Luis Barcena Work Samples

Page 1

L U I S NEW N NE W 4x12 4 RIDGE GE BEA EAM: SEE EE E STR TRUCT TURAL L DRAW D AW WIN INGS GS

SLOP LOPED ED CL E LNG NG G

ASPHALT SHINGLE ROOFING ON (2) LAYERS 30LB ROOFING FELT ON 5/8" EXTERNAL GRADE PLYWD SHEATHING ON 2x10 WD RAFTER FRAMING PER STRU UCTUR TU TUR URA AL DRAWINGS

B A R C E N A

luis.barcena@woodburyuniversity.edu 13177 Goleta Street NEW R-30 BATT NEW 2x12 RIDGE B Pacoima, California 91331 INSULATION SEE STRUCTURAL DRAWINGS 1.818.675.4713

5/8" / GW GW WB B FIN NISH SH ON N IN NT NT. SID SI SIDE DE

NEW EW CEIL CEI EIL LING IN NG G BEAM B BEA : SEE STRU STR STR ST RUCT C CTUR AL L DRAW DRAWIN DR DRA R RAW IN INGS IN NGS S FOR O DETAILS DETA ETAILS LS

FUL ULL HEIGHT POST: SEE S EE STR STRUCTURAL ST TR TRUCTURAL DRAWIN RAW WINGS NGS N S EX X G 2X 2X6 ROOF RAF FT TERS T

11'-3 3" FIN 3 N FLR TO FIN HP OF F FA AM A MILY M Y ROOM CEILING

1X4 4 PT TD W TD WD D BOARD AR FIN SH FINI H ON SL SLOPED OPE ED D CEILING CEIL NG & H HIGH H WAL ALL L ABOV BO B O EC CROWN OWN

F RA FTE RS

NE EW HDW E HDWD FLR F FINISH H ON 3/4 3EX' 3/4" /4 4'G"2XP PLYW PL LYW LY LYW YLIN W WD 4 CEILI IN N JOISTS NG JOIS STS TS S SUBFLOO UBFLOO LO LOO OOR O ON ON 2X? 2 JOISTS S TB BD

EX'G G2 2X 2X4 C CEILING EILING G JOIS JOI JOISTS

EL. 18'-0" VIF FINISHED CEILING

R-13 FIBERGLASS IB BE ERG GLASS S CL BATT AT TT T IN IINSULATION NS NSULATION NS O IIN NE EXT. T. W WALL ALLS, ALLS, SEQ E EQ TYP TY P

RETURN GUARDRAIL TO WALL BEYOND

11" TREADS TR READS, T TY YP

STAIR LANDING

EX'G WINDOW WINDOW NDO OW TO OR REMA REM EMAIN N

EX

'G

2" RAKE

ST RI

NG ER

MITER RETURN/ T TERMINATE PTD WD B BASE AT EDGE OF TOP RISER O

TO

R RETURN R NE EW E W GUARDRA G RDR DR IL D L TO WALL T LL

STAIR LANDING LANDIN NG

SHIM OUT FOR NEW RAKED RISERS NEW 3/4" HDWD D TREADS & RISERS E ON EX'G STAIR STRUCTURE STRUCTU RE TO REMAIN

1

4 1/2" 1/2 MAX PER C CODE

HA ANDRAIL W WIDTH VIF

RE M AI

CL

1

N

EX'G 2X1 2X12 FLO 2 FLOO OR R JOIS JOISTS JOI

18" 18 1 8" M MIN IN P PER PE ER E R S RU STRU UC CTUR URAL AL DRAW DRA AW A WINGS NG GS S

31 1/2" MIN PER CODE

1 1/2 2" GAP MIN PE ER CODE

40 0 1/4 1/4" EX EX'G G OPENING O ENING E VIF

NEW FL NEW FLOOR JOIST ST T& EX'G 2X X4 CEIL CEIL IIL LIN LING LIN NG N GJ JOIS O STS S G D GIRD DER ER RS RS: RS S:: SEE SE S EE S UCT STRU CTUR URAL UR AL DRAWI RAWINGS NGS N GS

NEW R R-19 19 FIB FIBERGL ERGLASS ERGL ASS S BATT INSULATION INS N ULATION

NEW W HDW HDWD D RISER ISER S R DIES S INTO INTO C CEILING CEIL LING P D WD PTD D COLUM COLUMN M ENCLOSURE ENCLOSU O URE W/ CROWN CR OWN WN & BA BASE A E TRIM T M TO T M MATCH TCH H E G EX'G

7'' 7'-7" 7

34" MIN PER P ER COD CODE DE

T T.O. R RAIL

T O. T.O. T.O T E TRE EA EAD AD

NEW W SOLI SOLID D RAIN AINWATE WATE A R DRAIN: DRAIN C CONNECT CONN ECT T TO EX'G AR AWAY AREA A W Y DRAI WA DRAIN N

EL L. 0'0'-0" 0" VIF FIN IN NISHED NISHE D FLOOR

NEW PERFORAT PERFORATED D 4" PIPE IN DRAINAGE GRAV D GRA AV VEL L W/ FILTER W FILTER FABR FABR RIIC WRAP W

NEW W CONC C. FOO OO OT O TING NG G REF EF FE F ER TO S R ST STR RUCTURA UCTUR U RA AL A DRA AW A WINGS W

W O R K

EX'G 2X10 EX 2 0 FLOO LOOR LOO R JOIST JO TS

ARCHITECTURE // 2016 // PBA // WORK SAMPLES

PROVIDE ID CONCEALED CONCEAL CONC CE LED D STL TAB AT ATT ATTACHMENT A TTAC ACHMENT MENT M TO STR TO STRUCTURA S STRU STRUCTURAL ST T UCTURAL CTURAL C U POST P OST S INSIDE ENCLOSURE ENC E C AT T BOTH TH RA RAI RAILS/ ILS// S SIDES I S

CU USTOM UST ST TO H HDWD HANDRAIL: STE EAM BE END N FOR GRA ADUAL L SWEEP TO

37 1/4" /4

3 A4 A4.0 A 4.0

5/8" PTD DG GWB WB FINISH F H ON SIDES & UND S UN UN ND DE ERSIDE ERS RSIDE S DE E

EX'G E X'G 2 X 2X X14 WD X14 D STRI STRIN TR N NGERS NG GE ERS R TO T O REMA RE EMA AIN N

DIN IN NIN NING NG PTD GW PTD PT GWB B ON N 2X3 3 PA PAR PARTITIION N ON ON UN NDERS SIIDE DE OF S STAI STAIRS

NEW W GIRDER POST F FOO FO OO O OTING OTIN BEYOND, YO TYP: S SEE 1 1/2" /2" STEP BACK FROM BA B F STRUCTURAL R DRAW WIN WI WING W IIN NGS NG G FA ACE CE OFS GWB

ENTR NTRY TRY 1 1/2 1/2" 1 " TO FACE OF GWB

NEW EW W FL FLA FLAT T WD BLOCKING K NG KI TO SUPPORT NEW GUARDRAIL BASE PLATE: E:

SEE STRUCTURALS CLAS AS ASS SS 1 VAPOR R RETARDER R A ER OVER SO O S SOILS, O S PER R CRC C C R408.1: 22" SEE 2/A 2/ 2/A2.2 //A A2 FOR C CRAWLSPACE VENT L LOCATION O

EX TO O

S A M P L E S EX'G EX G 2X10 FLOOR JOISTS

1


project 1/5: start

SCOPE OF WORK INTERIOR ALTERATION/ REMODEL OF EXISTING KITCHEN AND (3) BATHROOMS. NEW STRUCTURAL WORK TO REMOVE POST AND DROPPED BEAMS IN DINING/ DEN. REMODEL EXISTING STAIR TO REMAIN: NEW GUARDRAILS AND FINISHED TREADS/ RISERS. NEW HARDWOOD FLOORING, LIGHTING, ELECTRICAL AND PLUMBING THROUGHOUT.

VICINITY MAP ET

RE

S

LA

ST

S

BO

CH CH UR LA NE

S AN

D

AY EW

AR EV

E

E FR

UL

GO

NU ST

BO

E AV

DIE

IT ET

RE

K

IC

RW BE

A ED LV

5S

LO

ST

PU SE

40

BE

ET

RE

TA BA

AL

ET

RE

M

HA

ST

RN

BU

ET

RE

LT

ST

ET

RE

AU

RD

N HE

ST

FO

C

ER AT W

NORTH NOT TO SCALE

PROJECT SITE

105' OVERALL LOT DEPTH

3'

RWL

SIDE YARD

PROPERTY LINE

GRAVEL

EX'G 12" TERRA COTTA TILE

'G O BE UTD NC OO H R

RWL

EX

12'-6"

NEW OUTDOOR PATIO TABLE

2ND STORY OVERHANG

14'-10" +/- EX'G FRONT YARD SETBACK

NEW CLOVER GROUND COVER NEW WD FRAMED CEDAR DECK & STEPS: EXEMPT FROM PERMIT

RWL

EXISTING TWO STORY SINGLE FAMILY DWELLING 2,324 SF

UP

0'-0" AFF FINISHED FLOOR 1

4'-6" +/- CLR VIF

MIN 2-CAR CLR DRIVEWAY ZONE PER LA INFO BULLETIN P/ZC 2002-001

38'-3 3/4" +/- OVERALL BUILDING WIDTH

46'-6 7/8" +/- OVERALL BUILDING DEPTH

19'-2" +/-

FRONT LAWN

15'-7 1/2"+/-

19'-8 1/8" +/- EX'G FRONT YARD SETBACK

20'-0"+/-

4'

2ND STORY OVERHANG

PUBLIC UTILITY EASEMENT

RWL EX'G CONC SLAB

EX'G CONC DRIVEWAY

1'

EX'G SLOPE

6'-9 1/2"

EX'G 15'-8"W DOOR TO REMAIN

8'-7"

4'

EXISTING TWO-CAR GARAGE 378 SF

1

PLOT PLAN 1/4" = 1'-0" (1:48)

2016 // PBA // RHINO, AUTOCAD, PHOTO SHOP

2


project 1/5: continued

SEC EX'G 12" TERRA COTTA TILE TO REMAIN

CLOSET GUEST BATHROOM STUDY

GUEST BEDROOM

EX'G SLOPE REPLACE EX'G GALVANIZED PIPES UNDER SHOWER PER PLUMBING CODE. GC OR PLUMBER TO ADVISE

REMOVE EX'G TILES FOR NEW DECK

REMOVE EX'G FLOORING UNDER EX'G TOILET WHERE MOLD PRESENT PER OWNERS ESCROW INSPECTION REPORT.

4" R 6" R EX'G STAIRS TO BE DEMOLISHED

DEMO EX'G DOOR HEADER & REMOVE FRAMING UP TO EX'G CEILING JOISTS

HALL

7" R 7" R 6" R DOWN

DEMO EX'G PARTITIONS & WD WAINSCOTS

9'-9 7/8"

ENTRY 8'-3" AFF FIN. CEILING

DOWN 9'-0" AFF FIN. CEILING

0'-5 1/4" BFF T.O. DECK 2'-10 1/4" BFF T.O. ASTROTURF HB

REMOVE EX'G TREAD

EX'G FRENCH DOOR TO BE DEMOLISHED 72W x 84"H SH 3/4" HH 84-3/4"

DEMO EX'G GUARDRAIL

REMOVE HDWD FINISH FROM EX'G WD FRAMED STAIR TO REMAIN

DINING 3'-5 3/4" 0'-3" BFF FLOOR

0'-0" BFF FLOOR

STAIRS

EX'G 2" HDWD FLOORING TO BE DEMOLISHED

3x3 GUARD 36"H

REMOVE FINISHES AROUND EX'G STRUCTURAL POST TO REMAIN

EX'G CEILING BEAMS AND POST TO BE REMOVED 1'-5"

DEN EX'G DECK TO BE DEMOLISHED

HDWD TILE

EX'G AIR GRILLE TO REMAIN

EX'G 5-1/2" WD DECKING

2'-9 3/4" BFF GROUND LEVEL

LAUNDRY EX'G DOOR TO BE DEMOLISHED

EX'G SUPPLY AIR OPENING TO BE RELOCATED, CENTERED UNDER WINDOW.

LIVING ROOM

EX'G DBL OVEN'S TO BE REMOVED

EX'G STOVE TO BE REMOVED

0'-6" BFF FLOOR

2ND STORY OVERHANG ABOVE TO REMAIN

DEMO EX'G DOOR HEADER & REMOVE FRAMING UP TO EX'G CEILING JOISTS

EX'G REF/FRZ TO BE REMOVED

EX'G 7-1/2" TILE FLOORING TO BE REMOVED KITCHEN

2'-11 1/4" BFF T.O. DRIVEWAY

REMOVE EX'G CROWN MOLDING IN LIVING ROOM ONLY

UP

EX'G 1-1/2" HDWD FLOORING TO BE DEMOLISHED

EX'G KITCHEN WALL TILE TO BE REMOVED

HW

EX'G CONC. STAIRS TO BE DEMOLISHED EX'G DBL HUNG ALUM WIN TO BE DEMOLISHED 30"W x 35"H SH 45" HH 80"

EX'G WINDOW BOX W/ OPERABLE CASEMETS ON EA. SIDE TO BE DEMOLISHED 40"W x 46"H OPENING SH 42" HH 88"

PROJECT TRUE NORTH NORTH

EXISTING / DEMO FIRST FLOOR PLAN 3/8" = 1'-0" (1:32)

ROUTE DRYER DUCT BELOW THROUGH CRAWLSPACE TO SIDEWALL VENT

3'-0" SIDE YARD

GRAVEL

RWL EX'G 12" TERRA COTTA TILE TO REMAIN

RWL SEC AHU

8'-3" AFF FIN. CEILING

CLOSET 6'-0" x 2'-0"

2

10

STUDY 13'- 9 1/2" x 11'- 4 1/2"

A/C COND.

