LOLA MONTANER
CURRICULUM VITAE SUMMARY PORTFOLIO
LOLA MONTANER
07/06/82 Valencia, Spain
lola.montaner@yahoo.es +974 5590 0536 +34 667 53 79 09
Architect
Interior Designer
CURRICULUM VITAE FORMATION
2007 Valencia, SPAIN
2008 Paris, FRANCE
2009 Valencia, SPAIN
EXPERIENCE
2016 Doha, QATAR
2013 Valencia, SPAIN
MSc ARCHITECTURE Polytechnic University of Valencia ETSA 2012/13
Specialist URBAN PLANNING École technique supérieure d’architecture Paris-Malaquais
Munich, GERMANY
-Construction details development (steel stairs, welded joints and steel connections, mobile walls, etc.) -Interior designs (meeting points, entrance, corridors and bathrooms)
Competition “Hybrid building” (MENTION) -Complete ideation and development of all the facades 2011
Valencia, SPAIN
2015 Valencia, SPAIN
2015 Wales, UNITED KINGDOM
Valencia, SPAIN
(may-january)
-Development of competitions regarding different topics: rehabilitations of trade and licensing. Competition development in colaboration with architects and engineers
Collaboration GmasP Ingeniering+Architecture
Site manager in four Solar Farms in Wales and Cambridge
Lima, PERU
id12º 77º Studio
Lima, PERU
2011 Valencia, SPAIN
(may-october) _ project manager
Project manager of remodelling and interior design projects Furniture design -Remodeling and redistribution of an office space due to its expasion Design of the new furniture to optimize and adapt to the needs. -Transformation of a house into an office -Improvement of the project and interior design of a collective housing
2013/14
2011 Valencia, SPAIN
(january- frebuary) _ site manager
-Management and administrative tasks -Translation at the construction site 2014
Seguí Architecture and Planning Studio
(november- april) _ project manager
Co-management and coordination of the Spanish office in Lima
2010/11 Valencia, SPAIN
-Project Architect
(january-feb) _ freelance -Complete design of the outdoor space -Collaboration with another architect in the conception and design of the auditorium -Collaboration in the composition and layout of the panel presentations
Collaboration GmasP Ingeniering+Architecture
(sept-december) _ freelance
-Architectural desing and development of complete set of construction drawings -Coordination with structural design
Competition Gateway in Lasize, Italy (MENTION)
(june-july) _ freelance
-Collaboration in the design of the gateway and the insertion of it in the surroundings -Collaboration in the composition and layout of the panel presentations
Foundation of the Valencia City Council “FCVPE”
(agost-may) _ architect
Transformation and rehabilitation project of an academy and offices -Complete ideation and development of the project -Basic project -Measurements and budget
2010 Valencia, SPAIN
-Management of the Studio
Two social housing projects
Competition Auditorium & park in Rome, Italy
(march-april) _ freelance
-Architectural desing and development of complete set of construction drawings -Coordination with structural design
CAD Management and Development
(july-march ) _ architect
“Rational” Training center
“Swiss Life” headquarter
(february-current job ) _ architect / interior designer
QEZ Gateway for Qatar Economic Zone (Retail-Office Project)
Freelance Architect
Ackermann Architekten BDA Studio
-Support the project management -Construction details development -Interior designs (kitchens, bathrooms and classrooms)
Polytechnic University of Valencia ETSA
