Architectural Professional Portfolio

Page 1

+

+

P T L

[2024]

+

+

+

O F I

+

+

+

R O O

A M Safieddine - Portfolio 2024

+ A. Mahdi Safieddine

+ A. Mahdi Safieddine Part II Architectural Assistant 1


+

Portfolio 2024

+ A. Mahdi Safieddine

A. Mahdi Safieddine

Experience

ZEDfactory / ZEDpower Part II Architectural Assistant

Part II Architectural Assistant

Profile Resume

• • • •

Proficient in collaborative teamwork, adept at multitasking, and agile in adaptation, I specialize in shaping spaces that surpass expectations. Whether working under diverse conditions or utilizing effective communication skills, I consistently deliver exceptional results. My dedication to sustainability is evident through my expertise in zero-energy design.

An embodiment of the seamless fusion of passion and proficiency in architectural storytelling. I invite you to join me on this journey of design excellence.

Date of Birth: 27/03/1997 Nationality: Lebanese Address: London, SW19 2HD.

Atelier Lei Guo

Contact

Personal

About

A dedicated architect deeply engaged in the vibrant sphere of design innovation, I draw inspiration from the distinctive allure of diverse landscapes and the tranquil beauty of tailor-made projects. Each venture propels my creative journey.

Developing sustainable design strategies for diverse projects internationally. Leading projects independently, from concept development to final implementation, demonstrating strong project management skills. Engaging with clients to understand their needs and goals. Designing Zero-energy vehicles and furniture. Producing detailed architectural and technical drawings, 3D models, and visualizations. Maintaining precise attention to detail and adhering to timelines while meeting budget constrains. Assisting and supervising the team in presenting design concepts, sustainability and functionality solutions effectively to align with client goals.

Mobile: +44 7383404122 Email: msafieddine97@gmail.com

AutoCAD

Revit

Rhino

Sketchup

Ps

In

En

L

Photoshop

Indesign

Enscape

Lumion

3D M 3D printing

Model Making

Ls Gd Laser Cutting

Graphic Design

En

‫ض‬

English (F) Arabic (F)

Cr

L

Feb 2019-Aug 2019

• • • •

Prepared excellent hand sketched drawings. Produced detailed 3D models, floor plans, elevations, sections, and material mood boards. Conducted research following military requirements and goals. Coordinated with engineers and Colonels to align architectural designs with on-site construction.

Architectural Assistant / Consultant

May 2018-Sep 2018

Creativity Leadership

Ñ

PS

Spanish (B)

Problem Solving

Soft

S

Languages

Rv Rh

Technical (3+ Years)

Softwares (5+ Years)

A

Architectural Intern

Dandachli Trad. and Cont. Co. DATCO & LDRS

Jan 2022-Jan 2024 [occasionally]

Software / Skills

Directorate of Engineering in the Lebanese Army Barracks

Collaborated with overseas teams to ensure alignment with cultural, regulatory, and environmental considerations in China. Produced detailed drawings, renderings, and presentations for effective communication. Guaranteed products are delivered on time with no missing details. Developed architectural concepts for large-scale projects, integrating innovative design solutions. Provided expert guidance and support to ensure project success.

Resume

June 2021-present

Architectural Intern

• • • • •

Supervised on-site construction to ensure compliance with specifications. Conducted inspections and corrected errors promptly. Provided cost-saving bill of quantities and specification documents. Collaborated with contractors to streamline processes. Facilitated communication between project management and on-site personnel.

Education + Masters in Architecture - RIBA part II

+ Life Science Diploma

UWE Bristol

Burger King

University of the West of England, Bristol Faculty of Environment and Technology.

Houssam Hariri High School, Saida, Lebanon.

Jan 2020-May 2020

Dec 2019-Jan 2024

• • • •

2019-2021

Revit Support Tutor

Shift Manager

2016-present

Collaborated to achieve sales targets. Conducted inventory checks and ordering. Resolved customer complaints promptly. Trained and developed team members on operational procedures, customer service, and safety protocols. Managed day-to-day operations of Burger King restaurant, including staff supervision, customer service, and inventory management. Oversaw cash handling procedures and financial transactions, including opening and closing cash registers.