03 32" INT. CLR

11

NEW OUTDOOR PATIO TABLE

9

CL SHOWER

4" SHOWER CURB

12" INT. CLR NEW CAB ABOVE

GWB GWB

7

W/D

TILE

NEW TOILET

02

GUEST BEDROOM 13'-10" x 12'-10"

HDWD

FALSE DEN FLOOR ON SLEEPERS LEVEL W/ DINING ROOM FLOOR

6"

A1

6 A3.0

WD FRAMED DECK & STEPS BY GC W/ 1X6 UNFINISHED WESTERN RED CEDAR BOARDS

4

NEW HDWD THRESHOLD

LAUNDRY 5'-0 1/2" x 4'-8" +/-

2

A3.0

GUEST BATHROOM 10'-0" x 7'-1" +/-

5'-0 1/2" EX'G

NEW W/D HOOKUP: PROVIDE "Y" FITTING OFF CW VALVE TO SUPPLY BOTH WASHER & STEAM DRYER

EX'G SLOPE

GC TO REFURBISH EX'G CABS TO REMAIN: TUNE/ LUBRICATE HINGES, REPLACE NON-FUNCTIONAL OR MISSING BALL & MAGNET CATCHES CATCHES, NEW CAB PULLS OFCI

D

A3.1

2ND STORY OVERHANG ABOVE 2

NEW WASH STAND AND FAUCET: SEE PLUMBING FIXTURE SCHEDULE

A1

STAIRS ABOVE

6 A3.2

HALL 12'-3" x 3'-5" ALIGN, TYP

32" MIN RWL

0'-1 1/8" BFF T.O. DECK

DEN 15'-0" x 14'-10 +/-

1 4

NEW HDWD FLR THROUGH OUT

A3.2

8'-3" AFF FIN. CEILING

2

40'-9 3/4" VIF ALIGN

2'-5 3/16"

36" REF/FRZ OFCI

PANTRY

25"

8'-3" AFF FIN. CEILING

B

2

2"

PANTRY

2ND STORY OVERHANG ABOVE

1

3 ALIGN PANTRY 7'-1" x 7'-10" +/-

CL

5

SEE 2/A3.0

A3.0 2

3

5'-3 3/16"

2'-4"

NEW PUSH OUT CASEMENT WINDOW TO MATCH EX'G

2'-9"

EQ

24 1/4" +/PER MFR: VERIFY

EX'G SUPPLY AIR OPENING TO REMAIN IN FLOOR: PROVIDE NEW SHEET METAL TRANSITION TO TOE KICK SUPPLY GRILLE KITCHEN 11'-6" x 10'-2" +/-

CL

25"

19" VIF PANTRY

NEW DUMMY COLUMN

EX'G POST TO REMAIN W/ NEW ENCLOSURE

2 A4.0

DBL OVENS OFCI

A1

2 A4.1 8'-3" AFF FIN. CEILING

NEW HDWD FLR THROUGH OUT

0'-0" AFF MAIN FLOOR LIVING ROOM 23'-2" x 16-3" +/-

2

25" HOOD ABOVE OFCI

16'-5 3/8" VIF

36" GAS RANGE TOP OFCI

33" SINK OFCI T

DW OFCI

JT 2

32 3/4" VIF

B

2'-9 3/4"

43"

2'-6" BFF GROUND

5 A3.2 F.O.F STRINGER UP

NEW STRUCTURAL POST & PAD FOOTING BELOW: SEE STRUCTURAL

2'-8 1/4" BFF T.O. DRIVEWAY

HDWD

STAIRS 1 A4.0

DINING ROOM 11'-7" x 10'-3" +/-

3

OWNER'S BUTCHER BLOCK NIC

MAINTAIN MIN CLR DRIVEWAY ZONE

ENTRY

SEE FOR STAIR LAYOUT

4'-0"

2'-7 1/4" BFF T.O. ASTROTURF

FIXED

3'-6"

C

8'-7" AFF FIN. CEILING

9'-10" SINGLE SLIDER

01

COUNTER & DRAWERS ALIGN

NEW STRUCTURAL POSTS: SEE STRUCTURAL

(5) 6-13/16" +/- RISERS & (4) 12" TREADS, TYP

OPENING

FIELD RELOCATE EXG' SUPPLY AIR GRILLE W/ ARCHITECT

NEW FLOOR SUPPLY AIR GRILLE IN EX'G OPENING TO REMAIN

DOWN

32 1/2"

2

FLUSH

WALL MTD TV TBD

14'-10"

EQ

A1

WINE REF

BRICK

1

JT

0'-3/4" AFF T.O. HEARTH EXTENSION

2

R RWL

SLOPE

2

A2 2 NEW PUSH OUT CASEMENT WINDOW IN EX'G OPENING TO MATCH EX'G NEW TANKLESS WATER HEATER BY GC

A2

A1

1 NEW FRENCH PUSH OUT CASEMENT WINDOW TO MATCH EX'G: NEW INFILL FRAMING & STUCCO PATCH/ REPAIR AT SILL & HEAD TO ALIGN WITH ADJACENT WINDOW OPENING TO REMAIN: SEE ELEVATION

NEW UNDERMOUNT SINK : SEE PLUMBING FIXTURE SCHEDULE

EX'G CONC DRIVEWAY

VERONA QUARTZ NUVO COUNTER & BACKSPLASHES, TYP 2

FIELD DRILL OR CUT ST STL UNDERMOUNT SINK FLANGE TO COORDINATE W/ SINGLE FAUCET HOLE LOCATION

1

8'-7" DRIVE WAY

EX'G CONC DRIVEWAY TO REMAIN

1

2

PROJECT TRUE NORTH NORTH

1

2016 // PBA // AUTOCAD

PROPOSED FIRST FLOOR PLAN 3/8" = 1'-0" (1:32)

3


project 1/5: continued

EX'G SHOWER HEAD AND CONTROL TO BE ROMOVED AND REPLACED

7'-2 1/4" AFF FIN. CEILING L.P.

EX'G SINK AND FAUCET TO BE REMOVED AND REPLACED

EX'G COUNTER TO BE REMOVED AND REPLACED

11'-2 1/2" AFF B.O.BEAM KID'S BATH

CLOSET 10' x 2'

KID'S BEDROOM 13'-8 3/4"

2'-8"

CASEMENT DBL WIN 48"W x 36"H SH 44" HH 80"

5'-4 1/4"

LINEN CLOSET

AHU

STAIR LANDING

CASEMENT WIN 30"W x 46"H SH 46" HH 78"

DN

11'-2"

3'-8 3/4"

4 3/4"

8'-0" AFF FIN. CEILING LOWEST POINT

4'-1 1/4" VIF

11'-7" AFF FIN. CEILING HIGHEST PT.

FIXED DBL WIN 48"W x 36"H SH 44" HH 80"

10'-5 1/4" VIF 12'-11 1/2"

FIXED WIN 60"W x 46"H SH 46" HH 78"

8'-0" AFF FIN. CEILING

6'-9"

DEMO TILE AND STUDS FOR NEW RECESSED SHAMPOO NICHE

CASEMENT WIN 30"W x 46"H SH 46" HH 78"

STAIRS

11'-0" AFF B.O.BEAM

FIXED DBL WIN 48"W x 36"H SH 44" HH 80"

1'-0" VIF

3'-4 1/4" VIF

CASEMENT WIN 30"W x 52"H SH 27" HH 80"

MASTER BEDROOM 15'-0 1/2"

FIXED WIN 60"W x 52"H SH 28" HH 80"

11'-5" AFF FIN. CEILING HIGHEST PT

CASEMENT WIN 30"W x 52"H SH 28" HH 80"

EX'G CASEMENT DBL WIN 48"W x 32"H SH 48" HH 80"

21'-4 1/2"

13'-7 3/4" REMOVE EX'G MED CAB

EX'G FRAMING AROUND TUB TO BE DEMOLISHED 7'-9 1/2"

CASEMENT DBL WIN TO REMAIN 62"W x 51"H SH 32 1/2" HH 83 1/2"

MASTER BATH

CLOSET

7'-11 3/4" AFF FIN. CEILING

DEMO TILE AND STUDS FOR NEW RECESSED SHOMPOO NICHE

EX'G TUB TO BE REMOVED

EX'G TUB FILLER AND DRAIN TO BE REMOVED

EX'G COUNTER, SINKS AND FAUCETS TO BE REMOVED

EX'G SHOWER HEAD AND CONTROL TO BE REMOVED

PROJECT TRUE NORTH NORTH

1

EXISTING / DEMO SECOND FLOOR PLAN 3/8" = 1'-0" (1:32)

VERONA QUARTZ PURE WHITE COUNTER & BACKSPLASH, TYP NEW BATHROOM TILE

NEW BATHROOM HANDSHOWER & CONTROL: SEE PLUMBIING FIXTURE SCHEDULE

A

2 1

NEW BATHROOM SINK AND FAUCET: SEE PLUMBING FIXTURE SCHEDULE

ROOF OVERHANG 6", TYP

21"

NEW VANITY: SEE ELEVATIONS

BOOKS

TOYS

6

NEW SHAMPOO NICHE

CRIB

4'-2" NEW 5FT TUB IN EX'G LOCATION TO BE REUSED: SEE PLUMBING FIXTURE SCHEDULE

CHANGING

5

A3.1

BUILDING FOOTPRINT BELOW 7

8 CENTER OF ROOM IS START POINT OF TILE LAYOUT

KID'S BATH 8'-0" x 6'-9"

CLOS.

LIN & MED

KID'S BEDROOM

2"

25"

HDWD EX'G AHU

A

31 1/2 " MIN CLR PER CODE

NEW TOILET IN EX'G LOCATION: SEE PLUMBING FIXTURE SCHEDULE NEW HDWD THRESHOLD

STAIR LANDING 6'-7" x 10'-5" +/NEW HDWD FLR THROUGH OUT

2

EX'G CASEMENT WIN TO REMAIN TILE

2

DOWN

READING CHAIR DRESSER

B

CA KING STAIRS 3'-4" x 10'-5" +/-

MASTER BEDROOM

NEW HDWD FLR THROUGH OUT 3 2

A3.1

NEW HDWD THRESHOLD 4

TILE

MASTER BATH 13'-8" x 7'-10"

18"

EQ

1 HDWD

FREE STANDING TUB: SEE PLUMBING FIXTURE SCHEDULE

18"

PATCH & FILL EX'G MED CAB 6"

NEW FREE STANDING TUB FILLER: SEE PLUMBING FIXTURE SCHEDULE

DRESSER & VANITY

C

A

NEW TOILET: SEE PLUMBING FIXTURE SCHEDULE F.O. GLASS

04

6'-4"

3'-9" 18"

4" CURB

MASTER CLOSET NEW SHAMPOO NICHE

18"

EQ

21"

3'-0"

F.O. GLASS NEW BATHROOM SINK(S) AND FAUCET(S); SEE PLUMBIING FIXTURE SCHEDULE

NEW VANITY: SEE ELEVATIONS

2

CENTER OF ROOM IS START POINT OF HEX TILE LAYOUT 2

VERONA QUARTZ PURE WHITE COUNTER & BACKSPLASH

START POINT OF HEX TILES IS CENTER OF SHOWER

2

NEW BATHROOM HANDSHOWER & CONTROL; SEE PLUMBING FIXTURE SCHEDULE

1

PROJECT TRUE NORTH NORTH

1

2016 // PBA // AUTOCAD

PROPOSED SECOND FLOOR PLAN 3/8" = 1'-0" (1:32)

4


project 1/5: continued

EX'G SECURITY PANEL TO REMAIN

SEC

E

E

E

F

GFCI

E

E

E A1 E

A/C CONDENSER

A2

GUEST BATHROOM 8'-3" AFF

CLOSET 8'-3" AFF

DEMO EX'G TRACK LIGHT & REPLACE W/NEW SURFACE MTD FIXT AT JB IN CENTER OF CEILING

F

1 E G

LAUNDRY 8'-3" AFF

15 W/D

E

E E T

E

12" NEW INT CLR UPPER CAB

GUEST BEDROOM 8'-3" AFF

CL A1

STUDY 8'-3" AFF

E

JS

E

M

A2

A2

E E EX'G STAIR CLIPS CEILING PLANE HALL 8'-3" AFF A2

E EX'G SEC LIGHT

EX'G JB FOR RETRACTABLE AWNING TO REMAIN

E

EF

E

E

CL DOOR

E

E A2

E E

1

A1 5'-6""

DEN 8'-7" AFF

A1

36"

A1 DDDD SEC T

A1

1

1

A1

D

RANGETOP

HOOD

15"

A1

A1 GFCI

A1

A1

15

A1

E

CL WINDOW

A1

A1

1

GFCI

EQ DISP

15"

A1 D

HOOD LIGHT BY MFR

PANTRY 8'-3" AFF

GFCI

PATCH & REPAIR CEILING

LIVING ROOM 8'-3" AFF

REMOVE EX'G CROWN MOLDING IN LIVING ROOM & REPLACE WITH 2" TO MATCH

GFCI

KITCHEN 8'-3" AFF

C

15

EX'G SEC LIGHT A1

A1

A1

EQ

15"

FIELD LOCATE W/ ARCHITECT

X

CROWN STEPS UP

15 REF

E

D D

CL OVEN

ALIGN

E

A1

RELOCATED EX'G SECURITY KEYPAD & THERMOSTAT

OVENS

A1 E

30"

NEW SCONCE

X

40

A1

A1

REMOVE DOWNLIGHT FOR READING/ FLOOR LAMP INSTEAD

E

CL

APPROVED PER 07 & 11 OCT 2016 RFI RESPONSES

EQ

EQ

A1

PTD WD CROWN CAPITAL, TYP

EQ

1 EQ

STAIR WELL

24"

20

1 36"

EE E

A1

15

CL DOORS

3-WAY SWITCH UP TO 2ND FL STAIR LANDING FIXTURE

B

24"

ENTRY 8'-3" AFF

A1

1

DINING ROOM 8'-3" AFF

CL TABLE

NEW STRUCTURAL BEAM: SEE STRUCTURAL

A1

WINE REF

A1

A

30"

A1

PTD GWB CEILING TRANSITION

A1

SMALL LED FIXT INSIDE CORKAGE NICHE

E

CROWN STEPS UP

A1

EQ A

15 A1

D

1

DD

E

15

15 20 TV

NEW SCONCE

E

E

GFCI

DW

1

DISP CL WINDOW

ELEC METER & PANEL

CL WINDOW

REUSE EX'G SIDEWALL VENT FOR HOOD EXHAUST

CL WINDOW CL FIREPLACE

PROJECT TRUE NORTH NORTH

1

FIRST FLOOR REFLECTED CEILING & POWER PLAN 3/8" = 1'-0" (1:32)

E

E

GFCI A1

E

E

A1 KID'S BATH 8'-0" AFF A2

REMOVE EX'G SCONCE & REPLACE W/ NEW SCONCE

E

KID'S BEDROOM

E D D

E EX'G CEILING SLOPE

A1

K E

S

EQ

EQ

D S

E

E

E

EX'G CEILING SLOPE

E

E

EQ

E E

E E

H

A2

E

STAIR LANDING 8'-0" AFF

E

REMOVE (2) EX'G RECESSED LIGHTS

EQ

REMOVE EX'G SCONCE & REPLACE W/ NEW SCONCE

1

E

E E

E

E

E

E

E E

E

E E

A1

5'-0" TYP

EX'G CEILING SLOPE

EX'G CEILING SLOPE

E E A1

3'-0"

E 3'-0"

A1

3-WAY SWITCH DOWN TO MAIN SWITCH BANK AT DINING ROOM E

A1 E

E

5'-0" TYP

J

MASTER BEDROOM

A1

E

E

A1

A1

E

3'-0"

A1

E

E

A1

T

D

E

E

E E

EF MASTER BATH 8'-0" AFF

A1

CLOSET

A1

CL ROOM

A2 A1

A1 D GFCI

L

A1 L

L

GFCI

E

CL VANITY

PROJECT TRUE NORTH NORTH

1

2016 // PBA // AUTOCAD

SECOND FLOOR REFLECTED CEILING & POWER PLAN 3/8" = 1'-0" (1:32)

5


project 1/5: continued

CR LAURENCE CONCORD 037 SERIES WALL MOUNT HINGES, POLISHED CHROME FINISH #SD037CH, SEE 2/ SK-05 FOR HINGE LOCATIONS

KNAPE & VOGT 18" 8092P-EB-18 PIVOT / POCKET DOOR SLIDES W/ 8086 HKEZX-EB HINGE KITS (FOR 1-1/4" THICK DOORS) & 8092SB-EB-72 PINION SHAFTS: PROVIDE (3) HINGES PER DOOR AT 72" MAX DISTANCE BETWEEN TOP & BOTTOM HINGES PER MFR

