Proposed Residential Apartments - Kileleshwa, Nairobi County Proposed Chapel - Gul Yago, Kisumu County Conceptual Bowling Alley - Lang'ata, Nairobi County Proposed Residential Estate - Karen, Nairobi County Proposed Multi-Purpose Complex - Ongata Rongai, Kajiado County Proposed Sanctuary & Guest House - Kericho Town, Kericho County Proposed Residential Apartments - Kisumu City, Kisumu County Proposed Residential Estate - Pap Onditi, Kisumu County Proposed Residential Apartments - Makongeni, Kiambu County Proposed 3 Bedroom House - Rongo, Migori County Proposed Hotel & Conference - Limuru, Kiambu County Proposed Referral Hospital - Limuru, Kiambu County Proposed Residential Estate Master Plan - Kenyatta Road, Kiambu County Continous Professional Development Programme - Virtual Conference Proposed Residential Apartments - Ahero, Kisumu County
RESIDENTIAL APARTMENTS Scheme Design
Status
Dec 2018-Dec 2020
Time
RESPOSIBILITIES
Site Survey & Supervision Conceptualization Scheme Design Stakeholder Meetings Presentations EXPERIENCE
Brief Formulation Project Programming Design Considerations Costing
A GROUND FLOOR PLAN
E TYPICAL 4 BEDROOM UNIT ACHERA & PARTNERS ARCHITECTS, URBAN PLANNERS & INTERIOR DESIGNERS
S-02
S-01
E-02
F
G
H
M
O
P
R
S
T
3,700
450
2,550
5,450
450
3,250 1,600
1,500
1,500
1,550
1,150
Verandah
450 2,550
2. Drawing are not to scalled. Only figured dimensions to be used. 3. The contractor must check and verify all dimensions before commencement of any work. Any discrepancies to be clarified with the Project Architect.
Verandah 300x300mm Non-Slip Ceramic Tiles f.f
Kitchen
Dry Store
Cold Store
300x300mm Ceramic Tiles f.f
300x300mm Ceramic Tiles f.f
600x300mm Ceramic Tiles f.f
CONSTRUCTION
1
4. All slab at ground level to be cast over 1000 guage polythene sheet on 50mm thick murram blinding on hardcore.
R 1,000
5. All soil under slab around and under foundation to be treated for termite control.
800
CIVIL 6. All soil on cut embararkment to be stablized. The slope not to exceed 45 degree.
1,200
300x300mm Ceramic Tiles f.f
2
STRUCTURAL
450 100 200
300x300mm Ceramic Tiles f.f
24
4
25
4
26
27
28
29
200
23
30
Void Above
UP
1,050
LIFT
PARKING
6,850
450
5,000
6,700
450 50 450
5,900
5,450
450
6,250
3,050
250
5,000
2,850
250
3,000
3,050
2,400
800
5,450
1,900
800
6,700
5,000
10. All walls to be reinforced with loop iron at every alternate course. 11. All adjacent R.C. work and masonry walls to be tied with loop iron at every alternate course.
5
MECHANICAL 12. All plumbing and drainage to comply with relevant local authority.
6
13. SVP denotes soil vent pipe to be provided at the head of the drainage system. 14. Drains pass beneath buildings & driveways to be encased in 150mm concrete surround.
450
6,700
3,500
31 CARS
Planter
8. For all R.C work,refer to stuctural Engineer's details.
2,600
Lobby 600x600mm Granito Tiles f.f
7. All black cotton soil to be removed from all buildings and paved surfaces. 9. Depth of foundation to be detemined on site to S.E's aproval.
LIFT
5,450
1,900
450
900
3,050 800
Ladies Lav.
1,025
2,850 2,400
Gents Lav.
5,675
22
200
250
1,800
Laminated Tiber Strips
1. All dimensions are in mm unless otherwise specified.
31
3,000
5,900 450
21
5,200
5,650
15,350
20
J
200 250 200
GENERAL
450
2,550
1,050 250 450 800
1,400
2,400
NOTES
Z 3,000
1,600
4,300
1,800
3,050
450
1,500
3,850
5,000
450
4,500
E-03
2,000
5,450
450
X 450
3,250
1,800
15. The storm drain pipes to comply with BS 556 specification.
E-01
4,500
200
4,900
6,700
200
1,550
200
450
17
C
1,500
27,750
200
250
1,200 1,500
1,500
19
6
A
1,550
3
2,300
250
UP
1,400
LIFT
3,850
Void Above
600x600mm Granito Tiles f.f
1,825 200
5
3,800
Lobby
200
3,650
1,200
3,700
450
5,000
2,750
F
300x300mm Non-Slip Ceramic Tiles f.f
1,200
LIFT
4,300 3,850 150
200
4,250
2
1,400
250 1,825
5,400 7,700
200
W 5,450
450
2,600
600
2,700
Restaurant Dining (22 Pax)
18
R 2,800
3
3,050
450
2,400
600
2,750
450
3,150
Concrete Blocks Tiles f.f
Swimming Pool
2,850
450
2,600
1,200
600x300mm Ceramic Tiles f.f
Outdoor Dining (16 Pax)
200
3,000
250
1
8,500
3,050
450
5,000
1,800
200
3,000
200
3,000
450
800
1,150
600
3,500
3,650 450
1,300
3,000
800
450
1,500
Service
3,050
300
2,100
450
U
33,700
2,850
250
3,500
2,550
9,400 3,050 3,000
F
E 250
Copy Right: All rights reserved. No reproduction, copy or transmission of these drawings may be made without permission. The author has asserted his right to be identified as the author of this design in accordance with the Copyright, Designs and patents Act Cap 130 of the Laws of Kenya.
16. All underground foul and waste drain pipes shall be uPVC to comply with BS 5255.
450
8
7
6
5
4
3
2
10,250
900
S-02 7,025
2,000
A
900 2,125
100
1,850 150
1,250
650 150
600
D
450
REVISIONS
150 300
450
5,075
450
1,775
E
H
450
4,250
10,150
450 500
1,200
E-02
I
K
L
450
1,550
500
1,650
450
4,250
2,000
6,925
M
1,900
800
R
E-02
M
2,250
2,150
2,750
2,750
O
450
1,500
550
800
3,900
S-01
U
800
3,050
3,000
10
2,000
Y
10,900
2,150
2,750
450
1,550
6,925
V
S-01
550
450
1,900
3,225
T
2,150
2,300
3,350
S
10,900
550
S-02
450 300 800
2,400
S-01
3,350
48,175
Q
GROUND FLOOR
B TYPICAL APARTMENT PLAN
300 450 800
4,250 3,225
E-02
N
E-04
S-02
2,750
Z
Slope 25o
Slope 25o
P
R
ACHERA & PARTNERS NOTES
550
2,150
W
X
3. The contractor must check and verify all dimensions before commencement of any work. Any discrepancies to be clarified with the Project Architect.
NOTES
Z
1,800
1,500
2,500 500 200 500
2,850
A
1,500 2,800
9
DSQ 600x600mm Ceramic Tiles f.f
1,200
750
900
4,250
500 150
450 350 300 600
1,100
150
600
2,300 150
1,875
350 450 300 500 150
1,875
1,100
150
900
750
1,200
1
6
Toilet & Shower
Toilet & Shower
450x450mm Non-slip Ceramic Tiles f.f
450x450mm Non-slip Ceramic Tiles f.f
Corridor 600x600mm Ceramic Tiles f.f
Dining
600x600mm Granito Tiles f.f
600x600mm Granito Tiles f.f
57
Breakfast
Bedroom 1
600x600mm Ceramic Tiles f.f
600x600mm Ceramic Tiles f.f
2,800
1,500 2,850
K 3
2
L
67,100
M
1,500
2,500 500 200 500
2,850
1,500
1,200
750
4,250
6,925
S-01 S
Toilet 450x450mm Non-slip Ceramic Tiles f.f
Toilet
600 350 450 150 650 900 150 150 1,875 1,100
750
450
1,550
450
+27,600 9 Roof 2
A
Solar Water Heaters
450
4,250
2,000
1,775
450 S-02
4,700
450
2,775
1,850
5,450
B
C
Solar Photovoltaic Panels
E
S-02
450 300 450
2,400
3,050
D
Solar Water Heaters
450 300 450
2,850
F1
F2
Solar Cloak Corridor Photovoltaic Rm. Panels
450
1,850
450
2,775
3,050
4,250
H
6,350
I
Cloak Rm.
Verandah
+24,600 8 Roof 1
2,250 200
4,250
725
+27,600 9 Roof 2
K
J
L
1,500
2,500 500 200 500
2,800
1,500
900 200
2,850
V
7
Y
9
2,000 1,800
200
2,000
8
Kitchen
Corridor
67,100
M
Kitchen
Verandah
6,600
800
4,250
+27,600 +27,600 9 Roof 9 Roof 2 2
N
800
3,900
3,225
Z 7
Q
+27,600 9 Roof 2
R
Kitchen
Cloak Rm.
Verandah
Kitchen
Corridor
6,250
800
3,000 7,100 11,450
3,000
2,550
E-01
PROJECT
7
ELECTRICALS 19. No chases will be allowed for pipes. Sleeves will be allowed with Mazeras Road, Kileleshwa, Nairobi written approval of structural Eng's. No cutting23. of All concrete without 23. All conduits must be laid before plastering conduits must be laid before plastering Plot Number: express approval of the Architect or structural Eng. 21. All mechnical works must be co-odinated with electrical and any
conflict must be clarified before work begin. REVISIONS
7
NO. UNION SDAREVISION WEST KENYA ELECTRICALS Signature:
Date:
23. All conduits must be laid before plastering
REVISIONS
DATE
REVISION NO.
Contact:
REVISIONS
Drawn By:
8
KLL
CheckedDATE By:
REVISION NO.
C A0 M Approved By:
8
C A0 M
1:100
9
Signature:
1:100 Date:
9
Contact:
Drawing Titles
BASEMENT -1, GROUND FLOOR Drawing Numbers
L[--]-03, L[--]-02
10
1:100
Y
Solar Water Heaters
Client: 22. PV denotes permanent ventilation.
DATE
2,175
V
Location:
ELECTRICALS
E-01
4,300 1,050
18. Minimum slope in the drains pipes to be 1: 100. 18. Minimum slope in the drains pipes to be 1: 100. 14. Drains pass beneath buildings & driveways to be encased in 19. No chases will be allowed for150mm pipes. concrete Sleeves will be allowed with 19. No chases will be allowed for pipes. Sleeves will be allowed with surround. written approval of structural Eng's. No cutting of concrete without written approval of structural Eng's. No cutting of concrete without 15. storm Eng. drain pipes to comply with BS 556 specification. express approval of the Architect orThe structural express approval of the Architect or structural Eng. 16. All underground foul and waste drain pipes shall be uPVC to 21. All mechnical works must becomply co-odinated with electrical and any 21. All mechnical works must be co-odinated with electrical and any with BS 5255. Title: conflict must be clarified before Project work begin. conflict must be clarified before work begin. 17. All inspection chambers covers and framing shall be cast iron. PROPOSED RESIDENTIAL APARTMENTS 22. PV denotes permanent ventilation. 22. PV denotes permanent ventilation. 18. Minimum slope in the drains pipes to be 1: 100.
450
1,550
9,975
S-01 Solar Photovoltaic Panels
+27,600 9 Roof 2
Z
+27,600 9 Roof 2
Solar Photovoltaic Panels
1:100
+24,600 8 Roof 1
+24,600 8 Roof 1
+24,600 8 Roof 1
+21,600 7 Story
+21,600 7 Story
+18,600 6 Story
+18,600 6 Story
+15,600 5 Story
+15,600 5 Story
Scale:
Date:
Stage:
1:100
10/11/2019
Scheme Design
Job Number:
Sheet Number:
Orientation:
#Pln
A.02.2/34
N
S-01
E-02 Cloak Corridor Dining Rm.
Corridor
800
U
Solar Water Heaters
+24,600 +24,600 8 Roof 8 Roof 1 1
4,250
2,125
15. The storm drain pipes to comply with BS 556 specification.
MECHANICAL
16. All underground foul and waste drain pipes shall be uPVC to 16. All underground foul and waste drain pipes shall be uPVC to 12. All plumbing and drainage to comply with relevant local authority. comply with BS 5255. comply with BS 5255. 13. SVP denotes soil vent pipe to be provided at the head of the 17. All inspection chambers covers and framing 17. All inspection chambers covers and framing shall be cast iron. drainage system.shall be cast iron.
250
1,750
S-01
800
6,825
BASEMENT -1
Verandah
S-02 Dining
Corridor
22,650
6,925
E-04
600 250 2,750 1,700 2,100 200 200 450 200 2,550 1,200 1,000 1,850 725 5,650
E-01
Bedroom 2
6,925
U 8
6,800
450
+24,600 8 Roof 1
Kitchen
Verandah
250
TYPICAL APARTMENT (1ST. - 7TH. FLOORS)
5,450
G1 G2
Kitchen
450
1,775
2,000 450 450 50 450 1,200 1,550 500 2,000
200
400
900 450x450mm Non-slip Ceramic Tiles f.f
250
250 250
32,650
450
250
63
10 250
5,650
4,750
Toilet & Shower
600x600mm Ceramic Tiles f.f
3,225
R 9
S-01 Bedroom 1 600x600mm Ceramic Tiles f.f
1,200
8,950
Q
62
600x600mm Ceramic Tiles f.f
Pantry
Verandah 2,300 150
600x600mm Ceramic Tiles f.f
Corridor
1200x600mm Granito Tiles f.f
T
150 450 350 600 900 650 150 150 1,100 1,875
Master Bedroom
Walk-In Closet 600x600mm Non-slip Ceramic Tiles f.f
600x600mm Non-slip Ceramic Tiles f.f
450x450mm Non-slip Ceramic Tiles f.f
DSQ 600x600mm Ceramic Tiles f.f
S
4,050
E-01
200 5,200 850 250
Breakfast
Kitchen
T
DSQ 600x600mm Ceramic Tiles f.f
3,225
N
1,350
F
Verandah
E-04
1
59 Cloak 450x450mm Non-slip Ceramic Tiles f.f
1200x600mm Granito Tiles f.f
2,250 200
2,800
58 Cloak
450x450mm Non-slip Ceramic Tiles f.f
Kitchen 600x600mm Non-slip Ceramic Tiles f.f
Pantry
ROOF 2
125 600 600 900 2,250 1,025 200 150 50 200 200 1,500 1,800 500 1,650 2,000
1,800
6,250
450x450mm Non-slip Ceramic Tiles f.f
Lounge
360BEDROOM 61
Bedroom 2
2,200
Toilet & Bath
355BEDROOM 56
600x600mm Ceramic Tiles f.f
850
11,900 450
5,000
15. The storm drain pipes to comply with BS 556 specification.
F TYPICAL 3 BEDROOM UNIT
5
26,400
Dining
E-04
2,500 500 200 500
1,950
Balcony
450
2,600
11.&All adjacent to R.C. and in masonry walls to tied with 14. Drains pass beneath buildings driveways be work encased 14.beDrains passloop beneath buildings & driveways to be encased in iron at every alternate course. 150mm concrete surround. 150mm concrete surround.
6
200
200 400 1,300 800
800 450
4,900 450 2,500
3,000
200
4,050
1200x600mm Granito Tiles f.f
2,400
600x600mm Granito Tiles f.f
Bedroom 2
200
W
1,625
6,700
200
2,500
For all with R.C work,refer to stuctural Engineer's12. details. 12. All plumbing and drainage to8.comply relevant local authority. All plumbing and drainage to comply with relevant local authority. 9.be Depth of foundation to be on site13. to SVP S.E'sdenotes aproval.soil vent pipe to be provided at the head of the 13. SVP denotes soil vent pipe to provided at the head of detemined the drainage system. system.course. 10. All walls to be reinforced with loop iron atdrainage every alternate
5
4,300
2,400
450
2,600
11. All adjacent R.C. work and masonry walls to be tied with loop 11. All adjacent R.C. work and masonry walls to be tied with loop STRUCTURAL iron at every alternate course. iron at every alternate course. 7. All black cotton soil to be removed from all buildings and paved surfaces. MECHANICAL MECHANICAL
2
5,650
600x600mm Granite Tiles f.f
250
3,000
450
1,150
Slope 25o
4,900 550
1,800
200
5,000
600x600mm Granito Tiles f.f
600x600mm Ceramic Tiles f.f
43
6 250
Lounge
Bedroom 1
1,500
7,100
5,650 Breakfast
5,450
200
CIVIL 8. For all R.C work,refer to stuctural Engineer's details. 8. For all R.C work,refer to stuctural Engineer's details. 6. All soilon onsite cut to embararkment slope not to 9. Depth of foundation to be detemined S.E's aproval.to be stablized.9.The Depth of foundation to be detemined on site to S.E's aproval. exceed 10. All walls to be reinforced with loop 45 irondegree. at every alternate course. 10. All walls to be reinforced with loop iron at every alternate course.
2
1,050 5,650
725
1,150
12,800
750
Pantry
Pantry
4,550
42
16,600 200 200 4,9001,150
1,050 200
54
7,025
4
Slope 25o 725
Breakfast
F
Slope 25o
1,800
600x600mm Ceramic Tiles f.f
STRUCTURAL
5. All soil under slab around and under foundation to be treated for 7. All black cotton soil to be removed all buildings and paved 7. All black cotton soil to be removed from all buildings and paved termitefrom control. surfaces. surfaces.
11,800
53
I
5
2,400
41
40
Void Above 3,050 200 250 200 2,650
2,850
200 250 200
4
Electrical Room
Master 6,000 Bedroom
Toilet & Bath 450x450mm Non-slip Ceramic Tiles f.f
CIVIL
STRUCTURAL
6. All soil on cut embararkment CONSTRUCTION to be stablized. The slope not to 6. All soil on cut embararkment to be stablized. The slope not to exceed 45 degree. degree. 4. All slab at ground level to be cast over 1000exceed guage 45 polythene sheet on 50mm thick murram blinding on hardcore.
1
5,650
450x450mm Non-slip Ceramic Tiles f.f
Walk-In Closet 600x600mm Non-slip Ceramic Tiles f.f
600x600mm Ceramic Tiles f.f
Building Above
27
600x600mm Ceramic Tiles f.f
ROOF 2
H 3
Master Bedroom
600x600mm Ceramic Tiles f.f
Walk-In Closet 600x600mm Non-slip Ceramic Tiles f.f
4,700 21,400 600x600mm
6
5,000
32 CARS
Master Bedroom
Corridor
3,125
E 4
2,650 LIFT
1,625
450x450mm Non-slip Ceramic Tiles f.f
Corridor
4,750 450 4,050
Walk-In Closet
2,250 200
4,250
8,950
58
3,000
Balcony
600x600mm Non-slip Ceramic Tiles f.f
Pantry
Verandah
F
W
1,950
450 Toilet & Bath
450
3,000
600x600mm Non-slip Ceramic Tiles f.f
450x450mm Non-slip Ceramic Tiles f.f
2,150
Slope 25o
2,150 12,800
4,900 550
850
3,050
200
6,250
CIVIL
3,000
Kitchen
DSQ 600x600mm Ceramic Tiles f.f
LIFT
5,000
6,700
600x600mm Ceramic Tiles f.f
600x600mm Ceramic Tiles f.f
Lounge
4
Plastered f.f
LIFT
5,450
Bedroom 1
Toilet & Shower
6,000 4,700 Generator Room
UP
200
750
200
400
2,200
Z
450
450x450mm Non-slip Ceramic Tiles f.f
6,000
4
39
200
2,500
6,250
600x600mm Granito Tiles f.f
CONSTRUCTION
5. All soil under slab around and3.under foundationmust to becheck treated 5. All soil before under slab around and under foundation to be treated for The contractor andfor verify all dimensions termite control. termite commencement of any work. Any discrepancies to be control. clarified with the Project Architect.
1
450 250 600 900 3,750 200 200 450 200 200 200 2,750 1,150 1,850 1,000 5,200 1,200
RG
6
1,800
450 50 450
Dining
5,000
2 BEDROOM
Plastered f.f
F
1200x600mm Granito Tiles f.f
D 10 7
2,400
200
E-04
Toilet
450x450mm Non-slip Ceramic Tiles f.f
3,125
B
8
6,700 4,050
5,450
Granito Tiles f.f
38
BASEMENT PARKING
Breakfast
Verandah
2,250 200
7,025
37
W
600x600mm Non-slip Ceramic Tiles f.f
Void Above
F
1200x600mm Granito Tiles f.f
2,450
3. The contractor must check and verify all dimensions before commencement of any work. Any discrepancies to be clarified with the Project Architect.
Allover dimensions are inpolythene mm unless otherwise specified. 4. All slab at ground level to be 1. cast 1000 guage 4. All slab at ground level to be cast over 1000 guage polythene sheet on 50mm thick murram blinding on hardcore. sheet on to 50mm thick murram blinding on hardcore. 2. Drawing are not to scalled. Only figured dimensions be used.
