Lola Montaner | cv+summary

Page 1

LOLA MONTANER

CURRICULUM VITAE SUMMARY PORTFOLIO


LOLA MONTANER

07/06/82 Valencia, Spain

lola.montaner@yahoo.es +974 5590 0536 +34 667 53 79 09

Architect

Interior Designer


CURRICULUM VITAE FORMATION

2007 Valencia, SPAIN

2008 Paris, FRANCE

2009 Valencia, SPAIN

EXPERIENCE

2016 Doha, QATAR

2013 Valencia, SPAIN

MSc ARCHITECTURE Polytechnic University of Valencia ETSA 2012/13

Specialist URBAN PLANNING École technique supérieure d’architecture Paris-Malaquais

Munich, GERMANY

-Construction details development (steel stairs, welded joints and steel connections, mobile walls, etc.) -Interior designs (meeting points, entrance, corridors and bathrooms)

Competition “Hybrid building” (MENTION) -Complete ideation and development of all the facades 2011

Valencia, SPAIN

2015 Valencia, SPAIN

2015 Wales, UNITED KINGDOM

Valencia, SPAIN

(may-january)

-Development of competitions regarding different topics: rehabilitations of trade and licensing. Competition development in colaboration with architects and engineers

Collaboration GmasP Ingeniering+Architecture

Site manager in four Solar Farms in Wales and Cambridge

Lima, PERU

id12º 77º Studio

Lima, PERU

2011 Valencia, SPAIN

(may-october) _ project manager

Project manager of remodelling and interior design projects Furniture design -Remodeling and redistribution of an office space due to its expasion Design of the new furniture to optimize and adapt to the needs. -Transformation of a house into an office -Improvement of the project and interior design of a collective housing

2013/14

2011 Valencia, SPAIN

(january- frebuary) _ site manager

-Management and administrative tasks -Translation at the construction site 2014

Seguí Architecture and Planning Studio

(november- april) _ project manager

Co-management and coordination of the Spanish office in Lima

2010/11 Valencia, SPAIN

-Project Architect

(january-feb) _ freelance -Complete design of the outdoor space -Collaboration with another architect in the conception and design of the auditorium -Collaboration in the composition and layout of the panel presentations

Collaboration GmasP Ingeniering+Architecture

(sept-december) _ freelance

-Architectural desing and development of complete set of construction drawings -Coordination with structural design

Competition Gateway in Lasize, Italy (MENTION)

(june-july) _ freelance

-Collaboration in the design of the gateway and the insertion of it in the surroundings -Collaboration in the composition and layout of the panel presentations

Foundation of the Valencia City Council “FCVPE”

(agost-may) _ architect

Transformation and rehabilitation project of an academy and offices -Complete ideation and development of the project -Basic project -Measurements and budget

2010 Valencia, SPAIN

-Management of the Studio

Two social housing projects

Competition Auditorium & park in Rome, Italy

(march-april) _ freelance

-Architectural desing and development of complete set of construction drawings -Coordination with structural design

CAD Management and Development

(july-march ) _ architect

“Rational” Training center

“Swiss Life” headquarter

(february-current job ) _ architect / interior designer

QEZ Gateway for Qatar Economic Zone (Retail-Office Project)

Freelance Architect

Ackermann Architekten BDA Studio

-Support the project management -Construction details development -Interior designs (kitchens, bathrooms and classrooms)

Polytechnic University of Valencia ETSA

-Involved in Detail Design Stage (DD) and Tender Documents for a mixed project of 2 plots with 8 buildings -Highlighted tasks as complete/full interior concept development, from design to detail stage -BIM Revit Project (LOD 300) 2015

(july- sept) _ freelance -Collaboration with “GmasP Ingeniering+Architecture” in the conception and architectural design of the footbridge, landing areas and outdoor anphitheatre. -Composition and layout of the panel presentations

-Collaboration in the execution project

Specialist BUILDING

Makower Architects

Competition Footbridge in Manchester, England

2009 Valencia, SPAIN

Nagada construction & real estate development (march-july) _ architect -Final report of a housing project -Commercial plans

Valuation of property

(november-february) _ freelance

-Valuation of two plots, one development land and two warehouses


STUDENT

2007

Bolseria 29 Studio

Valencia, SPAIN

Project of housing

PERSONAL SKILLS

_ internship

(february - july)