29" CLR FOR MACHINES: F.O. DOOR IN RETRACTED POSITION TO F.O. CABINET SIDE PANELS

RECCESSED FLUSH GLAZING CHANNEL IN CEILING

NEW PTD WD CASEMENT W/ INTERIOR TRIM TO MATCH EX'G 8'-3" AFF FINISHED CEILING

LAUNDRY & CLEANING SUPPLIES

2

42"

48"

OUTLETS

WASHER

36"

2

SOUTH ELEVATION - GUEST BATH

SWITCH

PREP

BOARDS

0'-0" AFF

SOUTH ELEVATION - HALL

6

1/2" = 1'-0" (1:24) MIRROR(S), NIC

OPEN TO DEN BEYOND

8"

RECESSED FLUSH GLAZING CHANNEL IN CURB

PROVIDE HEATH CERAMICS CLASSIC FIELD TILE 4IN X 4IN, SLATE BLUE M8, FOR SIDES OF CURB, DOUBLE BULLNOSE FOR TOP OF CURB

1

GLASS SHOWER DOOR: SEE DOOR SCHEDULE

7

ART (NIC) 8"

1 1/2" PTD WD COUNTER

ADJUSTABLE SHELVES

NEW GLASS SHOWER ENCLOSURE

2

1" CLR GAP BETWEEN RETRACTABLE DOOR & SIDE OF CABINET

ADJUSTABLE SHELF

6"

20"

DRYER

1-1/4" THICK PTD WD BLIND DOORS IN FRONT W/ PUSH-LATCHES: F.O. DOORS FLUSH W/ PTD GWB

POLISHED CHROME PULL, TBD

CL

8"

8"

24" TOWEL BARS, TBD

ALIGN TO ADJ HEAD

ALIGN

6"

4" CLR

FINISHED FLOOR

OPEN PRE-FINISHED MAPLE BASE CABINET W/ (2) ADJUSTABLE SHELVES & UPPER CABINET W/ ADJUSTABLE SHELF

NEW TOE KICK AIR SUPPLY GRILLES: OBTAIN ARCHITECTS APPROVAL OF GRILLE

SOUTH ELEVATION - KITCHEN & DINING

5

1/2" = 1'-0" (1:24)

PROVIDE 1/2" CEMENT BOARD BACKER IN LIEU OF DRYWALL AT SPLASH ZONE BEHIND SINK: PROVIDE LEVEL 5 SKIM COAT ACROSS CEMENT BOARD & ADJACENT PLASTER TO REMAIN.

1/2" = 1'-0" (1:24) 2

NEW PTD GWB COLUMN ENCLOSURE W/ NEW CROWN CAPITAL & BASE

2

EX'G POST TO REMAIN

HOOD BY OWNER, NIC

CL RANGE TOP

8'-3" AFF FINISHED CEILING PROVIDE SOFFIT FRAMING TO SUPPORT LAUNDRY CABINET

PROVIDE MIN. REQUIRED SCRIBE AT HEAD & SIDES ADJUSTABLE SHELF

CL PLATE

OUTLET

8" 4"

WASHBASIN: SEE PLUMBING FIXTURE SCHEDULE

NEW PTD WD STORAGE CABINET W/ ADJ SHELVES & FLUSH PUSH LATCH DOORS

EQ EQ

1 OPEN TO LIVING ROOM BEYOND

PTD GWB AT BACK OF NICHES, TYP

14" CLR

ADJ SPACE FOR DRYER, DUCT & W/D HOOKUP

DBL OVENS, NIC

CL DBL OVENS & COUNTER TOP

OPEN NICHE

2 6'-8" AFF

3/4" SINGLE PANEL OF VERONA QUARTZ NUVO, UP TO B.O. HOOD AT COOKING AREA

T.O. COOKING SURFACE

OPEN

1-1/2" PTD WD FIXED COUNTER & SUPPORT FINS

ADJUSTABLE SHELVES

FIELD LOCATE TOILET PAPER HOLDER

36" METAL CONSOLE LEGS: SEE PLUMBING FIXTURE SCHEDULE. USE CONSOLE RAIL FOR HANDTOWELS

1" CLR BEHIND DOOR

1 1/2" COUNTER

NEW TOILET: SEE PLUMBING FIXTURE SCHEDULE

5'-0"

5'-2"

FAUCET & SIPHON SEE PLUMBING FIXTURE SCHEDULE

OPEN TO LIVING ROOM BEYOND

EQ

2

JT

T.O. WINDOWS & DOORS

OWNER'S 36" GAS RANGE TOP

30" CLR

NEW SCONCE, TBD

50" CLR

CL FAUCET

39"

CL

JT

EQ

2 SPICES

28 1/2" CLR MIN.

SHEETS

SPICES

POTS / PANS

OILS

BOWLS

18" CLR OPEN

PANS

1 1/2" SCRIBE STILE 0'-0" AFF

WASTE BASKET, NIC

PTD WD BASE, TYP

NORTH ELEVATION - GUEST BATH

4

INFILL FRAMING PATCH/ REPAIR GWB AT HEAD AND SILL TO ALIGN TO ADJACENT WINDOW

NEW FRENCH PUSH OUT CASEMENT TO MATCH EX'G

CL WINDOW

BUTT OUTLET TIGHT TO EX'G POST

2

NORTH ELEVATION - DINING & KITCHEN

3

1/2" = 1'-0" (1:24)

FINISHED FLOOR

1 1/2" SCRIBE STILE

PTD WD BASE W/ PTD FURNITURE GRADE PLYWD PLATFORM: T.O. PLATFORM FLUSH W/ T.O. BASE

OWNER'S WINE REF: CONFIRM UNIT DIMENSIONS IN SHOP DWGS

1/2" = 1'-0" (1:24)

NEW PTD WD CASEMENT W/ INTERIOR TRIM TO MATCH EX'G

NEW PTD WD CROWN TO MATCH EX'G LOCATED AT DOWNSTAIRS GUEST BEDROOM, TYP

CUSTOM PTD WD PANELS ON REF/ FRZ

8'-3" AFF

INSECT SCREEN: SEE WINDOW SCHEDULE, TYP.

CL

2

1

7 7/8" VIF TO UNDERSIDE OF WIN SILL

CL

2

EQ EQ

2

FLATWARE

UTENSILS

24 1/2"

24" CLR OPENING PER MFR

36"

33" MIN INTERIOR CLR

OPEN TO DINING BEYOND

PULL OUT PANTRY TRAYS

JT

NEW FULL HEIGHT CABINET W/ SOLID SHELVES

DW, NIC 16" MIN INTERIOR CLR

1 1/2" SCRIBE STILE

TRAY DETAIL

GC TO VERIFY THIS DIM IN FIELD

19"

CL

84" CLR

EQ

36" REF/ FZR BY OWNER, NIC

6"

EQ

2" INT CLR AT PANTRY CABINETS

COUNTER SLAB JOINT

NEW VERONA QUARTZ NUVO COUNTER & BACKSPLASHES, TYP

DISPOSAL SWITCH

FINISHED CEILING

NEW FULL HEIGHT CABINETS W/ SHELVES

ALIGN HEADS AT 6'-8"+/-

KOHLER SIMPLICE DECK MTD FAUCET: SEE PLUMBING FIXTURE SCHEDULE

EQ

EQ

EQ

EQ

EQ

1 1/2" SCRIBE STILE

2" INT CLR AT SM. APPL

1 1/2" SCRIBE STILE

36" CLR MIN.

EQ

FIXED 1 1/2" SCRIBE STILE 0'-0" AFF FINISHED FLOOR

2

DISPOSAL

CUSTOM PTD WDPANEL TO MATCH CABS.

4" TOEKICK

BASE CABINETS W/ PULL-OUT TRAYS ON HEAVY DUTY GLIDES

LOCATE NEW CW SUPPLY LINE & DUPLEX OUTLET PER MFR INSTALLATION GUIDE

TRAY DETAIL

EAST ELEVATION - KITCHEN

CUT TILE (EQ)

CUT TILE (EQ)

(8) FULL TILES

WEST ELEVATION - KITCHEN

1

1/2" = 1'-0" (1:24)

BULLNOSED EDGE, TYP BOTH SIDES: HEATH CERAMICS CLASSIC FIELD TILE, 4IN X 4IN SINGLE BULLNOSE, PARCHMENT M3

NEW TILED SHOWER WALL EQ

EQ

(15) FULL TILES

CL

(4) FULL TILES

2 (3) FULL TILES

CUT TILE (EQ)

(3) FULL TILES

EQ A

8'-0" AFF FINISHED CEILING FIXED SHOWER HEAD: CENTER ON TILE

(4) TILES

EQ

TILED SHAMPOO NICHE: PROVIDE HEATH CERAMICS CLASSIC FIELD TILE, 4IN X 4IN PARCHMENT M3 SINGLE BULLNOSED EDGES AROUND OPENING

(3) TILES

CL

SWITCHE(S)

6"

SHOWER MIXER / CONTROL: CENTER ON TILE

(14) TILES

EQ

TOILET PAPER HOLDER, OFCI

TILED SHOWER WALLS, TYP 48"

(23) FULL TILES, TYP

CR LAURENCE CONCORD SERIES WALL MOUNT GLASS SHOWER DOOR HINGES 037 POLISHED CHROME: CENTER ON TILES, TYP

1

NEW SHOWER WALL TILE

ALIGN TYP

2

0'-2" +/- AFF

0'-0" AFF FINISHED FLOOR

FINISHED SHOWER FLOOR 4" CURB

PROVIDE HEATH CERAMICS MODERN BASICS 2IN X 6IN IN CHALK MATTE M18, W/ FLUSH WHITE SCHLUTER EDGE

12" HAND TOWEL BAR, OFCI

NEW TILED SHOWER WALL

EQ

(8) FULL TILES

WEST ELEVATION - KID'S BATH

(8) TILES

30"

8"

WEST ELEVATION - KID'S BATH

1

5

1/2" = 1'-0" (1:24)

STAIN NICKEL PULL TBD

1

EQ

(13) TILES

1

2

2

PROVIDE HEATH CERAMICS CLASSIC FIELD TILE, 4IN X 4IN, FOR SIDES OF CURB, BULLNOSE TILE FOR TOP OF CURB TYP & BULLNOSE TOP CORNER TRANSITION TO MATCH CLOUD GREY M74

SOUTH ELEVATION - KID'S BATH 1/2" = 1'-0" (1:24)

NEW SCONCES, TBD 2

PLASTERED SHOWER WALL

2 CL

38"

8'-0" AFF FINISHED CEILING

38"

18"

CL PLATE B.O. MIRROR 48"

SHOWER CONTROL & DIVERTER

48"

26"

FREE-STANDING BATH FILLER: SEE PLUMBING FIXTURE SCHEDULE

OUTLET BOTH SIDES, TYP FREE-STANDING BATH TUB: SEE PLUMBING FIXTURE SCHEDULE

3"

15"

15"

EQ

24"

30"

1

CL VANITY

76"

5'-6"

HAND SHOWER

48"

1/2" = 1'-0" (1:24)

SWITCH

6"

36"

NORTH ELEVATION - MASTER BATH

4

18"

24" TOWEL BARS, OFCI

20"

0'-0" AFF FINISHED FLOOR

FIN SHOWER FLOOR

CL

6" 6" FIXED SHOWER HEAD

CL

2

CR LAURENCE CONCORD 037 SERIES 180 DEGREE GLASS-TO-GLASS HINGES, SATIN NICKEL FINISH, #SDH180SN

MIRRORS BY OWNERS, NIC

CL DRAIN

2

ROBE HOOK

PLASTERED SHAMPOO NICHE BEYOND:SLOPE SILL SLIGHTLY TO SHED WATER : CENTER NICHE IN PLAN ON SHOWER DRAIN

18 1/2"

NEW TOILET: SEE PLUMBING FIXTURE SCHEDULE

CUSTOM PTD WD VANITY W/ 3" SQ LEGS & 3/4" STONE COUNTERTOP W/ 1-1/2" SQUARE MITERED EDGE & MATCHING BACKSPLASH

4" OPEN BASE

16"

36"

6" 6"

+/-

6" 6"

2 13" TYP

6

1/2" = 1'-0" (1:24)

(3) TILES (2) TILES

FAUCET & UNDERMOUNT SINK: SEE PLUMBING FIXTURE SCHEDULE

NEW 5FT BATH TUB: SEE PLUMBING FIXTURE SCHEDULE

WASTE BASKET, NIC

EQ

8'-0" AFF FINISHED CEILING

TILED SHAMPOO NICHE: PROVIDE HEATH CERAMICS MODERN BASICS 2IN X 4IN SBN IN CHALK MATTE M18, BULLNOSED EGDES AROUND OPENING, NICHE IS 2 TILES BY 8 TILES

ROBE HOOKS

8"

8"

TUB FILLER : CENTER ON JOINT

+/-

PRESSURE BALANCE : CENTER ON JOINT

18 1/2"

DIVERTER : CENTER ON TILE

+/-

11 3/8"

OUTLET

36"

30"

EQ MATCHING STONE BACKSPLASH 8"

PTD WD BASE, TYP

7

51"

8 1/4"

TOILET: SEE PLUMBING FIXTURE SCHEDULE

4"

30" +/-

8 1/4" 24" TOWEL BAR, OFCI

CL WINDOW MUNTIN

5 3/4"

HAND SHOWER : CENTER ON JOINTS

45 3/8" +/-

2

4" OPENING

GLASS SHOWER DOOR: SEE DOOR SCHEDULE

2

RECESSED FLUSH GLAZING CHANNELS TOP & BOTTOM AT FIXED PANELS, TYP

2 2

RECESSED SHOWER TRACK W/ TROLLEYS

MIRROR, NIC FIXED SHOWER HEAD : CENTER ON JOINT

1/2" = 1'-0" (1:24) 1

EQ

14"

2

EAST ELEVATION - KID'S BATH

8

1/2" = 1'-0" (1:24) NEW CUSTOM FULL HEIGHT SHOWER CURTAIN, NIC

FAUCETS & UNDERMOUNT SINKS: SEE PLUMBING FIXTURE SCHEDULE

6" 6"

CL TUB

EAST ELEV - GUEST BATH SHOWER WALL

9

2

NEW TILED SHOWER WALL

EQ A

16"

1

(3) FULL TILES

15"

15"

3"

36"

A

48"

1/2" = 1'-0" (1:24)

8"

SOUTH ELEV - GUEST BATH SHOWER WALL

10

EX'G WIN TO REMAIN

EQ

1/2" = 1'-0" (1:24)

EQ

8"

WEST ELEV - GUEST BATH SHOWER WALL

EQ

EQ 6" 6"

11

1

A

FINISHED CEILING

EX'G WINDOW & FRAME TO REMAIN

1 11/16" F.O. GLASS TO EDGE OF EX'G WINDOW SILL TO REMAIN

2

FLUSH WHITE SCHLUTER EDGE

1

8'-3" AFF 2

CUT TILE (EQ)

1/2" = 1'-0" (1:24)

25 1/2"

REV-A-SHELF DOUBLE BOTTOM MOUNT PULL-OUT TRASH & RECYCLING BIN INSERT #5349-2150DM-217, 50 QT BINS

2

10" 0'-0" AFF

WASTE BASKET, NIC

PTD WD BASE, TYP TOILET PAPER HOLDER, OFCI

3

WEST ELEVATION - MASTER BATH 1/2" = 1'-0" (1:24)

