+
+
P T L
[2024]
+
+
+
O F I
+
+
+
R O O
A M Safieddine - Portfolio 2024
+ A. Mahdi Safieddine
+ A. Mahdi Safieddine Part II Architectural Assistant 1
+
Portfolio 2024
+ A. Mahdi Safieddine
A. Mahdi Safieddine
Experience
ZEDfactory / ZEDpower Part II Architectural Assistant
Part II Architectural Assistant
•
Profile Resume
• • • •
Proficient in collaborative teamwork, adept at multitasking, and agile in adaptation, I specialize in shaping spaces that surpass expectations. Whether working under diverse conditions or utilizing effective communication skills, I consistently deliver exceptional results. My dedication to sustainability is evident through my expertise in zero-energy design.
•
An embodiment of the seamless fusion of passion and proficiency in architectural storytelling. I invite you to join me on this journey of design excellence.
•
Date of Birth: 27/03/1997 Nationality: Lebanese Address: London, SW19 2HD.
Atelier Lei Guo
Contact
Personal
About
A dedicated architect deeply engaged in the vibrant sphere of design innovation, I draw inspiration from the distinctive allure of diverse landscapes and the tranquil beauty of tailor-made projects. Each venture propels my creative journey.
Developing sustainable design strategies for diverse projects internationally. Leading projects independently, from concept development to final implementation, demonstrating strong project management skills. Engaging with clients to understand their needs and goals. Designing Zero-energy vehicles and furniture. Producing detailed architectural and technical drawings, 3D models, and visualizations. Maintaining precise attention to detail and adhering to timelines while meeting budget constrains. Assisting and supervising the team in presenting design concepts, sustainability and functionality solutions effectively to align with client goals.
Mobile: +44 7383404122 Email: msafieddine97@gmail.com
AutoCAD
Revit
Rhino
Sketchup
Ps
In
En
L
Photoshop
Indesign
Enscape
Lumion
3D M 3D printing
Model Making
Ls Gd Laser Cutting
Graphic Design
En
ض
English (F) Arabic (F)
Cr
L
Feb 2019-Aug 2019
• • • •
Prepared excellent hand sketched drawings. Produced detailed 3D models, floor plans, elevations, sections, and material mood boards. Conducted research following military requirements and goals. Coordinated with engineers and Colonels to align architectural designs with on-site construction.
Architectural Assistant / Consultant
•
May 2018-Sep 2018
•
Creativity Leadership
•
Ñ
PS
•
Spanish (B)
Problem Solving
•
Soft
S
Languages
Rv Rh
Technical (3+ Years)
Softwares (5+ Years)
A
Architectural Intern
Dandachli Trad. and Cont. Co. DATCO & LDRS
Jan 2022-Jan 2024 [occasionally]
Software / Skills
Directorate of Engineering in the Lebanese Army Barracks
Collaborated with overseas teams to ensure alignment with cultural, regulatory, and environmental considerations in China. Produced detailed drawings, renderings, and presentations for effective communication. Guaranteed products are delivered on time with no missing details. Developed architectural concepts for large-scale projects, integrating innovative design solutions. Provided expert guidance and support to ensure project success.
Resume
June 2021-present
Architectural Intern
• • • • •
Supervised on-site construction to ensure compliance with specifications. Conducted inspections and corrected errors promptly. Provided cost-saving bill of quantities and specification documents. Collaborated with contractors to streamline processes. Facilitated communication between project management and on-site personnel.
Education + Masters in Architecture - RIBA part II
+ Life Science Diploma
UWE Bristol
Burger King
University of the West of England, Bristol Faculty of Environment and Technology.
Houssam Hariri High School, Saida, Lebanon.
Jan 2020-May 2020
Dec 2019-Jan 2024
•
• • • •
2019-2021
Revit Support Tutor
Shift Manager
2016-present
Collaborated to achieve sales targets. Conducted inventory checks and ordering. Resolved customer complaints promptly. Trained and developed team members on operational procedures, customer service, and safety protocols. Managed day-to-day operations of Burger King restaurant, including staff supervision, customer service, and inventory management. Oversaw cash handling procedures and financial transactions, including opening and closing cash registers.
+ EVOLO 2019 Skyscraper Competition
• •
+ Theory and Methodology of Design Workshop “Politecnico de Milano”
• •
Architectural Experience in the UK
Architectural Experience outside the UK
Architectural Related Experience
Other Experience
+ Bachelors in Architecture - RIBA part I
+ Online Certification - Future Cities
Beirut Arab University, Debbieh, Lebanon Faculty of Architecture, Design, and the Built Environment.
ETH Zürich.
2015-2019
Involvement + GSS Beirut workshop by IAAC 2019 2019
2018
2
2000-2015
2019
•
• •
Provided personalized tutoring sessions to students seeking assistance with Revit software. Collaborated with faculty and staff to coordinate tutoring schedules and resources while fostering a supportive learning environment to master the software. Tailored instruction to meet the specific needs and skill levels of individual students. Monitored students’ progress and provided feedback to help them improve their Revit skills.
Freelance
Providing architectural and detail drawings. Producing graphics for jewelry designers, social media infulencers, and album covers. Engaging in site visits. Generating 3D visualizations.
• •
3
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
01
Letaron Industrial Campus -
+
02
Shanghai Meixin Tower -
+
03
The Decent House -
+
04
E-bike, E-port -
+
05
White Stag Village -
+
06
Urban Design of Wugang Yungu -
+
07
Quba Mosque -
+
08
Living Water -
+
09
Living Time Capsule -
+
10
Solar Tree -
+
11
eVolo Skyscraper Competition -
+
12
External Work - Freelance - 2017
Professional Experience - 2021
Content
+
+ A. Mahdi Safieddine
Content
Portfolio 2024
Professional Experience - 2022
Professional Experience - 2022
Professional Experience - 2022
Professional Experience - 2022
Professional Experience - 2023
Professional Experience - 2023
Design Thesis - 2020
Design Studio A - 2019
Exhibition/Competition - 2021
Competition - 2019
The following portfolio is a curated collection of my professional, academic, and other architectural related projects. The work shown is a sample and full detailed work is available upon request. Executed Projects (Stages 0-7)
4
Detail and Design stage Projects (Stages 0-4)
University and Design Studio
Other and Personal Experience
5
+
Portfolio 2024
+ A. Mahdi Safieddine
+ 01 Letaron Industrial Campus Lets work in a garden on the roof
Letaron
Letaron
[Professional Experience - ZEDFactory]
+ Brief
2021-2024
Location: Dongguan, China Stage: RIBA 1-7 Letaron has developed into a photoelectric technology and energy innovation enterprise integrating terminal concept guidance, product development, production and sales, also gives importance on quality, and constantly innovates and transcends. All products have been tested by international authorities ensuring everything is top quality. Letaron requires a campus to showcase their products, test their products in labs, do workshops, exhibitions, and learning facilities all while generating energy and using the least amount of carbon. A combination of buildings is required to create a working space that encourages people to work and “enjoy work”.
+ Design Proposal The phrase “lets work on a garden on the roof” is associated with this project where all buildings have gardens on top and on balconies,providing the breathing space for all workers and users, while developing the green buildings running on solar power and natural renewable sources. This hub helps in showcasing all light products and equipment as well as developing the proper learning and working environment. The project goes through RIBA stages, from preparation, designing, tender drawing, construction, and handing out in addition to interior design and high tech finishing materials.
+ 6
Campus Social Hub 7
+
Portfolio 2024
+ A. Mahdi Safieddine
Main Buildings
Public Space
Letaron
Subtraction Green Roof for staff
Solid and Void
Public Circulation
Circulation Green Roof for staff only
Cooling towers at the highest points
Green Roof
Environmental Strategy
Outcome
The campus consists of various functions,each in a specific building block, all covered with green roofs, topped with a BIPV canopy. 8
9
Portfolio 2024
+ A. Mahdi Safieddine
Environmental Studies Solar panels are placed entirely over the building providing shading, reducing heat and thermal mass and at the same time generating energy over the year.
Over hanged PVs provide shading for the windows reducing any overheating in the interior, the use of blinds or a shading system is not needed, thus providing a full open view.
Letaron
Position of the sun during equinoxes and solstices.
Shading Strategy.
Letaron
+
The cold coils at the louvers bring cold air in, reducing the use of air conditioning. And at the top water tray dehumidifier to maintain the air humidity when cross ventilation occurs.
3D Section Maximize natural ventilation and air flow.
In providing sufficient facade ventilation the cooling and fan loads for the conditioning of the building are significantly reduced. This also allows the reduction of delivered air to fresh air minimum reducing the use of fans even further. Ensuring the thermal mass in the building could be cross ventilated ensuring that passive thermal gain was used to the best advantage in the building.
10
11
+
Portfolio 2024
+ A. Mahdi Safieddine
Letaron
Letaron
Main Entrance
Insulating the building is one of the most important aspects in construction. Making sure that no cold bridges are available or possible for the future.
Details
Entrance Elevation
Entrance Section
Drawings Entrance Plan
12
The PV system needed to be changed into smaller units due to new regulations that were enforced during construction, thus resulting in new details and a different end result.
13
+
Portfolio 2024
+ A. Mahdi Safieddine
Letaron
Letaron
Construction Process
Full Executed Buildings
Construction process from the first laid stone until completion of the project
14
15
+
Portfolio 2024
+ A. Mahdi Safieddine
Letaron
Letaron
Final Layout
Interior Renders After the construction of the buildings, one after the other, Interior design was required. 3D Renders and tender drawings of the interior were provided and the first buildings interior is fully assembled.
Completed Interiors
New PV Layout
16
17
+
Portfolio 2024
+ A. Mahdi Safieddine
+ 02 Shanghai Meixin Tower Meixin Tower
[Professional Experience - Atelier Lei Guo]
Meixin Tower
Renovating into Landmark
+ Brief
2022-2023
Location: Shanghai, China Stage: RIBA 1-5 A renovation project which requires design studies for facade and functional transformation from offices to apartments. It aims to create a landmark building along the Suzhou River, Shanghai. The main structural elements should be preserved and used with the new design.
+ Design Proposal Combining between past and present, modern and ancient, with arches at the bottom chunk and linear lines at the top, a blend of two design integrating together. The overall materials used in are modern, with brick and copper materials used for the main vertical components of the commercial podium, and a large area of glass panels on podium facade to increase commercial atmosphere. Silver aluminum and polished marble panels are used in the tower part.
+ 20
Campus Social Hub 21
+
Portfolio 2024
+ A. Mahdi Safieddine
Numerous number of designs were made to ensure that it suits the city, the culture and tradition. Different materials were used, different shapes and sizes were used and demonstrated until the right product is reached.
Meixin Tower
Meixin Tower
Facade Design
My role in this project was to work on the 3D model, build the details and produce the 3D renders and visualizations.
Introducing the arch design with the existing structure all over the podium. A blend of modern and traditional. The podium holds commercial units, social services and restaurants, while the tower above is now residential apartments.
Podium Design
22
23
+
Portfolio 2024
+ A. Mahdi Safieddine
+ 03 The Decent House Decent House
[Professional Experience - ZEDFactory]
Decent House
The ZED life
+ Brief
2022-2023
Location: Beijing, China Stage: RIBA 1-5 A decent residential house, with a ground floor, first floor, and an accessible roof. An exterior and mainly interior designs required to develop and produce a traditional yet modern Chinese house for a family.
+ Design Proposal Developing the required design drawings, technical and MEP drawings, in addition to 3D renderings of the interiors with the selected materials and finishes as the client requires.
+ 24
Final Product 25
+
Portfolio 2024
+ A. Mahdi Safieddine
Plans
1- Dining Area 2- Kitchen 3- Garage 4- Toilet 5- Bathroom 6- Guest Bedroom 7- Entrance 8- Front Garden 9- Outdoor Seating area 10- Tea Room 11- Living Room 12- Zen Garden 13- MEP (Under staircase)
02 01
26
13
04
12
10
05
06
11 07
09
Ground Floor Plan
03
Key 1- Bedroom 1 2- Walk-in closet 3- Bathroom 4- Bedroom 2 5- Storage (under staircase) 6- Bathroom 7- Master Bedroom 8- Master Closet 9- Living Space 10- Balcony 11- Garden 12- Double height living room
02
03 04
01
05
11
10
09
Decent House
+
Key
Decent House
+
06
08 12
07
08
First Floor Plan 27
Kitchen
28 Living Room
Interior Design
Bathroom
Tea Room
Entrance Hall
Interior Design
Decent House
Decent House
Kids Bedroom
+ Portfolio 2024 + A. Mahdi Safieddine
Master Bedroom
Guest Bedroom
29
+
Portfolio 2024
Construction Drawings
Air Conditioning Layout
Decent House
Lighting Layout
Decent House
Coil Layout
+ A. Mahdi Safieddine
Foundation Plan
GF Structural Plan
GF Beam Layout
Lintel Layout
FF Structural Plan
FF Beam Layout
Electric Layout
Detail Drawings
30
31
+
Portfolio 2024
+ A. Mahdi Safieddine
+
Uses and Connections Charge bike using BIPV E-port
04 E-Bike, E-Moto, and E-Port ZED Batteries
[Professional Experience - ZEDPower]
Replaceable lockable Batteries
ZED Batteries
Solar-Powered exchangeable batteries.
+ Brief
2022-2024
Location: UK and China. Many homes are difficult to make energy efficient,let alone net zero. There is often a desire to keep the external face, colour and texture of brickwork or masonry. Adding external wall insulation increases the wall thickness by around 150 mm - which means the external rain screen either has to be lightweight polymer reinforced render direct onto the EWI or additional expensive foundations are need to support an external masonry skin. Fixing a veneer of brick slips to non-breathable plastic external insulation board is also likely to be a very high cost and short term construction solution that has poor long term value. A modern eco-friendly solution is needed.
+ Design Proposal It makes sense to develop a long life exchangeable battery that can be charged from solar panels or the grid, and fit your home , your car and your personal micro transportation needs. Micro electric vehicles are designed to take this exchangeable / fixed battery product with integrated lockable docks. We have developed prototypes for a two battery e bike, a three battery moped, a four battery moto, and a micro car. Excess charging could help power up your house, saving energy and reducing carbon. Communities could invest in a mixture of communal solar electric charging arrays mounted on community buildings such as schools and public buildings or hotels that are coupled with battery docks allowing fresh battery exchanges and fast charging facilities – all monitored by a common phone app.
+ 32
Can go with the portable ZED Cabin
Lithium Titanium Oxide Cells Charge anywhere with multi-use 33
8
Portfolio 2024
&'()*+, -.01,234567 8 8 8
g46 9e4a 4 3 v vz y iz
NOTE ORIENTATION| izOF g46 9e4a 4 3 HOLES COUNTERSUNK v vz WHEN FOLDING PPd ~146 9rs0 d3 1yzyz
q
vy {i | iz
|vziz
rPw y9 wzyy efq2 012345684 P1 29 a rs0f216dE4t ue 9v
z4[{[/w za|cdwy1 zyy
rs0 d3 1
l$nogpq8lo$
pe
0
g hi
z0d{w5zd9|[wfy2 z }y/y[ c46/1 aa4: 5[4d5[d5 ~i 5 [[v[ 9v29z a d9 q 134[ }
rs0 d3 1
9 [ a123456[1 1 [ 59a [465459 59d5 ~25a2 1dh a2[[ :E ~ a121:10 3456[34 E 1 /41 ac1d:9 812a Pd5912f9d1 14d19d25~3d1t 25awd1 1df/1 : 59E 456/5a 192t 5
A3
Right Side View rs0 d3 1}yve25a:21945 2~} d5ad5ep|{0n 1:10 8zyz z v z nzyz z yz s:24 a d3 1ifd: 333i a d3 1ifd:
C Copyright ZEDpower 2020
A3
145.00
188.00 188.00
668.56
668.56
469.46
469.46
ZEDcargobike_Set 1 issued for:
INFORMATION
ZEDcargobike_Set 1
Drawing Number: issued for:
INFORMATION ZC / 2 / 022
314.56
Drawing Number: Created: 01/02/2022
366.00
rs0 d3 1}yve25a:21945 2~} d5ad5ep|{0n 8zyz z v z nzyz z yz s:24 a d3 1ifd: 333i a d3 1ifd: Right Side View
n1d59 4 3 v vz
Drawing Title:
366.00
rPw ywzyy efq2 P1 29 a
v iz
ZEDcargobike Drawing Title:
314.56
v vz q /a 12a35 29 Ea~Ew~ f ft aE~
0d5d9[f2 }/[ c46/1 aa4: 5[4d5[d5 ~i 5 [[[929 ad9 134[ } 9 [ a123456[1 1 [ 59a [465459 59d5 ~25a2 1dh a2[[ :E ~ a123456[34 E 1 /41 ac1d:9 812a Pd5912f9d1 14d19d25~3d1t 25awd1 1df/1 : 59E 456/5a 192t 5
ZED Batteries
0
g hi
469.46
420.00
pe
ZEDcargobike
49.68
l$nogpq8lo$
0123456$/:E 1
/a 12a35 29 Ea~Ew~ f ft aE~
Project:
49.68
4[[/ acd1
469.46
480.00 480.00
rs0f216dE4t
rs0f216dE4t ue 9v
Client: Project: Client:
49.68
iz
8
j1 f59 6849 01d2k34
C Copyright ZEDpower 2020
v yi
q
{ iz
| iz
Bike Drawings
D
PPd ~146 9rs0 d3 1yzyz
3.3
P 4 59
0123456$/:E 1
n1d59 4 3 v vz
yiv
185.61
56
rs0f216dE4t
iz
zziz
y|iz
v y i
185.61
8
668.56
P 4 59 j1dk f9
| iz
{ iz |vziz
v iz
zziz
| iz
yiv
306.00
3.3
.23
28x Ø5 x 90° Ø3 x 10
vy {i £¡ | iz
14
478.
