Luca Ferretti | Architect

Page 1

1

ARCHITECTURE PORTFOLIO

Arch. Luca Ferretti


2

COVER LETTER

I am a young architect graduated in April 2015 from the Politecnico of Milan and enable to practice at Alma Mater Studiorum, University of Bologna. In love with the architectural and urban planning I have already had experiences of working in architectural firms through internships, workshop and collaborations. I’m collaborating with the study of architecture and design Marco Gaudenzi & Associated, but I am currently looking for new experiences that can enrich my cultural background and that can test my knowledge and skills. I like to experience new ways to depict the projects, so continually I try to explore new digital programs and techniques of representation. The passion for architecture is accompanied by the one for design; this last passion inspired me to create something of my own, named LF PowerWallet. With this portfolio I intend to present myself together with some of my academic and professional work, which gave me great satisfaction. Enjoy t

2016


3

TABLE OF CONTENET RESUME CV

My backgrounds and skills

— 4

ACADEMIC WORKS CAMPUS of URBAN INTERCHANGE Manhattanville Campus, Columbia University, NYC, USA, second year of Master Degree, 2014, Professor E. Battisti

S.I.P.A. & A.C.C. Manhattanville Campus, Columbia University, NYC, USA, second year of Master Degree, 2014, Professor E. Battisti

POST EXPO Expo 2015, Milan, MI, Italy, first year of Master Degree, 2013, Professor M. De Lucchi

CAMPUS SOTENIBILE Politecnic of Milano, MI, Italy, first year of Master Degree, 2013, Professor E. Battisti

— 8

— 22

— 14

— 28

OTHER WORKS SCAVOLINI PALACE Competition for the municipally of Pesaro, PU, Italy, collaboration with Marco Gaudenzi & Associated, 2016

— 34

VILLA FABBRANI Preliminary project, Vallugola, PU, Italy, collaboration with Marco Gaudenzi & Associated, 2016

— 38

CONAD SUPERMARKET Preliminary project, Cattolica, RN; Italy, collaboration with Marco Gaudenzi & Associated, 2015

TC INFORMATICA Executive project, Cattolica, RN, Italy, 2013

— 42

— 44

RENDER - DESIGN - MODELS RENDERING

— 48

LF POWER WALLET Patent fot utility model n° 202015000026994, Italy, 2015

— 52

MODELS

— 54


4

CURRICULUM VITAE PERSONAL INFORMATION nome

Luca Ferretti

born

Cattolica (RN), Italy

date

10/01/1990

residence

Via Guglielmo Marconi 52, 47841, Cattolica (RN), Italy

cell phone

(+39) 338-4553505

E-mail driving license

arch.ferretti.luca@gmail.com

english

2015

License to practice the profession Alma Mater Studiorum, University of Bologna (ARB Part III)

2009-2015

Doctor in Architecture, Master degreee 107/110 GPA, Politecnico di Milano, (MI) Thesis on the hypothetical expansion of Columbia University (NY) in the new campus of Manhattanville

2004-2009

High School Degree 97/100 GPA, Scientific High School “G. Lemaitre”, Rimini (RN)

AeB

PUBBLICATIONS & EXHIBITIONS

LANGUAGES italian

EDUCATION

Native language Good knowledge of written and spoken language (level B2)

2013

Soliera inclusioni di prossimità urbane E. Colonna di Palliano e G. Frassine, Mimesis, 2013

2015

Zio Paperone e i segreti del deposito History and the static of the symbol of Paperopoli - Professor Luca Sgambi and his students

CAPACITY & ATTITUDES organizations

Outstanding skills to effectively manage working times. Good presence and excellent communication skills. Methodical, proactive and flexible.

social

Ability to interact and dialogue thanks to the experience gained in university laboratories, in sports and in summer jobs. Talented in design through sketches and logic diagrams, good level of technical drawing and graphics.

artistic

Ability to design on multiple levels, from the urban scale to the architectural composition, up to the design of furniture and interior design objects.

architetcure & design

Good critical thinking skills in identifying the weaknesses of a project and to seek alternative solutions.

