Lwazi | Ncanana
DESIGN
PORT
FOLIO ‘16 - ‘20
selected works 2016 - 2020
LWAZI NCANANA Masters of Architecture (Prof)
Faculty of Engineering & Built Environment University of Cape Town
ncananalwazi.j@gmail.com
2020
+27 (0)78 811 3220
“Compromise, Synthesis, Humility - the secret to working fruitfully with others.”
Design
| Portfolio
- G Stephens 17’
“...architecture has an ethical duty to respond to human activity in context - People; Place & Time become key drivers of Responsive design.” Dr Luckan, Y
Contents Contents | page 02 Resume | page 03-04 Selected works | page 02
Selected Work UNDERGADUATE PG Bison | Gastronomic Restaurant 3rd year project | page 07-10
Community Centre 3rd year project | page 11-26
Student Housing
2nd year project | page 27-30
Mixed-used High Rise 2nd year project | page 31-34
PROFESSIONAL WORK Commerce Crescent Valley | Showroom Paragon Architects | page 37-40
Business Square | Oman Paragon Architects | page 41-44
POST-GRADUATE Kigali Cultural Centre 4th year project | page 47-64
District Housing
4th year project | page 65-70
Simulated Office | Housing in D6 4th year project | page 71-80
Re-Birth of the Pan-African Narrative 5th year project | page 81-88
02
LWAZI SONKE PERFECT NCANANA | RESUME Student Architect | Masters of Architecture (Prof)
Born: 1996 ~ Durban, KwaZulu-Natal, South African Lived: KZN, Gauteng, WP T: +27 (0)78 811 3220 E: ncananalwazi.j@gmail.com L: English, isiZulu, Xhosa
Personal Statement
Design
| P o r t f o| l iRoe s u m e / / A b o u t M e
From a very young age, I have always been fascinated by the idea of community, form & structure and believe that these ideas continue to propel my love for the built environment. As a young professional, I am pro-active and keen to learn, with aspirations to positively contribute towards innovative and meaningful architecture.
03
Coming from a dynamic family of 6 siblings has greatly taught him that everyone has a story, and we all have the responsibility of claiming our power by channeling these hurdles into a successful future. I enjoy & appreciate working in a team, thus recognising and considering the work, opinions and contributions of others; as I believe this is one of the major keys in having a productive working environment. Through my academic & practice career I have had the opportunity to work in different multifaceted teams which has exposed me to different multi-scaled projects. This has encouraged me to explore spheres that I previously drowned self-doubt with the discovery of the inherent unique talents and abilities that I, like everyone else possess. It has strengthened my belief that we DEVELOP talents, we UNLOCK potential – it is not freely given or received. Passion is very important to me, and has always driven me to pursue excellence in every task. However, I have grown to understand that passion, motivation, or inspiration, is not always present – ‘it must find you working’. And so consistent hard work and dedication are principles that are inherent to me “Compromise; Synthesis, Humility - the secret to working fruitfully with others” - G Stephens ‘17
Lwazi | Ncanana | Resume
Design Skills Autodesk Revit Autodesk AutoCAD Adobe Photoshop Adobe Illustrator Adobe InDesign Lumion Microsoft Office
Education Current // University of Cape Town Masters of Architecture (Prof) 2019 // University of Cape Town Bachelor of Architectural Studies (Hons) 2015-17 // University of KwaZulu-Natal Bachelor of Architectural Studies (BAS)
Work Experience 2018-19 // Paragon Group | Paragon Architects Internship - Student Architect 2019-20 // University of Cape Town Tutor - Design (AiD- year 3), Hata (year 1) 2019-20 // University of KwaZulu-Natal Tutor - Design Studio (year 1)
Competitions + Merit Awards Mastercard Foundation Scholarship | University of Cape Town Academic Scholarship ~ 2020 Bench Warmers: Furniture Design Competition Paragon Craft | Finalist - 2018 PG Bison 1.618 Competition (National Competition) Top 10 Finalist ~ 2017 Golden Key | Architecture | University of KwaZulu-Natal International Honor Society ~ 2017 Bernstein Scholarship | Architecture University of KwaZulu-Natal Academic Scholarhip ~ 2017 Womeni in Architecture | KZN (WIA-KZN) 3rd Place ~ 2017 Building Science 3 (Acoustics) | UKZN Merit For Outstanding Performance ~ 2017 Theory Architecture 3A| UKZN Merit For Outstanding Performance ~ 2017 Theory Structures 2A | UKZN Merit For Outstanding Performance ~ 2016 Architectural Design and Technology | UKZN Merit For Outstanding Performance ~ 2015
04
PA R T 0 1
D e s i g n Po r t fo l i o | Un d e rg rd a u a t e
Lwazi | Ncanana
Selected Work
UNDERGRADUATE PROJECTS University of KwaZulu-Natal (2016-17)
PG Bison | Gastronomic Restaurant // 3rd year Community Centre // 3rd year Student Housing // 2nd year Mixed-used High Rise // 2nd year
06
01 THE “FARMERS MARKET RESTAURANT” PG BISON 1.618 COMPETITION | FINALIST
Third Year Project | 2017 Delta Park, Randburg, johannesburg DESCRIPTION
ADAPTING A HERITAGE BUILDING “Throughout time, people have used visual devices to capture stories. Visual storytelling displays a history of the past, an identity for the present, and a story for the future to compare and appreciate. “ The proposed “Farmers Market Restaurant” celebrates the historical essence of the Delta building & park. The proposed self-sustaining restaurant, fully opens-up to its surroundings allowing the building to express itself as part of the greater Delta Park fabric. The patrons harvest the fresh produce of their desired meal from the vertical garden. The transformative architecture of the building is an ever-present form of visual storytelling as it captures the history of a Delta and tells that story through space. Every building has a storey…
DESIGN DEVELOPMENT
07
08
09
Design
| Portfolio
Lwazi | Ncanana
10
02
Bath
Road
Bulwer Centre Community Centre
Third Year Project | 2017 Bulwer Road, Glenwood, Durban
TOWRADS AN ARCHITECTURE OF INCLUSIVITY THAT CELEBRATES THE IDEA OF COMMUNITY
or
Eb ad
Ro
The building fabric communicates both of MEMORY and CULTURE – of place, space, placelessness and lostspace. The notion of IN-BETWEEN speaks of tangible and intangible. The opportunity of the project is firstly in an attempt to find lostspace; Secondly to establish a connection in-between the diversity of both MEMORY and CULTURE.
CONCEPTS IN-BETWEEN: that which is found rather than defined. CULTURE: an expression of a community of people. MEMORY: that which provides a connection with people and place and time.
11
An i
Lwazi | Ncanana
N KZ SA T AR
se Ha ll
d
po
Ya r
Bu lw
er
Ro
ad
Cli
nic
Ca
fe
M
Offi ce
ult i-p
Co u
ur
rt
ck
Y
Blo
ER LL GA
ing
rk Pa
idea of Socially Responsible Architecture: an Architecture that responds to the needs of the project and the people at large:
“INTERGRATION | REGENERATION | ADAPTABILITY | FLEXIBILITY | TECHNOLOGY | ECOLOGY” - Norman Foster
12
Towards the open, the green, the warm light, the clean air, learning has become public –part of the
system of living things. While the park breathes public life, a place has been chosen which lies among distinct public realities – the intervention is placed to be a construct amid the system of ‘living things’.
Design
| Portfolio
A Multi-purpose Hall, Cafe, Clinic & an Office Block llifted off the ground – nature is allowed in – light | air | visual permeability. The different spaces learn to work togather to form and address the needs of the community at large. Therefore the building is open and inclusive, gently encountering the ground, while above she shelters. Learning has become open, no longer introverted.
13
Lwazi | Ncanana
14
As the building stretches its self across the site, it is anchored by a series of courtyards which
inturn form or act act as breakout and gathering spaces in-between the buildings...furthermore as these green court yard spaces bloom with greenery they help to naturally ventilate by keeping the buildings cool during summers and relatively warm during winters.
Front elevation view from main Street; Bulwer Road, Glenwwod
Design
| Portfolio
SOUTH ELEVATION |
15
WETS ELEVATION |
Side elevation view from main Street; Ebor Road, Glenwwod
Lwazi | Ncanana
The focus of this design seeks to reduce and minimise the negative impact of buildings and construction on our ecsystem. This is achieved through efficient and moderate use of materials, the form and spatial design of the Community Centre.
16
Design
| Portfolio
EAST ELEVATION |
17
WEST ELEVATION |
Back elevation view from Bath Road; Bulwer Road, Glenwwod
Side elevation view from parking & adjacent building; KZNSA Art Gallery, Glenwwod
Lwazi | Ncanana
The structure provides a variation on the surface, giving depth to the building faced. In conjunction with natural and artificial light, which starts to create opportunities for contrasting bright and shadowed areas.
18
19
Design
| Portfolio
Lwazi | Ncanana
20
21
Design
| Portfolio
Lwazi | Ncanana
22
23
Design
| Portfolio
Lwazi | Ncanana
24
| Portfolio Design
Physical Model
BULWER CENTRE | COMMUNITY CENTRE
25
Figure 1 | View 1
Lwazi | Ncanana
Figure 3 | View 3
Figure 6 | View 6
Figure 2 | View 2
Figure 4 | View 4
Figure 5 | View 5
Figure 7 | View 7
26
03
BLOCK E NORTH
BLOCK D SOUTH
HOPE VALLEY RESIDENCE
Student Housing
Second Year Project | 2016 Rick Turner road, Glenmore, Durban
BLOCK
SOUTH
PROJECT OVERVIEW Develop a Students Housing project, a master plan which includes housing and community services complex and two storey building project.
Design
| Portfolio
The proposed student housing site is located adjacent to the University of KwaZulu-Natal, Howard College, Durban. This proposed student facility looks into easing the pressure of the increasing demand of student housing caused by the growing enrollment numbers of students into university.
27
SITE MASTER PLAN SCALE: 1:200
A detailed study of into a student life has been conducted in developing this inclusive student housing facility, having considered materials and
sustainable design.
SITE MASTER PLAN | SCALE: 1:2
DESIGN DEVELOPMENT
SVE
NOR
Lwazi | Ncanana
GRO
ROA
D
BLOCK F NORTH
BLOCK G NORTH
STUDENT PARKING
D OA
RR NE
H
UR
KC
KT RIC
C
E OS G RP ILDIN IPU BU LT NAL MUOMMU
(13 BAY STRUCTURED BAY)
PROPOSED BUILDING LOCATION (SITE)
BLOCK A SOUTH
SIMPHIWE ZUMA ROAD
PROPOSED BUILDING LOCATION ON SITE
200
28
HOPE VALLEY RESIDENCE Student Housing
Second Year Project | 2016 Rick Turner road, Glenmore, Durban
3D INTERIOR PERSPECTIVE Student Communal Lounge
3D PERSPECTIVE | M
The proposed “Arti street culture. This brief was to create and inspire creativi
WEST ELEVATION
Design
| Portfolio
SCALE: 1:200
29
EAST ELEVATION
NORTH ELEVATION
SCALE: 1:200
SCALE: 1:200
Lwazi | Ncanana
MAIN ENTRANCE
ist Universe” is located in the heart of Berea, Durban which has a strong presence of s project is derived as a composition of the artist home, studio and gallery space. The a beautifully detailed, creative space for painting and sculpturing that would encourage ity.
