LORENA AKIN ARCHITECTURAL PORTFOLIO

Page 1


+ EDUCATION 2010-2013 North Carolina State University (NCSU) Raleigh, NC

Master of Architecure. January 2010 – May 2013

2001-2006 Autonomous University of Chiapas (UNACH)

Tuxtla Gutiérrez, Chi- apas México

Mexico Bachelor’s Degree Received 2007 Major Field of Study: Architecture August 2001 - December 2006

+ EMPLOYMENT HISTORY 05/2013-CURRENT KLING STUBBINS ARCHITECTURE / JACOBS GBN

Raleigh, NC Architectural Intern: Urban Planning, Multi family & Commercial design.

07/2013-CURRENT LEAVE AND RECEIVE Raleigh, NC Art Director.

04/2013 TONIC DESIGN- TONIC CONSTRUCTION

Raleigh, NC Design and 3D modelling of Town House Development in Durham, NC

05/2013 ADVANCED ENERGY

Raleigh, NC Translation of HVAC installation manual and webinars

2012 - 2014 KIRWAN ARCHITECTURE

Raleigh, NC CAD Drawings of Olson residence addition project; Renderings of Boylan-Pearce Building Renovation.

2012, 2014 HH ARCHITECTURE

Raleigh, NC Renderings of Tuskeegee University Student Housing project and Davie Street Presbyterian Church.

07/2011 FRANK HARMON ARCHITECT, PA

Raleigh, NC 3D model and renderings for Riverworks project

Spring 2011 NORTH CAROLINA STATE UNIVERSITY

Raleigh, NC Research Assistant for Professor Patricia Morgado’s research on the Anahuacalli Museum and Pablo Neruda’s Home. Illustrations for published articles

Fall 2010, 2011 NORTH CAROLINA STATE UNIVERSITY

Raleigh, NC Teaching assistant in Patricia Morgado’s drawing class for entering MArch students, track 3.

11/2009-CURRENT SPANGLISH UNLIMITED, INC. Raleigh, NC

Contract translator for: Training documents, Legal documents, Promotional material, and more.

2008 CONSEJO DE MEXICANOS EN LAS CAROLINAS (Mexican Council in the Carolinas)

Raleigh, NC

2008

Raleigh, NC

03-05/2007

Fort Bragg, CA

2006-2007

TGZ, Mexico

2004-2007

TGZ, Mexico

2001-2003

TGZ, Mexico

Graphic Design: Winning Logo

TARANTINI

Graphic design: Logo, business cards, menu cards, catering menu, marketing

LEVENTHAL, SCHLOSSER & NEWBERGER ARCHITECTS Internship: CAD Drafter on multiple residential projects

BIOARQ

Residential design (In collaboration w/ Architect Carlos Gordillo); “CIATES” veterinarian office remodel design.

IIUSA GENERAL CONTRACTOR

Construction Supervisor & drafter for public projects, including schools and urban parks.

POINT LINE GRAPHIC DESIGN OFFICE

Graphic Designer: Logos, office marketing materials, Nuestra Belleza Chiapas 01’ propaganda, gift

2001-2007 cards, etc TGZ, Mexico

VOLUNTEER EXPERIENCE

Remodel of Veterinary School’s Facilities. Design of a clinic and teaching facilities using the structure of an unfinished building. Mexican Annual Telethon. Fund raiser for non- profit organization intended to build the required facilities for handicapped children’s physical therapy. ZOOMAT (local zoo). Assistant to lead biologists in field research.


2014 portfolio

FLUENT

ENGLISH

SPANISH

MICROSOFT OFFICE QGIS

RENDER[in]

ECOTECT

INDESIGN

ILLUSTRATOR

PHOTOSHOP

SKETCHUP

REVIT

AUTOCAD

+ SKILLS

GOOD BASIC

+ SPECIAL RECOGNITION • RECIPIENT OF THE ARCHITECTURE FACULTY AWARD FOR DESIGN ACHIEVEMENT IN THE M.ARCH. PROGRAM IN HONOR OF THE EMERITUS FACULTY OF THE DEPARTMENT • NATIONAL HONORABLE MENTION IN GERALD D. HINES STUDENT URBAN DESIGN COMPETITION & FIRST PLACE IN THE REGIONAL ULI COMPETITION • NOMINEE FOR AIA TRIANGLE SCHOLARSHIP • CITY CAMP WINNER: RGREENWAY(proposal and design). Development of an interactive guide for Raleigh’s Greenway System. • CONSEJO DE MEXICANOS EN LAS CAROLINAS: Designer of winning logo

+ REFERENCES • FRANK HARMON, FAIA frank@frankharmon.com Principal at Frank Harmon Architect, PA (919) 829.9464 • ROBIN ABRAMS, PhD, AIA, ASLA robin_abrams@ncsu.edu Head of the School of Architecture (919) 515.8350 • DAVID HILL, AIA Associate Professor of Architecture

dhill@ncsu.edu (919) 515-8357

• VINCENT PETRARCA, AIA Principal at Tonic Design & Tonic Construction

vincent@tonic.com (919) 803.4278

• ALICIA KIRWAN, AIA ak@kirwanarchitecture.com Principal at Kirwan Architecture (919) 820.2404 CONTACT INFORMATION (919) 840 8806

@

LOrenapazakin@gmail.com

218 Idlewild Ave., Raleigh, NC 27601


01

KLING STUBBINS/ JACOBS 2014 NCSU PLANT SCIENCES BUILDING

05

KLING STUBBINS/ JACOBS 2014 BLUE CROSS BLUE SHIELD NC CAMPUS

07

KLING STUBBINS/ JACOBS 2013 THE L-BUILDING

11

KLING STUBBINS/ JACOBS 2013 SHIP CREEK WATERFRONT MASTERPLAN

15

SHIFT HOUSE

19

THE WEDGE HOUSE


TABLE OF CONTENTS

23 NATIONAL HONORABLE MENTION & REGIONAL 1ST PLACE

GERALD D. HINES STUDENT URBAN DESIGN COMPETITION

27

JENKINS CRAFT CENTER

31

AUDUBON SOCIETY RESEARCH CENTER

35

RECYCLING AND SOLID WASTE CONVENIENCE CENTER

38

THE SLIDING CHAIR


NCSU PLANT SCIENCES BUILDING RALEIGH, NC

The building (190,000 GSF) is organized across four levels with a rooftop greenhouse. From the Oval Drive entrance, users will enter at the 2nd Level and will have immediate access to a Flexible Conferencing area as well as Corporate and Research Laboratories. The lower level daylights to the south of the site and will contain Labs, Growth Chambers, Loading, and Mechanical Spaces. Levels 3 & 4 are occupied with Labs, both Corporate and Research. The Roof houses the Greenhouses, as well as Process Labs, Head Houses, and Mechanical areas. The planning diagram is comprised of two L-Shaped Laboratory & Office wings, wrapped around a central atrium space. the Atrium will serve as both a circulation and collaboration zone. Labs and Offices are arranged to maximize interaction both between the wing and between levels and allowing for maximum day lighting opportunities. Pedestrian movement through the building is encouraged at the 2nd Level, in keeping with the Master Plan Concepts. I participated in the design and production, including schematic layout, renderings, and assembly of the materials needed to begin fundraising efforts.

TYPICAL FLOOR LAYOUT


Lorena Paz Akin. Portfolio 2014

Jacobs/ KlingStubbins Work

2


1

1

ROOF

2 3

2

5

2

3

ROOFTOP GREENHOUSE LAB

4

4TH

2 3

2

5

2

3 4

3RD

ATRIUM VIEW 2 8

3 5

2

3 4

2ND 2 3

5

7

2

1. GREENHOUSE 2. RESEARCH LAB 3. OFFICE CLUSTER 4. CORPORATE SUITE 5. ATRIUM 6. GROWTH CHAMBERS 7. MECHANICAL 8. FLEXIBLE CONFERENCING 9. LOADING / SERVICE YARD

site plan

6

1ST


Lorena Paz Akin. Portfolio 2014

section a

4


Blue Cross Blue Shield, North Carolina Campus Durham, NC

Main North Carolina Campus expansion for Blue Cross Blue Shield, including master plan development, partial demolition, interior renovation of 2 existing buildings, and design of a new office building and parking garage. I participated in the master plan creation and construction process diagrams, the design of the ¨skin set for the renovation of building UP-400, coordination with other disciplines, and producing the final permit set for the review of the project architect. I also produced parts of the construction documents for the parking deck and facade studies for the new building. (under construction)

MAIN ENTRANCE PERSPECTIVE


Lorena Paz Akin. Portfolio 2014

Jacobs/ KlingStubbins Work

6


L-Building RALEIGH, NC

Multi-family and commercial infill development around an existing parking deck in downtown Raleigh. I was involved in the development of details, wall sections, the layout of a restaurant, the design of a bus shelter, and the development of the materials needed by the client for marketing. (under construction)

1 A-423

A-411 2

dF d2

EXTERIOR BEARING WALL 2 HOUR RATED

UNIT 2.3

30' - 2 3/4"

EXTERIOR BEARING WALL 2 HOUR RATED

1 A-422

E.O.S

505

509 UP

Trash 509

510

D.W3.D Storage 510

FEC

DN

501c

508

d3

512

Telecom 508 D.W3.D

501B

31' - 1 3/4"