+ EVOLO 2019 Skyscraper Competition

• •

+ Theory and Methodology of Design Workshop “Politecnico de Milano”

• •

Architectural Experience in the UK

Architectural Experience outside the UK

Architectural Related Experience

Other Experience

+ Bachelors in Architecture - RIBA part I

+ Online Certification - Future Cities

Beirut Arab University, Debbieh, Lebanon Faculty of Architecture, Design, and the Built Environment.

ETH Zürich.

2015-2019

Involvement + GSS Beirut workshop by IAAC 2019 2019

2018

2

2000-2015

2019

• •

Provided personalized tutoring sessions to students seeking assistance with Revit software. Collaborated with faculty and staff to coordinate tutoring schedules and resources while fostering a supportive learning environment to master the software. Tailored instruction to meet the specific needs and skill levels of individual students. Monitored students’ progress and provided feedback to help them improve their Revit skills.

Freelance

Providing architectural and detail drawings. Producing graphics for jewelry designers, social media infulencers, and album covers. Engaging in site visits. Generating 3D visualizations.

• •

3


+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

01

Letaron Industrial Campus -

+

02

Shanghai Meixin Tower -

+

03

The Decent House -

+

04

E-bike, E-port -

+

05

White Stag Village -

+

06

Urban Design of Wugang Yungu -

+

07

Quba Mosque -

+

08

Living Water -

+

09

Living Time Capsule -

+

10

Solar Tree -

+

11

eVolo Skyscraper Competition -

+

12

External Work - Freelance - 2017

Professional Experience - 2021

Content

+

+ A. Mahdi Safieddine

Content

Portfolio 2024

Professional Experience - 2022

Professional Experience - 2022

Professional Experience - 2022

Professional Experience - 2022

Professional Experience - 2023

Professional Experience - 2023

Design Thesis - 2020

Design Studio A - 2019

Exhibition/Competition - 2021

Competition - 2019

The following portfolio is a curated collection of my professional, academic, and other architectural related projects. The work shown is a sample and full detailed work is available upon request. Executed Projects (Stages 0-7)

4

Detail and Design stage Projects (Stages 0-4)

University and Design Studio

Other and Personal Experience

5


+

Portfolio 2024

+ A. Mahdi Safieddine

+ 01 Letaron Industrial Campus Lets work in a garden on the roof

Letaron

Letaron

[Professional Experience - ZEDFactory]

+ Brief

2021-2024

Location: Dongguan, China Stage: RIBA 1-7 Letaron has developed into a photoelectric technology and energy innovation enterprise integrating terminal concept guidance, product development, production and sales, also gives importance on quality, and constantly innovates and transcends. All products have been tested by international authorities ensuring everything is top quality. Letaron requires a campus to showcase their products, test their products in labs, do workshops, exhibitions, and learning facilities all while generating energy and using the least amount of carbon. A combination of buildings is required to create a working space that encourages people to work and “enjoy work”.

+ Design Proposal The phrase “lets work on a garden on the roof” is associated with this project where all buildings have gardens on top and on balconies,providing the breathing space for all workers and users, while developing the green buildings running on solar power and natural renewable sources. This hub helps in showcasing all light products and equipment as well as developing the proper learning and working environment. The project goes through RIBA stages, from preparation, designing, tender drawing, construction, and handing out in addition to interior design and high tech finishing materials.

+ 6

Campus Social Hub 7


+

Portfolio 2024

+ A. Mahdi Safieddine

Main Buildings

Public Space

Letaron

Subtraction Green Roof for staff

Solid and Void

Public Circulation

Circulation Green Roof for staff only

Cooling towers at the highest points

Green Roof

Environmental Strategy

Outcome

The campus consists of various functions,each in a specific building block, all covered with green roofs, topped with a BIPV canopy. 8

9


Portfolio 2024

+ A. Mahdi Safieddine

Environmental Studies Solar panels are placed entirely over the building providing shading, reducing heat and thermal mass and at the same time generating energy over the year.

