FMF Cape Breton 25th Anniversary Tribute

Page 20

historic

ORDNANCE SLABS

Reborn

A piece of HMC Dockyard’s rich ship repair past has been preserved on a feature wall within Dockyard’s Ship Repair Zone. wri t t e n B Y P e t e r M a l l e t t

L

arge concrete slabs engraved with the word “ORDNANCE”, once part of the façade of long-demolished building D192, have been incorporated into the landscape design delivered by the Fleet Maintenance Facility Cape Breton shop consolidation project. They are now displayed as a centre piece of a south-facing parkette located on Hospital Road near the access road leading towards the FMFCB main entrance.

18

D192, built in 1940, was the administrative headquarters for FMF’s predecessor, the Ship Repair Unit (Pacific). The large concrete slabs were part of that building’s front entrance motif. Project director for the ongoing consolidation project Clive Orford, of NDHQ’s Assistant Deputy Minister (Infrastructure & Environment) organization, says incorporating the slabs as part of the revamped ship

FMF CAPE BRETON  1996 - 2021


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.