+ EDUCATION 2010-2013 North Carolina State University (NCSU) Raleigh, NC
Master of Architecure. January 2010 – May 2013
2001-2006 Autonomous University of Chiapas (UNACH)
Tuxtla Gutiérrez, Chi- apas México
Mexico Bachelor’s Degree Received 2007 Major Field of Study: Architecture August 2001 - December 2006
+ EMPLOYMENT HISTORY 05/2013-CURRENT KLING STUBBINS ARCHITECTURE / JACOBS GBN
Raleigh, NC Architectural Intern: Urban Planning, Multi family & Commercial design.
07/2013-CURRENT LEAVE AND RECEIVE Raleigh, NC Art Director.
04/2013 TONIC DESIGN- TONIC CONSTRUCTION
Raleigh, NC Design and 3D modelling of Town House Development in Durham, NC
05/2013 ADVANCED ENERGY
Raleigh, NC Translation of HVAC installation manual and webinars
2012 - 2014 KIRWAN ARCHITECTURE
Raleigh, NC CAD Drawings of Olson residence addition project; Renderings of Boylan-Pearce Building Renovation.
2012, 2014 HH ARCHITECTURE
Raleigh, NC Renderings of Tuskeegee University Student Housing project and Davie Street Presbyterian Church.
07/2011 FRANK HARMON ARCHITECT, PA
Raleigh, NC 3D model and renderings for Riverworks project
Spring 2011 NORTH CAROLINA STATE UNIVERSITY
Raleigh, NC Research Assistant for Professor Patricia Morgado’s research on the Anahuacalli Museum and Pablo Neruda’s Home. Illustrations for published articles
Fall 2010, 2011 NORTH CAROLINA STATE UNIVERSITY
Raleigh, NC Teaching assistant in Patricia Morgado’s drawing class for entering MArch students, track 3.
11/2009-CURRENT SPANGLISH UNLIMITED, INC. Raleigh, NC
Contract translator for: Training documents, Legal documents, Promotional material, and more.
2008 CONSEJO DE MEXICANOS EN LAS CAROLINAS (Mexican Council in the Carolinas)
Raleigh, NC
2008
Raleigh, NC
03-05/2007
Fort Bragg, CA
2006-2007
TGZ, Mexico
2004-2007
TGZ, Mexico
2001-2003
TGZ, Mexico
Graphic Design: Winning Logo
TARANTINI
Graphic design: Logo, business cards, menu cards, catering menu, marketing
LEVENTHAL, SCHLOSSER & NEWBERGER ARCHITECTS Internship: CAD Drafter on multiple residential projects
BIOARQ
Residential design (In collaboration w/ Architect Carlos Gordillo); “CIATES” veterinarian office remodel design.
IIUSA GENERAL CONTRACTOR
Construction Supervisor & drafter for public projects, including schools and urban parks.
POINT LINE GRAPHIC DESIGN OFFICE
Graphic Designer: Logos, office marketing materials, Nuestra Belleza Chiapas 01’ propaganda, gift
2001-2007 cards, etc TGZ, Mexico
VOLUNTEER EXPERIENCE
Remodel of Veterinary School’s Facilities. Design of a clinic and teaching facilities using the structure of an unfinished building. Mexican Annual Telethon. Fund raiser for non- profit organization intended to build the required facilities for handicapped children’s physical therapy. ZOOMAT (local zoo). Assistant to lead biologists in field research.
2014 portfolio
FLUENT
ENGLISH
SPANISH
MICROSOFT OFFICE QGIS
RENDER[in]
ECOTECT
INDESIGN
ILLUSTRATOR
PHOTOSHOP
SKETCHUP
REVIT
AUTOCAD
+ SKILLS
GOOD BASIC
+ SPECIAL RECOGNITION • RECIPIENT OF THE ARCHITECTURE FACULTY AWARD FOR DESIGN ACHIEVEMENT IN THE M.ARCH. PROGRAM IN HONOR OF THE EMERITUS FACULTY OF THE DEPARTMENT • NATIONAL HONORABLE MENTION IN GERALD D. HINES STUDENT URBAN DESIGN COMPETITION & FIRST PLACE IN THE REGIONAL ULI COMPETITION • NOMINEE FOR AIA TRIANGLE SCHOLARSHIP • CITY CAMP WINNER: RGREENWAY(proposal and design). Development of an interactive guide for Raleigh’s Greenway System. • CONSEJO DE MEXICANOS EN LAS CAROLINAS: Designer of winning logo
+ REFERENCES • FRANK HARMON, FAIA frank@frankharmon.com Principal at Frank Harmon Architect, PA (919) 829.9464 • ROBIN ABRAMS, PhD, AIA, ASLA robin_abrams@ncsu.edu Head of the School of Architecture (919) 515.8350 • DAVID HILL, AIA Associate Professor of Architecture
dhill@ncsu.edu (919) 515-8357
• VINCENT PETRARCA, AIA Principal at Tonic Design & Tonic Construction
vincent@tonic.com (919) 803.4278
• ALICIA KIRWAN, AIA ak@kirwanarchitecture.com Principal at Kirwan Architecture (919) 820.2404 CONTACT INFORMATION (919) 840 8806
@
LOrenapazakin@gmail.com
218 Idlewild Ave., Raleigh, NC 27601
01
KLING STUBBINS/ JACOBS 2014 NCSU PLANT SCIENCES BUILDING
05
KLING STUBBINS/ JACOBS 2014 BLUE CROSS BLUE SHIELD NC CAMPUS
07
KLING STUBBINS/ JACOBS 2013 THE L-BUILDING
11
KLING STUBBINS/ JACOBS 2013 SHIP CREEK WATERFRONT MASTERPLAN
15
SHIFT HOUSE
19
THE WEDGE HOUSE
TABLE OF CONTENTS
23 NATIONAL HONORABLE MENTION & REGIONAL 1ST PLACE
GERALD D. HINES STUDENT URBAN DESIGN COMPETITION
27
JENKINS CRAFT CENTER
31
AUDUBON SOCIETY RESEARCH CENTER
35
RECYCLING AND SOLID WASTE CONVENIENCE CENTER
38
THE SLIDING CHAIR
NCSU PLANT SCIENCES BUILDING RALEIGH, NC
The building (190,000 GSF) is organized across four levels with a rooftop greenhouse. From the Oval Drive entrance, users will enter at the 2nd Level and will have immediate access to a Flexible Conferencing area as well as Corporate and Research Laboratories. The lower level daylights to the south of the site and will contain Labs, Growth Chambers, Loading, and Mechanical Spaces. Levels 3 & 4 are occupied with Labs, both Corporate and Research. The Roof houses the Greenhouses, as well as Process Labs, Head Houses, and Mechanical areas. The planning diagram is comprised of two L-Shaped Laboratory & Office wings, wrapped around a central atrium space. the Atrium will serve as both a circulation and collaboration zone. Labs and Offices are arranged to maximize interaction both between the wing and between levels and allowing for maximum day lighting opportunities. Pedestrian movement through the building is encouraged at the 2nd Level, in keeping with the Master Plan Concepts. I participated in the design and production, including schematic layout, renderings, and assembly of the materials needed to begin fundraising efforts.
TYPICAL FLOOR LAYOUT
Lorena Paz Akin. Portfolio 2014
Jacobs/ KlingStubbins Work
2
1
1
ROOF
2 3
2
5
2
3
ROOFTOP GREENHOUSE LAB
4
4TH
2 3
2
5
2
3 4
3RD
ATRIUM VIEW 2 8
3 5
2
3 4
2ND 2 3
5
7
2
1. GREENHOUSE 2. RESEARCH LAB 3. OFFICE CLUSTER 4. CORPORATE SUITE 5. ATRIUM 6. GROWTH CHAMBERS 7. MECHANICAL 8. FLEXIBLE CONFERENCING 9. LOADING / SERVICE YARD
site plan
6
1ST
Lorena Paz Akin. Portfolio 2014
section a
4
Blue Cross Blue Shield, North Carolina Campus Durham, NC
Main North Carolina Campus expansion for Blue Cross Blue Shield, including master plan development, partial demolition, interior renovation of 2 existing buildings, and design of a new office building and parking garage. I participated in the master plan creation and construction process diagrams, the design of the ¨skin set for the renovation of building UP-400, coordination with other disciplines, and producing the final permit set for the review of the project architect. I also produced parts of the construction documents for the parking deck and facade studies for the new building. (under construction)
MAIN ENTRANCE PERSPECTIVE
Lorena Paz Akin. Portfolio 2014
Jacobs/ KlingStubbins Work
6
L-Building RALEIGH, NC
Multi-family and commercial infill development around an existing parking deck in downtown Raleigh. I was involved in the development of details, wall sections, the layout of a restaurant, the design of a bus shelter, and the development of the materials needed by the client for marketing. (under construction)
1 A-423
A-411 2
dF d2
EXTERIOR BEARING WALL 2 HOUR RATED
UNIT 2.3
30' - 2 3/4"
EXTERIOR BEARING WALL 2 HOUR RATED
1 A-422
E.O.S
505
509 UP
Trash 509
510
D.W3.D Storage 510
FEC
DN
501c
508
d3
512
Telecom 508 D.W3.D
501B
31' - 1 3/4"
511 FEC Grease Shaft S503 Pipe Chase 2 C502
SHAFT 1 S501
E.O.S
33' - 0"
UNIT 1D.1 UNIT 1.2
The L DAVIE STREET MIXED USE BUILDING 205 W. DAVIE STREET RALEIGH, NC 27601
5 1/2" 2 A-421
F.O.B
42' - 0"
Description
501
FEC 3 A-422
5' - 11 3/4"
Date
1 A-422
5 1/2"
5 1/2"
As indicated
333 Fayetteville Street, Suite 1100 Raleigh, North Carolina 27601
P 919.334.3111 F 919.334.3122 W www.klingstubbins.com
Consultants:
Seals:
5TH FLOOR PLAN MCDOWELL BUILDING B: 7,731 SF STREET WING
SCALE: 1/8" = 1'-0"
2012 KlingStubbins, Inc or LLC
5TH FLOOR PLAN
F.O.B
28' - 5" General Notes: FLOOR PLANS
1
A-105
L3001900
Copyright: Scale:
F.O.B 1 A-423
9' - 1 3/4"
1. SEE SHEETS A-201 THRU A-204 FOR ENLARGED UNIT PLANS 2.ALL WOOD STUD WALLS ARE DIMENSIONED TO FACE OF STUD U.N.O. 3. SEE SHEETS A-500 AND A-501 FOR INTERIOR WALL TYPE DESCRIPTIONS. 4. SEE SHEETS A-400, A-401, A-402 FOR EXTERIOR WALL ENCLOSURE ASSEMBLIES. 5. EACH PIPE CHASE SHALL RECEIVE 2 ACCESS DOORS AT EACH FLOOR LEVEL, TUMBLER LOCKS, 45 MIN. RATED. PIPE CHASES SHALL HAVE RATED FLOOR ASSEMBLY AT EACH LEVEL. PENETRATIONS THRU FLOORS SHALL BE FIRESTOPPED. 6. EACH MECH. SHAFT SHALL RECEIVE 2 ACCESS DOORS AT EACH FLOOR LEVEL, TUMBLER LOCKS, 90 MIN. RATED.