511 FEC Grease Shaft S503 Pipe Chase 2 C502

SHAFT 1 S501

E.O.S

33' - 0"

UNIT 1D.1 UNIT 1.2

The L DAVIE STREET MIXED USE BUILDING 205 W. DAVIE STREET RALEIGH, NC 27601

5 1/2" 2 A-421

F.O.B

42' - 0"

Description

501

FEC 3 A-422

5' - 11 3/4"

Date

1 A-422

5 1/2"

5 1/2"

As indicated

333 Fayetteville Street, Suite 1100 Raleigh, North Carolina 27601

P 919.334.3111 F 919.334.3122 W www.klingstubbins.com

Consultants:

Seals:

5TH FLOOR PLAN MCDOWELL BUILDING B: 7,731 SF STREET WING

SCALE: 1/8" = 1'-0"

2012 KlingStubbins, Inc or LLC

5TH FLOOR PLAN

F.O.B

28' - 5" General Notes: FLOOR PLANS

1

A-105

L3001900

Copyright: Scale:

F.O.B 1 A-423

9' - 1 3/4"

1. SEE SHEETS A-201 THRU A-204 FOR ENLARGED UNIT PLANS 2.ALL WOOD STUD WALLS ARE DIMENSIONED TO FACE OF STUD U.N.O. 3. SEE SHEETS A-500 AND A-501 FOR INTERIOR WALL TYPE DESCRIPTIONS. 4. SEE SHEETS A-400, A-401, A-402 FOR EXTERIOR WALL ENCLOSURE ASSEMBLIES. 5. EACH PIPE CHASE SHALL RECEIVE 2 ACCESS DOORS AT EACH FLOOR LEVEL, TUMBLER LOCKS, 45 MIN. RATED. PIPE CHASES SHALL HAVE RATED FLOOR ASSEMBLY AT EACH LEVEL. PENETRATIONS THRU FLOORS SHALL BE FIRESTOPPED. 6. EACH MECH. SHAFT SHALL RECEIVE 2 ACCESS DOORS AT EACH FLOOR LEVEL, TUMBLER LOCKS, 90 MIN. RATED.

1 HOUR RATED FIRE PARTITION

1 HOUR RATED DWELLING UNIT SEPARATION FIRE PARTITION

2 HOUR RATED FIREWALL

2 HOUR RATED FIRE BARRIER

RATED WALL LEGEND:

2 HOUR RATED EXTERIOR BEARING WALL 3 HOUR RATED STRUCTURAL BEARING WALL

3 HOUR RATED FIRE WALL

Date

12-06-2013 10-29-2013

CONCORD EMPIRE DAVIE STREET, LLC

c/o EMPIRE PROPERTIES 133 FAYETTEVILLE ST 6TH FLOOR RALEIGH, NC 27601

Project Client:

Description

ISSUE FOR CONSTRUCTION ISSUE 1

The L DAVIE STREET MIXED USE BUILDING 205 W. DAVIE STREET RALEIGH, NC 27601

Number

2 1

Key Plan:

NORTH

5 1/2"

5 1/2"

Project No.:

Drawing Sheet Title:

BEARING WALLS ARE 2 HOUR RATED

F.O.B. F.O.B.

36' - 0"

2

19' - 1 1/4"

1

1

A-413

A-413

12-06-2013 10-29-2013

CAD File:

UNIT 2.2

F.O.B

5 1/2"

19' - 2"

1 A-422

UNIT 2.2

UNIT S.3

ISSUE FOR CONSTRUCTION ISSUE 1

Key Plan:

2 A-422

35' - 6 1/2"

DN

28' - 9"

1 A-422

DN

UP

UP

2 A-422

BRACE WALLS PER S4-01 ARE 2 HOUR RATED

504

Stair 2 504

Stair 2 504

UNIT S.3

2 1

3 A-422

FHC

Telecom 507

3 A-422

509

2 A-422

L3001900

As indicated

2012 KlingStubbins, Inc or LLC

5TH FLOOR PLAN

CAD File:

Copyright:

Project No.:

Drawing Sheet Title:

Scale:

A-105

Drawing Sheet Number:

Owner's Drawing Sheet No.:

typical floor plan - condos

Number

UNIT S.2

SHAFT 1 S501

E.O.S

503

Elevator 2 E502

2 A-421

5 1/2"

UNIT 1.1

42' - 0" 244' - 9"

28' - 9"

2 3/4"

5TH FLOOR PLAN DAVIE STREET BUILDING C: 9,919 SF WING

SCALE: 1/8" = 1'-0"

SHAFT 1 S501

2

42' - 0"

1 A-411

5' - 11 3/4"

E.O.S

3 HOUR RATED FIRE WALL

c/o EMPIRE PROPERTIES 133 FAYETTEVILLE ST 6TH FLOOR RALEIGH, NC 27601

507

BRACE WALLS PER S4-01 ARE 2 HOUR RATED 42' - 0"

2 HOUR RATED FIRE BARRIER 2 HOUR RATED EXTERIOR BEARING WALL 3 HOUR RATED STRUCTURAL BEARING WALL

Project Client:

CONCORD EMPIRE DAVIE STREET, LLC

2

UNIT S.1

EXTERIOR BEARING WALL 2 HOUR RATED 42' - 0"

2 HOUR RATED FIREWALL

A-105

F.O.B

UNIT 1.2 HC

SCALE: 1/8" = 1'-0"

DOUBLE ACTION EGRESS DOOR 90 MIN RATED

5 1/2"

UNIT S.2

1 HOUR RATED FIRE PARTITION 1 HOUR RATED DWELLING UNIT SEPARATION FIRE PARTITION

FHC

A-105

3" BUILDING EXPANSION JOINT ON NORTH SIDE OF CMU WALL

FEC

28' - 9"

UNIT 1.1

1 A-422

UNIT S.1

F.O.B

5 1/2"

UNIT 2.1

RATED WALL LEGEND:

5TH FLOOR PLAN DAVIE STREET BUILDING C: 9,919 SF WING

NORTH

5' - 11 3/4"

504 EWA:W1

1 A-422

E.O.S

5 1/2" 2 3/4"

E.O.S

Stair 2 504

UP

EXTERIOR BEARING WALL 2 HOUR RATED

East Corridor 501

5 1/2"

FEC

2

2

SHAFT 1 S501

FHC

DOUBLE ACTION EGRESS DOOR 90 MIN RATED

507

Telecom 507

3" BUILDING EXPANSION JOINT ON NORTH SIDE OF CMU WALL

FEC

DN

BEARING WALLS ARE 2 HOUR RATED

UNIT 2.2

2

1

FEC

A-413

511

28' - 5"

DN

512

F.O.B. F.O.B.

501B

2

501c

UNIT S.3

Storage 512 Storage 511

DN

SHAFT 2 S502

1. SEE SHEETS A-201 THRU A-204 FOR ENLARGED UNIT PLANS 2.ALL WOOD STUD WALLS ARE DIMENSIONED TO FACE OF STUD U.N.O. 3. SEE SHEETS A-500 AND A-501 FOR INTERIOR WALL TYPE DESCRIPTIONS. 4. SEE SHEETS A-400, A-401, A-402 FOR EXTERIOR WALL ENCLOSURE ASSEMBLIES. 5. EACH PIPE CHASE SHALL RECEIVE 2 ACCESS DOORS AT EACH FLOOR LEVEL, TUMBLER LOCKS, 45 MIN. RATED. PIPE CHASES SHALL HAVE RATED FLOOR ASSEMBLY AT EACH LEVEL. PENETRATIONS THRU FLOORS SHALL BE FIRESTOPPED. 6. EACH MECH. SHAFT SHALL RECEIVE 2 ACCESS DOORS AT EACH FLOOR LEVEL, TUMBLER LOCKS, 90 MIN. RATED.

F.O.B

28' - 9"

5 1/2"

5 1/2" 2 3/4"

501

5 1/2"

4 A-611

dF

5TH FLOOR PLAN MCDOWELL BUILDING B: 7,731 SF STREET WING

SCALE: 1/8" = 1'-0"

NEW HM DOOR AND FRAME 90 MIN RATED IN EXISTING 12" CMU 2HR RATED WALL EXISTING RAISED CURB

UNIT S.3

1

CONCRETE TOPPING SLAB AND RAMP AT 1:12 MAX.

9' - 1 3/4"

A-105

5 1/2"

4"Hx6"W CURB ALONG RAMP AND LANDING EDGE

7" BUILDING EJ ALL FOUR SIDES OF OPENING

BRACE WALLS PER S4-01 ARE 2 HOUR RATED

P7: 369.67' V.I.F.