3,300
900 200
S-02
Toilet
600x600mm Non-slip Ceramic Tiles f.f
W
2,000
450x450mm Non-slip Ceramic Tiles f.f
Lounge
50 Cloak 450x450mm Non-slip Ceramic Tiles f.f
Kitchen
600x600mm Ceramic Tiles f.f
Pantry
200
49 Cloak
U
Kitchen 200
3,050
450x450mm Non-slip Ceramic Tiles f.f
1200x600mm Granito Tiles f.f
351BEDROOM 52
450x450mm Non-slip Ceramic Tiles f.f
200 650 Toilet
GENERAL
CONSTRUCTION
200
3,000
Cloak
4,700
Power LIFT Backup
Cabro f.f
200
5,900
Toilet & Bath
346BEDROOM 47
48
2,400
450x450mm Non-slip Ceramic Tiles f.f
21,400
600x600mm Granito Tiles f.f
450x450mm Non-slip Ceramic Tiles f.f
1,600
Slope 25o
Underground Rain Water Collection Tank
4,700
Toilet & Bath
1,500
6,050 250
600x600mm Granito Tiles f.f
T
T
2,850
Lounge 4
6,000
24,000 450
5,000
600x600mm Granito Tiles f.f
Bedroom 1
1,800
DSQ
600x600mm Ceramic Tiles f.f
S
Slope 25o
Cloak
3,950
2,200
200 650
3,000 500 200 200 800 1,800
3,250
1,800
2,850
Dining
600x600mm Granito Tiles f.f
F
600x600mm Ceramic Tiles f.f
450
2,250
Dining
Breakfast
Bedroom 2S-02
800
DSQ
S
600x600mm Ceramic Tiles f.f
3,050 2,450
1,500
Verandah
Toilet
2 BEDROOM
600x600mm Non-slip Ceramic Tiles f.f
Master Bedroom
500
6,350
Kitchen 200
600x600mm Non-slip Ceramic Tiles f.f
3,700
200
3,000
Down
45
600x600mm Ceramic Tiles f.f
850
5,000
W
44
450x450mm Non-slip Ceramic Tiles f.f
5,450
RG
Corridor
1,950
5,450
600x600mm Granito Tiles f.f
1200x600mm Granito Tiles f.f
450
600x600mm Granito Tiles f.f
600x600mm Non-slip Ceramic Tiles f.f
Toilet & Shower
550
3,000
Dining
5,450
1,550
1200x600mm Granito Tiles f.f
450x450mm Non-slip Ceramic Tiles f.f
Corridor
36
Balcony
800
R
600x600mm Ceramic Tiles f.f
1,950
1,625
200 400
1,900
200
2,500
P
Slope 25o
200
3,150 450 1,200
450
1,800
200
200
5,000
Verandah 1200x600mm Granito Tiles f.f
Slope 25o
450
S-01900
1,400
NOTES
1. All dimensions are in mm unless otherwise specified.
patents Act Cap 130 of the Laws of Kenya.
U 150 150 650
2,325 600
2,700
RG
4,550
600x600mm Granito Tile f.f
5,650
5,450
200
2,650
Toilet & Shower 450x450mm Non-slip Ceramic Tiles f.f
8,950 150
2,325 600
1,400
ARCHITECTS, URBAN PLANNERS & INTERIOR DESIGNERS GENERAL
1:100
All rights reserved. No reproduction, copy or transmission of these drawings may be made without permission. The 2. Drawing are not to scalled. Only figured dimensions to be used. 2. Drawing are not to scalled. Only figured dimensions to be used. author has asserted his right to be identified as the author of this design in accordance with the Copyright, Designs and
Slope 25o
W
3,050
600x600mm Ceramic Tiles f.f
900
ACHERA & PARTNERS ARCHITECTS, URBAN PLANNERS & INTERIOR DESIGNERS Copy Right: All rights reserved. No reproduction, copy or transmission of these drawings may be made without permission. The author has asserted his right to be identified as the author of this design in accordance with the Copyright, Designs and patents Act Cap 130 of the Laws of Kenya.
1. All dimensions are in mm Copy unless otherwise specified. Right:
UP
200 250 200
2,400
1,800
250
Lounge
Walk-In Closet
600x600mm Ceramic Tiles f.f
2,350
Slope 25o
950 200
1,200
2,850
200 250 200
Bedroom 1
6,250
150 150 650
3,150 450
1,200
RG
1,625
5,000
450x450mm Non-slip Ceramic Tiles f.f
Master Bedroom
4,300
3,850
1,500
2,400
950 200 1,200
UP
250
2,650
200
1,550
W
1,950
20,100
5,650 450200
3,000
5,450 Balcony 450
2,000
9
1,950
3,050
200
5,000
Toilet & Bath
1,900
9
6
1,500
Walk-In Closet
J
1200x600mm Granito Tiles f.f
11,800 3,000 5,650 3,000 200 200 450 200 200 200 2,550 1,150 1,850 1,000 5,200 1,200 600 13,800 3,400 1,700
9
450
8
-]-06
5,450
200
35
3,000
Up
850
34
4,900
2,200
5,420
33
5,450
200 1,800
6,700
600x600mm Ceramic Tiles f.f
32
Void Above
UP
1,775
E-03
5,350 200 200 4,7501,150
2,500
3 10,900
3 Store
LIFT
4,650
250
8
Void Above
LIFT
Swimming Pool Above
450 380 450
4,750
E-03
200
2
Store 450x450mm Ceramic Tiles f.f
1,825
E-03 1,800 100°
7
550
250 1,825 4,300
1,550 250 1,825
5,650
5,350
150
6,700 4,050 1,350
7
LIFT
C
200
250
450
5
200
10,900
Cabro f.f
A
1,200
1
1,500
M 67,100 500
450 50 450
5,900
Slope 25o
3,500
LIFT
5
3,050 1,650
L
6,350
450
5,000
3,000 200 200 200 1,200 1,000 1,850 600 1,700 2,100
2,850 2,400
5,450
10,450
2,850
250
3,000
3,825 150
450
250
3
H
5,650
3,050
3,500
3
J
200
3,100 Slope 25o
G
9,400
2,350
F
250
2
3,050
200
2,400
Slope 25o
H
2,350
G
2,850
250
3,000
E
Slope 25o
Slope 25o
5,800
F 3,050
250
Slope 25o5,000
5,800
E 5,450
450
5,420
2,350
C 6,700
Slope 25o
A 250 580 450
3,250
1,600
E-02
200
1
3,700
200 500 800
900
550
2,350
1,150
5,100
1,900
2,350
4,750
550
550
550
2,350
550
5,100
1,150
1,800
3,000
2,350
ACHERA & PARTNERS ARCHITECTS, URBAN PLANNERS & INTERIOR DESIGNERS Copy Right: All rights reserved. No reproduction, copy or transmission of these drawings may be made without permission. The author has asserted his right to be identified as the author of this design in accordance with the Copyright, Designs and patents Act Cap 130 of the Laws of Kenya.
GENERAL Slope 25o
S-01
33,700 3,000 200
200
S-02 550
REVISION NO.
3,525
Down
600 350
2,300 3,900
S-028,950
18,950
B
23. All conduits must be laid before plastering
9
250
450 1,100
3,125
Slope 25o
975
100
ELECTRICALS
R 1,000
550
975
100
1,150
900
6,800 200
1,600
2,125
100
Slope 25o
100
550
1,250
900
1,150
100
1,600
1,550
1,550
8
2,750
Up
3,000
10 200
22. PV denotes permanent ventilation.
Security
Planter
2,000
19. No chases will be allowed for pipes. Sleeves will be allowed with written approval of structural Eng's. No cutting of concrete without express approval of the Architect or structural Eng.
600x300mm Ceramic Tiles f.f
200
300x300mm Non-Slip Ceramic Tiles f.f
450
18. Minimum slope in the drains pipes to be 1: 100.
21. All mechnical works must be co-odinated with electrical and any conflict must be clarified before work begin.
1
5,650
9
5,200
5,650
10
950
Verandah
11
250
Laundry 600x600mm Non-slip Ceramic Tiles f.f
12
DATE
D
Laminated Timber Strips f.f
13
300x300mm Ceramic Tiles f.f
150
Steam Rm. W
F. Changing 600x600mm Non-slip Ceramic Tiles f.f
14
Cloak
3,550 200 1,700
3,350
3,000
3,050
M. Changing 600x600mm Non-slip Ceramic Tiles f.f
200 200 200 950 450 100 900
9
Laminated Timber Strips f.f
900
350 Cloak 300x300mm Ceramic Tiles f.f
Steam Rm.
1,400
450 450 200 300 1,200 200 550 100 1,200 750 600 450
600x600mm Ceramic Tiles f.f
15
200
Corridor
600x600mm Ceramic Tiles f.f
1,800
Reception
16
7
1,200
200 1,200
1,200
10,450
Store
Corridor 600x600mm Ceramic Tiles f.f
1,250
450
Laminated Timber Strips f.f
5,650
3,800
4,450
GYM
200
8
200
17. All inspection chambers covers and framing shall be cast iron.
7
Verandah
Kitchen S
Laundry Pantry
P
R
Corridor
T Lounge
U
BalconyLaundry Pantry
Kitchen W
Lounge
Corridor
Balcony
35,300 5,450 3,000
450
200
3,500
200
2,800
800
200 Balcony
800
1,050 Corridor
Kitchen
Corridor
Lounge
Balcony
Lounge
Balcony
6,650
Kitchen
4
6
P
+9,600 3 Story
PROJECT
+12,600 4 Story
Slope 2o
BalconyLaundry Pantry
PROJECT
+12,600 4 Story Project Title:
5
200
+9,600 +9,600 3 Story 3 Story
800
+9,600 3 Story
1
200
Slope 2o
ENTERTAINMENT ROOFTOP Kitchen Corridor
250
+9,600 3 Story
1,150
200
200
200
900
950
200
Void
Below Lounge
Corridor
Room
Lounge
200
500 450
Lift
Mechanical Laundry Pantry Kitchen
Balcony
200
1,200
+12,600 4 Story
1,200
200
BalconyLaundry Pantry
Non-slip Ceramic Tiles f.f
Lounge
2
1,000
Cloak Lounge 450x450mm
Corridor
Non-slip Ceramic Tiles f.f
3,000
2,550 150 1,700
Juice Bar
1,200
BalconyLaundry Pantry
5,500
200
200
Cloak Laundry Pantry 450x450mm Kitchen
Corridor
11,300
Lounge
2,850
F
Corridor
+15,600 5 Story
Kitchen
200
Verandah
Kitchen 600x300mm Ceramic Tiles f.f
Kitchen Toilet 300x300mm Non-slip Ceramic Tiles f.f
3,850
4,300
4
+12,600 +12,600 4 Story 4 Story
Kitchen
Corridor
200
1,800
BalconyLaundry Pantry
Care Taker's
+18,600 Room 600x300mm 6 StoryCeramic Tiles f.f
Laundry Pantry
+15,600 +15,600 5 Story 5 Story
+12,600 4 Story Cloak Rm.
ENTERTAINMENT ROOFTOP
900
950
800 Verandah
200
250
Verandah
Kitchen
Corridor
450
Lounge
Corridor
3,850
1,200
Rm.
3,850
Void Below
Kitchen
3Cloak
+18,600 +18,600 6 Story 6 Story
2
Kitchen
DOWN
200 200
1,200
1,500
1,400 1,500
DOWN
250
Lift Mechanical Room Cloak Corridor Dining Rm.
Corridor
5
3,050 1,800
Verandah
1,200
Kitchen
Verandah
200 100
2,400
Kitchen
1,200
Dining
Corridor
2,850
250
3,000 Cloak Corridor Dining Rm.
3,800
4,300
+12,600 4 Story
Corridor
3,850
3
Kitchen
Verandah
200
1
500
Verandah
+15,600 5 Story
Barbeque
H
11,300
Verandah
G
1,000
Kitchen
Slope 2o
F
3,050
250
Dining
Corridor
Kitchen
Verandah
Cloak Corridor Dining Rm.
9,400
Kitchen
Verandah
Kitchen
+18,600 6 Story
E
+15,600 5 Story
Laundry Pantry
2,850 3,000 200 200 150 1,200 1,200 1,700 450 1,200 2,550
Corridor
Verandah
250
Cloak Rm.
+18,600 6 Story
Kitchen
5,500
Corridor
Corridor
1,700
2,750
3,850
Kitchen
Cloak Rm.
3,050 2,850 3,050 150 150 150 150 150 +21,600 1,050 1,125 1,125 1,050 1,700 600 7 Story600 2,700 2,750
450
1,800
3,800
Verandah
Verandah
200
250
Dining
Kitchen
Slope 2o
Corridor
Cloak Corridor Dining Rm.
5,450 3,000
1,150
Corridor
1,050
Kitchen
450
3,500
6,650
Verandah
800
Kitchen
Dining
200 +21,600 +21,600 7 Story 7 Story
2,800
200
Verandah
Corridor
200
200
Kitchen
800
11,250
Verandah
+21,600 7 Story
200
+21,600 7 Story
6
W
Project Title:
PROPOSED RESIDENTIAL APARTMENTS
PROPOSED RESIDENTIAL APARTMENTS
Location:
Location:
Mazeras Road, Kileleshwa, Nairobi
+9,600 3 Story
Plot Number:
+9,600 3 Story
PROJECT
Mazeras Road, Kileleshwa, Nairobi Plot Number:
4,300
200
3,0001,050
9
6
6,850
BUILDING SECTION 01
S
1,900
BalconyLaundry Pantry 800
5,000
U
5,650 1,050
4 5,450
1,800
3
3,000
27 200
1,050
1 3,900
6
+3,600 +3,600 1 Story 1 Story
Kitchen
200
1,050
4 5,450
200
-3,600 -3,600 -1-1Basement Basement
3,000
9 200
3,700
200
67,900
BUILDING SECTION 01
1:100
Kitchen
S-02E-04
Lounge
Corridor
Balcony
PROPOSED RESIDENTIAL APARTMENTS Client:
Client:
SDA WEST KENYA UNIONLocation: Mazeras Road, Kileleshwa, Nairobi Signature: Date: Contact: +6,600
+6,600 2 Story
Drawn By:
Checked By:
C A0 M
Client:
SDA WEST KENYA UNION
+3,600 Signature: 1 Story
200
BASEMENT PARKING
5,650
200
7
1:100
5,450
S-02
3,900
200
5,450
9
S-02
3,000
5,650 5,650
Date:
Contact:
C Contact: A0 M Approved By:
C A0 M Date:
Drawn By:
KLL
Contact:
Signature:
200
27 200
6,850
Drawing Titles
1,800
200
C A0 M ROOF 2, BUILDING SECTION Signature: 01, BUILDING Date: SECTION 02
Underground Rainwater Collection Tank
Drawing Titles
-1 Basement
Date:
Stage:
8/19/2019
Scheme Design
Job Number:
Sheet Number:
Job Number:
Sheet Number:
Orientation:
#Pln
A.02.4/30 Scale:
Date:
#Pln Stage:
A.02.4/30
10/11/2019
Scheme Design
1:100
1:100
employer ACHERA & PARTNERS ARCHITECTS CHARLES MISIANI, A 702
L[--]-06, S-01, S-02
Stage: TYPICAL APARTMENT (1ST. - 7TH. Scale: FLOORS), ROOF 1 8/19/2019 Scheme Design 1:100 Drawing Numbers
Scale:
2
800
BUILDING SECTION 02
2, BUILDING SECTION 01, BUILDING SECTION 02 Drawing Numbers
L[--]-06, S-01,-3,600 S-02
5,650
5
Drawing Titles
ROOF Contact:
Drawing Numbers
-3,600 -1 Basement
5,350
58
BUILDING SECTION 02
S-01
ROOF 1
Contact:
Checked By:
C A0 M ±0 0 Ground Floor Approved By:
Swimming Pool
UndergroundBASEMENT PARKING Rainwater Collection Tank 5,350
8
Date:
KLL
Checked By:
Swimming Pool
D CROSS SECTION 02
6,850
Signature:
±0 0 Ground Floor
Date:
Orientation:
L[--]-04, L[--]-05 N
1:100
personal KANALI LESTER LUSEKA Index No: 50A126, Log Sheet No: A1084
Date:
Approved By:
GYM
Signature:
Drawn By:
KLL +3,600 1 Story
Corridor
SDA WEST KENYA UNION
2 Story Plot Number:
6,650
F. Changing
Laundry Yard
-3,600 -1 Basement
1 6,850
BalconyLaundry Pantry
GYM
Corridor
±0 0 Ground Floor
3,000
2
Balcony 200 800
6,750
C A0 M F. Changing
SOLAR WATER HEATER
1,800
3
Lounge
Corridor
+3,600 1 Story
±0 ±0 0 Ground 0 Ground FloorFloor
-3,600 -1 Basement
2,800
5
Lounge
Corridor
SOLAR PANELS Laundry Pantry
Store
4,300
Kitchen 200
2,750
3,850 Lounge 800
T
+6,600 2 Story
E-01
R
Laundry Yard
Electrical Room
2,800
58 200
1,500 Laundry Pantry 3,950 Corridor Kitchen 200 800 2,500 2,400
WATER TANK STORAGE
SOLAR WATER BASEMENT Store PARKING HEATER
3,300
C CROSS SECTION 01 1,800
Verandah
±0 0 Ground Floor
200 200
Kitchen
Corridor
+3,600 1 Story
Slope 2o
Slope 2o
Cloak Rm.
Verandah
Slope 2o
Slope 2o 6,650 11,800 200
VEHICULAR RAMP
10 7
5,000
+6,600 +6,600 2 Story 2 Story
200
Kitchen
Electrical Room
5,650
200
13,600
800
Verandah
1,050
Kitchen
1,350
200
+6,600 2 Story
350 200 800
Corridor
200
H
200
800
GROUND FLOOR PARKING
BASEMENT PARKING
1,850
8
200
3,000
1,900
800 Cloak Corridor Dining Rm.
Corridor
GROUND FLOOR PARKING
1,150
-3,600 -1 Basement
Cloak Rm. 5,000
3,950 Verandah 800
G
200
Kitchen
Verandah
RAMP
01
2,400
Slope 2o
±0 VEHICULAR 0 Ground Floor
9
1,500 Kitchen
F
Slope 2o
1,150
Dining
Corridor
+3,600 1 Story
3,300
250
E
SOLAR PANELS
200
Kitchen
Verandah
Cloak 3,950 Corridor Dining Rm. 800 2,450
Corridor 5,000
Slope 2o
Kitchen
200
200
Slope 2o
Verandah 6,750
3,300
Dining
200
Slope 2o
E-03
Corridor
+6,600 2 Story
25,800
Project Title:
Kitchen
Verandah
1:100
project 1:100 KILELESHWA, NAIROBI COUNTY NEW CONSTRUCTION Job Number:
Sheet Number:
#Pln
A.02.3/34
Orientation:
N
N
SDA CHAPEL Status Time
Construction Dec 2018-Jan 2019 RESPOSIBILITIES
Site Survey & Supervision Conceptualization Scheme Design Tendering Presentations EXPERIENCE
Brief Formulation Project Programming Tender Process Costing Conslutants Coordination
A GROUND FLOOR PLAN 100mm high masonry walling with 50mm thick prefabricated concrete capping keyed to approval
ACHERA & PARTNERS ARCHITECTS, URBAN PLANNERS & INTERIOR DESIGNERS
20mm thick laminated timber floor to floor schedule
Copy Right: All rights reserved. No reproduction, copy or transmission of these drawings may be made without permission. The author has asserted his right to be identified as the author of this design in accordance with the Copyright, Designs and patents Act Cap 130 of the Laws of Kenya.
A
C
B
E
S-02
F
G
H
I
NOTES
E-01
GENERAL
21,300 50mm thick cut natural stone patterened to Architect's approval
3,000
3,000
3,000
3,000
3,000
750
2,800 1,800
200 450
300
900
14,900 900
900
300
900
900
900
300
900
900
200 900
300
900
900
900
300
2,700
2,700
200
3,300
CONSTRUCTION 4. All slab at ground level to be cast over 1000 guage polythene sheet on 50mm thick murram blinding on hardcore.
300
300
11. All adjacent R.C. work and masonry walls to be tied with loop iron at every alternate course.
MECHANICAL 13. SVP denotes soil vent pipe to be provided at the head of the drainage system.
1,750
U p
14. Drains pass beneath buildings & driveways to be encased in 150mm concrete surround. 15. The storm drain pipes to comply with BS 556 specification. 16. All underground foul and waste drain pipes shall be uPVC to comply with BS 5255. 17. All inspection chambers covers and framing shall be cast iron. 18. Minimum slope in the drains pipes to be 1: 100.
450
3b
850
21. All mechnical works must be co-odinated with electrical and any conflict must be clarified before work begin.
450 4,200
Preperation Room
200
2,800
900
900
900
300
900
900
900
300
900
900
200
900
300
900
900
900
300
1,100
3,300
14,900
200
T=300mm, R=150mm, N=20mm @ 2, 200mm thick r.c steps clad with 20mm thick cut stone. 20mm thick terazzo floor finish to patterned to Structure S.E detail approval
NYANZA
5. All soil under slab around and under foundation to be treated for Plot Number: termite control.
5
CIVIL 6. All soil on cut embararkment to be stablized. The slope not to Client: exceed 45 degree.
GUL YAGO CENTRAL NYANZA CONFERENCE Signature: STRUCTURAL
A
3,000
3,000
3,000
C
B
E-03
3,000
E
S-02
9. Depth of foundation to be detemined on site to S.E's aproval. K.L.L
10. All walls to be reinforced with loop iron at every alternate course. Checked By: 11. All adjacent R.C. work and masonry walls to be tied with loop C.O.A.M iron at every alternate course.