Over hanged PVs provide shading for the windows reducing any overheating in the interior, the use of blinds or a shading system is not needed, thus providing a full open view.

Letaron

Position of the sun during equinoxes and solstices.

Shading Strategy.

Letaron

+

The cold coils at the louvers bring cold air in, reducing the use of air conditioning. And at the top water tray dehumidifier to maintain the air humidity when cross ventilation occurs.

3D Section Maximize natural ventilation and air flow.

In providing sufficient facade ventilation the cooling and fan loads for the conditioning of the building are significantly reduced. This also allows the reduction of delivered air to fresh air minimum reducing the use of fans even further. Ensuring the thermal mass in the building could be cross ventilated ensuring that passive thermal gain was used to the best advantage in the building.

10

11


+

Portfolio 2024

+ A. Mahdi Safieddine

Letaron

Letaron

Main Entrance

Insulating the building is one of the most important aspects in construction. Making sure that no cold bridges are available or possible for the future.

Details

Entrance Elevation

Entrance Section

Drawings Entrance Plan

12

The PV system needed to be changed into smaller units due to new regulations that were enforced during construction, thus resulting in new details and a different end result.

13


+

Portfolio 2024

+ A. Mahdi Safieddine

Letaron

Letaron

Construction Process

Full Executed Buildings

Construction process from the first laid stone until completion of the project

14

15


+

Portfolio 2024

+ A. Mahdi Safieddine

Letaron

Letaron

Final Layout

Interior Renders After the construction of the buildings, one after the other, Interior design was required. 3D Renders and tender drawings of the interior were provided and the first buildings interior is fully assembled.

Completed Interiors

New PV Layout

16

17


+

Portfolio 2024

+ A. Mahdi Safieddine

+ 02 Shanghai Meixin Tower Meixin Tower

[Professional Experience - Atelier Lei Guo]

Meixin Tower

Renovating into Landmark

+ Brief

2022-2023

Location: Shanghai, China Stage: RIBA 1-5 A renovation project which requires design studies for facade and functional transformation from offices to apartments. It aims to create a landmark building along the Suzhou River, Shanghai. The main structural elements should be preserved and used with the new design.

+ Design Proposal Combining between past and present, modern and ancient, with arches at the bottom chunk and linear lines at the top, a blend of two design integrating together. The overall materials used in are modern, with brick and copper materials used for the main vertical components of the commercial podium, and a large area of glass panels on podium facade to increase commercial atmosphere. Silver aluminum and polished marble panels are used in the tower part.

+ 20

Campus Social Hub 21


+

Portfolio 2024

+ A. Mahdi Safieddine

Numerous number of designs were made to ensure that it suits the city, the culture and tradition. Different materials were used, different shapes and sizes were used and demonstrated until the right product is reached.

Meixin Tower

Meixin Tower

Facade Design

My role in this project was to work on the 3D model, build the details and produce the 3D renders and visualizations.

Introducing the arch design with the existing structure all over the podium. A blend of modern and traditional. The podium holds commercial units, social services and restaurants, while the tower above is now residential apartments.

Podium Design

22

23


+

Portfolio 2024

+ A. Mahdi Safieddine

+ 03 The Decent House Decent House

[Professional Experience - ZEDFactory]

Decent House

The ZED life

+ Brief

2022-2023

Location: Beijing, China Stage: RIBA 1-5 A decent residential house, with a ground floor, first floor, and an accessible roof. An exterior and mainly interior designs required to develop and produce a traditional yet modern Chinese house for a family.

+ Design Proposal Developing the required design drawings, technical and MEP drawings, in addition to 3D renderings of the interiors with the selected materials and finishes as the client requires.