1 HOUR RATED FIRE PARTITION
1 HOUR RATED DWELLING UNIT SEPARATION FIRE PARTITION
2 HOUR RATED FIREWALL
2 HOUR RATED FIRE BARRIER
RATED WALL LEGEND:
2 HOUR RATED EXTERIOR BEARING WALL 3 HOUR RATED STRUCTURAL BEARING WALL
3 HOUR RATED FIRE WALL
Date
12-06-2013 10-29-2013
CONCORD EMPIRE DAVIE STREET, LLC
c/o EMPIRE PROPERTIES 133 FAYETTEVILLE ST 6TH FLOOR RALEIGH, NC 27601
Project Client:
Description
ISSUE FOR CONSTRUCTION ISSUE 1
The L DAVIE STREET MIXED USE BUILDING 205 W. DAVIE STREET RALEIGH, NC 27601
Number
2 1
Key Plan:
NORTH
5 1/2"
5 1/2"
Project No.:
Drawing Sheet Title:
BEARING WALLS ARE 2 HOUR RATED
F.O.B. F.O.B.
36' - 0"
2
19' - 1 1/4"
1
1
A-413
A-413
12-06-2013 10-29-2013
CAD File:
UNIT 2.2
F.O.B
5 1/2"
19' - 2"
1 A-422
UNIT 2.2
UNIT S.3
ISSUE FOR CONSTRUCTION ISSUE 1
Key Plan:
2 A-422
35' - 6 1/2"
DN
28' - 9"
1 A-422
DN
UP
UP
2 A-422
BRACE WALLS PER S4-01 ARE 2 HOUR RATED
504
Stair 2 504
Stair 2 504
UNIT S.3
2 1
3 A-422
FHC
Telecom 507
3 A-422
509
2 A-422
L3001900
As indicated
2012 KlingStubbins, Inc or LLC
5TH FLOOR PLAN
CAD File:
Copyright:
Project No.:
Drawing Sheet Title:
Scale:
A-105
Drawing Sheet Number:
Owner's Drawing Sheet No.:
typical floor plan - condos
Number
UNIT S.2
SHAFT 1 S501
E.O.S
503
Elevator 2 E502
2 A-421
5 1/2"
UNIT 1.1
42' - 0" 244' - 9"
28' - 9"
2 3/4"
5TH FLOOR PLAN DAVIE STREET BUILDING C: 9,919 SF WING
SCALE: 1/8" = 1'-0"
SHAFT 1 S501
2
42' - 0"
1 A-411
5' - 11 3/4"
E.O.S
3 HOUR RATED FIRE WALL
c/o EMPIRE PROPERTIES 133 FAYETTEVILLE ST 6TH FLOOR RALEIGH, NC 27601
507
BRACE WALLS PER S4-01 ARE 2 HOUR RATED 42' - 0"
2 HOUR RATED FIRE BARRIER 2 HOUR RATED EXTERIOR BEARING WALL 3 HOUR RATED STRUCTURAL BEARING WALL
Project Client:
CONCORD EMPIRE DAVIE STREET, LLC
2
UNIT S.1
EXTERIOR BEARING WALL 2 HOUR RATED 42' - 0"
2 HOUR RATED FIREWALL
A-105
F.O.B
UNIT 1.2 HC
SCALE: 1/8" = 1'-0"
DOUBLE ACTION EGRESS DOOR 90 MIN RATED
5 1/2"
UNIT S.2
1 HOUR RATED FIRE PARTITION 1 HOUR RATED DWELLING UNIT SEPARATION FIRE PARTITION
FHC
A-105
3" BUILDING EXPANSION JOINT ON NORTH SIDE OF CMU WALL
FEC
28' - 9"
UNIT 1.1
1 A-422
UNIT S.1
F.O.B
5 1/2"
UNIT 2.1
RATED WALL LEGEND:
5TH FLOOR PLAN DAVIE STREET BUILDING C: 9,919 SF WING
NORTH
5' - 11 3/4"
504 EWA:W1
1 A-422
E.O.S
5 1/2" 2 3/4"
E.O.S
Stair 2 504
UP
EXTERIOR BEARING WALL 2 HOUR RATED
East Corridor 501
5 1/2"
FEC
2
2
SHAFT 1 S501
FHC
DOUBLE ACTION EGRESS DOOR 90 MIN RATED
507
Telecom 507
3" BUILDING EXPANSION JOINT ON NORTH SIDE OF CMU WALL
FEC
DN
BEARING WALLS ARE 2 HOUR RATED
UNIT 2.2
2
1
FEC
A-413
511
28' - 5"
DN
512
F.O.B. F.O.B.
501B
2
501c
UNIT S.3
Storage 512 Storage 511
DN
SHAFT 2 S502
1. SEE SHEETS A-201 THRU A-204 FOR ENLARGED UNIT PLANS 2.ALL WOOD STUD WALLS ARE DIMENSIONED TO FACE OF STUD U.N.O. 3. SEE SHEETS A-500 AND A-501 FOR INTERIOR WALL TYPE DESCRIPTIONS. 4. SEE SHEETS A-400, A-401, A-402 FOR EXTERIOR WALL ENCLOSURE ASSEMBLIES. 5. EACH PIPE CHASE SHALL RECEIVE 2 ACCESS DOORS AT EACH FLOOR LEVEL, TUMBLER LOCKS, 45 MIN. RATED. PIPE CHASES SHALL HAVE RATED FLOOR ASSEMBLY AT EACH LEVEL. PENETRATIONS THRU FLOORS SHALL BE FIRESTOPPED. 6. EACH MECH. SHAFT SHALL RECEIVE 2 ACCESS DOORS AT EACH FLOOR LEVEL, TUMBLER LOCKS, 90 MIN. RATED.
F.O.B
28' - 9"
5 1/2"
5 1/2" 2 3/4"
501
5 1/2"
4 A-611
dF
5TH FLOOR PLAN MCDOWELL BUILDING B: 7,731 SF STREET WING
SCALE: 1/8" = 1'-0"
NEW HM DOOR AND FRAME 90 MIN RATED IN EXISTING 12" CMU 2HR RATED WALL EXISTING RAISED CURB
UNIT S.3
1
CONCRETE TOPPING SLAB AND RAMP AT 1:12 MAX.
9' - 1 3/4"
A-105
5 1/2"
4"Hx6"W CURB ALONG RAMP AND LANDING EDGE
7" BUILDING EJ ALL FOUR SIDES OF OPENING
BRACE WALLS PER S4-01 ARE 2 HOUR RATED
P7: 369.67' V.I.F.