2,700
200
3,000
3,000
MECHANICAL C.O.A.M
Iron casement window spray painted black to window schedule
13. SVP denotes soil vent pipe to be provided at the head of the drainage system.
15. The storm drain pipes toDrawing complyTitles with BS 556 specification.
Gradient 1:5 200mm thick r.c ramp on well compacted hardcore ribbed ±0 to approval. 0 Ground Floor Structure to S.E detail
2,900
12. All plumbing and drainage to comply with relevant local authority. Signature: Date: Contact:
14. Drains pass beneath buildings & driveways to be encased in 150mm concrete surround.
100
16. All underground foul and waste drain pipes shall be uPVC to comply with BS FLOOR 5255. GROUND PLAN 17. All inspection chambers covers and framing shall be cast iron. 18. Minimum slope in the drains pipes to be 1: 100. Drawing Numbers 19. No chases will be allowed for pipes. Sleeves will be allowed with written approval of structural Eng's. No cutting of concrete without FP-01 express approval of the Architect or structural Eng.
3,000
3,000
F
3,000
G
H
3,000
I
200mm thick 600mm wide strip foundation 300mm by 300mmtor.c column footing. Structure S.E detail plastered and painted to approval. Structure to S.E detail
21. All mechnical works must electrical and any Scale: Date: be co-odinated with Stage: conflict must be clarified before work begin. 22. PV denotes permanent ventilation. 1:50 21-Dec-18
ELECTRICALS
S-01
FP-01 B CROSS SECTION 02 1:50
GSPublisherEngine 0.25.100.100
Contact:
8. For By: all R.C work,refer to stuctural Engineer's details. Drawn
6
21,300
3,000
Date:
7. All black cotton soil to be removed from all buildings and paved surfaces.
+3,600 1 Roof
450
3,000
450
3,000
450
150
4. All slab at ground level to be cast over 1000 guage polythene Location: sheet on 50mm thick murram blinding on hardcore.
300
2,700
Up
200mm thick ±0 masonry wall plastered and 0 Ground Floor painted to approval
Project Title:
CONSTRUCTION PROPOSED SDA CHURCH
Approved By:
300
2,550
750
Stage Podium
PROJECT
3. The contractor must check and verify all dimensions before commencement of any work. Any discrepancies to be clarified with the Project Architect.
2,500
100
2. Drawing are not to scalled. Only figured dimensions to be used.
2,000
200
NOTES 1. All dimensions are in mm unless otherwise specified.
200
1,750 712
900
900
Copy Right: All rights reserved. No reproduction, copy or transmission of these drawings may be made without permission. The author has asserted his right to be identified as the author of this design in accordance with the Copyright, Designs and patents Act Cap 130 of the Laws of Kenya.
GENERAL
4b
2,300
Up 300
300
135° 788
800
200
Planter
T=300mm, R=150mm, N=20mm @ 2, r.c steps clad with 20mm thick cut stone. Structure to S.E detail
E-04
850
70mm by 50mm steel roof truss anchored to masonry wall and r.c column to S.E detail
300
CONGREGATION SEATING
Entrance 1,800 450 Foyer
23. All conduits must be laid before plastering
50mm by 50mm hollow section steel roof battern welded to steel purlin to S.E detail 200
900
200
300
1,112
100
900
Up
Verandah
6
ELECTRICALS
ACHERA &REVISIONS PARTNERS ARCHITECTS, URBAN PLANNERS & DATE INTERIOR DESIGNERS REVISION NO.
30 0
Planter
Up
450 2,100 1,750
2,000
1,750
200
5
200
1,712
p U
3,000
850 30 0
4b
300
200
4a Planter
200mm by 150mm arched r.c beam. Structure to S.E detail 2,800
222 PAX
300
0 20 1,
1,200
1,938
+3,600 1 Roof
I
S-01 14,300
Stage Podium
H
5,000
G
900
F
450
E
200
B
4,900
450
22. PV denotes permanent ventilation.
1,700
C
19. No chases will be allowed for pipes. Sleeves will be allowed with written approval of structural Eng's. No cutting of concrete without express approval of the Architect or structural Eng.
1, 20 0
CONGREGATION SEATING
16 4
Entrance Foyer
A
12. All plumbing and drainage to comply with relevant local authority.
2,500
100
135°
5,176
Up
2,800
3,900
14,200
S-01 4,000
E-02
10. All walls to be reinforced with loop iron at every alternate course.
300 200
3b 3a
2,000
1,100 1,612
9. Depth of foundation to be detemined on site to S.E's aproval.
900
788 300
8. For all R.C work,refer to stuctural Engineer's details.
2
2,350
200
850
300
100
1,850
900
900 800 300 1,112
Office
7. All black cotton soil to be removed from all buildings and paved surfaces.
1
200
Up
Planter
Up
200
200 1,750 2,100 450 1,200
2,000
1,750 200
3,000
2,800 200
Verandah
Planter
Pitch 45 LT5 Profile zinc corrugated roof screwed to steel roof structure
4a
CIVIL
STRUCTURAL
8 53 1,
o
5. All soil under slab around and under foundation to be treated for termite control.
300mm by 300mm non-slip ceramic tiles to floor schedule
1
3a
3. The contractor must check and verify all dimensions before commencement of any work. Any discrepancies to be clarified with the Project Architect.
100
6. All soil on cut embararkment to be stablized. The slope not to exceed 45 degree.
Planter
2
2. Drawing are not to scalled. Only figured dimensions to be used.
Gradient 1:3 200mm thick r.c ramp on well compacted hardcore clad with 10mm thick carpet. Structure to S.E detail
3,000
Up
200 200mm by 200mm r.c column with 50mm thick capping at 600mm height plastered and painted. Structure to S.E detail.
3,000
1. All dimensions are in mm unless otherwise specified.
BUILDING SECTION 01
1:50
GROUND FLOOR PLAN
Job Number:
Sheet Number:
02/2018
A.01.1/12
23. All conduits must be laid before plastering
Working Drawings Orientation:
N
REVISIONS
70mm by 50mm 500mm deep hollow-section steel roof truss anchored to masonry wall and r.c column to S.E detail
1
2
3b
4b
5
DATE
6
REVISION NO.
50mm by 50mm hollow section steel roof battern welded to steel purlin to S.E detail
PROJECT Project Title:
PROPOSED SDA CHURCH Location:
Pitch 15o LT5 Profile zinc corrugated roof screwed to steel roof structure
Pitch 45o LT5 Profile zinc corrugated roof screwed to steel roof structure
NYANZA Plot Number:
Client:
GUL YAGO CENTRAL NYANZA CONFERENCE 9,000
Signature:
Date:
Contact:
Date:
Contact:
Drawn By: +3,600 1 Roof
+3,600 1 Roof
200
Approved By:
2,150
Verandah
200mm thick r.c floor slab clad with 20mm thick terazzo patterned to approval. Structure to S.E detail
100
±0 0 Ground Floor
BUILDING SECTION 01, CROSS SECTION 02
2,000
2,500
5,000
2,500
S-01, S-02
2,000
CROSS SECTION 02
employer ACHERA & PARTNERS ARCHITECTS CHARLES MISIANI, A 702
Drawing Numbers
±0 0 Ground Floor
300mm thick well compacted hardcore
GSPublisherEngine 0.25.100.100
Signature:
500
200mm thick strip foundation masonry walling to S.E detail
C.O.A.M
Drawing Titles
100
3,850
CONGREGATION SEATING
Verandah
personal KANALI LESTER LUSEKA Index No: 50A126, Log Sheet No: A1084
Checked By:
C.O.A.M
600mm by 200mm r.c beam plastered and painted to approval. Structure to S.E detail
S-02 1:50
K.L.L
project GUL YAGO, KISUMU COUNTY NEW CONSTRUCTION
Scale:
Date:
Stage:
1:50
21-Dec-18
Working Drawings
Job Number:
Sheet Number:
Orientation:
02/2018
A.01.5/12
BOWLING ALLEY Status Time
Conceptualization Jan 19-Feb 2019 RESPOSIBILITIES
Stakeholder Meetings Massing Studies Prelimenary Design Costing
EXPERIENCE
Ground Floor Plan
AREA - 4,404.36m2
Research BQs
Design Considerations
Public Bowling Alley
Food Court, Café & Snack Bars
Private Bowling Alley
Kichen
Bowling Shoes, Ball Storage, Mechanical Room & Pro Shop
Lavatories
Redemtion, Arcade & Laser Tag
Nursery
Administration
Laundry
Conference / Banquet Hall
Storage
Meeting Room
A GROUND FLOOR PLAN Deck Refuse Collection
Clean
DR
DR
Grounds Man Office
General Store
Up
Security
Natural Pool
Laundry Sorting
W
W
Loading Zone
Dry
Water Park Slides
Miniature Golf Course (9 Hole)
Mechanical Room
Swimming Pool
Up
Mechanical Room
Loading Zone
120 Up
Up
Rock Climbing Wall
General Store Cold Store
Equiplent Store
Kitchen
Dry Store F
F
DW
Control Room
Private Bowling Alley (2 Lanes)
Bowling Alley (10 Lane)
Void Above
Void Above
Up
Up
Up
Up
Up
Up
114
Laser Tag
Redemtion Conference Hall
Banquet Hall
(150 Pax)
112
Up
Up
Up
Up
Stage
115
113
Equiplent Store
DW
116 Stage
Gents Changing Room
Ladies Changing Room
Up
Main
Service
Security Chef's Office
Up
117
Gents Changing Room
118
Ladies Changing Room
119
Billiards
Private Dining
(74 Pax)
Counter Service
Room 111
F
UP
Store
Food Court
Store
(112 Pax)
Service
F
Service Kitchen
DW
108
F
Changing
Shoe Rental
110 109
Bowling Shoes & Ball Storage
Laser Store
Nursery
Arcade
W.C F
Arcade Store
Kichtenette
F
Ladies Lavatories
Ladies Lavatories Cleaner's Store
Void Above
DW
Board Room
Reception Down
F
Snack Bars (62 Pax)
Ladie s Ch angin g
ging Chan Gents
Fountain
Service Kitchen
Fountain DW
102
F
Gents Lavatories
Up
Service
Down
103
Pro Shop
F
Administration
(64 Pax)
Service Kitchen
Pro Shop Service
104
Café
Reception
Meeting Room (74 Pax)
Store
UP
Up
Gents Lavatories
105
Planter Void Above
Stage
UP
106
Cleaner's Store
Void Above
Service
Planter Void Above
UP
107
Amphitheatre (220 Pax)
Planter
101
Cold Store
Planter
Dry Store Up
99
98
97
96
95
94
93
92
91
90
89
88
87
86
Stage
63
62
61
60
59
58
57
56
55
54
53
Loading Zone
85
64
p U
U p
100
84
65
Security
Up
83
82
81
80
79
78
77
76
75
74
73
72
71
70
69
68
67
66
11
13
14
15
16
17
18
Up
Up
Up
52
51
50
49
48
47
46
45
44
43
42
41
40
39
23
24
25
26
27
28
29
30
31
32
33
34
35
36
120 Car Parking
1
2
3
4
5
6
7
8
9
10
19
20
21
22
Security
personal KANALI LESTER LUSEKA Index No: 50A126, Log Sheet No: A1084
employer ACHERA & PARTNERS ARCHITECTS CHARLES MISIANI, A 702
project LANG'ATA, NAIROBI COUNTY CONCEPTUAL PROJECT
37
38
RESIDENTIAL ESTATE Construction
Status
Mar 2019-Jan 2021
Time
RESPOSIBILITIES
Site Survey & Supervision Scheme Design Detail Design Scheduling Working Programme EXPERIENCE
Site Responses Consultant Coordination Snagging
K5a SCALE 1: 200
4,86 0
9,6 83
31,5 90
156°
11
A
880
415
50
415
880
70
350
200
2,465
2,440
2,650
200 1,000
800
1,000
200
2,300
1,300
1,000
200
23,840
1,150
2,100
900 600 750
3,500 2,600 200
200 2,100
200
4,300
Up
400
500
200
700
400
200
700 600 200 200 500 400
Up
4,500
2,800
200 1,000 200 2,300
600 RG
3,700
2,200
2,025
400
200
5,800
6,000
5,400
Drawn By:
KLL Checked By:
COAM
1,800 225
CIVIL GENERAL 6. All soil on cut embararkment to be stablized. The slope not to 2 1 4 are in mm unless otherwise specified. exceed 45 degree. 1. All dimensions 2. Drawing are not to scalled. Only figured dimensions to be used. STRUCTURAL 3. The contractor must check and verify all dimensions before 7. All black cotton be removed from all buildings and paved commencement ofsoil anytowork. Any discrepancies to be clarified with the surfaces. Project Architect. 8. For all R.C work,refer to stuctural Engineer's details. CONSTRUCTION 9. Depth of foundation to be detemined on site to S.E's aproval. 4. All at ground level to be cast over 1000 guage1,450 polythene sheet 4,200 10. Allslab walls to be reinforced with loop iron at every alternate course. on 50mm thick murram blinding on hardcore. 11. All adjacent R.C. work and masonry walls to be tied with loop iron 5. All soilalternate under slab around and under foundation to be treated for at every course. 200 4,000 200 1,250 200 termite control. MECHANICAL 100 CIVIL 700 600 250 2,200 250 with800 1,450 12. Allsoil plumbing and drainage totocomply relevant localnot authority. 6. All on cut embararkment be stablized. The slope to 13. SVP denotes soil vent pipe to be provided at the head of the exceed 45 degree. drainage system. STRUCTURAL 14. Drains pass beneath buildings & driveways to be encased in 150mm concrete 7. All black cottonsurround. soil to be removed from all buildings and paved 15. The storm drain pipes to comply with BS 556 specification. surfaces. 16. All all underground foul to and waste drain pipes details. shall be uPVC to 8. For R.C work,refer stuctural Engineer's comply BS 5255. to be detemined on site to S.E's aproval. 9. Depthwith of foundation 17. and framing shall alternate be cast iron. 10. All inspection walls to bechambers reinforcedcovers with loop iron at every course. 18. slope the drains pipes towalls be 1:to100. 11. Minimum All adjacent R.C.inwork and masonry be tied with loop iron 19. No chases will course. be allowed for pipes. Sleeves will be allowed with at every alternate written approval of structural Eng's. No cutting of concrete without MECHANICAL express approval of the Architect or structural Eng. pv drainage 12. All mechnical plumbing and to co-odinated comply withpv relevant local and authority. 21. works must be with electrical any 13. SVP denotes soil vent pipe to be provided at the head of the conflict must be clarified before work begin. 200 drainage system. 22. PV denotes permanent ventilation. 300 beneath buildings & driveways to pv 14. Drains pass be encased in 200 500 ELECTRICALS 150mm concrete surround. 23. mustpipes be laid 15. All Theconduits storm drain to before complyplastering with BS 556 specification. 1,450 600 16. All underground foul and waste drain pipes shall be uPVC to Bedroom comply with BS 5255. 2 17. All inspection chambers covers and framing shall be cast iron. Laminated Timber 18. Minimum slope in the drains pipes to be 1: 100. 19. No chases will pipes. Sleeves will be allowed with 500be allowed for 3,500 written approval of structural Eng's. No cutting of concrete without express approval of the Architect or structural Eng. pv Fall o 21. All mechnical with electrical DATE works must be co-odinated REVISION NO.30and any conflict must be clarified pvbefore work begin. 22. PV denotes permanent ventilation.
70
8430
COAM
50
pv
200 350 2,650
2,815
2,465 200
1,000
1,000
7. All black cotton surfaces. 8. For all R.C wor 9. Depth of found 10. All walls to b 11. All adjacent R at every alternate
B
MECHANICAL
12. All plumbing 13. SVP denotes drainage system. 14. Drains pass b 150mm concrete 15. The storm dr 16. All undergrou comply with BS 5 17. All inspection 18. Minimum slop 19. No chases wi written approval express approval 21. All mechnical conflict must be c 22. PV denotes p
C
4,500
4,330
2,300
15,615
900 100
ELECTRICALS
23. All conduits m
D
2,100
1
3,500
QTY
3,000
REVISION NO. 3
Bath
E-02
3,700
pv
2,400
1
200
PROJECT
pv pv
5 Bedroom House
Location:
10261/6 100
1.Project All dimensi Title: 2. Drawing ar Proposed Re 3. The contra commenceme Location: Project Archit Kuwinda Roa
CONSTRUCTI Plot Number: 4. All slab at No. 102 onL.R. 50mm thic 5. All soil und termite contro
PROJECT
Client:
CIVIL Jacob O. Om 6. All soil on c exceed 45 de Signature:
5 Bedroom House
Proposed Residential Estate Jacob O. Ombongi Fall 30o
Date: Contact: Kuwinda Road, Karen - Nairobi County
2,200
200
1,500
2,200
200
1,500
1,620
E-01 420
Fall 30o
Fall Plot Number: o 30
L.R. No. 10261/6
Approved By: MECHANICAL
Drawn By: 2,200
KLL 1,100 Client:
COAM
2,200
30
20
Jacob O. Ombongi COAM 300
Signature:
1,500
200
5 390
12. All plumb 13. SVP deno Signature: drainage syst 14. Drains pa 150mm concr 15. The storm 16. All underg comply with B 17.1ST. AllFLOOR inspecP 18. Minimum 19. No chase written appro express appro 21.FP-02 All mechn conflict must 22.Scale: PV denote
600
Checked By:
Approved By: 2,980 350
Date: 350 900 200
2,200 2,200
6,000
COAM 200
1,600
6,200
Signature: Drawn By:
1,800 Date:
200
Contact:
200
1,450
200
1,250
20
30
200
3,850 Contact:
600
KLL
20 6
7. All black co surfaces. Drawn By: 8. For all R.C L L of fo 9.KDepth 10. All walls Checked By: 11. All adjace COAM at every alter
Signature:
600
2,200
STRUCTURAL
9,000
650
2,100
600
Project Title: Client:
Checked By:
S-X
20
COAM 4
3
1
Drawing Titles
ELECTRICALS
23.1:100 All condu
Approved By:
1,500
1ST. FLOOR PLAN (206m2) WINDOW
1:100
DOOR C O A 01, M DOOR 02, DOOR 03, DOOR 04 Signature:
D-01, D-02, D-03, D-04
ELEVATION 02
Copy Right: All rights reserv may be made w identified as th Designs and pat
GENERAL
F
Glass Roof
Fall Fall Plot Number: 30o 30o
1,150 L.R. No. 1,150
ACHER ARCHI PL DATE INTERI
2,600
Non-Slip Laminated Timber Powder coated aluminium corner window, 100mm thick r.c coping, Ceramic Tiles Clear saftey glass.
700 600 200 200 500
920 50
150
Proposed Residential Estate SVP pv
QTY 600 750
REVISIONS W-02 WINDOW 02 Bedroom
Project Title:
pv
Contact: 4,100
7
CIVIL 6. All soil on cut e exceed 45 degree STRUCTURAL
2,050
Bath
Non-Slip
500
200
200 3,500
DATE
3,400
200
200
CONSTRUCTION 4. All slab at grou on 50mm thick m 5. All soil under s termite control.
A
Ceramic Tiles Powder coated aluminium corner window, 100mm thick r.c sill, pv E Clear saftey glass.
Void Below
27,850 Drawn By:
W-012,900WINDOW 01 150
23. All conduits must be laid before plastering
Laminated Timber
Down
80 200
2,350
GENERAL
1. All dimensions 2. Drawing are no 3. The contractor commencement o Project Architect.
1,150
600 50
700
2021/001
Copy Right: All rights reserved. may be made witho identified as the au Designs and patents
900
200
Corridor
+3,000
ELECTRICALS 1,200
5,000
Fall 30o
1,000 200
REVISIONS
2,300
Flue
700
Job Number:
ACHERA ARCHIT PLA INTERIO
200
880 3,300
Void Below
100
460 701,130
600
1,800
Date: 2,550
Scale:
1:100
Location:
5 Bedroom House
2,700
Jacob 1,500 O. Ombongi 950 200
FP-01
1:100
2,300
pv
600
325
GROUND FLOO
200
800
Void Below
70 3,100
1,850 Client:
200
5,950 Signature:
1,250
3,850
170
5,000
300
L.R. No. 10261/6
225 500 500
1,650
1,200
700
460 70 70
Fall 30o
3,500
300
225
6,000
Fall 30o
Plot Number:
Signature:
H
600
6,200
1
150
2,900 600 3,100
430 70 1,300
840
70 70
Jacob O. Om
Date: Drawing Numbers
Contact:
Job Number:
2021/001
50
Approved By:
70
1,000
70
50
COAM Date:
70
Signature:
project 1:20 2/5/2021 Detail Design KAREN, NAIROBI COUNTY NEW CONSTRUCTION D-01, D-02, D-03, D-04 2021/001 01.2.2.1/11
Contact:
Scale:
Drawing Titles Date:
Stage:
DOOR 01, DOOR 02, DOOR 03, DOOR 04
840 50
880
Client:
NOTES
100
Kuwinda Road, Karen - Nairobi County
701,140 900
2,050
2,100
100
70 70
L.R. No. 102
Kuwinda Road, Karen - Nairobi County
70 PROJECT
430
Checked By:
880
Plot Number:
G
S-X
200
1,200
F
1,200 200
70
600
Fall 30o
10
employer WINDOW 01 ACHERA & PARTNERS ARCHITECTS DOOR 04 CHARLES MISIANI, A 702 GSPublisherVersion 0.0.100.100
Kuwinda Roa
COAM
R 2,200
pv
70
SVP
KLL
ELEVATION 01
Location:
5. All soil under slab around and under foundation to be treated for termite control.
9
pv
2,300
Laminated Timber
pv
430
Proposed Residential Estate
400
250
1,800
1 5
pv
200
650
200
pv
Project Title:
430
50 250 20
200
825
400
30 440 20
11
Proposed Re
Copy Right: All rights reserved. No reproduction, copy or transmission of these drawings may be made without permission. The author has asserted his right to be identified as the author of this design in accordance with the Copyright, Designs and patents Act Cap 130 of the Laws of Kenya.