LNDG: 369.90'

Stair 1 503

19' - 1 1/4"

PARTIAL PLAN OF EXISTING ADJACENT PARKING DECK

2

1 A-422 5' - 11 3/4"

General Notes: FLOOR PLANS

2 3/4"

Grease Shaft S503

Pipe Chase 2 C502

2 ACCESS DOORS HIGH & LOW 45 MIN RATED

UNIT 1.1

19' - 2"

NORTH

d3

1 A-413

DN

1 A-421

2 A-421

2

Elev. Waiting 506

2 ACCESS DOORS HIGH & LOW 45 MIN RATED

1 A-421

42' - 0"

1 A-421

UNIT 2.2 UP

33' - 0"

Stair 2 504

1 A-423

275' - 4"

FEC

A-412 1

FHC

18' - 0"

FEC

NORTH

d2

42' - 0"

Elevator 2 E502

Seals:

Elevator 1 E501

2

Elev. Waiting 506

F.O.B

1 A-422

BRACE WALLS PER S4-01 ARE 2 HOUR RATED

UNIT S.2

UNIT 1D.1

Elevator 1 E501

Consultants:

5 1/2"

UNIT S.4

UNIT 1.2

UNIT 1.1

UNIT 1D.1

EWA:W1

Pipe Chase 1 C501 2 ACCESS DOORS HIGH & LOW 45 MIN RATED

3 A-422

2

UNIT 1D.1

EWA:W1

North Corridor 502

2 A-421

North Corridor 502

UNIT S.4

35' - 6 1/2"

2 A-422

Pipe Chase 1 C501 2 ACCESS DOORS HIGH & LOW 45 MIN RATED

EXTERIOR BEARING WALL 2 HOUR RATED

P 919.334.3111 F 919.334.3122 W www.klingstubbins.com

42' - 0"

1 A-421

EXTERIOR BEARING WALL 2 HOUR RATED

508

33' - 0"

A-412 1

EWA:W1

FEC

UNIT S.1

510

244' - 9"

Telecom 508 D.W3.D

Trash 509 D.W3.D Storage 510

33' - 0"

UNIT 1.2 HC

UP

505

UNIT S.1

18' - 0"

UNIT 1.1

1 A-411

DN Stair 3 505

UNIT S.1

333 Fayetteville Street, Suite 1100 Raleigh, North Carolina 27601

36' - 0"

East Corridor 501

UNIT 1.3

42' - 0"

UNIT 2.3

UNIT 1.3

275' - 4"

UNIT S.2

EXTERIOR BEARING WALL 2 HOUR RATED

EXTERIOR BEARING WALL 2 HOUR RATED

42' - 0"

PARTIAL PLAN OF EXISTING ADJACENT PARKING DECK

31' - 1 3/4"

4"Hx6"W CURB ALONG RAMP AND LANDING EDGE

10 1/2" 8' - 2 1/2" 10 1/2"

CONCRETE TOPPING SLAB AND RAMP AT 1:12 MAX.

UNIT 1.1

30' - 2 3/4"

NEW HM DOOR AND FRAME 90 MIN RATED IN EXISTING 12" CMU 2HR RATED WALL

EXISTING RAISED CURB

7" BUILDING EJ ALL FOUR SIDES OF OPENING

Storage 512 Storage 511

UNIT S.1

42' - 0"

71' - 4"

71' - 4"

DN Stair 3 505

P7: 369.67' V.I.F.

LNDG: 369.90'

SHAFT 2 S502

2

10 1/2" 8' - 2 1/2" 10 1/2"

4 A-611

Stair 1 503

DN

42' - 0"

UNIT 2.1

503

Drawing Sheet Number:

A-105 Owner's Drawing Sheet No.:


Lorena Paz Akin. Portfolio 2014

Jacobs/ KlingStubbins Work

8


1 4"

5' - 9" 7' - 7 1/8"

4

A-201 15' - 2 7/8"

7' - 7 1/8"

12' - 7 1/8"

3 1/2"

8' - 0 3/8"

5 1/2"

5 1/2"

M30 A-711

12

1

1 A-721

BEDROOM

12' - 0 5/8"

3/4" 3/4"

15' - 2 7/8"

3/4"

1 1/2"

34 3' - 3" 3 1/2"

0" 2X6

A-201

PLAN, UNIT TYPE 1.2 HC (TYPE A ACCESSIBLE)

The L The L DAVIE STREET DAVIE STREET MIXED USE MIXED BUILDING USE BUILDING 205 W. DAVIE 205 W.STREET DAVIE STREET RALEIGH, RALEIGH, NC 27601 NC 27601

LIVING

17' - 1 1/2"

Description

P

21' - 4 1/2"

12

A-711

8"

28' - 11 1/2"

BRICK VENEER WALL ASSEMBLY BRICK VENEER WALL ASSEMBLY PODIUMPODIUM ROOF ASSEMBLY ROOF ASSEMBLY

5 1/2"

5 1/2"

A-712

KITCHEN

CAD File:

CAD File:

Project No.:

L3001900 Project No.:

Copyright:

Copyright: 2012 KlingStubbins, 2012Inc KlingStubbins, or LLC Inc or LLC

Scale:

Scale: As indicated

L3001900

3 A-460

As indicated

REF.

Drawing Sheet Title: Drawing Sheet Title:

REF.

KITCHEN

5' - 0 3/4"

3 A-460 SIMBATH SIM BATH

1

2

3 3 IN CONC PLACE CONC CAST PLACE 8' - 0IN 3/8"CAST 12' - 4 1/8" 12' - 4 1/8" BROW, STRUCTURAL BROW, SEE STRUCTURAL 20'SEE -A-713 4 1/2" 20' -A-713 4 1/2" 1 1/2" 4

4

MOISTURE RESISTANT MOISTURE RESISTANT GWB CEILING ON METAL GWB CEILING ON METAL STUD FRAMING STUD FRAMING R-19 INSULATION ATTACHED R-19 INSULATION ATTACHED TO SLABTO SLAB

MTL PANEL MTL SPANDREL PANEL SPANDREL

4' - 0"

1

PODIUMPODIUM ROOF ASSEMBLY ROOF ASSEMBLY

A-712

3 A-460

SEALANT SEALANT

SEALANT SEALANT

4' - 0"

12-06-2013 10-29-2013

Key Plan:

P

5' - 4 1/4"

A-711

8' - 0 3/8"

1 1/2" 1 1/2"

ISSUE FOR 2 CONSTRUCTION ISSUE FOR CONSTRUCTION 12-06-2013 ISSUE 1 1 ISSUE 1 10-29-2013

A

UNIT PLANS UNIT PLANS TYPES TYPES S.1 / 1.1S.1 / 1.1 / S.2 / 1.2 / S.2 / 1.2HC / 1.2 // 1.2HC 1.3 / 1.3

VISION GLAZING VISION GLAZING

3/4"

3 A-460

LEVELLEVEL 2 2 37' - 11" 37' - 11"

4"

4"

1 1/2"

Date

34

5' - 4 1/4"

34

2' - 6"

4 1/8"

2' - 6"

2

L 27x12

5' - 0 3/4"

2X6

L 27x12

1

8' - 10 1/8"

28' - 11 1/2"

2' - 0 5/8"

5S/12"D

4"

8' - 10 1/8"

6' - 9"

2' - 0 5/8"

34

6' - 9"

1R/1S

1R/1S 34

1R/1S 2' - 6" 11' - 6"

1

1' - 6"

2X6

2 1

Key Plan: 5S/12"D

Date

A

2' - 7 1/4"

5S/18"D

8 1/2"

1 1/2" L 36X12

L 1' - 8 3/4"

5' - 4 3/4"

Description Number

W/D BRICK VENEER BRICK VENEER WALL ASSEMBLY WALL ASSEMBLY DW DW

W/D

2

1 1

SCALE: 3/8" = 1'-0"

CONCORD CONCORD EMPIRE DAVIE EMPIRE STREET, DAVIELLC STREET, LLC

3/4"

2x6 PLUMBING2x6 PLUMBING WALL 2 WALL

36X12 A-712

1

PLAN, UNIT PLAN, TYPES UNIT TYPES S.1 & 1.1 S.1 W/&TUB 1.1 W/ TUB = 1'-0" 3/8" = 1'-0" A-201 SCALE: A-2013/8"SCALE:

MTL PANEL MTL PANEL SPANDREL BACK BACK SPANDREL PAN BEYOND PAN BEYOND

2' - 7 1/4"

5S/18"D

W.I.C

1R/1S 34

1R/1S

W.I.C

2

BATH

8"

3 3

6' - 10"

1R/1S A-712

12' - 6 3/8" 21' - 4 1/2"

9' - 5"

2 HOUR RATED 2 FIRE HOURBARRIER RATED FIRE BARRIER

1 A-721

LIVING

6' - 10"

2X6

PLAN, UNIT PLAN, TYPE UNIT1.2 TYPE HC (TYPE 1.2 HCA(TYPE A ACCESSIBLE) ACCESSIBLE) = 1'-0" 3/8" = 1'-0" A-201 SCALE: A-2013/8"SCALE:

3

3' - 0 3/4"

c/o EMPIRE PROPERTIES c/o EMPIRE PROPERTIES 133 FAYETTEVILLE 133 FAYETTEVILLE ST ST 6TH FLOOR 6TH FLOOR RALEIGH, NC 27601 RALEIGH, NC 27601 1 A-721

HVAC

BEDROOM

34 12' - 6 3/8"

15' - 2 7/8"

FLASHING 12X36FLASHING 12X36

BATH

1 2X6

3/4"

0"

0"

1 1/2"

HVAC

2X6

KITCHEN

4" 3/4" 9' - 5"

W/D

4' - 0"

1

22

W/D

4' - 0"

1' - 6"

7' - 10 1/8"

2X6 KITCHEN

3' - 0 3/4" 9' - 5"

5' - 4 1/4"

34 5 1/2"

2' - 0"

5' - 4 3/4"

2' - 0"

2' - 8"

DW

4

1' - 8 3/4"

A-711

22 1

3/4" 3/4"

5' - 4"

Sim

3' - 8"

1' - 6"

43

M30

A-711

5 1/2"

3

M30 3' - 1 1/4"

DW

2

1' - 6"

5 A-712

REF.