COMPUTER SKILLS Operating Sistem

Windows Mac OS-X

Adobe Appliaction

Photoshop Illustrator InDesign Acrobat

Office Apllication

Word Power Point Excel

Graphics 2D/3D and Rendering

Others

Autocad Archicad Cinema 4D - Vray Rhinoceros Artlantis Studio Sketch Up Maxwell for Archicad Adina 900 node Gvsig ArchGIS Marvelous Design


5

Collaboration with list “Energia Civica 40” for the local elections in the municipality of Cattolica, RN, Italy March - Now

2016

Work at architecture firm Gaudenzi e Associati Pesaro, PU www.marcogaudenzi.it September - Now

License to practice the profession University of Bologna (ARB Part III) September

Master degree in Architecture Politecnico di Milano, (MI) April

Design, marketing and commercialization LF - Power Wallet August - Now

Patent for utility model LF- Power Wallet (n°202015000026994) August

2015

Study trip for thesis to New York City, USA October

Renovation of a private apartment Gabicce Mare, PU July Internship at architecture firm Gaudenzi e Associati Pesaro, PU January-March

Design of expansion for the company TC Informatica Cattolica (RN) June-August

2014

Agenzia CPInventa Ambassador for Nike Italy March- May Internship at architecture and engineering firm Franchini Cattolica-Padova, RN September-October

Third-year degree in Architecture Politecnico di Milano, (MI) September

Architetture Workshop Soliera, MO February-September

Graduation exam Scientific High School “G. Lemaitre” June

2013

Agenzia CPInventa Ambassador for Nike Italy Rimini Wellness

Internship at architecture and engineering firm Franchini Cattolica-Padova, RN August-September

2012 2009 Salesman at Ferretti Boutique Cattolica (RN) Summer seasons ‘06-’09


6


7

Academical works


8 Manhattanville Campus, Columbia University, NYC, USA | second year of Master Degree | 2014 | Professor E. Battisti

CAMPUS of URBAN INTERCHANGE NY analysis

Elevated

Green Areas

Diagonal in the grid

The grid


9

Masterplan

Columbia University requires an expansion of the campus of Morningside Heigths; The new site is located one kilometer to the north, in Manhattanville (Harlem-NYC) situated in an area of disused warehouses and parking lots. Strong human characteristics, such as urban grid, elevated infrastructure and large residential buildings, are situated on an orographic contest formed by soils with significant differences in height, fluvial water and green areas, thus generating some critical issues. The management of this problematic situation becomes a strong point of the project both through the approach of the city to the side of the park that runs close to the waterfront, and through the engagement of the various infrastructures that characterize the area into a dialogue with the city itself.


10 Manhattanville Campus, Columbia University, NYC, USA | second year of Master Degree | 2014 | Professor E. Battisti

CAMPUS of URBAN INTERCHANGE Manhattanville analysis

Ratio of 125th / Broadway / Hudson

Bulk of the block

Management of buildings in relation to the needs of the campus

Functions of interior spaces

Deformation of functional interior spaces

Tripartite dictated by pre-existences

Public spaces


11

Ground floor

‘Campus of Urban Interchange’ researches exchange among the university community, local community, and the territory by making itself available in order to create a new center through an urban campus fences-free. New urban squares, linear parks, elevated promenades and ground routes lead quickly to Broadway, a major artery that crosses Manhattan, to Hudson, serving at the same time a public layer on the ground floor dedicated to public services for citizens.


12 Manhattanville Campus, Columbia University, NYC, USA | second year of Master Degree | 2014 | Professor E. Battisti

CAMPUS of URBAN INTERCHANGE


13


14 Manhattanville Campus, Columbia University, NYC, USA | second year of Master Degree | 2014 | Professor E. Battisti

S.I.P.A & A.C.C.

Composition schemes auditorium

aule

spazi serventi e struttura

hall e zona commerciale

COMPOSIZIONE VOLUMI PRINCIPALI

SIPA

ACADEMIC CONFERENCE CENTER

promenade

GSPublisherEngine 0.0.100.100

broadway

promenade

ACC

125th

broadway

GSPublisherEngine 0.0.100.100

IO CC SON FA AF 'HUD LL

SU

TE AR 째P

TE AR 째P

2 DE

OM PR

A EN

1 DE

OM PR

A EN

TA ET OT PR RPO IUM R NA CO ZO DAL DITO 'AU LL DE

AA ZZ PIA ON IO 0 C CC 0.0 A A LA TA ELL L A UO ER m Q ASS .00 P +10

The master plan for the new campus of the Columbia Univesity focuses on a fulcrum identified by the main square, a public space protected that mediates the passage between the city and the University, around which are structured the two university buildings: the Academic Conference Center (ACC) and the School of International and Public Affairs (SIPA). GSPublisherEngine 0.0.100.100