SOUTH ELEVATION SCALE: 1:200
30
04
KHAYELIHLE CULTURAL CENTRE
Mixed-use Low Rise Building
Second Year Project | 2016 Cnr Bram Fischer Road & Florence Nzama Steet; Durban (CBD) PROJECT OVERVIEW The site of the proposed proposed “mixeduse high rise” is located within the heart of the Durban Rivertown precinct. The building provides a mixture of usable spaces that are relevant to urban context of the site. The Concept approach: REDFINING THE IDENTITY OF UBUNTU THROUGH “I AM BECAUSE YOU ARE” Looks to using architecture as a platform for reconciliation. Where the built form facilitates the idea of:
3D RENDER I | Exterior day-time render expressing the sout
Using common spaces to Bridging the gap of discrimination by eliminating spatial segregation between races & different income groups.
| Portfolio
Recognising & celebrating the social dynamics (diversity) that exist in our cities which allow us to be a community. Enhancing integration and the spirit of Ubuntu & Unity amongst members of the city.
Design
Celebrate the history that of the site Enhance liveable city.
North Elevation | Scale 1:200
31
DESIGN DEVELOPMENT
Lwazi | Ncanana
th eastern building facade
3D RENDER II | North East exterior Render
3D RENDER III | Exterior white wash monochromatic North West Render.
West Elevation | Scale 1:200
32
mixed-used | SEMILETTICE | overlapping
ROOF
RESIDENTIAL
SEVENTH FLOOR
OFFICES
THIRD FLOOR
GROUND FLOOR
RETAIL
FIRST FLOOR
South Elevation | Scale 1:200
Design
| Portfolio
“VERTICAL ART GALLERY”
East Elevation | Scale 1:200
Lwazi | Ncanana
Basement Parking | Scale 1:200
Ground Floor Plan | Scale 1:200
First Floor Plan | Scale 1:200
34
PA R T 0 2
D e s i g n Po r t fo l i o | I n t e r n s h i p ye a r
Selected Work
PROFESSIONAL PROJECTS Paragon Group | Architects (2018)
33 Commerce Crescent // Internship @ Paragon Architects Business Square * Muscat Oman // Internship @ Paragon Architects All images are copyright of Paragon Group (Ltd).
36
05
33 Commerce Crescent Architect: Paragon Group Developer: Alchemy Properties Location: Johannesburg, Gauteng Typology: Furniture Showroom
Project Description Commerce Crescent Valley Showroom is located within the viable neighborhood of Kramerville, Johannesburg. It is a development that forms part of a larger precinct which seeks to revitalize its neighboring surroundings.
Within the use of modern building principals, methods and systems, capable of weaving the architectural imagination into reality within a simple concept. The building materials of rough cast in situ concrete walls have been adopted from its industrial surroundings.
Design
| Portfolio
All images are copyright of Paragon Group (Ltd).
37
Project Responsibilities Design development: Focusing on circulation & core. Project Documentation: Technical working drawings | Demolition of existing building package
All images are copyright of Paragon G
Lwazi | Ncanana
38
Group (Ltd).
FIRS
STA
PLA
ENT
(TO L
ENT
(TO U
LOWE
3D PERSPECTIVE | ATRIUM ENTRANCE
Lwazi | Ncanana
The showroom is developed on an adaptive reuse principle, where an existing building was renovated and repurposed from a warehouse to a showroom. The building had to adopt new technology which allowed the necessary as it explored new materials to form a new aesthetic.
ST FLOOR
AIR TO FIRST FLOOR
ANTING
TRANCE
LOWER GROUND)
TRANCE
UPPER GROUND)
ER GROUND
40
06 Business Square Muscat Oman Architect: Paragon Group Area: 419 113m2/4 511 294m2 Location: Muscate, Oman Typology: Commercial, Retail, Residential, Hotel
Project Responsibilities Design development: Concept Design & Development 3d Modelling Visualization & Rationalization Presentation
41
Project Description Business Square is a multipurpose project comprising of commercial, retail, residential, & hotel typologies. The project is located in Muscat Oman Muscat features a hot, arid climate with long and very hot summers and warm “winters” Muscat features a hot, arid climate with long and very hot summers and warm “winters”. Oman shares many of the cultural characteristics of its Arab neighbours and these principles have incorporated into the architectural design through the spiral form that raps around sports fields and water features that aid in the cooling of the building.
42
41
Design
| Portfolio
Lwazi | Ncanana
Figure 3 | View 3
Figure 6 | View 6
Figure 2 | View 2
Figure 4 | View 4
Figure 5 | View 5
Figure 7 | View 7
44
PA R T 03
D e s i g n Po r t fo l i o | Po st - g ra d u a t e
Lwazi | Ncanana
Selected Work
POSTGRADUATE PROJECTS University of Cape Town (2019-20)
Kigali Cultural Centre// BAS (Hons) District Six | Housing// BAS (Hons) Simulated-Office (Group project) *Housing in District Six // BAS (Hons) The Re-birth of the Pan-African Narrative // M.Arch (Prof) ~ Extract from Theory Paper that precedes the Design Dissertation
46
Design
| Portfolio
07
Lwazi | Ncanana
48
Lwazi | Ncanana
50
51
Design
| Portfolio
Lwazi | Ncanana
52
53
Design
| Portfolio
54
55
56
57
58
59
60
61
62
63
Design
| Portfolio
Lwazi | Ncanana
64
08 District Six | Housing
Design
| Portfolio
Area: 419 113m2/4 511 294m2 Location: District Six, Cape Town Typology: Housing (Claiment,
65
Lwazi | Ncanana
66
67
Design
| Portfolio
Lwazi | Ncanana
68
69
Design
| Portfolio
Lwazi | Ncanana
70
09
CORRIDORS OF COMMUNITY
CISKE SMIT + JOHN-ALPHONSE ELONGA + LWAZI NCANANA
C O N T E X T U A L I S AT I O N
Keizersgracht Street, District Six
Erf NumbEr | 173 249 / SizE | 1700m
2
DENSITY / Medium - High Density | 150-250 dwellings per hectare / 25-42 Keizersgracht Street is earmarked for commercial development ZONING / Mixed Use 3 | Floor Factor: 6.0 | Coverage: 100% | Maximum height above base level to top of roof: 25m | Street Boundary Building Line: 0.0m | Common Boundary Line: 0.0m | Street Centre-Line Setback: 6m
DESIGN PRINCIPLES celebrating the historic fine urban grain
embracing densification
inclusivity + social condenser
71 buildability
72
PUBLIC GARDEN PERSPECTIVE
P U B L I C T H R O U G H F A R E E L E VAT I O N
S
DESIGN DEVELOPMENT diagrammatic exploration initial design long continuous balconies / lack of privacy / small communal space / corner building is an afterthought / council submission push and pull of balconies / low density / unfeasibly large units / balconies pose a challenge to circulation and unit layouts / final design central circulation system / communal space is integrated to circulation / three distinct user groups /
corridor communal
council to construction
communal space
Design
| Portfolio
more central location / en route to either side of the building / mezzanine allows for interaction between different levels
73
studio unit
self-sustaining unit / allow for a higher density / more efficient drainage layout
Lwazi | Ncanana
studio unit
self-sustaining unit / allow for a higher density / more efficient drainage layout
two bedroom unit
replicated throughout - for market and claimants / smaller private balconies as opposed to one large shared balcony / more efficient drainage
facades
fragment the facade to enhance the idea of an extruded fine urban grain / juxtaposition of solid and light between served and servant spaces / fibre cement alludes to areas of communal functions within the building
74
rb h ke m hig 150m
rb h ke m hig 150m
F ER
F ER
1732
mm 150
F 17
F 17
3227
46
mm 150
high
kerb
3228
3230
GS ELIN ASP high
ET TR E
kerb
RUT
3231 mm 150
ST GER
kerb
T REE
high
08
kerb
09
10
11
F ER
1732
12
48
13 17
ER F
D
248 173
F
1m
MON COM
Ben
03
04
05
N
O
06 1
F
UP
C
2 3 4
B
MON BOUN 12.97m COM
5
DARY
6
per
ter as
il deta
P 500mm high parapet wall to flat roof
G
7 8 Planter
Plan
Planter
30.03m COMMON BOUNDARY
500mm high parapet wall to flat roof
9
500mm high parapet wall to flat roof
10
hed Pitc
roof
to fall
11
OU
H
104.86m STREET BOUNDARY
New Tree
New Tree
New Tree
New Tree
New Tree
New Tree
New Tree
New Tree
New Tree
New Tree
New Tree
du
n of
m
7
fenc ing
6
Po sitio
K
5
7.9 0
4
rary
3
po
2
Position of temporary container site office New Tree
site
500mm high parapet wall to flat roof
Phase 1 1
Existing tree
STR EE TB
500mm high parapet wall to flat roof
J
Phase 2
tem
3 2 1
500mm high parapet wall to flat roof
R
New Tree
NN no DA tic e bo RY ards
Pitched roof to fall
Pitched roof to fall
I
Q
G 500mm high parapet wall to flat roof
of
Pitched roof to fall
PUBLIC THROUGHFARE
J New Tree
500mm high parapet wall to flat roof
Pitched roof to fall
Stone chips
Line
E
Pitched roof to fall
UP
D
temporary, secure & solid site fencing/boarding around site; pavement and parking bays rented from the local municipality for required duration
Stone chips
Stone chips
UP
C
New Tree
H
11.65m COMM ON BOUNDARY
B
ctio n
02
nc Be
ch
h
RY
01
A
A
E
DA BOUN
Ben
07 ERF 115728
ch
ch
ERF 173237
MON COM
ERF 173236
M
RY
ET STRE NTAC TO PO
ERF 173235
DA BOUN
180m
ERF 173234
MON COM
7m 22.5
41.2
Ben
ERF 173233
3m 16.8
ANCE ENTR ET MENT STRE BASE TGER NEW OF RU
17
Position of temporary crane
+/-
F ER
DARY BOUN
New Tree
1 2 3 4 5 6 7 8 9 10 11 12 13
14 3250
L
16 15
tru
high
g co ns
mm 150
rin
F 17
1732
kerb
3229
mm 150
ER
F ER
high
D RO A
ER
F 17
IS KER
ER ER
F 17
47
45
C STU
ER
1732
Position of portable site toilets
Line of temporary fencing during construction
Line of temporary fencing during construction
Line of temporary fencing during construction
Line of temporary fencing during construction
+/- 100m TO MY CITY BUS STOP
+/- 180m TO CHAPEL STREET
KEIZERSGRACHT / HANOVER STREET
Site Plan
Existing traffic island Existing traffic island
SCALE: 1 : 200 COPYRIGHT NOTICE Copyright ©
NOTES This drawing is the property of SNE Architects (Pty) Ltd. and is - intended for the use only on site and for the project to which it relates. - Copyright in this drawing is owned SNE Architects (Pty) Ltd. All work is to be carried out in accordance with SANS 10400 and - other relevant SANS Standards. This drawing is not to be scaled. Figured dimensions to be used. All - dimensions are in millimeters unless otherwise stated. All levels and dimensions to be checked on site by the contractor - before work is carried out and any discrepancies to be reported to the Architect. - The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85 of 1993) and any regulations promulgated in terms of that Act or the Factories Machinery and Building Works Act of 1941. - This drawing must be read in conjunction with all the relevant drawings, schedules and specifications from the Architect and all other consultants related to the project.
STUDIO SNE
Copyright subsists in this drawing. The person or entity, whose name appears in the title block of this drawing, is hereby granted a nonexclusive license to use, display, print, and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawing. This license in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licenses in respect of the copyright in this drawing to any other entity. This license confers no ownership rights in the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of SNE Architects (Pty) Ltd. Any unauthorized reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematograph film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil law copyright infringement and may in certain circumstances render the doer liable to criminal prosecution. Requests and enquiries concerning this drawing and the rights subsisting therein should be addressed to the copyright owner.