820
200
1,900
850 1,200
600 500
200 1,300
500
30 20
70
Project Title:
3. The contractor must check and verify all dimensions before commencement of any work. Any discrepancies to be clarified with the Copy Right: Architect.No reproduction, copy or transmission of these drawings All Project rights reserved. may be made without permission. The author has asserted his right to be CONSTRUCTION identified as at the authorlevel of to thisbedesign in 1000 accordance the Copyright, 4. All slab ground cast over guage with polythene sheet Designs and patents Act Cap 130 ofon thehardcore. Laws of Kenya. on 50mm thick murram blinding
600
415
F
200 250
3,775
20
E-02
150
300
Prayer Room
1,13070
30
20
FP-02 WINDOW
DATE
E
S-X ACHERA & PARTNERS 3 1 4 ARCHITECTS,NOTES URBAN GENERALPLANNERS & 1. All dimensions are in mm unless otherwise specified. INTERIOR DESIGNERS 2. Drawing are not to scalled. Only figured dimensions to be used.
10
2,700
375
900
200
1,100
500
25
30
20
600
900
4,800
1,900
830
20
800 F
400
200 F
2,100 200 200
600 2,800
5,400
200
150 250
70
30
I.C.
Shwr
70
20
1,200
2,300
880
200 1,200
1,200
pv
400
100
Corridor
Ceramic Tiles
200
6,200
5
3,000
830
1,500
200 3,200
2,700 900
50 830
50 830
300
1
1,620
10 6
WINDOW ELEVATION 04
100
50
2,050
430
70
1,500
50
pv
70
3,075
3,400
70
300 50
100
420
50 900
830
50
600 800
Fall 30o
600 150
50
50
150
70
830
30
50
2,700
10 30
personal W-01 KANALI LESTER LUSEKA D-01 DOOR 01 D-04 Index No: 50A126, Log Sheet No: A1084 950
1,700
pv
1,000
250 50
Ceramic Tiles
Utility
2,700
9,100
70 30
20 20
30
50 50
2,100
50 50 1,070
50
1,500
50
70
3,075
pv
20 10
100
430
I.C.
ACHERA & PARTNERS 350 ARCHITECTS, 450 350 URBAN 1,500 1,030 1,500 900 200 2,200 PLANNERS & 6,000 200 1,600 200 2,200 200 INTERIOR DESIGNERS
REVISION NO. 500
pv
860
600
150 1,120
1,000
300 300 300 300 150 300 300 300 150 300
50 470
70
pv
400
DATE R 1,500
pv
1,140 50
20
23. All conduits m
Porte Cochere
1,550
pv
50
WE-02 70
750
50
3,075
3,100
390
70 50
50
150
600
480
400
50
320
120 750
810
20 1,100
950
1,000
1,000
965
600
415
20
825
1
REVISIONS
860
480
70
3,000
Non-Slip pv Ceramic Tiles
70
965
400
Master Bath
30
70
490 pv
pv
420
10
250 50
2,200
23. All conduits must be laid before plastering
pv
1,110
600
50
pv
70
860
70
430
50
50 50 50
pv
1,000 QTY
900
200
ELECTRICALS Non-Slip Ceramic Tiles
500
30
50
95 70
30 50
150
200 1,990 1,625 1,200 2,300
20 50
200
450
12. All plumbing and drainage to comply with relevant local authority. pv 13. SVP denotes soil vent pipe to be provided at the head of the drainage system. 14. Drains pass beneath buildings & driveways to be encased in 150mm concrete surround. 15. The storm drainBedroom pipes to comply with BS 556Family specification. Master Room 16. All underground foul and waste drain pipes shall be uPVC to Laminated Timber Laminated Timber comply with BS 5255. 17. All inspection chambers covers and framing shall be cast iron. 18. Minimum slope in the drains pipes to be 1: 100. pv 19. No chases will be allowed for pipes. Sleeves will be allowed with written approval of structural Eng's. No cutting of concrete without express approval of the Architect or structural Eng. 200 be co-odinated with electrical and any 21. All mechnical works must pv begin. conflict must be clarified before work 200 1,600 200 500 1,850 3,350 22. PV denotes permanent ventilation.
900 100 3,500
30 420
ELECTRICALS
D
Approved By:
800
pv
1,110
370
900
Fall 30o
9,000
50
2,100
400
475
50
375
50
STRUCTURAL
12. All plumbing a 13. SVP denotes s drainage system. 14. Drains pass b 150mm concrete 15. The storm dra 16. All undergroun comply with BS 52 17. All inspection 18. Minimum slop 19. No chases wil written approval o express approval 21. All mechnical conflict must be c 22. PV denotes pe
5,250
Dresser
70
20
50
20
pv
50
30
50
-300
250 150
250
5,200 4,100 4. All slab at ground level to be cast over 1000 guage polythene sheet 200 on 50mm thick murram blinding on hardcore.
pv
1,100
pv
965
2,000
pv
30 50 1,07050
30
810 70
40
1,120
915
430
900
3,100
03
Laminated Timber
-150
Location:
415 30
30
pv
1,100
350
pv
1,000
5030
120 100
50
100
pv
70
450
30
70
5,000
1,500
20
95 70
415
40
70
5050
915
WE-01
415
1,000
50
20
415
1,000
30
965
900
20 30
70
1,500
F 2,000 DOOR
D-03
860
200
50
Non-Slip
900
Guest Bedroom 2
CIVIL 6. All soil on cut e exceed 45 degree
MECHANICAL
C
Cut Stone
CIVIL powder coated aluminium casement, 70mm by 50mm 6. All soil on cut embararkment to be stablized. The slope not to 10mm thick exceed clear 45safety degree.glass panel.
pv
900
pv
Entry Walk Way
7. All black cotton soil to be removed from all buildings and paved surfaces. 8. For all R.C work,refer to stuctural Engineer's details. 9. Depth of foundation to be detemined on site to S.E's aproval. -2,950 10. All walls to be reinforced with loop iron at every alternate course. 11. All adjacent Balcony R.C. work and masonry walls to be tied with loop iron Cutcourse. Stone at every alternate Up pv pv pv pv MECHANICAL
30
pv
pv
50
50
50
350
50
I.C.
STRUCTURAL
Ceramic Tiles
10
500
I.C.
200 1,300 5. All 750soil200 200 under 750 foundation 200 3,900 to be treated for 200 D-04 DOOR 04 under slab3,100around and QTY 400 termite control.
900
Walk-In Closet
200
E-04 pv
3,300
3,400
500
2,400
pv
50mm thick solid mahogany panel, Stained glass transom CONSTRUCTION 4,800
2,700
70 300 300 280
430 1,585
1,000
200
15,615 200
WINDOW DOOR 03 E ELEVATION 03
D-03
20
4,300
4,500
30
pv
gt pv
Up
pv
3. The contractor must check and verify all dimensions before commencement of any work. Any discrepancies to be clarified with the Project Architect. 27,850
2,100
20
Non-Slip Ceramic Tiles
150
pv gt
50mm thick solid mahogany panel, D-04 DOOR 04 QTY NOTES Clear glass transom. GENERAL 70mm by 50mm powder coated aluminium casement, 91. All dimensions are in mm unless otherwise 7 6 specified. E-03 10mm clear panel. 2. Drawing are notglass to scalled. Only QTY figured dimensions to be used. D-03 thick DOOR 03safety
pv
3,100
390
600
20
1,600
200
2,650
2,100 2,100
D
1,000 50
500
150
3,200
50 2,700
2,100
300 280
2,700
C
150 370
pv
Designs and patents Act Cap 130 of the Laws of Kenya.
10
200
Cloak
Non-Slip Ceramic Tiles
R 2,200
Floor & beam door springs Copymounter Right: All rights No reproduction, 50mm thick solidreserved. mahogany panel, copy or transmission of these drawings may be made without permission. The author has asserted his right to be Stained glass transom identified in accordance with the Copyright, D-02 DOOR 02as the author of this design QTY
1
11
±0
Void Above
INTERIOR DESIGNERS GROUND FLOOR PLAN (364m2) 70mm thick solid mahogany panel, Frosted D-03 DOOR 03 QTY glass side window, 9
QTY 70
pv
pv
Laminated Timber
Bath
Non-Slip Ceramic Tiles
600
Laminated Timber
±0
I.C.
CONSTRUCTION 4. All slab at grou on 50mm thick m 5. All soil under sl termite control.
7. All black cotton surfaces. 8. For all R.C wor 9. Depth of found 10. All walls to be 11. All adjacent R at every alternate
B
-150
pv 200 1,100
Kitchenette
500
Down
Entrance Lobby
Kitchen
Non-Slip Ceramic Tiles
E-01
1
70
5070 280 30 150 470
B
300 300 50
1,300
150
380
Laminated Timber
±0
5,000
pv
Up
200
Guest Lounge
Corridor
1,150
1,400
200
200 900 1,900 1,900
200
50
50
40
50
1,200
D-02 DOOR 02 QTY ACHERA & PARTNERS
A
300
300
320
30
2,350
700
±0
8 panel,URBAN 7 50mm thickARCHITECTS, solid mahogany Clear transom. D-01 glass DOOR 01PLANNERS & QTY
10
Powder coated aluminium corner window, 100mm thick r.c coping, Clear saftey glass.
150
2,100 2,100
30
500 DOOR 02
70
200
900
800
5,000
D-02
Bath
600
6,200 200 panel, 1,100 Frosted 600 200 glass 2,200 side 200 window, 1,500 200 70mm thick solid mahogany Floor & beam 5,850 mounter door springs 2,550 4,100
70
70 300
20 1,110 20 50 250 20 100
20
WINDOW ELEVATION 02
WINDOW 01
30
200
3,300
50 500
470
500 50 50
50
W-02 WINDOW 02 70 180
1,500
Floor and ceiling mounted swivel hindge 1,000 100
3,000
20 30
50 420 DOOR 02
430
Up
-150
6,150 D-01 DOOR 01
GSPublisherVersion 0.0.100.100
pv
70
pv
Non-Slip Ceramic Tiles
2,700
Breakfast
Ribbed Concrete
11
Clear saftey glass.
pv
2,700
D-02
mounted swivel hindge
Stainless steel door handle
Void Above
2 Car Garage
3,200
30
70
380
pv
1. All dimensions 2. Drawing are no 3. The contractor commencement o Project Architect.
Signature:
900
300 300
415
200
FP-01
70
500
180
300 300
20
±0
Ceramic Tiles
pv
QTY D 1 FLOOR PLAN Powder coated aluminium corner window, 100mm thick r.c sill,
1
150
30
WINDOW Floor andELEVATION ceiling 01
Store
Ceramic Tiles
R 1,500
Underground Water Tank
50
300
20
Laminated Timber
Down
pv
ST 01 W-01 WINDOW
50
375
Non-Slip Ceramic Tiles
Dresser
480
2,700
300 300
1,110
300 300
20
300 300
30 20 20
300
100
300 300
300
27023530
30
DSQ
2,000
600
70
30
50
200
440 30
20 30
300 300
20 300 300
2,100 2,100
R 4,000
30 50
600
235 50
50
pv
30
30 470
300 300
3050 235270 270270 3030 270270 3030
2,100
270270 3030
R 4,000
Stainless steel door 1,000 handle
50
180
200
±0
pv
600
70
900 70
1,750
200 W&D
pv 900 150 950
200
800
pv
1,000
600
950
pv 700
Ceramic Tiles
pv
200
1,100
Laundry
50
480
WINDOW ELEVATION 04
30
50
pv
27,850
PRESENTATION DRAWINGS 1,000 AUGUST 2017
20
130
pv
1,800
WIC
Non-Slip Ceramic Tiles
200
50
pv
50
200
pv
500
200
300
50
50
900
300
235 30 270
1,200 20
2,700
Lounge
pv
28050
180
PROPOSED RESIDENTIAL ESTATE
100
20
Formal Lounge
-300
Up
200
-150
150500
70
50
F18
50
50
30
270
50
Dining
Laminated Timber
1,200
Bath
1,900 Cut Stone
1,000
3,100
Kitchen Yard
900
900
50
20
3,700
130
ELEVATION 03
270270 3030
20
pv ±0
Non-Slip Ceramic Tiles
A
175 350
400
200
1,400
50
30 270270 3030
50
350
pv
6,000
4,500
4,300
900 200 2,100
50
1,500
20
pv
±0
pv
4,825
50 50
900
pv
pv
Up
pv
500
0.5011
B SCHEDULES WINDOW MR & MRS OGECHI 250 30
4,500
5
200
Down
Laminated Timber
200 5,800
6,000
1 ,03 54
rve se Re ad Ro
44°
0.5011 1,200
2,028 m2
1,250
Void Above pv
pv
1,000
ACRES
2,028 m2
200
Cut Stone
Guest Bedroom 1
200 3,700
2,900
6.00m Ro ad Rese rve
AR G 3 C KIN R PA
G
4,000
1,900
1,840
1,640 1,600
1,000 500
1,000
200
pv pv
3,200
300
200
Back Porch
-150
Cut Stone
1,200
23,840
3,700
2,900
90,965
E-04
H
100
350
Verandah
4,500
E
m .18 12 EXISTING BUILDING
20
3,000
6,000
1,450
PRESENTATION DRAWINGS 5,000 800 600 250 2,200 250 800 950 500 AUGUST 2017
-150
100
12,7 06 1 ,00 10
PLOT B
1,500
3,000
200 200 300 500
350 175
pv
D
99 2,9
33 9,0
REFUSE DISPOSAL AND COLLECTION POINT
SQUARE M
GENERAL
3,900
Down
AR G 3 C KIN R PA 90°
VEHICULAR ACCESS
SITE ACREAGE
750 200 150 250 600 800
Fire Place
90°
300
300
I.C.
GAZEBO
F
50
900
I.C.
121°
PLOT B
2,500
4,200
200
900
200
1,000 600
162°
PEDESTRIAN ACCESS
GSPublisherEngine 0.1.100.100
1,300 750 300 400 150 900 800 250
300
6,642
C
F21 158°
250 30
200
6,200
3,700
3,200
4,100 200
400
200
200
TO SEPTIC
200
2,650
38 ,4 28
B
Tr1
50
5,200 200
200
1,400
1,800
124°
HOUSE
1
2,200
3,300
PROPOSED RESIDENTIAL ESTATE
B
124°
32 ,98 9
2
4
S-X
1,900
200
MR & MRS OGECHI
Tr2
Ro ad Re se rve SECURITY GATE
5
6
E-03
200
3,200
100°
1 ,63 36
7
200
K4
112°
GSPublisherEngine 0.1.100.100
PLOT A
9
27,850
A
12 .00 m
10
Copy Right: All rights reserved. N may be made witho identified as the au Designs and patents
I.C.
8,91 8
68°
3,300
Tr16
1,200
m .00 12
rve se Re ad Ro
ACHERA ARCHITE PLAN INTERIO
TO SEPTIC
179°
2,300
GAZEBO
C GROUND FLOOR PLAN
K5
103°
5,000
LAYOUT A SITESITE LAYOUT
Drawing Titles
WINDOW 02, WINDOW 01
1,500
70
70
430
50 Numbers Drawing
420
50
430
50
Job Number:
Drawing Numbers Sheet Number:
Scale:
Date:
Orientation
Stage:
DATE
MULTI-PURPOSE COMPLEX Completed
Status
Mar 2019-Jun 2019
Time
RESPOSIBILITIES
Site Survey & Supervision Detail Drawings Scheduling Site Instructions Minute Taking EXPERIENCE
Snagging Progress Monitoring Sample Testing Final Reporting Handover
C CONCEPTUAL PERSPECTIVE FRN.
X2
X3
X4
X5
X6
X7
X8
X9
X10
E-04
3,000
3,000
2,900
2,000
2,500
2,830 1,600
2,000
200
±0.000
P.v
ff Non slip tiles P.v (PAX = 80)
P.v
3,850
3,800
5,400
200
Staicase to an existing road
P.v
4,000
7,000
X6
3,000
P.v
200
P.v
8,450
4,500
2,000
X7' X7''
X7
Y14 Y13 Y12 Y11 Y10 Y9 Y8 Y7""
200
P.v
Y7"
P.v
X8
Y7
P.v
X9
P.v
10 Washrooms above
3,000 3,000 3,000
8. Depth of foundations to be decided on site 9. pv denotes permanent air vents over doors and windows as shown on drawings 10. A single layer of 3-ply bituminous felt to be provided between masonry and r.c. work
3,000 3,000 3,000
38,940
Architects
11. Drain pipes passing under tarmac, driveways, and buildings to be achera & partners
S-06
encased in 150mm thick concrete sorround
architects, urban & interior design consultants 12. All
p.o. box 10114-00400
Y14 Roof (Main Hall) 10 degrees roofing pitch LT5 Roofing gauge 26 on Steel trusses to S.e's Details
Staircase above
Strong Room above
7. Walls below 200mm thick to be reinforced with hoop iron at every alternate course
520
2,180
X2
+7.200 P.v
500 1,000
4,000
P.v
3,500
3,000
P.v
3,500
X12
X13 X14 X15 MAIN HALL
X10 X11
X16
X17
P.v
4,350
36,020
Y6""
Y6"
Y6Y5""
Y5"
Y5
Y4
P.v
P.v
P.v
P.v
X18
reinforced concrete work to Structural Engineer's drawings
Nairobi Kenya
13. All sanitary works to the entire satisfaction of MoH
cell. 0722-414645
14. All roads, storm water drainage and foul sewerage to Civil Engineer's drawings
architect's signature .................................................................... CHARLES O.A. MISIANI [A 702]
Alucobond Y15 1200mm high alucobond parapet to S.E's Details Y16 Windows Purpose made window to window schedule.
E CONSTRUCTED AUDITORIUM
Drawing Title
Ground Floor Plan Drawn
-1.800
Checked:
B.N.G
+3.6001,500 2,150
Walling 200mm thick Natural stone X19 +1.800 X20 wall X21 keyed to architects approval ±0.000
Y3
Y2
Date
COAM
Scale:
Job No.:
Steps R.C steps to S.E's details E-01 Riser=150mm
1:100
March. 2017 Drawing No.:
AP/ARC/2017 AUA 03
AP/ARC/2017/03
Revision
Sheet No.
3
Check notes
Y1
P.v
+5.650
FRONT STAGE
BACK STAGE
7,000
MAIN HALL
Roof (Main Hall) 10 degrees roofing pitch. LT5 Profile Roofing Single Span gauge 26 on Steel trusses to S.e's Details
rev.
Flat Roof 150mm thick R.C slab painted with approved hot bitumen and blended with coarse sand to S.E's details
Project Title
Windows Aluminium framed windows to Window Schedule.
TERRACE
-1.350 450 1,200 18,000
13,480
SECTIONAL ELEVATION E-08
date
description
revisions:
PROPOSED ADVENTIST UNIVERSITY OF AFRICA (AUA) - MULTI-PURPOSE BUILDING ON PLOT NO NGONG /7888,ADVENTHILLONGATA RONGAI, NAIROBI. Client
ADVENTIST UNIVERSITY OF AFRICA (AUA) PRIVATE BAG 00503, MBAGATHI, NAIROBI
F CONSTRUCTED BALCONY SEATING
P.v
-1.800 1,200
specifications and notes PROPOSED ADVENTIST UNIVERSITY OF AFRICA (AUA) - MULTI-PURPOSE BUILDING 6. This drawing is to be read in conjunction with specifications and all ON PLOT NO NGONG /7888,ADVENTHILLother relevant drawings ONGATA RONGAI, NAIROBI.
2,370
X3
35o
o
P.v
1,200
21,700
600
Washrooms above
P.v
1,200
5. All work to be strictly in accordance to with the standard
Project Title
Substructure All R.C foundationY9 and substructure elements Client ADVENTIST UNIVERSITY OF to S.e's Details Y10 AFRICA (AUA) 25mm thick blinding on approved compacted PRIVATE BAG 00503, hardcore to approval MBAGATHI, NAIROBI Y11 client's signature ................................................... Depths to be determined on site
2,200
X4
Retaining Wall to S.e's Details
P.v
4,500
3,500
MAIN ENTRANCE
1,200
3,200
2,700 300
2,500 900 2,450
Urinal
3. All levels and dimensions to be checked on site before any building work commences 4. Any discrepancies to be reported to the office of the consultant
Substructure All R.C foundation and substructure elements to S.e's Details 25mm thick blinding on approved compacted hardcore to approval Depths to be determined on site
±0.000
1,200
Doors Hardwood Timber doors to door schedule. Y7''
100 200 100 1,000 200 900 900
description
revisions:
Y7'
Y13
CONTROL ROOM
20,340
500
200
1,700
+7.200
MAIN ENTRANCE
P.v
200
200
RampX5 above
+7.200 P.v
Steps R.C steps to S.E's details Riser=150mm
D3
WC SH
200
2,850
Scale 1:100
+3.600
+1.900
D3
wc
200
ff Mazeras
SECTIONAL ELEVATION S-07
R.C Slab 200mm thick VRC slab with fibre mesh to S.E,s Details
3,000
D5 P.v
B BUILDING SECTIONS
Glass Roof 10 degrees Roofing Pitch Glass Roofing on steel trusses to S.e's Details
200 -1.500
whb
ff Ceramic tls
D3
C
500
D2(b)
ff Ceramic tls P.v
D4 P.v
ff Ceramic tls
2,450
600
-1.500
1,500
D2(a) P.v
COLD CHANGING ROOMS STORE
DRY STORE
ff Ceramic tls
1. This drawing is copyright 2. Do not scale off this drawing date
rev.