On the quadrangular perimeter that reflects the shape of the block, two large inclined pillars connected at the top are inserted. These support the long arms of the building and provide sustenance of the public space on top cantilever. Inside, the building is composed by 4 different halls, a large auditorium with the foyer overlooking the promenade, and a large public space located at the intersection of the two sleeves.


15

Arrival from the subway

View of the main square


16 Manhattanville Campus, Columbia University, NYC, USA | second year of Master Degree | 2014 | Professor E. Battisti

S.I.P.A & A.C.C.

Ground floor

Axonometry


17

View of the main square

Entrance to S.I.P.A.


18 Manhattanville Campus, Columbia University, NYC, USA | second year of Master Degree | 2014 | Professor E. Battisti

S.I.P.A & A.C.C.

South elevation and section of the building


19

On the perimeter of the square, on the sides of 125th and Broadway are placed two large inclined pillars that join at the top to better withstand the lateral forces. These support the long arms of the building and allow to sustenain the ‘tip’ fully cantilevered. Inside, they contain the fire escapes, implants that need to be taken ashore, and discharges from rain water. Structurally, they lead four beams vieerendel topped with lattice that support both arms.


20 Manhattanville Campus, Columbia University, NYC, USA | second year of Master Degree | 2014 | Professor E. Battisti

S.I.P.A & A.C.C.

Elevation of the suspended volume


21

Section of the suspended volume


22 EXPO 2015, MIilano, MI, Italy | first year of Master Degree | 2013 | Professor M. De Lucchi, C. Macchi Cassia

POST EXPO

The project deals with the difficult subject of the redesign of the area assigned to EXPO Milan 2015 by combining at the existing intrinsic themes found a number of external contributions arising from the context. The control of the design process was performed by implementing a series of steps between the various scales, looking for the continuous moments of verification regarding the fundamental treated aspects. The particular location of this area and its heavy infrastructure require broader reasoning; such as the urban mobility and the involvement of the same area within a complex road network: the project provides for the maintenance of the Metro Red Line subway, placing near the same a “Kilometer-Zero� market that wants to be a physical and thematic connection between the city and the area in question.


23

Macrosistema MACROSISTEMA

MICROSISTEMA

Microsistema

30 Km

10 4 2

PRESISTENZE POST EXPO

MICROSISTEMA

PRESISTENZE POST EXPO

Attraversabilità pedonale

Permeabilità visiva

Attenuazione della

5% area parcheggio

5%

TESSUTO VERDE

TESSUTO VERDE

tramite inserimento degli spazi aperti privati e semiprivati

Spazio pubblico

Trattamento del suolo: minerale - ibrido - vegetale

GEMMAZIONE DELLA ATTIVITA' DEL CARCERE

1. Microviabilità del sistema carcere 2. Padiglioni di EXPO riusati dal sistema carcere

GEMMAZIONE DELLA ATTIVITA' DEL CARCERE GRIGLIA REGOLATRICE 1. Viabilità primaria 2. Carreggiata riservata al tram 3. Strade del tessuto residenziale

1. Mic

2. Pad


PRESISTENZE POST EXPO

OSISTEMA

24

EXPO 2015, MIilano, MI, Italy | first year of Master Degree | 2013 | Professor M. De Lucchi, C. Macchi Cassia

POST EXPO OSISTEMA UTO VERDE

Project’s principal schemes

ENZE POST EXPO

Preexistences Post-EXPO

TESSUTO VERDE

GEMMAZIONE DELLA ATTIVITA'Budding DEL CARCERE activities of prison GEMMAZIONE DELLA ATTIVITA' DEL CARCERE