08
DATE
PROPOSED MIXED-USE HOUSING
DRAW N
DESCRIPTION FOR
CITY OF CAPE TOWN ERF 173249 Keizersgracht Street, Zonnebloem, Cape Town
Site Plan SCALE: 1 : 200 PROJECT NUMBER
09
ACTS OF PARLIAMENT
REV
10
11
12
All Contractors shall ensure that, before any work is put in hand, they 7 800 comply with all the necessary Acts of Parliament of the Republic of South Africa.
7 800
SERIES - PAGE NO.
01
13
34 000 7 800
SHEET SIZE
REVISION
C100-001-A1 A1
INFO
2 800
COUNCIL
7 800
3rd Floor, Centlivres, Rondebosch, Cape Town, 7700, Tel 021 260 2595, info@studiosne.co.za
TENDER
PROJECT DATE:
DRAWN BY:
11/11/19
CS
CONSTRUCTION
17 420 3 75
Refuse exhaust vent extractor to engineer's specification
5
16
L
115 125 2 56
TAP
125 2 72
0
STORE 16
125
115 115 1 200
2 400 115
115 1 200 115 1 305
2 265
2 265
200
200
BICYCLE RACK
O
P22
kerb 150mm above FFL
EXHAUST VENT
2 075
5 m² SCREED
STORE RM 4 FES -7 m² SCREED
P01
CL P02
P03
P04
P05
P06
P07
P08
P09
4 95
C123-001-A1 ---
2 055
15 14 13 12 11 10
200 200 B32 D02
2 730
P10
P11
P12
P13
in-situ cast reinforced concrete staircase to engineer's specification. NOTE: Treads to be minimum of 250mm. Risers to be maximum of 200mm. Maximum 3000mm rise between landings
200
P14
UP
3500x5000m accessible parking bays, with painted white markers
2500x5000m parking bays, with painted white markers
P15
P16
P17
P18
P20
P19
13 12 11 10
FIRE ESCAPE 2
SW
B30 D01
B29 D01
B33 D01
2 500
0
1 00
0
1 00
P26
0
STORE RM 23
MOTORCYCLE PARKING BAYS
2 500
300
2 500
2 500
2 500
300
2 500
300
2 500
2 500
2 500
300
3 500
3 500
DB ROOM 20 m² SCREED
18 m² Screed
6 m² SCREED
B31 D01
STORE RM 25
24 m² SCREED
3 315 310mm brick and concrete retaining wall; wall to consist of a single inner 110mm brick wall, 200mm reinforced concrete wall and key footing as per engineer's specifications. Waterproofing system as per retaining wall detail.
7.9m STREET BOUNDARY 30mm screed on 200mm concrete slab on 350 micron DPM on 150mm layer of well compacted aggregate fill as per engineer's specifications
SUMP / PUMP ROOM 23 m² SCREED
310
6 m² SCREED
6 m² SCREED
B27 D01
B28 D11
7 m² SCREED
BICYCLE STORE ROOM 2 500
R
B26 D01
200mm reinforced concrete load bearing wall to engineer's specification
STORE RM 24
3 315
STORE RM 26
CAT
CH PIT
1 00
B35 D10
18 17 16 15 14
1 2 3 4 5 6 7 8 9
P21
300x450mm reinforced concrete column as per engineer's specification
20 m² SCREED
900
1 400
Wheelchair Holding Zone 300x450mm reinforced concrete column with rounded edge as per engineer's specification
7 8 9
18 m² Screed
G-GLift Lobby C210-005-A1
in-situ cast reinforced concrete to engineer's specification. NOTE: Treads to be minimum of 250mm. Risers to be maximum of 200mm. Maximum 3000mm rise between landings
30mm screed floor finish on 200mm concrete slab on 350 micron DPM on 150mm layer of well compacted aggregate fill
110mm Ø agricultural drain wrapped with stone chips and geotextile to fall as per specialist's specification
Q
Class B, 2 Hour fire rated steel fire door; door to be fitted with approved push-bar released lever and steel kickplate on internal face, as per manufacturer's spec.
Class B, 2 Hour fire rated steel fire door; door to be fitted with approved push-bar released lever and steel kickplate on internal face, as per manufactures spec.
UP
1 2 3 4 5 6
0
P25
200
931 m² SCREED
FFL -595
2 000
18 17 16
2 230
1 200
7 500
BASEMENT PARKING
B34 D02
9 m² SCREED
200
8 29
ELEVATOR
Lift consists of a 1.5m deep pit
115
STORE RM 5
kerb 150mm above FFL
SW CATCH PIT
300x300mm reinforced concrete beam as per engineer's specification
4 m² SCREED
18 TREADS @ 250mm 18 RISERS @ 170mm
2 115
SW CATCH PIT
150mm Ø PVC STORMWATER PIPE ENCASED IN 100mm CONCRETE @ FALL 1:100
1 600
2 500
200 1 160 200
2 170
4 425
14 950 3 905 2 295
SW CATCH PIT
0 1 66
2 250
SW CATCH PIT
0
K
SW CATCH PIT
STORE RM 7
FIRE ESCAPE 1
J
SW CATCH PIT
0 5 30
STORE RM 6
SW CATCH PIT
stormwater disposal as per SANS 10400-R; floor finish to fall towards grated stormwater catch pits and discharge into 150mm Ø PVC stormwater pipes @ 1:60 fall; pipes running underneath building or ramp encased in 100mm concrete
B07 D01
P
2 50
I
SW CATCH PIT
150mm Ø PVC STORMWATER PIPE ENCASED IN 100mm CONCRETE @ FALL 1:100
B06 D01
5 m² SCREED
P24
B04 D01
0
H
B03 D01
0
2 50
B05 D01
B02 D01
300x300mm reinforced concrete beam as per engineer's specification
CH PIT
300
115 1 200 115
SW B01 D01
CAT
0
STORE RM 2
Fire Rated top-hung smoke extraction point to engineer's specification.
2 50
G
5 m² SCREED
5 m² SCREED
170
P23
STORE RM 1
STORE RM 3
ARY UND
0
B08 D01
425
0 5 47
2 500
0
2 500
Class B Steel Fire Rated garage type roller shutter installed according to specialist's specification
6 m² SCREED
22 59
2 500
0 3 10
kerb 150mm above FLL
STORE RM 22
2 50
300
N 200mm concrete sheer wall as per engineer's specifications
300
2 500
D-D C210-002-A1
BO EET STR
300
UP
7m
2 500
1
0
2 500
2
22.5
B12 D01
3
0 5 60
B21 D01
4
C
2 500
5 m² SCREED
5
2 80
300
B19 D01
STORE RM 21
6
1:8
2 500
6 m² SCREED
6 m² SCREED
7
p@
2 800
4 m² SCREED
B11 D01
B17 D01
STORE RM 20
STORE RM 19
8
ay ram drivew
6 m² SCREED
B25 D12
DRAIN
STORE RM 8
0
B10 D01
B14 D01
B23 D11
110mm internal partition brick wall
STORE RM 18
5 m² SCREED
B09 D01
B13 D01
9
300mm wide mentis grid drain cover, as per manufacturer's specifaction
B24 D01
Solid hardwood, lockable, outward opening, self closing external door 150mm high sheet metal kick-plate and bottom ventilation grille
SW
125
0
215
8 m² SCREED
8 m² SCREED
8 m² SCREED
B22 D01
10
11
STORAGE
STORE RM 17 B20 D01
r doo
1 67
125
2 90
F
5
STORE RM 11
9 m² SCREED
B18 D01
12
0
07 To existing municipal sewer connection
1 78
125
5 1 48
6 m² SCREED
STORE RM 15
5 30
STORE RM 10 STORE RM 9
7 m² SCREED
B16 D01
tter
0
Drainage to drop below basement level
600 0
STORE RM 14
5 m² SCREED
B15 D01
shu
5 40
5 m² SCREED
3m
Roller
STORE RM 12
16.8
14 13
New
41.3
5
0 4 73
RY NDA BOU SITE
CW
0
415 12
2 70
27 m² SCREED
A-A C210-002-A1
ARY UND
125 2 56
200mm reinforced concrete boundary 295 wall
0
RY NDA BOU ITE mS STORE RM 13
140
2 20
REFUSE
125
2 72
5 4 88
14
5.5m
110mm Ø agricultural drain wrapped with stone 0 chips and geotextile to fall in accordance with 2 88structural engineer's instructions
C-C
M
305
new
11 m² SCREED
5 4 68
15 14
BO ITE mS
C210-001-A1
C210-003-A1
5 3 80
8.08
B-B
0
screed floor finish shall be graded and conctructed to drain into a 100mm floor trap
EXHAUST VENT
GULLEY
0 1 46
5 2 87
BASEMENT STORMWATER TO BE PUMPED UP STREET LEVEL TO DISCHARGE INTO EXISTING STREET STORMWATER SYSTEM
Distribution Cables supplying voltage from municipal transformer
54.7m STREET BOUNDARY
Basement Storey SCALE: 1 : 100
75
COPYRIGHT NOTICE Copyright ©
STUDIO SNE
Copyright subsists in this drawing. The person or entity, whose name appears in the title block of this drawing, is hereby granted a nonexclusive license to use, display, print, and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawing. This license in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licenses in respect of the copyright in this drawing to any other entity. This license confers no ownership rights in the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of SNE Architects (Pty) Ltd. Any unauthorized reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematograph film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil law copyright infringement and may in certain circumstances render the doer liable to criminal prosecution. Requests and enquiries concerning this drawing and the rights subsisting therein
NOTES This drawing is the property of SNE Architects (Pty) Ltd. and is - intended for the use only on site and for the project to which it relates. - Copyright in this drawing is owned SNE Architects (Pty) Ltd. All work is to be carried out in accordance with SANS 10400 and - other relevant SANS Standards. This drawing is not to be scaled. Figured dimensions to be used. All - dimensions are in millimeters unless otherwise stated. All levels and dimensions to be checked on site by the contractor - before work is carried out and any discrepancies to be reported to the Architect. - The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85 of 1993) and any regulations promulgated in terms of that Act or the Factories Machinery and Building Works Act of 1941. - This drawing must be read in conjunction with all the relevant drawings, schedules and specifications from the Architect and all other consultants related to the project.
REV
DATE
DRAW N
PROPOSED MIXED-USE HOUSING DESCRIPTION FOR
CITY OF CAPE TOWN
ERF 173249 Keizersgracht Street, Zonnebloem, Cap Town
Basement Storey Plan SCALE: 1 : 100 PROJECT NUMBER
SERIES - PAGE NO.
SHEET SIZE
REVI
08
09
10
11
12
13
17 34 000
7 800
7 800
2 800
7 800
7 800
16
L 1 46
200mm in situ cast concrete retaining wall to engineer's specification
5 4 68
14 13
12
11
10
9
6
5
4
3
2
STAIR NOTE:
1
14 TREADS @ 250mm 14 RISERS @ 170mm
UP
310
0 4 73
7
0 1 63
14
C210-001-A1
8
0 1 27
C210-002-A1
200
A-A
B-B
M
0
5 14 30 5 4 88
15
0 1 71
D-D 5 60
310
C210-002-A1
0
Paved Walkway
Paving to be Approved by Architect.