REF.

1 1 1/2"

12' - 0 5/8" 20' - 8"

3

P

2X6 PLUMBING2X6 WALL PLUMBING WALL

2

2' - 0"

1 HOUR RATED1 DWELLING HOUR RATED UNIT UNIT 6'DWELLING - 4 3/4" SEPARATION FIRE SEPARATION PARTITION FIRE PARTITION 3/4" 11' - 9 1/2" 2 HOUR RATED2 FIREWALL HOUR RATED FIREWALL

Number

1R/1S

P

2' - 8"

W/D

A

3' - 1 1/4"

W/D

1 1/2"

1 1/2"

W/D

5' - 4 1/4"

5S/12"D

P34

A FUR OUT WALL FUR TO OUT WALL TO SAME PLANE AS SAME PLANE AS W/D CLOSET WALL W/D CLOSET WALL

5 1/2"

5 1/2"

1

5S/12"D

34

5S/12"D

CLOSET 1R/1S

REF.

5' - 1 1/2"

3' - 0 3/4"

Sim

3' - 8"

1 1' - 6" 51' - 6" A-460 A-712 SIM SIM

22 1

CLOSET 1R/1S

P

2X6 PLUMBING WALL

1 HOUR RATED 1 FIRE HOURPARTITION RATED FIRE PARTITION

5' - 4"

Project Client: Project Client: 1 1/2"

5' - 4"

5' - 0 3/4"

LIVING

BATHROOM

A-712

11' - 9 1/2"

11' - 1"

1R/1S 5' - 0 3/4"

LIVING

42' - 0"

11' - 1" 5' - 9"

1 A-721

HVAC

11' - 3 3/4"

8' - 9 7/8"

11' - 3 3/4"

BEDROOM

W/D

RATED WALL LEGEND: RATED WALL LEGEND:

3 1/2"

M30

HVAC

8' - 9 7/8"

FUR OUT WALL TO SAME PLANE AS W/D CLOSET WALL

BATHROOM

5' - 1 1/2"

KITCHEN

6' - 11 1/4"

6' - 11 1/4"

1 1 1/2" 3 1/2"

5' - 4"

W/D

KITCHEN

34

KITCHEN

M30

5' - 9"

Sim

BEDROOM

C.

7' - 10 1/8"

5' - 0" 34 4 3/4" 3 1/2" 2' - 10 3/4"

L

16' - 9 3/8"

P34 A-711

CLOSET 1R/1S

3 HOUR RATED3 FIRE HOUR WALL RATED FIRE WALL 42' - 0"

15' - 5 1/8"

8 1/2"

15' - 5 1/8"

1 1/2"

3/4"

36 36 REF.

5 1/2"

2 3/4" 2' - 4 1/8"

4' - 3 3/8"

1 1/2"

2 3/4" 2' - 4 1/8"

2' - 6"

5' - 0" 4 3/4" 3 1/2" 2' - 10 3/4"

36 X12

L

8' - 9 7/8"

2 HOUR RATED 2 EXTERIOR HOUR RATED EXTERIOR BEARING WALL BEARING WALL 3 HOUR RATED3 STRUCTURAL HOUR RATED STRUCTURAL BEARING WALL BEARING WALL

2' - 6"

5' - 4"

1' - 11 5/8"

5S/12"D

28' - 9"

28' - 9"

5' - 11 3/8" 34

34

5' - 11 3/8"

1R/1S

1R/1S 1R/1S

1R/1S

1 1/2"

11' - 7 5/8"

General Notes: General Notes:PLANS UNIT FLOOR UNIT FLOOR PLANS 1. ALL WALL DIMENSIONS 1. ALL WALLARE DIMENSIONS TO FACE OF ARESTUD TO FACE OF STUD U.N.O U.N.O 2. WALL CENTER 2. WALL LINE DIMENSIONS CENTER LINEARE DIMENSIONS TO ARE TO CENTER OF DOUBLE CENTER WALL OF DOUBLE AIR SPACE. WALL AIR SPACE. MW DWSHALL 3. PLUMBING WALLS 3. PLUMBING SHALL WALLS BE 2X6 WALLS.BE 2X6 WALLS. 4. HVAC CLOSET 4. HVAC SHALLCLOSET BE LINED SHALL WITHBE SOUND LINED WITH SOUND INSULATION BOARDS. INSULATION BOARDS. 5. ALL PLUMBING 5. ALL FIXTURE PLUMBING CENTERLINE FIXTURE CENTERLINE DIMENSIONS ARE DIMENSIONS MEASURED ARE TOMEASURED FINISH FACE TOOF FINISH FACE OF 18 A-711 WALL. WALL.

DW

2

20' - 8"

4 1/8"

3/4"

REF.

BATHROOM

1 5 A-460

6' - 4 3/4" 11' - 9 1/2"

36 X12

7' - 10 7/8"

11' - 6"

1 A-721

P34 3/4"

7' - 10 7/8"

3' - 4 1/8"

C.

17

1/2"

1' - 6 1/4"

5' - 4"

2

7' - 10 1/8"

6' - 4 3/4" 3/4"

3" 5" 1/2" 1/2"

36 5S/12"D 3 1/2"

3' - 3"

3 1/2"

34 3' - 3" 36

W/D

KITCHEN

5' - 1 1/2"

LEVELLEVEL 2 2 37' - 11" 37' - 11"

3" 5"

1/2"

DW

P

A-712

1' - 6"

1' - 11 5/8"

36 5S.18"D

36 KITCHEN17

36

A-711

11' - 7 5/8"

1' - 10 1/2"

8' - 0 3/8"

21' - 2"

M30

3' - 1' 4 1/8" - 11 5/8"

36 5S.18"D

5' - 3"

36 17

18

3'36- 11 1/2"

A-711

1' - 4"

BATH A-712 3

17' - 1 1/2"

Sim

1 A-721

HVAC

C.

C.

5S.18"D

18

2' - 6"

2' - 6" BATH

BATH 1' - 10 1/2"

1 3 1/2"

34

2' 3' -- 1" 4 1/8"

C.

DW 3' - 11 1/2"

MW

1R/1S

1R/1S 3' - 0" 2' - 6" 1R/1S

1R/1S 34

3' - 0"

1' - 4"

BATH 3

34

5' - 5 1/2"

3/4"

3/4"

16' - 9 3/8"

2' - 1"

5S.18"D

5' - 3"

REF.

REF. DW

4

1' - 6 1/4"

10' - 9 1/2"

10' - 9 1/2"

13' - 4 1/2"

13' - 4 1/2"

3' - 0"

2' - 6 3/4"

12' - 7 1/8"

M30

M30

HVAC

C.

MW

W/D

2' - 1"

Seals:

34

3 1/2"

LIVING

9' - 8 1/2"

A-712

4

PLAN, UNIT PLAN, TYPES UNIT TYPES S.2 & 1.2 S.2W/ & 1.2 W/ SHOWER SHOWER = 1'-0" 3/8" = 1'-0" A-201 SCALE: A-2013/8"SCALE:

26' - 7 5/8" 3 1/2"

UNIT PLANS LIVING

W/D

M30

15' - 5 1/8"

5' - 5 1/2"

9' - 8 1/2"

3' - 0"

16' - 9 3/8"

15' - 5 1/8"

C. A-712

L 36 X12

P

2 2

26' - 7 5/8" 3/4"

C.

5' - 4"

21' - 2"

4 4

2' - 7 7/8"

2' - 6 3/4" 5' - 4"

3/4"

3/4"

PLAN, UNIT PLAN, TYPE UNIT1.3 TYPE 1.3 = 1'-0" 3/8" = 1'-0" A-201 SCALE: A-2013/8"SCALE: 3/4"

2' - 7 7/8"

1 1/2"

5' - 9"

9' - 2 1/2"

9' - 2 1/2"

2

Sim

BEDROOM

9' - 8 1/2"

5S/18"D

C.

5 1/2"

34 7' - 7 1/8"

2

L 36 X12

W/D

KITCHEN

REF.

REF.

1

5' - 9"

34

34 KITCHEN

C.

34

5' - 9 7/8"

5

5

2

2' - 9 3/8"

REF.

A-711

W/D

1 2' - 10 3/4"

REF.

A-711

23

2' - 10 3/4"

A-711 KITCHEN

4"

4"

1

KITCHEN 6' - 5"

FOYER 6' - 5"

FOYER

A-711

5' - 9 7/8"

3

6

W.I.C

PLUMBING WALL 2x6 PLUMBING2x6 WALL

2' - 9 3/8"

DW

6

10' - 11 3/4"

DW

10' - 11 3/4"

2X6 PLUMBING2X6 WALL PLUMBING WALL

DW

DW

3' - 7 3/4"

W/D

34

34 W/D

3' - 7 3/4"

2X6

W.I.C

P

P

2X6

5' - 0 3/4"

5' - 0 3/4"

6' - 4 1/4"

6' - 4 1/4"

C.

34

1R/1S

C.