-Involved in Detail Design Stage (DD) and Tender Documents for a mixed project of 2 plots with 8 buildings -Highlighted tasks as complete/full interior concept development, from design to detail stage -BIM Revit Project (LOD 300) 2015
(july- sept) _ freelance -Collaboration with “GmasP Ingeniering+Architecture” in the conception and architectural design of the footbridge, landing areas and outdoor anphitheatre. -Composition and layout of the panel presentations
-Collaboration in the execution project
Specialist BUILDING
Makower Architects
Competition Footbridge in Manchester, England
2009 Valencia, SPAIN
Nagada construction & real estate development (march-july) _ architect -Final report of a housing project -Commercial plans
Valuation of property
(november-february) _ freelance
-Valuation of two plots, one development land and two warehouses
STUDENT
2007
Bolseria 29 Studio
Valencia, SPAIN
Project of housing
PERSONAL SKILLS
_ internship
(february - july)
Autocad _ proficient Revit _ proficient
-Development of the plans -Layouts
Microstation _ proficient 2005 Valencia, SPAIN
Competition “Pladur� in Madrid, Spain (ACCESIT) _ student Transformation of an underground sation in Madrid
Adobe InDesing _ proficient
-Collaboration with two more students in the conception, design and development of the idea and the project -Collaboration in the composition and layout of the panel presentations
Microsoft Project _ good SketchUp _ good
2002 Valencia, SPAIN
Luis de Garrido Studio
(june - september)
_ internship
Adobe Illustrator _ good
Water-coulors of housing projects
Adobe Photoshop _ good Rhinoceros _ basic
EDUCATION & TRAINING
2015
Course in Project Management
2010
Web diseny and multimedia
2010
3D Studio
(40 hrs)
Flash _ basic
2009
3D Studio
(40 hrs)
Windows _ proficient
2009
Rhinoceros
2009
Valuation of property
2008
Digital editing software and image scanner
2005
Architecture and sustainability
2003
Madrid 2012: Architectures and Projects
2003
Modern architecture and tourism: 1925-65
2002
International days of landscape
1995/99
3D Studio _ basic
(100 hrs)
Dreamweaber _ good
(300 hrs)
(25 hrs) (20 hrs)
Drawing and painting courses
(200 hrs)
LANGUAGES
Spanish (mother tongue) English (C1)
(18 hrs) (33 hrs)
(15 hrs) (6 hrs per week)
(20 hrs)
French (A2) German (A1)
ES:
NOT L
ERA
GEN
M ,
ON CIFI ANY CTI SPE AND JUN THE GS , CON WIN IN AILS D DET DRA 'S
REA
BE AND ECT GS HIT TO IS WIN ARC G
NT WIN DRA S EVA GS. DRA ER' S INE REL WIN THI 3. ENG THE DRA
RKS S' NT WO LIST EVA THE CIA REL FOR SPE ALL H ION ER
WIT CAT OTH
N:
PLA
KEY
400
1300
1300
400
1300
1300
400
1300
3000
1300
400
1300
6000
1300
400
1300
1300
400
3000
1300
1300
400
1300
3000
1300
400
1300
3000
1300
400
1300
3000
1300
400
1300
200
1300
400
NB2
NA2
. 3000
845 400
1361
3000
600
3000
1300
1300
1300
400
1300
1300
400
1300
1300
400 845
2600
400
2600
400
2600
400
2600
400
2600
400
2600
400
2600
400
2600
400
2600
400
2600
400
2600
400
2600
400
2600
400
2600
400
2600
400 845
NB2
NA2
NA1
NB1
3600
3000
1300
750 600 445
1500
1500
1500
1500
1500
2250
1500
1500
750
1500
2250
1500
1500
1500
1500
1500
750
1500
2250
1500
1500 125
1500
750
1500
1500
1500
1500
1500
1500 1500
1500 1500
750
750
1500
2250
1500
750
1500
2250
1500
2250
1500
750
1500
1500
NA1
NB1
1625 1500
1045
1045 1500 1500 750
9000
1500 1500
1500
1500
1500
1500 1500
750
1500
1500
1500
1500 1500 1500 1500
1500 1500
750
1500
1500
1500 1500
750
4500
1500
2250
1500 1500 750
1500 1500
