1 minute read
Aquatic FacilityFeasibility StudyMacedon Ranges Shire Council (East)
An indoor aquatic facilityin the east of the Shire
Abouttheproject
Council’s Sport and Active Recreation Strategy identified the needfor afuture indoor aquatic facility in the east of theshire. Currently, residents must travel toGisborne or Kyneton to access indoor facilities. In 2013,the requestedfacility was identified as hosting a projected 113,000 visits per annum.
Council developed high level, draft concept plansin 2013. These plans indicated the redevelopment of the Romsey Recreation Centre to include: an Indoor 25m, six-lane pool; beach entry toddler’s pool; adjoining Learn to Swim/leisure water; spa; gymnasium; program room; upgraded amenities, reception and car parking.
Funding for a feasibility study is required. This study will test the current demand for an aquatic facility in the east of theshire in the context of the wider demand and utilisation across the municipality. Subject to need it willalso determine the most appropriate location and enablethe development of concept plans.
Benefits
Test the current demand/need for investment.
Subject to need, ensure the right siteand scalefor an aquatic facility development.
study.