1R/1S

11' - 9 1/8"

Seals:

5S/18"D

5S/18"D

1' - 8"

1 1/2"

BATH

1' - 8"1' - 6"

6

1R/1S

1' - 6"

62' - 0"

1 A-721

HVAC

Consultants:

LIVING

11' - 9 1/8"

4' - 3 3/8"

LIVING

LIVING

3/4"

5 1/2"

12' - 7 1/8"

34

34

BATH A-712

A-712

2' - 0"

1R/1S

1R/1S

34 1R/1S

CLOSET

P 919.334.3111P 919.334.3111 F 919.334.3122F 919.334.3122 W www.klingstubbins.com W www.klingstubbins.com

LIVING

2' - 10 3/4"

2' - 10 3/4"

3/4" 5' - 4"

333 Fayetteville333 Street, Fayetteville Suite 1100 Street, Suite 1100 Raleigh, North Carolina Raleigh, North Carolina 27601 27601

36

6' - 6 1/2"

10' - 9 1/2"

13' - 4 1/2"

6' - 6 1/2"

LIVING

10' - 6 1/2"

3' - 11 1/2"

10' - 6 1/2"

BEDROOM

16' - 11 7/8"

12' - 7 1/8"

BEDROOM

5S/18"D

CLOSET

Sim

1 A-721

34

3' - 0 1/4"

34

34

2' - 3' 8 3/4" - 0 1/4"

Sim

1 A-721

HVAC

34

2' - 8 3/4"

12' - 3 5/8"

34

7' - 4"

3 1/2" 3 1/2" 5 1/2" 2' - 4 1/2" 5 1/2" 2' - 4 1/2" 3' - 11 1/2"

16' - 11 7/8"

LIVING

34

7' - 4"

34

5' - 1 1/2"

HVAC

11' - 6 1/4"

11' - 6 1/4"

LIVING

BEDROOM

12' - 3 5/8" 5' - 1 1/2"

Sim

Consultants:

FACE OF 2X6 BEARING FACE OF WALL 2X6 BEARING WALL NOTED ON STRUCTURE NOTED ON STRUCTURE

BEDROOM

1 A-721

3 1/2"

M30

Sim

1 A-721

HVAC

M30

HVAC M30

M30

4 A-721

15' - 5 1/8"

5' - 5 1/2" 5 1/2"

15' - 2 7/8"

5S/12"D

1 1/2"

1 1/2" 5' - 4"

M30

4 A-721

HVAC M30

HVAC

2

A-2

26' - 7 5/8"

11' - 1" 5' - 4"

11' - 1" 5' - 9"

5' - 9"

5S.18"D

15' - 5 1/8"

15' - 5 1/8"

2

5S.18"D

2

7' - 5 1/2"

7' - 5 1/2"

PLAN, UNIT TYPE 1.3

SCALE: 3/8" = 1'-0"

3/4"

3/4"

3/4"

3/4"

Drawing Sheet Number: Drawing Sheet Number:

A-201 A-201

1' - 2"

1' - 2"

IN CONC PLACE CONC CAST INCAST PLACE BROW, SEE BROW, SEE STRUCTURAL STRUCTURAL

Owner's Drawing Owner's Sheet No.: Drawing Sheet No.:

BACK FACE OF BACK FACE OF DROPPED DROPPED GWB GWB CEILINGCEILING BEYONDBEYOND

MTL SPANDREL PANEL SPANDREL MTL PANEL

SPANDREL SPANDREL BACK BACK PAN BEYOND PAN BEYOND

1' - 4"

11' - 5 1/2"

11' - 5 1/2"

42' - 0"

42' - 0"

5' - 3"

18' - 11 1/8"

36

18' - 11 1/8"

3' - 11 1/2"

31' - 6"

1' - 4"

31' - 6"

12' - 5 3/8"

9' - 2 1/2"

5 1/2"

12' - 5 3/8"

2' - 10" 2' - 10"

1' - 0"

1' - 0"

1' - 0"

CEMENTITIOUS CEMENTITIOUS PANEL PANEL TRIM ASSEMBLY TRIM ASSEMBLY

1' - 0"

MISCFOR STEEL FOR MISC STEEL STOREFRONT MIDSPAN STOREFRONT MIDSPAN SUPPORT SUPPORT

STEEL STOREFRONT STEEL STOREFRONT SUPPORT POST, SEE SUPPORT POST, SEE STRUCTURAL STRUCTURAL

VISION GLAZING VISION GLAZING

3' - 1"

LEVELLEVEL 1 1 23' - 5"23' - 5"

1' - 0"

1' - 0"

CONCRETE CONCRETE COLUMN COLUMN INSIDE WRAP INSIDE WRAP

11 A-460

R.O. VARIES, 12'-0" MAX.

STOREFRONT STOREFRONT SUPPORT STEEL, STEEL, SUPPORT SEE STRUCTURAL SEE STRUCTURAL

1' - 0" 11 A-460

ACM PANEL ACMCOLUMN PANEL COLUMN WRAP WRAP

1' - 0"

CEMENTITIOUS PANEL PANEL CEMENTITIOUS TRIM ASSEMBLY TRIM ASSEMBLY

R.O. VARIES, 12'-0" MAX.

1' - 0"

11 A-460

12' - 6"

12' - 6"

STOREFRONT ASSEMBLY STOREFRONT ASSEMBLY

1' - 0"

11 A-460

10' - 8" R.O.

10' - 8" R.O.

VISION GLAZING VISION GLAZING

3' - 1"

LEVELLEVEL 1 1 23' - 5"23' - 5"

VISION GLAZING VISION GLAZING

STOREFRONT WALL ASSEMBLY STOREFRONT WALL ASSEMBLY STEEL POST @CORNER, STEEL POST @CORNER, SEE STRUCTURE SEE STRUCTURE R.O. VARIES, 12'-0" MAX.

STEP UP IN CONC STEP UP INBASE CONC BASE BEYONDBEYOND

VISION GLAZING VISION GLAZING

R.O. VARIES, 12'-0" MAX.

STOREFRONT ASSEMBLY STOREFRONT ASSEMBLY

CEMENTITIOUS CEMENTITIOUS COATEDCOATED CONCRETE CONCRETE WALL WALL

WALL SECTIONS - ENTRY ALCOVE

4"

CEMENTITIOUS CEMENTITIOUS COATEDCOATED CONCRETE CONCRETE WALL WALL

4"

D

REF.


Lorena Paz Akin. Portfolio 2014

EXHAUST DUCTS. TERMINATE BEHIND LOUVER DROPPED SOFFIT TRUNK DUCT

FLEX DUCT CONNECTION

2x4 WALL FRAMED ON THE FLAT

ENTRANCE

VTAC HVAC UNIT

PLENUM

DINING AREA

CONTINUOUS WALL LOUVER

VTAC

WAITING AREA

FLASHING. SLOPED TO DRAIN 7' - 10"

HOSTESS STAND

PLATFORM FRAMING

EXPANSION TANK HUNG FROM PLATFORM

KITCHEN 3' - 9 1/2"

E.T.

WATER HEATER

CONDENSATE DRA

ROOF DRAIN LEAD WHER INDICATE

WATER HEATER

DRAIN PAN

OFFICE

RESTROOMS

PLATFORM

BAR

WOOD FLOOR TRUSS ASSEMBLY

LOUVER WALL ASSEMBLY

6

RESTAURANT LAYOUT- OPTION A

A-721

SECTION, MECH. CLOSET, SIDE ACCESS DOOR

SCALE: 1" = 1'-0"

EXHAUST DUCTS. TERMINATE BEHIND LOUVER DROPPED SOFFIT

WAITING AREA

OPTION 1

HOSTESS STAND

ENTRANCE FACING DAVIE ST.

1 1/2"

TRUNK DUCT

FLEX DUCT CONNECTION

ENTRANCE

FLUSH DOOR WITH LOUVER

VTAC HVAC UNIT

DINING AREA

PLENUM

2' - 7 7/8"

CONDENSATE DRAIN

7' - 6"

FLASHING. SLOPED TO DRAIN 7' - 10"

ROOF DRAIN LEADER WHERE INDICATED

CONTINUOUS WALL LOUVER

VTAC

PLATFORM FRAMING

KITCHEN

COLD WATER FROM ABOVE

HOT WATER FROM ABOVE

EXPANSION TANK HUNG FROM PLATFORM

E.T.

3' - 9 3/8"

WATER HEATER

DRAIN PAN

BAR

PLATFORM 3"

RESTROOMS

3/4"

OFFICE

3' - 3"

3' - 9 1/2"

WATER HEATER

WOOD FLOOR TRUSS ASSEMBLY

LOUVER WALL ASSEMBLY

RESTAURANT LAYOUT- OPTION B

3

SECTION, MECH. CLOSET, FRONT ACCESS DOOR

Mechanical closet detail A-721

SCALE: 1" = 1'-0"

OPTION 2

ENTRANCE FACING MCDOWELL ST.

bus stop sketch

10


SHIP CREEK WATERFRONT REDEVELOPMENT ANCHORAGE, AK

Anchorage, despite being a waterfront city, lacks a true waterfront due to the railroad owning most of the frontage properties and the mudflats that separate Anchorage from the surrounding areas. The new master plan development creates a vibrant and active environment in which the designed spaces are functional in extreme weather conditions. The amphitheater, parking garage and bridges in winter become host to diverse recreational environments such as snowboarding courses and ice climbing walls. I participated in the design and research of this new urban proposal. Selected portions of the final report are featured below.