LNDG: 369.90'
Stair 1 503
19' - 1 1/4"
PARTIAL PLAN OF EXISTING ADJACENT PARKING DECK
2
1 A-422 5' - 11 3/4"
General Notes: FLOOR PLANS
2 3/4"
Grease Shaft S503
Pipe Chase 2 C502
2 ACCESS DOORS HIGH & LOW 45 MIN RATED
UNIT 1.1
19' - 2"
NORTH
d3
1 A-413
DN
1 A-421
2 A-421
2
Elev. Waiting 506
2 ACCESS DOORS HIGH & LOW 45 MIN RATED
1 A-421
42' - 0"
1 A-421
UNIT 2.2 UP
33' - 0"
Stair 2 504
1 A-423
275' - 4"
FEC
A-412 1
FHC
18' - 0"
FEC
NORTH
d2
42' - 0"
Elevator 2 E502
Seals:
Elevator 1 E501
2
Elev. Waiting 506
F.O.B
1 A-422
BRACE WALLS PER S4-01 ARE 2 HOUR RATED
UNIT S.2
UNIT 1D.1
Elevator 1 E501
Consultants:
5 1/2"
UNIT S.4
UNIT 1.2
UNIT 1.1
UNIT 1D.1
EWA:W1
Pipe Chase 1 C501 2 ACCESS DOORS HIGH & LOW 45 MIN RATED
3 A-422
2
UNIT 1D.1
EWA:W1
North Corridor 502
2 A-421
North Corridor 502
UNIT S.4
35' - 6 1/2"
2 A-422
Pipe Chase 1 C501 2 ACCESS DOORS HIGH & LOW 45 MIN RATED
EXTERIOR BEARING WALL 2 HOUR RATED
P 919.334.3111 F 919.334.3122 W www.klingstubbins.com
42' - 0"
1 A-421
EXTERIOR BEARING WALL 2 HOUR RATED
508
33' - 0"
A-412 1
EWA:W1
FEC
UNIT S.1
510
244' - 9"
Telecom 508 D.W3.D
Trash 509 D.W3.D Storage 510
33' - 0"
UNIT 1.2 HC
UP
505
UNIT S.1
18' - 0"
UNIT 1.1
1 A-411
DN Stair 3 505
UNIT S.1
333 Fayetteville Street, Suite 1100 Raleigh, North Carolina 27601
36' - 0"
East Corridor 501
UNIT 1.3
42' - 0"
UNIT 2.3
UNIT 1.3
275' - 4"
UNIT S.2
EXTERIOR BEARING WALL 2 HOUR RATED
EXTERIOR BEARING WALL 2 HOUR RATED
42' - 0"
PARTIAL PLAN OF EXISTING ADJACENT PARKING DECK
31' - 1 3/4"
4"Hx6"W CURB ALONG RAMP AND LANDING EDGE
10 1/2" 8' - 2 1/2" 10 1/2"
CONCRETE TOPPING SLAB AND RAMP AT 1:12 MAX.
UNIT 1.1
30' - 2 3/4"
NEW HM DOOR AND FRAME 90 MIN RATED IN EXISTING 12" CMU 2HR RATED WALL
EXISTING RAISED CURB
7" BUILDING EJ ALL FOUR SIDES OF OPENING
Storage 512 Storage 511
UNIT S.1
42' - 0"
71' - 4"
71' - 4"
DN Stair 3 505
P7: 369.67' V.I.F.
LNDG: 369.90'
SHAFT 2 S502
2
10 1/2" 8' - 2 1/2" 10 1/2"
4 A-611
Stair 1 503
DN
42' - 0"
UNIT 2.1
503
Drawing Sheet Number:
A-105 Owner's Drawing Sheet No.:
Lorena Paz Akin. Portfolio 2014
Jacobs/ KlingStubbins Work
8
1 4"
5' - 9" 7' - 7 1/8"
4
A-201 15' - 2 7/8"
7' - 7 1/8"
12' - 7 1/8"
3 1/2"
8' - 0 3/8"
5 1/2"
5 1/2"
M30 A-711
12
1
1 A-721
BEDROOM
12' - 0 5/8"
3/4" 3/4"
15' - 2 7/8"
3/4"
1 1/2"
34 3' - 3" 3 1/2"
0" 2X6
A-201
PLAN, UNIT TYPE 1.2 HC (TYPE A ACCESSIBLE)
The L The L DAVIE STREET DAVIE STREET MIXED USE MIXED BUILDING USE BUILDING 205 W. DAVIE 205 W.STREET DAVIE STREET RALEIGH, RALEIGH, NC 27601 NC 27601
LIVING
17' - 1 1/2"
Description
P
21' - 4 1/2"
12
A-711
8"
28' - 11 1/2"
BRICK VENEER WALL ASSEMBLY BRICK VENEER WALL ASSEMBLY PODIUMPODIUM ROOF ASSEMBLY ROOF ASSEMBLY
5 1/2"
5 1/2"
A-712
KITCHEN
CAD File:
CAD File:
Project No.:
L3001900 Project No.:
Copyright:
Copyright: 2012 KlingStubbins, 2012Inc KlingStubbins, or LLC Inc or LLC
Scale:
Scale: As indicated
L3001900
3 A-460
As indicated
REF.
Drawing Sheet Title: Drawing Sheet Title:
REF.
KITCHEN
5' - 0 3/4"
3 A-460 SIMBATH SIM BATH
1
2
3 3 IN CONC PLACE CONC CAST PLACE 8' - 0IN 3/8"CAST 12' - 4 1/8" 12' - 4 1/8" BROW, STRUCTURAL BROW, SEE STRUCTURAL 20'SEE -A-713 4 1/2" 20' -A-713 4 1/2" 1 1/2" 4
4
MOISTURE RESISTANT MOISTURE RESISTANT GWB CEILING ON METAL GWB CEILING ON METAL STUD FRAMING STUD FRAMING R-19 INSULATION ATTACHED R-19 INSULATION ATTACHED TO SLABTO SLAB
MTL PANEL MTL SPANDREL PANEL SPANDREL
4' - 0"
1
PODIUMPODIUM ROOF ASSEMBLY ROOF ASSEMBLY
A-712
3 A-460
SEALANT SEALANT
SEALANT SEALANT
4' - 0"
12-06-2013 10-29-2013
Key Plan:
P
5' - 4 1/4"
A-711
8' - 0 3/8"
1 1/2" 1 1/2"
ISSUE FOR 2 CONSTRUCTION ISSUE FOR CONSTRUCTION 12-06-2013 ISSUE 1 1 ISSUE 1 10-29-2013
A
UNIT PLANS UNIT PLANS TYPES TYPES S.1 / 1.1S.1 / 1.1 / S.2 / 1.2 / S.2 / 1.2HC / 1.2 // 1.2HC 1.3 / 1.3
VISION GLAZING VISION GLAZING
3/4"
3 A-460
LEVELLEVEL 2 2 37' - 11" 37' - 11"
4"
4"
1 1/2"
Date
34
5' - 4 1/4"
34
2' - 6"
4 1/8"
2' - 6"
2
L 27x12
5' - 0 3/4"
2X6
L 27x12
1
8' - 10 1/8"
28' - 11 1/2"
2' - 0 5/8"
5S/12"D
4"
8' - 10 1/8"
6' - 9"
2' - 0 5/8"
34
6' - 9"
1R/1S
1R/1S 34
1R/1S 2' - 6" 11' - 6"
1
1' - 6"
2X6
2 1
Key Plan: 5S/12"D
Date
A
2' - 7 1/4"
5S/18"D
8 1/2"
1 1/2" L 36X12
L 1' - 8 3/4"
5' - 4 3/4"
Description Number
W/D BRICK VENEER BRICK VENEER WALL ASSEMBLY WALL ASSEMBLY DW DW
W/D
2
1 1
SCALE: 3/8" = 1'-0"
CONCORD CONCORD EMPIRE DAVIE EMPIRE STREET, DAVIELLC STREET, LLC
3/4"
2x6 PLUMBING2x6 PLUMBING WALL 2 WALL
36X12 A-712
1
PLAN, UNIT PLAN, TYPES UNIT TYPES S.1 & 1.1 S.1 W/&TUB 1.1 W/ TUB = 1'-0" 3/8" = 1'-0" A-201 SCALE: A-2013/8"SCALE:
MTL PANEL MTL PANEL SPANDREL BACK BACK SPANDREL PAN BEYOND PAN BEYOND
2' - 7 1/4"
5S/18"D
W.I.C
1R/1S 34
1R/1S
W.I.C
2
BATH
8"
3 3
6' - 10"
1R/1S A-712
12' - 6 3/8" 21' - 4 1/2"
9' - 5"
2 HOUR RATED 2 FIRE HOURBARRIER RATED FIRE BARRIER
1 A-721
LIVING
6' - 10"
2X6
PLAN, UNIT PLAN, TYPE UNIT1.2 TYPE HC (TYPE 1.2 HCA(TYPE A ACCESSIBLE) ACCESSIBLE) = 1'-0" 3/8" = 1'-0" A-201 SCALE: A-2013/8"SCALE:
3
3' - 0 3/4"
c/o EMPIRE PROPERTIES c/o EMPIRE PROPERTIES 133 FAYETTEVILLE 133 FAYETTEVILLE ST ST 6TH FLOOR 6TH FLOOR RALEIGH, NC 27601 RALEIGH, NC 27601 1 A-721
HVAC
BEDROOM
34 12' - 6 3/8"
15' - 2 7/8"
FLASHING 12X36FLASHING 12X36
BATH
1 2X6
3/4"
0"
0"
1 1/2"
HVAC
2X6
KITCHEN
4" 3/4" 9' - 5"
W/D
4' - 0"
1
22
W/D
4' - 0"
1' - 6"
7' - 10 1/8"
2X6 KITCHEN
3' - 0 3/4" 9' - 5"
5' - 4 1/4"
34 5 1/2"
2' - 0"
5' - 4 3/4"
2' - 0"
2' - 8"
DW
4
1' - 8 3/4"
A-711
22 1
3/4" 3/4"
5' - 4"
Sim
3' - 8"
1' - 6"
43
M30
A-711
5 1/2"
3
M30 3' - 1 1/4"
DW
2
1' - 6"
5 A-712
REF.