1500
576
FHR
Vent. Duct Riser
4500
1500
1500
1500 1500
411
708 1645
2191
2250
1500
1500
1500
1500
1500
1500 1500 1500
750
1500
1500 750
1500
1499 1500
750
1500 1500 1500
1450 1550 1500
1500
1500
1300 400
1500
1500
9000 1500
1500 750
1500
155
1500
1500
750
2889
3563
1500
4500
1500
750 2250
1500 1500
750
4500
1500
1500 750
1500 1045
450 595
750
750
1500
1500
1500
2250
1500
750
1500
1450 1550
1500 1045
2250
1500 1500
2250
1300
9000 1300 400 1300 1300 400 1300 1300
4500
400 1300 1300 400
4500
1300 1300 845 400
1045
750
445 1500
1500
445 1500
445 600
826 750 750
1500
1500 1500 2301
1500
699
1500
1500
1300
9000 1300 400 1300 1300 400 1300 1300 1300 400
4500
1300 1300 1300
400
EQ EQ 849 2005 1195
645
400
1300
1500
1500
970
1500
445 600
645 600 1500
4500
1500 445 600 331
75 1500 750
4500
1500 1500 1500 1500
750
1500
1500
C
B
1500
1213
1213 Toilet Duct
Stub Duct for Tea Point
5117
Vent. Duct Riser
1500 1500
9000
1500 1500
750
1500
1500
1500
1500
445
445
1500
2250
D
750
Tenant Elec.Riser
1500
1249
PH Riser
826
1500
2250 750
1500
1500 1500 1500 1500
750 1500 1500
1500
1500
2250
1500
1500
750 1500
750
1500
1500
1500
4500 9000
1500 1498
A
415 1500
1500 750
1500
750
1500
1500
1500
ZS ZS ZS
750
1500
750
1500
1500 750
1500 1500
1500 1500
750
1500 1500
1500 750
1500 1500
1500 1500
750
1500 1500
1500 750
750
1500 1500
1500 1500
1500 750
1500 1500
750
1500 750
1500 1500
750
1500 1500
1500 750
1500 1500
750
1500 750
1500 1500
750
1500 1500
1500 750
1500 1500
1500 1500
750
1500 750
1500 1500
1500 1500
750
1500 1500
1500
445
1500
16 16 16 16 15
ZS ZS
JK JK JK
1500
08/ 06/ 03/ 02/ 01/
AS AS
TK TK TK
1500
15/ 15/ 27/ 18/ 21/
SH MV
SH MV
AS AS
ZS ZS
TK
JK
ZS
TK TK
JK JK
ZS ZS
ARC
IGN
NT:
DES
CLIE
:
ECT
HIT
DA HK
D PP
NC
DW
TE DA
N
TIO
RIP SC DE
V. RE
ARC
IGN
DES
:
NT:
ECT
CLIE
HIT
DA HK
D PP
NC
DW
TE DA
N
TIO
RIP SC DE
V. RE
SB2 First Floor Plan 2 1 : 100
1500
ion n iss sio bm ion mis ion Su iss ion ub iss m bm iss -S bm eri su bm Re Su Int Re Su
16 16 16 16 15
1
08/ 06/ 03/ 02/ 01/
SB2 Ground Floor Plan 1 : 100
15/ 15/ 27/ 18/ 21/
ion n iss sio bm ion mis ion Su iss ion ub iss m bm iss -S bm eri su bm Re Su Int Re Su
DD DD DD SD SD
ols mb Sy hic ap Gr & le ns Tit tio g in via aw bre Dr Ab 5 00 -0WG -D RC -A er WR mb MK Nu 2g S0 in -E aw 01 Dr EZ
5 4 3 2 1
S G N I W A R D E C N E R E F E R
1
750
1500
+13,780 mm SSL
665 750
NA2
645 600255
First Floor Office 2-1-02
445
NB2
Vent.Duct Riser
1322 1500
1500 1500
1500 750 1500
1500
4500
1500 1500 1500 1500 1500 1500 1500 1500 1500
A
415
610 435
845 400
1500
635
965 151
1500
965
1500
1858
435 941
Retail 1 Elec. Riser
600
IT/ELV Riser
4202
1249 FHR
535
Landlord Elec. Riser
1356
240.9 6° 1250 1250 1250 1305 400 1300 1300 400 1300 1300 400 1300
1300
1300
1387
UP
DD DD DD SD SD
1300
1387
FHR
2464
5 4 3 2 1
400
1387
PH Riser Tenant 2 Elec. Riser
bols Sym
1300
1387
Stairs S2
0-00 -053 WG- PC-0 C-D C-S
1300
1387
IT/ELV Riser
Wall to be aligned
-AR -AR
400
1363
Lobby 2-1-08
Future Expansion Corridor.
hic s Grap tion & s ifica Title tion Spec ing evia de
1300
1363
Female WC 2-1-09
+13,930 mm FFL +13,780 mm SSL
Draw Abbr Faca 5
1300
1363
Landlord Elec. Riser
Wall to be aligned
ber KWR KWR
400
Lobby 2-1-06
UP
Num 02-M 02-M
1300
1363
Male WC 2-1-07 +13,930 mm FFL +13,780 mm SSL
Stairs S1
ing 1-ES 1-ES Draw EZ0 EZ0
1300
1363
165.93°
Fire & Goods Lift
+13,780 mm SSL
Wall to be aligned
Wall to be aligned
S G N WI A R D E C N E R E EF R
400
END G: LEG DW
1300
1429
.