2016 // PBA // AUTOCAD

2

SOUTH ELEVATION - MASTER BATH 1/2" = 1'-0" (1:24)

1

FINISHED FLOOR

4" OPEN BASE

CUSTOM STAINED WD VANITY W/ 3" SQ LEGS & 3/4" STONE COUNTERTOP W/ 1-1/2" SQUARE MITERED EDGE & MATCHING BACKSPLASH

CABINET PULLS FOR HANDTOWELS, OFCI 1 2

EAST ELEVATION - MASTER BATH 1/2" = 1'-0" (1:24)

6


project 1/5: end

2 1/4" MAX PER CODE

CLEAR SEALED CLEAR VERTICAL GRAIN OAK HANDRAIL TO MATCH HDWD FLOORING

EX'G

2X6

EX'G 2X6 ROOF RAFTERS

ROO

F RA

FTER

S

EX'G 2X4 CEILING JOISTS

EL. 18'-0" VIF

TYPE 1 HANDRAIL

1 3/4" MAX PER CODE

TYPE 1 HANDRAIL

EX'G 2X4 CEILING JOISTS

FINISHED CEILING 1" X 1/4" FIELD WELDED STL BAR ATTACHMENT BRACKET W/ STAGGERED COUNTERSUNK FASTENERS

CL

EQ EQ

RETURN GUARDRAIL TO WALL BEYOND

11" TREADS, TYP

STAIR LANDING

'G

NEW 3/4" HDWD TREADS & RISERS ON EX'G STAIR STRUCTURE TO REMAIN

2" RAKE

ST

RIN

MITER RETURN/ TERMINATE PTD WD BASE AT EDGE OF TOP RISER

G

ER

TO

RE

4 1/2" MAX PER CODE

1

HANDRAIL WIDTH VIF

M

AIN

CL

1

31 1/2" MIN PER CODE

1 1/2" GAP MIN PER CODE TYP

34"

NEW HDWD FLOOR FINISH

RETURN NEW GUARDRAIL TO WALL

STAIR LANDING

SHIM OUT FOR NEW RAKED RISERS

EX

NOTCH EX'G WD STRINGER TO FIT BASE PLATE OVER TOP

EX'G WINDOW TO REMAIN

MAINTAIN EX'G 8" RISER, TYP

5/8" Ø STL ROD, BLACKENED FINISH W/ MATTE CLEAR SEAL

NEW 3/4" HDWD TREAD FINISH TO MATCH HDWD FLOOR

1/16" TOLERANCE

4" TYP

EX'G 2X12 FLOOR JOISTS

WD SHIM

EX'G 2X12 FLOOR JOISTS 40 1/4" EX'G OPENING VIF

EX'G 2X4 CEILING JOISTS

EL. 8'-3" VIF

EX'G 2X4 CEILING JOISTS

FINISHED CEILING

PTD WD COLUMN ENCLOSURE W/ CROWN & BASE TRIM TO MATCH EX'G

T.O. RAIL

7'-7"

3/4"

EXISTING 2X14 WD STRINGER TO REMAIN

HALL NEW WD SHIM/ BLOCKING OUTBOUND OF STRINGER

5/8" PTD GWB

CUSTOM HDWD HANDRAIL: STEAM BEND FOR GRADUAL SWEEP TO BOTTOM COLUMNS

37 1/4"

NEW HDWD RISER DIES INTO CEILING

SU

ALIGN

1/2" PTD "Z" FRY REVEAL REGLET W/ TAPE & JOINT COMPOUND

FINISHED FLOOR

34" MIN PER CODE

PE BY RSED E SK -02 D

EL. 10'-0" VIF 1/4" WELDED STL BASE PLATE & BOLTS PER STRUCTURALS: MODIFY FINAL STRUCTURAL DETAIL TO FIT W/ ARCHITECT & ENGINEER

EQ

EQ

NEW 5/8" Ø BLACKENED STL ROD BALUSTERS W/ CLEAR MATTE POLANE SEALER & WELDED BASE PLATE, TYP: SEE DETAIL

3 A4.0 44"

PROVIDE CONCEALED STL TAB ATTACHMENT TO STRUCTURAL POST INSIDE ENCLOSURE AT BOTH RAILS/ SIDES

5/8" PTD GWB FINISH ON SIDES & UNDERSIDE

EX'G 2X14 WD STRINGERS TO REMAIN

DINING

T.O. TREAD

ENTRY 1 1/2" TO FACE OF GWB

PTD GWB ON 2X3 PARTITION ON UNDERSIDE OF STAIRS

EX'G 2X WD STRINGER TO REMAIN

1 1/2" STEP BACK FROM FACE OF GWB

NEW FLAT WD BLOCKING TO SUPPORT NEW GUARDRAIL BASE PLATE: SEE STRUCTURALS

22"

EL. 0'-0" VIF FINISHED FLOOR EX'G 2X10 FLOOR JOISTS

EX'G 2X10 FLOOR JOISTS EX'G 4X6 GIRDERS

EX'G PIER

EX'G PIER

EX'G 4X8 GIRDER

EX'G PIER

EX'G 4X8 GIRDER

WD BLOCKING PER STRUCTURALS

3

STAIR HANDRAIL - DETAIL

LONGITUDINAL SECTION THROUGH STAIRS

2

FULLSCALE (1:1)

1

3/4" = 1'-0" (1:16)

FINISH TILE ON THINSET (3/8" TILE SHOWN)

TRANSVERSE SECTION THROUGH STAIRS 3/4" = 1'-0" (1:16)

3/8" CLEAR TEMPERED GLASS SHOWER PARTITION

1/2" DUROCK CEMENT BOARD W/ DUROCK SCREWS & FIBERGLASS TAPED & SEALED JOINTS PATCH & REPAIR EX'G PTD STUCCO TO REMAIN

SEE PLAN FOR CLEAR DIMENSION BETWEEN F.O. FINISHED SHOWER WALL & INSIDE F.O. GLASS PARTITION (3'-0" CLEAR SHOWN)

MINIMUM LAP UP WALL OF SHOWER PAN LINER BEYOND / ON ALL SIDES WHERE OCCURS

NEW PTD WD CASING TO MATCH EX'G TRIM DETAIL

PTD WD STUCCO MOLDING BY MARVIN OR GC TO MATCH EX'G DETAILS: PROVIDE FLASHING CAP

CONT OATEY PVC OR SIM FOLDED MEMBRANE WATERPROOF PAN LINER SYSTEM: WRAP AROUND CURB FRAMING

GRAVEL AROUND DRAIN BODY WEEP HOLES WITHIN MORTAR BED FINISH TILE ON THINSET (3/8" TILE SHOWN)

B.O. FINISHED WIN. HEAD

EQ

EQ

FLUSH RECESSED 3/4" X 3/4" ST STL GLAZING CHANNEL

1-1/2" +/- THICK MORTAR BED

6'-8" AFF

4" CURB

EQ

SOLID WD BLOCKING BETWEEN STUDS

SLOPED PORTLAND CEMENT MORTAR BED ON MTL LATH ON 15 LB BUILDING PAPER ON PLYWD SUBFLOOR

1/4" PER FT CONT PTD WD FILLER STRIP AT HEAD & JAMBS: SET F.O. STRIP FLUSH W/ F.O. PRE-HUNG FRAME MARVIN PTD WOOD & PRE-HUNG WINDOW PER WINDOW SCHEDULE

FLEXIBLE SILICONE CAULK JT BETWEEN CEMENT BOARD & MORTAR BED, ALL SIDES & CURB

INSECT SCREEN DELETED FROM BID SCOPE 06 SEP 2016

4" MIN

CL

EQ

ABOVE T.O. CURB

2-PIECE CLAMPING SHOWER DRAIN BODY, THREADED DRAIN THROAT & STRAINER PER PLUMBING FIXTURE SCHEDULE

4 1/4" +/-

WD HEADER PER STRUCTURAL DWGS

SHT MTL HEAD FLASHING: LAP VAPOR RETARDER / HOUSE WRAP OVER FLASHING

6 MIL WATERPROOF MEMBRANE ON STUDS: LAP OVER PAN LINER

VARIES PER FIN. FLR.

PARTITION TYPE PER PLAN

HANDRAIL RETURNS TO EXTERIOR WALL

STAIR LANDING

31 1/2" MIN PER CODE HANDRAIL OPENING AT TOP OF STAIRS

CL

EQ

SUBFLOOR CONSTRUCTION

EQ

HANDRAIL RETURNS TO WALL

1

3 EXTERIOR

1

TYPICAL SHOWER DETAIL 3"=1'-0" (1:4)

INTERIOR CUSTOM HDWD HANDRAIL: STEAM BEND FOR GRADUAL SWEEP TO BOTTOM COLUMNS

NEW PTD WD STOOL & APRON TO MATCH EX'G TRIM DETAIL

PTD WD MARVIN 2" SIMULATED THICK SUBSILL W10340 W/ DRIP KERF & STUCCO KEY (SUPPLIED BY MFR)

EDGE OF STAIRS

EDGE OF TREADS BELOW, TYP

EDGE OF STAIRS

44"

SHIM TO FILL

40 1/4" EX'G STAIR OPENING

CL STAIRS EQ

EQ

F.O. STAIRS

MARVIN SILL PAN FLASHING PER MFR'S INSTALLATION DETAILS: LAP OVER EX'G BUILDING PAPER

CL

HANDRAIL MEETS AT CENTER LINE OF COLUMN ENCLOSURE, TYP

MAINTAIN OR REPAIR EX'G BUILDING PAPER WATERPROOFING EXISTING EXTERIOR WALL CONSTRUCTION TO REMAIN

2 A4.1

1/2" MIN (VERIFY)

NEW NON-LOAD BEARING WD POST FOR GUARDRAIL SUPPORT

F.O. ENCLOSURE

CONCEALED STL TAB ATTACHMENT TO STRUCTURAL POST INSIDE ENCLOSURE AT BOTH RAILS/ SIDES

8 1/2"

5/8" PTD GWB OR EX'G INTERIOR PLASTER

1 7/8" VIF

3/4" PTD WD TIGHT TO POST THIS CORNER

7 1/2"

32 3/4" CLEAR (NOTE: 31 1/2" CLR MIN PER CODE)

7 1/2"

COLUMN ENCLOSURES BELOW

37 1/4" HANDRAIL OPENING AT BOTTOM OF STAIRS

3/4" PTD WD COLUMN ENCLOSURE, TYP

1

4

NEW CASEMENT WINDOW SECTION DETAIL HALFSCALE (1:2)

2016 // PBA // AUTOCAD

2

COLUMN ENCLOSURE - DETAIL 1-1/2"=1'-0" (1:8)

1

PLAN DETAIL: STAIR HANDRAIL 3/4" = 1'-0" (1:16)

7


project 2/5: start

SCOPE OF WORK ONE-STORY ADDITION TO BACK OF ONE-STORY SINGLE FAMILY RESIDENCE & INTERIOR ALTERATIONS/REMODEL. NEW KITCHEN & BATH. NEW EXTERIOR WINDOWS & DOORS AT ADDITION. NEW LIGHTING & PLUMBING FIXTURES. NEW HVAC. NEW GARAGE ADDITION/REMODEL W/ NEW RECREATION ROOM, UNDER SEPARATE PERMIT.

VICINITY MAP

NORTH NOT TO SCALE

PROJECT SITE

118' OVERALL LOT DEPTH

10' PARKWAY ZONE

5' SIDE

EX'G 8" CMU WALLS (6 FT TALL +/-)

EX'G CONC PAD

A/C COMP RWL

SETBACK ZONE

YARD SETBACK

PROPERTY LINE

EX'G MAIN ELEC PANEL & METER

RWL

ROCK

M

EAVE OVERHANG, TYP.

RAISED PLANTERS, TYP

17.8" TREE

9.5" TREE

VEGETABLE GARDEN

47' BUILDING DEPTH

42'-3"

A

28'-9"

R

5'

G A

11" +/TREE

2'-2" EAVE EXISTING SINGLE FAMILY DWELLING PROJECTION 1,269 SF (RFA) TYP

ROCK

EX'G CONC ENTRY STEPS

10'-10 3/8"

NEW CONC SLAB PATIO TO MATCH EX'G DRIVEWAY PATTERN

EX'G STONE WALK

20' FRONT YARD SETBACK

EL. 0'-0" FIN. FLOOR

20'-2"

2'-2"

ROCK

1' EAVE OVERHANG

1

9'-10"

5' SIDE

S T

E E

EX'G 8 FT STL TUBE FRAMED DOUBLE GATE

EX'G CONC SLAB DRIVEWAY

EX'G JOINTED CONC SLAB DRIVEWAY

YARD SETBACK

8'-6" NEW GARAGE DOOR

33'-11"

EX'G JOINTED CONC SLAB DRIVEWAY

EX'G GAS METER EXISTING 2-CAR GARAGE 332 SF

GARAGE ADDITION 225 SF

EX'G WATER METER

R

ROCK

5'-10 3/8"

18'-2"

2'-8"

12'-3 5/8"

EX'G 6" CONC CURB

10.8" TREE

EX'G IRRIGATION VALVES

HB

EXT 1'-0"

E

EL. -1'-5" GRADE

RWL

SHADE SAIL MOUNTNG PLATE UNDER GARAGE GUTTER, FIELD LOCATE W/ ARCHITECT

T PROPERTY LINE

NEW ADDITION 230 SF (RFA)

NEW TENSIONED SHADE SAIL & COMPONENTS: SEE A5.1

OWNER'S SHED

17'-1 1/2"

NEW 8"Ø STL SUPPORT POLE BY TENSHON, GC TO FIELD PAINT

40'-2" BUILDING WIDTH

ROCK

15' REAR YARD SETBACK 55' OVERALL LOT WIDTH

SHADE SAIL MOUNTING PLATE BY TENSHON, BOTH SIDES: SEE A5.1

27'-2"

PROPERTY LINE

PUBLIC UTILITY EASEMENT

NEW CONCRETE POLE FOOTING, DESIGN BY TENSHON, GC-INSTALLED

T

OWNER'S SHED

PROPERTY LINE SAW CUT LINE AT EX'G DIAMOND PATTERN CONC. SLAB TO REMAIN

SITE PLAN 3/16" = 1'-0" (1:64)