REF.
1 1 1/2"
12' - 0 5/8" 20' - 8"
3
P
2X6 PLUMBING2X6 WALL PLUMBING WALL
2
2' - 0"
1 HOUR RATED1 DWELLING HOUR RATED UNIT UNIT 6'DWELLING - 4 3/4" SEPARATION FIRE SEPARATION PARTITION FIRE PARTITION 3/4" 11' - 9 1/2" 2 HOUR RATED2 FIREWALL HOUR RATED FIREWALL
Number
1R/1S
P
2' - 8"
W/D
A
3' - 1 1/4"
W/D
1 1/2"
1 1/2"
W/D
5' - 4 1/4"
5S/12"D
P34
A FUR OUT WALL FUR TO OUT WALL TO SAME PLANE AS SAME PLANE AS W/D CLOSET WALL W/D CLOSET WALL
5 1/2"
5 1/2"
1
5S/12"D
34
5S/12"D
CLOSET 1R/1S
REF.
5' - 1 1/2"
3' - 0 3/4"
Sim
3' - 8"
1 1' - 6" 51' - 6" A-460 A-712 SIM SIM
22 1
CLOSET 1R/1S
P
2X6 PLUMBING WALL
1 HOUR RATED 1 FIRE HOURPARTITION RATED FIRE PARTITION
5' - 4"
Project Client: Project Client: 1 1/2"
5' - 4"
5' - 0 3/4"
LIVING
BATHROOM
A-712
11' - 9 1/2"
11' - 1"
1R/1S 5' - 0 3/4"
LIVING
42' - 0"
11' - 1" 5' - 9"
1 A-721
HVAC
11' - 3 3/4"
8' - 9 7/8"
11' - 3 3/4"
BEDROOM
W/D
RATED WALL LEGEND: RATED WALL LEGEND:
3 1/2"
M30
HVAC
8' - 9 7/8"
FUR OUT WALL TO SAME PLANE AS W/D CLOSET WALL
BATHROOM
5' - 1 1/2"
KITCHEN
6' - 11 1/4"
6' - 11 1/4"
1 1 1/2" 3 1/2"
5' - 4"
W/D
KITCHEN
34
KITCHEN
M30
5' - 9"
Sim
BEDROOM
C.
7' - 10 1/8"
5' - 0" 34 4 3/4" 3 1/2" 2' - 10 3/4"
L
16' - 9 3/8"
P34 A-711
CLOSET 1R/1S
3 HOUR RATED3 FIRE HOUR WALL RATED FIRE WALL 42' - 0"
15' - 5 1/8"
8 1/2"
15' - 5 1/8"
1 1/2"
3/4"
36 36 REF.
5 1/2"
2 3/4" 2' - 4 1/8"
4' - 3 3/8"
1 1/2"
2 3/4" 2' - 4 1/8"
2' - 6"
5' - 0" 4 3/4" 3 1/2" 2' - 10 3/4"
36 X12
L
8' - 9 7/8"
2 HOUR RATED 2 EXTERIOR HOUR RATED EXTERIOR BEARING WALL BEARING WALL 3 HOUR RATED3 STRUCTURAL HOUR RATED STRUCTURAL BEARING WALL BEARING WALL
2' - 6"
5' - 4"
1' - 11 5/8"
5S/12"D
28' - 9"
28' - 9"
5' - 11 3/8" 34
34
5' - 11 3/8"
1R/1S
1R/1S 1R/1S
1R/1S
1 1/2"
11' - 7 5/8"
General Notes: General Notes:PLANS UNIT FLOOR UNIT FLOOR PLANS 1. ALL WALL DIMENSIONS 1. ALL WALLARE DIMENSIONS TO FACE OF ARESTUD TO FACE OF STUD U.N.O U.N.O 2. WALL CENTER 2. WALL LINE DIMENSIONS CENTER LINEARE DIMENSIONS TO ARE TO CENTER OF DOUBLE CENTER WALL OF DOUBLE AIR SPACE. WALL AIR SPACE. MW DWSHALL 3. PLUMBING WALLS 3. PLUMBING SHALL WALLS BE 2X6 WALLS.BE 2X6 WALLS. 4. HVAC CLOSET 4. HVAC SHALLCLOSET BE LINED SHALL WITHBE SOUND LINED WITH SOUND INSULATION BOARDS. INSULATION BOARDS. 5. ALL PLUMBING 5. ALL FIXTURE PLUMBING CENTERLINE FIXTURE CENTERLINE DIMENSIONS ARE DIMENSIONS MEASURED ARE TOMEASURED FINISH FACE TOOF FINISH FACE OF 18 A-711 WALL. WALL.
DW
2
20' - 8"
4 1/8"
3/4"
REF.
BATHROOM
1 5 A-460
6' - 4 3/4" 11' - 9 1/2"
36 X12
7' - 10 7/8"
11' - 6"
1 A-721
P34 3/4"
7' - 10 7/8"
3' - 4 1/8"
C.
17
1/2"
1' - 6 1/4"
5' - 4"
2
7' - 10 1/8"
6' - 4 3/4" 3/4"
3" 5" 1/2" 1/2"
36 5S/12"D 3 1/2"
3' - 3"
3 1/2"
34 3' - 3" 36
W/D
KITCHEN
5' - 1 1/2"
LEVELLEVEL 2 2 37' - 11" 37' - 11"
3" 5"
1/2"
DW
P
A-712
1' - 6"
1' - 11 5/8"
36 5S.18"D
36 KITCHEN17
36
A-711
11' - 7 5/8"
1' - 10 1/2"
8' - 0 3/8"
21' - 2"
M30
3' - 1' 4 1/8" - 11 5/8"
36 5S.18"D
5' - 3"
36 17
18
3'36- 11 1/2"
A-711
1' - 4"
BATH A-712 3
17' - 1 1/2"
Sim
1 A-721
HVAC
C.
C.
5S.18"D
18
2' - 6"
2' - 6" BATH
BATH 1' - 10 1/2"
1 3 1/2"
34
2' 3' -- 1" 4 1/8"
C.
DW 3' - 11 1/2"
MW
1R/1S
1R/1S 3' - 0" 2' - 6" 1R/1S
1R/1S 34
3' - 0"
1' - 4"
BATH 3
34
5' - 5 1/2"
3/4"
3/4"
16' - 9 3/8"
2' - 1"
5S.18"D
5' - 3"
REF.
REF. DW
4
1' - 6 1/4"
10' - 9 1/2"
10' - 9 1/2"
13' - 4 1/2"
13' - 4 1/2"
3' - 0"
2' - 6 3/4"
12' - 7 1/8"
M30
M30
HVAC
C.
MW
W/D
2' - 1"
Seals:
34
3 1/2"
LIVING
9' - 8 1/2"
A-712
4
PLAN, UNIT PLAN, TYPES UNIT TYPES S.2 & 1.2 S.2W/ & 1.2 W/ SHOWER SHOWER = 1'-0" 3/8" = 1'-0" A-201 SCALE: A-2013/8"SCALE:
26' - 7 5/8" 3 1/2"
UNIT PLANS LIVING
W/D
M30
15' - 5 1/8"
5' - 5 1/2"
9' - 8 1/2"
3' - 0"
16' - 9 3/8"
15' - 5 1/8"
C. A-712
L 36 X12
P
2 2
26' - 7 5/8" 3/4"
C.
5' - 4"
21' - 2"
4 4
2' - 7 7/8"
2' - 6 3/4" 5' - 4"
3/4"
3/4"
PLAN, UNIT PLAN, TYPE UNIT1.3 TYPE 1.3 = 1'-0" 3/8" = 1'-0" A-201 SCALE: A-2013/8"SCALE: 3/4"
2' - 7 7/8"
1 1/2"
5' - 9"
9' - 2 1/2"
9' - 2 1/2"
2
Sim
BEDROOM
9' - 8 1/2"
5S/18"D
C.
5 1/2"
34 7' - 7 1/8"
2
L 36 X12
W/D
KITCHEN
REF.
REF.
1
5' - 9"
34
34 KITCHEN
C.
34
5' - 9 7/8"
5
5
2
2' - 9 3/8"
REF.
A-711
W/D
1 2' - 10 3/4"
REF.
A-711
23
2' - 10 3/4"
A-711 KITCHEN
4"
4"
1
KITCHEN 6' - 5"
FOYER 6' - 5"
FOYER
A-711
5' - 9 7/8"
3
6
W.I.C
PLUMBING WALL 2x6 PLUMBING2x6 WALL
2' - 9 3/8"
DW
6
10' - 11 3/4"
DW
10' - 11 3/4"
2X6 PLUMBING2X6 WALL PLUMBING WALL
DW
DW
3' - 7 3/4"
W/D
34
34 W/D
3' - 7 3/4"
2X6
W.I.C
P
P
2X6
5' - 0 3/4"
5' - 0 3/4"
6' - 4 1/4"
6' - 4 1/4"
C.
34
1R/1S
C.