+ 24

Final Product 25


+

Portfolio 2024

+ A. Mahdi Safieddine

Plans

1- Dining Area 2- Kitchen 3- Garage 4- Toilet 5- Bathroom 6- Guest Bedroom 7- Entrance 8- Front Garden 9- Outdoor Seating area 10- Tea Room 11- Living Room 12- Zen Garden 13- MEP (Under staircase)

02 01

26

13

04

12

10

05

06

11 07

09

Ground Floor Plan

03

Key 1- Bedroom 1 2- Walk-in closet 3- Bathroom 4- Bedroom 2 5- Storage (under staircase) 6- Bathroom 7- Master Bedroom 8- Master Closet 9- Living Space 10- Balcony 11- Garden 12- Double height living room

02

03 04

01

05

11

10

09

Decent House

+

Key

Decent House

+

06

08 12

07

08

First Floor Plan 27


Kitchen

28 Living Room

Interior Design

Bathroom

Tea Room

Entrance Hall

Interior Design

Decent House

Decent House

Kids Bedroom

+ Portfolio 2024 + A. Mahdi Safieddine

Master Bedroom

Guest Bedroom

29


+

Portfolio 2024

Construction Drawings

Air Conditioning Layout

Decent House

Lighting Layout

Decent House

Coil Layout

+ A. Mahdi Safieddine

Foundation Plan

GF Structural Plan

GF Beam Layout

Lintel Layout

FF Structural Plan

FF Beam Layout

Electric Layout

Detail Drawings

30

31


+

Portfolio 2024

+ A. Mahdi Safieddine

+

Uses and Connections Charge bike using BIPV E-port

04 E-Bike, E-Moto, and E-Port ZED Batteries

[Professional Experience - ZEDPower]

Replaceable lockable Batteries

ZED Batteries

Solar-Powered exchangeable batteries.

+ Brief

2022-2024

Location: UK and China. Many homes are difficult to make energy efficient,let alone net zero. There is often a desire to keep the external face, colour and texture of brickwork or masonry. Adding external wall insulation increases the wall thickness by around 150 mm - which means the external rain screen either has to be lightweight polymer reinforced render direct onto the EWI or additional expensive foundations are need to support an external masonry skin. Fixing a veneer of brick slips to non-breathable plastic external insulation board is also likely to be a very high cost and short term construction solution that has poor long term value. A modern eco-friendly solution is needed.

+ Design Proposal It makes sense to develop a long life exchangeable battery that can be charged from solar panels or the grid, and fit your home , your car and your personal micro transportation needs. Micro electric vehicles are designed to take this exchangeable / fixed battery product with integrated lockable docks. We have developed prototypes for a two battery e bike, a three battery moped, a four battery moto, and a micro car. Excess charging could help power up your house, saving energy and reducing carbon. Communities could invest in a mixture of communal solar electric charging arrays mounted on community buildings such as schools and public buildings or hotels that are coupled with battery docks allowing fresh battery exchanges and fast charging facilities – all monitored by a common phone app.

+ 32

Can go with the portable ZED Cabin

Lithium Titanium Oxide Cells Charge anywhere with multi-use 33


8

Portfolio 2024

&'()*+, -.01,234567 8 8 8

g46 9e4a 4 3 v vz y iz

NOTE ORIENTATION| izOF g46 9e4a 4 3 HOLES COUNTERSUNK v vz WHEN FOLDING PPd ~146 9rs0 d3 1yzyz

q

vy {i | iz

|vziz

rPw y9 wzyy efq2 012345684 P1 29 a rs0f216dE4t ue 9v

z4[{[/w za|cdwy1 zyy

rs0 d3 1

l$nogpq8lo$

pe

0

g hi

z0d{w5zd9|[wfy2 z }y/y[ c46/1 aa4: 5[4d5[d5 ~i 5 [[v[ 9v29z a d9 q 134[ }

rs0 d3 1

9 [ a123456[1 1 [ 59a [465459 59d5 ~25a2 1dh a2[[ :E ~ a121:10 3456[34 E 1 /41 ac1d:9 812a Pd5912f9d1 14d19d25~3d1t 25awd1 1df/1 : 59E 456/5a 192t 5

A3

Right Side View rs0 d3 1}yve25a:21945 2~} d5ad5ep|{0n 1:10 8zyz z v z nzyz z yz s:24 a d3 1ifd: 333i a d3 1ifd:

C Copyright ZEDpower 2020

A3

145.00

188.00 188.00

668.56

668.56

469.46

469.46

ZEDcargobike_Set 1 issued for:

INFORMATION

ZEDcargobike_Set 1

Drawing Number: issued for:

INFORMATION ZC / 2 / 022

314.56

Drawing Number: Created: 01/02/2022

366.00

rs0 d3 1}yve25a:21945 2~} d5ad5ep|{0n 8zyz z v z nzyz z yz s:24 a d3 1ifd: 333i a d3 1ifd: Right Side View

n1d59 4 3 v vz

Drawing Title:

366.00

rPw ywzyy efq2 P1 29 a

v iz

ZEDcargobike Drawing Title:

314.56

v vz q /a 12a35 29 Ea~Ew~ f ft aE~

0d5d9[f2 }/[ c46/1 aa4: 5[4d5[d5 ~i 5 [[[929 ad9 134[ } 9 [ a123456[1 1 [ 59a [465459 59d5 ~25a2 1dh a2[[ :E ~ a123456[34 E 1 /41 ac1d:9 812a Pd5912f9d1 14d19d25~3d1t 25awd1 1df/1 : 59E 456/5a 192t 5

ZED Batteries

0

g hi

469.46

420.00

pe

ZEDcargobike

49.68

l$nogpq8lo$

0123456$/:E 1

/a 12a35 29 Ea~Ew~ f ft aE~

Project:

49.68

4[[/ acd1

469.46

480.00 480.00

rs0f216dE4t

rs0f216dE4t ue 9v

Client: Project: Client:

49.68

iz

8

j1 f59 6849 01d2k34

C Copyright ZEDpower 2020

v yi

q

{ iz

| iz

Bike Drawings

D

PPd ~146 9rs0 d3 1yzyz

3.3

P 4 59

0123456$/:E 1

n1d59 4 3 v vz

yiv

185.61

56

rs0f216dE4t

iz

zziz

y|iz

v y i

185.61

8

668.56

P 4 59 j1dk f9

| iz

{ iz |vziz

v iz

zziz

| iz

yiv

306.00

3.3

.23

28x Ø5 x 90° Ø3 x 10

vy {i £¡ | iz

14

478.

808.55

306.00

56

134

£9 RSTU ¡ =¡££ 8

471.42 308.00

.23

y iz

y|iz

M

145.00

14

478.