D

CONNECT DOWNTOWN

TOWN SQUARE

SPACES DOWN-ARTIST performance TOWN CONNECTION

AMPHITHEATER

LINKED NEIGHBORHOODS

URBAN VILLAGE

pedestrian connection

WA A TE TI RF N RO G NT

fer r

y

G

ska WA vie t BO ing LKINws E T C T O R N A N IL E S C

RAFTING

RHIKIN multi-modal viewing CREEKSIDE STREET BIKING ALL SEASONS ACCESS LIVING RESTAURANTS incubation

HOTEL

NARAY H G K MAIN

GE

RD

ID

P L C

LOCAL R POWE

ITNEY D WHR NEP A K EALIGG

TED OU RER CKING TRU

BR

II

SH

W

FE PN

NE

K

A U

T EC NT NN NME CO VER GO L HIL

M AR C SA L


Lorena Paz Akin. Portfolio 2014

Jacobs/ KlingStubbins Work

12


PHASE 3 RECREATIONAL MASTER PLAN

E STREET COMMERCIAL PLAZA


Lorena Paz Akin. Portfolio 2014 ENHANCED PEDESTRIAN CONNECTION ABOVE TRACKS NEW CITY MARKET DENSE DEVELOPMENT ALONG CREEK OPEN SQUARE FOR WINTER SNOW SCULPTURE CONTEST BASE OF SLOPED ROOF PARKING DECK, USED AS A SKIING AND SNOWBOARDING RAMP IN WINTER

NEW MULTIMODAL TRANSIT STATION AND CITY MARKET

VIEW FROM KNIK ARM Residences Parking Office Space Recreation

Residences Office Space Recreation

PHASE II

PHASE II

Residences Parking Office Space Recreation Commerce Civic Building

PHASE III

PHASE I Residences Parking Commerces Recreation

3D PHASING DIAGRAM

PHASE I Residences Parking Commerces Hotel Recreation

PHASE I Fresh Water Marsh Boardwalk

14


Shift house RALEIGH, NC

As part of a housing studio, this project presented the opportunity to collaborate with engineers to enhance the depth of our sustainable concepts and to test them for validity. We decided upon a site in an urban core and chose to provide communal gardens and integrated live/work opportunities adjacent to pedestrian-rich streets.

05 Roof Plan

Bifacial Solar Array Area: 490 sq.ft.

3 1 2

04 Roof Terrace

Interior Area: 238 sq.ft. Exterior Area: 1,198 sq.ft.

1. Terrace with bar and seating area 2. Planting area (herb garden) 3. Balcony overlooking garden

2 6

3

7

5

6

1

4

8

03 Third level: Bedrooms Interior Area: 1,156 sq.ft.

3

2

1. Master Bedroom 2. Bedroom A 3. Bedroom B 4. Master Bathroom 5. Bathroom 6. Storage 7. TV Room 8. Master Walk-in closet

4

8

5

6

7

1

02 Second level: Living Interior Area: 1,045 sq.ft. Exterior Area: 213 sq.ft.

1. Terrace / Entrance 2. Living room 3. Kitchen 4. Dinning 5. Office / Reading Room 6. Powder room 7. Storage/ Laundry room 8. Pantry / Storage


Lorena Paz Akin. Portfolio 2014

shift

H

ouse

community oriented urban living

Graduate Work

16


view from living room

roof terrace/garden

AFFORDABLE MULTI-FAMILY HOUSING

LIVE-WORK UNITS ALONG HIGH TRAFFIC STREETS COMMUNITY CENTRAL GARDEN

RELOCATED PARK WITH BIOSWALES

site plan


Shared geothermal wells provide for 4 dwellings.

ENERGY

Rain-water collection from roof & parking is stored in an underground cistern located beneath the driveway for use in irrigation.

WATER

450 sq. ft. of bifacial solar panels. North facing windows, south facing porch.

Bio-swales between the dwelling and street would filter the contaminats from the water. Herb roof garden would decrease solar heat gain in the roof by acting as insulation. Driveway paved with permeable paving. Vegetation in bio-swales, yard and community gardens reduces heat island effect within the development.

VEGETATION

SOLAR

Lorena Paz Akin. Portfolio 2014

sustainable features diagram

roof terrace/garden

initial sketch

30

%

Narrow footprint

Flex space + 2,200 ft2 home

Adding private shaded exterior spaces + south facing terraces

terial overlap

Volume shifting + Material overlap

Adding private shaded exterior spaces + south facing terraces

Volume shifting + Material overlap

Windows for views and even daylight

Windows for views and even daylight

Windows for views and even daylight

concept evolution section a

18


Wedge house RALEIGH, NC

The Wedge house is an ACCESSORY DWELLING UNIT (ADU) located in Raleigh’s 5 points area. The 645 sq. ft. dwelling draws from the site and through these constraints acquires it’s triangular plan. Despite its small area, it provides a dynamic and comfortable living area with views to its own backyard and to the yard it shares with the existing dwelling.

INITIAL SKETCH

INITIAL SKETCH


Lorena Paz Akin. Portfolio 2014

Graduate Work

20


PLACED ON SITE

ADOPTS “WEDGE” SHAPE OF SITE

OVERHANGS FOR SOUTH FACADE

FORM DIAGRAM RV

ALLEY

FA I

IE

GL

W

WALL FOR PRIVATE ADAPTATION TO GARDEN & THE LANDFORM BEDROOM

EN O WO . VE DA

SITE LOCATION

PROPOSED ADU FAIR

VIE

SITE PLAN

W

EXISTING DWELLING

RD

.

PRIVATE GARDEN

PARKING

BEDROOM

BATH

KITCHEN

LIVING ROOM

BACKYARD


Lorena Paz Akin. Portfolio 2014

2 1

3 4 5

KEY PLAN 1. LIVING ROOM 2. KITCHEN/DINING 3. RESTROOM

6

4. BEDROOM 5. PRIVATE GARDEN 6. DRIVEWAY

BEDROOM VIEW

LIVINGROOM VIEW SUMMER SUN STORM WATER COLLECTION

WINTER SUN

NATURAL VENTILATION

VEGETATION

CISTERN

SECTION A

22


ATION

WASTE HEAT REUSE DINAMIC URBAN DEVELOPMENT DINAMIC URBAN DEVELOPMENT

SPORTATION ROUTES O EXISTING BIKE NETWORK.

THE HEAT AN WASTE CREATED BY RESTAURANTS AND MARKETS CREATING AND URBAN DURING CREATING ANACTIVE ACTIVE ANDDINAMIC DINAMIC URBANENVIRONMENT ENVIRONMENT DURINGTHE THE WILL BE REUSEDTO HEAT DWELLINGS. STADIUM SEASON OFF SEASON. STADIUM SEASONAND AND OFF SEASON.

VIKINGS STADIUM NATURE NATURE THE OPEN SPACE SURROUNDING THE STADIUM WILL REMAIN ACTIVE

1st Place Regional ULI, National Honorable mention in Gerald D. Hines Student Competition 2013

MENT

AMIC URBAN ENVIRONMENT DURING THE ASON. ASON.

place for numerous events to occur, such open green space.

AUSE NETWORK OF GREEN INFRASTRUCTURE CAPTURES STORMWATER, USE OF TO FILTRATE STORM BEFORE DRAINING OFVEGETATION VEGETATION TOOFF FILTRATE STORMWATER WATER BEFORE DRAINING REEITHER IS DURING OR SEASON. DUCES ISLAND EFFECT, PROVIDES AMENITIES. TO MISSISIPPI RIVER AND REDUCING THE HEAT TOTHE THEHEAT MISSISIPPI RIVER ANDAND REDUCING THERECREATIONAL HEATISLAND ISLANDEFFECT. EFFECT.

MASTER PLAN Design and Development Plan SUSTAINABLE SUSTAINABLEENERGY ENERGY

Living in Place is a development with a m the Minneapolis population. The commun spaces, interconnected by greenways from DISTR It is a neighborhood with appeal at DAILY every sional life; a retirement community for an tre; a starter home for a newlywed couple Living in Place is a development with a mixed population of young adults, families, and senior citizens representing a cross-section of streetscapes; a family-oriented the Minneapolis population. The community provides amenities such as a charter school, multiple food venues, retail and commercial neighbor MINNEAPOLIS, MN spaces, interconnected by greenways from the riverfront and the Mill District to Elliot Park. scape surrounding the stadium. It is a life It is a neighborhood with appeal at every stage of life, - a transitional point for a college graduate excited and eager to start a profes-

TE STORM WATER BEFORE DRAINING REDUCING THE HEAT ISLAND EFFECT.

PRODUCING PRODUCINGENERGY ENERGYON ONSITE SITEFROM FROMSUSTAINABLE SUSTAINABLESOURCES. SOURCES.

WASTE WASTEHEAT HEATREUSE REUSE

HEAT CREATED AND THE HEATWASTE WASTE CREATEDBY BYRESTAURANTS RESTAURANTS ANDMARKETS MARKETS Our proposal for Downtown THE East embraces the Vikings Stadium and allows it to play a vital role towards the cultivation and continuation ROM SUSTAINABLE SOURCES. WILL WILLBE BEREUSEDTO REUSEDTOHEAT HEATDWELLINGS. DWELLINGS. of urban life in Minneapolis.VIKINGS VIKINGSSTADIUM STADIUM THE THEOPEN OPENSPACE SPACESURROUNDING SURROUNDINGTHE THESTADIUM STADIUMWILL WILLREMAIN REMAINACTIVE ACTIVE RESTAURANTS AND MARKETS Recognizing its central location the surrounding district, the stadium no longer sits as an isolated monument, disconnected from EITHER DURING SEASON. EITHERIS ISwithin DURINGOR OROFF OFF SEASON. LLINGS. the city fabric. It becomes a catalyst for cross-cultural pollination. NG THE STADIUM WILL REMAIN ACTIVE An extensive pedestrian and bicycle bridge wraps around the stadium and over the freeway, connecting cultures and communities furSON. ther to the east, allowing Downtown East to be more active throughout the year. The stadium becomes a marker, a destination point, a place for numerous events to occur, such as festivals, parades, and winter recreational activities on the expansive, sculpted terrain and open green space.