Autocad _ proficient Revit _ proficient

-Development of the plans -Layouts

Microstation _ proficient 2005 Valencia, SPAIN

Competition “Pladur� in Madrid, Spain (ACCESIT) _ student Transformation of an underground sation in Madrid

Adobe InDesing _ proficient

-Collaboration with two more students in the conception, design and development of the idea and the project -Collaboration in the composition and layout of the panel presentations

Microsoft Project _ good SketchUp _ good

2002 Valencia, SPAIN

Luis de Garrido Studio

(june - september)

_ internship

Adobe Illustrator _ good

Water-coulors of housing projects

Adobe Photoshop _ good Rhinoceros _ basic

EDUCATION & TRAINING

2015

Course in Project Management

2010

Web diseny and multimedia

2010

3D Studio

(40 hrs)

Flash _ basic

2009

3D Studio

(40 hrs)

Windows _ proficient

2009

Rhinoceros

2009

Valuation of property

2008

Digital editing software and image scanner

2005

Architecture and sustainability

2003

Madrid 2012: Architectures and Projects

2003

Modern architecture and tourism: 1925-65

2002

International days of landscape

1995/99

3D Studio _ basic

(100 hrs)

Dreamweaber _ good

(300 hrs)

(25 hrs) (20 hrs)

Drawing and painting courses

(200 hrs)

LANGUAGES

Spanish (mother tongue) English (C1)

(18 hrs) (33 hrs)

(15 hrs) (6 hrs per week)

(20 hrs)

French (A2) German (A1)


ES:

NOT L

ERA

GEN

M ,

ON CIFI ANY CTI SPE AND JUN THE GS , CON WIN IN AILS D DET DRA 'S

REA

BE AND ECT GS HIT TO IS WIN ARC G

NT WIN DRA S EVA GS. DRA ER' S INE REL WIN THI 3. ENG THE DRA

RKS S' NT WO LIST EVA THE CIA REL FOR SPE ALL H ION ER

WIT CAT OTH

N:

PLA

KEY

400

1300

1300

400

1300

1300

400

1300

3000

1300

400

1300

6000

1300

400

1300

1300

400

3000

1300

1300

400

1300

3000

1300

400

1300

3000

1300

400

1300

3000

1300

400

1300

200

1300

400

NB2

NA2

. 3000

845 400

1361

3000

600

3000

1300

1300

1300

400

1300

1300

400

1300

1300

400 845

2600

400

2600

400

2600

400

2600

400

2600

400

2600

400

2600

400

2600

400

2600

400

2600

400

2600

400

2600

400

2600

400

2600

400

2600

400 845

NB2

NA2

NA1

NB1

3600

3000

1300

750 600 445

1500

1500

1500

1500

1500

2250

1500

1500

750

1500

2250

1500

1500

1500

1500

1500

750

1500

2250

1500

1500 125

1500

750

1500

1500

1500

1500

1500

1500 1500

1500 1500

750

750

1500

2250

1500

750

1500

2250

1500

2250

1500

750

1500

1500

NA1

NB1

1625 1500

1045

1045 1500 1500 750

9000

1500 1500

1500

1500

1500

1500 1500

750

1500

1500

1500

1500 1500 1500 1500

1500 1500

750

1500

1500

1500 1500

750

4500

1500

2250

1500 1500 750

1500 1500

1500

576

FHR

Vent. Duct Riser

4500

1500

1500

1500 1500

411

708 1645

2191

2250

1500

1500

1500

1500

1500

1500 1500 1500

750

1500

1500 750

1500

1499 1500

750

1500 1500 1500

1450 1550 1500

1500

1500

1300 400

1500

1500

9000 1500

1500 750

1500

155

1500

1500

750

2889

3563

1500

4500

1500

750 2250

1500 1500

750

4500

1500

1500 750

1500 1045

450 595

750

750

1500

1500

1500

2250

1500

750

1500

1450 1550

1500 1045

2250

1500 1500

2250

1300

9000 1300 400 1300 1300 400 1300 1300

4500

400 1300 1300 400

4500

1300 1300 845 400

1045

750

445 1500

1500

445 1500

445 600

826 750 750

1500

1500 1500 2301

1500

699

1500

1500

1300

9000 1300 400 1300 1300 400 1300 1300 1300 400

4500

1300 1300 1300

400

EQ EQ 849 2005 1195

645

400

1300

1500

1500

970

1500

445 600

645 600 1500

4500

1500 445 600 331

75 1500 750

4500

1500 1500 1500 1500

750

1500

1500

C

B

1500

1213

1213 Toilet Duct

Stub Duct for Tea Point

5117

Vent. Duct Riser

1500 1500

9000

1500 1500

750

1500

1500

1500

1500

445

445

1500

2250

D

750

Tenant Elec.Riser

1500

1249

PH Riser

826

1500

2250 750

1500

1500 1500 1500 1500

750 1500 1500

1500

1500

2250

1500

1500

750 1500

750

1500

1500

1500

4500 9000

1500 1498

A

415 1500

1500 750

1500

750

1500

1500

1500

ZS ZS ZS

750

1500

750

1500

1500 750

1500 1500

1500 1500

750

1500 1500

1500 750

1500 1500

1500 1500

750

1500 1500

1500 750

750

1500 1500

1500 1500

1500 750

1500 1500

750

1500 750

1500 1500

750

1500 1500

1500 750

1500 1500

750

1500 750

1500 1500

750

1500 1500

1500 750

1500 1500

1500 1500

750

1500 750

1500 1500

1500 1500

750

1500 1500

1500

445

1500

16 16 16 16 15

ZS ZS

JK JK JK

1500

08/ 06/ 03/ 02/ 01/

AS AS

TK TK TK

1500

15/ 15/ 27/ 18/ 21/

SH MV

SH MV

AS AS

ZS ZS

TK

JK

ZS

TK TK

JK JK

ZS ZS

ARC

IGN

NT:

DES

CLIE

:

ECT

HIT

DA HK

D PP

NC

DW

TE DA

N

TIO

RIP SC DE

V. RE

ARC

IGN

DES

:

NT:

ECT

CLIE

HIT

DA HK

D PP

NC

DW

TE DA

N

TIO

RIP SC DE

V. RE

SB2 First Floor Plan 2 1 : 100

1500

ion n iss sio bm ion mis ion Su iss ion ub iss m bm iss -S bm eri su bm Re Su Int Re Su

16 16 16 16 15

1

08/ 06/ 03/ 02/ 01/

SB2 Ground Floor Plan 1 : 100

15/ 15/ 27/ 18/ 21/

ion n iss sio bm ion mis ion Su iss ion ub iss m bm iss -S bm eri su bm Re Su Int Re Su

DD DD DD SD SD

ols mb Sy hic ap Gr & le ns Tit tio g in via aw bre Dr Ab 5 00 -0WG -D RC -A er WR mb MK Nu 2g S0 in -E aw 01 Dr EZ

5 4 3 2 1

S G N I W A R D E C N E R E F E R

1

750

1500

+13,780 mm SSL

665 750

NA2

645 600255

First Floor Office 2-1-02

445

NB2

Vent.Duct Riser

1322 1500

1500 1500

1500 750 1500

1500

4500

1500 1500 1500 1500 1500 1500 1500 1500 1500

A

415

610 435

845 400

1500

635

965 151

1500

965

1500

1858

435 941

Retail 1 Elec. Riser

600

IT/ELV Riser

4202

1249 FHR

535

Landlord Elec. Riser

1356

240.9 6° 1250 1250 1250 1305 400 1300 1300 400 1300 1300 400 1300

1300

1300

1387

UP

DD DD DD SD SD

1300

1387

FHR

2464

5 4 3 2 1

400

1387

PH Riser Tenant 2 Elec. Riser

bols Sym

1300

1387

Stairs S2

0-00 -053 WG- PC-0 C-D C-S

1300

1387

IT/ELV Riser

Wall to be aligned

-AR -AR

400

1363

Lobby 2-1-08

Future Expansion Corridor.

hic s Grap tion & s ifica Title tion Spec ing evia de

1300

1363

Female WC 2-1-09

+13,930 mm FFL +13,780 mm SSL

Draw Abbr Faca 5

1300

1363

Landlord Elec. Riser

Wall to be aligned

ber KWR KWR

400

Lobby 2-1-06

UP

Num 02-M 02-M

1300

1363

Male WC 2-1-07 +13,930 mm FFL +13,780 mm SSL

Stairs S1

ing 1-ES 1-ES Draw EZ0 EZ0

1300

1363

165.93°

Fire & Goods Lift

+13,780 mm SSL

Wall to be aligned

Wall to be aligned

S G N WI A R D E C N E R E EF R

400

END G: LEG DW

1300

1429

.