125 850 145 850 145 855
260
850 145
2 075
145
1 405
Counter
FFL 2 685
aluminium frame glass door – Midrail – single hinged 2200x2100mm above FFL. Unitized curtain wall panel; refer to typical door detail
310 200 2 230
230x450mm reinforced concrete column to engineer's specification
230mm brick wall; plastered and painted on both sides
305
15 600
2 410
405
2 405
2 180
25 24 23 22 21 20
7 8 9 10 11 12 13
19 18 17 16 15 14
planted landscaping
Main Entrance to Residential Floors
25 TREADS @ 250mm 25 RISERS @ 170mm
260
4 470
310
54 m² EPOXY SCREED
280mm brick cavity wall plastered and painted on both FFL 2 685 sides; stepped DPC across cavity between inner and outer skin with weepholes at 900mm intervals in external leaf aluminium frame glass door – Midrail – single hinged 2200x2100mm above FFL. Unitized curtain wall panel; refer to typical wall detail G02 C02
FFL 2 655
steel handrail to 1000mm height along staircase, refer to sheet C740-001-A1
3 460
G03 C03
RETAIL
SINK
G12 D07
mild steel open riser staircase as per engineer's specifications
G11 D07
10 550
R
G14 D07
10 72
0
5 11 56 G13 D200
FFL 2 655 5 41512 310
19 455
41 170
Pavement to be redone single glazed shopfront panel; solar E clear 6mm armourplate safety glass with 3mm matt silver aluminium front pan
STAIR NOTE: 2 TREADS @ 250mm 2 RISERS @ 170mm
230mm brick boundary wall to act as balustrade
FFL 2 365
Ramp 1:12
aluminium frame glass door – Midrail – single hinged 2200x2100mm above FFL. Unitized curtain wall panel; refer to typical door detail
landscape stair; refer to detail 2
Pavement to be redone
1 2 3 4 5 6
STAIR NOTE:
G01 C02
G10 D07
310
2 075
FFL 2 655
280mm brick cavity wall plastered and painted on both sides; stepped DPC across cavity between inner and outer skin with weepholes at 900mm intervals in external leaf
BAKERY 65m2 EPOXY SCREED
UP
FFL 2 685
255
planted landscaping
890
4 350
145
CL
Q
4 m² TILE
G18 D04
FFL 2 705
310
FFL 2 055
7 515
200
2 670 260
1 465
G-G
C210-005-A1
0 1 11
STAIR NOTE:
1 620
310 1 705 310 520 295
310 1 350 125 2 980
1 825
200
300 G08 SINK C02
G09 D11
260
47m2 EPOXY SCREED
SINK
78 m² TILE
LOBBY
37 m² TIMBER LAMINATE
RETAIL WHB
4 705
2 075 4 425 12 700
200 10 880 3 905
3 860
WHB
0
2 295
12 m² TILE
WHB
G15 D200
230mm brick wall; plastered and painted to architects to later spec
SINK
125
1 190
2 055
Male Ablutions
G39 D01
0 3 78
1 315
200
G38 D01
G07 D07
7 515
305
4 m² TILE
Security Room
310
LAUNDROMAT FFL 2 705
G37 D01
15 m² TILE
G08 D200
790
Pantry
WC
FFL 2 705
1 66
G36 D01
Female Ablutions
FFL 2 655
1 500
200mm in-situ cast concrete lift shaft as per engineer's specifications
115mm brick interior wall; plastered and painted to later spec
Kitchen
260
WM
G06 D07
200
Elevator
3 m² TILE
WHB
G17 D300
5 3 61
G35 D01
260
9 m² TILE
0 2 34
1 820
200
G26 D01
UR
0 1 54
G19 D07
G04 C05
8 m² EPOXY SCREED
0
UR
P Staff Office
Staff WC
5 30
UR
WC
0 1 07
G16 D04
145
5 1 65
200
ET
WC
2 525
995
125
WC
220
200
260
WC
aluminium frame glass door – Midrail – single hinged 2200x2100mm above FFL. Unitized curtain wall panel; refer to typical wall detail
145 0 2 59
SINK
TR E
5 m² TILE
G05 C05
300x450mm reinforced concrete column to engineer's specification
145 310
Caretaker's Bath
4 m² TILE
SINK
455 410 455 410 455 1 505
305
brick planter box
G21 D07
0 2 44
D01
Duct
in-situ cast reinforced concrete staircase to engineer's specification. NOTE: Treads to be min 250mm; Risers to be max 200mm; Maximum 3000mm rise between landings; refer to sheet C123-001 for detail
24 TREADS @ 250mm 24 RISERS @ 170mm
740 200
4 470
G20 D07
single glazed shopfront panel; solar E clear 6mm armourplate safety glass with 3mm matt silver aluminium front pan
0
305 G30
WHB
WM
26 27 28
18 m² Screed
260
G42 D07
5 1 17
WM
FFL 2 685
FIRE ESCAPE 1
2 765
115mm brick interior wall; plastered and painted to later spec
5 47
905
WC
78m2 EPOXY SCREED ?
19 20 21 22 23 24 25
29
300
WHB
RETAIL Room
STAIR NOTE:
1 205
FFL 2 655
Landscape Seating
ce
0 3 39
5 1 22
125
WHB
UP
36 35 34 33 32 31 30
310 600 295
G29 D01
WC
G05 D02
37
2 720
WHB
145
1 465 G33 D01
WM
Intermediate Landing
260
WC
ACC Ablutions 300
280mm brick cavity wall plastered and painted on both sides; stepped DPC across cavity between inner and outer skin with weepholes at 900mm intervals in external leaf
Class B, 2 Hour fire rated steel fire door; door to be fitted with approved push-bar released lever and steel kickplate on internal face, as per manufacturer's spec. G04 D02
planter box; refer to sheet C123-001 for detail
2 115
WHB
4 m²
10mm steel mesh grating
sculptural wall; refer to detail of floating wall
J
280mm brick cavity wall plastered and painted on both sides; stepped DPC across cavity between inner and outer skin with weepholes at 900mm intervals in external leaf
G03 D200
SINK
I in-situ cast ramp @ 1:12 gradient to engineer's specification
310 Planted landscaping
G40 D07
Entran rnative Alte to Creche
65 m² FLEX RUBBER
15 905
305
Planted landscaping G41 D07
965
FFL 1 060
7 515
G02 D100
G01 D100
200
PUBLIC THROUGHFARE
260
S GER
0 1 68
FFL 2 405
WC 9 m² FLEX RUBBER
310
Intermediate Landing
G07 C03
C123-001-A1 ---
ClearVu wrought iron gate installed to manufacturer's spec
Intermediate Landing
FFL 1 655
6 985 30mm screed finished with 0.8mm cementitious colour cote, primer coat and sealant to supplier's spec on 250mm reinforced suspended concrete slab to engineer's spec
0
WC
Sleeping Area
CRECHE Play & Learning Area
0 8 32
FES -
125
22 59
145
WHB
Passage
O
975
WHB
10 m² TILE
G22 D04
seating
310
brick landscape retaining wall
G
Planter
300mm ⌀ reinforced concrete column to engineer's spec
15 910
1 000 305 405
8 TREADS @ 450mm 8 RISERS @ 200mm
WC
300x450mm reinforced concrete column to engineer's specification
PUBLIC GARDEN
brick landscape retaining wall
34 305
F
in-situ cast concrete staircase to engineer's specification
5 m² EPOXY SCREED
WHB Landscaping exhaust vent extract point
H
Store Room
aluminium frame glass door – Midrail – single hinged 2200x2100mm above FFL. Unitized curtain wall panel;
G06 refer to typical wall detail C03
145 735 145
G23 D07
Public Seating Area
Concrete Seating
07
brick planter box
recessed mat
R UT
310
195 Planter Landscaped Seating
0
Paving
brick landscape retaining wall
3 10
C210-003-A1
300mm ⌀ reinforced concrete column to engineer's spec 5 2 23
N
5 4 34
5 1 87
C-C
310
5 1 40
145
310 310
300mm ⌀ reinforced concrete column to engineer's spec
Main Entrance to Creche
landscaping burm; refer to typical landscape detail
0 5 94
Wrought Iron Gate
Sandpit to Engineers Detail.
200mm in situ cast concrete retaining wall to engineer's specification
0 3 50
G24 D100
Concrete Seating
FFL 2 380
Pavement to be redone
Pavement to be redone
KEIZERSGRACHT / HANOVER STREET
Ground Storey SCALE: 1 : 100
COPYRIGHT NOTICE Copyright ©
STUDIO SNE
Copyright subsists in this drawing. The person or entity, whose name appears in the title block of this drawing, is hereby granted a nonexclusive license to use, display, print, and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawing. This license in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licenses in respect of the copyright in this drawing to any other entity. This license confers no ownership rights in the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of SNE Architects (Pty) Ltd. Any unauthorized reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematograph film or television broadcast is an act of copyright infringement which will render the doer of the act
NOTES This drawing is the property of SNE Architects (Pty) Ltd. and is - intended for the use only on site and for the project to which it relates. - Copyright in this drawing is owned SNE Architects (Pty) Ltd. All work is to be carried out in accordance with SANS 10400 and - other relevant SANS Standards. This drawing is not to be scaled. Figured dimensions to be used. All - dimensions are in millimeters unless otherwise stated. All levels and dimensions to be checked on site by the contractor - before work is carried out and any discrepancies to be reported to the Architect. - The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85 of 1993) and any regulations promulgated in terms of that Act or the Factories Machinery and Building Works Act of 1941. - This drawing must be read in conjunction with all the relevant drawings, schedules and specifications from the Architect and all other consultants related to the project.
REV
DATE
DRAW N
76
PROPOSED MIXED-USE HOUSING
DESCRIPTION
FOR
CITY OF CAPE TOWN
ERF 173249 Keizersgracht Street, Zonnebloem, Cape Town
Ground Storey Plan
08
09
10
11
12
13
17
16
L 5
1 46
4 68
5
A-A
0
14
300mm ⌀ reinforced concrete column to engineer's spec
5
1 31
4 88
150
14 30
C210-002-A1
5 60
106
0
W1
step
129 D09
fall
ther m wea
0
D-D
SCREED
50m
4 73
405
BALCONY
C210-002-A1
B-B C210-001-A1
M
0
15
3 81
105 W1
0
104
BEDROOM 1
W1
34 000 2 800
7 800
BALCONY
FFL 6 195
KITCHEN/LIVING ROOM
KITCHEN/LIVING ROOM
103
fall
28 m² TIMBER LAMINATE
128 D01
0
29 m² TIMBER LAMINATE
W1
3 60
260
1 770
145
1 625
260
1 860
145
1 770
310
1500
Class B fire rated door
50mm weather step
1 845
200 2 230
fall
fall
shelving
200
BATH
3 m² EPOXY SCREED
3 m² EPOXY SCREED
146 D04
145
149 D04
114 C02
1 500
18 17 16 15 14 13 12 11
50mm weather step
UNIT 07
20 m² SCREED
150mm reinforced concrete slab to engineer's spec.