2016 // PBA // RHINO, AUTOCAD, PHOTOSHOP

EX'G 6'-0" WALL

EX'G 6" STL TUBE POSTS

EX'G 6" CONC CURB

TRUE NORTH

8


project 2/5: continued

2

DEMO PARTITION INFILL AT EX'G ORIGINAL FRAMED OPENING

LIVING ROOM REMOVE EX'G CAPRET, PAD & TACK STRIPS DOWN TO EX'G HDWD FLOORS

REMOVE & PROTECT EX'G REFRIGERATOR TO BE REUSED: CONSULT OWNER FOR TEMPORARY RELOCATION DURING CONSTRUCTION

PROTECT EX'G FIREPLACE & HEARTH TO REMAIN

BEDROOM

DEMO EX'G PLYWD ENCLOSURE UNFINISHED SPACE

CLOSET

PROTECT EX'G CASEWORK TO REMAIN

MASTER BATH NO WORK

REMOVE EX'G WD DOOR & PROTECT FOR REUSE

HALL

REMOVE EX'G SKYLIGHT ABOVE

REMOVE EX'G WINDOW

DEMO EX'G TILE FLOOR FINISH & UNDERLAYMENTS DOWN TO SUBFLOOR

REMOVE EX'G PLASTER & LATH DOWN TO STUDS AT NEW BATH LOCATION

1

REMOVE EX'G WD & GLASS DOOR ONLY AND PROTECT FOR REUSE

1 A2.2

REMOVE EX'G TOILET DRAIN STACK & CAP BENEATH FLOOR IN CRAWLSPACE FOR POSSIBLE REUSE

BATH ROOM

EX'G ELEC PANEL TO BE REMOVED: GC TO ADVISE ON RELOCATION IF NECESSARY

OFFICE

DEMO EX'G SERVICE PORCH SLAB & STEP

MASTER CLOSET DEMO CONCRETE STEP & DOOR THRESHOLD CURB

PROTECT EX'G TANKLESS HW HEATER FOR POSSIBLE REUSE

PORCH EX'G TANK HW HEATER TO REMAIN DURING CONSTRUCTION TO SERVICE OWNER LIVING QUARTERS: GC TO ADVISE ON RELOCATION AND TEMPORARY RE-PLUMBING IF NEEDED

REMOVE EX'G EXTERIOR PLASTER, LATH & BLDG PAPER DOWN TO F.O. EX'G STUDS 2

REMOVE EX'G DOOR & PROTECT FOR REUSE AT GARAGE REC ROOM

DEMO EX'G CONCRETE SLAB

REMOVE EX'G CAPRET, PAD & TACK STRIPS DOWN TO EX'G PLYWD SUBFLOORS

1 EX'G CLEANOUT TO BE ABANDONED OR RELOCATED

DEMO CONCRETE STEP & DOOR THRESHOLD CURB MASTER BEDROOM

EX'G AREA DRAIN TO BE RELOCATED

DEMO EX'G STONE & CONCRETE PAVERS & SLAB UNDERLAYMENTS DOWN TO SOILS

PORCH

DEMOLISH EX'G TUBE STEEL FRAMED PORCH STRUCTURE & INFILL PARTITIONS

REMOVE EX'G WD & GLASS DOOR ONLY AND PROTECT FOR REUSE

1 A2.1 TRUE NORTH

1

EXISTING / DEMOLITION PLAN 3/8" = 1'-0" (1:32)

40'-2" 12'-8"

18'-0"

9'-6" EL. -0' -5" T.O. LANDING

EX'G 36" WIDE ENTRY DOOR

3 2 A4.1

CL DOOR

EL. -1' -6" GRADE

4

ROOF OVERHANG ABOVE, TYP

A4.1 1

EL. 0'-0" FIN. FLR.

A1

32"

45'-0"

D7

D4 9

5

3 1/2" 2 A2.2

REVISE OWNER'S EX'G RANGE EXHAUST HOOD ABOVE W/ FLASHED OPENING THRU-WALL & NEW SHT MTL VENT

18" JT

D5

A2

10 A4.1

6

EQ EQ

INFILL ABANDONDED WINDOW OPENING: PATCH STUCCO

36" GAS RANGE

JT

12"

A4.1

25"

25"

5"

HALL 2 RWL

33" R.O.

24" 4 1/8" 6 A4.2

2'-4"

15"

4'-11"

7 A4.2

06

SHOWER NO WORK

08 8

NEW PTD WD BASE CABINETS W/ 1 1/4 " THICK HONED SOAPSTONE COUNTERS W/ SQ EDGES, SEE ELEVS FOR DETAILS

5"

D2 BEDROOM 2 14'-0" x 11'-5"

15

1 2

4

3'-2"

A4.1

4'-8 1/2" 7 3/4"

C2

3'-5" R.O.

3'-0"

EL. -0'-1" T.O. LANDING

11"

11"

3'-0"

NEW CONCRETE LANDING & STEPS

NEW 4" CONCRETE SLAB ON GRADE ON VAPOR BARRIER ON 4" GRAVEL BASE

VIF (3R @ 6 5/8" = 19 7/8" 2T @ 11" = 22")

EL. -1'-9" GRADE

2"

3'-5" R.O.

2 A2.1

6"

3

NEW STRUCTURAL POST

4" TYP

1

3'-0"

PATIO

13'-0"

3 1/2"

2"

2

02

SLOPE 1/8" / FT

NEW WD POST: SEE STRUCTURAL DRAWINGS

3'-5" R.O.

CL FRONT DOOR

01

A2 MAIN ELECTRICAL PANEL & METER

SLOPE 1/8" / FT

1

3'-0"

4 1/2"

SLOPE 1/8" / FT

1'-6" 0" AFF FIN. FLR.

1'-6"

NEW RAINWATER LEADER CONNECTED TO EX'G AREAWAY SUBSURFACE DRAIN

B1

B1

B1

CL WALL

2

3

1'-6"

9'-9 5/8" VIF

MASTER BEDROOM 14'-4" x 12'-1"

A4.0

FRAME OPENING LOW ON WALL FOR A / V EXTENDED DEPTH NICHE: SEE ELEV.

PTD WD BUILT-IN WARDROBE

NEW RAINWATER LEADER FROM NEW GUTTER COLLECTION BOX ABOVE 1'-6"

2

4

7 3/4"

24" CLR

NEW HVAC CONDENSER IN EX'G LOCATION TO REMAIN

REVISE OWNER'S EX'G TANKLESS HEATER (UNDER SEPERATE PERMIT)

1 FAMILY ROOM 12'-2" x 15'-3"

80" HDTV

2

3

EX'G

2

NEW STRUCTURAL WD POSTS, TYP.

12'-2"

MASTER CLOSET NO WORK

EL. 0'-0" FIN. FLR.

13'-11 1/2" VIF

09

1

CL HALL

DW 25"

COAT & BAG HOOKS / CUBBIES 1

SHOWER

18"

NEW HDWD TO MATCH

35'-2 3/8" VIF

D5

4

5 A4.2

33" R.O.

8" EXG

2'-11"

21"

07

D3

EX'G HDWD

1

EDGE OF CURB

BATH 6'-0" x 8'-0"

R

KITCHEN 15'-5" x 15'-3"

15"

14

4" CURB

21"

6'-0"

21" LAUNDRY 6'-0" x 3'-5" VAC NIC

HDWD

30"

TILE

W/D

D1

5

F.O. WALL BOARD D5

05 HDWD

03

A1

CAB.

T

1

NEW HDWD THRESHOLD

HALL 1 C1

NEW 7 A4.1

TILE

2'-3"

PROVIDE LAYER OF 1/2" PLYWD OR STRAPPING BEHIND GWB AT REMAINDER OF KITCHEN WALL TO FLUSH OUT W/ STRUCTURAL SHEAR WALL PLYWD

ALCOVE 6'-3" x 5'-2" 32"

ALIGN

REMOVE EX'G DOOR STOPS EX'G

MASTER BATHROOM NO WORK 1

6 1/4" 1'-9"

ALIGN BOTH SIDES

LINEN CAB.

D6 1 1/2"

32" CLR

13

8'-0"

CLOSET NO WORK

D6

42" BUILT-IN REF/FRZ

EX'G HDWD FLOOR DIRECTION, TYP

3'-6"

1 BEDROOM 1 NO WORK

04

PANTRY

5'-5"

DOOR

GLASS

FIELD LOCATE FLOOR MTD DOOR STOP

RWL

8 A4.2

24"

9" 2'-8"

3'-0"

ALIGN

11"

D1 EX'G PTD BRICK FIREPLACE & TILE HEARTH EXTENSION TO REMAIN

3-1/2" MIN TO GLASS

GAS METER

8"

12

ENTRY / DINING 12'-1" x 17'-1"

NEW TENSIONED SHADE SAIL ABOVE

27'-2" TRUE NORTH

1

2016 // PBA // AUTOCAD

FLOOR PLAN 3/8" = 1'-0" (1:32)

9


project 2/5: continued

EX'G CHIMNEY CHIMNEY CAP TO REMAIN

RWL

EX'G SLOPE

EX'G VENT TO REMAIN

EX'G SLOPE

EX'G GUTTER TO REMAIN, TYP.

EXISTING FOOTPRINT OF HOUSE BELOW, TYP.

EX'G SLOPE

EX'G SLOPE

26" ROOF EAVE TYP.

EX'G GUTTER TO REMAIN, TYP.

EX'G ATTIC VENT TO REMAIN

EX'G 4:12 (VIF) SLOPE TO REMAIN

EX'G ANTENNA TO REMAIN

EX'G SKYLIGHT TO BE REMOVED: SALVAGE FOR REUSE

RWL

SLOPE

EX'G CUPOLA TO BE DEMOLISHED

EX'G EYEBROW ATTIC VENTS TO REMAIN

EX'G 4:12 (VIF) SLOPE TO REMAIN

EX'G SATELLITE DISH TO REMAIN

EX'G PORCH TO BE DEMOLISHED

EX'G SLOPE

EX'G ELEC. SERVICE MAST TO REMAIN

SLOPE

TRUE NORTH

1

EXISTING / DEMOLITION ROOF PLAN 3/8" = 1'-0" (1:32)

GUTTER EX'G GUTTER TO REMAIN, TYP.

26" ROOF EAVE TYP.

EXISTING FOOTPRINT OF HOUSE BELOW, TYP.

GUTTER

EX'G SLOPE

GUTTER

EX'G SLOPE

EX'G CHIMNEY CHIMNEY CAP TO REMAIN

RWL

GUTTER

NEW PTD SHT MTL GUTTER TO MATCH EX'G

EX'G SLOPE

EX'G VENT TO REMAIN EX'G SLOPE

EX'G GUTTER TO REMAIN, TYP.

PATCH ROOF AT REMOVED SKYLIGHT

NEW GALV SHT MTL LOW-PROFILE VENT FOR KITCHEN RANGE EXHAUST: FLASH & PATCH INTO ROOF

1 NEW FLASHED WHOLE HOUSE VENTILATION FAN TERMINATION: FIELD LOCATE W/ OWNER & ARCHITECT

NEW OR REUSE EX'G OPENING FOR NEW ATTIC FAN

EX'G 4:12 (VIF) SLOPE TO REMAIN

EX'G ANTENNA TO REMAIN

EDGE OF EX'G ROOF AND EAVE TO REMAIN

22'-3 1/8" VIF

OVERLAP PER MFR

MIN SLOPE 1:12

RWL

NEW RAINWATER LEADER TO MATCH EXISTING

RWL

EX'G EYEBROW ATTIC VENTS TO REMAIN

MATCH EX'G SLOPE

EX'G 4:12 (VIF) SLOPE TO REMAIN

MATCH EX'G SLOPE

GUTTER

13'-0 3/4" VIF

GUTTER

NEW SEALED ASPHALT ROLL ROOFING, COLOR & TEXTURE TO MATCH MAIN ROOF ASPHALT SHINGLES

13'-0 3/4" VIF

EX'G SATELLITE DISH TO REMAIN

EX'G SLOPE

GUTTER

TURN DOWN ASPHALT ROLL ROOFING OVER EXPOSED FASCIA & FLASH INTO NEW SHT MTL COLLECTION BOX

EX'G ELEC. SERVICE MAST TO REMAIN

NEW CUSTOM SMOOTH GALVANIZED SHT MTL GUTTER / COLLECTION BOX W/ INTEGRAL CONDUCTOR HEAD FLASHED INTO EX'G & NEW ROOF

TRUE NORTH

1

2016 // PBA // AUTOCAD

NEW ROOF PLAN

GUTTER

3/8" = 1'-0" (1:32)

10


project 2/5: continued CL F.O. EAVE FASCIA

NEW STRUCTURAL POST IN FAMILY ROOM: SEE PLAN

TURNED DOWN ASPHALT ROOFING AT FASCIA ABOVE GUTTER

EL. 15'-4" VIF

F.O. EAVE FASCIA

EQ A

T.O. CHIMNEY

A MATCH EX'G PITCH

EL. 13'-2" VIF

NEW GABLE DORMER CALIFORNIA FRAMED BACK TO EX'G HIPPED ROOF BEYOND

12 4

NEW PTD WD TRIM BAND TO ALIGN WITH & MATCH EX'G TRIM UNDER EAVES, TYP

8" PTD WD RAKE

NEW CRICKET BEYOND: SEE BUILDING SECTION

T.O. HIGH ROOF EL. 12'-5 1/2" VIF T.O. NEW GABLE EL. 11'-0" VIF T.O. LOW ROOF

NEW TENSIONED SHADE SAIL: FIELD LOCATE ATTACHMENT POINTS W/ ARCHITECT

1

MATCH EX'G EAVE FASCIA HEIGHT, TYP

NEW PTD WD CUSTOM WINDOWS TO MATCH EX'G, CUSTOM 3-UNIT FRAME TO INCLUDE REUSED EX'G DOOR

NEW PTD GALV SHT MTL GUTTER TO MATCH EX'G

EL. 7'-4" VIF

6"

B.O. EAVES

EQ NEW PTD WD EGRESS WINDOW

RELOCATED / REUSED EX'G PTD WD & GLASS DOOR

EX'G EAVE) 1

F.O. EXTERIOR WALL 5'-0"

8"

NEW SUBSURFACE DRAINAGE PIPE TO CONNECT TO EX'G AREA DRAIN LINE IN DRIVEWAY

NEW PTD GALV SHT MTL RAINWATER LEADER TO MATCH EX'G: CONNECT TO EX'G AREAWAY SUBSURFACE DRAIN

26" (MATCH

13"

ALIGN TYP

TYP

RECESSED STEP LIGHT: CENTER IN SIDING BOARD

NEW EAVE EXTENSION W/ PTD WD TRIM & PTD WD BOARD SOFFIT TO MATCH EX'G DETAILS, TYP

F.O. TRIM BAND

ALIGN TYP

NEW 4" DIA. SMOOTH GALVANIZED SHT MTL RAINWATER LEADER

EXTERIOR WALL MTD SCONCE: SEE LIGHTING FIXTURE SCHEDULE NEW PAINTED WESTERN RED CEDAR CLAPBOARD SIDING TO MATCH EX'G FRONT FACADE WAINSCOT CLAPBOARDS & COURSING, TYP

8" EXPOSURE, TYP

1

17"

EX'G STUCCO, WINDOW & TRIMS TO BE REPAINTED

NEW CUSTOM SMOOTH GALVANIZED SHT MTL GUTTER . COLLECTION BOX W/ INTEGRAL CONDUCTOR HEAD FLASHED INTO EX'G & NEW ROOFS

10"

10"