1300
750
1429
REV
400
MK 2S0 -E 01 EZ
1300
1429
5 3 30 1GW D CAR RW
1300
:
400
1429
LY
1300
1429
UAL
1300
1429
MAN D A1 ERE :
400
+13,930 mm FFL
ALT SIZE G BE DW NOT G. T ORI
1300
1429
Wet Mech. Services
Goods Lift Lobby 2-1-04
MUS
1300
AND G0
400
WIN 10
1300
DRA 1
1300
1429
FHR
1805
1009
CAD A LE IS S SCA:
400
THI
1300
1429
194.07°
809
50m
1300
0
400
1500
Lobby 2-1-01
+13,780 mm SSL
bols Sym
1300
1500
Door to be centered with the lift opening
0-00 -053 WG- PC-0 C-D C-S
1300
1500
Janitor Room 2-1-11
Temporary Plywood & Timber Door
-AR -AR
400
1500
Passenger Lift 1
hic s Grap tion & s ifica Title tion Spec ing evia de
1300
1573
Passenger Lift 2
Draw Abbr Faca 5
1300
ber KWR KWR
400
Num 02-M 02-M
1300
1573
Q
Colonnade (Building Overhang)
ing 1-ES 1-ES Draw EZ0 EZ0
1300
1573
S G N WI A R D E C N E R E EF R
Edge of Mezzanine
400
1573
12580
N
+5,130 mm SSL
SB2
1 ne Zo c mi o on Ec r ta Qa
Retail Space 2 2-G-12
E:
TITL
Dashed doors to be part of tenant fit-out package
NA1
SA1
an Pl r oo Fl t rs Fi A G 1 SA
Temporary Blockwork
Wall to be centered on S14
ARC
B
346
IGN
DES
G DIN BIN R FO
NT:
Retail 1 Elec. Riser
435
1300
1573
+13,930 mm FFL
Building line above
1300
1573
CLIE
+5,280 mm FFL
+5,130 mm SSL
400
1573
C
+5,130 mm SSL
Storage 2-G-05
Retail Space 1 2-G-11
1300
1573
:
Corridor 2-G-10
D
Building line above
ECT
Storage 2-G-09
804
Edge of Mezzanine
1300
SA1 First Floor Plan 1 : 100
645
LEVEL : 0 FFL / -150 SSL +5280 QND
435
HIT
1500
ZS ZS D PP
865
ZS
JK JK DA HK
635
Life Safety Riser
Lobby 2-G-13
ZS
JK
NB2 NC
1387
UP
ZS
AS
DW
1387
+5,280 mm FFL +5,130 mm SSL
AS
TK TK
TE DA
1387
Fire Command Centre 2-G-14
N
1387
TIO
1387
RIP SC DE
V. RE
1363
1
:
1363
PH Riser
Wall to be aligned with S13A
845 400
END
LEG
1363
50m
1363
165.93°
+5,280 mm FFL +5,130 mm SSL
Reception BoH 2-G-03
5798
1363
Q
7465
1429
N
1429
PH Riser
Goods Lift Lobby 2-G-11
Accessible WC 2-G-04
2250 920
G:
1429
.