1R/1S
11' - 9 1/8"
Seals:
5S/18"D
5S/18"D
1' - 8"
1 1/2"
BATH
1' - 8"1' - 6"
6
1R/1S
1' - 6"
62' - 0"
1 A-721
HVAC
Consultants:
LIVING
11' - 9 1/8"
4' - 3 3/8"
LIVING
LIVING
3/4"
5 1/2"
12' - 7 1/8"
34
34
BATH A-712
A-712
2' - 0"
1R/1S
1R/1S
34 1R/1S
CLOSET
P 919.334.3111P 919.334.3111 F 919.334.3122F 919.334.3122 W www.klingstubbins.com W www.klingstubbins.com
LIVING
2' - 10 3/4"
2' - 10 3/4"
3/4" 5' - 4"
333 Fayetteville333 Street, Fayetteville Suite 1100 Street, Suite 1100 Raleigh, North Carolina Raleigh, North Carolina 27601 27601
36
6' - 6 1/2"
10' - 9 1/2"
13' - 4 1/2"
6' - 6 1/2"
LIVING
10' - 6 1/2"
3' - 11 1/2"
10' - 6 1/2"
BEDROOM
16' - 11 7/8"
12' - 7 1/8"
BEDROOM
5S/18"D
CLOSET
Sim
1 A-721
34
3' - 0 1/4"
34
34
2' - 3' 8 3/4" - 0 1/4"
Sim
1 A-721
HVAC
34
2' - 8 3/4"
12' - 3 5/8"
34
7' - 4"
3 1/2" 3 1/2" 5 1/2" 2' - 4 1/2" 5 1/2" 2' - 4 1/2" 3' - 11 1/2"
16' - 11 7/8"
LIVING
34
7' - 4"
34
5' - 1 1/2"
HVAC
11' - 6 1/4"
11' - 6 1/4"
LIVING
BEDROOM
12' - 3 5/8" 5' - 1 1/2"
Sim
Consultants:
FACE OF 2X6 BEARING FACE OF WALL 2X6 BEARING WALL NOTED ON STRUCTURE NOTED ON STRUCTURE
BEDROOM
1 A-721
3 1/2"
M30
Sim
1 A-721
HVAC
M30
HVAC M30
M30
4 A-721
15' - 5 1/8"
5' - 5 1/2" 5 1/2"
15' - 2 7/8"
5S/12"D
1 1/2"
1 1/2" 5' - 4"
M30
4 A-721
HVAC M30
HVAC
2
A-2
26' - 7 5/8"
11' - 1" 5' - 4"
11' - 1" 5' - 9"
5' - 9"
5S.18"D
15' - 5 1/8"
15' - 5 1/8"
2
5S.18"D
2
7' - 5 1/2"
7' - 5 1/2"
PLAN, UNIT TYPE 1.3
SCALE: 3/8" = 1'-0"
3/4"
3/4"
3/4"
3/4"
Drawing Sheet Number: Drawing Sheet Number:
A-201 A-201
1' - 2"
1' - 2"
IN CONC PLACE CONC CAST INCAST PLACE BROW, SEE BROW, SEE STRUCTURAL STRUCTURAL
Owner's Drawing Owner's Sheet No.: Drawing Sheet No.:
BACK FACE OF BACK FACE OF DROPPED DROPPED GWB GWB CEILINGCEILING BEYONDBEYOND
MTL SPANDREL PANEL SPANDREL MTL PANEL
SPANDREL SPANDREL BACK BACK PAN BEYOND PAN BEYOND
1' - 4"
11' - 5 1/2"
11' - 5 1/2"
42' - 0"
42' - 0"
5' - 3"
18' - 11 1/8"
36
18' - 11 1/8"
3' - 11 1/2"
31' - 6"
1' - 4"
31' - 6"
12' - 5 3/8"
9' - 2 1/2"
5 1/2"
12' - 5 3/8"
2' - 10" 2' - 10"
1' - 0"
1' - 0"
1' - 0"
CEMENTITIOUS CEMENTITIOUS PANEL PANEL TRIM ASSEMBLY TRIM ASSEMBLY
1' - 0"
MISCFOR STEEL FOR MISC STEEL STOREFRONT MIDSPAN STOREFRONT MIDSPAN SUPPORT SUPPORT
STEEL STOREFRONT STEEL STOREFRONT SUPPORT POST, SEE SUPPORT POST, SEE STRUCTURAL STRUCTURAL
VISION GLAZING VISION GLAZING
3' - 1"
LEVELLEVEL 1 1 23' - 5"23' - 5"
1' - 0"
1' - 0"
CONCRETE CONCRETE COLUMN COLUMN INSIDE WRAP INSIDE WRAP
11 A-460
R.O. VARIES, 12'-0" MAX.
STOREFRONT STOREFRONT SUPPORT STEEL, STEEL, SUPPORT SEE STRUCTURAL SEE STRUCTURAL
1' - 0" 11 A-460
ACM PANEL ACMCOLUMN PANEL COLUMN WRAP WRAP
1' - 0"
CEMENTITIOUS PANEL PANEL CEMENTITIOUS TRIM ASSEMBLY TRIM ASSEMBLY
R.O. VARIES, 12'-0" MAX.
1' - 0"
11 A-460
12' - 6"
12' - 6"
STOREFRONT ASSEMBLY STOREFRONT ASSEMBLY
1' - 0"
11 A-460
10' - 8" R.O.
10' - 8" R.O.
VISION GLAZING VISION GLAZING
3' - 1"
LEVELLEVEL 1 1 23' - 5"23' - 5"
VISION GLAZING VISION GLAZING
STOREFRONT WALL ASSEMBLY STOREFRONT WALL ASSEMBLY STEEL POST @CORNER, STEEL POST @CORNER, SEE STRUCTURE SEE STRUCTURE R.O. VARIES, 12'-0" MAX.
STEP UP IN CONC STEP UP INBASE CONC BASE BEYONDBEYOND
VISION GLAZING VISION GLAZING
R.O. VARIES, 12'-0" MAX.
STOREFRONT ASSEMBLY STOREFRONT ASSEMBLY
CEMENTITIOUS CEMENTITIOUS COATEDCOATED CONCRETE CONCRETE WALL WALL
WALL SECTIONS - ENTRY ALCOVE
4"
CEMENTITIOUS CEMENTITIOUS COATEDCOATED CONCRETE CONCRETE WALL WALL
4"
D
REF.
Lorena Paz Akin. Portfolio 2014
EXHAUST DUCTS. TERMINATE BEHIND LOUVER DROPPED SOFFIT TRUNK DUCT
FLEX DUCT CONNECTION
2x4 WALL FRAMED ON THE FLAT
ENTRANCE
VTAC HVAC UNIT
PLENUM
DINING AREA
CONTINUOUS WALL LOUVER
VTAC
WAITING AREA
FLASHING. SLOPED TO DRAIN 7' - 10"
HOSTESS STAND
PLATFORM FRAMING
EXPANSION TANK HUNG FROM PLATFORM
KITCHEN 3' - 9 1/2"
E.T.
WATER HEATER
CONDENSATE DRA
ROOF DRAIN LEAD WHER INDICATE
WATER HEATER
DRAIN PAN
OFFICE
RESTROOMS
PLATFORM
BAR
WOOD FLOOR TRUSS ASSEMBLY
LOUVER WALL ASSEMBLY
6
RESTAURANT LAYOUT- OPTION A
A-721
SECTION, MECH. CLOSET, SIDE ACCESS DOOR
SCALE: 1" = 1'-0"
EXHAUST DUCTS. TERMINATE BEHIND LOUVER DROPPED SOFFIT
WAITING AREA
OPTION 1
HOSTESS STAND
ENTRANCE FACING DAVIE ST.
1 1/2"
TRUNK DUCT
FLEX DUCT CONNECTION
ENTRANCE
FLUSH DOOR WITH LOUVER
VTAC HVAC UNIT
DINING AREA
PLENUM
2' - 7 7/8"
CONDENSATE DRAIN
7' - 6"
FLASHING. SLOPED TO DRAIN 7' - 10"
ROOF DRAIN LEADER WHERE INDICATED
CONTINUOUS WALL LOUVER
VTAC
PLATFORM FRAMING
KITCHEN
COLD WATER FROM ABOVE
HOT WATER FROM ABOVE
EXPANSION TANK HUNG FROM PLATFORM
E.T.
3' - 9 3/8"
WATER HEATER
DRAIN PAN
BAR
PLATFORM 3"
RESTROOMS
3/4"
OFFICE
3' - 3"
3' - 9 1/2"
WATER HEATER
WOOD FLOOR TRUSS ASSEMBLY
LOUVER WALL ASSEMBLY
RESTAURANT LAYOUT- OPTION B
3
SECTION, MECH. CLOSET, FRONT ACCESS DOOR
Mechanical closet detail A-721
SCALE: 1" = 1'-0"
OPTION 2
ENTRANCE FACING MCDOWELL ST.
bus stop sketch
10
SHIP CREEK WATERFRONT REDEVELOPMENT ANCHORAGE, AK
Anchorage, despite being a waterfront city, lacks a true waterfront due to the railroad owning most of the frontage properties and the mudflats that separate Anchorage from the surrounding areas. The new master plan development creates a vibrant and active environment in which the designed spaces are functional in extreme weather conditions. The amphitheater, parking garage and bridges in winter become host to diverse recreational environments such as snowboarding courses and ice climbing walls. I participated in the design and research of this new urban proposal. Selected portions of the final report are featured below.