TENSHON "STRAIGHT MOUNT" STL MOUNTING PLATE BOTH SIDES: GC TO FIELD PAINT PLATE TO MATCH FASCIA

VIF

F.O. TRIM BAND

EQ

NEW POURED CONCRETE PLINTH W/ LANDINGS, STEPS & INTEGRAL PLANTERS

EL. 0'-0" VIF FINISHED FLOOR

EXPOSED CONC STEM WALL EL. - 1'-9" VIF GRADE AT SE CORNER

2

CUSTOM BEVELED OAK SILL ACROSS DOOR & FULL HEIGHT WINDOWS

1

SOUTH EXTERIOR ELEVATION - PROPOSED 1/2" = 1'-0" (1:24) EX'G CHIMNEY BEYOND TO REMAIN EX'G SATELLITE DISH TO REMAIN, TYP

EX'G EYEBROW ATTIC VENTS BEYOND TO REMAIN EL. 13'-2" VIF

EX'G ELECTRICAL SERVICE MAST TO REMAIN, TYP

T.O. HIGH ROOF

EL. 11'-0" VIF 12

EX'G PTD MTL GUTTER TO REMAIN, TYP

T.O. LOW ROOF

4 EX'G CUPOLA TO BE DEMOLISHED

12

EL. 7'-4" VIF

2

B.O. EAVES

EX'G SITE WALL TO REMAIN EX'G EXTERIOR SCONCES TO BE REMOVED

EX'G TELEPHONE BOX TO REMAIN

EX'G STUCCO TO BE REPAINTED TYP

B.O. EX'G PORCH BEAM

EX'G STEEL TUBE COLUMNS, BEAMS & WD FRAMED PORCH OVERHANG TO BE REMOVED

EX'G DOOR & SIDELIGHTS TO BE REMOVED: DOOR TO BE SLVAGED & REUSED

EX'G HVAC CONDENSER BEYOND TO REMAIN

EL. 5'-11" VIF

EX'G TANKLESS HOT WATER HEATER TO BE REUSED / RELOCATED (GC TO ADVISE)

EX'G CASEMENT WINDOW TO BE REMOVED

EX'G CRAWLSPACE VENT TO BE ABANDONDED

EX'G SERVICE PORCH DOOR TO BE REUSED EL. 0'-0" VIF

EX'G CONC SLAB TO BE DEMOLISHED

FINISHED FLOOR

EL. - 1'-9" VIF GRADE AT SE CORNER EX'G VENT TO BE REMOVED

EX'G CONCRETE STEPS AT DOORS TO BE REMOVED, TYP

1

SOUTH EXTERIOR ELEVATION - EXISTING 1/2" = 1'-0" (1:24)

12" ROOF EAVE

VENT

RWL EX'G SLOPE

12" ROOF EAVE

12" ROOF EAVE

EX'G ASPHALT SHINGLE ROOF TO REMAIN

NEW CLASS A OR B ROOF SHINGLES

GUTTER 1/2"/FT SLOPE

EX'G SLOPE

EX'G SLOPE

PROPERTY LINE

EX'G GUTTER TO REM

EX'G SLOPE

EX'G FOOTPRINT OF GARAGE

PROPERTY LINE

8" ROOF RAKE

4"

NORTH

ROOF PLAN

3

1/4" = 1'-0" (1:48)

12 4

RELOCATED EX'G SERVICE PORCH DOOR: REUSE EX'G WINDOW HEAD IF FEASIBLE

1

15" 15"

B

1

A 1'-0" EAVE

C

STORAGE NEW PTD WD STUCCO MOLD TRIM TO MATCH EX'G

18'-2"

NEW SEGMENTED INSULATED PAINTED PLAIN METAL OVERHEAD GARAGE DOOR W/ (4) TEMPERED GLASS VISION PANELS. REUSE OWNER'S EX'G MOTORIZED OPENER, TRACKS & HARDWARE AS FEASIBLE.

24"

TENSHON "STRAIGHT MOUNT" STL MOUNTING PLATE FOR SHADE SAIL, FIELD LOCATE W/ ARCHITECT: GC TO FIELD PAINT

NEW 4X4 WD POST

A

EX'G TOILET ROOM 101 (18 SF)

1

A

D

NEW 8'-6"W X 7'-0"H ROLL-UP GARAGE DOOR OPENING

C

PATCH & REPAIR EX'G OPENING ON BOTH SIDES B

NEW 24" DOOR

8'-0"

11 RECREATION ROOM 102 (170 SF UNCONDITIONED)

LL TA GS KIN AR T P "D AC 15'-0 MP CO "W X 6 7'EX'G SLAB JOINT

NEW TANDEM 2-CAR GARAGE 100 (384 SF UNCONDITIONED)

LL

G KIN AR D P 0"D AR ND 18'STA "W X 6 8'-

33'-0" CLR

STA

9'-0" CLR

EX'G PITCH

1 A3.3 10

NEW 4X4 WD POST B PATCH & REPAIR STUCCO TO MATCH EX'G AT WALL INFILL

1

NORTH ELEVATION - GARAGE 3/4" = 1'-0" (1:16)

2016 // PBA // AUTOCAD

33'-11"

1

FLOOR PLAN

X NORTH

1/4" = 1'-0" (1:48)

11


project 2/5: end

ASSSUMED ROOF CONSTRUCTION: 1" ASPHALT SHINGLE BUILDUP ON ROOFING FELT ON 1/2" PLYWOOD ON EX'G ORIGINAL SKIP SHEATHING (3/4" ASSUMED) ON 2X6 RAFTERS

F.O. EAVE FASCIA

CL NEW STRUCTURAL POST IN FAMILY ROOM: SEE PLAN

NEW WD RIDGE BEAM OVER FAMILY ROOM ADDITION REFER TO STRUCTURAL DRAWINGS

A

A

EX'G 2X6 WD HIP RAFTERS AND CEILING JOISTS

1" ASPHALT SHINGLE ROOFING ON (2) LAYERS 30LB ROOFING FELT ON 5/8" EXTERNAL GRADE PLYWD SHEATHING ON 2x10 WD RAFTER FRAMING PER STRUCTURAL DRAWINGS

MATCH EX'G PITCH 12 4

NEW R-30 FIBERGLASS BATT INSULATION

EL. 11'-3" VIF FINISHED HIGH CEILING

EX'G FIBERGLASS BATT INSULATION TO REMAIN

NEW FRAMED CRICKET COT / COPED END OF BEAM PER EX'G ROOF RAFTER ANGLE: SEE STRUCTURAL FOR COPING REQUIREMENTS

1X4 PTD WD BOARD FINISH ON SLOPED CEILING & VERTICAL WALL ABOVE OPEN CASEWORK

B.O. JOIST

5/8" GWB CEILING FINISH

NEW WD CEILING BEAM REFER TO STRUCTURAL DRAWINGS FOR DETAILS

NEW CEILING JOISTS REFER TO STRUCTURAL DRAWINGS

NEW EXTERIOR INFILL WALL FRAMING IN EX'G WALL LOCATION TO REMAIN

NEW WD CEILING BEAM BEYOND REFER TO STRUCTURAL DRAWINGS 5/8" GWB FINISH

NEW R-13 FIBERGLASS BATT INSULATION

9'-1" EX'G, VIF

8'-3 3/4"

NEW R-30 FIBERGLASS BATT INSULATION

11'-3" FIN FLR TO FIN HP OF FAMILY ROOM CEILING

REMOVE EX'G EAVE CONSTR. BACK TO LINE OF STRUCTURE

EL. 8'-3" VIF T.0. EX'G DBL TOP PLATE

NEW ACOUSTIC INSULATION

5/8" GWB FINISH ON INT. SIDE

SEE 1/A4.0 FOR CASEWORK LAYOUT

NEW 3/4" HDWD FINISH ON SUBFLOOR

T.O. 3/4" DIAGONAL BOARD SUBFLOOR EL. 0'-0" VIF FINISHED FLOOR

18" MIN PER STRUCTURAL DRAWINGS

EL. - 0'-5" EX'G INSULATION TO REMAIN

NEW FLOOR JOIST & GIRDERS: SEE STRUCTURAL DRAWINGS

T.O. LANDING

NEW R-19 FIBERGLASS BATT INSULATION

EL. - 1'-9" VIF GRADE

UNDISTURBED SOIL

EX'G CONC. FOOTING TO REMAIN

1

NEW GIRDER POST FOOTING BEYOND, TYP: SEE STRUCTURAL DRAWINGS

CLASS 1 VAPOR RETARDER OVER SOILS, PER CRC R408.1: SEE 2/A2.2 FOR CRAWLSPACE VENT LOCATION

COMPACTED SOIL

LIQUID APPLIED WATERPROOFING MEMBRANE

NEW CONC. FOOTING REFER TO STRUCTURAL DRAWINGS

NEW PERFORATED 4" PIPE IN DRAINAGE GRAVEL W/ FILTER FABRIC WRAP

NEW SOLID RAINWATER DRAIN: CONNECT TO EX'G AREAWAY DRAIN

TRANSVERSE BUILDING SECTION THROUGH ADDITION 3/4" = 1'-0" (1:16)

ASPHALT SHINGLE ROOFING ON (2) LAYERS 30LB ROOFING FELT ON 5/8" EXTERNAL GRADE PLYWD SHEATHING ON 2x10 WD RAFTER FRAMING PER STRUCTURAL DRAWINGS

PTD CEDAR CLAPBOARDS TO MATCH EX'G ON VAPOR RETARDER ON 1/2" EXTERIOR GRADE PLYWD SHEATHING ON 2X4 WD FRAMING

NEW 4x12 RIDGE BEAM: SEE STRUCTURAL DRAWINGS

NEW R-30 BATT INSULATION

NEW 2x12 RIDGE BOARD: SEE STRUCTURAL DRAWINGS

NEW DBL ROOF RAFTER BEYOND PER STRUCTURAL DRAWING

MATCH EX'G PITCH

CALIFORNIA ROOF FRAMING: SEE STRUCTURAL DRAWINGS

EX'G ROOFING BUILDUP ON PLYWD SHEATHING ON ORIGINAL SKIP SHEATHING ON EX'G RAFTERS

12 4

EX'G ATTIC TO REMAIN

EL. 11'-3" VIF

SLOPED CLNG

FINISHED HIGH CEILING

EX'G 2x6 WD HIP RAFTERS AND CEILING JOISTS W/ EX'G FIBERGLASS BATT INSULATION TO REMAIN

5/8" GWB FINISH ON INT. SIDE

NEW HVAC AHU IN EX'G LOCATION TBD

EL. 8'-2 3/8" VIF FINISHED LOW CEILING

NEW GUTTER & RAINWATER LEADER BEYOND FULL HEIGHT POST: SEE STRUCTURAL DRAWINGS

11'-3" FIN FLR TO FIN HP OF FAMILY ROOM CEILING

1X4 PTD WD BOARD FINISH ON SLOPED CEILING & HIGH WALL ABOVE CROWN

R-13 FIBERGLASS BATT INSULATION IN EXT. WALLS, TYP

NEW CEILING BEAM: SEE STRUCTURAL DRAWINGS FOR DETAILS

NEW CEILING BEAM & KING POST: SEE STRUCTURAL DRAWINGS

NEW NON-LOAD BEARING PARTITION: SEE PART. KITCHEN SCHEDULE 4x4 HEADER PER STRUCTURAL DRAWINGS

SEE 4/A4.0 FOR CASEWORK LAYOUT

NEW HDWD FLR FINISH ON 3/4" PLYWD SUBFLOOR ON 2X? JOISTS TBD

NEW CONC. LANDING & STAIRS ON WATERPROOF MEMBRANE ON 4" GRAVEL BED NEW HDWD FLR FINISH ON EX'G 2X6 FLOOR FRAMING TO REMAIN EL. 0'-0" VIF FINISHED FLOOR

NEW FLOOR JOIST & GIRDERS: SEE STRUCTURAL DRAWINGS

18" MIN PER STRUCTURAL DRAWINGS

EL. - 0'-5"

NEW R-19 FIBERGLASS BATT INSULATION

NEW R-19 FIBERGLASS BATT INSULATION IN EX'G JOIST BAYS TO REMAIN

T.O. LANDING NEW DBL FLOOR JOIST: SEE STRUCTURAL DRAWINGS

EL. - 1'-10" VIF GRADE

UNDISTURBED SOIL

LIQUID APPLIED WATERPROOFING MEMBRANE

1

COMPACTED SOIL

NEW SOLID RAINWATER DRAIN: CONNECT TO EX'G AREAWAY DRAIN

NEW PERFORATED 4" PIPE IN DRAINAGE GRAVEL W/ FILTER FABRIC WRAP

NEW CONC. FOOTING REFER TO STRUCTURAL DRAWINGS

NEW GIRDER POST FOOTING BEYOND, TYP: SEE STRUCTURAL DRAWINGS

CLASS 1 VAPOR RETARDER OVER SOILS, PER CRC R408.1: SEE 2/A2.2 FOR CRAWLSPACE VENT LOCATION

EX'G CONC. FOOTING TO REMAIN

NEW PAD POST FOOTING BEYOND: SEE STRUCTURAL DRAWINGS

EX'G GIRDER POST FOOTING BEYOND TO REMAIN

LONGITUDINAL BUILDING SECTION THROUGH ADDITION 3/4" = 1'-0" (1:16)

2016 // PBA // AUTOCAD

12


project 3/5: start

SCOPE OF WORK INTERIOR REMODEL OF EXISTING KITCHEN, POWDER ROOM & FAMILY ROOM. NEW HPOZ-APPROVED EXTERIOR DOORS & WINDOWS, NEW EXTERIOR CONCRETE LANDINGS & STEPS, NEW EXTERIOR PAINT SCHEME, NEW ELECTRICAL & PLUMBING.

VICINITY MAP

BLV

D.

VIC

TOR

IA P

ARK

PL.

ITA S

HA

MR

T.

VEN

BLV

D.

D

OA

OA

IA R

BLV CRE

NSH

AW

WES

T BLV

WE

D.

LLIN

GTO

VIR

NR

GIN

BU

CK

D

ING

ICE

D.

LOM

OA

D

S.

VIC

PL.

RIA

ICE

16TH

TO

VEN

W.

AVE .

WE

ST BLV D.

W. PICO BLV D.

LAFAYETTE SQUARE NOT TO SCALE

2016 // PBA // AUTOCAD, PHOTO SHOP

ST.

CH

ARL

ES

PL.

NORTH

PROJECT SITE

13


project 3/5: continued

2016 // PBA // AUTOCAD

14


project 3/5: continued

2016 // PBA // AUTOCAD

15


project 3/5: continued

2016 // PBA //AUTOCAD

16


project 3/5: end

2016 // PBA // AUTOCAD, PHOTO SHOP

17


project 4/5 start

SCOPE OF WORK NEW TENANT IMPROVEMENT TO EXISTING ONE-STORY U.R.M. BUILDING. REMOVE PORTION OF EXISTING DEMISING WALL. NEW ACCESSORY STORAGE ROOMS ("PHONE BOOTHS") & REMODEL EX'G BREAK ROOM.

VICINITY MAP

VIOLET ST

LOS AN

S. SANTA FE AVE

GELES RIVER

MATEO ST

BAY ST

SACRAMENTO ST

E. 8TH ST

I-10

NTA

/ SA

AY

EEW

A FR

NIC

MO

NORTH NOT TO SCALE

16.91'

PROPERTY LINE

170.80'

30.13'

2153 & 2159 SACRAMENTO

'

123.0'

2149 SACRAMENTO

AREA OF WORK

EXISTING / NOT IN SCOPE

NE ERTY LI PROP

139.97'

2145 SACRAMENTO

142.67

PROPERTY LINE

92.33'

' 107.58

ADJACENT PROPERTY

PROJECT SITE

ADJACENT PROPERTY

89.75'

PROPERTY LINE

195.52'

SACRAMENTO

2016 // PBA // AUTOCAD

NORTH

STREET

SCALE: 1/16" = 1'-0" (1:192)

18


project 4/5: continued OCCUPANT LOAD CALCULATION

EGRESS COMPONENT ANALYSIS EXIT STAIRS

SEE FLOOR PLAN A1.1 FOR ROOM LAYOUT & LOCATIONS. LOAD FACTORS BELOW PER CBC TABLE 1004.12. ROOM NO.