808.55
306.00
56
134
£9 RSTU ¡ =¡££ 8
471.42 308.00
.23
y iz
y|iz
M
145.00
14
478.
808.55
471.42
¤¥¦§¨ { ©y q /:454/:gªe
;NO Q
145.00 179.00 80.00
145.00
668.56
150.00 150.00
y|iz | zi
| iz
9 RSTU ¡£ =¡££ 8
&'()*+, -.01,234567 8 8 8
D
{ iz
VW@XYZ\2 ]^_ Q ` > > #
| iz
{ziz
C
M
v ziz
;NO Q
¤¥¦§¨ { ©y q /:454/:gªe
179.00
145.00 179.00
80.00
308.00
y|iz
{ziz
yyzizv ziz
|ziz
VW@XYZ\2 ]^_ Q ` > > # ¡£
179.00
{ iz
«¬®¯°±²³´µ¶·
|viz v{ iz v iz
| zi
|ziz yyziz
£¡££? 8
«¬®¯°±²³´µ¶·
@A;BCDFGHI2 JK«L M > = =
ZED Batteries
OA 452
% ¡£ «¬ ! " #
.00
CTR 10.5
9 ;< =¡£ ¡ >
208
CTRS 70.75
CTRS 70.75
CTR 5.5
v i ¡£ % «¬ ! " #
z{i
378.57
|viz v{ iz v iz
134
12.3
9 ;< =¡£ ¡ > £¡££ ? zi 8
378.57
Top View 1:10 Top View 1:10
.00
C
v i
zi z{i
@A;BCDFGHI2 JK«L M > = =
759.40
208
Down 90° R1.5
v { i
|{ iz
B
8d 4 3 v vz
759.40
807.50
100.00
v { i
8d 4 3 v vz B
807.50
100.00
vvyiz v iz v iz
CTR 24
yz|iz v iz
CTRS 52
CTR 8.5
vvyiz v iz v iz
yz|iz v iz
CTRS 52
145.00
v yi
y|i
CTR 24
13.7
CTR 5.5
A
660.78
CTRS 53 Down 90° R1.5
+ A. Mahdi Safieddine
v yi y|i
A
660.78
+
7
49.68
6
420.00
5
4
PRODUCED PRODUCED BY AN BY AUTODESK AN AUTODESK STUDENT STUDENT VERSION VERSION
3
2
|{ iz
1
Front View 1:10 Front View 1:10
226.40
226.40
342.00
342.00
226.40 342.00
Motor-Bike Drawings
Back View 1:10 Back View 1:10
226.40 342.00
ZC / 2 / 022
Assembling
Technical reference
Sheet Size: A3 Scale 1:4
F
Material: 1.5mm Aluminium
Created by
Jlew
Do not scale, use figured dimensions only. Unless sta these drawings represent design intent only and appr drawings will be required from the Trade Contractor p and /or procurement being undertaken
Approved by
18/10/2023
Document type
Document status
Title
DWG No.
Aluminium Sleeve
2
3
4
5
6
Date of issue
Sheet
7
1/2
8
E-port Drawings Vehicles are design to meet international standards so that they can be used anywhere and anytime.
1092.11
1
PRODUCED BY AN AUTODESK STUDENT VERSION
F Rev.
2280.85
2600.00
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
1092.11
2500.00
D1
2500.00
2720.00
Isometric View
Top View 2720.00 2238.59
300.00
300.00
2120.00
90.63
2500.00
1205
.00
100.00
2470
D2
963.21
.00
1043.84
2300.00
1114.23
100.00
1205
50.00
.00
155°
Client: Project:
ZED-port
2570.00
2400.00
2499.62
3613.84
1205.00
1155.00
3683.34
50.00
3613.84
115°
Drawing Title:
ZED-port_Frame 1 issued for:
%:&& &&
8;%
%3&& &&
"&& &&
;%
0
0
53 &&
'& &&
4&& &&
"&& &&
4&& &&
0;"%
%3%% &&
%413 5&
%:<
%453 '&
8
%:<
%431 3&
Charged from solar panels and fit your home , your car and your personal micro transportation needs. Also, charges 10 times faster than a normal lithium battery, making mid journey charging realistic.
Created: 01/06/2022
Scale: 1:30 @ A3 1:15 @ A1
Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
0
0 =HIJKL >>?@ABCDEFG MOLMPP ;%
A
0
%:;%:812- 1 2 19 1 4 3 +62 2547 912)
;%
8
0 The E-port is easy to assemble on site, and can fit vehicles of any size, charging the batteries and storing energy. $%$&%% 4 59
1 9
0 19
0123456849
0 19! 12 " 4 4 294 5 4 1
8
0123456 1
1 29 &"$&'$%&%% "&& &&
)146+9 0 3 1%&%&
"&& &&
BD
Rev.
ZEDpower
"&& &&
;3
checked by:
MS
T 020 8404 1380 F 020 8404 2039 E mail@zed-power.com www.zed-power.com
Left View
2500.00
"&& &&
A3
drawn by/ updated by:
ZC / 2 / 022
ZEDpower, 21 Sandmartin Way, London SM6 7DF
100.00
Front View
4
34
90°
C Copyright ZEDpower 2020
A larger non exchangeable / fixed battery has also been developed combining 4 no 0.5 kwh cells to create a 2kwh heavier battery at 72 volts.(Suitable for larger vehicles)
Battery
1205.00
1305.00
D3
PRODUCED BY AN AUTODESK STUDENT VERSION
It is important that battery life, durability, and safety are now considered for this scarce and valuable technology that facilitates electric vehicles. It is now possible to build a 48 volt 0.5 kwh battery that can be picked up and easily exchanged and each battery charged in about 15 minutes.
INFORMATION Drawing Number:
1235 29 )$) + - )
A
Sca 1:1
Do not Tscale, figured dimensions Unless 020use 8404 1380 F 020only. 8404 2039sta these drawings represent design intent only and appr E mail@zed-power.com drawings will be required from the Trade Contractor p and /orwww.zed-power.com procurement being undertaken
E
Dept.
Re Sca 1:1
T 020 8404 1380 F 020 8404 2039 E mail@zed-power.com www.zed-power.com ZEDpower, 21 Sandmartin Way, Londo
PRODUCED BY AN AUTODESK STUDENT VERSION
OA 459.79
E
A
MS
ZEDpower, 21 Sandmartin Way, Londo
PRODUCED BY AN AUTODESK STUDENT VERSION
PART IS SYMMETRICAL ABOUT CENTRELINE
MS
Re drawn by updated
ZEDpower ZEDpower
Created: 01/02/2022
Down 90° R1.5 191.2
drawn by updated
80
2 " 4&6 4 " ":6 "
0 3 1
0 3 1(%" 25 21945/2)(0 5 5 '10 8&%&23&3"42& &%&23&3%&45 24 67 3 1 333 7 3 1 0 5 9 2 ( 46 1 4 54 5 5 ) *5 929 9+ 134 ( 9+ 123456 1 1 59 465459 59 5 )25 2 1 2 ) 123456 34 1 , 41 1 9+ 812 5912 9 1 14 19 25)3 125 $ 1 1 1 59 456 5 192- 5
35
+
Portfolio 2024
+ A. Mahdi Safieddine
Assembling
Prototypes
E-BIKES
ZED Batteries
ZERO BILLS HOME
ZED Batteries
BIPV PANELS
Final Product
E-MOPED
E-MOTO
E-CAR
Micro electric vehicles are designed to take this exchangeable / fixed battery product with integrated lockable docks. The process goes that the solar panels would charge the batteries fast, exchangeable batteries would be used for different vehicles and also excess energy would power the house.
Render
In Exhibition Client Use
36
37
+
Portfolio 2024
+ A. Mahdi Safieddine
+ 05 White Stag Village White Stag
[Professional Experience - ZEDFactory]
White Stag
Zero Energy Urbanism
+ Brief
2022-2024
Location: Henan, Zhengzhou, China Stage: RIBA 1-5 (Parts of the project reached stage 7) Located in a rural in a country side, this vast land is an open green field area requested to be turned into a camp site. An attraction point for the area and the whole region, the campsite should be composed of various tents, big, small, and luxurious, in addition to zero energy cabins, and three main buildings. A lake building, a social and agricultural market, and a service building with accommodation, finally, a greenhouse area for agriculture and social events. All spaces are required to be eco-friendly and accessible for people and users of all ages.
+ Design Proposal Starting with our prefabricated zero-energy cabins, our target is to connect all functions in a smooth and well designed matter, these cabins will be luxury accommodation next to the lake. However, the artificial lake is design to be suitable for all ages for swimming and boat activities. In the middle is the lake building full of various functions and topped with PV panels to reduce energy use and keep all elements green. The other buildings are all working on solar energy, with light weight structures and prefabricated containers, it would be easy to move the buildings around and construct and remove when needed. In addition to solar powered parking slots, providing energy to electric cars and excess energy would be used for the buildings.
+ 38
39
+
Portfolio 2024
Luxury Tents
Walkway
Camping Parking
Central Square
Services
Market
Greenhouse/Activity Area
White Stag
Masterplan
+ A. Mahdi Safieddine
Small Tents
Smart Green House
40
Entrance Viewing Platform Sunken Square
Gardening Experience Hall
Fruit picking Experience
Lake Building
Lake
Kid Playground
Lake-side Cabins
Camping sites
41
+
42
White Stag
+ A. Mahdi Safieddine
White Stag
Portfolio 2024
Tents
Water side
Activity Area
Night Masterplan 43
+
Portfolio 2024
+ A. Mahdi Safieddine
Entrance Viewing Platform
374-EBP-04-300 2
N
R-01
版本 日期 Rev
Date
设计变更内容 Amendments
X
22122022
Drawing Layout
A
27042023
Plans, Elevations, and Diagram Layout
B
19052023
Plans, Elevations, and Building Layout structure amendment
C
08082023
Addition of Slides and Swings - Drawing amendment
C-01
C-26
Slide Structure layout - connected to main structure of EBP. situated 2.5meters abouve ground level.
秋千结构平面-连接结构柱间的钢梁--距离地 面2.5米高
C-25 C-23
C-21
C-02
C-24
C-22
R-02 C-03
C-20
UP
C11
The Entrance Viewing Platform functions as a structure at the entrance to view the site.
C-05
1374-EBP-04-300 ---
1374-EBP-04-300 ---
UP
R-07
C-06
C-19 R-10
R-03
White Stag
UP
C-18 R-06
甲方 WINRUN GROUP - 万润集团 Project: 工程名称
C-07
Client:
White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇 C-17 C-08 C-16
R-05
Drawing Title:
C-09
R-04
图纸标题
Entrance Building Platform - Ground Floor Plan 入口观景平台 - 一层平面
C-15 C-14
issued for:
C-13
drawn by/ update by:
COORDINATION
C-10
C-11
Created:
checked by:
MS
图纸号 374-EBP-04-100 Drawing Number:
C-12
Rev.
DF
White Stag
C-04
R-08
版本
C
创建日期
Scale:
08/08/2023
比例 (@ A1)
1 : 100
ZEDfactory ZEDfactory, 21 Sandmartin Way, London SM6 7DF
A1
Ground Floor Plan
374-EBP-04-300 2
1
Entrance Building Platform Ground Floor Plan - 入口观景平台 - 一层平面 1 : 100
C Copyright ZEDfactory 2023
374-EBP-04-300 2
N
R-01
C-01
T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com
Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
版本 日期 Rev
Date
设计变更内容 Amendments
X
22122022
Drawing Layout
A
27042023
Plans, Elevations, and Diagram Layout
B
19052023
Plans, Elevations, and Building Layout structure amendment
C
08082023
Addition of Slides and Swings - Drawing amendment
C-26
Slide Structure layout - connected to main structure of EBP. situated 2.5meters abouve ground level.
秋千结构平面-连接结构柱间的钢梁--距离地 面2.5米高 C-25 C-23
C-02
C-24
R-03
C-22
C-21
C11
R-02 C-03
C-20
UP
7.00 m
C-04
UP
C11 7.00 m
It is a connecting point for users to cross from the tent side to the lake area.
7.00 m
C-05 R-08 C18 1 374-EBP-04-300
1 374-EBP-04-300
UP
R-07 C-06
R-10
UP
7.00 m
UP
C-19
1600
C-18
7.00 m
50 17
R-05
UP
900
R-07
R-06
甲方 WINRUN GROUP - 万润集团 Project: 工程名称
C-07
Client:
2100
White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇
2550
C-17 C-08 Drawing Title:
C-16
R-05
C-09
R-04
图纸标题
Entrance Building Platform - First Level Floor Plan 入口观景平台 - 二层平面
C-15
issued for:
C-14
drawn by/ update by:
COORDINATION C-10
C-13
checked by:
MS
Drawing Number: 图纸号 374-EBP-04-102
Rev.
DF
版本
C
C-12 Created:
创建日期
Scale:
08/08/2023
C-11
比例 (@ A1)
1 : 100
ZEDfactory
A1
First Floor Plan
374-EBP-04-300 2
Entrance Building Platform Level 1 - 入口观景平台 - 二层平面 1 : 100
C Copyright ZEDfactory 2023
N 374-EBP-04-300 2
Plans
ZEDfactory, 21 Sandmartin Way, London SM6 7DF
1
R-01
C-01
T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com
Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
版本 日期 Rev
Date
设计变更内容
X
22122022
Drawing Layout
A
Amendments
27042023
Plans, Elevations, and Diagram Layout
B
19052023
Plans, Elevations, and Building Layout structure amendment
C
08082023
Addition of Slides and Swings - Drawing amendment
C-26
Slide Structure layout - connected to main structure of EBP. situated 2.5meters abouve ground level.
秋千结构平面-连接结构柱间的钢梁--距离地 面2.5米高 C-25 C-23
C-21
C-02
C-24
R-03
C-22 R-02
C-03 C-20
11.48 m
C-04
UP
C11
2810
11.48 m
C-05 UP 1 374-EBP-04-300
1 374-EBP-04-300
R-07 C-06
C-19
11.48 m
UP
R-03
C-18
11.48 m
R-07
甲方 WINRUN GROUP - 万润集团 Project: 工程名称
C-07
Client:
The viewing platform has activities such as swinging, sliding, planting, and seating for users of all ages.
White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇 C-17 C-08 Drawing Title:
C-16
R-05
C-09
R-04
图纸标题
Entrance Building Platform - Second Level Floor Plan 入口观景平台 - 三层平面
C-15
issued for:
C-14
drawn by/ update by:
COORDINATION C-10
C-13
checked by:
MS
图纸号 374-EBP-04-103 Drawing Number:
Rev.
DF
版本
C
C-12 Created:
创建日期
Scale:
08/08/2023
C-11
比例 (@ A1)
1 : 100
ZEDfactory
A1
374-EBP-04-300 2
ZEDfactory, 21 Sandmartin Way, London SM6 7DF
1
Entrance Building Platform Level 2 入口观景平台 - 三层平面
Second Floor Plan
1 : 100
C Copyright ZEDfactory 2023
374-EBP-04-300 2
N
R-01
C-01
T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com
Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
版本 日期 Rev
Date
设计变更内容 Amendments
X
22122022
Drawing Layout
A
27042023
Plans, Elevations, and Diagram Layout
B
19052023
Plans, Elevations, and Building Layout structure amendment
C
08082023
Addition of Slides and Swings - Drawing amendment
C-26
C-25 C-23
C-21
C-02
C-24
R-03
C-22 R-02
C-03 C-20 15.96 m
C11
C-04 15.96 m
C-05
Consists of three levels above the ground.