D
CONNECT DOWNTOWN
TOWN SQUARE
SPACES DOWN-ARTIST performance TOWN CONNECTION
AMPHITHEATER
LINKED NEIGHBORHOODS
URBAN VILLAGE
pedestrian connection
WA A TE TI RF N RO G NT
fer r
y
G
ska WA vie t BO ing LKINws E T C T O R N A N IL E S C
RAFTING
RHIKIN multi-modal viewing CREEKSIDE STREET BIKING ALL SEASONS ACCESS LIVING RESTAURANTS incubation
HOTEL
NARAY H G K MAIN
GE
RD
ID
P L C
LOCAL R POWE
ITNEY D WHR NEP A K EALIGG
TED OU RER CKING TRU
BR
II
SH
W
FE PN
NE
K
A U
T EC NT NN NME CO VER GO L HIL
M AR C SA L
Lorena Paz Akin. Portfolio 2014
Jacobs/ KlingStubbins Work
12
PHASE 3 RECREATIONAL MASTER PLAN
E STREET COMMERCIAL PLAZA
Lorena Paz Akin. Portfolio 2014 ENHANCED PEDESTRIAN CONNECTION ABOVE TRACKS NEW CITY MARKET DENSE DEVELOPMENT ALONG CREEK OPEN SQUARE FOR WINTER SNOW SCULPTURE CONTEST BASE OF SLOPED ROOF PARKING DECK, USED AS A SKIING AND SNOWBOARDING RAMP IN WINTER
NEW MULTIMODAL TRANSIT STATION AND CITY MARKET
VIEW FROM KNIK ARM Residences Parking Office Space Recreation
Residences Office Space Recreation
PHASE II
PHASE II
Residences Parking Office Space Recreation Commerce Civic Building
PHASE III
PHASE I Residences Parking Commerces Recreation
3D PHASING DIAGRAM
PHASE I Residences Parking Commerces Hotel Recreation
PHASE I Fresh Water Marsh Boardwalk
14
Shift house RALEIGH, NC
As part of a housing studio, this project presented the opportunity to collaborate with engineers to enhance the depth of our sustainable concepts and to test them for validity. We decided upon a site in an urban core and chose to provide communal gardens and integrated live/work opportunities adjacent to pedestrian-rich streets.
05 Roof Plan
Bifacial Solar Array Area: 490 sq.ft.
3 1 2
04 Roof Terrace
Interior Area: 238 sq.ft. Exterior Area: 1,198 sq.ft.
1. Terrace with bar and seating area 2. Planting area (herb garden) 3. Balcony overlooking garden
2 6
3
7
5
6
1
4
8
03 Third level: Bedrooms Interior Area: 1,156 sq.ft.
3
2
1. Master Bedroom 2. Bedroom A 3. Bedroom B 4. Master Bathroom 5. Bathroom 6. Storage 7. TV Room 8. Master Walk-in closet
4
8
5
6
7
1
02 Second level: Living Interior Area: 1,045 sq.ft. Exterior Area: 213 sq.ft.
1. Terrace / Entrance 2. Living room 3. Kitchen 4. Dinning 5. Office / Reading Room 6. Powder room 7. Storage/ Laundry room 8. Pantry / Storage
Lorena Paz Akin. Portfolio 2014
shift
H
ouse
community oriented urban living
Graduate Work
16
view from living room
roof terrace/garden
AFFORDABLE MULTI-FAMILY HOUSING
LIVE-WORK UNITS ALONG HIGH TRAFFIC STREETS COMMUNITY CENTRAL GARDEN
RELOCATED PARK WITH BIOSWALES
site plan
Shared geothermal wells provide for 4 dwellings.
ENERGY
Rain-water collection from roof & parking is stored in an underground cistern located beneath the driveway for use in irrigation.
WATER
450 sq. ft. of bifacial solar panels. North facing windows, south facing porch.
Bio-swales between the dwelling and street would filter the contaminats from the water. Herb roof garden would decrease solar heat gain in the roof by acting as insulation. Driveway paved with permeable paving. Vegetation in bio-swales, yard and community gardens reduces heat island effect within the development.
VEGETATION
SOLAR
Lorena Paz Akin. Portfolio 2014
sustainable features diagram
roof terrace/garden
initial sketch
30
%
Narrow footprint
Flex space + 2,200 ft2 home
Adding private shaded exterior spaces + south facing terraces
terial overlap
Volume shifting + Material overlap
Adding private shaded exterior spaces + south facing terraces
Volume shifting + Material overlap
Windows for views and even daylight
Windows for views and even daylight
Windows for views and even daylight
concept evolution section a
18
Wedge house RALEIGH, NC
The Wedge house is an ACCESSORY DWELLING UNIT (ADU) located in Raleigh’s 5 points area. The 645 sq. ft. dwelling draws from the site and through these constraints acquires it’s triangular plan. Despite its small area, it provides a dynamic and comfortable living area with views to its own backyard and to the yard it shares with the existing dwelling.
INITIAL SKETCH
INITIAL SKETCH
Lorena Paz Akin. Portfolio 2014
Graduate Work
20
PLACED ON SITE
ADOPTS “WEDGE” SHAPE OF SITE
OVERHANGS FOR SOUTH FACADE
FORM DIAGRAM RV
ALLEY
FA I
IE
GL
W
WALL FOR PRIVATE ADAPTATION TO GARDEN & THE LANDFORM BEDROOM
EN O WO . VE DA
SITE LOCATION
PROPOSED ADU FAIR
VIE
SITE PLAN
W
EXISTING DWELLING
RD
.
PRIVATE GARDEN
PARKING
BEDROOM
BATH
KITCHEN
LIVING ROOM
BACKYARD
Lorena Paz Akin. Portfolio 2014
2 1
3 4 5
KEY PLAN 1. LIVING ROOM 2. KITCHEN/DINING 3. RESTROOM
6
4. BEDROOM 5. PRIVATE GARDEN 6. DRIVEWAY
BEDROOM VIEW
LIVINGROOM VIEW SUMMER SUN STORM WATER COLLECTION
WINTER SUN
NATURAL VENTILATION
VEGETATION
CISTERN
SECTION A
22
ATION
WASTE HEAT REUSE DINAMIC URBAN DEVELOPMENT DINAMIC URBAN DEVELOPMENT
SPORTATION ROUTES O EXISTING BIKE NETWORK.
THE HEAT AN WASTE CREATED BY RESTAURANTS AND MARKETS CREATING AND URBAN DURING CREATING ANACTIVE ACTIVE ANDDINAMIC DINAMIC URBANENVIRONMENT ENVIRONMENT DURINGTHE THE WILL BE REUSEDTO HEAT DWELLINGS. STADIUM SEASON OFF SEASON. STADIUM SEASONAND AND OFF SEASON.
VIKINGS STADIUM NATURE NATURE THE OPEN SPACE SURROUNDING THE STADIUM WILL REMAIN ACTIVE
1st Place Regional ULI, National Honorable mention in Gerald D. Hines Student Competition 2013
MENT
AMIC URBAN ENVIRONMENT DURING THE ASON. ASON.
place for numerous events to occur, such open green space.
AUSE NETWORK OF GREEN INFRASTRUCTURE CAPTURES STORMWATER, USE OF TO FILTRATE STORM BEFORE DRAINING OFVEGETATION VEGETATION TOOFF FILTRATE STORMWATER WATER BEFORE DRAINING REEITHER IS DURING OR SEASON. DUCES ISLAND EFFECT, PROVIDES AMENITIES. TO MISSISIPPI RIVER AND REDUCING THE HEAT TOTHE THEHEAT MISSISIPPI RIVER ANDAND REDUCING THERECREATIONAL HEATISLAND ISLANDEFFECT. EFFECT.
MASTER PLAN Design and Development Plan SUSTAINABLE SUSTAINABLEENERGY ENERGY
Living in Place is a development with a m the Minneapolis population. The commun spaces, interconnected by greenways from DISTR It is a neighborhood with appeal at DAILY every sional life; a retirement community for an tre; a starter home for a newlywed couple Living in Place is a development with a mixed population of young adults, families, and senior citizens representing a cross-section of streetscapes; a family-oriented the Minneapolis population. The community provides amenities such as a charter school, multiple food venues, retail and commercial neighbor MINNEAPOLIS, MN spaces, interconnected by greenways from the riverfront and the Mill District to Elliot Park. scape surrounding the stadium. It is a life It is a neighborhood with appeal at every stage of life, - a transitional point for a college graduate excited and eager to start a profes-
TE STORM WATER BEFORE DRAINING REDUCING THE HEAT ISLAND EFFECT.
PRODUCING PRODUCINGENERGY ENERGYON ONSITE SITEFROM FROMSUSTAINABLE SUSTAINABLESOURCES. SOURCES.
WASTE WASTEHEAT HEATREUSE REUSE
HEAT CREATED AND THE HEATWASTE WASTE CREATEDBY BYRESTAURANTS RESTAURANTS ANDMARKETS MARKETS Our proposal for Downtown THE East embraces the Vikings Stadium and allows it to play a vital role towards the cultivation and continuation ROM SUSTAINABLE SOURCES. WILL WILLBE BEREUSEDTO REUSEDTOHEAT HEATDWELLINGS. DWELLINGS. of urban life in Minneapolis.VIKINGS VIKINGSSTADIUM STADIUM THE THEOPEN OPENSPACE SPACESURROUNDING SURROUNDINGTHE THESTADIUM STADIUMWILL WILLREMAIN REMAINACTIVE ACTIVE RESTAURANTS AND MARKETS Recognizing its central location the surrounding district, the stadium no longer sits as an isolated monument, disconnected from EITHER DURING SEASON. EITHERIS ISwithin DURINGOR OROFF OFF SEASON. LLINGS. the city fabric. It becomes a catalyst for cross-cultural pollination. NG THE STADIUM WILL REMAIN ACTIVE An extensive pedestrian and bicycle bridge wraps around the stadium and over the freeway, connecting cultures and communities furSON. ther to the east, allowing Downtown East to be more active throughout the year. The stadium becomes a marker, a destination point, a place for numerous events to occur, such as festivals, parades, and winter recreational activities on the expansive, sculpted terrain and open green space.
