way is one of the responsibilities of the track gangs. Since we were a self funded, non-profit museum we

had little more than hand tools and chainsaws for use in controlling the vegetation. A lot of our members were farmers and some of them would bring their spraying equipment over from time to time and try to spray chemical weed killers along the right of way, but in the early years these attempts were sporadic at best and most of the brush was cut by hand. In addition to the brush, we would deal with the occasional tree blocking the tracks. Most of these were removed in the spring after the snow melted and we could get out on the line with our trucks and motor cars to inspect and see what sort of damage had occurred over the winter. Our track would lay dormant for three to four months from the time we shut down operations in the beginning of December usually until about the middle of March

February, March, April - 2012 The Rail Rag

Page | 8


when it became warm enough to thaw the ground and work outside for a few hours depending on how the weather went each year. A lot of trees would come down in the winter storms and it usually took us a couple of Saturdays to clear the line of fallen trees. We would load up our hirail truck with chainsaws and axes, chains and come alongs, and fuel and water and set out to do battle with Mother Nature, who sometimes seemed determined to shut us down. Downed trees come in all sizes from less than a foot in diameter up to huge monsters nearly four feet in diameter which are a lot of work when most of your chainsaws have short bars less than two feet long. We rarely had more than three or four guys out there at a time and sometimes there would just be two of us. The easiest trees to remove were the one that fell

at an angle to the tracks, with ofter just the brushy top fouling the track, the trunk nearly parrallel to the rails. That was just a matter of cutting the limbs and using a combination of lining bars and come alongs to move the trunk away from the track. Next in difficulty were trees the fell across the tracks which usually meant a lot of sawing to remove the trunk from the rails and track structure. In many cases this required us to cut the tree into pieces small enough to be moved with the manpower at hand. By far the most difficult trees to remove were the ones that leaned against another tree on the other side of the track. This situation was complicated by the danger of the tree falling on the guys trying to cut it down and we had several close calls with these over the years. In addition to blocking the railroad physically, falling trees

could cause other problems, too. In at least one case, a tree fell on a creek bank after the roots were undermined by floodwaters and left a hole in the bank that those same floodwaters eroded until they washed out the roadbed under a bridge approach and left some twenty-odd feet of track hanging in the air. This happened in June and could have cost us quite a bit of lost revenue, except for the fact that we were running a special event for two weekends which did not require us to cross the bridge. The same spring storm that caused the washout also dropped more trees on the line further south the track gang spent most of its time during the event reopening the rest of the line, while a contractor was hired to deal with the washout. One of the craziest tree involved situations that I was involved in happened on a Sunday afternoon

February, March, April - 2012 The Rail Rag

Page | 9


in 1985. Normal operating weekends at the museum involved two passenger trains operating each day, one being a small train of a locomotive, coach and caboose that ran deadhead on Saturday morning from our northern terminus to our southern terminus, seventeen miles away and hauled passengers two miles out and back from our southern terminus, making several trips on Saturday and Sunday, before deadheading north on Sunday. The other passenger train was a roundtrip from the northern terminus to the south and back after a two hour layover. This train consisted of a locomotive, three coaches or more if necessary and a caboose.

deadhead about a tree across the track obstructing their progress. I got the hirail truck and a chainsaw and headed down to them. Sure enough a tree had fallen across the track between the two trains. I cut it up as quickly as I could with the chainsaw and the engine crew got down from the cab to move the pieces out of the way. To the best of my knowledge that is the only time something like that has ever happened at the museum.

On that particular Sunday, the daily train returned and unloaded and the crew was in the process of putting their train away when we heard a plaintive call from the February, March, April - 2012 The Rail Rag

Page | 10


Churnet Valley Railway Churnet Valley Railway/Moorlands And City Railway Permanent Way

By Neil Higginson February, March, April - 2012 The Rail Rag

Page | 11


Here in North Staffordshire, England is the Churnet Valley Railway, an 8 1/2 mile long heritage line. This is connected to the Moorlands and City Railway, a new project to connect the Moorland District with the network mainline at Stoke on Trent. These lines were last used by passenger trains in the early 1960's and by freight in the 1980's. They were then mothballed until the North Staffordshire Railway company bought the track from Leekbrook Jn to Oakamoor in 1996.