808.55

471.42

¤¥¦§¨ { ©y q /:454/:gªe

;NO Q

145.00 179.00 80.00

145.00

668.56

150.00 150.00

y|iz | zi

| iz

9 RSTU ¡£ =¡££ 8

&'()*+, -.01,234567 8 8 8

D

{ iz

VW@XYZ\2 ]^_ Q ` > > #

| iz

{ziz

C

M

v ziz

;NO Q

¤¥¦§¨ { ©y q /:454/:gªe

179.00

145.00 179.00

80.00

308.00

y|iz

{ziz

yyzizv ziz

|ziz

VW@XYZ\2 ]^_ Q ` > > # ¡£

179.00

{ iz

«¬®¯°±²³´µ¶·

|viz v{ iz v iz

| zi

|ziz yyziz

£¡££? 8

«¬®¯°±²³´µ¶·

@A;BCDFGHI2 JK«L M > = =

ZED Batteries

OA 452

% ¡£ «¬ ! " #

.00

CTR 10.5

9 ;< =¡£ ¡ >

208

CTRS 70.75

CTRS 70.75

CTR 5.5

v i ¡£ % «¬ ! " #

z{i

378.57

|viz v{ iz v iz

134

12.3

9 ;< =¡£ ¡ > £¡££ ? zi 8

378.57

Top View 1:10 Top View 1:10

.00

C

v i

zi z{i

@A;BCDFGHI2 JK«L M > = =

759.40

208

Down 90° R1.5

v { i

|{ iz

B

8d 4 3 v vz

759.40

807.50

100.00

v { i

8d 4 3 v vz B

807.50

100.00

vvyiz v iz v iz

CTR 24

yz|iz v iz

CTRS 52

CTR 8.5

vvyiz v iz v iz

yz|iz v iz

CTRS 52

145.00

v yi

y|i

CTR 24

13.7

CTR 5.5

A

660.78

CTRS 53 Down 90° R1.5

+ A. Mahdi Safieddine

v yi y|i

A

660.78

+

7

49.68

6

420.00

5

4

PRODUCED PRODUCED BY AN BY AUTODESK AN AUTODESK STUDENT STUDENT VERSION VERSION

3

2

|{ iz

1

Front View 1:10 Front View 1:10

226.40

226.40

342.00

342.00

226.40 342.00

Motor-Bike Drawings

Back View 1:10 Back View 1:10

226.40 342.00

ZC / 2 / 022

Assembling

Technical reference

Sheet Size: A3 Scale 1:4

F

Material: 1.5mm Aluminium

Created by

Jlew

Do not scale, use figured dimensions only. Unless sta these drawings represent design intent only and appr drawings will be required from the Trade Contractor p and /or procurement being undertaken

Approved by

18/10/2023

Document type

Document status

Title

DWG No.

Aluminium Sleeve

2

3

4

5

6

Date of issue

Sheet

7

1/2

8

E-port Drawings Vehicles are design to meet international standards so that they can be used anywhere and anytime.

1092.11

1

PRODUCED BY AN AUTODESK STUDENT VERSION

F Rev.

2280.85

2600.00

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

1092.11

2500.00

D1

2500.00

2720.00

Isometric View

Top View 2720.00 2238.59

300.00

300.00

2120.00

90.63

2500.00

1205

.00

100.00

2470

D2

963.21

.00

1043.84

2300.00

1114.23

100.00

1205

50.00

.00

155°

Client: Project:

ZED-port

2570.00

2400.00

2499.62

3613.84

1205.00

1155.00

3683.34

50.00

3613.84

115°

Drawing Title:

ZED-port_Frame 1 issued for:

%:&& &&

8;%

%3&& &&

"&& &&

;%

0

0

53 &&

'& &&

4&& &&

"&& &&

4&& &&

0;"%

%3%% &&

%413 5&

%:<

%453 '&

8

%:<

%431 3&

Charged from solar panels and fit your home , your car and your personal micro transportation needs. Also, charges 10 times faster than a normal lithium battery, making mid journey charging realistic.

Created: 01/06/2022

Scale: 1:30 @ A3 1:15 @ A1

Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

0

0 =HIJKL >>?@ABCDEFG MOLMPP ;%

A

0

%:;%:812- 1 2 19 1 4 3 +62 2547 912)

;%

8

0 The E-port is easy to assemble on site, and can fit vehicles of any size, charging the batteries and storing energy. $%$&%% 4 59

1 9

0 19

0123456849

0 19! 12 " 4 4 294 5 4 1

8

0123456 1

1 29 &"$&'$%&%% "&& &&

)146+9 0 3 1%&%&

"&& &&

BD

Rev.

ZEDpower

"&& &&

;3

checked by:

MS

T 020 8404 1380 F 020 8404 2039 E mail@zed-power.com www.zed-power.com

Left View

2500.00

"&& &&

A3

drawn by/ updated by:

ZC / 2 / 022

ZEDpower, 21 Sandmartin Way, London SM6 7DF

100.00

Front View

4

34

90°

C Copyright ZEDpower 2020

A larger non exchangeable / fixed battery has also been developed combining 4 no 0.5 kwh cells to create a 2kwh heavier battery at 72 volts.(Suitable for larger vehicles)

Battery

1205.00

1305.00

D3

PRODUCED BY AN AUTODESK STUDENT VERSION

It is important that battery life, durability, and safety are now considered for this scarce and valuable technology that facilitates electric vehicles. It is now possible to build a 48 volt 0.5 kwh battery that can be picked up and easily exchanged and each battery charged in about 15 minutes.