11th AVE S.
Living in place 77
1 am 3 am 5 am 7 am 9 am
sional life; a retirement community for an elderly couple sharing a love for the arts and attending weekend shows at the Guthrie Theatre; a starter home for a newlywed couple, able to walk to work in the morning and stroll in the evenings along pedestrian-oriented streetscapes; a family-oriented neighborhood where children attend a neighborhood school, and anticipate snow tubing in the land5 scape surrounding the stadium. It is a life-cycle 6neighborhood embraces the Vikings Our proposal for the Downtown Eastcommunity.
11 am 1 pm 3 pm 5 pm
The Armory, a prominent historical buildi3 2 tial and retail buildings. It also houses th Stadium and allows it to play a vital role towards the cultivation and FINANCES The Armory, a prominent historical building, marks the midpoint of a pedestrian-oriented axis, which is flanked by mixed-use residenganic goods. A holistic green infrastructu continuation of urban life in Minneapolis. central location tial and retail buildings. It also houses the local farmersRecognizing market with freshits produce and small shops within selling local products and orthe surrounding district, the stadium no fingers”, longerconsisting sits as of anbio-swales, isolated monument, ganic goods. A holistic green infrastructure of “green retention ponds, and green roofs, run parallel to the proposed built environment as wel to the proposed built environment well as to existing city streetscapes. These green fingers not only aesthetically enhance the disconnected from the cityas fabric. It the becomes a catalyst for cross-cultural Downtown East district, but also slow down water run off reducing pollutants and toxic sediments from entering the Mississippi Downtown East district, butRiver. also slow dow pollination. Thoughtfully interspersed within the development, commercial and public places act as a “buffer” from crowds emerging from the Thoughtfully within the deve The stadium axis, also a green boulevard accommodating a wide variety of retail and entertainment locales, provides various Anstadium. extensive pedestrian and bicycle bridge wraps around the stadium and interspersed 2 destination points for tourists and residents alike to enjoy before, during, and after community and sporting events. over the freeway, connecting cultures and communities further to the east stadium. Theand stadium axis, also a green b allowing Eastacting to bealongside more active throughout the year. The stadium The LivingDowntown in Place community, the Vikings Stadium, will enhance the Downtown East area and truly become a new 16 destination points for tourists and residen NG STRATEGY model of urban living. 1 7 pm 9 pm
6
44
3
11 am
5
2
88
33
23 23
22
4,000,000
99
10 10
11 11
12 12
3,000,000
24 24
2,000,000
22
2
16 16
1,000,000
13 13
becomes a marker, a destination point, a 14place for festivals, parades, and 21 winter recreational activities on the sculpted terrain and open green space. 21
2015
22 22
1
16
2016
11
14
Financing Plan
RESOURCE
The Living in Place community, acting alo 22 The retrofitted Armory is one of the main destination points in our proposal. Its model interior is renovated to house a farmers market on the of urban living. 287,304 21 Marcy-Holmes
Waste to Energy 20 20 Facility
22
21
Dinkytown lower level with permanentHOTEL locations for specialized local shops located on the mezzanine15above. The Armory, along with a wide selec18 57,000 RECREATION Downtown West tion of food venues, eliminates the “food desert” in Downtown East, and encourages people to spend time in the area after work or after 16 Mill District 762,034 HOUSING games. 15
Baseball & Basketball Stadiums
23
18
16
Financing Plan
731,114 RETAIL Armory Within the first year ofTheconstruction, we not only refurbish the Armory and create new housing, but also construct a charter elementary University of 20 Minnesota 2,046,956 20 PARKING school, to be rented out with a 20-year lease, which will attract young families to the neighborhood. Located adjacent to the proposed East Bank Metrodome ofcome into the area or downtown for work. New retail and office space prolight rail stop, drop-off by parents will be convenient as University they Stadium Minnesota PHASE West Bank 1 vide a buffer for the residential areas, particularly on special event days. With the completion of the Vikings stadium in 2016, a five star Cedar Riverside hotel is designed overlooking the proposed tailgating space and with a direct view to the stadium. The hotel will accommodate incomElliot Park ing fans making this a destination for the weekend, and not just for a day. 23 18 Changing the stadium from an isolated monument surrounded by seas of parking, the Living in Place development integrates the sta18 PARTI DIAGRAM Ventura Villageof the community. The ambitious nature of the design will set new expectations for 21st century dium into the culture and liveliness LEGEND downtown stadiums. WINTER ON THE FIFTH STREET BOULEVARD BUILDING USE + MASSING LEGEND
1
Downtown East
STADIUM PLAZA
THE ARMORY
The retrofitted Armory is one of the main lower level with permanent locations for SEASONAL tion of food venues, eliminates the “food games. COMMUNITY GARDEN DAY
1,117,555
SPRING
19 19
17 17 OFFICE
17 17
14 The neighborhoods created through this scheme become an attraction for all people living within the city of Minneapolis. There is the ARMORY VILLAGE AND PARK 15 PEDESTRIAN 19garden near the homeless shelter to strength1,108,320 skyscraper lifestyle for some, more affordable housingBRIDGE for others, and even a community19 HOTEL 3 BIOFILTRATION WETLANDS 16 ATHLETIC en the community. With the garden at this location,PERFORMANCE the membersCENTER of the shelter can tend the garden and then sell excess produce at the RECREATION 4 CAFE HEALTHnear CARE CLINICS 17 located 1,935,104 market in the Armory. AHOUSING three star hotel the new clinic area for specialists and the existing hospital makes staying with 5 MIXED-USE RETAIL + RESIDENTIAL CARE CLINICS 18 HEALTH 1,912,499 loved ones easier while receiving necessary services and treatments. OFFICE 2
Within the first year of construction, we n school, to be rented out with a 20-year le 6 MIXED-USE RETAIL + RESIDENTIAL AFFORDABLE HOTEL 19803,515 7 HISTORIC LOCK SWIM PARK light rail stop, drop-off by parents will be AFFORDABLE 2,046,956 Examining the existing area consisting 20 of mass surfaceRESIDENTIAL parking lots and some businesses, the future value with no development occur8 MIXED-USE RETAIL + RESIDENTIAL ring would be $38,833,722. In Phase 1 21 we AFFORDABLE have createdRESIDENTIAL multiple residential, office, retail space, school, and retrofitted the Armory. In a buffer for the residential areas, par MIXED-USE RETAIL + RESIDENTIAL 9 Phase PHASE 2 for the specialtyvide HIGH RISE,and TOWER: MIXED-USE 2, we built the skyscraper, a three hotel a space health clinics. For Phase 3, we complete the area with 22 star CHARTER SCHOOL 10anK-5 RETAIL, OFFICE + RESIDENTIAL athletic performance center, community garden, and affordable housing. We’ve financed development ofoverlooking 30.44 million square the propose hotel isthedesigned MIXED-USE GROCER + OFFICE EXISTING BUILDING IN UNDEVELOP11feet 23 from with 70% from loans and 30% equity the existing land, $55,051,300, and cash, $245,222,471. Even with the cost of this develABLE PARCEL (TYPICAL) LUXURYat HOTEL 12opment $907,956,882, the Net Present Value of the project is $208,917,106 our design we are not onlya bringing in more ing. With fans making this destination for the 24 BUILDING PROPOSED FOR FUTURE TRAIN STATION 13housing, both market rate and affordable, but new jobs with office space, retail, and amenities, and integrating the area as a cohesive VISION (TYPICAL) Changing the stadium from an isolated m community for all. RETAIL
PARKING
HOUSING (RENTAL & FOR-SALE)
OFFICE
AFFORDABLE HOUSING
OPEN SPACE
HOTEL
SCHOOL
RETAIL
PARKING (SURFACE+STRUCTURED)
h as festivals, parades, and winter recreational activities on the expansive, sculpted terrain Lorena Paz Akin. Portfolio 2014
7 mixed population of young adults, families, and senior citizens representing a cross-section nity provides amenities such as a charter school, multiple food venues, retail and commerc m the riverfront and the Mill District to Elliot Park. stage of life, - a transitional point for a college graduate excited and eager to start a profes n elderly couple sharing a love for the arts and attending weekend shows at the Guthrie Th e, able to walk to work in the morning and stroll in the evenings along pedestrian-oriented rhood where children attend a neighborhood school, and anticipate snow tubing in the land 5 e-cycle community. 6 7
5
6
44
88
33ing,
marks the midpoint of a pedestrian-oriented axis, which is flanked by mixed-use resid he local farmers23market with fresh produce and small shops selling local products and or9 ure of “green fingers”, consisting of10bio-swales, retention ponds, and green roofs, run para 11 ll as to the existing city streetscapes. These green fingers not only aesthetically enhance th 12 24 sediments from entering the Mississippi Riv wn water run off reducing pollutants and toxic elopment, commercial and public places act as a “buffer” from crowds emerging from the boulevard accommodating a wide variety of retail and entertainment locales, provides vario nts alike to enjoy before, during, and after community and sporting events. 23
9
10
11
12
24
13 13
ongside the Vikings Stadium, will enhance the Downtown East area and truly become a new 14 14
n destination points in our proposal. Its interior is renovated to house a farmers market on specialized local shops located on the mezzanine15above. The Armory, along with a wide s desert” in Downtown East, and encourages people to spend time in the area after work or 15
16 16
not only refurbish the Armory and create new housing, but also construct a charter elemen ease, which will attract young families to the neighborhood. Located adjacent to the propos e convenient as they come into the area or downtown for work. New retail and office space rticularly on special event days. With the completion of the Vikings stadium in 2016, a five ed tailgating space and with a direct view to the stadium. The hotel will accommodate inco e weekend, and not just for a day. Graduateintegrates Work 24 s monument surrounded by seas of parking, the Living in Place development the
OTHER RECREATION INDUSTRIAL INFRASTRUCTURE HOUSING OFFICE RETAIL
02% 02% 02% 02% 05% 14% 03%
66%
PARKING
CURRENT SITUATION
14%
HOTEL RECREATION
02%
32%
HOUSING
27%
OFFICE
18%
RETAIL PARKING
07%
PROPOSED AREA
MINNEAPOLIS URBAN AREA
SUMMER SUN STORM WATER COLLECTION
WINTER SUN
GREEN ROOF/ COMMUNITY GARDENS
SIDEWALK W/ BICYCLE LANE
NATURAL VENTILATION
BIOSWALE
PERMEABLE PAVING RETAIL
DIAGRAMMATIC STREET SECTION
COURTYARD
PORTLAND AVE.