DW
G DIN BIN R FO
1429
REV
1429
Fire & Goods Lift
Stairs S1
RS DJ TK
NB1
SB1
SA2
5 1 30 1GW D CAR RW MK 2S0 -E 01 EZ
Site Elevation B-B 1 : 300
G N DI N BI R FO
:
1429
Wet Mech. Services
LY
E: AM EN FIL
1429
Wall to be aligned
NA2
E
595 450
S17 6000
SB2 UAL
1429
Stair 1 Lobby 2-G-08
MAN D A1 ERE :
1429
194.07°
? Passenger ? Lift 1
ALT SIZE G BE 0 DW NOT G. T ORI
1500
Fire Protection Riser
Tenant 1 Elec. Riser
Passenger Lift 2
MUS
1500
Janitor Room 2-G-07
Life Safety Riser
AND G0
1500
209.04°
Reception 2-G-01
+5,280 mm FFL +5,130 mm SSL
WIN 10
1500 1250 1250
1250 1250 1250 2500
1250 1250
DRA 1
Building line above
NB2
NA1
CAD A LE IS S SCA
SA1 Ground Floor Plan 1 : 100
THI
1
1250
SA1
ion
1500
16 16 16 15
1500
06/ 03/ 02/ 01/
1500
15/ 27/ 18/ 21/
1 ne Zo c mi o on Ec r ta Qa
E: AM EN FIL
SB2
iss bm ion ion Su iss ion iss m bm iss bm eri su bm Su Int N: Re Su
F
PLA SD SD DD DD
KEY 2 1 5 4 3
1500
S16A
,
1500
3000
ON CIFI ANY 08/ CTI SPE AND 15/ JUN THE , GS CON WIN IN AILS D DET DRA 'S n
1500
S16
REA
1500
BE AND ECT sio GS HIT mis TO IS WIN ARC ub G
NT -S WIN DRA S EVA Re GS. DRA ER' S WIN INE REL DD THI 3. ENG THE DRA
1500
6000
RKS S' NT WO LIST EVA THE CIA REL FOR SPE ALL H ION ER
1500
WIT CAT OTH 16
1500
S15A 3000
M
1500
S15 6000
FRO
1500
S14A 3000
LED
S14 6000
SCA
S13A 3000
OR D
S13 6000
ERE
S12A 3000
ALT
E:
TITL
an Pl r oo Fl nd ou Gr A G 1 SA
S12 6000
BE
1546
S11A SA1
NOT T
194.04°
1546
S11
MUS
1546
6000
AND G
1546
WIN
1546
DRA
NB1
CAD
1546
SB1
A LY. IS S UAL THI 2. MAN
1546
AND
1546
ED
1546
S17
400 845
G
1546
END
1546
INT E
Edge of mezzanine
2000
4500
400 1300
150
700
700 1350
1550 2624
2540
411
EQ
1500
400 845 1300 1300 400
EQ EQ EQ EQ EQ
14850
EQ EQ EQ EQ
1667
+13,780 mm SSL
1546
POS
1500
PUR
1500
THE D.
1500
USE FOR Y BE LL ONL D SHA S USE BE ION
1500
ENS MAY G DIM N WIN TTE DRA S WRI Y THI 1. ONL
1500
ES:
1500
750 75
NOT L
1500 1500
ERA
1300 3000 1300
1893
+13,930 mm FFL
UP
GEN
1500 1500
bols Sym
1500 750
NB2
NA1
0-00 -053 WG- PC-0 C-D C-S
1500 1500
E
S16A
400
I
-AR -AR
773
+13,780 mm SSL
hic s Grap tion & s ifica Title tion Spec ing evia de
1300
+13,930 mm FFL
Draw Abbr Faca 5
1300 6000 400 1300
Male WC 1-1-02
Corridor 1-1-04
Wall to be aligned
ber KWR KWR
S16 1300
Wall to be aligned
Fire & Goods Lift
Num 02-M 02-M
400
J
H
ing 1-ES 1-ES Draw EZ0 EZ0
2610
Stairs S1
Elec. & Mech 1-1-07 +13,930 mm FFL
,
S15A 1300 3000 1300
Vent. Duct Riser
M
FRO
LED
SCA
1500 1500
D PP
ARC
IGN
DES
400
Passenger Lift 2 1
165.96° 1500
1500
NT:
CLIE
:
ECT
DA HK
HIT
NC
1300
Temporary ply wood boxing out with door access
Temporary Plywood & Timer Door
Passenger Lift 1
AND
ED
ZS ZS ZS
1045
NA2
END
ZS
JK JK JK
RKS S' NT WO LIST EVA THE CIA REL FOR SPE ALL H ION ER
WIT CAT OTH
ZS
AS
TK TK TK
OR D
ERE
ALT
BE
NOT T
MUS
AS
DJ
INT E
POS
RS
DW
TE DA
N
1300 6000 400 1300
TIO
RIP SC DE
V. RE
S15 1300
PUR
N:
PLA
KEY
16 15
02/ 01/
400
990
Tenant 2 Elec.Riser
Wall to be aligned
FHR
+13,780 mm SSL
THE D.
