Lane Pak Architecture Portfolio

Page 1

LANE PAK PORTFOLIO

PORTFOLIO

issuu.com/lpak/docs/por olio

LINKEDIN

linkedin.com/in/lanepak/

ADDRESS

LANE PAK

PROFESSIONAL EXPERIENCE7 YEARS

ASSOCIATE

C2K Architecture, Inc. (Portland, OR)

Alfa:

July 2017 - January 2023

5.5 years

Schema c Design | Design Development | Construc on Documenta on

• Developed unit plan studies and collaborated on exterior design.

• Responsible for document coordina on among owner, contractor, and consultants and led OAC mee ngs.

Silvery Towers: Construc on Administra on

• Responsible for crea ng Field Observa on Reports and responding to RFIs and Submi als.

• Assisted project manager on ASIs and Change Orders.

• Par cipated in OAC mee ngs and made regular site visits.

20th Place:

Schema c Design | Design Development | Construc on Documenta on

• Contributed to early exterior design discussions with the larger team.

• Created and coordinated the design development drawings.

• Assisted on the construc on document drawings for permit.

Coral Academy School:

Schema c Design | Design Development | Construc on Documenta on

EMAIL

lane.pak@gmail.com

15781 NW Rondos Drive Portland, OR 97229 503.713.7376

• Extensive collabora on with team during early conceptual and schema c phases.

• Designed the school library interior and outdoor amphitheater.

• Responsible for interior sheets during documenta on.

Villebois Village Center: Design Development | Construc on Documenta on

• Responsible for document drawings during DD for one of the three buidings in this project.

• Coordinated document consistency across all three buildings during DD and CD.

Juno:

Schema c Design | Construc on Documenta on

• Par cipated in early conceptual studies for project.

• Developed mul ple yield studies.

• Assisted in development of construc on documents for permit.

General Office:

• Coordinated with others on the new logo and business card designs.

• Designed the decal work on the conference room glass walls.

• Organized discussion and incorporated virtual reality for current and future projects.

Korea Japan Western Europe Italy (Study Abroad)

English Korean Spanish

INTERN ARCHITECT MEDIA COACH

July 2015 - March 2017

jrj architects, llc (Beaverton, OR)

• In charge of coordina ng the Revit model within team.

2 years

• Regularly in correspondence with clients, consultants, & contractors.

• Received detailed exposure to healthcare design standards.

Jan. 2014 - March 2014

UO Department of Architecture (Eugene, OR)

PRACTICUM STUDENT

Arbor South Architecture (Eugene, OR)

3 months

Oct. 2013 - Dec. 2013

3 months

0 1 2 3 4 5 6 7 8 9 10 SKILLS AutoCAD Revit InDesign SketchUp Photoshop Illustrator HandMedia DigitalArt ModelMaking PHONE
TRAVEL HISTORY LANGUAGES
Na ve Proficient Beginner
ALFA 20TH PLACE SILVERY CORAL ACADEMY ART LOGO DESIGN & GLASS DECAL TRAVEL TABLE OF CONTENTS 04 08 12 14 16 18 19 CONCEPTUAL SKETCH FOR JUNO PROJECT

ALFA

Loca on Project Type

Construc on Area

Unit Count

Sacramento, CA

Mid-Rise Mixed-Use

Type IA & IIIA

6,000 SQ FT 24 units; 7 floors

Par cipated in charre es for exterior, breezeway, and common area designs. Created drawings for En tlements and Design Development.

4

LEVEL 3-7

LEVEL 2

LEVEL 1

5

Responsible for document coordina on between owner, contractor, and consultants, and led bi-weekly OAC mee ngs.

6

Developed extensive unit plan studies which would become the basis of design for other projects.

7

20TH PLACE

Loca on Project Type

Construc on Area Unit Count

Sacramento, CA Mid-Rise Mixed-Use Type IIIA

45,000 SQ FT 50 units; 5 floors

Researched California Building Code specific to live/work units at ground floor and garage renova on across the alley.

Contributed to early exterior design discussions with the larger team.

8

LEVEL 2-4 LEVEL

9
LEVEL 5
1
10
Created and coordinated the DD drawings and assisted on the construc on document drawings for permit.

Managed less experienced team members during the DD phase.

11

SILVERY TOWERS

Loca on Project Type Construc on Area Unit Count

San Jose, CA

High-Rise

Post Tensioned Concrete

1,100,000 SQ FT

640 units

Ground floor retail, penthouse levels, and an amenity podium connec ng the towers at Level 3.

Maintained regular contact with owner representa ve, contractor, and consultants over the course of two years during CA.

Responsible for crea ng Field Observa on Reports for monthly site visits and responding to RFIs and Submi als.

12

Shared coordina on of CA items with lead project manager, and o en took over general CA coordina on when PM was out of town.

13

CORAL ACADEMY SCHOOL

Loca on Project Type

Construc on Area

Las Vegas, NV Educa onal Type IIB

50,000 SQ FT

Four separate buildings surround a quad for children to use for outdoor classes and play. The facility doubles as a venue for public events hosted by the Air Force Base outside of school hours.

14
Designed the school library interior and outdoor amphitheater. Produced mul ple studies and diagrams with the team during conceptual and schema c phases of design.

Developed the road design, exterior landscaping, and interior materials and finishes. Responsible for interior drawing sheets during documenta on.

15

SKETCHES

16

DIGITAL ART

17

LOGO DESIGN

The firm underwent a logo redesign a few years ago and I worked with others on designing the new logo and business cards.

GLASS DECAL

I designed the conference room glass decals in an effort to keep people from running into them. Every couple of weeks, I drew something new on the smaller conference room wall to showcase one of the office dogs, holidays, or upcoming office events.

18

TRAVEL

19
KOREA & JAPAN 2019HAWAII 2020
VEGAS 2022
THANK YOU olivebacardijack

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.