R-08 1 374-EBP-04-300
1 374-EBP-04-300
R-07 C-06
C-19 15.96 m
C-18 10 10 0
C-07
甲方 WINRUN GROUP - 万润集团 Project: 工程名称 Client:
White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇 C-17 C-08 Drawing Title:
C-16
R-05
C-09
R-04
C-15
图纸标题
Entrance Building Platform - Third Level Floor Plan 入口观景平台 - 四层平面 issued for:
C-14
COORDINATION C-10
C-13
Drawing Number: 图纸号 374-EBP-04-104
drawn by/ update by:
checked by:
MS
Rev.
DF
版本
C
C-12 Created:
创建日期
08/08/2023
C-11
Scale:
比例 (@ A1)
1 : 100
ZEDfactory
1 A1
44
1 : 100
C Copyright ZEDfactory 2023
374-EBP-04-300 2
ZEDfactory, 21 Sandmartin Way, London SM6 7DF
Entrance Building Platform Level 3 入口观景平台 - 四层平面
Third Floor Plan
T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com
Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
45
+
Portfolio 2024 Top of Rail FFL: +17.16m
1200
Top of Rail FFL: +17.16m
Elevations
Third Level FFL: +15.96m
4480
Third Level FFL: +15.96m
Second Level FFL: +11.48m
Top of Rail FFL: +17.16m
Top of Rail FFL: +17.16m
Third Level FFL: +15.96m
Third Level FFL: +15.96m
structure amendment
08082023
Addition of Slides and Swings - Drawing amendment
版本 日期 Rev
Date
设计变更内容
+ A. Mahdi Safieddine
Amendments
NW
X
22122022
Drawing Layout
A
27042023
Plans, Elevations, and Diagram Layout
B
19052023
Plans, Elevations, and Building Layout structure amendment
C
08082023
Addition of Slides and Swings - Drawing amendment
NE NW
Second Level FFL: +11.48m
Staircase Landing FFL: +3.5m
White Stag
4480
NE
First Level FFL: +7.0m
Ground Floor FFL: +0.0m
3500
First Level FFL: +7.0m Ground Floor FFL: +0.0m
White Stag
17160
4480 Second Level FFL: +11.48m
Staircase Landing FFL: +3.5m
3500
17160
17160
19052023
C
First Level FFL: +7.0m
First Level FFL: +7.0m
3500
4480
17160
1200
Second Level FFL: +11.48m
B
Staircase Landing FFL: +3.5m
Staircase Landing FFL: +3.5m
EBP North East Elevation 东北立面图 4
3500
1 : 100 Ground Floor FFL: +0.0m
Ground Floor FFL: +0.0m
North East Elevation EBP North East Elevation 东北立面图 4
Top of Rail FFL: +17.16m
Top of Rail FFL: +17.16m
Third Level FFL: +15.96m
Third Level FFL: +15.96m
4480
1200
1 : 100
甲方 WINRUN GROUP - 万润集团 Project: 工程名称
Second Level FFL: +11.48m
Top of Rail FFL: +17.16m
Top of Rail FFL: +17.16m
Third Level FFL: +15.96m
Third Level FFL: +15.96m
White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇
4480
1200
Second Level FFL: +11.48m
甲方图纸标题
Drawing Title: Client:
First Level FFL: +7.0m
Entrance Building Platform - North East - North West WINRUN GROUP - 万润集团 Elevations 东北和西北立面图 Project: issued for:
Second Level FFL: +11.48m
Staircase Landing FFL: +3.5m
Staircase Landing FFL: +3.5m
First Level FFL: +7.0m
First Level FFL: +7.0m
Ground Floor FFL: +0.0m
Ground Floor FFL: +0.0m
图纸号 374-EBP-04-200
版本
Third Level FFL: +15.96m
Sections
C
X
22122022
Drawing Layout
A
Plans, Elevations, and Diagram 27042023 ZEDfactory, 21Layout Sandmartin Way, London SM6 7DF
Second Level FFL: +11.48m
Second Level FFL: +11.48m
Plans, Elevations, and Building Layout 19052023 T 020 8404 1380 F amendment 020 8404 2039 structure
Top of Rail FFL: +17.16m
Top of Rail FFL: +17.16m
Top of Rail FFL: +17.16m
Third Level FFL: +15.96m
EBPThirdNorth West Elevation 西北立面图 Level FFL: +15.96m
Third Level FFL: +15.96m
First Level FFL: +7.0m
First Level FFL: +7.0m
As indicated
ZEDfactory
B SW C
E mail@zedfactory.com Addition of Slides and Swings - Drawing www.zedfactory.com 08082023 amendment
Third Level FFL: +15.96m
1 : 100 First Level FFL: +7.0m
Second Level FFL: +11.48m
Second Level FFL: +11.48m
Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
SE
Staircase Landing FFL: +3.5m
17160
3500 4480
3500 4480
Ground Floor FFL: +0.0m First Level FFL: +7.0m
Second Level FFL: +11.48m
Second Level FFL: +11.48m
Staircase Landing FFL: +3.5m
Staircase Landing FFL: +3.5m
5450
3500
3500
1550
4480
First Level FFL: +7.0m
44801200
Second Level FFL: +11.48m
4480
Amendments
SW 17160
Top of Rail FFL: +17.16m
Rev08/08/2023 Date undertaken
Ground Floor FFL: +0.0m
staircase Landing FFL: +3.5m
17160
Top of Rail FFL: +17.16m Third Level FFL: +15.96m
17160
4480 3500 4480 1200
17160
T 020 8404 1380 F 020 8404 2039 08082023 amendment E mail@zedfactory.com www.zedfactory.com Drawing Number: Rev.
Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and
Top of Rail FFL: +17.16m
17160
COORDINATION MS DF Addition of Slides and Swings - Drawing
C
approved will be required from the Trade 版本 日期assembly 设计变更内容 Created: Scale: 比例 (@ A1) 创建日期drawings Contractor prior to any work and /or procurement being
Ground Floor FFL: +0.0m
C Copyright ZEDfactory 2023
ZEDfactory
issued for: drawnand by/Building checked Plans, Elevations, Layout - by: 19052023 update structure amendment ZEDfactory, 21 Sandmartin Way, by: London SM6 7DF
B
1 : 100
Second Level FFL: +11.48m
A1
X08/08/2023 22122022 Drawing Layout Entrance Building Platform - North - North West As East indicated
Plans, Elevations, and Diagram 东北和西北立面图 A Elevations 27042023 Layout
Top of Rail FFL: +17.16m
C Copyright ZEDfactory 2023
2
checked by:
Drawing Number: 图纸号 Rev. 版本 C 374-EBP-04-200 版本 日期 设计变更内容 Rev Date Amendments Drawing Title: 图纸标题 Created: 创建日期 Scale: 比例 (@ A1)
Third Level FFL: +15.96m Staircase Landing FFL: +3.5m
Third Level FFL: +15.96m Staircase Landing FFL: +3.5m
EBP North West Elevation 西北立面图
2 A1
North West Elevation
drawn by/
17160
1200
8200
3500
Top of Rail FFL: +17.16m
工程名称
update by: White Deer Village at Southern Taihang Mountain COORDINATION MS DF - 南太行白鹿零碳小镇
4480
3500
17160
4480
8200 4480
3500
Second Level FFL: +11.48m
1200
First Level FFL: +7.0m
17160
4480
4480
17160
4480
4480
Client:
First Level FFL: +7.0m Ground Floor FFL: +0.0m
First Level FFL: +7.0m Ground Floor FFL: +0.0m
3500
3500
1550
Ground Floor FFL: +0.0m First Level FFL: +7.0m
SE
EBP South East Elevation 东南立面图 staircase Landing FFL: +3.5m
Staircase Landing FFL: +3.5m
Staircase Landing FFL: +3.5m
Staircase Landing FFL: +3.5m
EBP Section AA 剖面 AA
3500
1
5450
1 : 100
3500
1
1 : 100
Ground Floor FFL: +0.0m
South East Elevation
Section A-A
Top of Rail FFL: +17.16m
Top of Rail FFL: +17.16m
Third Level FFL: +15.96m
Third Level FFL: +15.96m
First Level FFL: +7.0m
First Level FFL: +7.0m
Second Level FFL: +11.48m
Second Level FFL: +11.48m
Top of Rail FFL: +17.16m
Top of Rail FFL: +17.16m
Third Level FFL: +15.96m
Third Level FFL: +15.96m
17160
4480
First Level FFL: +7.0m
First Level FFL: +7.0m
8960
3500
WINRUN GROUPdrawn - 万润集团 by/ checked by:
Second Level FFL: +11.48m
Second Level FFL: +11.48m
Staircase Landing FFL: +3.5m
Staircase Landing FFL: +3.5m
374-EBP-04-201
C
创建日期
Scale:
比例 (@ A1)
First Level FFL: +7.0m Ground Floor FFL: +0.0m
As indicated
Entrance Building Platform - South East - South West ZEDfactory Elevations 东南和西南立面图 ZEDfactory, 21 Sandmartin Way, London SM6 7DF issued for: drawn by/ checked by: T 020 8404 1380 F 020 8404by: 2039 update
Staircase Landing FFL: +3.5m
E mail@zedfactory.com MS COORDINATION www.zedfactory.com
DF
First Level FFL: +7.0m Ground Floor FFL: +0.0m
Section B-B
3500
South West Elevation Staircase Landing FFL: +3.5m
3500 4480
update by:
1000
First Level FFL: +7.0m Ground Floor FFL: +0.0m
08/08/2023 Drawing Title: 图纸标题
8200
Project: 工程名称 COORDINATION MS DF White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇 Drawing Number: 图纸号 Rev. 版本
4280 3700
Staircase Landing FFL: +3.5m
3500
Staircase Landing FFL: +3.5m
Staircase Landing FFL: +3.5m
EBP Drawing Number: Rev. 版本 BB 剖面 BB 图纸号 Section 2 1 : 100 C 374-EBP-04-201
3700
Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken C Copyright ZEDfactory 2023 Created: Scale: (@ A1)
创建日期
C Copyright ZEDfactory 2023 Ground Floor FFL: +0.0m
Ground Floor FFL: +0.0m
08/08/2023 A1
3500
8200
Third Level FFL: +15.96m
issued for:
Second Level FFL: +11.46m
Staircase Landing FFL: +3.5m
Created:
1 : 100
图纸标题
17160
3500
8960 8200 17160
A1
Drawing Title:
Second Level FFL: +11.48m
EBP South West Elevation 西南立面图
46
White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇
Entrance Building Platform - South East - South West Client: 甲方 Elevations 东南和西南立面图
4480
17160
1200 4280
8960
Client:
First Level FFL: +7.0m Ground Floor FFL: +0.0m
2
甲方 WINRUN GROUP - 万润集团 Project: 工程名称
Top of Rail FFL: +17.16m
Third Level FFL: +15.96m
1000
Second Level FFL: +11.46m
44801200
Second Level FFL: +11.48m
8200
1200
Third Level FFL: +15.96m
4480
Third Level FFL: +15.96m
1 : 100
1200
1 Top of Rail FFL: +17.16m
Top of Rail FFL: +17.16m
EBP Section AA 剖面 AA Top of Rail FFL: +17.16m
4480
1 : 100
8960
EBP South East Elevation 东南立面图 1
Ground Floor FFL: +0.0m
Ground Floor FFL: +0.0m
Ground Floor FFL: +0.0m
比例
As indicated
ZEDfactory ZEDfactory, 21 Sandmartin Way, London SM6 7DF
Ground Floor FFL: +0.0m
Ground Floor FFL: +0.0m
47
+
Portfolio 2024
+ A. Mahdi Safieddine
Lake Building
Ground Floor
Multi-purpose rooms Music rooms Core + Service Classrooms
Second Floor
Conference Hall Restaurant Core + Service Bar + Dining
Indoor Stage VIP Area Changing Lounge
Mezzanine Floor
Third Floor
BIPV Roof MEP Room Core + Service Storage
Open Exhibition Art Display Core + Service Seating
First Floor
White Stag
White Stag
Theatre Stage Restaurant Core + Service Corridors
Building Roof
The Lake Centre Building is the main attraction point of the site that functions as a social hub for all users and visitors. Functioning as a theatre and a conference center with exhibition spaces, its multi-functional and educational spaces also help attract users of all ages. Split Levels
Adjustment
Reduction
Structure
Its spiral form and structure help in projecting its orientation to all the main views of the site, making it look as if emerging from the sea. The BIPVs on the roof allow to make the building eco-friendly and rely on renewable sources.
Slope
BIPV Panels
Subtract
Orient
Using the main stage for multi-functions followed by the spectacular mountain view. Addition
48
Surroundings
Views + Orientation
Final Form
49
+
Portfolio 2024
Energy Strategy
+ A. Mahdi Safieddine
Air intake to reversible heat pump is in non-habitable portion of the roof. The heat pump is on vibration mounts to reduce noise and also in an insulated noise enclosure allowing the roof to be used around it.
Heat is extracted from the heat pump units through PV canopy at the tallest point in structure Electricity produced from the PV panels is used directly for lighting and appliances
Water from canopy and roofs are stored under the usable roof so that water can be gravity fed for WCs
The thin plan depth allows cross ventilation in spring and autumn to reduce cooling load
The refrigerant is transported water efficiently around the building. Being in a central location the pump energy is minimised.
Gaps between the building allow ventilation to the parking level. Large air intake to parking level ensures good ventilation driven by wind pressure
White Stag
Fan coil units are placed at the facade to condition the building where heat and coolth losses are greatest
White Stag
On stand alone blocks (not under canopy) the plant room roofs are clad with solar thermal tubes to feed the heat pump. Each space is fed by refrigerant to deliver conditioned demand driven air. Units only work when windows for natural ventilation are closed
2000
Roof FFL: +25.5m
Parapet FFL: +22.5m
Roof FFL: +22.5m
Roof FFL: +21.5m
Roof FFL: +21.5m
Third Floor FFL: +18.0m
Third Floor FFL: +18.0m
Second Floor FFL: +13.5m
Second Floor FFL: +13.5m
First Floor FFL: +9.0m
First Floor FFL: +9.0m
Mezzanine Floor FFL: +3.0m
Mezzanine Floor FFL: +3.0m
版本 日期
设计变更内容
Rev
Date
X
31032022
Amendments
6400
4500 4500
FFL: +25.5m
3600
3000
A heat recovery ventilation system using displacement ventilation are used in units to conserve heat. Thermally massive structure help stores heat and coolness in the structure
6000
25500 4500 6000
Ground Floor FFL: +0.0m
Ground Floor FFL: +0.0m
South East Elevation
South East Elevation 东南立面图 FFL: +25.5m
2000
FFL: +19.5m
Parapet FFL: +23.5m
Parapet FFL: +19.5m
Roof FFL: +22.5m
Roof FFL: +19.5m
Third Floor FFL: +18.0m
Third Floor FFL: +15.0m
Second Floor FFL: +13.5m
Second Floor FFL: +10.5m
First Floor FFL: +9.0m
First Floor FFL: +6.0m
甲方 WINRUN GROUP - 万润集团 Project: 工程名称
3600
Client:
White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇
25500 4500
2600
900
4500
900
4500
3000
1 : 100
5500
1
SE
3000
3000
Elevations
3600
900
SW
Drawing Title:
图纸标题
Theatre Conference Centre - South East - South West Elevations 东南和西南立面图 issued for:
drawn by/ update by:
4000
COORDINATION
6000
Created:
6000
Checker
Rev.
