Catalog Catalog
About us The Artec Group, Inc. is a General Contracting company founded in Florida on February 1991 by Louis H. Sanchez and is a certified 100% Owned Minority Business Enterprise and a US Small Business Administration 8(a)BD Program Graduate. ARTEC is a full service LEED AP General Contractor, Design Builder and Construction Manager Firm. ARTEC routinely delivers outstanding results on commercial, private, local and state government, transportation and federal contracts; including the US Military domestically and internationally. ARTEC’s portfolio of services includes construction management, design build, design bid build, hard “lump sum” build, Green LEED AP construction services and sustainable energy construction services. In addition ARTEC provides new construction services, preconstruction services, job site and project management, administration support, document control, design build services, LEED services, program management, project assessments and a wide variety of projects. ARTEC’s primary goal is to provide the highest quality of service to our clients construction needs. The Artec Group focuses on building successful relationships with every client and is evidenced by our expanded base of repeat clients. The Artec Group The Artec Group staff is made up of the highest quality Managers, Estimators, Superintendents, Project Managers, OHSA certified safety managers and Clerical staff with a wide range of versatility and experience to offer our clients. Professional education and training of our team consists of MBA holders, Structural and Civil Engineers, Architects and Designers, Land Planers, LEED AP award winners, combat and Service Disabled Veterans and cultural diversity of management that allows us the ability to offer our services to a wide variety of clients. The Artec Group leads the industry with its Safety 1st Policy, as it is the philosophy of The Artec Group to provide a safe environment for its employees and subcontractors. As a team, our mission is zero accidents. On-site basics require head, eye, and foot protection, long pants, shirts with sleeves, and safety vests as required by ARTEC and client’s project safety goals.
Our services
As a General Contractor or Prime Contractor, ARTEC is responsible for the day-to-day oversight of our construction sites, management of vendors and trades, and communication of information to involved parties throughout the course of a building project. Whether it’s a negotiated or hard-dollar bid, ARTEC fully understands the bidding process and can offer solid numbers based on a clear understanding of job scope. No two jobs are the same, which means you need ARTEC’s proven track record that has delivered successful general contracting projects time and time again.
Projects
CASA VERDETum faccabo rrores et eaquiat. Aximili gnimetur? Quiatet omnistrum Casa Verde� is one of the first high performance green homes in South East United States. Project Executive Louis H. Sanchez, LEED Accredited Professional Professional Architect, Structural Engineer and Geotechnical Engineered and sealed design and drawings.
MACDILL AFB, FIRE TRAINING FACILITY This Training Facility provides an almost limitless number of different training scenarios, including: interior fires, such as a four-burner system, cockpit fire, battery compartment fire, passenger compartment fire, and cargo compartment fire; exterior fires, such as a twoengine fire on the right wing, a high tail engine fire, wheel fire, and APU fire; and spill fires.up.
USCG HANGAR AND BRIDGE CRANETum faccabo rrores et eaquiat. Aximili gnimetur? Quiatet omnistrum Design and Installation of a 5-Ton Bridge Crane Hanger Repair Fire Suppression Systems and Water Tank Weapons System Integration Facility Valve Isolation.
Projects
MACDILL AIR FORCE BASE NAVAL RESERVE TRAINING CENTER
STATE OF OKLAHOMA EMERGENCY 100 TON CHILLER SET
The Naval Reserve Training Center, constructed for the Tampa Port Authority/Peter Brown Construction, contains classrooms, high tech systems, offices, a large multipurpose room with a stage, an auditorium, lockers, and conference rooms.
mergency replacement of existing cooling and chilling system for the Library of the Blind.Involved new piping, structural retrofitting to roofing and building, upgrades of controls and electrical systems.$500,000.00
METAL BUILDING Artec was the building specialty constructor of a “Kingspan System” metal building approx. 24,000 SF mixed-use office center consisting of shell build out, elevator and parking areas.
The Artec Group, Inc. P.O. Box 50335 Sarasota, Florida 34232-0302 Pone: (941) 960-1378 Fax: (305) 421-0490