11th AVE S.

Living in place 77

1 am 3 am 5 am 7 am 9 am

sional life; a retirement community for an elderly couple sharing a love for the arts and attending weekend shows at the Guthrie Theatre; a starter home for a newlywed couple, able to walk to work in the morning and stroll in the evenings along pedestrian-oriented streetscapes; a family-oriented neighborhood where children attend a neighborhood school, and anticipate snow tubing in the land5 scape surrounding the stadium. It is a life-cycle 6neighborhood embraces the Vikings Our proposal for the Downtown Eastcommunity.

11 am 1 pm 3 pm 5 pm

The Armory, a prominent historical buildi3 2 tial and retail buildings. It also houses th Stadium and allows it to play a vital role towards the cultivation and FINANCES The Armory, a prominent historical building, marks the midpoint of a pedestrian-oriented axis, which is flanked by mixed-use residenganic goods. A holistic green infrastructu continuation of urban life in Minneapolis. central location tial and retail buildings. It also houses the local farmersRecognizing market with freshits produce and small shops within selling local products and orthe surrounding district, the stadium no fingers”, longerconsisting sits as of anbio-swales, isolated monument, ganic goods. A holistic green infrastructure of “green retention ponds, and green roofs, run parallel to the proposed built environment as wel to the proposed built environment well as to existing city streetscapes. These green fingers not only aesthetically enhance the disconnected from the cityas fabric. It the becomes a catalyst for cross-cultural Downtown East district, but also slow down water run off reducing pollutants and toxic sediments from entering the Mississippi Downtown East district, butRiver. also slow dow pollination. Thoughtfully interspersed within the development, commercial and public places act as a “buffer” from crowds emerging from the Thoughtfully within the deve The stadium axis, also a green boulevard accommodating a wide variety of retail and entertainment locales, provides various Anstadium. extensive pedestrian and bicycle bridge wraps around the stadium and interspersed 2 destination points for tourists and residents alike to enjoy before, during, and after community and sporting events. over the freeway, connecting cultures and communities further to the east stadium. Theand stadium axis, also a green b allowing Eastacting to bealongside more active throughout the year. The stadium The LivingDowntown in Place community, the Vikings Stadium, will enhance the Downtown East area and truly become a new 16 destination points for tourists and residen NG STRATEGY model of urban living. 1 7 pm 9 pm

6

44

3

11 am

5

2

88

33

23 23

22

4,000,000

99

10 10

11 11

12 12

3,000,000

24 24

2,000,000

22

2

16 16

1,000,000

13 13

becomes a marker, a destination point, a 14place for festivals, parades, and 21 winter recreational activities on the sculpted terrain and open green space. 21

2015

22 22

1

16

2016

11

14

Financing Plan

RESOURCE

The Living in Place community, acting alo 22 The retrofitted Armory is one of the main destination points in our proposal. Its model interior is renovated to house a farmers market on the of urban living. 287,304 21 Marcy-Holmes

Waste to Energy 20 20 Facility

22

21

Dinkytown lower level with permanentHOTEL locations for specialized local shops located on the mezzanine15above. The Armory, along with a wide selec18 57,000 RECREATION Downtown West tion of food venues, eliminates the “food desert” in Downtown East, and encourages people to spend time in the area after work or after 16 Mill District 762,034 HOUSING games. 15

Baseball & Basketball Stadiums

23

18

16

Financing Plan

731,114 RETAIL Armory Within the first year ofTheconstruction, we not only refurbish the Armory and create new housing, but also construct a charter elementary University of 20 Minnesota 2,046,956 20 PARKING school, to be rented out with a 20-year lease, which will attract young families to the neighborhood. Located adjacent to the proposed East Bank Metrodome ofcome into the area or downtown for work. New retail and office space prolight rail stop, drop-off by parents will be convenient as University they Stadium Minnesota PHASE West Bank 1 vide a buffer for the residential areas, particularly on special event days. With the completion of the Vikings stadium in 2016, a five star Cedar Riverside hotel is designed overlooking the proposed tailgating space and with a direct view to the stadium. The hotel will accommodate incomElliot Park ing fans making this a destination for the weekend, and not just for a day. 23 18 Changing the stadium from an isolated monument surrounded by seas of parking, the Living in Place development integrates the sta18 PARTI DIAGRAM Ventura Villageof the community. The ambitious nature of the design will set new expectations for 21st century dium into the culture and liveliness LEGEND downtown stadiums. WINTER ON THE FIFTH STREET BOULEVARD BUILDING USE + MASSING LEGEND

1

Downtown East

STADIUM PLAZA

THE ARMORY

The retrofitted Armory is one of the main lower level with permanent locations for SEASONAL tion of food venues, eliminates the “food games. COMMUNITY GARDEN DAY

1,117,555

SPRING

19 19

17 17 OFFICE

17 17

14 The neighborhoods created through this scheme become an attraction for all people living within the city of Minneapolis. There is the ARMORY VILLAGE AND PARK 15 PEDESTRIAN 19garden near the homeless shelter to strength1,108,320 skyscraper lifestyle for some, more affordable housingBRIDGE for others, and even a community19 HOTEL 3 BIOFILTRATION WETLANDS 16 ATHLETIC en the community. With the garden at this location,PERFORMANCE the membersCENTER of the shelter can tend the garden and then sell excess produce at the RECREATION 4 CAFE HEALTHnear CARE CLINICS 17 located 1,935,104 market in the Armory. AHOUSING three star hotel the new clinic area for specialists and the existing hospital makes staying with 5 MIXED-USE RETAIL + RESIDENTIAL CARE CLINICS 18 HEALTH 1,912,499 loved ones easier while receiving necessary services and treatments. OFFICE 2

Within the first year of construction, we n school, to be rented out with a 20-year le 6 MIXED-USE RETAIL + RESIDENTIAL AFFORDABLE HOTEL 19803,515 7 HISTORIC LOCK SWIM PARK light rail stop, drop-off by parents will be AFFORDABLE 2,046,956 Examining the existing area consisting 20 of mass surfaceRESIDENTIAL parking lots and some businesses, the future value with no development occur8 MIXED-USE RETAIL + RESIDENTIAL ring would be $38,833,722. In Phase 1 21 we AFFORDABLE have createdRESIDENTIAL multiple residential, office, retail space, school, and retrofitted the Armory. In a buffer for the residential areas, par MIXED-USE RETAIL + RESIDENTIAL 9 Phase PHASE 2 for the specialtyvide HIGH RISE,and TOWER: MIXED-USE 2, we built the skyscraper, a three hotel a space health clinics. For Phase 3, we complete the area with 22 star CHARTER SCHOOL 10anK-5 RETAIL, OFFICE + RESIDENTIAL athletic performance center, community garden, and affordable housing. We’ve financed development ofoverlooking 30.44 million square the propose hotel isthedesigned MIXED-USE GROCER + OFFICE EXISTING BUILDING IN UNDEVELOP11feet 23 from with 70% from loans and 30% equity the existing land, $55,051,300, and cash, $245,222,471. Even with the cost of this develABLE PARCEL (TYPICAL) LUXURYat HOTEL 12opment $907,956,882, the Net Present Value of the project is $208,917,106 our design we are not onlya bringing in more ing. With fans making this destination for the 24 BUILDING PROPOSED FOR FUTURE TRAIN STATION 13housing, both market rate and affordable, but new jobs with office space, retail, and amenities, and integrating the area as a cohesive VISION (TYPICAL) Changing the stadium from an isolated m community for all. RETAIL

PARKING

HOUSING (RENTAL & FOR-SALE)

OFFICE

AFFORDABLE HOUSING

OPEN SPACE

HOTEL

SCHOOL

RETAIL

PARKING (SURFACE+STRUCTURED)


h as festivals, parades, and winter recreational activities on the expansive, sculpted terrain Lorena Paz Akin. Portfolio 2014

7 mixed population of young adults, families, and senior citizens representing a cross-section nity provides amenities such as a charter school, multiple food venues, retail and commerc m the riverfront and the Mill District to Elliot Park. stage of life, - a transitional point for a college graduate excited and eager to start a profes n elderly couple sharing a love for the arts and attending weekend shows at the Guthrie Th e, able to walk to work in the morning and stroll in the evenings along pedestrian-oriented rhood where children attend a neighborhood school, and anticipate snow tubing in the land 5 e-cycle community. 6 7

5

6

44

88

33ing,

marks the midpoint of a pedestrian-oriented axis, which is flanked by mixed-use resid he local farmers23market with fresh produce and small shops selling local products and or9 ure of “green fingers”, consisting of10bio-swales, retention ponds, and green roofs, run para 11 ll as to the existing city streetscapes. These green fingers not only aesthetically enhance th 12 24 sediments from entering the Mississippi Riv wn water run off reducing pollutants and toxic elopment, commercial and public places act as a “buffer” from crowds emerging from the boulevard accommodating a wide variety of retail and entertainment locales, provides vario nts alike to enjoy before, during, and after community and sporting events. 23