ROOM NAME

AREA

100

WAREHOUSE

5,497 SF

OCCUPANCY GROUP

FUNCTION OF SPACE

OCCUPANT LOAD FACTOR

OCCUPANT LOAD 10.99

110 OCCUPANTS X 0.3 MEANS OF EGRESS CAPACITY FACTOR (STAIRWAY) = 33.0" TOTAL REQUIRED EGRESS CAPACITY FOR EXIT STAIRS 33.0" DIVIDED BY (2) EXIT STAIRS = 16.5" REQUIRED CAPACITY PER STAIR

S-2

LOW-HAZARD STORAGE

WAREHOUSE

500 GROSS

EXISTING STAIRS ARE 48" WIDE ----> COMPLIES

101

LIGHT MANUFACTURING

4,904 SF

F-1

MODERATE-HAZARD FACTORY INDUSTRIAL

INDUSTRIAL AREA

100 GROSS

49.04

102

BREAK ROOM

748 SF*

B

BUSINESS

ASSEMBLY WITHOUT FIXED SEATS (UNCONCENTRATED)

15 NET

49.87*

103

PHONE BOOTH

27 SF

B

BUSINESS

ACCESSORY STORAGE AREA

300 GROSS

0.09

104

PHONE BOOTH

27 SF

B

BUSINESS

ACCESSORY STORAGE AREA

300 GROSS

0.09

TOTAL OCCUPANT LOAD

110.08 ----> 110

EXIT DOORS 110 OCCUPANTS X 0.2 MEANS OF EGRESS CAPACITY FACTOR (OTHER) = 22.0" TOTAL REQUIRED EGRESS CAPACITY FOR EXIT DOORS 22.0" DIVIDED BY (2) EXITS = 11.0" REQUIRED CAPACITY PER DOOR EXISTING DOORS ARE 36" WIDE X 84" HIGH ----> COMPLIES

EGRESS DIAGRAM

*BREAK ROOM CONSIDERED B (BUSINESS) OCCUPANCY PER CBC 303.1.2.2.

PROPERTY LINE

BREAK ROOM (B BUSINESS) 49.87 OCCUPANTS

15 "D

-5 ISTAN D LF HA

1'

L NA 1/2" GO '-8 IA E: 75

135 FT

128 FT

80'-2" EXIT

EX'G CREATIVE OFFICE NOT IN SCOPE OF WORK (B BUSINESS)

120 FT

LIGHT MANUFACTURING (F-1 MODERATE-HAZARD FACTORY INDUSTRIAL) 49.04 OCCUPANTS

WAREHOUSE (S-2 STORAGE) 10.99 OCCUPANTS

103 OCCUPANTS PER PERMIT # 15016-10000-12440

LINE ERTY PROP

PROPERTY LINE

C

EX'G DOOR TO REMAIN

ACCESSIBLE ROUTE 80 FT

SEPARATION

EX'G DOOR TO REMAIN

EX'G ADA WHEELCHAIR LIFT

EXISTING USE DIAGRAM PROPERTY LINE

PROPERTY LINE

WAREHOUSE PER

LIGHT MANUF. PER

CREATIVE OFFICE PER

1923LA51306

15016-1000014509

15016-10000-12440

LIGHT MANUF. PER THIS APPLICATION

PROPERTY LINE

EX'G 3'-0" X 7'-0" EXIT DOOR TO REMAIN

USE DIAGRAM PER THIS APPLICATION

S A C R A M E N T O

EX'G 3'-0" X 7'-0" EXIT DOOR TO REMAIN

EX'G 3'-6" X 9'-3" EXIT DOOR TO REMAIN

PHONE BOOTH (B BUSINESS) 0.09 OCCUPANT EA.

S T R E E T

1/16" = 1'-0" SCALE (1:192)

PARKING ANALYSIS

PROPERTY LINE 45'-0"

(NO CHANGE)

45'-0"

USE

RATIO (SPACES / SF)

AREA

A

WAREHOUSE (EX'G)

1 PER 500 (FIRST 10,000 SF)

5,497 SF

10.99

B

LIGHT MANUF (EX'G)

1 PER 500

5,349 SF

10.70

C

CREATIVE OFFICE (EX'G)

1 PER 500

10,618 SF

A

WAREHOUSE (NO CHANGE)

1 PER 500 (FIRST 10,000 SF)

TOTAL REQUIRED SPACES (EX'G)

PROPERTY LINE

105'-9 1/4"

44'-9"

105'-9 1/4"

44'-9"

1/32" = 1'-0" SCALE (1:384)

REQUIRED SPACES

TENANT

5,497 SF

B

LIGHT MANUF (NO CHANGE)

1 PER 500

5,349 SF

C

CREATIVE OFFICE (NO CHANGE)

1 PER 500

10,618 SF

TOTAL REQUIRED SPACES (NEW)

1/32" = 1'-0" SCALE (1:384)

REQUIRED PARKING = (TOTAL NEW) - (TOTAL EX'G)

REQUIRED MINIMUM PLUMBING FACILITIES

PROPERTY LINE

21.24 PROPERTY LINE

EX'G

15016-10000-12440

THIS APPLICATION

123'-0"

123'-0"

PROPERTY LINE

16016-1000019127 (NO CHANGE)

CREATIVE OFFICE PER

42.93 ---> 43 10.99

TENANT A

TENANT B

TENANT C

5,497 SF

5,349 SF

10,618 SF

TY LINE PROPER

16016-1000019127 (NO CHANGE)

E ERTY LIN PROP

E ERTY LIN PROP

PROPERTY LINE

RATIOS PER LA ZONING CODE SECTION 12.21A.4.(C)

WAREHOUSE PER THIS APPLICATION

10.70 21.24 42.93 ---> 43

PROPERTY LINE

0

(A) EXISTING BUILDING

TYPE OF ROOM ROOM NAME OCCUPANCY NO.

AREA

E01

EX'G CREATIVE OFFICE

6,069 SF

E02

EX'G OFFICE

E03

EX'G CONFERENCE ROOM

E04

GROUP B OFFICE

200

30.35

95 SF

GROUP B OFFICE

200

0.48

211 SF

GROUP A-2 CONF. ROOM

30

7.03

EX'G CONFERENCE ROOM SUITE

393 SF

GROUP A-2 CONF. ROOM

30

13.10

E05

EX'G BREAK ROOM

748 SF

GROUP B OFFICE

200

3.74

E06

EX'G CONFERENCE ROOM

836 SF

GROUP A-2 CONF. ROOM

30

TOTAL B-BUSINESS PLUMBING OCCUPANTS F-1 INDUSTRIAL

E07

EX'G LIGHT MANUFACTURING

4,904 SF

GROUP F WORKSHOP

2000

S-2 STORAGE

E08

EX'G WAREHOUSE

5,221 SF

GROUP S WAREHOUSE

5000

(B) EXISTING BUILDING + NEW ALTERATION

B BUSINESS

EX'G CREATIVE OFFICE

E02

EX'G OFFICE

6,069 SF

GROUP B OFFICE

200

30.35

95 SF

GROUP B OFFICE

200

0.48

EX'G CONFERENCE ROOM

211 SF

GROUP A-2 CONF. ROOM

30

7.03

393 SF

GROUP A-2 CONF. ROOM

30

13.10

E06

EX'G CONFERENCE ROOM

836 SF

GROUP A-2 CONF. ROOM

30

28.77

102

BREAK ROOM

748 SF

GROUP B OFFICE

200

S-2 STORAGE

100

5,289 SF

EX'G SERVER ROOM EXCLUDED

EX'G BREAK ROOM E05

1

3

1

1

1

NONE

EX'G CONF ROOM E06

ENTRY EXCLUDED

1 EX'G WAREHOUSE E08

GROUP F WORKSHOP

2000

GROUP S WAREHOUSE

5000

1

1

NONE

1

1

1

1

1

1

NONE

1

1

1

1

EX'G LIGHT MANUFACTURING E07

EX'G CREATIVE OFFICE E01

EX'G HALLWAYS EXLCUDED

EX'G CONF ROOM E03

EX'G ENTRY STAIR & HALLWAYS EXCLUDED

EX'G OFFICE E02

EX'G TOILET ROOMS EXCLUDED

3

5

1

3

3

2

3

EX'G CONF ROOM SUITE E04

STAIR & ELECTRICAL ROOM EXCLUDED

EX'G LOCKER/SHOWER ROOMS & STAIR EXCLUDED

1/16" = 1'-0" SCALE (1:192)

(B) EXISTING BUILDING + NEW ALTERATION 1

3

1

1

1

NONE

1 EX'G SERVER ROOM EXCLUDED

83.47 --> 84 42 MALE 42 FEMALE 2.45 --> 3 1.5 MALE 1.5 FEMALE 1.06 --> 2 1 MALE 1 FEMALE

EX'G CONF ROOM E06

1

1

NONE

1

1

1

ENTRY EXCLUDED

1 BREAK RM 102

1

NONE

1

1

1

1

3

5

1

3

3

2

3

(B) MINUS (A) = ADDITIONAL REQUIRED FIXTURES

0

0

0

0

0

0

0

TOTAL REQUIRED

3

5

1

3

3

2

3

PROVIDED

3

8

5

3

3

2

0

EX'G HALLWAYS EXLCUDED

WAREHOUSE 100

EX'G CREATIVE OFFICE E01

LINE ERTY PROP

1

(B) EXISTING BUILDING + NEW ALTERATION REQUIRED FIXTURES

WAREHOUSE

44'-9"

SERVICE SINK

3.74

TOTAL B-BUSINESS PLUMBING OCCUPANTS

4,904 SF

47'-8"

DRINKING FOUNTAIN

EX'G WOMEN'S RESTROOM EXCLUDED

EX'G CONFERENCE ROOM SUITE

LIGHT MANUFACTURING

FEMALE

EX'G MEN'S RESTROOM EXCLUDED

E03

101

MALE

28.77

E04

F-1 INDUSTRIAL

REQ'D LAVATORIES

83.47 --> 84 42 MALE 42 FEMALE 2.45 --> 3 1.5 MALE 1.5 FEMALE 1.04 --> 2 1 MALE 1 FEMALE

(A) EXISTING BUILDING REQUIRED FIXTURES

E01

REQ'D URINALS

123'-0"

B BUSINESS

PLUMBING REQ'D WATER CLOSETS PLUMBING OCC. PLUMBING OCCUPANCY LOAD OCCUPANTS MALE FEMALE FACTOR

LINE ERTY PROP

(A) EXISTING BUILDING

SEE FLOOR PLAN A1.1 FOR NEW TENANT IMPROVEMENT LAYOUT. VALUES BELOW PER CPC TABLE 422.1 & PLUMBING OCC. LOAD FACTORS PER TABLE A

EX'G MEN'S RESTROOM EXCLUDED

LIGHT MANUFACTURING 101

EX'G WOMEN'S RESTROOM EXCLUDED

EX'G ENTRY STAIR & HALLWAYS EXCLUDED

EX'G CONF ROOM E03

EX'G OFFICE E02

EX'G CONF ROOM SUITE E04

STAIR & ELECTRICAL ROOM EXCLUDED

2016 // PBA // AUTOCAD

EX'G LOCKER/SHOWER ROOMS EXCLUDED

1/16" = 1'-0" SCALE (1:192)

19


project 4/5: continued LEGEND NOT IN SCOPE OF WORK

EXISTING WALLS TO BE DEMOLISHED : SEE STRUCTURALS 46'-5 3/16"

43'-10 1/2"

DEMOLITION GENERAL NOTES 1.

EX'G ELECTRICAL PANELS TO REMAIN

2.

EX'G WD COLUMNS & STL MOMENT FRAMES TO REMAIN

EX'G CONF ROOM TO REMAIN

3

EX'G SERVER ROOM TO REMAIN

SHEET NOTES 1

PORTION OF EX'G GWB WALL TO REMAIN AT EX'G ELEC PANELS & CONDUITS

2

EX'G GWB WALL TO REMAIN

EX'G BREAK ROOM

2

3

DEMOLISH EX'G KITCHENETTE, BASE & UPPER CABINETS, REMOVE EX'G PLUMBING & ELEC BACK TO WALL AND CAP FOR RE-USE. REMOVE AND PROTECT TENANT'S EX'G APPLIANCES & EQPT FOR RE-USE.

4

DEMO EX'G TOILET ROOM

5

DEMO HATCHED PORTION OF EX'G GWB WALL

6

EX'G STRUCTURAL WOOD COLUMN TO REMAIN

ADJACENT PROPERTY

WAREHOUSE

LIGHT MANUFACTURING

123'-0"

6

4'-0"

1

EX'G MEN'S ROOM TO REMAIN

EXISTING CREATIVE OFFICE TO REMAIN (NO WORK) EX'G WOMEN'S ROOM TO REMAIN 5 TYP

4

EX'G ELEC. PANEL ROOM TO REMAIN

EX'G MEN'S LOCKERS TO REMAIN

EX'G LOADING DOCK

EX'G CONF TO REMAIN 4

1

S A C R A M E N T O

EXISTING / DEMOLITION PLAN

NORTH

S T R E E T

1/8" = 1'-0" (1:96)

LEGEND XX

NOT IN SCOPE OF WORK

DOOR TAG PROPERTY LINE

EXISTING WALLS TO REMAIN NEW PARTITIONS

X

WINDOW TAG

X

SHEET NOTE: SEE BELOW

92'-11 11/16", VIF

PLUMBING FIXTURES X

MIN ADA PUSH SIDE CLEARANCE

PARTITION TAG: SEE BELOW 46'-5 3/16"

43'-10 1/2"

5 FT DIAMETER ADA TURNING CIRCLE MIN ADA PULL SIDE CLEARANCE DW

3

DIMENSIONS ARE F.O. FINISH TO F.O. FINISH, UON.

2.

TABLE (NIC) TOPS AT 34" MAX AFF, W/ 27" MIN KNEE CLR AT 19" MIN DEEP, & 30" MIN CLR WIDTH BELOW TO ALLOW FOR A FRONT / FORWARD APPROACH.

C T R R

21'-6 3/4"

1.