19 m² EPOXY SCREED
UNIT 11
115 D07
BALCONY
UNIT 12
UNIT 13
19 m² EPOXY SCREED
20 m² EPOXY SCREED
310
164 D15
3 715
260
163 D15
3 540
260
157 D15
3 775
260
30mm screed finished with 0.8mm cementitious colour cote, primer coat and sealant to supplier's spec on 250mm reinforced suspended concrete slab to engineer's spec
156 D15
01 C820-006-A1
3 480
405
2 400
3 730
polyethylene planter box on cantilevered concrete slab to engineer's specification; finished with rhino wood decking as per manufacturer's spec; refer to section G-G
153 D15
3 780
260
02 C910-001-A1
148 D15
3 530
260
147 D15
3 725
11 m² TIMBER LAMINATE
FFL 6 195 138 D01
134 D09
BALCONY
R
SCREED
FFL 6 145 3 05
LIVING / DINING ROOM
150 0
11 m² TIMBER LAMINATE
04
W2
135 D15
BEDROOM 2 10 m² TIMBER LAMINATE
136 D15
6 000
305
30mm screed finished with 8mm timber laminate and DPM to manufacturer's spec on 250mm reinforced suspended concrete slab to engineer's spec 3
300 145 970 145 145 C820-006-A1
1 86
0
2 97
310
C910-002-A1
2 89
5
310 680
260
03
112 W04
310
5mm x 40mm galvanised steel flat bar hand rail welded to 45mm x 5mm galvanised steel flat bar uprights welded to 3mm galvanised steel base plate to be finished with anticorrosive paint and primer to steel fabricator's specification; refer to section 1 for detail
LIVING / DINING ROOM
113
116 C02
3 460
W1
FFL 6 195
UNIT 16
139 D01
140
steel handrail to 1000mm height along staircase, refer to sheet C740-001-A1
280mm brick cavity wall plastered and painted on both sides; stepped DPC across cavity between inner and outer skin with weepholesat 900mm intervals in external leaf
310
111
UNIT 17
10 m² TIMBER LAMINATE
mild steel open riser staircase as per engineer's specifications
3 200
20 m² EPOXY SCREED
SCREED
FFL 6 160
5mm x 40mm galvanised steel flat bar hand rail welded to 45mm x 5mm galvanised steel flat bar uprights welded to 3mm galvanised steel base plate to be finished with anti-corrosive paint and primer to steel fabricator's specification; refer to typical balcony threshold
144 D07
W2
25 TREADS @ 250mm 25 RISERS @ 170mm
310
screed finish to 1:200 fall towards fullbore outlets; full bores set at least 500mm away from upstands ; refer to typical balcony threshold
FFL 6 185
110 W2
405
2 025
UNIT 06 230x450mm reinforced EPOXY concrete column to engineer's specifications
FFL 6 185
fall
4 495
UNIT 05
19 m² EPOXY SCREED
20 m² EPOXY SCREED
FFL 6 185
FFL 6 185
Q
BEDROOM
11 m² TIMBER LAMINATE
KITCHEN
18 m² TIMBER LAMINATE
BEDROOM 1
5
UNIT 04
FFL 6 185
KITCHEN
14 m² TIMBER LAMINATE
3 17
FFL 6 185
133 D01
4 m² EPOXY SCREED
143 D04
C210-005-A1
115 C02
STAIR NOTE:
FFL 6 185
3 200
3 m² TILE
114
10
fall
310 1 780
2 075
450
4 065 145
3 975
4 425
1 870 260
450
1500 260
14 950
3 455
3 905
2 155
BATH
152 D04
200
132 D01
BATH 140 D04
Utility Store
1 2 3 4 5 6 7 8 9
r doo
150
BATH
3 m² EPOXY SCREED
1 500 UP
Class A fire rated door 145 D01
131 D04
rated fire sA Clas 141 D01
5
Class A fire rated door 150 D01
G-G
10 m² TIMBER LAMINATE
0
155 D04
200mm in-situ cast concrete lift shaft as per engineer's specifications
EPOXY SCREED
FFL 6 185
FFL 6 185
5
P
BEDROOM
1 50
BATH
3 m² EPOXY SCREED
3 m² EPOXY SCREED
EPOXY SCREED
117 D01 Class A fire rated door
CORRIDOR
LOBBY
1 76
0 142 D200
r doo rated 130 D01
step
158 D04
230mm brick wall separating units; plastered and painted on both sides
3 09
W1
fire
ther m wea
BATH
162 D04
23 m² Rubber United Tatami Mats Blue
145 117 C04
109
sA Clas
50m
3 m² EPOXY SCREED
Games Room
ELEVATOR
3 m² EPOXY SCREED
Class A fire rated door
Class A fire rated door 151 D01
154 D01
159 D01
200
145
BATH
114 D01
Rubber United Tatami rubber mats (or similar sound absorbent floor finish) installed according to supplier's specifications
Class A fire rated door
BATH
BATH
3 m² EPOXY SCREED
111 D01
FFL 6 210
161 D01
2 525
5
fall
160 D200
3 m² EPOXY SCREED
Class A fire rated door
EPOXY SCREED
Class A fire rated door
200
118 D04
2 16
260
0
1 66
CORRIDOR
UNIT 10
18 m² EPOXY SCREED
BATH
3 m² EPOXY SCREED
17
FFL 6 185
Class A fire rated door 166 D01
BATH
115 D04
1 77
145
310
service ducts; refer to sheet C910-001 for detail
108 D01 Class A fire rated door
open steel staircase to engineer's specification; risers max 200mm and treads min 250mm
UNIT 09
16 m² EPOXY SCREED
112 D04
145 855 145
450
58 m² Rubber United Gym Tile Smooth
9 10 11 12 13 14 15 16
r doo rated 1 520
5
101 D02
105 D01 Class A fire rated door
5 6 7 8
Multi-Purpose Room BATH
3 m² EPOXY SCREED
102 D01 Class A fire rated door
UNIT 08
18 m² EPOXY SCREED
4
109 D04
3 m² EPOXY SCREED
3 m² EPOXY SCREED
UP 150
CL
fire
3 71
106 D04
BATH
150
sA Clas
0
BATH
110 D07 2 500
120 D01
10 m² TIMBER LAMINATE
0
145
0
5 30
103 D04
in-situ cast reinforced concrete staircase to engineer's specification. NOTE: Treads to be min 250mm; Risers to be max 200mm; Maximum 3000mm rise between landings; refer to sheet C123-001 for detail
150
CL
BEDROOM 2
5
1 37
145
150
18 m² EPOXY SCREED
110mm brick wall; painted and plastered on both sides
2 53
0
2 295
FFL 6 185
2 97
450
FFL 6 185
300x450mm reinforced concrete column to engineer's specification 1 2 3
145
5
UNIT 03
UNIT 02
17 m² EPOXY SCREED
Class B, 2 Hour fire rated steel fire door; door to be fitted with approved push-bar released lever and steel kickplate on internal face, as per manufactures spec.
FFL 6 160
FFL 6 185
50mm weather step
260
2 250
SCREED
FFL 6 160
FFL 6 185
FFL 6 185
0
FFL 6 185
310 3 06
EPOXY SCREED
101 W1
125 D01 r doo rated
fire
CORRIDOR
3 m² TILE
119 D15
3 60
FFL 6 185
sA Clas
BATH
260
3 m² TILE
124 D04
5 47
BATH
121 D01
3 810
125 1 065 455
310
126 D04
122 D01
W2
116 D15
O
W1
310
125
K
3 725
door to height of 2100mm above FFL; comprised of 400mm insulated aluminium spandrel panel below to match 1600mm aluminium inward opening glazed section above; refer to detail Y
113 D15
BALCONY
FES -
165 D04
J
260
5mm x 40mm galvanised steel flat bar hand rail welded to 45mm x 5mm galvanised steel flat bar uprights welded to 3mm galvanised steel base plate to be finished with anti-corrosive paint and primer to steel fabricator's specification; refer to typical balcony threshold
150mm reinforced concrete slab to engineer's spec.
C123-001-A1 ---
UNIT 01
I
3 530
102
screed finish to 1:200 fall towards fullbore outlets; full bores set at least 500mm away from upstands; refer to typical balcony threshold
110 D15
107 D15
104 D15
18 m² EPOXY SCREED
H
260
670
G
3 755
260
800x2100mm bi-sliding perforated aluminium sun visors (40%) fixed to top and bottom rails, runners and necessary hardware according to manufacturer's specification
F
405
0
1 770
9 805
0
145
305 100
2 06
1 800
3 775
260
310
260
22 59
07
3 540
10 m² TIMBER LAMINATE
UNIT 14
11 m² TIMBER LAMINATE
260
108
BEDROOM 2
BEDROOM 1 3 715
5
127 D01
UNIT 15
310
3 10
C-C C210-003-A1
N 107 W2
123 D09
SCREED
5mm x 40mm galvanised steel flat bar hand rail welded to 45mm x 5mm galvanised steel flat bar uprights welded to 3mm galvanised steel base plate to be finished with anticorrosive paint and primer to steel fabricator's specification; refer to typical balcony threshold
11 m² TIMBER LAMINATE
FFL 6 195
150mm reinforced concrete slab to engineer's spec.
7 800
145
7 800
ther m wea 50m step
7 800
3 68
0
5
310
First Storey SCALE: 1 : 100
COPYRIGHT NOTICE Copyright ©
STUDIO SNE
Copyright subsists in this drawing. The person or entity, whose name appears in the title block of this drawing, is hereby granted a nonexclusive license to use, display, print, and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawing. This license in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licenses in respect of the copyright in this drawing to any other entity. This license confers no ownership rights in the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of SNE Architects (Pty) Ltd. Any unauthorized reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematograph film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil law copyright infringement and may in certain circumstances render the doer liable to criminal prosecution. Requests and enquiries concerning this drawing and the rights subsisting therein should be addressed to the copyright owner.
NOTES This drawing is the property of SNE Architects (Pty) Ltd. and is - intended for the use only on site and for the project to which it relates. - Copyright in this drawing is owned SNE Architects (Pty) Ltd. All work is to be carried out in accordance with SANS 10400 and - other relevant SANS Standards. This drawing is not to be scaled. Figured dimensions to be used. All - dimensions are in millimeters unless otherwise stated. All levels and dimensions to be checked on site by the contractor - before work is carried out and any discrepancies to be reported to the Architect. - The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85 of 1993) and any regulations promulgated in terms of that Act or the Factories Machinery and Building Works Act of 1941. - This drawing must be read in conjunction with all the relevant drawings, schedules and specifications from the Architect and all other consultants related to the project.
REV
DATE
DRAW N
PROPOSED MIXED-U DESCRIPTION FOR
CITY OF CAPE TOWN
ERF 173249 Keizersgracht Street, Town
First Storey Plan SCALE: 1 : 100 PROJECT NUMBER
01
ACTS OF PARLIAMENT
Design
| Portfolio
All Contractors shall ensure that, before any work is put in hand, they comply with all the necessary Acts of Parliament of the Republic of South Africa.
INFO
3rd Floor, Centlivres, Rondebosch, Cape Town, 7700, Tel 021 260 2595, info@studiosne.co.za
SERIES - PAG
C100-004 COUNCIL PROJECT DATE:
11/11/19
Q
P
O
N
M
L
22 600 1 655
5 300
F
5 470
3 095
5 620
Lwazi | Ncanana
R
G
H
I
J
K
1 460
20 655
S
14 950 4 425
3 905
2 295
2 250 2 900
2 075 20 655
Roof
S plastered and painted
17 755
S
17 755
Fifth Storey
S plastered and painted
2 900
2 900
plastered and painted
14 855
plastered and painted
2 900
S 161,18°
11 955
plastered and painted
2 900
Third Storey 9 225
S
9 055
S
9 055
Second Storey
S plastered and painted
6 155
S F
plastered and painted
6 155
F
2 650
F
F
955
First Storey
F
161,18°
161,18°
First Storey
S
Second Storey
F
3 500
2 900
plastered and painted
Third Storey
2 900
2 900 21 250
9 225
plastered and painted
plastered and painted
21 250
2 900
S
11 955
Fourth Storey
161,18°
Fourth Storey
S plastered and painted
plastered and painted
Fifth Storey
2 900
14 855
Roof
7 125 1 820
8 075
plastered and painted
3 500
2 655
S
Ground Storey
bagged brickwork
2 655
Ground Storey
S
3 250
bagged brickwork
-595
Basement Storey
3 250
S
-595
Basement Storey
S
East Elevation
West Elevation
SCALE: 1 : 100
SCALE: 1 : 100
NOTES
08
09
10 11
B-B
12
14
Sim
16
15
17 L M N O
C210-002-A1
0203
04
05
07
06
F G
A
P F
Q R
H
B
G
H
I
J
K
14 950
I J K
C D E
COPYRIGHT 2 075
4 425
3 905
2 295
2 250
Copyright ©
Boundary Line
01
- This drawing intended for t - relates. Copyright in t - All work is to other relevan - This drawing dimensions a - All levels and before work i - Architect. The contracto provisions of 85 of 1993) a - the Factories This drawing drawings, sch other consult
13
Copyright sub appears in th exclusive lice the extent ne the title block 17 755
S
C210-01-02_Reference Plan _Section B-B
Fifth Storey
Boundary Line
SCALE: 1 : 500
This license c drawing and times, remain unauthorized inclusion of t is an act of c liable for civil circumstance and enquiries should be ad
2 900
2 405
This license i and the perso grant sub-lice other entity.