版本
X
创建日期
Scale:
21/10/2022 Mezzanine Floor FFL: +3.0m
checked by:
Author
图纸号 374-B1-201 Drawing Number:
比例 (@ A1)
As indicated
Mezzanine Floor FFL: +3.0m
ZEDfactory
3000
ZEDfactory, 21 Sandmartin Way, London SM6 7DF
Ground Floor FFL: +0.0m
Ground Floor FFL: +0.0m
South West Elevation
South West Elevation 西南立面图 2
1 : 100
C Copyright ZEDfactory 2022
FFL: +25.5m
FFL: +25.5m
Parapet FFL: +23.5m
Parapet FFL: +23.5m
Roof FFL: +22.5m
Roof FFL: +22.5m
Third Floor FFL: +18.0m
Third Floor FFL: +18.0m
Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
版本 日期
设计变更内容
Rev
Date
X
31032022
Amendments
A
B
3600
B
Second Floor FFL: +13.5m
First Floor FFL: +9.0m
First Floor FFL: +9.0m
Mezzanine Floor FFL: +3.0m
Mezzanine Floor FFL: +3.0m
25500
900
Second Floor FFL: +13.5m
2600
4500
26700
4500
4500
4500
3000
A1
T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com
3000
Sections
6000
6000
4000
A
Ground Floor FFL: +0.0m
1200
Ground Floor FFL: +0.0m Pool Floor: -1.0m
Parapet FFL: +25.5m
FFL: +25.5m
Parapet FFL: +23.5m
Parapet FFL: +23.5m
Roof FFL: +22.5m
Roof FFL: +22.5m
3600
7500
1900
1000
1 : 100 2000
1
Lake Floor: -1.2m
Section A-A
Section AA 剖面AA
Third Floor FFL: +18.0m
Third Floor FFL: +18.0m
3600
4500
900
甲方 WINRUN GROUP - 万润集团 Project: 工程名称 Client:
Second Floor FFL: +13.5m
Drawing Title:
2550 1000
4500
3600
25500
900
Second Floor FFL: +13.5m
White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇
First Floor FFL: +9.0m
图纸标题
Theatre Conference Centre - Sections AA BB 剖面AA和BB First Floor FFL: +9.0m
issued for:
COORDINATION
图纸号 374-B1-300
6000
6000
3560
Drawing Number:
Created:
创建日期
21/10/2022
2150 Mezzanine Floor FFL: +3.0m
Mezzanine Floor FFL: +3.0m
drawn by/ update by:
checked by:
Author
Checker
Rev.
版本
X Scale:
比例 (@ A1)
As indicated
ZEDfactory T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com
2110
3000
3000
ZEDfactory, 21 Sandmartin Way, London SM6 7DF
Ground Floor FFL: +0.0m
Ground Floor FFL: +0.0m
Section BB 剖面BB 2 A1
50
Lake Floor: -1.2m
1 : 100
C Copyright ZEDfactory 2022
Section B-B
Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
51
Portfolio 2024
+ A. Mahdi Safieddine N
Service Building
B3-A
B3-B
B3-C
B3-D
B3-E
B3-F
B3-H
B3-G
B3-I
版本 日期 Rev
Date
设计变更内容 Amendments
X
22122022
Drawing Layout
A
27042023
Plans, Elevations, and Diagram Layout
B
19052023
B3-J
41650 34800 3600
3600
3600
3600
5200
3600
3600
3
2
374-B3-04-300
374-B3-04-300
3600
3600
B3-6 1100
B3-6
AHU
16
02
14
06
3200
05
13
HWC UP
13490
The first floor is an open plan kitchen area for all families and campers. And finally the third floor are accommodations split to two types, single bedrooms and family bedrooms.
15 0.00 m
B3-4
17
18
3200
13940
11800
11
12
19
B3-4
17 04 08 10 04
White Stag
B3-3
UP
3200
B3-3
10
01
B3-2
09
1100
03
03
07
B3-2
01
1
B3-1
B3-1
374-B3-04-300
甲方 WINRUN GROUP - 万润集团 Project: 工程名称 Client:
01- Locker Room
B3-A
B3-B
B3-C
B3-D
B3-E
B3-F
B3-G
B3-I
B3-H
存储柜 02- Shower + Changing 带更衣室的洗澡间 03- Changing Room 更衣室 04- Female Toilets 女卫生间 05- Fire Control Room 消防控制室 06- AHU Room 空调机房 07- Baby chnging room 母婴室 08- Cleaning Supply Room 清洁工具储藏室 09- Disabled Toilet 残疾人卫生间 10- Male Toilets 男卫生间 11- Staff Toilet 员工卫生间 12- Fire Lobby 消防ӹ室 13- Entrance Lobby 入口大厅 14- Reception Room 门卫 15- Storage 贮存 16- LV Room 低压机房
B3-J
White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇
Drawing Title:
Ground Floor Plan
01 Service Centre Ground Floor 首层平面图 -公共卫生间/更衣室/营地办公室 1 : 75
C Copyright ZEDfactory 2023
-公共卫生间/更衣室/营地办公室 issued for:
B3-C
B3-D
B3-E
B3-F
B3-G
B3-H
B3-I
drawn by/ update by:
COORDINATION
Created:
checked by:
MS
Drawing Number: 图纸号 374-B3-04-100
DF
Rev.
版本
B
创建日期
Scale:
05/19/2023
1 : 75
比例 (@ A1)
Accommodation
ZEDfactory ZEDfactory, 21 Sandmartin Way, London SM6 7DF
带݅衣间的ڈ؟䃷 浴隔间 18- Security Room 安保监控室 19- Linens Storage 服务于三层酒店房间的)床单等储藏室
N B3-B
B3-A
图纸标题
Service Centre - Ground Floor Plan 首层平面图
T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com
17- Family shower + changing
A1
Plans, Elevations, and Diagram Layout Building Boundary Amendment
B3-5
B3-5
1
The Service building is divided into 2 main attributes; public and private. Split over three floors, the ground floor serves as showers, toilets, changing facilities and receptions.
B3-J
Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
版本 日期 Rev
Date
设计变更内容 Amendments
X
22122022
Drawing Layout
A
27042023
Plans, Elevations, and Diagram Layout
B
19052023
Plans, Elevations, and Diagram Layout Building Boundary Amendment
Open Kitchen
34800 34000 3600
3600
3600
3600
5200
3600
3
2-
374-B3-04-300
374-B3-04-300 ---
3600
3600
White Stag
+
3600
Toilet Facilities
B3-6 1100
B3-6
B3-5
3200
B3-5
04
01
UP
01
Plans
B3-4
F
F
F
F
F
F
4.00 m
3200
13000
11800
B3-4
F
02
02
03
05 F
3200
B3-3
F
F
F
01
UP
F
B3-3
Double Rooms
01
B3-2 1100
B3-2 -
B3-1
B3-1
---
甲方 WINRUN GROUP - 万润集团 Project: 工程名称 Client:
White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇
Drawing Title:
Single Rooms
图纸标题
Service Centre - First Floor Plan 二层平面图 -共享厨房 issued for:
drawn by/ update by:
COORDINATION B3-A
B3-C
B3-B
B3-D
B3-E
B3-F
B3-G
B3-H
B3-I
B3-J
图纸号 374-B3-04-101 Drawing Number:
Created:
First Floor Plan
02 Service Centre First Floor 二层平面图 -共享厨房 1 A1
餐厅 02- Kitchen and Food Preperation 共享厨房 03- Lobby 门厅 04- Core Lobby 消防前室 05- Fire Escape Staircase 消防ࠡࠐ
1 : 75
C Copyright ZEDfactory 2023
B3-A
B3-B
B3-C
B3-D
B3-F
B3-E
B3-G
B3-H
B3-I
版本
B Scale:
1 : 75
比例 (@ A1)
ZEDfactory ZEDfactory, 21 Sandmartin Way, London SM6 7DF T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com
Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
版本 日期
N
DF
Rev.
创建日期
05/19/2023 01- Dinning Hall
checked by:
MS
Rev
Date
X
设计变更内容 Amendments
22122022
Drawing Layout
A
27042023
Plans, Elevations, and Diagram Layout
B
19052023
Plans, Elevations, and Diagram Layout Building Boundary Amendment
Family Room Layout
B3-J
41650 34600 3600
3600
3600
3600
5200
3
2-
374-B3-04-300
374-B3-04-300 ---
3600
3600
3600
3600
B3-6 1100
B3-6
B3-5
B3-5
3200
UP
01
01
02
04
02
02
02
01
01 B3-4
3200
13940
11800
B3-4
8.00 m
05 B3-3
B3-3
01
3200
DN
01
02
02
03
02
02
01
01
Kids Bedroom
B3-2 1100
B3-2 -
B3-1
B3-1
甲方 WINRUN GROUP - 万润集团 Project: 工程名称
---
Client:
White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇
Drawing Title:
Bedroom 2
图纸标题
Service Centre - Second Floor Plan 三层平面图
Corridor
-酒店房间
图纸号 374-B3-04-102
Rev.
创建日期
Scale:
Created:
B
01- Large En-suite Bedroom
Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
X
B3-1
11800
B3-D
B3-E
B3-F
B3-G
B3-H
B3-I
B3-J
B3 Section CC 剖面CC
1 : 100
3600
3600
3600
3600
5200
3600
3
3600 1 : 100
3600
3600
3600
B3-E
3600
B3-F
5200
B3-G
3600
B3-H
3600
B3-I
3600
B3-J
3600
and Mezzanine FFL: +12.00m White Deer VillageMEP at Southern Taihang Mountain - 南太行白鹿零碳小镇
MEP and Mezzanine FFL: +12.00m Second Floor FFL: +8.00m
甲方 WINRUN GROUP - 万润集团 Project: 工程名称 图纸标题
B3 Section AA 剖面AA FFL: +0.00m 1Ground Floor 1 : 100
52
A1
2700
Section A-A
COORDINATION
drawn by/ update by:
4000
checked by:
MS
DF
图纸标题Second Floor FFL: +8.00m First Floor Drawing Number: Rev. Service Centre -图纸号 Sections AAFFL: - BB+4.00m - CC版本 剖面AA BB B 374-B3-04-300 CC Drawing Title:
issued for:
Created: 创建日期 COORDINATION 05/19/2023
drawn by/ update by: Scale:
MS
2700 1000 1000 2000 27001000 1000
B3-D
3600
3600
B3-C
B3-E
B3-F
3600
3600
B3-D
3600
5200
B3-E
B3-G
3600
B3-F
B3-H
3600
B3-G
B3-I
3600
B3-H
First Floor FFL: +4.00m Ground Floor FFL: +0.00m
First Floor FFL: +4.00m Rev. Ground Floor FFL: +0.00m
创建日期
T 020 8404 1380 F 020 8404 2039 Created: Scale: E mail@zedfactory.com
05/19/2023 www.zedfactory.com
比例 (@ A1)
1 : 100
B3 South West Elevation 和西
Do not scale, use figured dimensions only. Unless stated Ground Floor FFL: +0.00m otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade 1 :ZEDfactory, 100 21 Sandmartin Way, London SM6 7DF Contractor prior to any work and /or procurement being T 020 8404 1380 F 020 8404 2039 undertaken C Copyright ZEDfactoryE2023 mail@zedfactory.com www.zedfactory.com
2
Ground Floor FFL: +0.00m
A1
ZEDfactory
B3 South West Elevation 和西
Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken C Copyright ZEDfactory 2023
2
1 : 100
C Copyright ZEDfactory 2023
A1
First Floor FFL: +4.00m Ground Floor FFL: +0.00m
Ground Floor FFL: +0.00m
B3-J
3600
5200
3600
3600
3600
B3-I
3600
1 : 100
Top Of Roof: +18.00m
B3-J
3600
checked by:
比例 DF(@ A1)
1 : 100
图纸号 版本 ZEDfactory B 374-B3-04-300 ZEDfactory, 21 Sandmartin Way, London SM6 7DF Drawing Number:
C Copyright ZEDfactory 2023
1
B3-C
3600
B3-B
- 南太行白鹿零碳小镇 Service Centre - Sections AA - BB - CC 剖面AA BB CC
B3 Section AA 剖面AA A1
18000
and Mezzanine FFL: +12.00m White Title: Deer VillageMEP at Southern Taihang Mountain Drawing Second Floor FFL: +8.00m
Second Floor FFL: +8.00m First Floor FFL: +4.00m
Second Floor FFL: +8.00m First Floor FFL: +4.00m
2000
MEP and Mezzanine FFL: +12.00m
1000 1000 2000 27001000 1000
4000 4000 4000
7700
First Floor FFL: +4.00m Ground Floor FFL: +0.00m
18000
Top Of Roof: +18.00m 甲方 WINRUN GROUP - 万润集团 Project: 工程名称 Client:
issued for:
Transfer Beam
B3-B
3600
B3-A
Top Of Roof: +18.00m
2000
4000 4000
18000 7700
Second Floor FFL: +8.00m First Floor FFL: +4.00m
B3-A
Top Of Roof: +18.00m
Transfer Beam
Detail 1
MEP and Mezzanine FFL: +1 Second Floor FFL: +8.00m
1 : 100
Client:
Detail 1
MEP and Mezzanine FFL: +1
South East Elevation
1 : 100
B3 South East Elevation 东南 1
4000
18000 10300
MEP and Mezzanine FFL: +12.00m Second Floor FFL: +8.00m
18000
4000 4000 4000 Ground Floor FFL: +0.00m
6000
MEP and Mezzanine FFL: +12.00m
1100 Top Of Roof: +18.00m
B3 South East Elevation 东南 1
11300
3600
B3-D
3200
8000
First Floor FFL: +4.00m Ground Floor FFL: +0.00m
11300
6000
3600
B3-C
10300
Top Of Roof: +18.00m
B3-B
3200
8000
Second Floor FFL: +8.00m First Floor FFL: +4.00m
Top Of Roof: +18.00m
B3-A
3200
Top Of Roof: +18.00m
10000
B3-C
B3 Section BB 剖面BB Top Of Roof: +18.00m
1100
6000
B3-B
1 : 100
MEP and Mezzanine FFL: +12.00m Second Floor FFL: +8.00m
Elevations
B3-A
Section C-C
B3 Section CC 剖面CC 3
4000
4000 Ground Floor FFL: +0.00m
Section B-B
1 : 100
18000
12000 4000 4000 2000 4000
1500
First Floor FFL: +4.00m Ground Floor FFL: +0.00m
2500
4000
Top Of Roof: +18.00m
B3-1
11800
MEP and Mezzanine FFL: +12.00m
4000 4000
2000 4000
2500 2000
Detail 2
B3 Section BB 剖面BB
2
Plans, Elevations, and Diagram Layout Building Boundary Amendment
4000
17930
2000 1500 2000
Second Floor FFL: +8.00m First Floor FFL: +4.00m
Ground Floor FFL: +0.00m
2
19052023
18000
17930
2000
18000 4000 4000 4000 4000
Sections
MEP and Mezzanine FFL: +12.00m Second Floor FFL: +8.00m
Detail 2
First Floor FFL: +4.00m Ground Floor FFL: +0.00m
27042023
B
6000
12000
MEP and Mezzanine FFL: +12.00m
10000
4000 Second Floor FFL: +8.00m First Floor FFL: +4.00m
18000
MEP and Mezzanine FFL: +12.00m Second Floor FFL: +8.00m
Top Of Roof: +18.00m
A 1100
6000
MEP and Mezzanine FFL: +12.00m
B3-1
1100
B3-2
10000
3200
B3-2
3200
B3-3
MEP and Mezzanine FFL:
MEP and Mezzanine FFL: Second Floor FFL: +8.00m
1300
3200
Top Of Roof: +18.00m
10000
Top Of Roof: +18.00m
3200
B3-3
3200
B3-4
2700
1100
3200
B3-5
Second Floor FFL: +8.00m First Floor FFL: +4.00m
1300 1500
1100
6000
3200
B3-4
11800
6000
3200
6000
3200
B3-5
1100
B3-6
Plans, Elevations, and Diagram Layout
2700 2500
11800 1100
B3-6
Plans, Elevations, and Diagram Layout
X
First Floor FFL: +4.00m Ground Floor FFL: +0.00m
1500
B3-2
South West Elevation
2500
B3-3
66°
B3-4
66°
B3-5
66°
B3-6
66°
B3-6
66°
B3-5
Amendments
66°
B3-4 13940
Top Of Roof: +18.00m 22122022 Drawing Layout
66°
B3-3
Plans, Elevations, and Diagram Layout -
Building Boundary Amendment 设计变更内容
Date
66°
B3-2
Drawing Layout
27042023
Rev
66°
B3-1
22122022
B 日期 19052023 版本
60 °
B3-1
1100
60 °
B3-2
3200
66°
B3-3
3200
66°
B3-4
3200
66°
B3-5
1100 Top Of Roof: +18.00m
66°
B3-6
1100
66°
B3-6
A
3200
66°
B3-5
11800
3200
Amendments
6000
B3-4 13940 11800
Top Of Roof: +18.00m
设计变更内容
Date
10000
B3-3
3200
Rev
10000
B3-2
1100
版本 日期
4000 4000
B3-1
T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com
10300
1 : 75
C Copyright ZEDfactory 2023
ZEDfactory, 21 Sandmartin Way, London SM6 7DF
18000
1 A1
Bedroom 2 Ladder Access to Mezzanine
比例 (@ A1)
ZEDfactory
大套间 02- Single En-suite Bedroom 小套间 03- Lounge 酒店前厅 04- Core Lobby 消防前室 05- Fire Escape Staircase 消防ࠡࠐ
66°
Second Floor Plan
03 Service Centre Second Floor 三层平面图 -酒店房间
1 : 75
B3-J
6000
B3-I
10300
B3-H
4000 4000
B3-G
B3-F
7700
B3-E
4000 4000
B3-D
7700
B3-C
4000
B3-B
版本
Drawing Number:
05/19/2023 B3-A
checked by:
DF
11300
drawn by/ update by:
MS
11300
issued for:
COORDINATION
Ground Floor FFL: +0.00m
53
+
Portfolio 2024
+ A. Mahdi Safieddine GH-A
GH-B
GH-C
GH-D
GH-E
GH-F
GH-G
GH-H
版本 日期 Rev
Date
设计变更内容
A
21072023
Updated Drawing Layout
Amendments
77600 12200
43400 18900
3400
16000
2400
6000
6000
28800
6000
6000
374-GH-04-300 B-B
6000
GH-1
Storage
仓储
9500
3000
13450
8600
5900
+8.00m
6000
22100
6000
374-GH-04-300 C-C
Greenhouse Area
2000 6000
Stair to Basement
厕所
通往地下室的楼梯
Kitchen
厨房 6000
14470
Toilets
5000
GH-2
Bride/Groom Dressing Room
新人更衣间
Reception
2100
2250
+6.60m
21800
GH-3
6000
6000
室外礼台
A-A 374-GH-04-300
6000
Outdoor Stage
30400
+7.20m
18000
礼台
17060
Stage
9000
+6.60m
UP
A-A 374-GH-04-300
3000
8660
18000
28000
49400
Plans
+6.60m
+8.00m
Wedding Hall
婚礼及活动主厅
GH-7
9000
Multi-purpose hall
多功能厅
9800
9800
20370
GH-6
2000
9500
3900 374-GH-04-300 C-C
GH-C
GH-D
Drawing Title:
issued for:
冷柜
冷库
Dry Stock
干货间
12200
2900
2900
+5.20m
8700
25600
12200
9100 6000
Scale:
比例 (@ A1)
1 : 150
Ground Floor Plan
16000
ZEDfactory
77600
3450
DF
版本
A
25/07/2023
22000
43400
GH-3 3250
Rev.