1300

750

1429

REV

400

MK 2S0 -E 01 EZ

1300

1429

5 3 30 1GW D CAR RW

1300

:

400

1429

LY

1300

1429

UAL

1300

1429

MAN D A1 ERE :

400

+13,930 mm FFL

ALT SIZE G BE DW NOT G. T ORI

1300

1429

Wet Mech. Services

Goods Lift Lobby 2-1-04

MUS

1300

AND G0

400

WIN 10

1300

DRA 1

1300

1429

FHR

1805

1009

CAD A LE IS S SCA:

400

THI

1300

1429

194.07°

809

50m

1300

0

400

1500

Lobby 2-1-01

+13,780 mm SSL

bols Sym

1300

1500

Door to be centered with the lift opening

0-00 -053 WG- PC-0 C-D C-S

1300

1500

Janitor Room 2-1-11

Temporary Plywood & Timber Door

-AR -AR

400

1500

Passenger Lift 1

hic s Grap tion & s ifica Title tion Spec ing evia de

1300

1573

Passenger Lift 2

Draw Abbr Faca 5

1300

ber KWR KWR

400

Num 02-M 02-M

1300

1573

Q

Colonnade (Building Overhang)

ing 1-ES 1-ES Draw EZ0 EZ0

1300

1573

S G N WI A R D E C N E R E EF R

Edge of Mezzanine

400

1573

12580

N

+5,130 mm SSL

SB2

1 ne Zo c mi o on Ec r ta Qa

Retail Space 2 2-G-12

E:

TITL

Dashed doors to be part of tenant fit-out package

NA1

SA1

an Pl r oo Fl t rs Fi A G 1 SA

Temporary Blockwork

Wall to be centered on S14

ARC

B

346

IGN

DES

G DIN BIN R FO

NT:

Retail 1 Elec. Riser

435

1300

1573

+13,930 mm FFL

Building line above

1300

1573

CLIE

+5,280 mm FFL

+5,130 mm SSL

400

1573

C

+5,130 mm SSL

Storage 2-G-05

Retail Space 1 2-G-11

1300

1573

:

Corridor 2-G-10

D

Building line above

ECT

Storage 2-G-09

804

Edge of Mezzanine

1300

SA1 First Floor Plan 1 : 100

645

LEVEL : 0 FFL / -150 SSL +5280 QND

435

HIT

1500

ZS ZS D PP

865

ZS

JK JK DA HK

635

Life Safety Riser

Lobby 2-G-13

ZS

JK

NB2 NC

1387

UP

ZS

AS

DW

1387

+5,280 mm FFL +5,130 mm SSL

AS

TK TK

TE DA

1387

Fire Command Centre 2-G-14

N

1387

TIO

1387

RIP SC DE

V. RE

1363

1

:

1363

PH Riser

Wall to be aligned with S13A

845 400

END

LEG

1363

50m

1363

165.93°

+5,280 mm FFL +5,130 mm SSL

Reception BoH 2-G-03

5798

1363

Q

7465

1429

N

1429

PH Riser

Goods Lift Lobby 2-G-11

Accessible WC 2-G-04

2250 920

G:

1429

.

DW

G DIN BIN R FO

1429

REV

1429

Fire & Goods Lift

Stairs S1

RS DJ TK

NB1

SB1

SA2

5 1 30 1GW D CAR RW MK 2S0 -E 01 EZ

Site Elevation B-B 1 : 300

G N DI N BI R FO

:

1429

Wet Mech. Services

LY

E: AM EN FIL

1429

Wall to be aligned

NA2

E

595 450

S17 6000

SB2 UAL

1429

Stair 1 Lobby 2-G-08

MAN D A1 ERE :

