Work Samples - February 2024

Page 1

Native aquatic/ emergent plants

Aerator/bubblers (typ.)

Native aquatic/ emergent plants

Post lights (typ.)

New entry and footbridge

Continuous bioengineered shoreline and riparian buffer

ADA-compliant footbridge over dam

Pond

Grass paver emergency access

Pond Tot lot

Bicycle racks

Restored gravel paths (typ.)

Rain gardens

Parlor lawn with benches

Nature play area

Rain gardens

Rain garden

Event lawn

ADA-accessible ramp (gravel path)

New gravel paths

Bioswale

Tot lot

Restored gravel paths (typ.)

Post lights (typ.)

Continuous bioengineered shoreline and riparian buffer

ADA-compliant footbridge over impoundment structure

Bioswale

Native canopy and woodland gardens

Aerator/bubblers (typ.)

Event lawn

Renovated gazebo

Entry plaza and relocated agpole

Conceptual Plan: Phase I

Liberty Park

Scale: 1 = 30 -0

Borough of Peapack-Gladstone, New Jersey CVDA/Princeton Hydro

Native canopy and woodland gardens

Permeable parking ADA-accessible ramp (gravel path)

Relocated agpole

Vegetated curb bump-outs (typ.)

Scale: 1 = 30 -0

Renovated gazebo

Conceptual Plan: Phase 2

Liberty Park

Borough of Peapack-Gladstone, New Jersey CVDA/Princeton Hydro











Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.