OPS 574 Wk 4 Discussion - Complex Projects

Page 1

OPS 574 All Discussions The Latest Version A+ Study Guide **********************************************

OPS 574 All Discussions Link https://www.onlinehelp123.com/ops-574 **********************************************

OPS 574 Wk 4 Discussion - Complex Projects Post a total of 3 substantive responses over 2 separate days for full participation. This includes your initial post and 2 replies to other students or your faculty member. Dr. Peter expects the response be a minimum 175 words and the reply be a minimum of 100 words and properly cited and referenced. Due Day 3 (Thursday night) Respond to the following in a minimum of 175 words: Consider the most complex project you’ve ever been involved in. Briefly describe the project, giving examples of the following as they pertain to the project:     

The work breakdown structure Tasks Subtasks Work package Were you on the critical path? Additionally, explain the role the project manager played in managing the project’s success or failure. Include an example. Due Day 7 Reply to at least 2 of your classmates or your faculty member. Be constructive and professional in your responses.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.