15/ 15/ 27/ 18/ 21/
ion n iss sio bm ion mis ion Su iss ion ub iss m bm iss -S bm eri su bm Re Su Int Re Su
DD DD DD SD SD
5 4 3 2 1
S14A
1275 3000
Wall to be aligned
Stairs S2
ON CIFI ANY CTI SPE AND JUN THE GS , CON WIN IN AILS D DET DRA 'S REA AND BE ECT GS HIT TO IS WIN ARC G WIN DRA NT
S ER' EVA GS. DRA16 16 16 S INE REL WIN THI08/ 06/ 03/ 3. ENG THE DRA
400 S141300
AND G
1300
1500
Female WC 1-1-03
WIN
1300
6000
1500
IT/ELV Riser Wall to be aligned
1281
1-1-05
DRA
3000
1500
475 Goods Lift Lobby
CAD
400
S13A
6000
1500
UP
A LY. IS S UAL THI 2. MAN
1300
Storage 1-1-09
USE FOR Y BE LL ONL D SHA S USE BE ION
1300
Life Safety Riser
Tenant 1 Elec.Riser
ENS MAY G DIM N WIN TTE DRA S WRI Y THI 1. ONL
S13
3000
G
F
Wall to be centered on mullion
GRC shelf above
400
1500
First Floor Terrace Door
ES:
1275
1500
Lobby 1-1-01
Stub Duct for Tea Point
NOT L
S12A
6000
1250
ERA
D
Wall to be centered on mullion
165.96°
1250
GEN
+5,130 mm SSL
Q
1250
1500
S G N WI A R D E C N E R E EF R
+5,130 mm SSL
Blockwork to align with concrete
+5,280 mm FFL
N
: ND GE LE S12
1250
1500
First Floor Terrace Door
bols Sym
+5,280 mm FFL +5,130 mm SSL
175
m 50
0
S11A 3000
Retail Space 4 1-G-13
Goods Lift Lobby 1-G-09
UP
B 1250
0-00 -053 WG- PC-0 C-D C-S
1250
S11
Wall to be aligned
SB2
1250
-AR -AR
Retail Space 5 1-G-06
1250
hic s Grap tion & s ifica Title tion Spec ing evia de
1250
1250
Draw Abbr Faca 5
425
SA1
175
1250
1250
1500
PH Riser
ber KWR KWR
1250
A
1250
1500
Temporary Plywood & Timer Door
Note: Dimensions are to finished faces of walls and are approximate only. Please refer to Finishes Schedule and Wall build-ups sheet to confirm. Num 02-M 02-M
2500 Stairs S2
Wall to be aligned
SA2 D
1250
Terrace 1-1-06
990
Temporary ply wood boxing out with door access
+13,780 mm SSL
H
ing 1-ES 1-ES Draw EZ0 EZ0
1250
UP
Door centered
44°
First Floor Office 1-1-10
S G N WI A R D E C N E R E EF R
1250
SB1
124.
:
1250
Fire & Goods Lift
1250
Building line above
Retail 3 Elect. Riser
Wall to be aligned
Stairs S1
+5,280 mm FFL +5,130 mm SSL
Vent. Duct Riser
END
1250
Passenger Lift 2
NA1
Elec. & Mech. 1-G-07
Storage 1-G-14
LEG
1250
Passenger Lift 1
Tenant Elec.Riser
NB1
Accessible WC 1-G-04
Reception 1-G-03 +5,280 mm FFL +5,130 mm SSL
510
SB2
50m
1250
Retail 2 Elec. Riser
+5,130 mm SSL
1256
G DIN BIN R FO
0
1177
NB2
+5,280 mm FFL
Life Safety Riser
J
I
868
IT/ELV Riser
SA1
SA2
Q
159.60°
Stub Duct for Tea Point
C
SB1
K
N
2880
: AN PL Y KE
NA2
700
Site Elevation A-A 1 : 300
:
Temporary Blockwork
B
1775
2
END
Dashed doors to be part of tenant fit-out package
Lift Lobby 1-G-08
510
+5,130 mm SSL
, KD
OR S' NT W E ST VA LI LE TH IA R EC RE L FO SP AL N R IO TH AT HE WI IC OT N IF Y IO EC AN CT SP D UN E AN
NJ TH GS CO S, IN IL IN TA AW AD DE DR RE D S T' BE AN EC TO GS IT IN CH IS G AW AR IN DR NT AW 'S VA . DR ER LE GS IN IS NE RE TH GI E AW 3. EN TH DR
Wall to be centered on S13A
Wall to be aligned
Retail Space 3 1-G-12
+5,130 mm SSL
+5,130 mm SSL
C
SA2
LEG
Edge of mezzanine
Retail Space 2 1-G-11
OM FR
ED AL SC
OR D RE TE AL
BE T NO
ST MU D AN G IN AW DR D CA A. LY IS AL IS TH NU 2. MA Retail Space 1 1-G-10
A
SB1
SB2 N
0
LY ON D AN
ED ND TE IN E OS RP PU E TH R FO . ED LY US ON BE ED L US AL BE SH Y NS MA IO G NS IN ME AW DI DR N IS TE TH IT 1. WR
NB1
SA1
SA2 50m
EQ
1045
400 845
SB1 K
Q
S: TE NO L RA NE GE
NA2
S: TE NO L RA NE GE E:
TITL
1 ne Zo c mi o on Ec r ta Qa LY
UAL
G:
DW
.