创建日期
Created:
checked by:
MS
图纸号 374-GH-04-100 Drawing Number:
9700
2000
UP
3400
drawn by/ update by:
COORDINATION
Chiller
6800
4800
Walk-in Freezer
GH-2
ZEDfactory, 21 Sandmartin Way, London SM6 7DF
374-GH-04-300 C-C
T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com
Green House Basement 主体建筑地下室 2
A1
图纸标题
Greenhouse - Ground Floor Plan 主体建筑地面层
10100
GH-1
Main Hall
甲方 WINRUN GROUP - 万润集团 Project: 工程名称 Client:
White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇
374-GH-04-300 B-B
3900
2000
GH-8
White Stag
6000
GH-5
374-GH-04-300 C-C
White Stag
GH-4
Green House Ground Floor Plan 主体建筑地面层 1
1 : 150
1 : 150
C Copyright ZEDfactory 2023
GH-H
GH-G
GH-F
GH-E
GH-D
GH-C
GH-B
42000 6000
6000
GH-H
6000
GH-G
6000
GH-F
6000
GH-E
6000
GH-D
版本 日期
设计变更内容
A 日期 版本 Rev
Date
设计变更内容
A
21072023
Updated Drawing Layout
Rev Date Amendments Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken21072023 Updated Drawing Layout Amendments
GH-A
6000
GH-C
GH-B
GH-A
42000 6000
6000
6000
6000
6000
6000
6000
2200
Top of Greenhouse: +20.60m
2200
Top of Structure: +18.40m Top of Greenhouse: +20.60m
6050
13400
6050
Top of Structure: +18.40m
4550
13400
Facade: +12.35m
Facade: +12.35m
600 4550
Water Pool Level: +7.20m Ground Level: +6.60m
North Elevation
Water Pool Level: +7.20m
600
Ground Level: +6.60m
Greenhouse North Elevation 北立面 1
1 : 100
Greenhouse North Elevation 北立面 1
GH-A
1 : 100
GH-B
GH-C
GH-D
GH-E
GH-F
GH-G
GH-H
42000 6000
6000
GH-A
6000
GH-B
6000
GH-C
6000
GH-D
6000
GH-E
6000
GH-F
GH-G
GH-H
42000
Top of Greenhouse: +20.60m
6000
6000
6000
6000
6000
6000
2200
6000
2200
Top of Structure: +18.40m Top of Greenhouse: +20.60m
甲方 WINRUN GROUP - 万润集团 Project: 工程名称 Client:
6050
Top of Structure: +18.40m
WINRUN GROUP - 万润集团 Project: 工程名称
White Deer Village at Southern Taihang Mountain
4550
13400
Elevations
6050
13400
White Deer Village at Southern Taihang Mountain Client: 甲方 - 南太行白鹿零碳小镇 Facade: +12.35m
版本 日期 图纸标题 设计变更内容 - 南太行白鹿零碳小镇
Drawing Title: Rev Date
Facade: +12.35m
South Elevation A
21072023 issued for: Drawing Title:
4550 600
Water Pool Level: +7.20m Ground Level: +6.60m
GH-8
GH-7
GH-6
GH-5
GH-4
GH-3
GH-2
3000
6000
6000
6000
6000
6000
Updated Drawing Layout drawn by/ checked by: update by:
图纸号 版本 日期 设计变更内容 drawn by/ A 374-GH-04-200 update by: Amendments Drawing Number: issued for: Rev Date
36000 Ground Level: +6.60m
图纸标题
COORDINATION MS ElevationsDF Greenhouse - North and South 主体建筑南北立面
GH-1
Water Pool Level: +7.20m
600
Amendments
Greenhouse - North and South Elevations 主体建筑南北立面
Rev.
COORDINATION
3000
版本
checked by:
MS
DF
Scale: 比例 (@ A1) 创建日期 Rev. 版本 1 : 100 A 21072023 Updated Drawing Layout A 374-GH-04-200 ZEDfactory ZEDfactory, London Created: (@ 7DF A1) 创建日期 21 Sandmartin Way,Scale: 比例SM6
Created:
25/07/2023 Drawing Number: 图纸号
2200
Top of Greenhouse: +20.60m
GH-8
GH-7
GH-6
GH-5
GH-4
GH-3
GH-2
GH-1
Top of Structure: +18.40m
25/07/2023 : 100 T 020 8404 1380 F 020 8404 1 2039
36000 3000
6000
6000
6000
6000
6000
E mail@zedfactory.com www.zedfactory.com
3000
ZEDfactory
Greenhouse South Elevation 南立面
A1
2
Top of Structure: +18.40m
1 : 100
Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
Facade: +12.35m
C Copyright ZEDfactory 2023
13400
4550 6050
The greenhouse area consists of agricultural activities, cafe, classrooms for children, and a main wedding and multi-purpose area. In addition to a vast landscape.
Greenhouse South Elevation 南立面 13400
A1
ZEDfactory, 21 Sandmartin Londonstated SM6 7DF Do not scale, use figured dimensionsWay, only. Unless otherwise, these8404 drawings design intent only and T 020 1380 represent F 020 8404 2039 approved drawings will be required from the Trade E assembly mail@zedfactory.com Contractor prior to any work and /or procurement being www.zedfactory.com undertaken
Top of Greenhouse: +20.60m
1 : 100
2200 6050
2
C Copyright ZEDfactory 2023
Facade: +12.35m Ground Level: +6.60m
4550
600
Water Pool Level: +7.2m
East Elevation
Greenhouse East Elevation 东立面 Water Pool Level: +7.2m
1 : 100
Ground Level: +6.60m
600
1
Greenhouse East Elevation 东立面 1
GH-1
1 : 100
GH-2
GH-3
GH-4
GH-5
GH-6
GH-7
GH-8
36000 3000
6000
6000
6000
6000
6000
3000
2200
Top of Greenhouse: +20.60m
GH-1
GH-2
GH-3
GH-4
GH-5
GH-6
GH-7
GH-8
Top of Structure: +18.40m
36000 3000
6000
6000
6000
6000
6000
甲方 WINRUN GROUP - 万润集团 Project: 工程名称 Client:
3000
2200 6050
13400
Top of Greenhouse: +20.60m
White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇 Top of Structure: +18.40m
甲方 图纸标题 WINRUN GROUP - 万润集团
Facade: +12.35m
Client:
Drawing Title:
13400
4550 6050
Greenhouse - East and West Elevations Project: 工程名称 主体建筑东西立面 White Deer Village at Southern Taihang Mountain for: drawn by/ -issued 南太行白鹿零碳小镇
600
Water Pool Level: +7.20m
update by:
MS
Drawing Number: 图纸号 图纸标题 374-GH-04-201
Facade: +12.35m Ground Level: +6.60m
Rev.
4550
Greenhouse - East and West Elevations Created: 创建日期 Scale: 比例 (@ A1) 主体建筑东西立面 25/07/2023 1 : 100 issued for:
600
Ground Level: +6.60m
GH-A
GH-B
GH-C
GH-D
GH-E
GH-F
GH-G
1 : 100 6000
6000
6000
6000
6000
6000
21072023 Updated Drawing Layout Created: Scale: (@ A1) Do not scale, use figured dimensions only. Unless stated 25/07/2023 otherwise, these drawings represent design 1 :intent 100 only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
2200
ZEDfactory
ZEDfactory, 21 Sandmartin Way, London SM6 7DF Top of Structure: +18.40m
Greenhouse West Elevation 西立面
T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com
1 : 100
Do not scale, use figured dimensions only. Unless stated otherwise, these drawings B Crepresent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
6050
2
比例
创建日期
A
6000
Top of Greenhouse: +20.60m
C Copyright ZEDfactory 2023
13400
A1
checked by:
ZEDfactory, 21 Sandmartin Way, London SM6 7DF Rev Date AmendmentsRev. Drawing Number: T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com
GH-H
42000
C Copyright ZEDfactory 2023
drawn by/ update by:
COORDINATION DF ZEDfactory MS 版本 日期 设计变更内容 图纸号 版本 A 374-GH-04-201
Water Pool Level: +7.20m
Greenhouse West Elevation 西立面
A1
DF
版本
A
Drawing Title:
2
checked by:
West Elevation COORDINATION
A
A
4550
Facade: +12.35m
B C
Water Pool Level: +7.20m
600
Ground Level: +6.60m
Greenhouse Section A-A 剖面AA A-A 1 : 100
GH-1
GH-3
GH-4
GH-5
GH-6
GH-7
Section A-A
GH-8
36000 6000
6000
6000
6000
6000
3000
2200
Sections
GH-2
3000
Top of Greenhouse: +20.60m
13400
6050
Top of Structure: +18.40m
4550
Facade: +12.35m
Water Pool Level: +7.20m
600
Ground Level: +6.60m
Greenhouse Section B-B 剖面 BB B-B 1 : 100
+6.60m
Section B-B 甲方 WINRUN GROUP - 万润集团 Project: 工程名称 Client:
GH-1
GH-2
GH-3
GH-4
GH-5
GH-6
GH-7
GH-8
36000 6000
6000
6000
6000
6000
White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇
3000
2200
3000
2200
Top of Greenhouse: +20.60m
Top of Structure: +18.40m
Drawing Title:
图纸标题
6050
6050
Greenhouse - Sections AA BB CC 剖面AA BB CC issued for:
13400
COORDINATION 16400
Facade: +12.35m
图纸号 374-GH-04-300 Drawing Number:
Created:
创建日期
5150
4550
25/07/2023
drawn by/ update by:
checked by:
MS
Rev.
DF
版本
A Scale:
比例 (@ A1)
As indicated
ZEDfactory ZEDfactory, 21 Sandmartin Way, London SM6 7DF
Greenhouse Section C-C 剖面 CC C-C 1 : 100 A1
54
C Copyright ZEDfactory 2023
T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com
Ground Level: +6.60m
3000
600
Water Pool Level: +8.00m
Basement Level: +3.6m
Section C-C Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
55
+
Portfolio 2024
+ A. Mahdi Safieddine PRODUCED BY AN AUTODESK STUDENT VERSION
Detailed Plan
below : GF Plan
N
下图:地面平面
2
7800
2600 1300
设计变更内容
Amendments
2600
6
1300
Date
4
2600
5
1300
3
日期
Rev
1300
7
1300
750
1300
2900
SEC A-A PT103-4-111
4150
SEC B-B PT103-4-112
Lake Cabins
1
版本
Detail 01 PT103-4-113
D
310
Detail 02 PT103-4-113
1575 705 ED 01
Note: - Any errors or inconsistencies found on the approved drawings or changes made to the approved drawings relating to information issued by the architects on these sheets must be reported to the Architect before work is carried out. - It is the responsibility of the recipient to ensure the drawings are printed to the correct scale.
The lake cabins were the first set of building to be constructed on the site.
ALL DIMENSIONS AND SPECIFICATIONS SHOULD BE VERIFIED BY the CONTRACTOR BEFORE ACTUAL CONSTRUCTION BEGINS.
2560
150
3250 X
Detail 04 PT103-4-114
ID 06
3480
6350
B
3100
C
1200
EW 02
Detail 03 PT103-4-114
Client: 甲方
UK DIT
Project: 工程名称
1550
Henan Cabin Detail 05 PT103-4-114
Detail 06 PT103-4-114
SW 02
310
SW 01
Drawing Title: 图纸标题
A
All the technical and detail drawings have been made to ZEDfactory achieve this result, exterior and interior design was made and executed to meet the requirements.
GF Plan 地面平面
3300
Construction
SEC B-B PT103-4-112
SEC A-A PT103-4-111
issued for:
1200
1400
1200
MS
DF
Rev. 版本
X
Created: 创建日期
Scale: 比例
15/07/2022
700
checked by:
drawn by/ updated by:
Drawing Number: 图纸号
PT103/4/110
PRODUCED BY AN AUTODESK STUDENT VERSION
1:20@A1 & 1:40@A3
ZEDfactory, 21 Sandmartin Way, London SM6 7DF T 020 8404 1380 F 020 8404 2039 日期 设计变更内容 E mail@zedfactory.com Rev Date Amendments www.zedfactory.com
Detailed Section
版本
below : Section AA
Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
下图:AA 剖面 图片
C Copyright ZEDfactory 2019
D
C
B
A
PRODUCED BY AN AUTODESK STUDENT VERSION
A1
White Stag
WD 05
2560
PRODUCED BY AN AUTODESK STUDENT VERSION
White Stag
Y
PRODUCED BY AN AUTODESK STUDENT VERSION
3100
1550
NW 04
6350
3100
150
3100
Detail 13 PT103-4-115
Interiors
Detail 10 PT103-4-115
Initial Design
Detail 12 PT103-4-115
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
Detail 08 PT103-4-115
Note: - Any errors or inconsistencies found on the approved drawings or changes made to the approved drawings relating to information issued by the architects on these sheets must be reported to the Architect before work is carried out. - It is the responsibility of the recipient to ensure the drawings are printed to the correct scale.
Technical Design
Steel Structure Layout
ALL DIMENSIONS AND SPECIFICATIONS SHOULD BE VERIFIED BY the CONTRACTOR BEFORE ACTUAL CONSTRUCTION BEGINS.