9

10

11

12

24

13 13

ongside the Vikings Stadium, will enhance the Downtown East area and truly become a new 14 14

n destination points in our proposal. Its interior is renovated to house a farmers market on specialized local shops located on the mezzanine15above. The Armory, along with a wide s desert” in Downtown East, and encourages people to spend time in the area after work or 15

16 16

not only refurbish the Armory and create new housing, but also construct a charter elemen ease, which will attract young families to the neighborhood. Located adjacent to the propos e convenient as they come into the area or downtown for work. New retail and office space rticularly on special event days. With the completion of the Vikings stadium in 2016, a five ed tailgating space and with a direct view to the stadium. The hotel will accommodate inco e weekend, and not just for a day. Graduateintegrates Work 24 s monument surrounded by seas of parking, the Living in Place development the


OTHER RECREATION INDUSTRIAL INFRASTRUCTURE HOUSING OFFICE RETAIL

02% 02% 02% 02% 05% 14% 03%

66%

PARKING

CURRENT SITUATION

14%

HOTEL RECREATION

02%

32%

HOUSING

27%

OFFICE

18%

RETAIL PARKING

07%

PROPOSED AREA

MINNEAPOLIS URBAN AREA

SUMMER SUN STORM WATER COLLECTION

WINTER SUN

GREEN ROOF/ COMMUNITY GARDENS

SIDEWALK W/ BICYCLE LANE

NATURAL VENTILATION

BIOSWALE

PERMEABLE PAVING RETAIL

DIAGRAMMATIC STREET SECTION

COURTYARD

PORTLAND AVE.

5th AVE. SOUTH

VIEW FROM HOUSING TO THE ARMORY

RETAIL

RETAIL

OPEN SPAC


.B RID

GE

Lorena Paz Akin. Portfolio 2014

3rd AV E

WASHINGTON AVE.

B.L. 16

HOTEL

RI

DG E

7th ST. N

RC HB

RECREATION

762,034

HOUSING

ST ON

EA

B.L. 19&5

287,304 57,000 1,117,555

OFFICE

731,114

RETAIL

2,046,956

PARKING

PHASE 1

1,108,320

HOTEL

CEDAR ST

HIAWATHA LINE LIGHT RAIL

MN HWY 55

11th AVE.

BUS 19 & 5

PORTLAND ST.

3rd AVE. S.

BUS LINE 16/ PEDESTRIAN BRIDGE

RECREATION

1,935,104

HOUSING

1,912,499

OFFICE

803,515

RETAIL

2,046,956

PARKING

PHASE 2

TRANSPORTATION DIAGRAM

1,204,088

HOTEL RECREATION

175,063 3,128,214

HOUSING

1,898,242

OFFICE

1,671,589

RETAIL

2,046,956

PARKING

PHASE 3

HOUSING (RENTAL & FOR-SALE)

OFFICE

AFFORDABLE HOUSING

OPEN SPACE

HOTEL

SCHOOL

RETAIL

PARKING (SURFACE+STRUCTURED)

LAND USE DIAGRAM

LARGER VISION PLAN

TO WASTE TO ENERGY FACILITY

1.5 MILES AWAY

ROOF WATER COLLECTION CAPTURE AND FILTER STORM WATER RUNOFF FOR USE IN IRRIGATION FOR LANDSCAPE, TOILETS AND CROPS

WASTE HEAT

HEAT FROM RESTAURANTS INSIDE THE STADIUM IS CAPTURED TO HEAT WALKWAYS IN FRONT OF THE STADIUM.

THE “ARMORY”

REVITALIZED AS A MARKET WHERE THE COMMUNITY COULD ALSO SELL THEIR PRODUCE.

COMPOST

ORGANIC WASTE COMPOSTS IN PLACE, CHEMICAL REACTION HEATS WATER AND FINAL COMPOST IS USED IN ROOFTOP COMMUNITY GARDENS.

26


Nomination for the AIA Scholarship Award

2013

JENKINS CRAFT CENTER MILL RUN, PA

Light, Shadow, And Movement Emerging From The Ground And Extending A View To The Horizon. As A Response To Site, This Building Represents An Attempt To Flip The Duality, Or To Subvert The Normal Relationship Between The Building And Site. As The Building Houses The Creation Of Craft And Art, I Decided To Reduce The Site To Art: Light, Shadow, And Movement.

AFT C

ENTE

R

TR A

IL

parking

TISSU

PE

NI NS

UL

A

E LN

to fallingwater

.

MILL

TO CR

RUN

RD.

The Ground Plane Is Harnessed As Inseparable From The Building’s Core Movement.


Lorena Paz Akin. Portfolio 2014

Graduate Work

28


gallery view

Section model

Transversal Section A

painting studio view

1st level plan

gallery section

LONGITUDINAL SECTION: GALLERY SCALE 1/8”-1’0” JENKINS CRAFT CENTER, MILL RUN, PA

Helical Wind Turbine

Functions in wind from any direction Functions in turbulent or gusty winds Rated power of 1.5 kW 672,533 kbtu/year produced with 15 turbines, 60% of electricity needed Return on investment in 6 years

1 PV Panels + Solar water

2

395 PV panels installed 518,833 kbtu/year produced 47% of electricity needed Return on investment in 1.5 years

Earth Sheltered Cons

53% of the center is sh

SUSTAINABLE FEATURES SECTION


Lorena Paz Akin. Portfolio 2014

VIEW FROM BENEATH THE GALLERY

1/16” MODEL PHOTOGRAPH

Living Roof

Local Plants and soil covering the roof insulate the building Irrigated with collected rain water exterior gallery

entrance

s. courtyard

struction

heltered (19,799 sq. ft.)

painting studio

lightwell

seminar room

Geothermal Heating + Cooling

administration

inverter

switch board

The geoexchange system circulating a mix of water and antifreeze through 64 Deep wells;

72˚ 45˚

mechanical room heating and cooling equipment pumps

300’ 55˚

extra 7% of energy produced would go to the grid creating a revenue of $4 every month meter

Stable earth Temperature 55˚

30


THE AUDUBON SOCIETY RESEARCH FACILITY

11

CURRITUCK, NC

The Audubon society research facility is located in the Outer Banks of North Carolina. Due to global warming, sea level rise threatens to flood nearly the entire site in the next 50 years. Knowing this and due to the historic nature of the current complex, I decided to place the building in the highest point of the site, which is also a clearing surrounded by native vegetation. The form is derived from the scientific process used to study and store water and living samples.

SEA LEVEL RISE DIAGRAM

EA LEVEL RISE DIAGRAM_

40 year prediction (4’ rise)

n

100 year prediction (6’ rise)

5 1 6 4

2

3 1. 2. 3. 4. 5. 6. WINDS, ACCESS AND RELATIONSHIP WITH EXISTING CAMPUS

LOCATION DIAGRAM_

Research center

Dwellings

Hunting lodge

Guide’s Cottage

Mickey Cottage

Lookout

n

8


Lorena Paz Akin. Portfolio 2014

7

9

10 6

5

3

3

4

2 1

12

Graduate Work

32


SKETCH

ENTRANCE VIEW

SECTION A-A_ scale 1/8”=1’ 4

SITE SECTION


Lorena Paz Akin. Portfolio 2014

NORTH ELEVATION

SECTION THROUGH COMMONS

RESEARCHER’S RESIDENCE

34


WASTE CONVENIENCE CENTER RALEIGH, NC

The Wake County Recycling and Solid Waste Convenience Centers are trash and recycling drop off stations scattered throughout Wake County and are used every day by thousands of county residents. Typically, 1 to 3 county workers operate each station at a given time and their responsibilities include directing people to the proper waste bins and watching over the grounds so that no one is hurt or removes any of the recycling from the collection area. The Convenience Center Huts (CCHs) are shelters that provide the workers with protection from the elements, a small workspace and an area to prepare and store food. Most of the county’s 11 current CCHs are dilapidated and use large amounts of energy for heating and cooling despite their small size. The goal of the Summer 2010 design-build studio at North Carolina State University was to replace the buildings in 3 of the sites.

SITE PLAN


Lorena Paz Akin. Portfolio 2014

RENDERED VIEW

14'-0” 13'-8" 8'-01 2"

5'-71 2"

6'-9"

1'-3"

1'-10 1 4"

3'-6"

6'-0” 8'-0”

4'-83 4"

6'-0”

OFFICE 3'-0”

13'-6"

11"

PLAN

Final Render. Entrance View 1'

ARCHITECTURAL PLAN 2

NORTH 1

A5.2

A5.2

5

A5.2

4

A5.2

6

A5.2

6

A5.2

3

A5.2

SECTION A

Graduate Work

36


CONSTRUCTION PROCESS


Lorena Paz Akin. Portfolio 2014

Sliding chair SPRING 2011

Fabricated by myself from Birch bending plywood with Walnut and Maple lumber accents. There was no need for any hardware as it was my intention to explore and study wood connections.

initial sketch

connection detail

Graduate Work

38


CONTACT INFORMATION (919) 840 8806

@

LOrenapazakin@gmail.com

218 Idlewild Ave., Raleigh, NC 27601


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.