1429

194.07°

? Passenger ? Lift 1

ALT SIZE G BE 0 DW NOT G. T ORI

1500

Fire Protection Riser

Tenant 1 Elec. Riser

Passenger Lift 2

MUS

1500

Janitor Room 2-G-07

Life Safety Riser

AND G0

1500

209.04°

Reception 2-G-01

+5,280 mm FFL +5,130 mm SSL

WIN 10

1500 1250 1250

1250 1250 1250 2500

1250 1250

DRA 1

Building line above

NB2

NA1

CAD A LE IS S SCA

SA1 Ground Floor Plan 1 : 100

THI

1

1250

SA1

ion

1500

16 16 16 15

1500

06/ 03/ 02/ 01/

1500

15/ 27/ 18/ 21/

1 ne Zo c mi o on Ec r ta Qa

E: AM EN FIL

SB2

iss bm ion ion Su iss ion iss m bm iss bm eri su bm Su Int N: Re Su

F

PLA SD SD DD DD

KEY 2 1 5 4 3

1500

S16A

,

1500

3000

ON CIFI ANY 08/ CTI SPE AND 15/ JUN THE , GS CON WIN IN AILS D DET DRA 'S n

1500

S16

REA

1500

BE AND ECT sio GS HIT mis TO IS WIN ARC ub G

NT -S WIN DRA S EVA Re GS. DRA ER' S WIN INE REL DD THI 3. ENG THE DRA

1500

6000

RKS S' NT WO LIST EVA THE CIA REL FOR SPE ALL H ION ER

1500

WIT CAT OTH 16

1500

S15A 3000

M

1500

S15 6000

FRO

1500

S14A 3000

LED

S14 6000

SCA

S13A 3000

OR D

S13 6000

ERE

S12A 3000

ALT

E:

TITL

an Pl r oo Fl nd ou Gr A G 1 SA

S12 6000

BE

1546

S11A SA1

NOT T

194.04°

1546

S11

MUS

1546

6000

AND G

1546

WIN

1546

DRA

NB1

CAD

1546

SB1

A LY. IS S UAL THI 2. MAN

1546

AND

1546

ED

1546

S17

400 845

G

1546

END

1546

INT E

Edge of mezzanine

2000

4500

400 1300

150

700

700 1350

1550 2624

2540

411

EQ

1500

400 845 1300 1300 400

EQ EQ EQ EQ EQ

14850

EQ EQ EQ EQ

1667

+13,780 mm SSL

1546

POS

1500

PUR

1500

THE D.

1500

USE FOR Y BE LL ONL D SHA S USE BE ION

1500

ENS MAY G DIM N WIN TTE DRA S WRI Y THI 1. ONL

1500

ES:

1500

750 75

NOT L

1500 1500

ERA

1300 3000 1300

1893

+13,930 mm FFL

UP

GEN

1500 1500

bols Sym

1500 750

NB2

NA1

0-00 -053 WG- PC-0 C-D C-S

1500 1500

E

S16A

400

I

-AR -AR

773

+13,780 mm SSL

hic s Grap tion & s ifica Title tion Spec ing evia de

1300

+13,930 mm FFL

Draw Abbr Faca 5

1300 6000 400 1300

Male WC 1-1-02

Corridor 1-1-04

Wall to be aligned

ber KWR KWR

S16 1300

Wall to be aligned

Fire & Goods Lift

Num 02-M 02-M

400

J

H

ing 1-ES 1-ES Draw EZ0 EZ0

2610

Stairs S1

Elec. & Mech 1-1-07 +13,930 mm FFL

,

S15A 1300 3000 1300

Vent. Duct Riser

M

FRO

LED

SCA

1500 1500

D PP

ARC

IGN

DES

400

Passenger Lift 2 1

165.96° 1500

1500

NT:

CLIE

:

ECT

DA HK

HIT

NC

1300

Temporary ply wood boxing out with door access

Temporary Plywood & Timer Door

Passenger Lift 1

AND

ED

ZS ZS ZS

1045

NA2

END

ZS

JK JK JK

RKS S' NT WO LIST EVA THE CIA REL FOR SPE ALL H ION ER

WIT CAT OTH

ZS

AS

TK TK TK

OR D

ERE

ALT

BE

NOT T

MUS

AS

DJ

INT E

POS

RS

DW

TE DA

N

1300 6000 400 1300

TIO

RIP SC DE

V. RE

S15 1300

PUR

N:

PLA

KEY

16 15

02/ 01/

400

990

Tenant 2 Elec.Riser

Wall to be aligned

FHR

+13,780 mm SSL

THE D.