TENZE POST EXPO

1. M

2. P

MAZIONE DELLA ATTIVITA' DEL CARCERE

1. Microviabilità del sistema carcere 2. Padiglioni di EXPO riusati dal sistema carcere

O VERDE

GEMMAZIONE DELLA ATTIVITA' DEL CARCERE

O VERDE

GRIGLIA REGOLATRICE Green tissue

GRIGLIA REGOLATRICE

Grid regulator

1. Microviabilità del sistema carcere

2. Padiglioni di EXPO riusati dal sistema carcere

1. V

2. C

3. S

GLIA REGOLATRICE

GRIGLIA REGOLATRICE ZIONE DELLA ATTIVITA' DEL CARCERE

AZIONE DELLA ATTIVITA' DEL CARCERE

1. Viabilità primaria 2. Carreggiata riservata al tram

VIABILITA' VIABILITA'

3. Strade del tessuto residenziale 1. Viabilità primaria 2. Carreggiata riservata al tram 3. Strade del tessuto residenziale

1. Microviabilità del sistema carcere

2. Padiglioni di EXPO riusati dal sistema carcere

1. V 1. Microviabilità del sistema carcere

2. Ca

2. Padiglioni di EXPO riusati dal sistema carcere

3. St

A rigid grid is built (as opposed to the “softer” park next to it) that could integrate with the existing buildings such as the prison, an BILITA'indefinite industrial fabric and the new residential / commercial construction, making them fit together but with a different grit that both unites and diversifies the three ranges. The agricultural park becomes in the territory of post EXPO an area equipped with several features: keeping the link with Cascina VIABILITA' Triulza, a relationship with the prison is established, where the inmates are held outside its walls and are applied to a new formation 1. Viabilità primariathe park system as a sort of offshoot of the process through community service in the halls that used to be the EXPO’s halls, making prison. 2. Carreggiata riservata al tram 1. Viabilità primaria The park offers areas for recreational / sports / entertainment in the far south; in del the North the area of the Pavilion 0 is maintained 3. Strade tessuto residenziale 2. Carreggiata riservata al tram as market area at Km 0 of the products of the agricultural park and as memory of the EXPO and its theme. 3. Strade del tessuto residenziale

A REGOLATRICE

IA REGOLATRICE

1. Viabilità primaria 2. Carreggiata riservata al tram


25

Ground floor plans


26 EXPO 2015, MIilano, MI, Italy | first year of Master Degree | 2013 | Professor M. De Lucchi, C. Macchi Cassia

POST EXPO

Park view

Sections


27

Axonometries and plans


28 Politecnico di Milano, MIilano, MI, Italy | first year of Master Degree | 2013 | Professor E. Battisti

CAMPUS SOSTENIBILE

Masterplan Sustainable Campus

CittĂ Studi, in collaboration with the Politecnico of Milan, proposes the redevelopment of the railway Lambrate in Milan, with the aim of creating a sustainable campus. The core of the design experience is to have a project developed in all its phases, from urban design to the development of a complete architectural building structure, giving account of the technical solutions, construction and language.


29

Views from of the campus

Guidelines

Primary axis

Secondary axis

Pre-existing areas of interest

Fulcrums primary axis

Fulcrums secondary axis


30 Politecnico di Milano, MIilano, MI, Italy | first year of Master Degree | 2013 | Professor E. Battisti

CAMPUS SOSTENIBILE

The ground floors of the Sustainable Campus

The design theme is the conversion of the railway station Lambrate, aimed at redesigning the urban edge and open spaces, through the creation of a new park and buildings (whose functional program is specified below) designed to accommodate functions of general interest related to UniversitĂ Statale and to the Politecnico and open to public use.


31

Plans of upper floor

Section of the Campus Center


32


33

Other works


34 Pesaro, PU, Italy | collaboration with Marco Gaudenzi & Associated | Competition for the municipally of Pesaro | 2016

SCAVOLINI Palace - New foyer

Plan of the foyer

“RED CARPET” é il titolo utilizzato per descrivere il progetto che proponiamo per l’ingresso del palazzetto. Il tappeto rosso (red carpet) é diventato il simbolo del l’avvenimento importante, dell’accoglienza festosa, dell’attenzione mediatica, il sipario rosso delimita il boccascena del teatro.