REV
MK 2S0 -E 01 EZ
5 3 30 2GW D CAR RW
:
MAN D A1 ERE :
ALT SIZE G BE DW NOT G. T ORI
MUS
AND G0
WIN 10
DRA 1
CAD A LE IS S SCA
G:
DW
.
REV
MK 2S0 -E 01 EZ
5 1 30 2GW D CAR RW
:
THI
LY
UAL
MAN D A1 ERE :
ALT SIZE G BE DW NOT G. T ORI
MUS
AND G0
WIN 10
ZS
PD AP D HK C N W D : NT IE CL
E: TL TI
1 e n o Z ic m o n o c E r a t a Q
SB2
AS
s n o ti a v e l E e it S V. RE
1
G:
DW
0 3 1 0 G W D C R A R W K M 2 0 S E 1 0 Z E
LY AL NU MA D A1 RE : TE ZE AL SI G BE T DW . NO IG ST OR MU D AN G 0 IN 0 AW 3 : DR D1 CA A E IS AL IS SC TH
Site Elevation D-D 1 : 300
SH
T: EC IT CH AR
GN SI DE
5
TE DA
N IO PT RI SC DE
V. RE
SA2 E: M NA LE FI
6 1 6/ 0 5/ 1
n o si is m b u S D D
1
Project Manager
DRA 1
NA2
ols mb Sy hic ap Gr & le ns Tit tio g in via aw bre Dr Ab 5 00 -0WG -D RC -A er WR mb MK Nu 2g S0 in -E aw 01 Dr EZ
NB2
Lima, PERU
V. RE
S G N I W A R D E C N E R E F E R
id12º77º Studio
1
G:
DW
0 3 1 0 G W D C R A R W K M 2 0 S E 1 0 Z E
: ND GE LE
LY AL NU MA D A1 RE : TE ZE AL SI G BE T DW . NO IG ST OR MU D AN G 0 IN 0 AW 3 : DR D1 CA A E IS AL IS SC TH
NB2
NA1
G N DI N BI R FO
CAD A LE IS S SCA
Q
B
THI
N
A
m 50
Site Elevation C-C 1 : 300
SB2
D
D 0
6
: NT IE CL
SA2
1 e n o Z ic m o n o c E r a t a Q
SA1
Site Elevation B-B 1 : 300
ZS
PD AP D HK C N W D
E: TL TI
SB2
Site Elevation D-D 1 : 300
SB2
1
AS
SA1
s n o ti a v e l E e it S
5
SH
T: EC IT CH AR
GN SI DE
SA2
Site Elevation A-A 1 : 300
E: M NA LE FI
TE DA
N IO PT RI SC DE
V. RE
SB1
SB1
2
6 1 6/ 0 5/ 1
n o si is m b u S D D
1
NB1
C
NB2
NA1
SA2
an Pl r oo Fl t rs Fi A G 2 SB
1 ne Zo c mi o on Ec r ta Qa
: AN PL Y KE
B NA2
NB1
E:
TITL
E: AM EN FIL
, KD
OR S' NT W E ST VA LI LE TH IA R EC RE L FO SP AL N R IO TH AT HE WI IC OT N IF Y IO EC AN CT SP D UN E AN
NJ TH GS CO S, IN IL IN TA AW AD DE DR RE D S T' BE AN EC TO GS IT IN CH IS G AW AR IN DR NT AW 'S VA . DR ER LE GS IN IS NE RE TH GI E AW 3. EN TH DR
A C
an Pl r oo Fl nd ou Gr A G 2 SB
OM FR
ED AL SC
OR D RE TE AL
E: AM EN FIL
BE T NO
ST MU D AN G IN AW DR D CA A. LY IS AL IS TH NU 2. MA
Site Elevation C-C 1 : 300
LY ON D AN
ED ND TE IN E OS RP PU E TH R FO . ED LY US ON BE ED L US AL BE SH Y NS MA IO G NS IN ME AW DI DR N IS TE TH IT 1. WR
6
NA2
in Lima, Peru
FRO
400
FHR
for Qatar Economic Zone Retail-Office Buildings in Doha, Qatar
Collective Social Housing