15/ 15/ 27/ 18/ 21/

ion n iss sio bm ion mis ion Su iss ion ub iss m bm iss -S bm eri su bm Re Su Int Re Su

DD DD DD SD SD

5 4 3 2 1

S14A

1275 3000

Wall to be aligned

Stairs S2

ON CIFI ANY CTI SPE AND JUN THE GS , CON WIN IN AILS D DET DRA 'S REA AND BE ECT GS HIT TO IS WIN ARC G WIN DRA NT

S ER' EVA GS. DRA16 16 16 S INE REL WIN THI08/ 06/ 03/ 3. ENG THE DRA

400 S141300

AND G

1300

1500

Female WC 1-1-03

WIN

1300

6000

1500

IT/ELV Riser Wall to be aligned

1281

1-1-05

DRA

3000

1500

475 Goods Lift Lobby

CAD

400

S13A

6000

1500

UP

A LY. IS S UAL THI 2. MAN

1300

Storage 1-1-09

USE FOR Y BE LL ONL D SHA S USE BE ION

1300

Life Safety Riser

Tenant 1 Elec.Riser

ENS MAY G DIM N WIN TTE DRA S WRI Y THI 1. ONL

S13

3000

G

F

Wall to be centered on mullion

GRC shelf above

400

1500

First Floor Terrace Door

ES:

1275

1500

Lobby 1-1-01

Stub Duct for Tea Point

NOT L

S12A

6000

1250

ERA

D

Wall to be centered on mullion

165.96°

1250

GEN

+5,130 mm SSL

Q

1250

1500

S G N WI A R D E C N E R E EF R

+5,130 mm SSL

Blockwork to align with concrete

+5,280 mm FFL

N

: ND GE LE S12

1250

1500

First Floor Terrace Door

bols Sym

+5,280 mm FFL +5,130 mm SSL

175

m 50

0

S11A 3000

Retail Space 4 1-G-13

Goods Lift Lobby 1-G-09

UP

B 1250

0-00 -053 WG- PC-0 C-D C-S

1250

S11

Wall to be aligned

SB2

1250

-AR -AR

Retail Space 5 1-G-06

1250

hic s Grap tion & s ifica Title tion Spec ing evia de

1250

1250

Draw Abbr Faca 5

425

SA1

175

1250

1250

1500

PH Riser

ber KWR KWR

1250

A

1250

1500

Temporary Plywood & Timer Door

Note: Dimensions are to finished faces of walls and are approximate only. Please refer to Finishes Schedule and Wall build-ups sheet to confirm. Num 02-M 02-M

2500 Stairs S2

Wall to be aligned

SA2 D

1250

Terrace 1-1-06

990

Temporary ply wood boxing out with door access

+13,780 mm SSL

H

ing 1-ES 1-ES Draw EZ0 EZ0

1250

UP

Door centered

44°

First Floor Office 1-1-10

S G N WI A R D E C N E R E EF R

1250

SB1

124.

:

1250

Fire & Goods Lift

1250

Building line above

Retail 3 Elect. Riser

Wall to be aligned

Stairs S1

+5,280 mm FFL +5,130 mm SSL

Vent. Duct Riser

END

1250

Passenger Lift 2

NA1

Elec. & Mech. 1-G-07

Storage 1-G-14

LEG

1250

Passenger Lift 1

Tenant Elec.Riser

NB1

Accessible WC 1-G-04

Reception 1-G-03 +5,280 mm FFL +5,130 mm SSL

510

SB2

50m

1250

Retail 2 Elec. Riser

+5,130 mm SSL

1256

G DIN BIN R FO

0

1177

NB2

+5,280 mm FFL

Life Safety Riser

J

I

868

IT/ELV Riser

SA1

SA2

Q

159.60°

Stub Duct for Tea Point

C

SB1

K

N

2880

: AN PL Y KE

NA2

700

Site Elevation A-A 1 : 300

:

Temporary Blockwork

B

1775

2

END

Dashed doors to be part of tenant fit-out package

Lift Lobby 1-G-08

510

+5,130 mm SSL

, KD

OR S' NT W E ST VA LI LE TH IA R EC RE L FO SP AL N R IO TH AT HE WI IC OT N IF Y IO EC AN CT SP D UN E AN

NJ TH GS CO S, IN IL IN TA AW AD DE DR RE D S T' BE AN EC TO GS IT IN CH IS G AW AR IN DR NT AW 'S VA . DR ER LE GS IN IS NE RE TH GI E AW 3. EN TH DR