1,650
200
2,800 D3
LADIESP.v
4,000
200
2,500
1,750
P.v D2(a)
P.v
P.v
-1.500+5.300
200
200
600
P.v
Retaining Wall to S.e's Details P.v
8,400
RE
KITCHEN ff Ceramic tls
LADIES 200 P.v
NOTES
R.C Beam 600x200mm thick R.C Y7 Beam to S.E,s Details
200 500 200 2,600 2,500
P.v
P.v
+8.700
RG
P.v
RE
P.v
AREA = 2,122m2
Scale 1:100
Parapet wall 900mm high parapet walling with single feathered coping Y6'' to later details
P.v
RG
P.v
1,200 1,200 1,200 1,200 1,200 1,200 1,200
200 500 200 P.v 2,600
520
200
X5
200 500 200 2,600
15
14
13
19
18
17
16
21
-1.500
10,600
18,100
11,100
(PAX = 180) -1.500
D CONCEPTUAL PERSPECTIVE BCK.
S-07
Y6'
2,250
200
20
22
200
3,100
200
12
+12.100 P.v
GSPublisherVersion 0.0.100.100
Y16 Y15
200
2,800
300
8,600
9,100
3,200 3,000 3,000
600 2,450 500 2,450
3,000
ff Non slip tiles
S-08
GROUND FLOOR PLAN
200
4,950
P.v D5
+0.150
3,550
P.v
6,900
200
7,560
-1.500
SERVERY ffLADIES Non slip tls
OPEN RAMP
X6
+0.1050 +0.900 +0.750 +0.600 +0.450
+0.300
±0.000
5,600
6,100
4,000
-1.500 200
P.v 200D5(a)
ff Non slip tiles
P.v
DINING HALL
Landing above
5,700
P.v
35o
UP
3,400 3,400
X4
P.v
3,000 3,000
X7
P.v
UP P.v
3,400
X3 STAIRCASE
ff Non slip tiles -1.500
5,900
X8 X7"" X7" D2(a)
39,900
X2
P.v
Y5'
Handrail Y5'' 75mm diameter aluminium handrail mounted to detail
2,100
5,250
P.v
P.v
P.v
CHEFS +15.650 OFFICE P.v
DINING
P.v
P.v
1,700 2,000 2,250 200 200 500 200 2,600
520
RAMP
ff Non slip tiles
RECEPTION LECTURE ff Non slip tiles THEATRE
Glass walling with aluminium framing to later detail.
P.v
P.v
X1
P.v
P.v
X19 PRIVATE X20X21
Y12
S-10
P.v
+5.300
+1.900
D1
S-09
X11 X10 ±0.000 X9
±0.000
7,000
P.v
Corridor above
1,200
P.v
STAIRCASE
400 2,250 1,999 1,700 2,800 200 500 200 200 200 2,600 3,000
40,930
Y7''
UP
X12
6,400
35o
X18
3,900 1,900 2,000
landing above
CORRIDOR ff Non slip tiles
18,000
2,000
X17
P.v
200
X15X14 X13
+8.700
3,500
3,000
RAMP
Y8
400
X16
S-11
22 x 155 = 3,400
Ramp above
35o
STAIRCASE
Y7'
200
1,800
P.v
Kitchen to later detail
4,850
-1.500 650 2,000 STAIRCASE 200 ff Non slip tiles
11,450
P.v
P.v
8,100
X16
OPEN WALK WAY
P.v
21,200 3,000
500
200
1,800
OPEN RAMP
ff Mazeras
3,000
7,500
550 200
1
5
4
3
2
9
8
7
6
4,570
Y6''
1,500 200
ff Non slip tls
UP
11
10
12
24 x 150 = 3,600
Y6'
500
900mm high m.s railing to later detail.
±0.000
X17
RAMP
ff Non slip tls
13. All sanitary works to the entire satisfaction of MoH
33,400
24
23
22
21
20
19
18
X18
17
STAIRCASE ff Non slip tiles
P.v
X7' X7''
P.v
1,300 1,300 1,300
X12 Y6 Y5'' X13 X14X15
400
P.v
D1
3,200
RAMP
2,470
2,900
4,200
2,600
±0.000 P.v
P.v
33,000
2,000
3,800
1,800
DOWN
2,400 2,500
200
1,800 2,000
P.v DOWN
±0.000
4,800
200
-0.300
MAIN ENTRANCE 16
X21X20 X19
3,000
200
P.v
-0.600 P.v
DOWN
P.v D1
P.v
1,300 1,300 1,300
15
2,200
2,400
P.v
10. A single layer of 3-ply bituminous felt to be provided between masonry and r.c. work 11. Drain pipes passing under tarmac, driveways, and buildings to be encased in 150mm thick concrete sorround 12. All reinforced concrete work to Structural Engineer's drawings
DOWN
1,200 1,200
2,400
2,000
P.v
-0.900
P.v
±0.000
±0.000 P.v
P.v
P.v
-0.600
1,800
UP
-1.200
6,000
1,200
-0.900
200 2,000
P.v
-0.300 MAIN ENTRANCE
P.v
200
P.v
DOWN
1,500
9. pv denotes permanent air vents over doors and windows as shown on drawings
1,500
3,949
5,000
Y5'
2,470
P.v
-1.200 CONTROL ROOM
P.v
6,000
UP
-1.500
1,800
1,800
P.v
STAIRCASE
1,500
-1.800
2,150
14. All roads, storm water drainage and foul sewerage to Civil Engineer's drawings
13,000
ff Non slip tiles 5,700
1,200
1,200
P.v
P.v
6,600
UP
1,200
P.v
P.v
1,800
-1.500
4,350
ff Non Slip tiles
1,800
15,601
6,600 -1.800
UP
14
5,900
200
600
1,500
P.v
-2.100
DOWN
6,000
UP
9,000
3,500
ROOFED WALK WAY
Y5
5,700
500
1,500
P.v
+12.100
2,100
200
200
P.v
14,900
ff Mazeras
E-03
D1 P.v
-1.800
32,900
3,000
Walling 200mm thick Natural stone wall keyed to architects approval E-01
X10 X11
28,700
1,300 1,300 1,300 1,300 1,300 1,300 1,300 1,300 1,300 1,300
19,600
20,300
1,800 2,000
35,600
3,000
ff Non Slip tiles
Scale 1:100
Balustrates Purpose made aluminium handrail and balustrates to later detail
X9
Emergency Exit door
MAIN HALL
9,000
DOWN
520
X7" X7""X8
(PAX = 800)
P.v
2,470 2,180
X7
P.v
500
24,490
-1.800
X6
X20 X21
Y4
1,300 1,300 1,300 1,300 1,300 1,300 1,300 1,300 1,300 1,300
1,800 1,300 1,300 1,300 1,600
9,200
8,600 8,500
58,670
7,000
X5
3,000
9
P.v D1
X4
Emergency Exit door
5,100
Y15 Windows Purpose made window to window schedule. Y16
P.v
P.v
13
2,370
S-11
900mm high m.s railing to
+15.650
D6 P.v
P.v
later detail.ELEVATION S-06 SECTIONAL
Y14 Roof 25 degrees roofing pitch Decra Roofing tiles on Timber trusses to S.e's Details
-1.800
4,950
P.v
400
Y12
1,600
32,900
Steps Riser = 150mm Tread = 300mm
P.v
2,000
3,500
8
2,000
P.v
Y11
Y13
45°
15,900
200
2,700
X19
7
±0.000
-1.350 200
8. Depth of foundations to be decided on site
X18
23,500
500 1,000
4,000
X17
6
+3.600
2,000
D6 P.v
ff Non slip tls
500
6,550
-1.800
X16
5
Y8 R.C Slab 200mm thick VRC slab with Y9 fibre mesh to S.E,s Details Y10
P.v
ff Mazeras
STORE
ff Non slip tls
CHANGING ROOMS
X13 X14 X15
4
Glass Roof 25 degrees Roofing Pitch Glass Roofing on steel trusses to S.e's Details
OPEN WALK WAY +7.200
P.v D3
1,800
-1.800
P.v
200 200 100 100 200 1,100 1,000 1,000 1,000
ff Non Slip tiles
7. Walls below 200mm thick to be reinforced with hoop iron at every alternate course
X12
X11
3
Y7
6,000
-1.350
FRONT STAGE
D3
6. This drawing is to be read in conjunction with specifications and all other relevant drawings
Y3
2
Roof (Main Hall) 35 degrees roofing pitch. LT5 Profile Roofing Single Span gauge 26 on Steel trusses to S.e's Details
1,350
5. All work to be strictly in accordance to with the standard specifications and notes
Y2
400
1
RAMP
200
14,700
D3
-1.350
X3
ff Non slip tls
D3
1,600
11
X2
-1.350
C
3. All levels and dimensions to be checked on site before any building work commences 4. Any discrepancies to be reported to the office of the consultant
10
X1
Y6
ff Non Slip tiles
NOTES 1. This drawing is copyright 2. Do not scale off this drawing
UP
S-07
40 5,9
1,500
200 1,100 200 200 1,400
3,700
5,830 P.v D6
200
2,650
CHANGING ROOMS ff Non slip tls
200
500
Y5
2,000
200 100 100 200 1,000 1,000 1,000 P.v
3,200
Room Room Room #1 #2 #3
600
1,800
200
2,700
BACK STAGE
200
200
D6 P.v
200
D3
3,200
200 1,100 200 D2(a) P.v
D3
STORE
ff Non slip tls
-1.800
D3
1,200 1,500
17,800
5,000
200 1,600 200 1,800
D3
UP
ff Non slip tiles
-1.350
15,400
P.v
STEPS
DOWN
ff Non-slip tls
1,500 1,200
Room Room Room #1 #2 #3 P.v
3,700
500 200
ff Non slip tiles UP
4,800
3,600
STEPS
3,200
40 5,9
Y4
DOWN
4,200
Steps Riser = 150mm Tread = 300mm
1,500
2,400
2,600
7,329
Y3
1,600
200 200 1,100 200 200 1,100 200 1,400 3,200
3,700
2,830
ff Non slip tiles
TERRACE
DOWN
400
RAMP
UP
200
3,000
Ramp Slope to be determined on site
3,500
Steps Riser = 150mm Tread = 300mm Y1
S-10
4,500
E-02
2,000
4,500
8,600
2,250
DOWN
Y2
S-06
7,000
Steps Riser = 150mm Tread = 450mm
10,900
1,300 1,300 1,300 1,600
8,350
2,000
Y1
8,900
35,600
ff Cabro blocks
3,000
4,000
STEPS
ff Non slip tiles
8,500
39,900 6,900
4,000
7,000
7,000
LOADING BAY
2,000
2,000
5,400
E-03
UP
3,500
N
X1
E-02
E-04
S-09
S-08
A GROUND FLOOR PLAN
Steps R.C steps to S.E's details Riser=150mm Tread=450mm
client's signature ...................................................
Architects
achera & partners
Scale 1:100 Parapet Wall 200mm thick parapet walling with one feathered coping to detail
Y16 Y15
Y14 Y13 Y12 Y11 Y10 Y9 Y8 Y7""
Y7"
Y7
Y6""
Y6"
Y6Y5""
Y5"
Y5
Y4
Y3
Y2
+15.650
Water Storage High level storage water tank to manufactures specs
+12.100
Windows Purpose made window to window schedule.
+8.700
3,550 3,400
TERRACE STAIRCASE
R.C Wall 200mm thick R.C retaining wall to S.e's Details
RAMP
3,400
35o
STAIRCASE
P.v
RAMP
P.v
P.v
LECTURE HALL
P.v
P.v
P.v
+7.200
LECTURE HALL P.v
P.v
P.v
+5.300
STAIRCASE
R.C Slab 200mm thick VRC slab with fibre mesh to S.E,s Details
Roof (Main Hall) 35 degrees roofing pitch. LT5 Profile Roofing Single Span gauge 26 on Steel trusses to S.e's Details
STAIRCASE
3,400
Staircase R.C staircase to S.E's details Riser=150mm Tread=300mm
P.v
RAMP
P.v
P.v
LECTURE HALL
P.v
P.v
architects, urban & interior design consultants
Roof 25 degrees roofing pitch Decra Roofing tiles on Timber trusses to S.e's Details
Y1
p.o. box 10114-00400 Nairobi Kenya cell. 0722-414645 architect's signature .................................................................... CHARLES O.A. MISIANI [A 702]
Drawing Title
Alucobond 1200mm high alucobond parapet to S.E's Details
Sectional Elevations
+5.650
Windows Purpose made window to window schedule.
P.v
LECTURE HALL
+1.900
Drawn
B.N.G Date
P.v
P.v
DINING HALL -1.350
-1.500
200
SECTIONAL ELEVATION S-09 Scale 1:100
personal KANALI LESTER LUSEKA Index No: 50A126, Log Sheet No: A1084
Doors Hardwood Timber doors to door schedule.
employer ACHERA & PARTNERS ARCHITECTS CHARLES MISIANI, A 702
COAM
Scale:
March. 2017 Job No.:
Substructure All R.C foundation and substructure elements to S.e's Details 25mm thick blinding on approved compacted hardcore to approval Depths to be determined on site
Checked:
Drawing No.: AP/ARC/2017 AUA 03
AP/ARC/2017/03
Revision
Sheet No.
9
Check notes
project ONGATA RONGAI, KAJIADO COUNTY CONSTRUCTION FINALIZATION
SANCTUARY &
GUEST HOUSE Outline Design
Status
Apr 2019-Jul 2019
Time
RESPOSIBILITIES
Site Survey & Supervision Conceptualization Design Team Meetings Costing Presentations EXPERIENCE
Brief Formulation Site Survey Spatial Planning
NAIROBI ROAD
N
LEGEND SPACE
56,116 18,865
18,729
18,522
NAIROBI ROAD
Main Access
6,000
S-02
A GROUND FLOOR PLAN
H 1ST. FLOOR
QUANTITY DIMENSION (m)
AREA
CHURCH HALL
570 Pax
27.5 x27.5
668.6 m2
NURSERY
16 Pax
17.7 x 6.3
69.7 m2
CHOIR PRACTICE
25 Pax
6.1 x 4.8
29.3 m
4.8 x 3.2
15.1 m2
14 Pax
6.3 x 4.8
30.0 m2
B 1ST MEZZANINE FLOOR PLAN CLERK'S OFFICE
Basement Access
Entry 3
Entry 2
GUEST LAUNGE/ VESTRY
Entry 1
NAIR
2
INDOOR DINING
60 Pax
12.5 x 9
112.5 m2
OUTDOOR DINING
40 Pax
12.5 x 6
71.1 m2
KITCHEN
12.5 x 6.5
72.6 m2
5 Units
6.2 x 4.8
29.8 m2
5 Units
6.2 x 4.8
29.8 m2
4.4 x 2.5
10.9 m2
Main Access
GENTS LAVATORIES
S-01
D
68,504
400
600
100
400
1,300
Entry 2
300
16
800 1,900
X2
IP SH OW L LL AL ax FE H 0 P 13
1,950 900
1,700 900
100
100
GENERAL STORE
600
G IN RD IO CO UD RE ST
200
1,300
500
Strong Room
X2
6,000
F
Up Up
5
R 6,250
Disabled
4
Changing
C
F
1:500
A
10
B
Room 1
W
er
in 9
W
Laundry Cleaner's Room
X3
10
Room 2
X2
6,000
Entry 9
10
F
DW
g
y
Lobby
Up
DINING
8
Up DR
43,500
Outdoor Dining
1,800
9
9 Cutlery Store
Changing Room
3,800
Up Entry 8
Disabled
8
Board Room
200
Gents Lav.
6,000
TOTAL AREA - 7,465.67m2 8
Up
Ladies Lav.
Up
Reception
Disabled
Up
Up
rs
7 X1
Elevator
9
at
16 200
3
7
500
Reception
Up
Disabled
10
Ba
Guest Room
8
6
y str
pti
Up
Entry 4
Up
Entry 5
Gents Lav.
Elevator
L. Changing
X1 6
X1
Ladies Lav.
Kitchenette
G. Changing
6,000
Up
2
Void Above & Below
5
7
C
Lock
4
X2
Clerk's Office
Entry 6
B
3
3
Choir Practice Room
7
SITE PLAN
200
Treasury
Library & Book Shop
6
A
1,500
Up
1
X1
SP-01
500
14,050
Up Entry 7
X3
5
oir Ch & m ax diu 0 P Po 4
Up
Up
6,000 2
5,500
Up
re Sto
4
EMMANUEL AGC CHURCH
Up
Void Above
18,776
6
KERICHO GOLF CLUB
6,000
Assistant Pastor's Office
GENERAL STORE
ol ntr Co oom R
Entry 9
4
19,123 60,167 S-02
B
Pastor's Office
Up
Deaconry
22,269
5
1
A
Usher's Booth Elevator
X3
Entry 8
LL HA CH AX UR 0 P 57
G
502.6 m2
1642 M2
l ca Vo om Ro
CH
X2
F
8,000
3
3
500
Access Main 5,200
CIRCULATION
TOTAL AREA
4,800
3
X3
E
Se
rs Nu
Sea
ting
ery
Entry 5
500
1,200
250
200 800 300
4
S-01
D
1,200
2
2
200 400
600
Entry 6
Changing Room
C
650
F
900
100
600
600 800
4,100
3,100
Entry 4
1,900 400
w.c
Up
Check-in
Kitchenette
1800
1
X3 Entry 1
2
300
Down
Up
Elevator
Security
A
Basement Access
Entry 3
LADIES LAVATORIES
KITCHEN CHANGING ROOM
EMMANUEL AGC CHURCH
Up
B
12,200
Generator Room
B
A
G
200
SITE
F
300
C
Up
SITE
Entry 7
w.c
Generator Room
1
E
Reception
C
Security
SITE
54,880
B
Nu
A
40 PAX
11
11
Up
KITCHEN
60 PAX
11
note Room
F
G
C 1ST FLOOR PLAN
Client: SUNRISE SDA CHURCH
14,750 E
1
2
3
A
4
B
5
C
S-01
D
2
floor plan
6
E
7
F
G
8
9
10
11
A
12
B
C
7
S-01
D
E
GSPublisherEngine 0.2.100.100
1
R 3
Strong Room
X2
Balcony
Treasury
3
Balcony
w.c & shw.
Room
w.c w.c & & shw. shw.
Balcony
Room
w.c w.c & & shw. shw.
Balcony
X2
Library & Book Shop
+7,000 2 Story
Balcony
Void Above & Below
5
5 G. Changing
G. Lav
General Store
+3,500 1 Story
Balcony
Up
try
tis
p Ba
X1 6
7
7 X1
Board Room
YOUTH CLASS 3
Disabled
9
1
6,000
2
6,000
3
6,000
4
5
3,000
Reception
6,000
Room 3
6
Room 4
7
D
S-01
A
11
6,000 12
S-01
3,000
8
E
F
9
Room 6
10
B
Room 7
4,000
9
12
10
Room 8
11
4,000
10
11
4,000
11
Room 9
12
12
G
BUILDING SECTION 01 1:200 personal employer KANALI LESTER LUSEKA ACHERA & PARTNERS ARCHITECTS Index No: 50A126, Log Sheet No:Architects: A1084 ACHERA & PARTNERS CHARLES MISIANI, A 702 Client: SUNRISE SDA CHURCH GSPublisherEngine 0.2.100.100
Up
10
Room 2
11
-9,000 -2 Basement -2
Room 5
C
Cleaner's Room
Room 1
8
9
Laundry
F
10
B
Disabled
Kitchenette
9
W
70 Pax
8
Genral Store
3,500
A
W
8
Cold Store
Gents Lav.
Cleaner's Lounge
4,500
Refuse Collection DR
Lobby
PARKING 29 Cars
6,000
F
Disabled
C
Store
Cleaner's Store
Ladies Lav.
Up
Up
Disabled
5
GENERAL STORE
Gents Lav.
-5,500 -1 Basement -1
Elevator Lobby
Void Below
5
Elevator
PARKING 29 Cars
8
B 4
Elevator
Elevator Lobby
A
85 Pax
6
7
Ladies Lav.
Up
5,800 6,000
Up
DINING 60 Pax
G. Lav
X1 ±0 0 Ground Floor
200
3
YOUTH CLASS 2 4
6
Podium & Choir 40 Pax
7
1,600
19,750
L. Changing
X1 6
Elevator Lobby
6,000
200
Down
Elevator Lobby
200 2,500
Down
Up
1040 PAX
G. Lav
1,600
Up
X3
4
22,200
l ca Vo om Ro
re Sto
200
Up
Up
Room
w.c w.c & & shw. shw.
1,750
Up
Deaconry
w.c & shw.
85 Pax
200
Lock
3
ol ntr Co oom R
Lobby
2
G IN AT SE X Y PA ON 70 C 4 L BA
Up
DIN OR DIO EC TU S
R 1,950
2
Water Tank Storage
Lobby
+14,000 4 Roof
CHURCH HALL
Up
YOUTH CLASS 1 2
Assistant Pastor's Office
GENERAL STORE
G
Elevator Lobby
Up
Down
8
Lav.
6,350
Pastor's Office
Up
X3
GENERAL STORE
4
Client: S Ladies Up 1
Elevator
Usher's Booth Elevator
2
+10,500 3 Story
G
Reception
+17,500 5 Roof 2
F
1
Usher's Booth Elevator
IP SH OW L LL AL ax FE H 0 P 13
G
6,000
Architects: ACHERA & PARTNERS 1
F
6
Up
Architects: ACHERA & PARTNERS
N
S-01
D
SCALE - 1: 200
KERICHO GOLF CLUB
D BUILDING SECTION 01
Entry 4
E
Entry 5
S-01
12
6,000
I 2ND. FLOOR D
3,000
H 1ST. FLOOR
Room 4
3 Dimensions (m) indicates maximum lengths and 12 5 widths and may not directly indicate the exact dimensions of the spaces. Spaces are also measured to include wall dimensions.