35

In coerenza con le qualità del progetto di gara la proposta di miglioramento architettonico della pensilina di ingresso che presentia Definisce un rapporto forte con l’intorno urbano Aumenta la protezione dalle intemperie per il pubblico in occasione delle manifestazioni Caratterizza come unico ambiente l’esterno e l’interno del foyer Qualifica tutto l’ambiente del foyer con il controsoffitto inclinato fonoassorbente che prosegue dall’esterno all’interno in tutto lo spazio di ingresso ed oltre, sopra la scala di accesso al campo di gara.


36 Pesaro, PU, Italy | collaboration with Marco Gaudenzi & Associated | Competition for the municipally of Pesaro | 2016

SCAVOLINI Palace - New foyer Elevation

View from the steet


37

Section

View from the steet


38 Vallugola, Gabicce Mare, PU, Italy | collaboration with Marco Gaudenzi & Associated | 2016

VILLA FABBRANI

Masterplan


39

Floorplans


40 Vallugola, Gabicce Mare, PU, Italy | collaboration with Marco Gaudenzi & Associated | 2016

VILLA FABBRANI

By night


41


42 Cattolica, RN, Italy | collaboration with Marco Gaudenzi & Associated | 2015

CONAD Supermarket

Masterplan

The project involves the urbanization of free area currently owned by The Building SRL on Via Francesca da Rimini, in Cattolica. In this place it is liable to move the supermarket CONAD Via Macanno. In the area of intervention they are required public and private parking, a new urban center (square), paths and the new supermarket on two floors with ample space dedicated to the loading / unloading and parking. The peculiarity of the batch is given by the slope of the same, which makes it necessary the connection between the parts most depressed with the portion of entry to the supermarket.


43

View under the cantilever roof

The square and the entrance from Via Francesca da Rimini


44 Cattolica, RN, Italy | 2014

TC INFORMATICA Plan

WC

1

2 OFFICE

WORK SPACE WORK SPACE

CLOSET

OFFICE

ENTRANCE & MANAGEMENT

MAIN ENTRANCE

GSPublisherEngine 0.0.100.100

GM office

TC Computing, a developer of websites, apps and software needs of an expansion with new work environments for trainees, a private office, a meeting room and a lobby with waiting room and administration. The existing environment [1] consisted of an open-space room where they were gathered workspaces, entry and administration. The expansion involved the use of a neighboring environment [2] connected to the first through an existing opening in the bearing wall central. The design is based on spaces divided by crystals to-ceiling, in a way that allows visual permeability but not the acoustics. This way you can create all environments richeisti by the client and at the same time does not affect the livability and minimum clearances.


45

Photos


46


47

Design Models Render


48

RENDERING Photo studio


49

Milano, MI, Italy


50

RENDERING Ex Hotel Palace


51

Pesaro, PU, Italy


52 Patent for utility model n° 202015000026994

LF - POWER WALLET

GSPublisherEngine 0.0.100.100

E P I T O T O PR

A unique design object, patented as utility model, which brings together a number of requirements. It offers to the user the possibility of having a portfolio of retail different functions. The idea was born by looking at the needs of today’s society, so LF PowerWallet combines two common objects breaking them down and reassembling, forming an innovative product and of real use for the user: - A card slots and documents that is redesigned with an additional pocket and some clippings functional; - A power bank that was redesigned into its main components in order to make it as thin as possible and to accommodate LED, microUSB port and power cable. With the “portfolio with charging for smartphones and tablets” is born an innovative object pocket that allows you to have everything needed for social life today in a small footprint.


53

The card holder charging the smartphone Made in Italy

S S E

I K R O W

R G O R NP


54

MODELS

Lab. Progettazione II Music pavilion 2011 Material: strips of wood, cardboard plant Procedure: cutting and manual assembly


55

Workshop, Soliera Zoning 2011 Materials: printed cards, cards vegetables, poliplat Procedure: cutting and manual assembly, plotting


56

MODELS

Lab. Progettazione V Manhattanville Campus 2015 Material: fir, walnut, colored construction paper, cardboard plant Procedure: cutting machine, laser cutter, cut and manual assembly


57

Master Thesis SIPA & ACC 2015 Material: fir, colored construction paper, cardboard plant, strips of wood, polished and matt polycarbonate Procedure: cutting machine, laser cutter, plotting, cutting and manual assembly


58

Arch. Luca Ferretti 338-4453505 arch.ferretti.luca@gmail.com https://it.linkedin.com/in/lucaferrrettiarch


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.