Client: 甲方
UK DIT
Project: 工程名称 Detail 07 PT103-4-115
Henan Cabin
Detail 09 PT103-4-115
Detail 11 PT103-4-115
Drawing Title: 图纸标题
Section AA / AA 剖面 图片 issued for:
Construction Drawing Number: 图纸号
Well Insulated
checked by:
drawn by/ updated by:
MS
DF
Rev. 版本
PT103/4/111
X
Created: 创建日期
Scale: 比例
15/07/2022
1:10@A1 & 1:20@A3
ZEDfactory ZEDfactory, 21 Sandmartin Way, London SM6 7DF T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com
PRODUCED BY AN AUTODESK STUDENT VERSION
Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
C Copyright ZEDfactory 2019
below : Detail 08
below : Detail 10
版本
日期
Rev
Date
设计变更内容
Amendments
Different Layouts
PRODUCED BY AN AUTODESK STUDENT VERSION
A1
下图:节点08
下图:节点10
Details
Hot- dip galvanised steel 热浸镀锌钢 1.5mmEPDM tanking Water Proof Membrane (roof) 1.5mm厚EPDM橡胶防水卷材 8mm Mgo Board 8mm玻镁板 30mm Cavity Ventilation Void 30mm 立面通风层 50mm Soft Rockwool Insulation Fixings between the steel stud 50mm厚软岩棉保温层塞满钢结构龙骨间空隙 50mm Timber stud 50mm 木龙骨 ATL Wraptite external air tightness barrier
Metal flashing to spec 金属片参见规格
PV roof to spec: 光伏屋面参见规 Metal flashing to spec 金属片参见规格
单向汽密膜
1.5mmEPDM tanking Water Proof Membrane (roof) 1.5mm厚EPDM橡胶防水卷材 100x100mm Steel Beam 100X100mm热镀锌方钢
100x100mm Steel Column 100X100mm热镀锌方钢
8mm Mgo Board
Zero-energy
8mm玻镁板
50mm Rockwool Insulation 50mm厚岩棉保温层 Spruce timber wall finish 云杉木墙完成面
1.5mmEPDM tanking Water Proof Membrane (roof) 1.5mm厚EPDM橡胶防水卷材
50mm Timber stud
50mm 木龙骨
50x50mm Steel Column 50X50mm热镀锌方钢
ATL Wraptite external air tightness barrier 单向汽密膜 RHEINZINK black matt cladding 黑色亚光莱茵辛克镀锌板
Spruce timber wall finish 云杉木墙完成面 100mm Rockwool Insulation 100mm 厚岩棉保温层 8mm Mgo Board
8mm玻镁板
ATL Wraptite external air tightness barrier 单向汽密膜 50mm Soft Rockwool Insulation Fixings between the steel stud 50mm厚软岩棉保温层塞满钢结构龙骨间空隙
PRODUCED BY AN AUTODESK STUDENT VERSION
Outside 外
Water Proof Membrane 防水卷 RHEINZINK black matt cladding 黑色亚光莱茵辛克镀锌板 Inside 内
below : Detail 07
Expanding Foam Insulation around Door/ window opening 延门窗洞口周围的膨胀保温发泡胶
10mm玻镁板
Water Proof Membrane 防水卷 Insect mesh
Spruce timber floor finish 云杉木地板
10mm Mgo Board
10mm玻镁板
50mm Rockwool Insulation 50mm厚岩棉保温层 10mm Mgo Board
10mm玻镁板
ATL Wraptite external air tightness barrier 单向汽密膜 50mm Soft Rockwool Insulation Fixings between the studs 50mm厚软岩棉保温层塞满钢结构龙骨间空隙 10mm Cavity Ventilation Void 10mm 立面通风层 10mm Mgo Board
10mm玻镁板
Water Proof Membrane 防水卷 C Copyright ZEDfactory 2019
Note: - Any errors or inconsistencies found on the approved drawings or changes made to the approved drawings relating to information issued by the architects on these sheets must be reported to the Architect before work is carried out. - It is the responsibility of the recipient to ensure the drawings are printed to the correct scale. ALL DIMENSIONS AND SPECIFICATIONS SHOULD BE VERIFIED BY the CONTRACTOR BEFORE ACTUAL CONSTRUCTION BEGINS.
50x50mm Steel Column 50X50mm热镀锌方钢 Spruce timber wall finish 云杉木墙完成面
Client: 甲方
UK DIT
100mm Rockwool Insulation 100mm 厚岩棉保温层
Project: 工程名称
50mm Timber stud
Henan Cabin
8mm Mgo Board
50mm 木龙骨 8mm玻镁板
ATL Wraptite external air tightness barrier 单向汽密膜
防虫网
Paving support spacers (to hold up spruce timber floor finish) 支撑云杉木地板的垫块
RHEINZINK black matt cladding 黑色亚光莱茵辛克镀锌板
Outside 外
10mm Mgo Board 10mm玻镁板 50mm Rockwool Insulation 50mm厚岩棉保温层 ATL Wraptite external air tightness barrier 单向汽密膜
Water Proof Membrane 防水卷
Inside 内
Spruce timber floor finish 云杉木地板 Paving support spacers (to hold up spruce timber floor finish) 支撑云杉木地板的垫块
50mm Soft Rockwool Insulation Fixings between the steel stud 50mm厚软岩棉保温层塞满钢结构龙骨间空隙 10mm Cavity Ventilation Void 10mm 立面通风层 10mm Mgo Board 10mm玻镁板
100x200mm Steel Beam 100X200mm热镀锌方钢
Outside 外
下图:节点09 Inside 内
10mm Mgo Board
ATL Wraptite external air tightness barrier 单向汽密膜
Inside 内
below : Detail 09
下图:节点07
Outside 外
Can me built and moved PRODUCED BY AN AUTODESK STUDENT VERSION
Expanding Foam Insulation around Door/ window opening 延门窗洞口周围的膨胀保温发泡胶
Insect mesh
防虫网
50mm Soft Rockwool Insulation Fixings between the steel stud 50mm厚软岩棉保温层塞满钢结构龙骨间空隙 Water Proof Membrane 防水卷 RHEINZINK black matt cladding 黑色亚光莱茵辛克镀锌板
Drawing Title: 图纸标题
Details 7-8-9-10 节点7-8-9-10 issued for:
Construction Drawing Number: 图纸号
drawn by/ updated by:
checked by:
MS
DF
Rev. 版本
PT103/4/115
X
Created: 创建日期
Scale: 比例
15/07/2022
1:5@A1 & 1:10@A3
ZEDfactory ZEDfactory, 21 Sandmartin Way, London SM6 7DF T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
A1
PRODUCED BY AN AUTODESK STUDENT VERSION
56
57
+
Portfolio 2024 1
N 1530
2600
2600
1300 300
400
400
300
300
400
1300 400
Rev
2600
1300 400
400
400
1530
1300 400
300
300
400
1300 400
400
400
400
TCAR100x5
设计变更内容
Date
Amendments
A
11.05.21
Amended from one to double cabin units
B
18.05.21
Amended floor beams
300
100
175
1300 400
TREC200x100x10
100 50 100
D
400
+ A. Mahdi Safieddine 版本 日期
2
CAE50x5
CAE50x5
CAE50x5
1550
550
0 4x5
3000
CAE50x5
3100
FL
TCAR100x5
TCAR100x5
0 4x5
TCAR100x5
CAE50x5
TCAR100x5
FL
FL
550 50 50
550
0
600
4x5
0
0
TREC100x50x3.2
FL
4x5
4x5
600
FL
FL
TREC100x50x3.2
4x 50
50
1550
600
TREC100x50x3.2
150
150
6450
50 100 100
1550
TREC100x50x3.2
350
TCAR100x5
TCAR100x5
3100
CAE50x5
TREC100x50x3.2
TREC100x50x3.2
TREC100x50x3.2
TREC100x50x3.2
TREC100x50x3.2
TREC100x50x3.2
TREC100x50x3.2
TREC100x50x3.2
TREC100x50x3.2
TREC100x50x3.2
TREC100x50x3.2
TREC100x50x3.2
TREC100x50x3.2
TREC100x50x3.2
TREC100x50x3.2
CAE50x5
TREC200x100x10 CAE50x5
3000
150
CAE50x5
CAE50x5
TREC200x100x10
50 550
6350
CAE50x5
TREC100x50x3.2
TREC100x50x3.2
50
600
B
550
600
TREC100x50x3.2
C
TREC100x50x3.2
TREC100x50x3.2
550
600
50
1550
TREC100x50x3.2
600
4x 50
TREC100x50x3.2
600
550
600
TREC100x50x3.2
350
TREC100x50x3.2
TREC100x50x3.2
TCAR100x5
100 225 50 100
350
50
350
1225
1580
50
350 50
50
350
50 1225
350
50 225 100 225 50 100
350
50 1225
350
50
350 50
50
350
50
350
50 225 100 225 50
1225
100
350
50
350
50
1225
350 50
50
350
50
350
1225
50 250 50 100
1430
7800
甲方 UK DIT Pproject: 工程名称 Client:
100
TREC100x50x3.2
TREC100x50x3.2
TREC100x50x3.2
TREC100x50x3.2
TREC100x50x3.2
TREC100x50x3.2
TREC100x50x3.2
CAE50x5
CAE50x5 TREC200x100x10
TCAR100x5
1430
TREC100x50x3.2
CAE50x5
TREC100x50x3.2
100
TREC100x50x3.2
TREC100x50x3.2
TREC100x50x3.2
TREC100x50x3.2
TREC100x50x3.2
TREC100x50x3.2
550
TREC100x50x3.2
TREC100x50x3.2
600
50
1550 600 175
100 100 50
A
TREC100x50x3.2
TREC100x50x3.2
100
Tianjing Exhibtion
1580
10960
Drawing Title:
Structure Framing Schedule Count
1 A1
Excavation
Details
Structural Framing _ Floor Plan-地板钢架结构平面 1 : 20
C Copyright ZEDfactory 2019
Type
CAE50x5 24 CAE50x5 4 CAE50x5 FL 4x50 12 FL 4x50 4 FL 4x50 TCAR50x5 41 TCAR50x5 14 TCAR50x5 15 TCAR50x5 8 TCAR50x5 18 TCAR50x5 18 TCAR50x5 TCAR100x5 10 TCAR100x5
Cut Length
Structural Material
2500 3000
Metal - Steel - 345 MPa Metal - Steel - 345 MPa
4000 8226
Structural Steel - S235 Structural Steel - S235
1225 1425 1430 2095 3012 3290
Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa
1468
Metal - Steel - 345 MPa
Structure Framing Schedule Count
Type
9 TCAR100x5 5 TCAR100x5 6 TCAR100x5 1 TCAR100x5 5 TCAR100x5 TREC100x50x3.2 16 TREC100x50x3.2 36 TREC100x50x3.2 TREC200x100x10 4 TREC200x100x10 250
Cut Length
White Stag
TREC100x50x3.2
TREC100x50x3.2
White Stag
600
TCAR100x5
CAE50x5
TCAR100x5
FL
TCAR100x5
TCAR100x5
FL
FL
CAE50x5
TCAR100x5
4x 50
4x 50
1550
550 50 550
600
0 4x5
50
FL
0 4x5
0 4x5
TREC100x50x3.2
FL
FL
600
TREC100x50x3.2
Structural Material
3000 3174 3288 6450 7700
Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa
1430 3000
Metal - Steel - 345 MPa Metal - Steel - 345 MPa
7700
Metal - Steel - 345 MPa
图纸标题
Structural Framing _ Floor Plan-地板钢架结构平面 issued for:
Coordination Drawing Number: 图纸号 PT103/6/100 Created:
创建日期
09/08/2022
drawn by/ update by:
checked by:
MS
Rev.
DF
版本
B
比例
Scale: 1:20@A1 & 1:40@A3
ZEDfactory ZEDfactory, 21 Sandmartin Way, London SM6 7DF T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com
Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
Steel Structure detail drawings with specifications and quantities.
Construction Process of the Lake Cabins
Constructed Cabin
Cladding
Insulation
Lake Cabins 58
Exterior
Interior
59
+
Portfolio 2024
+ A. Mahdi Safieddine
+ 06 Urban Design of Wugang Yungu Metropolis Ring
Time Capsule
[Professional Experience - Atelier Lei Guo]
+ Brief 2023
Location: Wuhan, China Stage: RIBA 1-3 The site is located in the core area of Future Sci-Tech City in Yuhang District, Hangzhou. It is the strategic intersection of ‘Corridor, Axis’, where Chengxi Sci-Tech Innovation Corridor meets Millennium Development Axis of Yuhang, and the important new function center in the main urban area. The layout of emerging industries should feature headquarters economy, sci-tech R&D and “double innovation (cultural innovation and scientific innovation)”, and coordinate functional formats, industrial development, planning layout, transportation organization, landscape environment and other factors. In the design, consideration to production, life and ecology should be given while highlighting creativity and implementation. And a functional diversified, harmonious and symbiotic demonstration area for transformation and upgrading will be built.
+ Design Proposal With limited time to complete the requirements, the main idea was to create a centered metropolis in the industrial area, keeping a little bit of heritage of whats existing and transforming whats there to modern units, a social hub for all users to get together and experience the lifted gardens, enjoy the activities and networks all surrounded by commercial structure. Clusters are created within the master plan, the Oval shape is main feature and around it are the residential units, offices, hotels and commercial spaces.
+ 60
Super Service Hub 61
+
Portfolio 2024
Original Layout
+ A. Mahdi Safieddine
Birds-eye Masterplan
The main urban site is located next to Wuhan Railway station, a main point for user access. The area is covered with old industrial factories that need to be turned into a social hub for users and in the surrounding area a mixture of social, economical, and living facilities. Some recently built units need preservation and are a main factor to keep on the site. The figure above shows the distribution of the urban layout.
The birds-eye render above is the urban design proposal for the site (figure on the left shows the existing condition of the site). A huge oval structure will cage the industrial area creating a green social hub for users, with commercial units, activity facilities, and kiosks surrounding the area.
Internal Use
Some of the existing facilities that need preserving, following the same structural design.
The design process, development, and the making of this project was made within 1 week, my contribution was creating the 3D model, producing all necessary drawings and generating the 3D renders of the entire project.
62
63
+
Portfolio 2024
+ A. Mahdi Safieddine
+ 171 BIPV Panels (300 kWp each) Generating a total of 290.2 MWh annually.
07 ZED Quba Mosque
Zero energy Masjid and Education center
Mosque
Mosque
[Professional Experience - ZEDPower]
Outdoor prayer area viewing the city.
Web Welding Steel Structures.
+ Brief
Accessible green roof.
2023-2024
Learning children can see the lecture below and prayers.
Location: Hayes, London, UK. Stage: RIBA 1-4
Void to allow natural ventilation to cross between levels.
Quba Masjid & Education Centre is an Islamic organization that focuses on educational, religious, and social activities. The number of weekly visitors to the mosque has increased especially those attending the Friday prayers. An extension to the mosque is needed with a requirement that the building would become zero-energy and focuses on renewable sources to decrease the carbon footprint. Extra facilities horizontally and vertically were required.
Double height space for open conferences or lectures.
Birds-eye View
+ Design Proposal The initial mosque building was an industrial factory, later transformed to a mosque and education center. So the main structure and slabs were designed and constructed by another practice, we had the freedom to remove partitions and extend the spaces to achieve our design. The main focus was achieving our design with the least amount of damage and cost. By adding skylights and double height spaces, we can achieve natural lighting and ventilation, in addition to the connectivity of the spaces where young learners can watch the adults attending the prayers and lectures. Additional fire escapes and access points which makes it easier of male and female visitors.
Naturally lighted area for the Imam and the people praying.
Extra facilities for washing, storage, and escapes.
Main Prayer hall, can be turned into smaller facilities.
Multipurpose hall for praying, celebrations, lectures, and more.
By applying a BIPV Canopy over the roof connected to the main existing structure and applying the same construction method we achieve a building that generates energy and additional spaces.
+ 64
Exploded Layout 65
+
Portfolio 2024
+ A. Mahdi Safieddine
Final Outcome
Drawings
Interiors and Common Spaces
A
B
C
D
E
F
G
REV.
H
I
J
K
DATE
AMENDMENTS
L
36695 3300
4000
4000
4000
4000
3750
1500
2700
4000
3500
1945
01 1500
01
02 1290
02
03
04
6210
16890
04
Mosque
Mosque
3140
03
05
4750
05
Client:
QUBA Masjid
06
06
Project:
ZED_QUBA Masjid
Drawing Title:
ZEDquba_masjid_set1 drawn by/ updated by:
issued for:
INFORMATION B
D
C
E
F
H
G
I
J
K
L
BD
Rev.
ZC / 2 / 022
A
Created: 08/11/2023
Scale: 1:150 @ A3
ZEDpower
Ground Floor Plan
Ground Floor Plan 1:150
checked by:
MS
Drawing Number: REV. DATE AMENDMENTS
A
ZEDpower, 21 Sandmartin Way, London SM6 7DF T 020 8404 1380 F 020 8404 2039 E mail@zed-power.com www.zed-power.com Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
A
B
D
C
E
F
H
G
I
J
K
L
36695 3300
4000
4000
4000
4000
3750
1500
2700
4000
3500
1945
01 1500
01
02
1290
REFUGE
02
03
3140
03
REFUGE
04
6210
16890
04
05
4750
REFUGE
05
Client:
QUBA Masjid
06
06
Project:
ZED_QUBA Masjid
Drawing Title:
REV.