ACTS OF PA 14 855
S
1 850
450
3 000
1 015
1 860
Fourth Storey
All Contracto comply with a South Africa.
4 600
REV
CL
2 010
2 030
2 780
Sliding folding door: laminated safety glazing
Double Acting Class A Fire rated door
2100x3000
DATE
galvanised steel balustrade to 1000mm above FFL, finished with anti-corrosive paint and primer to architect's paint specification, balusters every 100mm
2100x1700 300
4 C230-001-A1
11 955 8010
250
300
SOFFIT 11 575
12mm skimmed plasterboard fixed to brandering structure as per manufacturer's specifications
6x6mm water drip recess in slab
Third Storey
300
250mm RC slab to engineer's specification
680
250
250
15x15mm coated aluminium shadow trim fixed to wall
S
5 800
370
500
500
FFL 12 030
38x38mm SA pine brandering @ 450mm c/c max secured to supporting timbers with 75mm nails Eco-Cellulose insulation to comply with SANS10400XA; installed to manufacturer's specifications 2 530
400
CL
CL
1200
400
CL
400
CL
400
CL
400
1200
CL
400
CL
400
300
CL
365
435
400
400
375
400
400
300
260
300
FFL 9 115
38x50mm timber battens @ 400mm c/c
9 055
16
2° 146,2
15 14
254x146x43 steel I-beam as bearer beams @ 1200 c/c; chemically anchored to reinforced concrete slab
skimmed and painted concrete soffit 38x50mm timber battens fixed to concrete; apply 2 layers of flintkote over floor and battens to prevent sweat
320 smooth painted and plastered
970
,78°
2.0mm x 1.2m wide Superflex® vinyl sheeting, laid in FloorworX No. 62 acrylic adhesive and 30mm screed
FFL 6 210
6 155
540
2 980
240
galvanised steel wall tie every 4 brick courses @ 900mm c/c 2 605
CL
265
4 280
310
3 485
recessed LED downlight
300mm ⌀ reinforced concrete column to engineer's spec
295
ceiling sub-structure fitted to manufacturer's specification
280mm brick cavity wall plastered and painted on both sides; stepped DPC across cavity between inner and outer skin with weepholes at 900mm intervals in external leaf
Female Ablutions Internal Timber Door
2 655
9.8mm plasterboard fixed to 38x38mm aluminium battens as per supplier's specifications
3 305
PUBLIC GARDEN
First Storey
2 310
skimmed and painted concrete soffit
LED ceiling mounted light
145
ceiling void
3 500
LED Coreline wall mounted light
730
skimmed and painted concrete soffit
SOFFIT 5 905
400
250mm RC slab to engineer's specification
CL
6x6mm water drip recess in slab
S
400
1
380
123
55 165 165 165
3 2
250
2 360
2 250
10mm medium-density water-tight treated fibre cement board fixed to 280mm external cavity wall with concealed undercut
320
4
refer to typical balcony detail
2 370
320
Games Room
smooth painted and plastered
320
2 650
Multi-Purpose Room
7 6 5
Second Storey
1 730
320
built-in shelving; 20x300x1400mm pine shelving to supplied and fitted by specialist
11 10 9 8
S
FFL 8 805
13 12
845
150
1 625
18 350
400
CL
2 900
1000mm galvanised steel balustrade, finished with anti-corrosive paint and primer to architect's paint specification, balusters every 100mm
300x450mm reinforced concrete beam to engineer's specification; painted and plastered
250
5 420
CL
1200
CL polyurethane elastic sealant, injected all around as per manufacturer's spec.
3 070
smooth painted and plastered
CL
smooth painted and plastered
150 250 150
aluminium window as per window schedule
2 350
2 220
8 450
Co-Working Double Volume
Covered Walkway
Glazed Aluminium Door
smooth painted and plastered
2100x1600 1 550
2 570
2032x813
745
1 065
220
810
4 470
75mm⌀ drainage pipe at fall, to drain according to engineers specification
200mm reinforced concrete load bearing wall to engineer's specification
110mm internal partition brick wall
Corridor
bagged brickwork
1 665
2 510
Store RM 13
125
1 200
2 265
230 200
Ground Storey
3rd Flo
75mm⌀ drainage pipe at fall, to drain according to engineer's specification
1535x433mm Galvanised sheet steel Jet fan System-Air ventilation and smoke extraction system thrusting air towards extractor fan/ducts. 300°C/120min Insulation class F and class H
CL
300x450mm reinforced concrete column with rounded edge as per engineer's specification
Basement Parking
200mm reinforced concrete retaining wall; retaining wall to consist of a 110mm skin brick wall on the inner basement and lined with 4mm Reoxthene torch-on membrane and covered with 7mm Dorken protective sheeting on the outerbasement through wicking to engineer's spec.
300x450mm cast in-situ reinforced concrete column to engineers spec
bagged brickwork
200
2 275
450
1 625
PROPOSE
225 225
30mm screed floor finish to fall on 200mm concrete slab on 350 micron DPM on 300mm layer of well compacted aggregate fill
450
7 875
FFL -585
110mm loose NBR bricks for water drainage
S
C230-001-A1
285
300x300mm reinforced concrete transfer beam cast in-situ spanning more than 10m as per engineer's specification
225 225
Store RM 19
115
2 655
2 585
150
3 445
bagged brickwork
bagged brickwork
115
SOFFIT 2 455
255
SOFFIT 2 195
305
SOFFIT 1 915
110mm cavity
105
6 475
200
3 250
200 130
200mm RC slab to engineer's specification
220
FFL 2 620
205 5
390
200mm RC slab to engineer's specification
No fines concrete to act as filter; to landscape architect's detail screed to min 1:60 fall; 30mm min thickness, 100mm max thickness
refer to detail 2
180
1 025
geotextile membrane to specialist's detail
200
FFL 2 705
200mm RC slab to engineer's specification
waterproofing membrane to lap 150mm high up wall
Existing boundary wall in elevation
10mm tile as approved by architect laid on 30mm screed and 10mm tile adhesive
FFL 2 595
260
1 025
1 390
refer to detail 3
refer to detail 2
fullbore outlet in background soil layers to specialist's specification
450
1 850
450
2 115 110mm loose NBR bricks for water drainage
FFL -595
150mm galvanised steel stormwater channel drain to fall to sump outlet
310
Well compacted earth backfill in layers of 300mm and consisting of 10% cement stabilizer
FOR -595
S
375 micron dpm
Basement Storey
Wicking system. 7mm dorken sheeting with geotextile layer on both sides Stone chips
100mm ⌀ agricultural pipe with peforations, sitting in graded stone, wrapped in geo-textile layer. 1600mmx300mm Cantilever Retaining wall footing with 400x300mm shear key to engineer's spec.
300mm stone layer for drainage
Wicking system. 7mm dorken sheeting with geotextile layer on both sides. Final argricultural pipe position
300
100mm ⌀ agricultural pipe with perforations, sitting in graded stone, wrapped in geo-textile layer at a 1:200 fall
CITY OF C
ERF 1732 Keizersgr Town
1300x1300mm reinforced concrete pile cap footing as per engineer's spec
8 290
2 075
4 425
3 905
2 295
Section B
2 650
SCALE: As in
Section B-B SCALE: 1 : 50
78
PROJECT NUMBER
01 INFO
08
FES -
7
I
8
32 31 30 26
29
27
9
67
56
66
57
65
58
64
59
Intermediate Landing
UP
60
63
61
COPYRIGHT NOTICE Copyright ©
This license in respect of the cop and the person and/or entity refe grant sub-licenses in respect of t other entity.
This license confers no ownershi drawing and this drawing and the times, remain the property of SN unauthorized reproduction, public inclusion of this drawing in a cine is an act of copyright infringemen liable for civil law copyright infring circumstances render the doer lia and enquiries concerning this dra should be addressed to the copy
Intermediate Landing
1 505
200
1 500
3 205
CL
1 505
J
J 1 505
J
I
200
CL
CL
1 500
J
3 205C L
ACTS OF PARLIAMENT
CL
1 550
All Contractors shall ensure that, comply with all the necessary Ac South Africa.
3 255
CL
H
CL
CL 14 855
S
Fourth Storey
REV
FES Plan - Basement
161,18°
161,18°
200
S
Copyright subsists in this drawing appears in the title block of this d exclusive license to use, display, the extent necessary to carry out the title block of this drawing.
62
Intermediate Landing
1 750
SCALE: 1 : 500
55
28
1 750
1 750
123-01-00_FES Reference Plan
I
54
68
2 000
6
33
69
3 500
11
10
34
250 250 250 250 250 250 250 250
5
35
1 500
12
24 TREADS @ 250mm 24 RISERS @ 170mm
LVL 11 955
UP
36
1 750
4
37
250 250 250 250 250 250 250
3
13
2 250
14
UP
4 000
2
2 000
1
15
Grano Finish 40mm to Treads & 20mm to Risers with Reeded 24 TREADS @ 250mm 24 RISERS @ 170mm
3 500
250 250 250 250 250 250 250 250 250
I
24 TREADS @ 250mm 24 RISERS @ 170mm
16
3 500
2 250 4 000
C D E
Third Floor LVL 6 160 Grano Finish 40mm to Treads & 20mm to Risers with Reeded
18 17
- This drawing is the property of SN intended for the use only on site - relates. Copyright in this drawing is owne - All work is to be carried out in acc other relevant SANS Standards. - This drawing is not to be scaled. dimensions are in millimeters unl - All levels and dimensions to be c before work is carried out and an - Architect. The contractor shall in all aspects provisions of the Occupational H 85 of 1993) and any regulations p - the Factories Machinery and Buil This drawing must be read in con drawings, schedules and specific other consultants related to the p
1 500
H
250 250 250 250 250 250 250 250
Q R
200
First Floor
Grano Finish 40mm to Treads & 20mm to Risers with Reeded
I J K
CL
1 505
1 750
P
H
B
CL
1 500
18 m²
LVL -595
F G
A
200
NOTES
3 205
1 500
1 160
07
06
CL
1 505
FIRE ESCAPE 1
1 500
05
CL
H N O
1 500
04
3 205
CL
1 550
L M
250 250 250 250 250 250 250 250 250
0203
16
15
1 750
01
17
200
2 250
14
CL
1 505
1 750
13
3 750
12
250 250 250 250 250 250 250 250 250
10 11
C123-001-A1
1 500
09
FES
C123-001-A1 ---
CL
3 255
1 500
08
08
08
FES -
C123-001-A1 ---
CL
FES Plan - First Floor
SCALE: 1 : 50
SCALE: 1 : 50
08
DRAW N
DATE
FES Plan - Third Floor SCALE: 1 : 50
08
198,82°
FES
11 955
TOC 11 955
S
49
42
grano finish 40mm to treads & 20mm to risers with reeded
41 40 39
TOC 6 155
3 365
38 37
200mm THICK R.C. FLOOR SLAB TO ENG. DETAIL
35
250 250 250 250 250 250 250 250 230
1 650
34
1 425
33 32
1 270
4 020
21
33
22
32
23
31
24
30
25
UP
26
29
I
1 750
20
34
69
54
68
55
67
56
66
57
65
58
64
59
6 155
S
1 505
TOC 2 695
60
63
61 62
Intermediate Landing
200
First Storey
TOC 6 160
UP
1 495
Intermediate Landing
3 200
TOC -595 1 505
J
200
1 500
3 205
J
30
26 25 24 23 22
grano finish 40mm to treads & 20mm to risers with reeded
21 20
TOC 2 655
19 18
200mm THICK R.C. FLOOR SLAB TO ENG. DETAIL
3 500
29
240145185185185185185185185185185
27
185
250 28
19
35
28
200
31
Intermediate Landing
36
27
1 770
43
170
44
I
2 900
45
12 550
240165 340 170170170170170170170
46
1 500
Second Storey
48
47
200 385 150
S
1 705
250
905
50
Intermediate Landing
TOC 7 860
9 055
250 250 250 250 250 250 250
2 060
3 500
2 590 1 195
200mm THICK R.C. FLOOR SLAB TO ENG. DETAIL
1 750
TOC 9 015
54
24 TREADS @ 250mm 24 RISERS @ 170mm
1 750
55
53
250 250 250 250 51 250 250 250 250
TOC 9 055
LVL 9 055 24 TREADS @ 250mm 24 RISERS @ 170mm
37
2 250
56
52
1 500
Grano Finish 40mm to Treads & 20mm to Risers with Reeded
3 750
grano finish 40mm to treads & 20mm to risers with reeded
1 500
LVL 2 695
250 250 250 250 250 250 250 250 250
57
TOC 11 955
200
Ground Floor
1 500
1 630
58
1 505
1 500
59
2 250
60
250 250 250 250 250 250 250 250 250
2 605
61
1 495
Second Floor
1 660
180
64 63
62
200
H
1 840
1 270
TOC 10 685
1 505
H
2 900
200mm THICK R.C. FLOOR SLAB TO ENG. DETAIL
66 65
3 205
1 630
290 180180180180180180180180180180180180180180180180
68 67
250
C123-001-A1
3 200
Third Storey
1 195
69
Intermediate Landing
FES
C123-001-A1
grano finish 40mm to treads & 20mm to risers with reeded
250 250 250 250 250 250 250 250
1 770
1 500
2 655
S
Ground Storey
FES Plan - Ground Floor
FES Plan - Second Floor
SCALE: 1 : 50
SCALE: 1 : 50
3D View 1 505
50
1 405
50
3rd Floor, Centlivres, Rond Tel 021 260 2595, in
13
4 3 2 1
TOC -645
250
-595
S -1 140
100
10151015101510 25
15 100
10
FOR
CITY OF CAPE TOWN
40 x 40 x 3 mm GMS Angle
40
ERF 173249 Keizersgracht Street, Town
Basement Storey Basement Foundation 250
S
RC Stair to Engineer's Detail.