12
200 200 1,200 50
12
15,000
11
D
S-01
Room 10
E
F
12
G
P-01
project KERICHO TOWN, KERICHO COUNTY NEW CONSTRUCTION
* Acc with 1 2 Que both t
GROUND FLO
floor plans
All righ author patent
spray painted black to Door Schedule
masonry wall to Architect's detail
2 No. 75mm high 100mm concrete moulding at 375mm spacing c-c adjacent to r.c beam plastered and painted
1000mm high steel stair railing with 50mm by 50mm hardwood timber handrail and vertical balustrades at 100mm c-c sprat painted to Architect's Detail
G
RESIDENTIAL APARTMENTS
1
2
3 c t
C
I
J
K
L
M
N
O
P
Q
R
7
6
5
4
3
2
1
7
1,750 280
550
+10,750 4 Roof 2
520
6
5
75 300 75 250 150 100 1,350 1,350
G H
100
F
500
2,700
2,200
2,700
2,200
500
2,700
4,000
1,400
2,700
2,700
1,400
1,200
3,800
1,400
2,000
1,400
2,550
6 e
S
7 s
+9,000 3 Roof 1
8
9
1
1 ir
+6,000 2 Apartments
Scheme Revisions STAIRS LOBBY
M
1
1 d
Detail Design
1 1 +3,000 1 Apartments
1
1 c
Consultants Meetings
STAIRS LOBBY
ENTRANCE
1 w e
2 c
2
EXPERIENCE
3,800
1
1 ±0 0 Apartments
Presentations
1,200
C
Site Survey & Supervision
75 300 75
2,000
5 t
Dec 2019-Apr 2021 RESPOSIBILITIES
STAIRS LOBBY
STAIRS LOBBY
200 150 100 100 100 TBD 1,050 1,400
-3,000 -1 Parking
4 s
2 1 Construction
+10,750 4 Roof 2
WATER TANK STORAGE
2,800
2,550
150
+3,000 1 Apartments
±0 0 Apartments
00
Time
75 300 75
1,000
15,350
+6,000 2 Apartments
Status
WATER TANK STORAGE
2,550
+9,000 3 Roof 1
4
E
-3,000 -1 Parking
2
Site Supervision
1,400
3,400
2,000
Project Programming 150mm thick stairs flight slab with T=300mm, R=150mm clad
ACHERA PARTNERS with 20mm thick granitto tiles to & Architect's Detail Cost Design Consideration ARCHITECTS, URBAN PLANNERS
DESIGNERS 600mm by 200mm&r.cINTERIOR strip foundation footing at 600mm min
1000mm high steel railing with 50mm by 50mm h.w timber hand rail anchored to 100mm high masonry walling with 50mm concrete copping spray painted to Architect's Detail
depth. Structure to S.E Specifications Instruction Issuarance
Copy Right: All rights reserved. No reproduction, copy or transmission of these drawings may be made without permission. The author has asserted his right to be identified as the author of this design in accordance with the Copyright, Designs and patents Act Cap 130 of the Laws of Kenya.
300mm deep well compacted hardcore
NOTES
Conslutants Coordination GENERAL
Structure above at Level 0
1. All dimensions are in mm unless otherwise specified.
Building Elevation 02
S-01 1:100
2. Drawing are not to scalled. Only figured dimensions to be used.
Cross Section 01
3. The contractor must check and verify all dimensions before commencement of any work. Any discrepancies to be clarified with the Project Architect.
E-03
CONSTRUCTION
ACHERA & PARTNERS
C
E
F S-02
I
J
S-01
URBAN PLANNERS N ARCHITECTS, P & INTERIOR DESIGNERS
M
B CROSS SECTION 02
A SITE LAYOUT 200mm masonry wall cladded with 20mm thick4,100 cut and 4,100 200 200 200 200 polished sandstone patterened to approval 1,200
2,500
200
2,500
7. All black cotton soil to be removed from all buildings and paved surfaces.
200
8. For all R.C work,refer to stuctural Engineer's details.
+3,000 1 Apartments
5,400
M
P PROJECT
Proposed Housing Units
0 4,50
IC
90,677
,540 11
West Kenya Union Church Signature:
1,400
2,000
1,400
3,800
Date:
1,400
11,050
E-02
4,400
2,000
R
PASSAGE
PARKING
1,200
KLL
OL
LIVING ROOM
BALCONY
Drawn By:
MH
1,400
200 200 600 600 3,550 700 1,400
Q
KITCHEN
G IN M
L
K
REVISIONS
DATE
KITCHEN YARD
P
REVISION NO.
C
W
S
±0 0 Apartments
D
K
3,800
C
-3,000 -1 Parking
A
AREA SCHEDULE
1,400
3,400
Arch C.O.A.M
IM
P
+3,000 1 Apartments
STORE
Checked By:
SW
P
ELECTRICALS
KITCHEN 23. All conduits must be laid before plastering YARD
Contact:
1,200
,110 12
KITCHEN
2550mm by 2000mm h.w timber louvered door varnished to approval. Detail to Door Schedule
-3,000 Client: -1 Parking 2,000
PASSAGE
22. PV denotes permanent ventilation.2 Apartments
LIVING ROOM
2,550
Kisumu County
30 7,7 15
200 BALCONY
1,150
4 Bedroom Block
Location:
0 4,13
0 2,20
KITCHEN
300
2,700
O ±0 0 Apartments Project Title:
6
1,850 300
2,550
J
S-01
3,800
75 300 75 100 75 300 75 1,200 1,250 1,500
2,700
LIVING ROOM
75 300 75
I
,110 12
1,400
PO
2,000
REVISION NO. 5,100
Plot Number:
IC
IC
1,560
300
DATE
,180 10
HOUSE 3
2,000 700 REVISIONS
1,850
5,100
5,400
19. No chases will be allowed for pipes. Sleeves will be allowed with written approval of structural Eng's. No cutting of concrete without express approval of the Architect or structural Eng. KITCHEN YARD 21. All mechnical works must be co-odinated with electrical and any conflict must be clarified before work +6,000 begin. 1,550 300
550 1,000
+9,000
18. Minimum slope in the drains pipes3 Roof to be1 1: 100.
PASSAGE
1,000
2,000
300
BALCONY
50
700
15. The storm drain pipes to comply with BS 556 specification.
100
2,000
14. Drains pass beneath buildings & driveways to be encased in 150mm concrete surround.
100 450 100
700 5,100
15,210
2,000
200 100 200
13. SVP1denotes soil vent pipe to be provided at the head of the drainage system.
5
12
2,550
1,550
2,000
2
17. All inspection chambers covers and framing shall be cast iron.
11
+6,000 ELECTRICALS 2 Apartments 23. All conduits must be laid before plastering
450
4
19. No chases will be allowed for pipes. Sleeves will be allowed with written approval of structural Eng's. No cutting of concrete without express approval of the Architect or structural Eng.
22. PV denotes permanent ventilation.
0 0 3,70 1,50
0 6,00
MECHANICAL 12. All plumbing and drainage to comply with relevant local authority.
4
16. All underground foul and waste drain pipes shall be uPVC to comply with BS 5255.
300
20R x 150 19G x 300 10 1) (A AN
0 1,50
3 5
16. All underground foul and waste drain pipes shall be uPVC to comply with BS 5255.
21. All mechnical works must be co-odinated with electrical and any conflict must be clarified before work begin.
,540 11
0 4,50
MH
,630 12
,800 16
IC
IC
2,700
10
E-01
R 3,000
R 3,000
9
IC IC
R 7,500
2,700
8
9. Depth of foundation to be detemined on site to S.E's aproval.
100mm by 50mm h.w timber trusses with 30o pitch, bolted to 10. All walls to be reinforced with loop iron at every alternate course. 100mm by 50mm timber R.C. wallwork plate treated towalls approval. 11.h.w All adjacent and masonry to be tied with loop Structure to S.Eiron Specifications. at every alternate course.
15. The storm drain pipes to comply with BS 556 specification.
+9,000 17. All inspection chambers covers and framing shall be cast iron. 3 Roof 118. Minimum slope in the drains pipes to be 1: 100.
C E
A 202
F S-02
0 4,13
0 2,20
6
STORE 10 STORE 11 STORE 12 13. SVP denotes soil vent pipe to be provided at the head of the
38,100
,110 12
,600 11
0 3,36
0 4,50
,190 10 MH
1,400
7
2,700
MH
IC
IC
MH
0 8,49
0 9,15
STORE 09
,540 11
0 4,50
0 8,85
IC
IC
,350 14
STORE 08
6,00 0
200 100 200 IC
IC
7
12. All plumbing and drainage to comply with relevant local authority.
,180 10
HOUSE 2
A 203
300 700 300
A 201
2,20
0 2,16 0 4,13
5,400
IC
R 1,500 9,300
2,000
5,100
,630 12
,800 16
3,000
,886 28
IC
0 4,70
450 50 900 0
IC
IC
0 8,30
D
,400 11
0 8,58 0 3,20
2,000
300
HOUSE 1 700
5,400
0 5,59 ,680 11
700
,180 10
,290 26
IC
IC
C
R 3,000
0 4,70
,630 12
2,700
0 5,77
R 1,500 9,300
0 ,40 31
MH 40 ,2 10
R 6,000
R 6,000
2,000
,400 11
5,100
R 3,000
2,700
B
1,0009,100 550
IC
,600 11
1,400
A
1,850 300
,800 16
2,000
6
R 3,000
IC
0 8,30
0 8,85
5,100
STORE 07
20 ,97 0
,600 11
700 IC
MH
3,000
2,000 300
1,500
1,150
0 4,70
,500 20 ,770 10
70°
IC
,000 15
1,850 200
,380 23
0 4,24
KB BLOC oom) dr (3 Be
11. All adjacent R.C. work and masonry walls to be tied with loop iron at every alternate course.
+10,750 14. Drains pass beneath buildings & driveways to be encased in 4 Roof 2150mm concrete surround.
R 1,500 9,300
R 6,000
,680 11
10. All walls to be reinforced with loop iron at every alternate course.
drainage system.
0 8,85
2,000
7
MECHANICAL
ENTRANCE
0 6,99
5 ,400 11
IC
IC
C BLOCK m) (3 Bedroo
2,550
STRUCTURAL
2
75 300 75
,240 10
4
R 3,000
6
1
EN TR
3
MH
0 ,00 40
70 7,1 0 ,10 13
11,500
150,980
2,050
200
9. Depth of foundation to be detemined on site to S.E's aproval.
2
9,6 70
0 2,95
IC
2
IC
4,000
1,200
8. For all R.C work,refer to stuctural Engineer's details.
4
1,50 0
3,550
0 ,10 251
0 7,26
2,700
2,9 50 5STORE ,95 3 06 0 ,49 6
STORE 05
70°
IC
IC
500
2,500 2,500before 3. The contractor must check and verify all dimensions commencement of any work. Any discrepancies to be clarified with the Project Architect.
7. All black cotton soil to be removed from all buildings and paved surfaces.
6 5
5
1,50 0 3,00 0
STORE 04
KA BLOC oom) dr (4 Be
IC
18 ,268
,000 15
1,500
STORE 03
IC
4
UP
0 5,47
,380 12
2,200
3
1,50 0 IC
STORE 02
11°
2,700
100mm thick r.c6.floor sloped at 1:30 gradient externally All soilslab on cut embararkment to be stablized. The slope not to exceedthick 45 degree. and clad with 20mm cut sandstone patterened to approval. Structure to S.E specifications
4,100
2. Drawing 200are not to scalled. Only figured 200 dimensions to be used.200
STRUCTURAL
3
2
6,00 0
STORE 01
2,500
2,200
WC
1
7,50 0 IC
,470 14
3,800
35 ,68 4
18 ,805
IC
0 4,30
60,303
800
0 ,00 32
IC
80 2,4
500
2,500
7
14 ,570
A
13 0,1 80
1,00 0
B
20 7,8
6
CIVIL
4,100 1. All dimensions are in mm unless otherwise specified. 200
2,500
1,800
1,400
200
2,400
2,000
5
1,400
4
TO BE PLANTED AND LANDSCAPED FOR THE C STAFF
D
IC
2,700
4,000 200
2,500
6. All soil on cut embararkment to be stablized. The slope not to exceed 45 degree.
IC
00
200
2,500
CIVIL
70 8,4
E
11,050
800
100
E-04
F
200
1,500
5. All soil under slab around and under foundation to be treated for termite control.
200 200 600 600
CE EN TR AN
H G
1,000
4. All slab at ground level to be cast over 1000 guage polythene sheet on 50mm thick murram blinding on hardcore.
,830 15
I
200
2,500
CONSTRUCTION
3 J
SECURITY 5,400 GATE HOUSE
2,700
200
2,500
180mm high 20mm thick h.w timber eave facia treated and varnished to approval
2
K
5,400 200
2,500
51 ,46 3
0 ,37 55
200
4,000
2,500
GENERAL
200 100 50 TBD
1.5m WIDE PRE-FABRICATED CONCRETE BLOCK PEDESTRIAN PAVEMENT
L
5. All soil under slab around and under foundation to be treated for termite control.
NOTES
38,100
M
4. All slab at ground level to be cast over 1000 guage polythene sheet on 50mm thick murram blinding on hardcore.
R
Copy Right: All rights reserved. No reproduction, copy or transmission of these drawings may be made without permission. The author has asserted his right to be identified as the author of this design in accordance with the Copyright, Designs and patents Act Cap 130 of the Laws of Kenya.
300
A
2,050
E-02 1:100
2,000
SPACE
A
A
AREA
S
Parking Level -1
208.25 m2
Individual Apartment Level
338.61 m2
Approved By:
Arch C.O.A.M
CONCRETE BLOCK PAVED DRIVE WAY
6m WIDE STEEL MAIN ENTRANCE GATE HOUSE
,380 30
Signature:
Date:
200mm thick r.c retaining tanking wall with cementitious admixture water-proofing, plasteredLevels and painted 1,015.83 m2 Total Apartment 0-2 to approval. Structure to S.E Specifications
Contact:
IC
FP-01 1:100
Drawing Titles
NK (-1)2050mm Parkingby Floor Plansteel grill spray TA IC 900mm painted to approval. IC
,100 14
IC
150mm thick r.cRoof floor1slab with 10mm thick ceramic floor tiles patterened to Architect's Detail. Structure to S.E Roof 2 Specifications
SITE PLAN
PT SE
Pattern to Window Schedule
SEPTIC TANKS TO M.E SPECIFICATIONS
Drawing Numbers
COMMUNIAL GROUND AND SOCIAL FACILITIES
0 8,36
C TYPICAL APARTMENT FLOOR
E-04 1:100
SP-01
Building Elevation 04
Scale:
Date:
1:400
1/24/2021
Scheme Design
Job Number:
Sheet Number:
Orientation:
01/2020
A.01.5/13
FACILITIES
6
Individual 4 Bedroom Unit
N
Cross Section 02
157.74 m2
Unit Numbers
12
Parking Numbers
200mm wide 100mm high masonry walling plastered and painted with 50mm thick 20mm overhanging copping to Architect's Detail
GSPublisherVersion 0.8.100.100
11.60 m2
200mm thick strip foundation walling to S.E Specifications. 1,251.92 M2 GRAND TOTAL Depth to be determined on site
Stage:
S-02 1:100
16.24 m2
E-03
A
C
E
F S-02
G
I
J
S-01
L
M
N
P
R
A
38,100
1,400
200
1,200
300x300mm ceramic tiles f.f
WC/BATH 250x2500mm non-slip ceramic tiles f.f
200
300x300mm ceramic tiles f.f
LOUNGE 300x300mm ceramic tiles f.f
100
1,200
PASSAGE
1,200
1,500
1,200
700
1,500
200
1,400
750
900
500
600
200
300x300mm patterned granito tiles f.f
2,900
1,100
800
300
900
950
900
1,900
350
900
BEDROOM 01 (GUEST)
LOUNGE 300x300mm ceramic tiles f.f
600
3,800 2,700
600
2,600
2,700
1,500 200
1,400
1,500 3,800 4,000
1,400
1,200
550 600
200
300x300mm ceramic tiles f.f
300x300mm ceramic tiles f.f
WC/BATH 250x2500mm non-slip ceramic tiles f.f
1,500
600 200
5,200 3,200
2,200
2,500 2,500
600
1,500
900
200
2,700
600 550
1,400 200
5,200 2,200
1,300
cut sandstone f.f
1,200
3,200
1,500 3,800
1,500
600
200
4,000
1,100 2,600
1,400
2,000 1,400
PROJECT Project Title:
4
Proposed Housing Units (4 Bedroom Block)
5
B
C
D
E
F S-02
H
I
S-01
Kisumu County Plot Number:
Client:
West Kenya Union Church
600
500
K
M
N
7
Date:
Contact:
KLL Checked By:
950
700
200
1,500
700 200
3,800
2,700
O
Contact:
Drawn By:
2,700
1,400 1,200
200
Arch C.O.A.M Approved By:
Arch C.O.A.M
1,400
Signature:
J
Date:
6
38,100
A
Location:
Signature:
BALCONY
cut sandstone f.f
900
3 2,000
3,300
MASTER BEDROOM
BALCONY
cut sandstone f.f
1,100
200
550 300x300mm ceramic tiles f.f
3,200
BEDROOM 03
STAIRCASE LOBBY
BALCONY
cut sandstone f.f
200
1,800
900 300x300mm ceramic tiles f.f
200
BALCONY
200
550 1,400
BEDROOM 02
W
laundry
F
1
1,700
BEDROOM 01 (GUEST)
RG
3 2
UP
E-02
200
250x2500mm non-slip ceramic tiles f.f
3
2
1,400
1,000
300x300mm non-slip ceramic tiles f.f
300x300mm ceramic tiles f.f
5 4
2
1
12,100
4,200
KITCHEN
DINING
6
1
1,100
WC/SHW
clk room
8
1,700
3,800
MASTER BEDROOM
1,500
200
9
7
C
200
3,300
1,500
3,800
PASSAGE
200
200 600 1,100
3,600
F
1,100
1,500
1,200
200 400 200
3,300
2,600
200
1,900
4,100
200 600
600
3,600
200 400 200
4,100 2,500
3,800
2,000
1,450
200
200
200
900
1,100
1,100
400
200
laundry
4,000 200
2,500
300 400 300 400 250 600 700 600 900 900 600
1,200
2,700 200
2,500
300
10
200 200
DR
600
DINING 300x300mm ceramic tiles f.f
20R x 150 19G x 300
KITCHEN 300x300mm non-slip ceramic tiles f.f
4,200
clk room
W
2,000
3,600
300x300mm ceramic tiles f.f
1,400
3,200
BEDROOM 03
1,300
12,100
700
300x300mm non-slip ceramic tiles f.f
200 900 400
1,200 2,700
1,500
1,200
300x300mm ceramic tiles f.f
1,400 4,100
2,700 200
2,500
KITCHEN YARD
200 3,800
3,600
E-04
E-02
13,200 1,200
7
2,700 200
2,500
RG
200
550 900
1,800
2,000
200
550 1,400
1,400
WC/SHW 250x2500mm non-slip ceramic tiles f.f
BEDROOM 02
3,300
3,800 Fall 30o
2,700 200
2,500
300x300mm non-slip ceramic tiles f.f
200
1,200
2,000 1,400 4,800
Fall 30o
6
Fall 30o
Fall 30o
200
250 400 300 400 300 300 600 900 900 600 700 600 700
KITCHEN YARD
Fall 30o
600
1,100
1,450
20
5
600
19
Fall 30o
4
2,700 200
2,500
2,600
18
Fall 30o
1,500
17
3
4,000 200
3,900
1,100
11
Fall 30o
1,500
16
2
1,500
15
1
4,100 200
3,900
1,100
DR
4,100
200
3,800
14
300
13
1,600
12
2,700
B
200
100
P
Q
R Drawing Titles
(-1) Parking Floor Plan, (0-2) Typical Apartment Floor Plan, (3) Roof 1 Floor Plan, Site Plan (2), Site Plan (3)
E-01
350mm by 350mm r.c column clad with 25mm thick cut and polished sandstone patterned to Architect's Detail. Structure to S.E Specifications
(0-2) Typical Apartment Floor Plan personalFP-02 1:100 KANALI LESTER LUSEKA Index No: 50A126, Log Sheet No: A1084
employer ACHERA & PARTNERS ARCHITECTS CHARLES MISIANI, A 702
project KISUMU CITY, KISUMU COUNTY NEW CONSTRUCTION
Drawing Numbers
FP-01, FP-02, FP-03, SP-01 Scale:
Date:
Stage:
1:100, 1:500, 1:2000
1/27/2020
#Project Status
Job Number:
Sheet Number:
Orientation:
#Pln
A.01.1/10
N
RESIDENTIAL ESTATE Outline Design
Status
Feb 2020-Sep 2020
Time
RESPOSIBILITIES
Site Survey Conceptualization Research Scheme Resolution Presentations EXPERIENCE
Brief Formulation Site Condition Design Stakeholder Coordination
N
SITE PLAN
JOB'S HOUSE (3 BEDRMS)
FLOOR AREA
SCALE - 1:100 FLOOR AREA
SITE AREA Homestead Other Development Total Area
For Other Development
BUILDING AREA Internal Area External Area Total Area
1.1 Acres 1.6 Acres 2.7 Acres
N
SCALE - 1:1250
202.08 m2 45.36 m2 247.44 m2
Interior Area Exterior Area Total Area
602.62 m2 247.33 m2 849.95 m2
S CES AC
HOMESTEAD
da un Bo ed) ings irm aw nf Dr Co inal o Be Orig (T
B MAIN & GUEST HOUSE
ry
A SITE LAYOUT
20,000 60,435
6,000
200
1,200
300
1,500
800
2,400 300
200
3,000
300
1,800
800
200
1,800
1,200
1,100
200
2,100
600 500 600
200
900
1,550
3,300
200
1,800
950
1,550
200
1,800
950
200
2,400 1,200
4,200
900 200
N
900 600
400 200 3,000 200
21,400
1,200
8,000
200 200
200
1,400
1,100
3,000
200
600 500 900 1,200
200
1,200
1,100
3,000
200
900
200
900 200
200
1,300 200
1,800 4,000
200
1,800
4,200 200
50 50 900 200 1,000
1,800
200 900
3,000
200
2,600
4,800
3,000
200
1,700
6,000
750
200
900
750
2,400
200
350
900 1,200
2,150 200
2,600 4,200
200
2,700
200
2,700
200
1,200
200
50
900
250
1,800
600
950
900
200
2,400
750
24
6,000
30
LEGEND 1. Main Entrance 2. Airlock 3. Coat 4. Lounge 5. Fire Place 6. Family Room 7. Patio 8. Dining 9. Breakfast 10. Kitchen 11. Pantry 12. Laundry & Mud Room 13. Store 14. Corridor 15. Bedroom 16. Walk-In Closet 17. Toilet & Shower 18. Cloak Room 19. Office / Nursery 20. Master Bedroom 21. Master Bathroom 22. Master Walk-In Closet & Dresser 23. Kitchen Yard 24. Mechanical & Electrical Room 25. Car Port (2 No. Cars) 26. Guest Parking (2No. Cars) 27. Landscaped Garden 28. Gazebo Seating 29. Study 30. Courtyard
26
3,300
200
200
2,100
2,700
600
350
1,200
200
1,200
6,200
1,600
1,200
900
200 1,200
300
1,400
2,400
200
2,600
2,000
200
3,300
2,100
1,000
200
1,200
900
7,600
1,200
300
300 800 1,400 200
200
1,200
2,600 2,400
1,200
800 200 200
29
150 600 800
2,700
8,200
300 900
F
900 450
23 1,500
200
900
7
3,000
2,200
RG
4
8
50
1,200 200
200
9
21
200
3,000
3 20
1,200
3,200
GUEST HOUSE
850
1,800
200
1,500
15 6,800
200 800
200
1,800 3,000
1,100 200
600 500 900 1,200
200
1,200
1,100
3,000
200
900
1,700 2,400
200
700
200
20,000
LEGEND 1. Main Entrance 2. Airlock 3. Coats 4. Cloak Room 5. Living Room 6. Patio 7. Fire Place 8. Dining 9. Breakfast 10. Kitchen 11. Pantry 12. Laundry 13. Car Port (1 No. Car)
PROJECT
CLIENT
ARCHITECT
Proposed Residential Estate
Charles Misiani Achera
Kanali Lester Luseka
North Nyakach
acheraarch@gmail.com
lester.kanali.lk@gmail.com
GSPublisherVersion 0.3.100.100
personal KANALI LESTER LUSEKA Index No: 50A126, Log Sheet No: A1084
200
200
700
900
13
200
2,400 200
900
15 1,300
25,550
3,000
2,300 3,000
200
900
1,800
200
200
900
700 200
14 400
200
900 200 1,100
200
450
1,050
lester.kanali.lk@gmail.com
16,400
400
900
19
A.03
Kanali Lester Luseka
3,000 200
150 200 1,000
17
18
ARCHITECT
12 Achera Charles Misiani
1,200 200
3,050
2
1,200
8
RG
13
200
3
200
F
1,500
10
2,500
W
DR
200
11
21
3,600
1,000 500
9
22
2,200 200
1,400
200 1,200
8,000
200 200 200 4,500
4,500
13
200
200
1 void above
4,600
4
200
5
1,200
6 15
1,200
200 2,050 100
1,000
LEGEND 1. Main Entrance 2. Airlock 3. Coats 4. Cloak Room 5. Living Room 6. Patio 7. Fire Place 8. Dining 9. Breakfast 10. Kitchen 11. Pantry 12. Laundry 13. Car Port (1 No. Car) 14. Mechanical Room 15. Battery Storage 16. Corridor 17. Bedroom 18. Toilet & Shower 19. Office / Nursery 20. Master Bedroom 21. Walk-In Closet 22. Master Bathroom
18
3,000
21
600
DR
4
22
600
12
W
RG
10
200
1,800
20
200
16,400
3 17
1,800
700
900
1,700 2,400
4,200
1,200
19
18
200
23
850
400
2
11
200
1,800
4,200
1,800
CLIENT
17
200
20
F
9
1,800
2,400
800
200
900
18
200
1,800
1,100
600
W DR
1,200
3,200
200
700
900
200
750
acheraarch@gmail.com
200
600
200
900
1,200
17
16
4,800
300
25
3,000
900
1
Skylight Above
8
4,500
900 2,400
North Nyakach
400
1,700
7
900
3,000
300
500
900
5
200 4,400
200
2,200 900
32,200
21,400
2,400 1,400 1,200
2,200 200 4,200
6
200 400
200
2,600
6,000
900
3,300
200 4,500
2,400
1,100
700
600 500 600
300
11,350
2,300 200 1,100
200
7
950
200
16
1,100
39,750 1,800
2,100
600
15
200 800
200 1,350
14
PROJECT
6,000
300
1,800
200
6,000 1,200
14
200
300
1,200
200
800
200
16
13
200
6,000
300
1,500
3,000
3,500
200
Achera & Partners
Architects Sheet Size A2
20,000 200
17
Proposed Residential Estate
GSPublisherVersion 0.20.100.100
21,400
4,500
4,500
A.01
GSPublisherVersion 0.3.100.100
1,200
250
1,800
1,150
200 lester.kanali.lk@gmail.com
1,800
900
650
450 4,200
acheraarch@gmail.com
800
50
200
16
1,200 North Nyakach
ACHERA & PARTNERS
Copy Right All rights reserved. No reproduction, copy or transmission of these drawings may be made without permission. The author has asserted his right to be identified as the author of this design in accordance with the Copyright, Designs and patents Act Cap 130 of the Laws of Kenya.