DATE
AMENDMENTS
ZEDquba_masjid_set1
drawn by/ updated by:
issued for:
INFORMATION A
B
D
C
E
F
H
G
I
J
K
L
First Floor Plan
Sections
DO NOT SCALE FROM DRAWING WORK TO FIGURED DIMENSIONS ONLY ALL EXISTING DIMENSIONS TO BE CHECKED ON SITE DRAWN ON AUTOCAD LT LAYERS ON THIS DRAWING COMPLY WITH BS 1192
Details
checked by:
MS
BD
Drawing Number:
Rev.
ZC / 2 / 022
A
Created: 08/11/2023
Scale: 1:150 @ A3
ZEDpower
ZEDpower, 21 Sandmartin Way, London SM6 7DF T 020 8404 1380 F 020 8404 2039 E mail@zed-power.com www.zed-power.com
First Floor Plan 1:150
Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
A
B
C
D
E
F
G
H
I
J
K
L
36695 3300
4000
4000
4000
4000
3750
1500
2700
4000
3500
1945
DO NOT SCALE FROM DRAWING WORK TO FIGURED DIMENSIONS ONLY ALL EXISTING DIMENSIONS TO BE CHECKED ON SITE DRAWN ON AUTOCAD LT LAYERS ON THIS DRAWING COMPLY WITH BS 1192
01 1500
01
02
1290
REFUGE
02
03
REFUGE
3140
03
04
6210
16890
04
C
C
D
D
05
05
REFUGE
B
B
4750
A
A
Client:
QUBA Masjid
06
06
Project:
ZED_QUBA Masjid
Drawing Title:
REV.
DATE
AMENDMENTS
ZEDquba_masjid_set1 issued for:
INFORMATION Drawing Number:
A
B
D
C
E
F
H
G
I
J
K
L
Second Floor Plan
drawn by/ updated by:
checked by:
MS
BD
Rev.
ZC / 2 / 022
A
Created: 08/11/2023
Scale: 1:150 @ A3
ZEDpower
ZEDpower, 21 Sandmartin Way, London SM6 7DF T 020 8404 1380 F 020 8404 2039 E mail@zed-power.com www.zed-power.com
Second Floor Plan 1:150
Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
A
D
C
E
F
H
G
I
J
K
L
36695 4000
4000
4000
4000
3750
1500
2700
4000
3500
1945
178
60
30
25
1500
01
02
Rev
Date
02 1290
178
207
60
102
60
60
01
40
40
40
134
60
207
207
60
134
60
134
457
40
40
60
207
B
3300
40
40
30
60
30
Slab Details
25
60
40
40
30
60
207
60
30
30
207
30
40
30
03
Author / Ckd
Notes
03
BURKE RICKHARDS 91 North Hill Plymouth PL4 8JT T (01752) 266111 www.burkerickhards.co.uk
Quba Islamic and Education Trust
CLIENT
REFUGE
102
3140
134
191
04
04
Quba Islamic and Education Centre Structural plans. Details CT NOV 2014 -
AUTHOR DATE CHKD Chartered Architects
Leisure Consultants
Rev
REV
-
SCALE
1:10 @ A1
Project Managers
Date
Author / Ckd
Notes
BUILDING REGS
BURKE RICKHARDS
2116/355 Cost Consultants
16890
JOB REF
DETAIL
6210
134
91 North Hill Plymouth PL4 8JT T (01752) 266111 www.burkerickhards.co.uk
191 CLIENT
Quba Islamic and Education Trust
JOB REF
Quba Islamic and Education Centre
DETAIL
Structural plans. Details
AUTHOR DATE CHKD Chartered Architects
CT NOV 2014 Leisure Consultants
REFUGE
05 REV
-
SCALE
1:10 @ A1
Project Managers
05
2116/355 4750
134
457
BUILDING REGS
Cost Consultants
Client:
Beam Details
QUBA Masjid
06
06
Project:
ZED_QUBA Masjid
Drawing Title:
ZEDquba_masjid_set1 issued for:
INFORMATION Drawing Number:
A
B
C
D
E
F
G
H
I
J
K
L
Roof Plan
drawn by/ updated by:
checked by:
MS
BD
Rev.
ZC / 2 / 022
A
Created: 08/11/2023
Scale: 1:150 @ A3
ZEDpower
ZEDpower, 21 Sandmartin Way, London SM6 7DF
66
T 020 8404 1380 F 020 8404 2039 E mail@zed-power.com www.zed-power.com
Third Floor Plan 1:150
67
Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
+
+ A. Mahdi Safieddine
Mosque
Portfolio 2024
Perspectives
Elevations
West Elevation
East Elevation
South Elevation
68
North Elevation
69
+
Portfolio 2024
+ A. Mahdi Safieddine
+ 08 Living Water: Educational and Research Center Living Water
[MArch II Design Thesis Project - Urbanism Unit: Healthy Cities]
Living Water
Contaminations, Viruses, and Wellbeing
+ Brief
2020-2021
Our Design Studio was invited to discuss the key concepts of health and the city during the final year of the MArch program. As a group, a master plan was developed and the key health and well-being issues were focused throughout. Health was assessed in the physical, social, and mental spheres. We thought a healthier city could be tackled and based on it. In my project, I chose to concentrate on social and mental health in a certain part of the city and physical health to look at our unhealthy relationship and lack of virus awareness. The virus is regarded as a taboo issue, something to fear or to avoid, a simple example is that of a “hospital,” a place to be healed, but the place to visit is most feared, but why? The design for viruses, reserve buildings, or platitudes has been expressed in this.
+ Design Proposal Arriving at this location in the Old Market district, a water research center for viruses and contaminations in based there next to the stream of river. But, not just offering research facilities and enclosed spaces, but rather open public spaces for all the users to come, socialize, meditate, and get informed of whats new concerning infections, new discoveries in the water they drink and basic knowledge. The building offers activities and facilities for everyone, acting as a social hub in the public area, education spaces in the semi public spaces, and the in depth sampling and researching in the private research facilities. As a random user visiting the site, it is an eye catching place to relax, it offers a journey with no dead ends within it, going up and down, left and right, discovering materials, textures, and culture. Be one with nature, and know about nature. Surely when someone hears “Virus research” it is directly translated to fear, here in this project it is the opposite, it invites people to engage, and know more. A person might be at greater risk of catching something (virus, infection...) if he is an ignorant.
+ 70
Site Layout 71
+
Portfolio 2024
+ A. Mahdi Safieddine
Playing with sound. Site analysis and developing the site with regards to sound waves.
Living Water
4
Living Water
+
Analysis
5 1
Dissecting the site As seen how each body has more than 4 sides, a random shape, but unique.
Understanding the focus area
Fig 38 Fig 36 Human Tears of Sadness
Fig 37 Human Eye Nerves
Human Bone Injury
Study area: Research Centers
6
Fig 41 Fig 39 Mitosis
Fig 40 Tobacco Mosaic Virus
Human Tears of Pain
Fig 44 Fig 42 Human Muscle Cells
2 3
Fig 43 Human Eye Nerves
SARS Virus
Patterns under the Lens
Man-made and Nature
+ 72
73
+
Portfolio 2024
+ A. Mahdi Safieddine
Plans
1
6
7
9 8
3
Living Water
1- Waiting area 2- Lounge 3- Terrace 4- Lobby 5- Offices 6- Showers 7- Exchange 8- Reception 9- Core 10- Stairs 11- Elec/mech room 12- Storage 13- Head Offices 14- Observatory 15- Laboratory 16- Research testing 17- Decontamination 18- Wash 19- Fire Escape 20- Terrace 21- WC facilities 22- Storages
5
2
10 11
12
4
17 13
16 18 15
14
22 20 19
21
10
+
11
4 5 3 6 12
8
7
2
13
14
9 1
16
15 17
Key: 1- Entrance Lobby 2- Auditorium 3- Stage 4- Eating/seating 5- Cafe 6- Exhibition space 7- Indoor garden 8- Canopy 9- Core 10- Storage 11- Loading 12- Exterior Canopy 13- Kiosks 14- Library 15- Foyer 16- Offices 17- WC 18- Control 19- Multi-purpose 20- Outdoor Exhibition
+
13 11 12
14
17
15
18 16
20
21
Key:
Living Water
+
Key: 1- Lecture hall 2- Lab workshop 3- Reception 4- Sanitization 5- Elec/mech room 6- Lab offices 7- Terrace 8- Research Lab 9- Wash 10- Lounge 11- Decontamination 12- Change 13- Fire escape 14- Work space 15- Staircase 16- Chemical testing 17- Water store 18- Equipment 19- Cleaning facility 20- Hallway 21- Store 22- Water Sampling
19
18 22
20 19
74
75
+
Portfolio 2024
+ A. Mahdi Safieddine
76
Living Water
Living Water
Details
77
+
Portfolio 2024
+ A. Mahdi Safieddine
+ 09 The Living Time Capsule Time Capsule
[MArch II Design Studio A - Bristol Archipelago: water-lines and fluid grounds]
+ Brief
Time Capsule
Reviving the Treasure
2019-2020
We were asked to study and survey, first in groups and then individually, a series of urban and suburban archipelagos, that is cluster of sites that present individual, local characteristics but are recognized as parts of, and connected to, the wider urban context by means of their relationship to a body of water. Considering how these areas define conditions of insularity and connectivity, which register across both natural and man-made situations and how they might propose new ways for understanding the urban landscape in its social, programmatic, environmental and/or formal dimension. This project will pro-ject, that is, it will constitute itself a positioning towards the city: its formal, social and environmental systems and the exchanges that take place between them.
+ Design Proposal The initial design response focuses initially on the creation of a hub that connects several sectors together, where the public is invited to experience and witness a new journey, while at the same time educate the ones who are curious to know more. By separating the building functions into three main hubs, starting with the main block, where it acts as the main access and attraction point where it connects to all the other facilities. It would be the start of the story, the journey within the site, the other connections would be activity spaces, exhibitions, working studios, and most importantly research facilities. Within the other spaces circulate the concepts of what a research center might offer, Initially the main target is health and wellbeing, the focus on the research and testing, and at the same time, in a more indirect way through the visitors. However, Work places are part of the initial idea and they would be located close to private spaces, since their respective users would benefit from them.
+ 78
Site Layout 79
+
Portfolio 2024
+ A. Mahdi Safieddine
Time Capsule
Time Capsule
Analysis
Creation of space through mapping. By placing the map of the area from different generations and picking out the solid and the void spaces, this helped in achieving what is occupied and what is not for a longer duration. All these led to the shape and size of the final proposed building.
Installation
Using model making through different materials and texture to extrude the site, by the help of abstract elements and objects reflecting our groups ideas of how each and every one of us viewed the site and its boundaries.
Journey Abstraction of spaces and their distribution, the journey throughout different levels and stages.
80
81
+
Portfolio 2024
+ A. Mahdi Safieddine
Plans
10
1- Multipurpose hall 2- Lecture hall 3- Storage 4- Documentary Hall 5- WC 6- Offices 7- Reception desk 8- Head office 9- Indoor gallery 10- Outdoor open space 11- Outdoor gallery
4
6
1
Time Capsule
7 8 9
5
Time Capsule
Key:
3
2
6
7
11
8 8
9
7
5
6
9
5
Continuing the journey from the main block, comes the workshop buildings on the ground floor level, the exterior is split into semi covered spaces and open spaces, however the open corridor in the middle is covered with a narrow bridge, scaffolding units, and dangling vines, however the interior spaces are protected due to the fact that the first floor slab is extruded from each side, covering the ground floor. The block on the left is a multi purpose hall for the workshops, for events and ceremonies.
1
3
7
4
8
11
5 6
9 12
14
20 10
13
15 16
17
18
19
4
Key:
2
1- Recycling Deck 2- Loading Deck 3- Lobby 4- Hallway 5- Bridge 6- Food kiosks 7- Electro/Mech room 8- Security 9- Storage/service 10- Exterior link 11- Core 12- Lounge 13- Outdoor seating 14- Juice bar 15- Security 16- Storage/service 17- Core 18- Seating area 19- Outdoor lounge 20- Indoor resting hut
Key: 123456789-
3
2
4
Core Services Elec/mech room Gathering Spaces Housing Pod Type 1 Single Housing Pod Type 1 Double Housing Pod Type 2 Single Housing Pod Type 2 Double Cluster Neighborhood
1 9
4
4
3 7
The main block at the ground level serves as the main attraction point for visitors, as it is the hub the connects to all other functions. Entering from the north face, the first thing to see would be the open plaza in the middle, with the several voids in the ceiling, surrounded by the food huts, kiosks, and souvenir shops, on the sides are the cores for the residential towers, where only residents can access, and proceeding the journey would lead to either one of the cafes, or taking a trip over the bridges or proceeding directly into the workshop buildings.
2 4
6 1
4
On this level of the residential block appears to have a cocoon hanging, this cluster of pods together form a type of neighborhood, enclosing on these units, it has its own social spaces and connections, however, other residential users can access it. This feature would create an enclosure within an enclosure, making each set of pods unique, with its own special characteristics, that its own user can benefit from.
8
5
82
83
+
Portfolio 2024
+ A. Mahdi Safieddine
Capsules
Layers
Single Residential Pod Unit 12.0m x 4.2m x 4.0m Heat Resistant, and Fully Insulated
Time Capsule
Time Capsule
Honeycomb Aluminum Panels
Triple glazed low E windows, preventing radiation from entering.
Aluminum Frames to hold glass and outer panels 0.1m x 0.1m Aluminum Panels, attached to steel pipes, as a shell for the pod
+ Wall Layers
84
85
+
Portfolio 2024
+ A. Mahdi Safieddine
+ 10 Solar Tree
Solar Tree
[Professional Experience (Exhibition) - ZEDFactory]
Solar Tree
Energy Tree Providing Shade
+ Brief
2021-2022
Solar Tree 1
ZED Solar trees provide shade, shelter and charging for ZEDelectric vehicles and electronics. It incorporates ZEDpower Lithium batteries. The solar-tree is a robust, freestanding, PV panel mounting system with a 3kWp self supporting solar charging structure that requires no foundations to be built. The solar tree has been designed to sit in streetscapes, parks and public spaces. It has been engineered to be robust, and both steel and recycled wood structures and toughened glass PV panels are very resilient to vandalism. It functions as street furniture, providing a bench, bike storage, planter and shelter.
+ Design Proposal
The first Solar tree is a combination of CNC cut boards, made as a series so that the pieces would fit together creating a wave form that would function as a bench, a stand, and a bike rack. In addition to PV panels on the top to charge the batteries. However, Solar tree 2 is made of recycled steel pipes. It acts as a bench, storage and for shading.
+ 86
Each Component is made of a repetitive set in order not to have so many pieces, it would be easy to construct. Construction planning was made through design development, an implementation strategy, processing, manufacturing,and finally assembling everything together. 87
+
Portfolio 2024
+ A. Mahdi Safieddine
Solar Tree
Solar Tree
Solar Tree 2
Initial design proposal 版本
N
日期
设计变更内容
Rev
Date
Amendments
A
11.05.21
Amended from one to double cabin units
B
18.05.21
Amended floor beams
5010.0
版本
5010.0
设计变更内容
Date
Amendments
A
11.05.21
Amended from one to double cabin units
B
18.05.21
Amended floor beams
1
6.0
1545.0
167
Final Product in use.
