CMGT 442 All Discussions The Latest Version A+ Study Guide **********************************************
CMGT 442 All Discussions Link https://www.onlinehelp123.com/cmgt-442 **********************************************
CMGT 442 Wk 5 Discussion - Disaster Recovery Plan (DRP) Post a total of 3 substantive responses over 2 separate days for full participation. This includes your initial post and 2 replies to classmates or your faculty member. Due Day 3 Respond to the following in a minimum of 175 words:
If you have a business continuity plan (BCP), fault tolerance systems, and backup systems, does your business really need a disaster recovery plan (DRP)? If you have a computer incident response team (CIRT), do you still need a BCP or DRP? Provide examples to support your position. Due Day 7 Post 2 replies to classmates or your faculty member. Be constructive and professional.
CMGT 442 Wk 5 Discussion - Disaster Recovery Plan (DRP) Post a total of 3 substantive responses over 2 separate days for full participation. This includes your initial post and 2 replies to classmates or your faculty member. Due Day 3 Respond to the following in a minimum of 175 words:
If you have a business continuity plan (BCP), fault tolerance systems, and backup systems, does your business really need a disaster recovery plan (DRP)? If you have a computer incident response team (CIRT), do you still need a BCP or DRP? Provide examples to support your position. Due Day 7 Post 2 replies to classmates or your faculty member. Be constructive and professional.