PROPOSED MIXED-US
250
20mm Thick Grano Finish "Honed" 250
5
10
40 x 40 x 3 mm GMS Angle Nosing with Estended Lugs Fixed to Concrete
185
6
35
7
10 15
11 10
8
3 250
250 9
180
Intermediate Landing
15
12
40 10
40mm Thick Grano Finish "Honed" wiht 110mm Wide Reeded Finish to be Approved
10
1 425
14
1 625
1 480
1 625
555
180180180180180180180180180
5 090
200
15
16 15
Fire Escape Stair Deta SCALE: As indicated PROJECT NUMBER
FES Section
Typical Detail 01 - FES Reeded Nosing Detail
Typical Detail 02 - FES Reeded Nosing Detail Plan
SCALE: 1 : 50
SCALE: 1 : 10
SCALE: 1 : 10
SERIES - PAGE
01
C123-001
INFO
COUNCIL PROJECT DATE:
11/11/19
4 250
NOTES
4
1 415
C123-002-A1
250
1 415
C123-002-A1
915
G
250
250
G
915
H
- This drawing is th intended for the u - relates. Copyright in this - All work is to be c other relevant SA - This drawing is n dimensions are in - All levels and dim before work is ca - Architect. The contractor sh provisions of the 85 of 1993) and a - the Factories Ma This drawing mus drawings, schedu other consultants
G 40 mm wall mounted steel handrail
30
4 165 40 mm wall mounted steel handrail 17 TREADS @ 250mm 17 RISERS @ 167mm
1000mm galvanised steel balustrade, finished with anti-corrosive paint and primer to architect's paint specification, balusters every 100mm
2
3
250
250
250
250
250
250
250
250
250
250
250
250
915
925
UP
50mm Mild Steel finished according to specialist spec 1
250
Intermediate Landing
915
925
895
UP
915
17 TREADS @ 250mm 17 RISERS @ 167mm
Intermediate Landing
50mm Mild Steel finished according to specialist spec
1000mm galvanised steel balustrade, finished with anti-corrosive paint and primer to architect's paint specification, balusters every 100mm
FFL 6 715
1
2
3
6
FFL 6 715
C123-002-A1
FFL 9 085
30 165 165
250
7
C123-002-A1
250
250
250
11
250
11
250
12
250
12
250
13
250
13
14
250
14
15
250
15
16
250
16
2° 146,2
10
9
All Contractors s comply with all th South Africa.
165
6
REV
165
4
165
3
165
2
1
165
FFL 6 210
17 TREADS @ 250mm 17 RISERS @ 167mm
6 155
H
H
17
First Storey
250mm RC slab to engineer's specification 17
FFL 9 085
Steel Stair Plan - First Floor
Steel Stair Plan - Second Floor
Steel Stair Section
SCALE: 1 : 20
SCALE: 1 : 20
SCALE: 1 : 20
1000mm galvanised steel balustrade, finished with anti-corrosive paint and primer to architect's paint specification, balusters every 100mm
65 40mm ⌀ wall mounted circular handrail fixed at 1000mm above stair, finished with anticorrosive paint and primer to architect's paint specification.
FFL 9 085
40mm ⌀ wall mounted circular handrail fixed at 1000mm above stair, finished with anti-corrosive paint and primer to architect's paint specification.
10mm ⌀ steel angle to hold up hand rail 40mm away from away finish
35
| Portfolio
S
FFL 6 210
DATE
165
5
50mm Mild Steel finished according to specialist spec
ACTS OF PARLI
165
1 085
7
Intermediate Landing
FFL 6 715
165
Lightweight steel treadwelded to mild steel stringer to engineer's spec and architect's approval
This license conf drawing and this times, remain the unauthorized rep inclusion of this d is an act of copyr liable for civil law circumstances re and enquiries co should be addres
165
0 25 8
Copyright subsis appears in the tit exclusive license the extent neces the title block of t
This license in re and the person a grant sub-license other entity.
14
165
11
200x20mm flat bar mild steel stringer to engineer's spec.
2° 146,2
165
915
15
165
250
9
10
12
15 150 15
250
250
9
10
250
8
250
4 165
8
250
4 165
250
13
1000mm galvanised steel balustrade, finished with anti-corrosive paint and primer to architect's paint specification, balusters every 100mm
Copyright ©
Second Storey
165
250
6
7
S
165
250
6
250
5
FFL 6 210
250
165
5
COPYRIGHT NO 9 055
16
2 845
250
250
C123-002-A1
5
17
2 595
250
4
250
5
4
7
40mm ⌀ wall mounted circular handrail fixed at 1000mm above stair, finished with anti-corrosive paint and primer to architect's paint specification.
200x20mm flat bar mild steel stringer to engineer's spec.
1000mm galvanised steel balustrade, finished with anti-corrosive paint and primer to architect's paint specification, balusters every 100mm
Balustrade to Wall Detail
C123-002-A1
SCALE: 1 : 5
lightweight steel treadwelded to mild dteel stringer to engineer's spec and architect's approval.
Lightweight steel treadwelded to mild steel stringer to engineer's spec and architect's approval.
H mild steel cap to step line with finish floor.
915
9 055
S
Second Storey Inte
10
iate rmed
ing Land
FFL
6 71
5
FFL 6 210
165
lightweight steel treadwelded to mild steel stringer to engineer's spec and architect's approval.
FOR
200x20mm flat bar mild steel stringer to engineer's specification
250
165
CITY OF CAP First Floor FFL 6 210
1015
0 25
Plate welded to mild steel stringer to Eng. spec.
PROPOSED
First Floor
17 TREADS @ 250mm 17 RISERS @ 167mm
55
10
lightweight steel treadwelded to mild steel stringer to engineer's spec and architect's approval
3rd Floor, C Tel 0
FFL 6 715
200x20mm flat bar mild steel stringer to engineer's spec. 30
25
30
200x20mm flat bar mild steel stringer to engineer's spec
15
Design
30
65
steel plate bolted to wall
1000mm galvanised steel balustrade, finished with anti-corrosive paint and primer to architect's paint specification, balusters every 100mm
ERF 173249 Keizersgrac Town
Steel Stair t
Stainless steel anchor bolt
SCALE: As indic
250mm Concrete Slab to Eng. Spec
PROJECT NUMBER
Steel Stair to Brick Wall Connection
Steel Stair to Concrete Floor Slab Connection
Steel Stair 3D View 2
Steel Stair 3D View 1
SCALE: 1 : 10
SCALE: 1 : 5
SCALE:
SCALE:
01 INFO
PR
08 20 655
S
4
09
10 11
12
Roof
13
14
17
16
15
L M
C210-005-A1
01
0203
04
05
F G
A
P
Sim
Q R
I J K
C D E
1650x650x3mm galvanised steel perforated screen, powder coated, hinged and fixed to inner 76x38x1.6mm Rectangular steel tube frame with M5 bolt
G-G C210-005-A1
H
B vertical wire cable trellis fixed to 76x38mm galvanised steel rectangular tube
N O
07
06
C210-01-00_Reference Plan SCALE: 1 : 500 300
50x50x3mm galvanised steel angle, fixed to 76x38mm rectangular steel tube frame and to 75x45 galvanised steel 'C' channel with anchor bolt, welded to I.P.E 127 (127x76x13) galvanised steel beam
125 95
HSL-3-G M8/40
10
HSL-3-G M8/40
17 755
S
Fifth Storey
refer to typical concrete flat roof detail 745
FFL 17 795
20 655
Roof
S
1650x650x3mm galvanised steel perforated screen, powder coated, hinged and concealed fixed to 76x38mm galvanised rectangular tube
490x3mm galvanised steel perforated grate fixed to 75x45mm Cchannels using hot dip galvanised grating clip
M5 bolt to fix frame to concrete slab 1650x650x3mm galvanized steel perforated screen concealed fixed to 76x38mm rectangular tube through slits made
195
10
1650x650mm Galvanised steel perforated screen, powder coated, hinged and concealed fixed to 76x38mm galvanised rectangular tube
50x50x3mm galvanized steel angle fixed to perforated screen support structure and 125mm reinforced concrete slab to engineer's specification screen, powder coated, hinged and fixed to inner 76x38x1.6mm rectangular steel tube frame with M5 bolt
900x350mm polyethylene planter box
1650x650x3mm galvanised steel perforated screen, powder coated, hinged and concealed fixed to 76x38mm galvanised rectangular tube vertical wire cable trellis fixed to 76x38mm galvanised steel rectangular tube using 35x35x5mm steel angle
1 645
25 75 10
180
Detail A SCALE: 1 : 10
2
10
C210-005-A1
FFL 9 075
50x50x3mm galvanised steel angle, fixed to 76x38mm rectangular steel tube frame and to 75x45 galvanised steel C channel with anchor bolt, welded to I.P.E 127 (127x76x13) galvanised steel beam
125 95
HSL-3-G M8/40
HSL-3-G M8/40
9 055
S
Second Storey
490x3mm galvanised steel perforated grate fixed to 75x45mm C channels using hot dip galvanised grating clip
10
FFL 9 095
aluminium glazed door as per door schedule; installed to manufacturer's specifications
hot dip galvanised grating clip
FFL 9 095
FFL 9 075
900x350mm polyethylene planter box 50x50x3mm galvanised steel angle, fixed to 76x38mm rectangular steel tube frame and to 75x45 galvanised steel C channel with anchor bolt, welded to I.P.E 127 (127x76x13) galvanised steel beam
aluminium frame glass door – mid-rail – single hinged 2200x2100mm above FFL as per door schedule
220
polysulphide sealant I.P.E 127 (127x76x13) galvanised steel beam welded to 5mm base plate and fixed to reinforced concrete slab using m8 anchor bolt
490x3mm galvanised steel perforated grate
2 715
3 300
99
,6
0°
I.P.E 127; angle tapered as indicated 75x45mm C channels using hot dip galvanised grating clip to tie down steel grate
Detail B SCALE: 1 : 10 3 C210-005-A1
FFL 6 185
75
6 155
FFL 6 140
S
First Storey
76x38x1.6mm cold rolled rectangular steel tube for perforation fixing according to engineers spec
19mm timber rhino wood decking as per manufacturer's spec on 30mm screed, cast on 150mm reinforced concrete slab to engineers specification
HSL-3-G M8/40
HSL-3-G M8/40
38x38mm treated timber batterns Aluminium glazed door as per door schedule; installed to manufacturer's specifications
19mm timber rhino wood decking as per manufacturer's spec on 30mm screed, cast on 150mm reinforced concrete slab to engineers specification 75mm ⌀ PVC concealed drainage pipe in reinforced concrete slab to planter box
1650x650x3mm galvanised steel perforated screen, powder coated, hinged and concealed fixed to 76x38mm galvanised rectangular tube to engineers spec FFL 6 185
Epoxy screed finish perforated panels concealed fix with steel hangers fitted into steel tube slits and bolted on both ends to engineers spec.