February, March, April - 2012 The Rail Rag

Page | 12


Extensive track renovation has taken place with many track panels completely replaced, and 1000s of sleepers (ties) replaced due to the damp track bed. Our permanent way gang is totally voluntary, mainly being golden oldies (me being an exception). The MCR line from Leekbrook Jn-Cauldon Lowe was completed in 2010, and work is underway to renew the line from Leekbrook Jn-Stoke on Trent as we speak. There are many varied duties to perform on the Permanent Way gang, from track renewal to weed killing, crossing replacement to drain clearing. It’s not always the easiest of jobs, but it’s a very satisfying one to watch trains roll by when it’s done. We have acquired a mobile tool van to help us out on our endeavours, a Permaquip 4wd to get us to where our tasks take us. It also helps to eat our lunch in the dry, as its often raining up on the moors. All people working on the railway, be it on the national rail system (Network Rail) or on a railway like ours are required to wear orange hivisibility kit at all times. Safety is priority number one for us. February, March, April - 2012 The Rail Rag

Page | 13


Professional rail contractors have been brought in from time to time with their time-saving (and labour saving too) machinery such as tampers and sleeper changers. These will have to be hired in again as the Stoke on Trent line needs much upgrading. Over 5000 sleepers will have to be changed, and many chairs replaced, as well as lineside fencing, signalling cable and bridge/crossing/ station infrastructure restored/replaced. Once finished, the line into the quarry at Cauldon Lowe can be extended into the premises, and cement brought out to various UK destinations. Freight will also be taken into Cauldon Lowe, as their power station burns green energy sources, imported by rail. The revenue generated by this will allow a further line from Leekbrook Jn to Leek to be reopened, and also a link to Alton Towers, Britain's biggest theme park, to be reopened from Oakamoor. An hourly passenger service is planned from Leek to Stoke, and in season trains

--Neil Higginson February, March, April - 2012 The Rail Rag

Page | 14


February, March, April - 2012 The Rail Rag

Page | 15


February, March, April - 2012 The Rail Rag

Page | 16


Visit Fostoria Ohio

During 2011 and 2010 I visited Fostoria Ohio, the location of 2 of railstreams live cams. I had a fun time! The first time there in 2010 I saw many trains! When I visited in 2010, the platform from the old station along the CSX double track mainline was still there, this has sadly now been removed. I loved it how I could see NS & CSX trains at

By Chris - with photos from Chris, Bill and Richard

the one location. I also saw many units for other railroads such as BNSF and it was my first time seeing a UP food car. I was so lucky because I really wanted to see that train, I think it’s the best train that goes through Fostoria. During my visit in 2011 I only saw one NS and but saw many CSX trains. I saw an a train which had, CSX, CN and 'The J'

leading it. For me, this was my second time I seeing a J. The J is orange, Bright orange. But sadly I did not get a photo of that train. But I got video. I am hoping to go there during 2012, and have more fun and maybe see a few of you there. I am also hoping I can go to Deshler too! Fostoria is Awesome! -- Chris - DownRiverBoys

February, March, April - 2012 The Rail Rag

Page | 17


February, March, April - 2012 The Rail Rag

Page | 18


February, March, April - 2012 The Rail Rag

Page | 19


February, March, April - 2012 The Rail Rag

Page | 20


February, March, April - 2012 The Rail Rag

Page | 21


February, March, April - 2012 The Rail Rag

Page | 22


February, March, April - 2012 The Rail Rag

Page | 23


February, March, April - 2012 The Rail Rag

Page | 24


Churnet Valley Railway Photography

By Neil Higginson February, March, April - 2012 The Rail Rag

Page | 25


February, March, April - 2012 The Rail Rag

Page | 26


February, March, April - 2012 The Rail Rag

Page | 27


lll

February, March, April - 2012 The Rail Rag

Page | 28


lll

February, March, April - 2012 The Rail Rag

Page | 29


February, March, April - 2012 The Rail Rag

Page | 30


February, March, April - 2012 The Rail Rag

Page | 31


ll

February, March, April - 2012 The Rail Rag

Page | 32


February, March, April - 2012 The Rail Rag

Page | 33


February, March, April - 2012 The Rail Rag

Page | 34


Looking for Articles and columnists Article Writers

Columnists

With the first issue done and now out there to read, for the team its onto next month's issue but we need your help. As you would have noticed most articles are written by you, our readers. We are always looking for more articles. Please use the article submit link under 'Magazine' on the railstream website. There is no way to attach a document in this section, this is because before you write your article we would like you to let us know what you idea is.

RailRag is also looking for some columnists, these people write something for each issue under the same topic but on different ideas and sub-topics. These could be on model railroads, real trains, train simulators or anything in between. If you have an idea and would like to contribute in each magazine, you will be required to write your column on a bimonthly basis.

Please include the following

Please use the submit article page and include the following

 The main idea of your topic

 Topic idea

 The approximant length of your article

 A brief overview of what could be included

 Your name

 Name

Once we look at this, and if we like the idea, we will ask you to write the column for the first month and we will decide whether to include it. Editors We are also looking for editors, please contact us via submit article page for more info

-Isaac Logan RailRag Editor

 Any further info we may find helpful February, March, April - 2012 The Rail Rag

Page | 35


Humour & Last Word - Isaac Logan

Q. What do you call a man who steps on a live 3rd rail?

Monster: I did once but they made me give it back

A. A conductor

Q. What's the angriest piece of track? A. A cross tie

Halloween Train Monster: I have to walk 25 miles home. Grandma: Why not take the train. February, March, April - 2012 The Rail Rag

Page | 36


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.