Wall to be centered on S13A

Wall to be aligned

Retail Space 3 1-G-12

+5,130 mm SSL

+5,130 mm SSL

C

SA2

LEG

Edge of mezzanine

Retail Space 2 1-G-11

OM FR

ED AL SC

OR D RE TE AL

BE T NO

ST MU D AN G IN AW DR D CA A. LY IS AL IS TH NU 2. MA Retail Space 1 1-G-10

A

SB1

SB2 N

0

LY ON D AN

ED ND TE IN E OS RP PU E TH R FO . ED LY US ON BE ED L US AL BE SH Y NS MA IO G NS IN ME AW DI DR N IS TE TH IT 1. WR

NB1

SA1

SA2 50m

EQ

1045

400 845

SB1 K

Q

S: TE NO L RA NE GE

NA2

S: TE NO L RA NE GE E:

TITL

1 ne Zo c mi o on Ec r ta Qa LY

UAL

G:

DW

.

REV

MK 2S0 -E 01 EZ

5 3 30 2GW D CAR RW

:

MAN D A1 ERE :

ALT SIZE G BE DW NOT G. T ORI

MUS

AND G0

WIN 10

DRA 1

CAD A LE IS S SCA

G:

DW

.

REV

MK 2S0 -E 01 EZ

5 1 30 2GW D CAR RW

:

THI

LY

UAL

MAN D A1 ERE :

ALT SIZE G BE DW NOT G. T ORI

MUS

AND G0

WIN 10

ZS

PD AP D HK C N W D : NT IE CL

E: TL TI

1 e n o Z ic m o n o c E r a t a Q

SB2

AS

s n o ti a v e l E e it S V. RE

1

G:

DW

0 3 1 0 G W D C R A R W K M 2 0 S E 1 0 Z E

LY AL NU MA D A1 RE : TE ZE AL SI G BE T DW . NO IG ST OR MU D AN G 0 IN 0 AW 3 : DR D1 CA A E IS AL IS SC TH

Site Elevation D-D 1 : 300

SH

T: EC IT CH AR

GN SI DE

5

TE DA

N IO PT RI SC DE

V. RE

SA2 E: M NA LE FI

6 1 6/ 0 5/ 1

n o si is m b u S D D

1

Project Manager

DRA 1

NA2

ols mb Sy hic ap Gr & le ns Tit tio g in via aw bre Dr Ab 5 00 -0WG -D RC -A er WR mb MK Nu 2g S0 in -E aw 01 Dr EZ

NB2

Lima, PERU

V. RE

S G N I W A R D E C N E R E F E R

id12º77º Studio

1

G:

DW

0 3 1 0 G W D C R A R W K M 2 0 S E 1 0 Z E

: ND GE LE

LY AL NU MA D A1 RE : TE ZE AL SI G BE T DW . NO IG ST OR MU D AN G 0 IN 0 AW 3 : DR D1 CA A E IS AL IS SC TH

NB2

NA1

G N DI N BI R FO

CAD A LE IS S SCA

Q

B

THI

N

A

m 50

Site Elevation C-C 1 : 300

SB2

D

D 0

6

: NT IE CL

SA2

1 e n o Z ic m o n o c E r a t a Q

SA1

Site Elevation B-B 1 : 300

ZS

PD AP D HK C N W D

E: TL TI

SB2

Site Elevation D-D 1 : 300

SB2

1

AS

SA1

s n o ti a v e l E e it S

5

SH

T: EC IT CH AR

GN SI DE

SA2

Site Elevation A-A 1 : 300

E: M NA LE FI

TE DA

N IO PT RI SC DE

V. RE

SB1

SB1

2

6 1 6/ 0 5/ 1

n o si is m b u S D D

1

NB1

C

NB2

NA1

SA2

an Pl r oo Fl t rs Fi A G 2 SB

1 ne Zo c mi o on Ec r ta Qa

: AN PL Y KE

B NA2

NB1

E:

TITL

E: AM EN FIL

, KD

OR S' NT W E ST VA LI LE TH IA R EC RE L FO SP AL N R IO TH AT HE WI IC OT N IF Y IO EC AN CT SP D UN E AN

NJ TH GS CO S, IN IL IN TA AW AD DE DR RE D S T' BE AN EC TO GS IT IN CH IS G AW AR IN DR NT AW 'S VA . DR ER LE GS IN IS NE RE TH GI E AW 3. EN TH DR

A C

an Pl r oo Fl nd ou Gr A G 2 SB

OM FR

ED AL SC

OR D RE TE AL

E: AM EN FIL

BE T NO

ST MU D AN G IN AW DR D CA A. LY IS AL IS TH NU 2. MA

Site Elevation C-C 1 : 300

LY ON D AN

ED ND TE IN E OS RP PU E TH R FO . ED LY US ON BE ED L US AL BE SH Y NS MA IO G NS IN ME AW DI DR N IS TE TH IT 1. WR

6

NA2

in Lima, Peru

FRO

400

FHR

for Qatar Economic Zone Retail-Office Buildings in Doha, Qatar

Collective Social Housing

LED

1300

Edge of mezzanine

G DIN BIN R FO

“QEZ Gateway”

Collective Housing

SCA

1300

1.75mm High balustrade

1

Lima, PERU

OR D

400

1250

Project Manager

ERE

1300

1250

Seguí Studio

ALT

3000

56080

Architect / Interior Designer

2013/14

BE

3000

1300

3000

Private Office Remodelling & interior design in Lima, Peru

NOT T

N:

PLA

3000

845 400

SA2

“Klohn Crippen Berger” Remodelling & interior design in Lima, Peru

MUS

S16A 3000

AND G

S16 6000

WIN

S15A 3000

DRA

CAD

A LY. IS S UAL THI 2. MAN

S15 6000

AND

S14A 3000

ED

S14 6000

END

S13A 3000

INT E

S13 6000

POS

S12A 3000

PUR

S12 6000

THE D.

S11A 3000

USE FOR Y BE LL ONL D SHA S USE BE ION

ENS MAY G DIM N WIN TTE DRA S WRI Y THI 1. ONL

S11 6000

KEY

3000

5990

Makower Architects

Collective Housing in Lima, Peru

ES:

,

ON CIFI ANY CTI SPE AND JUN THE GS , CON WIN IN AILS D DET DRA 'S REA AND BE ECT GS HIT TO IS WIN ARC G

NT WIN DRA S EVA GS. DRA ER' S INE REL WIN THI 3. ENG THE DRA

RKS S' NT WO LIST EVA THE CIA REL FOR SPE ALL H ION ER

WIT CAT OTH

S10A

3000

Colonnade above

3000

Doha, QATAR

2014

NOT L

ERA

GEN

M

FRO

LED

SCA

OR D

ERE

ALT

BE

NOT T

S16A

MUS

S16 6000

AND G

S15A 3000

WIN

S15 6000

DRA

CAD

A LY. IS S UAL THI 2. MAN

EXPERIENCE 2016

S14A 3000

AND

S14 6000

ED

S13A 3000

END

S13 6000

INT E

S12A 3000

POS

S12 6000

PUR

S11A 3000

THE D.

S11 6000

USE FOR Y BE LL ONL D SHA S USE BE ION

ENS MAY G DIM N WIN TTE DRA S WRI Y THI 1. ONL

S10A

1035


Freelance

2013

Valencia, SPAIN

Competition Footbridge and landing areas in Salford, United Kingdom

2012/13

Ackermann Architekten Munich, GERMANY

Architect Competition Hybrid Building in Nurnberg, Germany (MENTION)

“Rational” Training Center in Lansdberg, Germany

“Swiss Life” Headquarter Office Building in Munich, Germany

2011

Freelance Valencia, SPAIN

Competition Mobile Gateway & landing areas in Lasize, Italy (MENTION)


Valencia City Council

2010/11

Valencia, SPAIN Project Manager

Transformation & rehabilitation of an academy in Valencia, Spain

Freelance

2011

Valencia, SPAIN

Competition Auditorium & park in Acilia, Rome, Italy

STUDENT 2009

Final Project Dregree Valencia, SPAIN

Residence for the elderly in Valencia, Spain

2008

University Projects Paris, FRANCE

Residence for the elderly in Paris, France Museum of sculpture (transformation&rehabilitation)

in Venice, Italy


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.