2,400
1,300
4,000
900 600
200 4,200
Kanali Lester Luseka
200
Charles Misiani Achera
400
1,800
200
15
650 1,100
Proposed Residential Estate
200
200
300
500
ARCHITECT
200
1,300
400
2,700
CLIENT
200 500 450
PROJECT
6,000
900
20,000
1,800
SCALE - 1:200
200
300
300
1,350
15
MAIN HOUSE
400
200
6,000
N
N
32,117
400
300
200
3,637
32,814
200
21 32,200
22 4,200
1,100
13
17
Vegetable Garden
0
ARCHITECTS, URBAN PLANNERS & INTERIOR DESIGNERS
200
3,000
200
Play Ground
C 3 BEDROOM HOUSE
18
17
3,000
4,200
14
200
6
202.08 m2 45.36 m2 247.44 m2
3
2004
200
450
12 1,800
200 2,600
3,550
4
17,740
USE (3 BEDRMS)
20
4,500
400
2,100
67,807
650
GUEST HOUSE
2
11 200
10 1,800
200
19
3,000
1,700 1,200
3,000
900
F
200
3,000
200
200
2,433
7
18
RG
3,000
5
17
89.44 m2 22.14 m2 111.58 m216
27
9
4,800
4,400
JOB'S HOUSE
MAIN HOUSE
GAZEBO
1
Skylight Above
GUEST 8HOUSE Internal Area External Area Total Area
347.14 m2 119.20 m2 466.34 m2
200
31,913
10,000
21,400
MAIN HOUSE Internal Area External Area Total Area
7
900
300
500
SCALE - 1:100 FLOOR AREA
400
MAIN & GUEST HOUSE
Landscaped Garden
600
Landscaped Garden
4,500
1,200
5
900
Gazebo
4,200
19,830
3
1,400
2,200
2,400
6
2,200
200
1,800
200
800
1,400
200
2
1
6,730
200
400
200
Security
Landscaped Garden
11,618
400
200
9,322
employer ACHERA & PARTNERS ARCHITECTS CHARLES MISIANI, A 702
project PAP ONDITI, KISUMU COUNTY NEW CONSTRUCTION
A.02
RESIDENTIAL APARTMENTS Prelimenary Design
Status
Jun 2020-Aug 2020
Time
RESPOSIBILITIES
Site Survey Conceptualization Feasibility Study Consultants Meeting Presentations EXPERIENCE
Brief Formulation Site Survey Dispute Resolution
A OUTLINE SKETCHES
B GROUND FLOOR PLAN OUTLINE DESIGN
Binding Space Sheet Size A2
a ground floor plan Total Floor Area
162.3 m2
Parking* (Not in Total)
188.9 m2
Shop 1
21.4 m2
Shop 2
27.7 m
2
Shop 3
14.3 m2
Shop 4
14.8 m2
2 Bedroom
61.1 m2
C
D
E
F
3,100 200
1,400
3,000
300
200
2,900
200
1,200
2,800 200
850
150
600 800
2,900
200
2,500
5,950
3,200 150
700 600 800 600 700
2,600
3,000 700 600
900
200
850
600 700
400
150
B
C
D
E
1,328.8 m2
Total Floor Area
3,100
1,500
A
Studio Type A
19.1 m
Studio Type B
18.0 m2
1 Bedroom Type A
42.3 m2
1 Bedroom Type B
41.2 m2
3,100 200
1,400
2,500 950
200
500
1,500
950
2,800
1,200
200
2,500
600 800
3,100 200
2,500
2,400 1,000
2,900 200
500
1,200
1,200
3,000
200
1,500
1,000
800
200
1,000
4,500
4,400
300
2,500
200
3,100
1,400
850
150
1,500
900
1,500
200
2,900
2,800
B
C
200 RG
950 600 1,750
4,200 4,200
22,500
5,400 2,400
300 900
5
40 0
2,000
F
Living Room
0
6
2,200
62
0
60 0
200
62
10
WC & Shower
Bedroom 1
50 4 0 00 12 0
11
RG
Void
13 12
200
6
15 14
9
2,700
TYPE A
17R x 150 16G x 250
16
WC & Shower
STUDIO
Kitchen
150
4,200
17
2,400
Balcony
F
1 BEDROOM TYPE B
Kitchenette
1,300
RG
4,200
1 BEDROOM TYPE A
RG
4
900
RG
Living Room
F
Hallway
WC & Shower
Balcony
F
Bedroom 1
Kitchenette
9,300
1,200
4,200
Void
150
TYPE A
1,200
200
5
WC & Shower
4,200
1,000
200 2,700
STUDIO
1,500
600 1,750
2,400 900 1,750 600
1,000
150
950 1,500
200
900
300 1,450
1,500
950 1,200 900
200
150
2,400
Balcony
800 WC & Shower
600 550
1,600
1,500
200
RG
100
150
2,850
TYPE B 850
900
WC & Shower
1,700 200
3,100
1,200
1,300
2,800
200
2,900
900
700
1,300
350
3,200
650
850
950 150
200
1,500 2,600
3,200
950 400
600 800
200
3,100
1,200
2,500 200
1,400
2,500
1,000 200
D
2,800
1,200 500
200
600 650 1,200
3,100
900
150
675
1,500
150
2,900
1,575
1,700
1,900
1,100
1,000 200
800
150 50
3,200
17,800
E
F
G
PROJECT
CLIENT
Proposed Residential Apartments
Prof. Kanali Christopher Luchebeleli
Kanali Lester Luseka
Makongeni - Thika, Kiambu County
c_kanali@yahoo.com
lester.kanali.lk@gmail.com
personal KANALI LESTER LUSEKA Index No: 50A126, Log Sheet No: A1084
1,200 2,400
17,800
A
Kitchen
F
500 200
600
1,200
Kitchen
200 1,450 4,200
1,600 600 150 2,100 150 500
200 500
3
200 2,100 150
F
Kitchenette
900
Private Access
150 200
10
2,200
Front Yard & Hanging Lines
200
6
9
1,300
R
8
6
5
4,200
350 900 650
Kitchen G
F
Bedroom 1
4
1,450
Yard
150
7
11
500
Living Room
6
12
2,200
17R x 150 16G x 250
Void Above
5
WC
13
4
15
3
4,250
2
16
14
2 BEDROOM UNIT
WC & Shower
600
1,200
200
UP 1
PRIVATE PARKING 2 Cars
17
5,650
9 Underground Water Tank
850
RG
4
150
2,700
8
500
Void Above
2,100 150
Pedestrian Entance
5,000
4,200
6
150
1,500 200
F
1,500
Kitchenette
750
UP
5
Master Bedroom
Hallway
F
4,200
4,050 800
200 5,100
5,400
200
8
Planter
4
Living Room
STUDIO
TYPE B
250 1,600
22,500
22,500
1,200
STUDIO
2
1,500
8,700
200
150 4,200
4,075 200 600
3
150
2,100 300 3,600
Open to Sky
3
5,400
150 150
600 650 600 550
Pedestrian Entance
Septic Tank
750
Security
450
Dry
150
Wet
150 150 150 150 50 1,200 600 600 1,300
Main Access
2,600
4,350
200 4,200
5,000 3,600
13,600
300
7
PARKING 8 Cars
Void Above
2,800
6
300
WC & Shower
Bedroom 1
5
1,100
TYPE A
4
2,800
Void
WC & Shower
STUDIO
3
300
1 BEDROOM TYPE A
Kitchenette
150
1 BEDROOM TYPE A
RG
2
Shop 4
1
2
1
2
2
200
1
150
F
2
Kitchenette
1
1,500
3
Living Room
RG
5 4
Kitchen
Void Above
WC & Shower
UP
F
17
Void Above
3
Refuse
5,400
150 1,450
Balcony
2,100
15 16
1
Bedroom 1
7 6 17R x 150 16G x 250
TYPE A
4,050
4,200
WC & Shower
17
14
4
2,800
22,500
3,200 1,500
900
9
10
200
200
300
950 550 600
Shop 3
4,075
13
17R x 150 16G x 250
Shop 2
3 2
4,200
9
10
200
11 12
4,050
5 4
11
Void Above
WC
8
STUDIO
16
Utility
1
15
Shop 1
1
14
7 6
3
4,200
150
*1,874.5 m2* With Parking
Underground Water Tank
ARCHITECT
A
01
employer ACHERA & PARTNERS ARCHITECTS CHARLES MISIANI, A 702
Copy Right All rights reserved. No reproduction, copy or transmission of these drawings may be made without permission. The author has asserted his right to be identified as the author of this design in accordance with the Copyright, Designs and patents Act Cap 130 of the Laws of Kenya.
GSPublisherVersion 0.4.100.100
1,200
600 650
1,685.5 m2
RG
5
N
G
17,800
2
500
UP
2
F
332.2 m2
Single Floor Area
17,800
8
4,200
b typical apartment plan (1st.-4th.)
N
G
Binding Space Sheet Size A2
13
1
B
OUTLINE DESIGN
12
TOTAL BUILDING FLOOR AREA
A
C TYPICAL APARTMENTS FLOOR
GSPublisherVersion 0.4.100.100
B
C
D
E
F
G
PROJECT
CLIENT
Proposed Residential Apartments
Prof. Kanali Christopher Luchebeleli
Kanali Lester Luseka
Makongeni - Thika, Kiambu County
c_kanali@yahoo.com
lester.kanali.lk@gmail.com
ARCHITECT
project MAKONGENI, KIAMBU COUNTY NEW CONSTRUCTION
Copy Right All rights reserved. No reproduction, copy or transmission of these drawings may be made without permission. The author has asserted his right to be identified as the author of this design in accordance with the Copyright, Designs and patents Act Cap 130 of the Laws of Kenya.
02
RESIDENTIAL HOME Scheme Design
Status
Oct 2020-Jul 2021
Time
RESPOSIBILITIES
Site Survey & Monitoring Conceptualization Working Drawings Presentation Working Programme EXPERIENCE
Brief Formulation Stakeholder Coordination Minute Taking
A SITE PLAN
AR
2.7 x 1m STEEL SIDE HUNG PEDESTRIAN GATE FIXED TO R.C COLUMN TO DOOR SCHEDULE
EXISTING STRUCTURES 74,400 11,800
7,400
IC
1,500
4,500
Copy All ri auth paten
39,700
4,200
SECURITY HOUSE
R 1,400
500
13,900
3,600
9,000
2,500
9,400
IC
MH
IC
MH
SEPTIC TANK
MH
MH
5 x 3m, 2m Deep SEPTIC TANK TO M.E SPECIFICATIONS
12,250
4.5 x 2.7m STEEL SIDE GUNG VEHICULAR GATE FIXED TO R.C COLUMNS TO DOOR SCHEDULE
3x3x2m UNDERGROUND WATER TANK
IC
35,500
R 3,000
3,600
17,150 IC
MAIN 3 BEDROOM HOUSE
R 1,000
41,400
R 800
MAIN HOUSE OUT DOOR SPACES
6,000
3 CAR PARKING COVERED BY TENSITE STRUCTURE
IC
500
9,000
10,100
IC
1m DEEP PLANTER WITH 200mm THICK MASONRY WALLING CAPPED WITH 250mm WIDE 50mm THICK PREFABRICATED CONCRETE CAPPING AND CLAD WITH CUT SANDSTONE
R 2,800
100mm THICK COBBLE STONE PAVING ON WELL COMPACTED HARDCORE PATTERNED TO APPROVAL
MH
7,430
MH
71,400
Plan SECTIONS C ELEVATIONS & Site
1,400
200
4,200
3,000
200
2,300
3,200
200
2,500
B
C
D
E E-02
ublisherVersion 0.6.100.100
200mm thick masonry wall finished with 20mm thick stucco externally and 20mm thick smooth lime plaster internally
Ground Floor Plan
3,500
MECHANICAL
7 7
10
9
7
S-02
250
950 350
6,200
3,200
Proposed 3 Bedroom House Location:
S-01 S-01 S-01
1:100
personal KANALI LESTER LUSEKA Index No: 50A126, Log Sheet No: A1084
10 10
9 9
7 7
6 6
5 5
10
9
7
6
5
5,250
3,200
4 4 4
Drawn By:
KLL
2,5402,540 2,540 1,200
3,500
1,400
1,800
1,000
1,400 3,200 Elevation 02 Elevation 02 Elevation 02
GSPublisherVersion 0.6.100.100
3,200
2,500
1
Approved By:
1:50 E-06
1:50 E-07 COAM Signature:
Date:
Contact:
S-01
Ground Floor Plan, Roof Plan PV
PV
PV
PV
PV
PV
PV
Pitch 35o dark red ceramic roof tile on timber PV truss to later detail. Roof Structure to S.E Specifications PV
PV
PV
PV
PV
FP-01, FP-02
PV
200mm thick masonry gable end with 50mm thick 6,400 6,400
2,300 2,300
6,400
2,300
FP-02
prefabricated 1,700 wall capping,2,800 plastered and painted 3,500 1,700 to approval 1,700 3,500 2,800 1,700
Building 3,500 Section 1,70001 BuildingRoof Section Plan01 Building Section 01
2,800
1,700
1:100
6,200 6,200 6,200
Drawing Numbers
PV
Scale:
Date:
1:100
13/04/2021
Job Number:
Sheet Number:
03/2021
3,200 3,200 3,200
A.02.2/5
+ 2,400 ROOF LEVEL +- 0 G.L +- 0 - 300 G.L UPPER GROUND FLOOR - 300 +- 0 - 600 GROUND FLOOR UPPER G.L LOWER GROUND FLOOR - 600 - 300 LOWER GROUND FLOOR UPPER GROUND FLOOR
250
2,100
2,500
she CO 5. A term 4. A 5. she term + 2,400 ROOF LEVEL + 2,400 ROOF LEVEL
600
3,200
- 600 LOWER GROUND FLOOR
1:100 1:100 1:100
3,200
+ 250
G.L
K K
J J
G G
D D
C C
K
J
G
D
C
1:50
B
A
PV
PV
PV
3,200 3,200 3,200
7,100
4,200
7,100
4,200 4,200 Elevation 04 Elevation 04 Elevation 04
7,100
3,500
1,200
2,100
3,500
1,200
2,100
3,500
1,200
2,100
B B
D D
G G
J J
B
D
G
J
1:50 E-08
PV
PV
PV
PV
PV
PV
4,700 4,700
4,200 4,200
4,700
4,200
Stage:
Working Drawings Orientation:
1:100 NS-02 1:100 S-02 1:100 S-02
PV
surA 7. sur ST 8. F 7. F A 9. D 8. sur 10.D 9.
8. F 11. 10. iron 9. D 11. iron 10.
ME 11. ME 12. iron
13. 12. dra ME 13.
14. 16. 15. 150 com 16.
com 15. 17.
16. 18. 17. com 18. 19. wri 17. 19. exp wri 18.
23.
