PK714_091023

Page 1

HANDRAIL KIT FOR AM8000 Applicable for Kits:

PK-714

091023

ASSEMBLY INSTRUCTIONS

STEP 3 – ATTACH DROP CHAIN ASSEMBLY TO GUARDRAIL. 1. HOOK 5/16" WELDED EYE BOLT INTO SNAP HOOK 2. PLACE 5/16" WASHER ONTO WELDED EYE BOLT 3. INSERT WELDED EYE BOLT INTO HOLE PROVIDED ON THE GUARDRAIL. 4. PLACE 5/16" WASHER ON WELDED EYE BOLT 5. SCREW ON 5/16" SPIRALOCK NUT. 6. REPEAT STEPS 2 - 5 FOR THE OTHER END OF THE CHAIN. 7. REPEAT STEP FOR OPPOSITE SIDE OF GUARDRAIL

STEP 1 – MOUNT SOCKET TO THE PLATFORM ASSEMBLY USING (4) 5/16-18x1" HHCS, (2) 5/16" WASHERS (NOTE: WASHERS USED ON THE TOP (2) HHCS AS A SPACER) AND (4) 5/16" SPIRALOCK NUTS. (4) SOCKETS PER ASSEMBLY (2) ON EACH SIDE OF THE PLATFORM ASSEMBLY.

STEP 2 MOUNT THE GUARDRAIL THRU THE SOCKETS AND ALIGN HOLES. USE (2) 5/16-18x2 1/2" HHCS AND (2) 5/16" WINGNUTS PER SOCKET. REPEAT STEP FOR OPPOSITE SIDE.

Louisville Customer Care 1(800) 666-2811 www.louisvilleladder.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.