8'-0"

3

GENERAL NOTES

2

PORTION OF EX'G FULL HEIGHT NON-STRUCTURAL GWB WALL TO REMAIN WHERE TENANT'S EX'G ELEC PANELS & CONDUITS OCCUR: FINISH CUT END OF PARTITION W/ PTD GWB TO MATCH ADJACENT GWB

25'-0"

EX'G EXTERIOR EGRESS DOOR TO REMAIN

1 A2.0

EX'G 8'X8' SLIDERS TO REMAIN 6

4

EX'G WINDOW TO REMAIN

5

(NOT USED)

6

NEW SHEAR WALL PANELING & NEW CONC FOOTING PER STRUCTURALS

7

EX'G OVERHEAD DOOR TO REMAIN

42" 10

6'-0"

BREAK ROOM (B BUSINESS) 102 9

8

EX'G STRUCTURAL WOOD COLUMN TO REMAIN

9

EX'G DOOR TO REMAIN WATER STATIONS (IN LIEU OF DRINKING FOUNTAINS PER CPC 415.2)

11

PROVIDE DIRECTIONAL SIGNAGE THAT READS "ACCESSIBLE ENTRANCE, THIS WAY", POINTING TO ADA ENTRY AT CREATIVE OFFICE

12

PROVIDE INTERNATIONAL SYMBOL OF ACCESSIBILITY ADJACENT TO ENTRANCE DOOR

PARTITION TYPES

ADJACENT PROPERTY 8 123'-0" VIF

10

2 4'-0"

3

2 A2.0

41'-0" VIF

1

CATERING COUNTER

DW

SHEET NOTES

DETAILS DRAWN AT 1/2" = 1'-0" (1:24) SCALE

EX'G MEN'S ROOM

WAREHOUSE (S-2 STORAGE) 100

3/4" PLYWD 2X12 WD JOISTS 16" O/C

EXISTING CREATIVE OFFICE TO REMAIN (NO WORK)

LIGHT MANUFACTURING (F-1 MODERATE-HAZARD FACTORY INDUSTRIAL) 101 EL. 244.49' FINISHED FLOOR

5/8" TYPE X GWB

EX'G WOMEN'S ROOM

SIMPSON H4 SEISMIC TIE (LARR 25718) 2X4 WD STUDS 16" O/C: FILL CAVITIES W/ ACOUSTIC BATT INSULATION 5/8" TYPE X GWB BOTH SIDES SIMPSON TITEN HD ANCHOR, TYP (LARR 25741) EX'G CONC SLAB FLOOR TO REMAIN

9

102

BREAK ROOM

103

PHONE BOOTH

104

PHONE BOOTH

2 1/2" STRAIGHT EX'G BRICK & LEVEL RUBBER BASE TO 5 GWB MATCH EX'G 2 1/2" STRAIGHT EX'G BRICK & LEVEL RUBBER BASE TO 5 GWB MATCH EX'G 2 1/2" STRAIGHT EX'G BRICK & LEVEL RUBBER BASE TO 5 GWB MATCH EX'G 2 1/2" STRAIGHT EX'G BRICK & LEVEL RUBBER BASE TO 3 GWB & FABRIC MATCH EX'G 2 1/2" STRAIGHT EX'G BRICK & LEVEL RUBBER BASE TO 3 GWB & FABRIC MATCH EX'G

EX'G POLISHED CONCRETE

EX'G EXPOSED WD TRUSSED CEILING

EX'G POLISHED CONCRETE

EX'G EXPOSED WD TRUSSED CEILING

EX'G POLISHED CONCRETE

EX'G EXPOSED WD TRUSSED CEILING

EX'G POLISHED CONCRETE

LEVEL 5 GWB

EX'G POLISHED CONCRETE

LEVEL 5 GWB

EX'G REQUIRED EXIT ONLY TO REMAIN

EX'G LOADING DOCK

EX'G ELECTRIC PANEL ROOM

EL. 241.27' EXTERIOR GRADE

NOTE: INTERIOR FINISH MATERIALS APPLIED TO WALLS AND CEILINGS SHALL BE CLASS C, TYPICAL, TESTED AS SPECIFIED IN CBC 803.

1 A2.1

3'-6"

UP EX'G REQUIRED EXIT ONLY TO REMAIN

EX'G MEN'S LOCKERS

EX'G ADA ENTRY

51" UP

UP

2

1

4

4

7

11

1

1

11

CONSTRUCTION / FLOOR PLAN

5" TYP

12

PROPERTY LINE

ROUTE OF TRAVEL FLUSH TRANSITION

FINISH (WALLS) -- EX'G BRICK: N/A / GWB: EGGSHELL PAINT, COLOR TBD BY TENANT (CEILINGS) -- GWB: FLAT PAINT, COLOR TBD BY TENANT

2016 // PBA // AUTOCAD

36"

30" CEILING

S A C R A M E N T O

S T R E E T

5'-7 1/2" VIF

PHONE BOOTH 103

A

4'-9 1/4" VIF

LIGHT MANUF

FLOOR

18"

WAREHOUSE

101

BASE

40"

100

WALLS

12" 36"

FINISH SCHEDULE ROOM ROOM NO.

3'-0" 18"

4-3/4" THICK NON-LOAD BEARING PARTITION

PROPERTY LINE

A

5'-7 1/2" VIF 4 3/4" PARTITION

PHONE BOOTH 104

NORTH

1/8" = 1'-0" (1:96)

20


project 4/5: end LEGEND DUPLEX WALL RECEPTACLE: "X" DENOTES AMPERAGE, "GFCI" DENOTES GROUND FAULT PROTECTION

X X

NEW SWITCH/CONTROL, "E" DENOTES EX'G SWITCH LOCATION TO REMAIN, "D" DENOTES DIMMING, "VS" DENOTES VACANCY SENSOR, "T" DENOTES TIMER

T

NEW THERMOSTAT/HVAC CONTROL, TBD BY TENANT'S HVAC DESIGN/BUILD SUB

92'-11 11/16" 11"

C L

46'-9 3/16"

1'-1"

44'-2 1/2"

NEW CEILING HVAC SUPPLY AIR GRILLE, TBD BY TENANT'S HVAC DESIGN/BUILD SUB NEW CEILING HVAC RETURN AIR GRILLE, TBD BY TENANT'S HVAC DESIGN/BUILD SUB SUSPENDED / CEILING MOUNTED DIGITAL PROJECTOR, NIC, TBD BY TENANT

PROJ

2

NEW WALL MTD DATA OUTLET, NIC BY TENANT, "X" DENOTES NO. OF DATA PORTS

X

GFCI DW

NEW FLOOR MTD DATA OUTLET, NIC BY TENANT, "X" DENOTES NO. OF DATA PORTS

X

1

B

DUPLEX FLOOR RECEPTACLE: "X" DENOTES AMPERAGE

X

GFCI MICRO GFCI MICRO

QUAD FLOOR RECEPTACLE: "X" DENOTES AMPERAGE

X

B

ILLUMINATED EXIT SIGN

GFCI DW

LIGHTING FIXTURE SCHEDULE A

B

13'-4" AFF

13'-9-1/2" AFF

B.O. BEAM

B.O. BEAM

17'-3 1/2" VIF

GFCI

H.P. SLOPED CEILING

GFCI

LED RECESSED DOWNLIGHT (3000K): HALO H4 LED GEN2 ADJUSTABLE GIMBAL, DIMMING, WHITE FINISH, NON-IC HOUSING, SUITABLE FOR DRY AND DAMP LOCATIONS, #H457TATE010 - ELG406930-WH

FREEZER

LED UNDERCOUNTER / COVE STRIP (3000K): EDGE LIGHTING SURFACE MOUNT LIGHT CHANNEL, DIMMING, DIFFUSER LENS, LENGTHS BY GC TO FIT SPACE, LCSM-12V-DWW-SA

REF

BREAK ROOM (B BUSINESS) 102

REF

REF BEVERAGE WATER STATION WATER STATION ICE DISPENSER

NEW NEW PENDANT

RCP GENERAL NOTES 1. 2.

ADJACENT PROPERTY

ALL DIMENSIONS ARE FROM F.O. FINISH TO F.O. FINISH, UON. OVERHEAD GENERAL LIGHTING AT EXPOSED WOOD CEILING NIC, PROVIDED BY OWNER.

3.

ALL NEW WALL OUTLETS SHALL BE MOUNTED 18" AFF TO CENTER OF DEVICE, UON. ALL NEW SWITCHES SHALL BE MOUNTED 48" AFF TO CENTER OF DEVICE, UON.

4.

ELECTRICAL SUBCONTRACTOR SHALL REVIEW AND VERIFY ALL PROPOSED LIGHTING FIXTURE SPECIFICATIONS, AND REPORT ANY CONFLICTS TO ARCHITECT. VERIFY THERE IS SUFFICIENT CAPACITY IN EX'G ELECTRICAL SUBPANEL TO REMAIN TO SUPPORT PROPOSED NEW LOADS.

WAREHOUSE (S-2 STORAGE) 100

13'-2" AFF L.P. SLOPED CEILING

SHEET NOTES

LIGHT MANUFACTURING (F-1 MODERATE-HAZARD FACTORY INDUSTRIAL) 101

EXISTING LIGHTING TO REMAIN

NEW

1

EX'G SLIDING DOOR HEADERS TO REMAIN

2

NEW KEYCARD READER BY TENANT, NIC: MOUNT MAX 48" AFF PER ADA

EXISTING LIGHTING TO REMAIN

EXISTING CREATIVE OFFICE TO REMAIN (NO WORK) NEW

EXISTING (NO WORK)

NEW

NEW

EXISTING (NO WORK)

EX'G

EX'G

15

EX'G

15 2

EX'G

EX'G

2

EX'G

A

A

EX'G

PHONE BOOTH 103 9'-0" AFF

1

2

EX'G

PHONE BOOTH 104 9'-0" AFF

NORTH

REFLECTED CEILING PLAN 1/8" = 1'-0" (1:96)

HARDWARE NOTES 1.

ALL CABINET DOORS SHALL HAVE BLUM HEAVY DUTY SOFT CLOSE CONCEALED EURO HINGES, TYP.

2.

ALL DRAWERS SHALL HAVE BLUM HEAVY DUTY SOFT CLOSE UNDERMOUNT GLIDES, TYP.

3.

ALL PULLS SHALL BE DOUG MOCKETT DP57C 5-7/16" SATIN ST STL WIRE PULLS, TYP, UON.

PLUMBING FIXTURE & APPLIANCE SCHEDULE SPECIFICATION

FAUCET, NIC

PLAM 1" ADJUSTABLE SHELVES, TYP (18) EQUAL PANELS

ELKAY AVADO UNIVERSAL MOUNT SINK 30-1/2" X 16" X 10", MODEL # EFRTUS332210, ST STL FINISH

PLAM CASEWORK W/ PLAM TOE KICK, TYP: WILSON ART FINISH, COLOR TBD

14 GA 304 ST STL COUNTERTOP W/ 1 1/2" FORMED SQUARE EDGE

AMERICAN STANDARD PEKOE 4332.350.F15 PULL DOWN FAUCET, 1.5 GPM MAX, POLISHED CHROME

1 1/2"

MICROWAVE, NIC

28 1/2"

2" TYP WATER FILTER, NIC

GC'S PLUMBER TO SPECIFY EVERPURE CANISTER-TYPE WATER FILTER (SIMILAR TO CB20 SYSTEM): OBTAIN FINAL APPROVAL FROM TENANT

4" TOE KICK

PER ADA

SINK, NIC

BOSCH 800 SERIES 24" RECESSED HANDLE SPECIAL APPLICATION DISHWASHER, ADA-COMPLIANT, SGE68U55UC, STAINLESS STL

MAX 34"

ITEM

DISHWASHER

SAMSUNG 1.7 CU FT OVER-THE-RANGE MICROWAVE, ME17H703SHS, STAINLESS STL 4" TYP

2

ISLAND ELEVATION (BACK SIDE IDENTICAL) 1/2" = 1'-0" (1:24)

EX'G BRICK STRUCTURAL WALL BEYOND

APPLIANCE & EQPT NOTE: REFRIGERATORS, FREEZERS, WATER DISPENSERS, BEVERAGE COOLER, ICE MAKER/DISPENSER, & MICROWAVES ARE NIC, BY TENANT.

EX'G STEEL ANGLE BRACES BEYOND, TYP

GENERAL NOTE: ALL NEW ELECTRICAL OUTLETS ABOVE COUNTER FED FROM BACKSIDE OF WALL (NO EXPOSED CONDUIT)

1 3/4" SCRIBE STILE AT BRICK WALL

(16) EQUAL PANELS

C L FOR COUNTER OUTLETS, TYP

8'-0" AFF T.O. UPPER CABINETS

40"

PROVIDE ADD'L STUB OUT FOR FUTURE APPLIANCE HOOKUPS BY TENANT

ALIGN OUTLETS W/ CENTERLINES OF UPPER CABINETS, TYP

FILLER STILES TYP PER MICROWAVE DIMS

RELOCATE & INSTALL TENANT'S EX'G MICROWAVE MICRO (NEW)

3/4" CAESARSTONE 1141 PURE WHITE, HONED COUNTER W/ 1-1/2" MITERED SQUARE EDGE

1

(2) WATER STATIONS IN LIEU OF DRINKING FOUNTAINS PER CPC 415.2, NIC

FREE STANDING 24" W BEVERAGE REFRIGERATOR, NIC

TRASH COMPOST BIN BIN NIC NIC

DOUBLE WIDE DRAWERS FOR SERVING TRAYS & PLATTERS

DISHWASHER 32"

BASE BID: BOSCH 800 SERIES ADA-COMPLIANT DISHWASHER NARROW CABINET FOR PLATTER / TRAY STORAGE, TYP 0'-0" AFF

4" PLAM TOE KICK, TYP FREE STANDING ICE MAKER & DISPENSER, NIC

RECYCLE RECYCLE BIN BIN NIC NIC

DISHWASHER

PER ADA

1"

MAX 34"

FREE STANDING REFRIGERATOR, NIC

BASE BID: BOSCH 800 SERIES ADA-COMPLIANT DISHWASHER

EVERPURE WATER FILTER, PER SCHEDULE

FINISHED FLOOR

11'-6" EX'G

12" EX'G

FREE STANDING REFRIGERATOR, NIC

18" TYP

FREE STANDING REFRIGERATOR, NIC

8"

6"

FREE STANDING FULL FREEZER, NIC

4" BACKSPLASH TO MATCH COUNTER

22"

MICRO

CONCEALED UNDERCABINET LIGHTING

4" TYP

STUB OUT 1/4" COPPER TUBE CW SUPPLY FOR TENANT'S WATER STATIONS

ALIGN

STUB OUT 1/4" COPPER TUBE CW SUPPLY FOR TENANT'S ICE MAKER, PER MFR INSTRUCTIONS

EX'G WASTE PIPE CONNECTION POINT

NEW SLOPED DRAIN LINE: VERIFY FALL W/ PLUMBER IN FIELD

CABINET DOORS (INCLUDING TOE KICK) TO OPEN FOR ADA ACCESS

LOCATE OUTLET PER MFR INSTALLATION REQUIREMENTS, TYP

WEST ELEVATION : BREAK ROOM 1/2" = 1'-0" (1:24)

2016 // PBA // AUTOCAD

21


project 5/5: start

SCOPE OF WORK NEW POOL DESIGN WITH INTEGRATED POOL COVER AND UTILITIES. NEW CEDAR DECK AND STEPS DESIGN WITH BENCHES AND PLANTERS.

VICINITY MAP

LORRAINE BLVD.

S WINDSOR BLVD.

S PLYMOUTH BLVD.

S LUCERNE BLVD.

S ROSS

MORE

S ARDEN BLVD.

AVE.

W 5TH ST

W 6TH ST

ENS

W8

TH

ST

CR

HANCOCK PARK

HAW

FRE

MO

BLV

NT

D.

PL.

WILSHIRE BLVD.

NORTH NOT TO SCALE

2016 // PBA // RHINO, AUTOCAD, PHOTO SHOP

PROJECT SITE

22


project 5/5: continued

2016 // PBA // AUTOCAD, PHOTO SHOP

23


project 5/5: continued

2016 // PBA // RHINO, AUTOCAD, PHOTO SHOP

24


project 5/5: end

2016 // PBA // AUTOCAD, PHOTO SHOP

25


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.