• SAP Project Systems (PS) • This SAP Module is where you can manage your projects, large and small, including Make to order, Plant shut downs (as a project), Third party billing (on the back of a project)
www.saponlinetrainings.net
2
• Project System provides tools to track project milestone, costs and resources. SAP's Project System module contains tight integration to the Controlling, Human Resources, and Logistics modules. It utilizes personnel records from HR, rolls costs into Controlling and links to materials or customers in the Logistics modules. www.saponlinetrainings.net
3
• Two key objects that define the Project in SAP are: • Work Breakdown Structure - defines tasks and assign resources to those tasks • Network - defines the dependencies within the Work Breakdown Structure (WBS) Common processes in Project System include: www.saponlinetrainings.net
4
• Tracking costs against WBS elements. These costs can either be from personnel time charged against the project or from materials and/or services procured to support the project. • Tracking milestones against key dates defined in the project. www.saponlinetrainings.net
5
SAP PS INTRODUCTION • Project System is part of SAP‘s solution for Project and Portfolio Management. Project System helps you manage the project through its entire life cycle, from setting up a structure, to drawing up detailed plans, to execute and completing the project. www.saponlinetrainings.net
6
• Because of its tight integration into financial and logistic core enterprise processes Project System can especially be used for large and complex projects such as construction, production, maintenance, investment, or costs projects in all industries. Project Builder and Project Planning Board Project Struck
www.saponlinetrainings.net
7
• In Project System you can use Work Breakdown Structures (WBS) and Networks to structure your projects hierarchical and/or using network techniques. Milestones and documents help you to mark project events of particular interest and document your project appropriate.
www.saponlinetrainings.net
8
• You can set up project structures manually or based on templates. Project structures can also be created automatically from sales documents or c projects projects for example. • Using access control lists, partner data and persons responsible you can easily define authorizations and responsibilities for project elements. www.saponlinetrainings.net
9
Sap ps online training remote server access • Project System provide various date planning functions. Flexible scheduling techniques can be used to calculate earliest/latest dates, floats or critical paths within projects. • Dependent dates, such as requirement dates of materials, services or capacities, billing dates or periods of planned costs can automatically be derived from planned dates. www.saponlinetrainings.net
10
Sap ps online training remote server access • Comparing forecasted, planned and actual dates you can easily identify deviations from your project plan. Additional tools such as Progress Tracking, Sub network Monitor, Simulations or Milestone Trend Analysis enables you to manage the dates of your projects efficiently.
www.saponlinetrainings.net
11
Hi new batches are starts on SAP PS. PS Further details contact us:+91-9052666559 or +919052666558,USA : +1-678-693-3475. full course details please visit our website http://www.magnifictraining.com or www.saponlinetrainings.net. For any further details please mail us all queries to info@magnifictraining.com www.saponlinetrainings.net
12
Duration for course is 30 days or 45 hours and special care will be taken. It is a one to one training with hands on experience. Resume preparation and Interview assistance will be provided. Magnific training is also provide SAP ( all modules ).ORACLE ( all modules ),HADOOP (admin & dev ) and MS Dynamics ( all modules ). www.saponlinetrainings.net
13