perforated screen detail fixed to 50x50mm steel angle with M5 bolt and to concrete slab with M8 anchor bolt to engineers spec aluminium flashing with 5mm drip to architect's colour specification
shopfront aluminium frame glass door – Mid-rail – single hinged 2200x2100mm above FFL as per door schedule
75mm⌀ stormwater pipe to fall from fulbore, to drain according to engineer's specification 850
10 75 10
Detail C SCALE: 1 : 10
2 655
S
Ground Storey
Strip Section G-G SCALE: 1 : 20
NOTES This drawing is the property of SNE Architects and is intended for the use only - site and for the project to which it relates. on Copyright in this drawing is owned by SNE Architects - work is to be carried out in accordance with SANS 10400 and other All relevant SANS Standards. This drawing is not to be scaled. Figured dimensions to be used. All dimensions are in millimeters unless otherwise stated. - levels and dimensions to be checked on site by the contractor before work All is carried out and any discrepancies to be reported to the Architect. The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85 of 1993) and any regulations promulgated in terms of that Act or the Factories Machinery and Building Works Act of 1941. This drawing must be read in conjunction with all the relevant drawings, schedules and specifications from the Architect and all other consultants related to the project.
REV
DATE
DRAW N
DESCRIPTION
PROPOSED MIXED-USE HOUSING
Strip Section
FOR
CITY OF CAPE TOWN ERF 173249 Keizersgracht Street, Zonnebloem, Cape Town
SCALE: As indicated PROJECT NUMBER
SERIES - PAGE NO.
SHEET SIZE
01
C210-005-A1
A1
INFO
COUNCIL
TENDER
PROJECT DATE:
DRAWN BY:
11/11/19
JE
REVISION
CONSTRUCTION
10
UNIVERSITY OF CAPE OF TOWN School of Architecture, Planning and Geomatics M.Arch (Prof) Theory & Technology Studies
The [Re]birth of the Pan-African Narrative in the Contemporary Age Towards an Interdisciplinary and Experimental African Centre for Performative Art within a post-apartheid Cape Town
LWAZI NCANANA
NCNLWA001
Design
| Portfolio
M.Arch (Prof).July 2020
Supervisor(s) Simone Le Grange
Alta Steenkamp Co-Supervisor Philippa Tumubweinee
_01: The [Re]Birth: The body as a medium, sets itself on a journey of discoveries (image by Mackay, 2020)
z 2020 | Theory & Technology Studies University of Cape Town | M.Arch (Prof.) 1
Preface. Getting started The lense of initiating_As I take the first steps towards my m.arch design dissertation, this paper serves as a framework for what is to unfold later, and thus as an entry point I would like to reflect on the journey that has led to this very moment. This reflection allows me to surface various some critical and relevant moments and perhaps moments that may seem irrelevant to the study. As I intend to thread and curate the arguments of this paper as a story of discovery, they do not only form part of theoretical, technical discoveries but they also a means of discovering one's self. And with that said, it is without a doubt that all these moments (mentioned below) are all key in fueling this research inquiry. Why_My interests in architecture have largely been influenced by my past experiences (both the good & the bad), and the hope for a better future…
Design
| Portfolio
Community & resilience_Coming from the dusty roads of a tribal village located in a small town known as Melmoth, KwaZulu-Natal, in the early 2000’s my parents embarked on their first journey to search for ‘greener pastures’ in the inner city of Durban. Having 6 children meant that they faced many challenges along the way, and so from a young age we had to develop resilience as we learned to compromise, to share, and care for one another.
1
Now it goes without saying that this was my first encounter of the community as and it was through this family structure that I developed my interests to see how these aspects of compromise, share, and care exists in the extended greater public community - what role do people (as individuals) and the built environment have in the making and sustaining our communities. As I reflect, I got to understand that it's not buildings that make community, but people who inhabit space. And therefore, buildings simply become the platforms in which the livelihoods of the community exist and are performed.
(Papanicolaou 2019)
[Set]backs turn to discoveries_Having started my primary education at a Zulu medium school, then later enrolling at an English medium school (Grade 2) meant I was met by a language barrier. At this early stage of my education, I struggled in conducting basic communication, and so it was at this point that I developed “another language” to help me communicate better - an expression of ‘the artists’ hand that meets the paper’. This is when I learnt how to communicate my ideas through drawing and effectively developed my English alongside my art as mediums of communication. Opportunities_During my Honours year as part of Studio Adapt! (2019), we were invited to partake in a nine-day International Forum held in Rwanda focusing around the development of Cultural Spaces for Kigali. This initiative organized by the Rwanda Arts Initiative (RAI), with the assistance of the African Architecture Matters and Bozar Brussels allowed us to engage with and transform abandoned sites which will form “precincts for the production, exhibition and preservation of the work of artists represented by the Rwanda Arts Initiative. These range from painters, sculptors, movie makers, theatre directors, actors, musicians and comedians, amongst others”.1 However, in emerging African contexts, ‘arts’ in the broader term needs to be reimagined in its quest for relevance. Conclude_These reflections on different moments and experiences have given rise to the question of the relevance of art (performance and visual arts) in a contemporary post-colonial and post-apartheid context. In preceding a Design dissertation, this investigation also explores the question; how can architecture facilitate a symbiotic and cross-disciplinary space for innovation & development of new artforms? With that, setting forth the possibilities of an interdisciplinary and experimental Pan-African performative arts center within the context of South Africa. This inquiry is also an extension to a call for the development of such spaces within our South African context by Dr Ricardo Peach (director of the Vryfees in Bloemfontein).
Lwazi | Ncanana _06: Meaning in complexity: This sketch depicts a system of complexities that are represented through organic forms. Similar complex patterns also exist within our bodies, and in their variations can be understood at different scale. When analyzing these natural structures, they can help us to understand a set of principles that can be adopted in generating meaningful design. Which will allow an exploration of the relationship between form and function. (Sketch by Author).
z 2020 | Theory & Technology Studies University of Cape Town | M.Arch (Prof.) 1
13. Illustration Series Understanding through Analysis by Author
Understanding through analysis and generate forms & spatial: This section presents a series of illustrations done by the author. These illustrations are an analysis of a basic body position in motion as a performance occurs, and different illustrations look at different outcomes (fluidity, structure, core – stability and proposition). This analysis is an initial entry point into a design process, it seeks understand how the movement of the body can be analyzed through motion - as the body challenges the many lateral forces of gravity (Illustrations by Author).
Design
Understanding through analysis and generate forms & spatial: This section presents a series of illustrations done by the author. These illustrations are an analysis of a basic body position in motion as a performance occurs, and different illustrations look at different outcomes (fluidity, structure, core – stability and proposition).
| Portfolio
This analysis is an initial entry point into a design process, it seeks understand how the movement of the body can be analyzed through motion - as the body challenges the many lateral forces of gravity (Illustrations by Author).
Lwazi | Ncanana
Illustration 01: Two bodies in sync, the bodies express form, structure, stability, motion and flexibility (Illustrations by Author).
Illustration 02: Analysis 01_line of stability (Illustrations by Author).
Illustration 03_Joints that allow flexibility (Illustrations by Author).
Illustration 04_Boardser of limitations (Illustrations by Author).
z 2020 | Theory & Technology Studies University of Cape Town | M.Arch (Prof.) 5
Illustration 05_Identifying nodes (Illustrations by Author).
Illustration 06_Overlaying layers (Illustrations by Author).
Illustration 06_The diagram of design (Illustrations by Author).
Design
| Portfolio
Illustration 04_Joining of key intersections (Illustrations by Author).
z 2020 | Theory & Technology Studies University of Cape Town | M.Arch (Prof.) 6
Lwazi | Ncanana
Illustration 07_The diagram of design {simple} (Illustrations by Author).
z 2020 | Theory & Technology Studies University of Cape Town | M.Arch (Prof.) 7
LWAZI SONKE PERFECT NCANANA | RESUME Student Architect | Masters of Architecture (Prof)
Born: 1996 ~ Durban, KwaZulu-Natal, South African Lived: KZN, Gauteng, WP
Design
| Portfolio
T: +27 (0)78 811 3220 E: ncananalwazi.j@gmail.com L: English, isiZulu, Xhosa
Illustration 07_The diagram of design {simple} (Illustrations by Author).
“Trust in the Lord with all your heart; do not depend on your own understanding. Seek his will in all you do, and he will show you which path to take” Proverbs 3:5-6
z 2020 | Theory & Technology Studies University of Cape Town | M.Arch (Prof.) 7
Autodesk Revit Autodesk AutoCAD Adobe Photoshop Adobe Illustrator Adobe InDesign Lumion Microsoft Office
Education Current // University of Cape Town Masters of Architecture (Prof) 2019 // University of Cape Town Bachelor of Architectural Studies (Hons) 2015-17 // University of KwaZulu-Natal Bachelor of Architectural Studies (BAS)
Work Experience 2018-19 // Paragon Group | Paragon Architects Internship - Student Architect 2019-20 // University of Cape Town Tutor - Design (AiD- year 3), Hata (year 1) 2019-20 // University of KwaZulu-Natal Tutor - Design Studio (year 1)
Competitions + Merit Awards Mastercard Foundation Scholarship | University of Cape Town Academic Scholarship ~ 2020 Bench Warmers: Furniture Design Competition Paragon Craft | Finalist - 2018 PG Bison 1.618 Competition (National Competition) Top 10 Finalist ~ 2017 Golden Key | Architecture | University of KwaZulu-Natal International Honor Society ~ 2017 Bernstein Scholarship | Architecture University of KwaZulu-Natal Academic Scholarhip ~ 2017 Womeni in Architecture | KZN (WIA-KZN) 3rd Place ~ 2017 Building Science 3 (Acoustics) | UKZN Merit For Outstanding Performance ~ 2017 Theory Architecture 3A| UKZN Merit For Outstanding Performance ~ 2017 Theory Structures 2A | UKZN Merit For Outstanding Performance ~ 2016 Architectural Design and Technology | UKZN Merit For Outstanding Performance ~ 2015
Lwazi | Ncanana
Design Skills
Thank you for your time :)
Design
| Portfolio