LED
1300
Edge of mezzanine
G DIN BIN R FO
“QEZ Gateway”
Collective Housing
SCA
1300
1.75mm High balustrade
1
Lima, PERU
OR D
400
1250
Project Manager
ERE
1300
1250
Seguí Studio
ALT
3000
56080
Architect / Interior Designer
2013/14
BE
3000
1300
3000
Private Office Remodelling & interior design in Lima, Peru
NOT T
N:
PLA
3000
845 400
SA2
“Klohn Crippen Berger” Remodelling & interior design in Lima, Peru
MUS
S16A 3000
AND G
S16 6000
WIN
S15A 3000
DRA
CAD
A LY. IS S UAL THI 2. MAN
S15 6000
AND
S14A 3000
ED
S14 6000
END
S13A 3000
INT E
S13 6000
POS
S12A 3000
PUR
S12 6000
THE D.
S11A 3000
USE FOR Y BE LL ONL D SHA S USE BE ION
ENS MAY G DIM N WIN TTE DRA S WRI Y THI 1. ONL
S11 6000
KEY
3000
5990
Makower Architects
Collective Housing in Lima, Peru
ES:
,
ON CIFI ANY CTI SPE AND JUN THE GS , CON WIN IN AILS D DET DRA 'S REA AND BE ECT GS HIT TO IS WIN ARC G
NT WIN DRA S EVA GS. DRA ER' S INE REL WIN THI 3. ENG THE DRA
RKS S' NT WO LIST EVA THE CIA REL FOR SPE ALL H ION ER
WIT CAT OTH
S10A
3000
Colonnade above
3000
Doha, QATAR
2014
NOT L
ERA
GEN
M
FRO
LED
SCA
OR D
ERE
ALT
BE
NOT T
S16A
MUS
S16 6000
AND G
S15A 3000
WIN
S15 6000
DRA
CAD
A LY. IS S UAL THI 2. MAN
EXPERIENCE 2016
S14A 3000
AND
S14 6000
ED
S13A 3000
END
S13 6000
INT E
S12A 3000
POS
S12 6000
PUR
S11A 3000
THE D.
S11 6000
USE FOR Y BE LL ONL D SHA S USE BE ION
ENS MAY G DIM N WIN TTE DRA S WRI Y THI 1. ONL
S10A
1035
Freelance
2013
Valencia, SPAIN
Competition Footbridge and landing areas in Salford, United Kingdom
2012/13
Ackermann Architekten Munich, GERMANY
Architect Competition Hybrid Building in Nurnberg, Germany (MENTION)
“Rational” Training Center in Lansdberg, Germany
“Swiss Life” Headquarter Office Building in Munich, Germany
2011
Freelance Valencia, SPAIN
Competition Mobile Gateway & landing areas in Lasize, Italy (MENTION)
Valencia City Council
2010/11
Valencia, SPAIN Project Manager
Transformation & rehabilitation of an academy in Valencia, Spain
Freelance
2011
Valencia, SPAIN
Competition Auditorium & park in Acilia, Rome, Italy
STUDENT 2009
Final Project Dregree Valencia, SPAIN
Residence for the elderly in Valencia, Spain
2008
University Projects Paris, FRANCE
Residence for the elderly in Paris, France Museum of sculpture (transformation&rehabilitation)
in Venice, Italy