+ 2,400 ROOF LEVEL +- 0 G.L
+ 2,950+- 0
- 300 G.L
ROOF UPPER LEVEL GROUND FLOOR
- 300 +- 0 - 600 GROUND FLOOR UPPER G.L LOWER GROUND FLOOR - 600 - 300 LOWER GROUND FLOOR UPPER GROUND FLOOR - 600 LOWER GROUND FLOOR
1:100 1:100 1:100
600mm deep 200mm thick strip foundation masonrydeep walling on 600mm widefoundation 200mm thick r.c 600mm 200mm thick strip footing. Structure to 600mm S.E Specifications masonry walling on wide 200mm thick r.c footing. to S.E Specifications 600mm Structure deep 200mm thick strip foundation masonry onstack 600mm wide thick 200mm thick Fire placewalling chimnet 300mm brick andr.c footing. Structure tostack S.E Specifications masonry walling on 300mm thick thick 900mm wide Fire place chimnet 300mm brick andr.c footing towalling later detail masonry on 300mm thick 900mm wide r.c footing to later detail Fire place chimnet stack 300mm thick brick and K on 300mm thick + 250 masonry walling 900mm wide r.c K detail footing to later GROUND FLOOR
K
13. 14. dra 150 15.
+ 2,400 ROOF LEVEL + 2,400 ROOF LEVEL
+- 0 G.L
1:50
Proj
Proj Pro
Pro Loca Proj Loca Ka Pro Ka Plot
Loca Plot L.R
Ka L.R
Plot Clie
L.R Clie Pr.
Pr. Sign
Clie Sign
Pr.
Sign Dra
Dra KL K CheL Dra Che CO K LO C App Che App CO CO O C Sign
App Sign
CO
Sign
PV
PV
PV
PV
PV
PV
PV
PV
PV
PV
PV
7,100 7,100
Building Section 7,100 02 Building Section 02 Building Section 02
project RONGO, MIGORI COUNTY NEW CONSTRUCTION
ST 6. A ST 7. excA
EL
300 300 300 1,200 900 900 1,2001,200 300 2,265 300 300 2,2652,265
PV
PV
PV
exc 6. A exc CIV
exp 21. 19. con wri 21. exp con 22. 21. 22. EL con EL 23. 22. 23.
900
PV
PV
PV
CIV 5. A CIV 6. A term
dra 12. 14. 150
2400mm high 200mm thick masonry wall with 300mm thick capping and 1200mm high 2400mm highr.c 200mm thick masonry wall with 200mm thick wide openings at and 500mm c-c high 300mm r.c capping 1200mm 200mm at 500mm c-c wall with 2400mmwide highopenings 200mm thick masonry B 300mm thickAr.c capping and 1200mm high B 200mm wideAopenings at 500mm c-c
900 1,500 900 1,5001,500
PV
PV
900
PV
PV
300 600 600 2,400 300 3002,4002,400
PV
COAM
22,150
the 3. T CO com CO 4. theA she 4. A
2,765
1:100 E-04 Main HouseE-04 1:100 1:100 E-04
2
GE 2. 3. D T com 1. T A 3. the com 2. D
250 250 100 600 600 2,350 100 1002,350 300 2,350300 200 300 200 2,660200 2,6602,660
150 150 1,400
600
PV
150mm thick r.c floor slab on 300mm thick well County Kamagambo/Kamburo - Rongo, Migori compacted hardcore sand thick blinding. 150mm thick r.c floor and slab50mm on 300mm well Plot Number: Structure tohardcore S.E Specifications compacted and 50mm sand blinding. L.R No. Specifications 3517 Structure to S.E 150mm thick r.c floor slab on 300mm thick well compacted and 50mm sand blinding. 400mm highhardcore 200mm thick masonry walling with Client: Structure to h.w S.E Specifications 50mm thick capping painted 400mm high 200mm thickplastered masonryand walling withto Pr. Samuel & Dr.plastered Eunice Misiani approval 50mm thick h.w capping and painted to Signature: Date: approval 400mm high 200mm thick masonry walling withContact: 1 50mm thick h.w capping2plastered and painted to 2 1 approval
5,700
employer ACHERA & PARTNERS ARCHITECTS CHARLES MISIANI, A 702
GSPublisherVersion 0.6.100.100
150
1,000
GSPublisherVersion 0.6.100.100
GSPublisherVersion 0.6.100.100
2,200 200 200 300 2,2002,200 300 300
1,800
200
1,400
900 900
3,500
2,550
1,200
3,200
600
900 1,500 900 1,5001,500
2,100
2,500
300 600 600 2,400 300 3002,4002,400
2,2652,265 1,610
3,200
2,050
FALL 35O
- 600 LOWER GROUND FLOOR
1,400
Checked By:
5,250
+ 2,400 ROOF LEVEL + 2,400 ROOF LEVEL
500mm deep MDF built-in entertainment unit to fittings schedule
250
300
3,200
PROJECT 3,200
Project Title: 6,200
Drawing Titles
+ 2,400 ROOF LEVEL +- 0 G.L +- 0 - 300 G.L UPPER GROUND FLOOR - 300 +- 0 - 600 UPPER GROUND FLOOR G.L LOWER GROUND FLOOR - 600 - 300 LOWER GROUND FLOOR UPPER GROUND FLOOR
1,000
PV
600
1,085 200
1,085
6,200 6,200
K
S-01
1,800
ARC
2. A D 1.
4,235
3,500 Elevation 03 Elevation 03 Elevation 03
2,300
200
2,7002,700
6,200 6,200
600
PV
PV
600
3,500 3,500
PV
300
2,700
PV
2,300
PV
250 250 100 600 600 2,350 100 1002,350 300 2,350300 200 300 200 2,661200 2,6612,661
E-03
28,650 PV
550
PV
PV
2,400
900
PV
PV
PV
REVISION NO.
150
600
PV
PV
FALL 35O
Diam. 13 aluminium fixed to masonry wall by 10mm thick hangers at 450mm C-C 1,200
PV
2,300
6,400
REVISIONS DATE
6,400
300
6,400 6,400
1,400
23. All conduits must be laid before plastering
FALL 35O PV
900 900 900 600 900 900 600 600
PV
PV
3,500
21. All mechnical works must be co-odinated with electrical and any conflict must be clarified before work begin.
5,850
1,155 3,6753,675
PV
PV
1,200
+- 0
ELECTRICALS
600
PV
2,100
PV
14. Drains pass beneath buildings & driveways to be encased in
19. No chases will be will be allowed with 2 allowed for pipes. Sleeves 1 written approval of structural Eng's. No cutting of concrete without express approval of the Architect or structural Eng.
FALL 35O
300
PV
PV
GROUND FLOOR
1000mm150mm high steel balustrade concrete surround. on 300mm high masonry15. walling spray painted black towith fittings 1000mm high balustrade 300mm high Thesteel storm drain pipes toon comply BS 556 specification. schedule16. masonry walling spray painted fittings All underground foul andblack wasteto drain pipes shall be uPVC to schedule 1000mmcomply high steel balustrade on 300mm high with BS 5255. 2 1 masonry17. walling spray painted black to fittings All inspection chambers covers and framing shall be cast iron. 1 schedule18. Minimum slope 2 in the drains pipes to be 1: 100.
4
PV
13. SVP denotes soil vent pipe to be provided at the head of the drainage system.
22. PV denotes permanent ventilation.
1,250
E-02 E-02 E-02
PV
12. All plumbing and drainage to comply with relevant local authority.
4 4
ROOF LEVEL
ARC ARC
Copy Righ All rights authorRigh has Copy patents All rightsAc author has patents Ac Copy Righ All rights author has patents Ac
GE GE 1. A
2,765 370 2,765 370 370
E-05
9 9
1:100 1:100 1:100
iron at every alternate course.
2,850
4,200
10 10
2,265
2,900 2,900work and masonry walls to be tied with loop 11. All adjacent R.C.
950
G.L
1,1551,155
FALL 35O FALL 35O
8,6308,630 8,630 FALL 35O
- 600 LOWER GROUND FLOOR
1,250
+- 0
FALL 35O
6,900
FALL 35O
PV
10. All walls to be reinforced with loop iron at every alternate course.
2,900
+ 250
2,7002,700
2,900 2,900 to stuctural Engineer's details. 8. For all R.C work,refer 2,900 2,900 to be detemined on site to S.E's aproval. 9. Depth of foundation
+ 2,950
900
1,700
3,500 3,500
900
2,800
Elevation 01 Elevation 01 Elevation 01
STRUCTURAL
2,850
5,900
PV
900
2,900 2,900
PV
PV
PV
900
1,700 1,700
PV
7. All black cotton soil to be removed from all buildings and paved surfaces. 300
2,800 2,800
PV
2,350
5,900 5,900
PV
PV
6. All soil onPVcut embararkment to be stablized. The slope not to exceed 45 degree.
2,700
1,500
PV 3,800
PV
1,800
PV
420 420 420 1,6101,610 735 735 735
420 735 420 735 735
PV
300 300 300 900 1,500 900 1,5001,500 200 200 200 3,675
PV
PV
2,000
2,000
CIVIL
PV
PV
300 300 300 300 300 300 300 600 600 2,100 300 300 300 2,1002,100 300200 300 200 2,660200 2,6602,660 1,940 150 1,9401,940 150 150150 150 150
1,800 600 1,800 600 600
6,350
PV
3,6753,675 420
1,085 200 300
5. All soil under slab around and under foundation to be treated for termite control.
PV
FALL 35O
8,100
4. All slab at ground level to be cast over 1000 guage polythene sheet on 50mm thick murram blinding on hardcore.
PV
2,000
1:50 FP-04 Security Roof Plan
3,200
J
CONSTRUCTION
R 1,500
1,000
H.W truss comprising 100 by 50mm rafter, 100 30mm batterns to S.E Specifications by 50mm purlin, 100 by 50mm ceiling joist, 30 by batterns Specifications H.W truss 30mm comprising 100 to byS.E 50mm rafter, 100 by 50mm purlin, 100r.c bybeam 50mmonceiling joist,walling 30 by 300 by 200mm masonry FALL to S.E Specifications 30mm batterns plastered and painted to approval. Structure to 300 by 200mm r.c beam 35O on masonry walling S.E Specifications plastered and painted to approval. Structure to S.E Specifications 300 by 200mm r.c beam on masonry walling 13 plastered and painted to approval. Structure to S.E13 Specifications 100mm aluminium rain water downpipe
1000mm high steel balustrade on 300mm high masonry walling spray painted black to fittings schedule
1500mm high 600mm wide steel window with 10mm thick clear glass spray painted black to Window Schedule
FP-01
I
2. Drawing are not to scalled. Only figured dimensions to be used.
PV
3,200
E-02
H
R 1,500
3,200
850 150 2,950 2,950 150
1,250
300 250
1,450
PV
FALL 35O
300 1,250
S-02
S-02
E-08
1,100 1,250 E-01
28,650
300
+ 2,400 ROOF LEVEL +- 0 G.L +- 0 - 300 G.L UPPER GROUND FLOOR - 300 +- 0 - 600 UPPER GROUND FLOOR G.L LOWER GROUND FLOOR
21,700
A
1,100
PV
PV
3,100
E-03 E-03 H.W truss comprising 100 by 50mm rafter, 100 E-03 by 50mm purlin, 100 by 50mm ceiling joist, 30 by
3,225 2,975
1,350
PV
o dark red ceramic on timber I J roof tile K truss to later detail. Roof Structure to S.E Specifications
300 300 300 150 150150 150 150
3,500
5,400
GPitch H 35
150mm thick prefabricated concrete chimney stack capping anchored to steel structure with to 150mm thick prefabricated concrete chimney later detail stack capping anchored to steel structure with to later detail 150mm thick prefabricated concrete chimney K anchored to steel structure with to stack capping later detail K
J J
4,8004,800 150
Security House Floor Plan 200
F
300 300 4,800
600 600
E
400 400 400 150 150 150 300 750 300 750 1,550 750 1,550 300 1,550
4,500
D
I I
+ 2,400 ROOF LEVEL + 2,400 ROOF LEVEL
PV PV
PV
3,200 3,200
300
200
300
5,250
1,200 600
C
H H
4,8314,831
2,800
B
600 200 150 200 600 600 2,400 150 1502,400 300 2,400300 200 300 200 200 4,831
600
MH
A
100
1,800 1,800 900
PV
5,250
200mm thick masonry wall finished with 20mm thick stucco and 20mm thick 200mm thickexternally masonry wall finished withsmooth 20mm plaster thick stucco externally andlime 20mm thickinternally smooth FALL plaster internally 35O 200mm thick masonry walllime finished with 20mm 13thick smooth thick stucco externally and 20mm 13 internally lime plaster
- 600 - 300 LOWER GROUND FLOOR UPPER GROUND FLOOR
10
13
G G
3. The contractor must check and verify all dimensions before commencement of any work. Any discrepancies to be clarified with the Project Architect.
5,250
PV PV
5,400
F F
R 1,500
600
E-07
S-01 22,150
3,200
+ 2,400 ROOF LEVEL + 2,400 ROOF LEVEL
9
200
IC
E-04
13
5,800
2,100
900
2,500
E E
GROUND FLOOR
300 950
200
2,100
Toilet & Shower
E-03
7
D D
600
1,000
PV
3,300
2,100
300 300 4,8004,800 150 300150 150150 150 150
8,1008,100 300 2,350
200 3,200
3,200
3,000 200
6,200
4,500
1,8006,000
950
200
3,600
600
4,500
1,400
200
- 300 UPPER GROUND FLOOR
C C
+ 2,950
E-01 E-01 E-01
300 200
750
4
+ 2,400 ROOF 300LEVEL +- 0 300 600 350 G.L +- 0 - 300 G.L UPPER GROUND FLOOR - 300 +- 0 UPPER GROUND FLOOR G.L
B B
1500mm by6 700mm window 5 7 steel corner 8 11 spray 12 13 NOTES painted black with 10mm thick one way tinted GENERAL glass to Window Schedule 1900 by 1000mm 150mm thick prefabricated 1. All dimensions are in mm unless otherwise specified.
ROOF LEVEL
1:200
ACHERA & PARTNERS 200mm thick masonry gable end with 50mm thick prefabricated wall capping, plastered and painted 200mm thick masonry gable end with 50mm thick ARCHITECTS, URBAN PLANNERS to approval & wall prefabricated capping, plastered and painted INTERIOR DESIGNERS to approval 200mm thick masonry gable end with 50mm thick 11 12 capping, plastered 13 and painted A Copy Right: prefabricated wall All rights reserved. No reproduction, copy or transmission of these drawings may be made without permission. The author has asserted his right to be identified as the author of this design in accordance with the Copyright, Designs and 11 12 13 A to approval patents Act Cap 130 of the Laws of Kenya.
200
1,200
3,300
200
950
900
1,800
200
600 200
300
+100
PV
200
1,100
PV PV
5,100 200
PV
Toilet
Dresser
1,150
200
2,100
1,000
50
1,700
1,450 1,300
PV
-300
PV
200
900
MASTER BEDROOM -300
4,200
PV
Closet
1,875
300
200 Dresser
PV
Master Bathroom
IC
250
300
PV
Corridor
2,000
-300
1,200
200
IC PT SE NK TO TA
6,200
2,600 PV
2,500
Outdoor Sitting
Planter
1,150
Down
1,800
Down
2,100
2,100
1,450 300
1,150
-450
3,500
-300
TO SEPTIC TANK
3,000
BEDROOM 1
500
500
-300 500 Walk-In 500
3,000
+250
2,000
PV
PV
4,000
6,200
500
BEDROOM 2
1,800
3,300
E-06 PV
2,700
PV
-300
STUDY
950
3,500
4,200
900
200
FAMILY ROOM
1,200
-300
Planter R 800
100
PV
-300
3,500 Cloak Room
(Cathedral Ceiling)
1,800
2,700
2,900
1,000
Lobby 200
Veranda
(Cathedral Ceiling)
400
2
300
1,000
IC
Foyer
400
-750
SECURITY -600
R 800
2,600
PV
200
1,800
1,200
2,700
4,000 -300
1
PV
PV
500 500
DINING
900
2,100
breakfast
600
RG
1,300
1,500
R 800
PV
LIVING ROOM
Up
1,700
KITCHEN
Up
400
850
2,900
200 1,800
PV
1,000
PV
200
700
Down
2,800
1,200 700
-450
250
600
200 2,700
2,900
3,225
700
PV
1,500
DW
1,200
PV
Down
800
28,000
200
2,600
1,850
1,200
PV
5,700
5,900
2,400
IC
2,125
FP-03
600 600
2,100
1,000
100mm thick concrete block paving on well MH compacted hardcore and patterned to approval
13
1,000
Down
PV
F
2,250
12
600
2,100
Laundry 200 1,600
-300
11
1,000
250
PV
Pantry
1,650
200
8
600
2,975
2,100
200
IC
PV
DR
-300
PV
Up
PV
W
600
1,200
900
1,700
200
7
1,000
+ 2,400 ROOF LEVEL + 2,400 ROOF LEVEL
3,200 200
1,025 200
400
E-01
±0
6
600
1,800
IC
-450
600 1,200
5
2,800
4,200 1,200
2,400
500
200
3,200
3,200
3,000 1,800
1,800
9,000
2,900 6,200
1,900
Up
MH
1,000
2,000
200
1,100
KITCHEN YARD
1,950
S-02
3
800
700
900
450
4,500
900
2
900
1,700
4,000
-600
200
500
900
200
4,550
200
450 1
25
800
1,500
300
K
200
2,400
200
1,600
J
21,700
E-05 3,200
3,500
200
I
3,500
2,200
H
3,300
1,200
200
G
200
675
F
2,300
2,100 250
D
28,000
C
6,400
B
6,200
A
S-01
6 7 capping plastered 8 300 by 300mm r.c wall and 8 Detail painted to6approval.7Structure to S.E
concrete chimney stack capping anchored to steel structure to later detail
300 300 1,200 900 900300 1,2001,200 300 300 300 4,800
E-04
5 5
150 by 150mm square profile1 aluminium2 gutter3 fixed to 10mm thick aluminium hangers screwed to roof facia at 600mm C-C
900
250mm high 200mm thick masonry walling clad with 20mm thick lime plaster and 50mm thick prefabricated concrete capping
450mm ceramic tiles to finishing schedule. Structure to S.E Detail
3 3
200 200 3,675
400 by 400mm r.c column clad with 25mm thick cut sandstone with 500 by 500mm prefabricated concrete 150mm thick r.c floor slab finishedcapping. with 450 by Structure to S.E Specs.
Pitch 35o dark red ceramic roof tile on timber truss later detail. Roofroof Structure to S.E Pitch 35oto dark red ceramic tile on timber Specifications truss to later detail. Roof Structure to S.E Pitch 35o dark red ceramic roofSpecifications tile on timber 1 Roof Structure 2 truss to later detail. to S.E 1 2 Specifications
1,800200 1,800
1800mm by 900mm fire place made up of 300mm brick and masonry composite wall clad with cut sandstone to later detail
300 300 600 900 600 9001,800 900
2400mm high 200mm thick masonry wall with 300mm thick r.c capping and 1200mm high 200mm wide openings at 500mm c-c
600
GROUND FLOOR PLAN BSP-01
3,200
+ 2,400 ROOF LEVEL +- 0 G.L +- 0 - 300 G.L UPPER GROUND FLOOR - 300 +- 0 - 600 GROUND FLOOR UPPER G.L LOWER GROUND FLOOR - 600 - 300 LOWER GROUND FLOOR UPPER GROUND FLOOR - 600 LOWER GROUND FLOOR
1:100 1:100 1:100
Sc
Sc
1 Sc 1
Jo
Jo 1
0 Jo 0
0
HOTEL & CONFERENCE Status Time
Outline Design Jan 2021-Mar 2021 RESPOSIBILITIES
Site Analysis Research Conceptualisation Outline Design Presentation EXPERIENCE
Brief Formulation EIA Feasibility Studies
A HOTEL FLOOR PLAN
B CONFERENCE CENTRE PLANS
personal KANALI LESTER LUSEKA Index No: 50A126, Log Sheet No: A1084
employer ACHERA & PARTNERS ARCHITECTS CHARLES MISIANI, A 702
project LIMURU, KIAMBU COUNTY NEW CONSTRUCTION
REFERRAL HOSPITAL Detail Design Mar 2021-May 2021
Status Time
RESPOSIBILITIES
Scheme Revision Detail Design Schedules Research Presentation EXPERIENCE
Consultant Coordination Tendering Architect's Instructions
A HOSPITAL FLOOR PLAN
B CONFERENCE CENTRE PLANS
personal KANALI LESTER LUSEKA Index No: 50A126, Log Sheet No: A1084
employer ACHERA & PARTNERS ARCHITECTS CHARLES MISIANI, A 702
project LIMURU, KIAMBU COUNTY NEW CONSTRUCTION
MASTER PLAN Scheme Design May 2021-Jun 2021
Status Time
RESPOSIBILITIES
Scheme Revision Research Stakeholder Meeting Presentation EXPERIENCE
Consultant Coordination Land Surveying Public Authority Consents
personal KANALI LESTER LUSEKA Index No: 50A126, Log Sheet No: A1084
employer ACHERA & PARTNERS ARCHITECTS CHARLES MISIANI, A 702
project KENYATTA ROAD, KIAMBU COUNTY MASTER PLAN
RESIDENTIAL APARTMENTS Scheme Design Jun 2021-Aug 2021
Status Time
RESPOSIBILITIES
Brief Formulation Outline Design Scheme Development Presentations Site Analysis EXPERIENCE
Design Considerations Costing
A FLOOR PLANS
B SECTIONS
personal KANALI LESTER LUSEKA Index No: 50A126, Log Sheet No: A1084
employer ACHERA & PARTNERS ARCHITECTS CHARLES MISIANI, A 702
project AHERO, KISUMU COUNTY NEW CONSTRUCTION
Kanali Lester Luseka 2021