5th AVE. SOUTH
VIEW FROM HOUSING TO THE ARMORY
RETAIL
RETAIL
OPEN SPAC
.B RID
GE
Lorena Paz Akin. Portfolio 2014
3rd AV E
WASHINGTON AVE.
B.L. 16
HOTEL
RI
DG E
7th ST. N
RC HB
RECREATION
762,034
HOUSING
ST ON
EA
B.L. 19&5
287,304 57,000 1,117,555
OFFICE
731,114
RETAIL
2,046,956
PARKING
PHASE 1
1,108,320
HOTEL
CEDAR ST
HIAWATHA LINE LIGHT RAIL
MN HWY 55
11th AVE.
BUS 19 & 5
PORTLAND ST.
3rd AVE. S.
BUS LINE 16/ PEDESTRIAN BRIDGE
RECREATION
1,935,104
HOUSING
1,912,499
OFFICE
803,515
RETAIL
2,046,956
PARKING
PHASE 2
TRANSPORTATION DIAGRAM
1,204,088
HOTEL RECREATION
175,063 3,128,214
HOUSING
1,898,242
OFFICE
1,671,589
RETAIL
2,046,956
PARKING
PHASE 3
HOUSING (RENTAL & FOR-SALE)
OFFICE
AFFORDABLE HOUSING
OPEN SPACE
HOTEL
SCHOOL
RETAIL
PARKING (SURFACE+STRUCTURED)
LAND USE DIAGRAM
LARGER VISION PLAN
TO WASTE TO ENERGY FACILITY
1.5 MILES AWAY
ROOF WATER COLLECTION CAPTURE AND FILTER STORM WATER RUNOFF FOR USE IN IRRIGATION FOR LANDSCAPE, TOILETS AND CROPS
WASTE HEAT
HEAT FROM RESTAURANTS INSIDE THE STADIUM IS CAPTURED TO HEAT WALKWAYS IN FRONT OF THE STADIUM.
THE “ARMORY”
REVITALIZED AS A MARKET WHERE THE COMMUNITY COULD ALSO SELL THEIR PRODUCE.
COMPOST
ORGANIC WASTE COMPOSTS IN PLACE, CHEMICAL REACTION HEATS WATER AND FINAL COMPOST IS USED IN ROOFTOP COMMUNITY GARDENS.
26
Nomination for the AIA Scholarship Award
2013
JENKINS CRAFT CENTER MILL RUN, PA
Light, Shadow, And Movement Emerging From The Ground And Extending A View To The Horizon. As A Response To Site, This Building Represents An Attempt To Flip The Duality, Or To Subvert The Normal Relationship Between The Building And Site. As The Building Houses The Creation Of Craft And Art, I Decided To Reduce The Site To Art: Light, Shadow, And Movement.
AFT C
ENTE
R
TR A
IL
parking
TISSU
PE
NI NS
UL
A
E LN
to fallingwater
.
MILL
TO CR
RUN
RD.
The Ground Plane Is Harnessed As Inseparable From The Building’s Core Movement.
Lorena Paz Akin. Portfolio 2014
Graduate Work
28
gallery view
Section model
Transversal Section A
painting studio view
1st level plan
gallery section
LONGITUDINAL SECTION: GALLERY SCALE 1/8”-1’0” JENKINS CRAFT CENTER, MILL RUN, PA
Helical Wind Turbine
Functions in wind from any direction Functions in turbulent or gusty winds Rated power of 1.5 kW 672,533 kbtu/year produced with 15 turbines, 60% of electricity needed Return on investment in 6 years
1 PV Panels + Solar water
2
395 PV panels installed 518,833 kbtu/year produced 47% of electricity needed Return on investment in 1.5 years
Earth Sheltered Cons
53% of the center is sh
SUSTAINABLE FEATURES SECTION
Lorena Paz Akin. Portfolio 2014
VIEW FROM BENEATH THE GALLERY
1/16” MODEL PHOTOGRAPH
Living Roof
Local Plants and soil covering the roof insulate the building Irrigated with collected rain water exterior gallery
entrance
s. courtyard
struction
heltered (19,799 sq. ft.)
painting studio
lightwell
seminar room
Geothermal Heating + Cooling
administration
inverter
switch board
The geoexchange system circulating a mix of water and antifreeze through 64 Deep wells;
72˚ 45˚
mechanical room heating and cooling equipment pumps
300’ 55˚
extra 7% of energy produced would go to the grid creating a revenue of $4 every month meter
Stable earth Temperature 55˚
30
THE AUDUBON SOCIETY RESEARCH FACILITY
11
CURRITUCK, NC
The Audubon society research facility is located in the Outer Banks of North Carolina. Due to global warming, sea level rise threatens to flood nearly the entire site in the next 50 years. Knowing this and due to the historic nature of the current complex, I decided to place the building in the highest point of the site, which is also a clearing surrounded by native vegetation. The form is derived from the scientific process used to study and store water and living samples.
SEA LEVEL RISE DIAGRAM
EA LEVEL RISE DIAGRAM_
40 year prediction (4’ rise)
n
100 year prediction (6’ rise)
5 1 6 4
2
3 1. 2. 3. 4. 5. 6. WINDS, ACCESS AND RELATIONSHIP WITH EXISTING CAMPUS
LOCATION DIAGRAM_
Research center
Dwellings
Hunting lodge
Guide’s Cottage
Mickey Cottage
Lookout
n
8
Lorena Paz Akin. Portfolio 2014
7
9
10 6
5
3
3
4
2 1
12
Graduate Work
32
SKETCH
ENTRANCE VIEW
SECTION A-A_ scale 1/8”=1’ 4
SITE SECTION
Lorena Paz Akin. Portfolio 2014
NORTH ELEVATION
SECTION THROUGH COMMONS
RESEARCHER’S RESIDENCE
34
WASTE CONVENIENCE CENTER RALEIGH, NC
The Wake County Recycling and Solid Waste Convenience Centers are trash and recycling drop off stations scattered throughout Wake County and are used every day by thousands of county residents. Typically, 1 to 3 county workers operate each station at a given time and their responsibilities include directing people to the proper waste bins and watching over the grounds so that no one is hurt or removes any of the recycling from the collection area. The Convenience Center Huts (CCHs) are shelters that provide the workers with protection from the elements, a small workspace and an area to prepare and store food. Most of the county’s 11 current CCHs are dilapidated and use large amounts of energy for heating and cooling despite their small size. The goal of the Summer 2010 design-build studio at North Carolina State University was to replace the buildings in 3 of the sites.
SITE PLAN
Lorena Paz Akin. Portfolio 2014
RENDERED VIEW
14'-0” 13'-8" 8'-01 2"
5'-71 2"
6'-9"
1'-3"
1'-10 1 4"
3'-6"
6'-0” 8'-0”
4'-83 4"
6'-0”
OFFICE 3'-0”
13'-6"
11"
PLAN
Final Render. Entrance View 1'
ARCHITECTURAL PLAN 2
NORTH 1
A5.2
A5.2
5
A5.2
4
A5.2
6
A5.2
6
A5.2
3
A5.2
SECTION A
Graduate Work
36
CONSTRUCTION PROCESS
Lorena Paz Akin. Portfolio 2014
Sliding chair SPRING 2011
Fabricated by myself from Birch bending plywood with Walnut and Maple lumber accents. There was no need for any hardware as it was my intention to explore and study wood connections.
initial sketch
connection detail
Graduate Work
38
CONTACT INFORMATION (919) 840 8806
@
LOrenapazakin@gmail.com
218 Idlewild Ave., Raleigh, NC 27601