日期
Rev
.0 676
8.0
502
N
6.0
1545.0
N
5600.0 3580.0
3580.0
4840.1
5600.0
167
C:\Users\MSI\OneDrive\Desktop\20220809 construction drawings\PT103_Cabin_STR_OR_20220708(1)-Logoforstationary-15-792181.png
C:\Users\MSI\OneDrive\Desktop\20220809 construction drawings\PT103_Cabin_STR_OR_20220708(1)-Logoforstationary-15-792181.png
Client: 甲方
UK DIT
Client: 甲方
UK DIT
Pproject: 工程名称
Pproject: 工程名称
Tianjing Exhibtion
Count
3400.0
1 A1
Structural Framing _ Floor Plan- 地板钢架结构平面 1 : 20
Cut Length
Type
CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 TCAR100x5 10 TCAR100x5
C Copyright ZEDfactory 2019
A1
5100 1300 5100 1300 5100 1300 5100 1300 5100 1300 5100 1300
1
1468
Structural Material
Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235
Structure Framing Schedule Count
Type
9 TCAR100x5 5 TCAR100x5 6 TCAR100x5 1 TCAR100x5 5 TCAR100x5 TREC100x50x3.2 16 TREC100x50x3.2 36 TREC100x50x3.2 TREC200x100x10 4 TREC200x100x10 250
Cut Length
Structural Material
3000 3174 3288 6450 7700
Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa
1430 3000
Metal - Steel - 345 MPa Metal - Steel - 345 MPa
7700
Metal - Steel - 345 MPa
drawn by/ update by:
Coordination
Structure Framing Schedule
checked by:
MS
PT103/6/100 Created: 创建日期
DF
Count
Rev. 版本
B
N
Scale: 比例 1:20@A1 & 1:40@A3
09/08/2022
ZEDfactory
ZEDfactory, 21 Sandmartin Way, London SM6 7DF
T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken
1
C Copyright ZEDfactory 2019
A1
N
Tianjing Exhibtion
475.0
issued for:
Drawing Number: 图纸号
Technical Drawings
Structural Framing _ Floor Plan- 地板钢架结构平面 Metal - Steel - 345 MPa 1 : 20
Structural Framing _ Floor Plan- 地板钢架结构平面
版本
Type
CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 TCAR100x5 1 : 20 10 TCAR100x5
Cut Length
Structural Material
5100 1300 5100 1300 5100 1300 5100 1300 5100 1300 5100 1300
Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235
1468
Metal - Steel - 345 MPa
Structure Framing Schedule Count
Structural Framing _ Floor Plan- 地板钢架结构平面
C Copyright ZEDfactory 2019
日期
设计变更内容
Rev
Date
Amendments
A
11.05.21
Amended from one to double cabin units
B
18.05.21
Amended floor beams
Type
9 TCAR100x5 5 TCAR100x5 6 TCAR100x5 1 TCAR100x5 5 TCAR100x5 TREC100x50x3.2 16 TREC100x50x3.2 36 TREC100x50x3.2 TREC200x100x10 4 TREC200x100x10 250
Cut Length
Structural Material
3000 3174 3288 6450 7700
Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa
1430 3000
Metal - Steel - 345 MPa Metal - Steel - 345 MPa
7700
Metal - Steel - 345 MPa
475.0
Structure Framing Schedule
Drawing Title: 图纸标题
Drawing Title: 图纸标题
Structure Framing Schedule
Structural Framing _ Floor Plan- 地板钢架结构平面 issued for:
Coordination
drawn by/
update by: Count MS
checked by:
DFType
ID=40 Drawing Number: 图纸号CHS OD=50 Rev. 版本
CHS OD=50 ID=40 PT103/6/100 24 BCHS OD=50 ID=40 4 CHS OD=50 ID=40 Created: 创建日期 Scale: 比例 2 CHS OD=50 ID=40 1:20@A1 & 1:40@A3 09/08/2022 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 4 CHS OD=50 ID=40 ZEDfactory ZEDfactory, 21 Sandmartin Way, CHS LondonOD=50 SM6 7DF 2 ID=40 T 020 8404 13804 F 020 8404 2039 CHS OD=50 ID=40 E mail@zedfactory.com 2 CHS OD=50 ID=40 www.zedfactory.com 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 Do not scale, use figured dimensions only. Unless stated otherwise, these drawingsTCAR100x5 represent design intent only and approved assembly drawings will be required from the Trade 10 TCAR100x5 Contractor prior to any work and /or procurement being
Cut Length
Structural Material
5100 1300 5100 1300 5100 1300 5100 1300 5100 1300 5100 1300
Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235
1468
Metal - Steel - 345 MPa
Structure Framing Schedu Count
Cut Length
Type
9 TCAR100x5 5 TCAR100x5 6 TCAR100x5 1 TCAR100x5 5 TCAR100x5 TREC100x50x3.2 16 TREC100x50x3.2 36 TREC100x50x3.2 TREC200x100x10 4 TREC200x100x10 250
Struc Mate
3000 日期 3174 Date 3288 A 6450 11.05.21 7700
Metal - Steel 设计变更内容 Metal - Steel Amendments Metal - Steel Amended from on Metal - Steel Metal - Steel -
1430 3000
Metal - Steel Metal - Steel -
7700
Metal - Steel -
版本
Rev
B
18.05.21
Amended floor be
undertaken
C:\Users\MSI\OneDrive\Desktop\20220809 construction drawings\PT103_Cabin_STR_OR_202207
Client: 甲方
UK DIT Pproject: 工程名称
Tianjing Exhibtion
Drawing Title: 图纸标题
Structural Framing _ Floor Plan- 地板钢 issued for:
Coordination
Detail Drawings 1
A1
Structural Framing _ Floor Plan- 地板钢架结构平面 1 : 20
C Copyright ZEDfactory 2019
Client: 甲方
UK DIT Pproject: 工程名称
Tianjing Exhibtion
MS
R
Created: 创建日期
S 1:2
09/08/2022
B
ZEDfactory
ZEDfactory, 21 Sandmartin Way,
T 020 8404 1380 F 020 8404 2 E mail@zedfactory.com www.zedfactory.com
Do not scale, use figured dimensions only. otherwise, these drawings represent desig approved assembly drawings will be requir Contractor prior to any work and /or procur undertaken
C:\Users\MSI\OneDrive\Desktop\20220809 construction drawings\PT103_Cabin_STR_OR_20220708(1)-Logoforstationary-15-792181.png
88
drawn by update b
Drawing Number: 图纸号
PT103/6/100
89
+
Portfolio 2024
+ A. Mahdi Safieddine
+ 11 2019 eVolo Skyscraper Competition Skyscraper
[Competition Participant]
Skyscraper
New Vision Skyscraper
+ Design Proposal 2018-2019
Tariq el Jdideh, Beirut, Lebanon is a well known city hub, a very populated area within the Lebanese Capital. Building a skyscraper that both respects sustainability factors as well as is innovative and solution driven for the citizens was not an easy task to accomplish. Our design comes as a vital answer to an urgent need for the area for development as well as flourishing. The construction of this one of a kind Vertical Farm Tower with other functions to fulfill needs in response to crafting the first generation of farming centers in Lebanon that are more viable while maintaining a residential amenity for a sustainably-minded clientele. The main objective behind this project was to bring this green revolution to the urban people, and make of Tariq el Jdideh a better place for living. Reports done by UNICEF found that almost 24% of the population are unemployed while the other major needs are shelter, food, and education.
+ 90
91
Portfolio 2024
+ A. Mahdi Safieddine
For sustainable reasons and in order to maximize the green initiative that we had in mind, we opted first of all to use gray waters (polluted waters) and apply the Bio-Remediation techniques. This technique uses safe bacteria to break down wastes and digest them leading to clean water; it’s better than using chemicals that will end up in what we are seeding. Furthermore, all of the vertical farm workers will be living within the skyscraper’s premises in modular elements that are easy to construct, deconstruct, transport and can grow to fit its resident’s number, this modular capsule can be extended to increase its capacity and understand more users. By making these farmers live in the skyscraper itself, we will decrease the use of cars of them coming, and decrease traffic jams that the area is familiar with.
Skyscraper
+
As for materials and solutions provided; the use of “Litracon” that is a combination of optical fibers and fine concrete, produced as prefabricated concrete blocks for a translucent glass-like look with a powerful strength (translucent concrete). Also the nanotechnology used in the building; on glass and concrete (self-cleaning technique). This design will hopefully be a breath of fresh air for Lebanon and its capital, making Tariq el Jdideh a better place, and set an example for future projects to respect sustainability values and try and create a world that is less polluted, and more productive while respecting the environment we live in and answering the peoples’ and regions’ specific needs. In the near future it will solve not only pollution issues, but hunger and labor issues, thus feeding the whole world.
92
93
+
Portfolio 2024
+ A. Mahdi Safieddine
+ 12 Epoch Collage
Bizarre, out of this world photo composition
Collage
Collage
[Personal Work - Graphic Art]
+ Brief - Seeking Adventure -
- New Red Dot -
- Solo Walks -
- Inner Thoughts -
A selection of some of my personal and collaborative graphic work. The following prints are “postcards from the future” that have emotions and nostalgia attached to each one of them.
- Roller coaster of Emotions -
- The Lost Astronaut 94
- Bubblegum Giraffes -
- Bloom Out III -
- Soft and Hard -
- Twilight -
- Where we Belong 95
+
Collage
+ A. Mahdi Safieddine
Collage
Portfolio 2024
- Return to the Future -
- Maybe One Day 96
-RETRO-
- Self Portrait -
- Brainwashed Society -
- Boat Race -
- I got your back -
- All About the Journey-
- It used to be Crowded There -
- Bloom Out-
- Where’s the Vibe at? 97
+
Portfolio 2024
+ A. Mahdi Safieddine
Freelance
Freelance
Site Visits
Model Making V01
V02
V03
V04
V05
V06
V07
V08
Y01
V09
V01
3625 720
380
220
360
360
360
V02
600
V04
360
V05
360
V06
V07
4485
X05
720
360
480
0 60
sliding window double glazed 200x220cm
V03
480
wooden pergola lightweight structure 10x10cm cross section
Y02
0
65
570
200 330
65
65
65
65
200 340
65
0 21 5 38 0 66 0
5 34
0
0 30
15 12 93
0 720
0 5 34
3885
0 46
5 30
5 58
330
360
35
5
375
345 330
1245
720
0
27
0 34 1633
345
345
345
5 64
115
B01
480 D01
246 FL:+0.45m CL:+0.35m
1060
D03
W01
01
D03
D02
Clinic 2 GF 11
Clinic 3 GF 12
Clinic 4 GF 13
345
330
345
W01
W01
W01
FL:+0.45m CL:+0.35m
FL:+0.45m CL:+0.35m
03 04 05 06 07 08 09
215
B02
W03
H01
Y05 240
240
135
360
105
240
120
720
0
60
360
24 23 125 22 21 20 19 18 17
FL:+0.45m CL:+0.35m
curtain wall double glazed
X04
R6
00
45°
R9
00
X03 H02
10 11 12 13 14 15 16
FL:+1.80m CL:+1.65m
FL:+0.45m CL:+0.35m
360
460
0
125 02
1065
330
72
H03
Cafe GF 14
480
FL:+0.45m CL:+0.35m
Y04
480
A01
°
450
480
Clinic 1 GF 10
240
360
D02 W02
W03
X05
R750
D02
FL:+0.45m CL:+0.35m
135
WC GF 09
1560
650
260
H03
D01
1920 375
CW1
A02
360
330
45°
520
H04
2370
260
240
D02
480
FL:+0.45m CL:+0.35m
480
360 360
Terrace GF 15
1545
120
303030
45
30 60 240
360 3885
450 720 240
90°
440
0
0
585
8° 10
1780 372 380
340
46
01 03
02
240 360
2550
1680
690
660
1060 1410
65
20 0 45
0 20 60
0
360
360 270
270 2130
65 200 330 65 65 200 340 65 65 200 340
00
480
445
445
840
165 240
225
303030303030303030303030
345
360 240 360
70
2550
5
13
360
0
0
600
60
24
360
0
360
12
Office 3 GF 08
W01
915
Y01
0
24
360
5
375
12
H02
360
11
360
0
220
D03
21 0
FL:+0.45m CL:+0.35m
45°
380
wooden pergola lightweight structure
CL:+0.35m
280
0
360
720
24
FL:+0.45m CL:+0.35m
Y03
X01
W02
FL:+0.45m CL:+0.35m
D03
Office 2 GF 07
CW1
H05
FL:+0.45m CL:+0.35m
Storage GF 16
45
Y02
H01
X02
480
FL:+/-0.00m
H06
Clinic 5 GF 17
D02
5
15x3cm stone coping
X04
FL:+0.45m CL:+0.35m
85
22
D02
3625
V01
5
FL:+0.45m CL:+0.35m
W01
530
X03
480
18°
360
W01
850
03 02 01
480
13
Y01
H02
W01
W01
FL:+0.45m CL:+0.35m
72
450
Administration GF 04
WC GF 06
H03
0
141
FL:+0.45m CL:+0.35m
FL:+0.45m CL:+0.35m
440
Y02
25
1920
D02
5
460
Administration GF 17
8°
530
W01
70
10
330
FL:+0.45m CL:+0.35m
planting pods
D02
D03
FL:+0.45m CL:+0.35m
0
200
30cm cavity wall
Office GF 02
265 WC GF 05
42
160
H05
H04
FL:+0.45m CL:+0.35m 460
Y06
FL:+0.45m CL:+0.35m
5
planting pods
0
Y01
Pharmacy GF 15
FL:+0.45m CL:+0.35m
Clinic 6 GF 18
D03
37
0
200
H04
Office GF 16
D01
330
160
FL:+0.45m CL:+0.35m
60
330
FL:+0.45m CL:+0.35m
220
33 0
FL:+0.45m CL:+0.35m
285
Office 1 GF 03
33
Y02
D02
D02
W01
D02
505
W01
°
FL:+0.45m CL:+0.35m
D01
FL:+/-0.00m
D02
FL:+0.45m CL:+0.35m
FL:+0.45m CL:+0.35m
FL:+0.45m CL:+0.35m
H06
72
D02
H01
2295
Clinic 7 GF 19
FL:+0.45m CL:+0.35m
5
480
480
Entrance Lobby GF 01
D02
lounge GF 02
H05
485
03 02 01
FL:+0.45m CL:+0.35m
D03
X02
D02
220
34 5
planting pods
70
X01
Entrance Lobby GF 01
5
470
Y03
570
Cafe GF 14
FL:+0.45m CL:+0.35m
360
FL:+0.45m CL:+0.35m
W01
W01
0
250
Clinic 1 GF 03
Y03
D01 D02
360
3565
D02
480
Y05
W01
36
X04 345
1320
X03
Clinic 2 GF 04
W01
Clinic 8 GF 20
5
470
FL:+0.45m CL:+0.35m
560
0
5
1115
350
H02
D03
230
Clinic 3 GF 05
350
W01
D01
185
72
D03
73 FL:+0.45m CL:+0.35m
34
630
FL:+0.45m CL:+0.35m
5
485
Clinic 9 GF 21
D02
FL:+/-0.00m
H06
265
W01
34
170
200
D01
560
planting pods
D01
X01 W01
105
0
955
D04
2135
Y04 24
935
FL:+0.45m CL:+0.35m
72
0
FL:+0.45m CL:+0.35m
X02
H07
350
W01
H03
1085
CL:+0.35m
0
315 WC GF 09
W02
H04
Terrace GF 13
D05
12
D05
0
D05
0
33
170
1050
W02 12 13 14 15 16 17 18 19 20 21 22 23 24
34
30
5
5
FL:+0.45m CL:+0.35m
455
Y03
13
W01
0 45 Clinic 10 GF 22
0
460 WC GF 06
36
56
W02
350
FL:+0.45m CL:+0.35m
FL:+0.45m CL:+0.35m
4
690
510
0
X03
24
Clinic 8 GF 12
17
H06
FL:+0.45m CL:+0.35m
90
2cm plaster 10cm solid wall 5cm cavity 15cm solid wall 3cm stone cladding
Clinic 7 GF 11
190
FL:+2.25m CL:+2.15m
11 10 09 08 07 06 01 05 04 03 02 01
FL:+0.45m CL:+0.35m
37
410
D02
Clinic 6 GF 10
455
W03
690
D02
W01
planting pods
24 0
15x3cm stone coping
rc staircase
W03
FL:+0.45m CL:+0.35m
340
Clinic 5 GF 08
FL:+0.45m CL:+0.35m
15x3cm stone coping
H05
H08
715
60
465
Clinic 4 GF 07
48
X04
FL:+/-0.00m
W01
200 340
84
W01
W01
68
32
200 335
30
480
planting pods
H07
68
300
68
03 02 01
200 335
0 42
68
0 10
W01
W01
H08
465
240
X02
550
360
H01
480 4485
V02
V03
V04
V05
V06
V07
V08
V09
V01
V02
V03
V04
V05 Y06
V06
V07 X01
Freelance Projects
Freelance 3D Rendering
Album Covers 98
99
+
Portfolio 2024
+
+ +
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
A. Mahdi Safieddine
+
+
+
+
+
+
+
+
Contact:
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+44 7383404122 + msafieddine97@gmail.com
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
Thank You
[2024] 100