INFORMATION Drawing Number:

1235 29 )$) + - )

A

Sca 1:1

Do not Tscale, figured dimensions Unless 020use 8404 1380 F 020only. 8404 2039sta these drawings represent design intent only and appr E mail@zed-power.com drawings will be required from the Trade Contractor p and /orwww.zed-power.com procurement being undertaken

E

Dept.

Re Sca 1:1

T 020 8404 1380 F 020 8404 2039 E mail@zed-power.com www.zed-power.com ZEDpower, 21 Sandmartin Way, Londo

PRODUCED BY AN AUTODESK STUDENT VERSION

OA 459.79

E

A

MS

ZEDpower, 21 Sandmartin Way, Londo

PRODUCED BY AN AUTODESK STUDENT VERSION

PART IS SYMMETRICAL ABOUT CENTRELINE

MS

Re drawn by updated

ZEDpower ZEDpower

Created: 01/02/2022

Down 90° R1.5 191.2

drawn by updated

80

2 " 4&6 4 " ":6 "

0 3 1

0 3 1(%" 25 21945/2)(0 5 5 '10 8&%&23&3"42& &%&23&3%&45 24 67 3 1 333 7 3 1 0 5 9 2 ( 46 1 4 54 5 5 ) *5 929 9+ 134 ( 9+ 123456 1 1 59 465459 59 5 )25 2 1 2 ) 123456 34 1 , 41 1 9+ 812 5912 9 1 14 19 25)3 125 $ 1 1 1 59 456 5 192- 5

35


+

Portfolio 2024

+ A. Mahdi Safieddine

Assembling

Prototypes

E-BIKES

ZED Batteries

ZERO BILLS HOME

ZED Batteries

BIPV PANELS

Final Product

E-MOPED

E-MOTO

E-CAR

Micro electric vehicles are designed to take this exchangeable / fixed battery product with integrated lockable docks. The process goes that the solar panels would charge the batteries fast, exchangeable batteries would be used for different vehicles and also excess energy would power the house.

Render

In Exhibition Client Use

36

37


+

Portfolio 2024

+ A. Mahdi Safieddine

+ 05 White Stag Village White Stag

[Professional Experience - ZEDFactory]

White Stag

Zero Energy Urbanism

+ Brief

2022-2024

Location: Henan, Zhengzhou, China Stage: RIBA 1-5 (Parts of the project reached stage 7) Located in a rural in a country side, this vast land is an open green field area requested to be turned into a camp site. An attraction point for the area and the whole region, the campsite should be composed of various tents, big, small, and luxurious, in addition to zero energy cabins, and three main buildings. A lake building, a social and agricultural market, and a service building with accommodation, finally, a greenhouse area for agriculture and social events. All spaces are required to be eco-friendly and accessible for people and users of all ages.

+ Design Proposal Starting with our prefabricated zero-energy cabins, our target is to connect all functions in a smooth and well designed matter, these cabins will be luxury accommodation next to the lake. However, the artificial lake is design to be suitable for all ages for swimming and boat activities. In the middle is the lake building full of various functions and topped with PV panels to reduce energy use and keep all elements green. The other buildings are all working on solar energy, with light weight structures and prefabricated containers, it would be easy to move the buildings around and construct and remove when needed. In addition to solar powered parking slots, providing energy to electric cars and excess energy would be used for the buildings.

+ 38

39


+

Portfolio 2024

Luxury Tents

Walkway

Camping Parking

Central Square

Services

Market

Greenhouse/Activity Area

White Stag

Masterplan

+ A. Mahdi Safieddine

Small Tents

Smart Green House

40

Entrance Viewing Platform Sunken Square

Gardening Experience Hall

Fruit picking Experience

Lake Building

Lake

Kid Playground

Lake-side Cabins

Camping sites

41


+

42

White Stag

+ A. Mahdi Safieddine

White Stag

Portfolio 2024

Tents

Water side

Activity Area

Night Masterplan 43


+

Portfolio 2024

+ A. Mahdi Safieddine

Entrance Viewing Platform

374-EBP-04-300 2

N

R-01

版本 日期 Rev

Date

设计变更内容 Amendments

X

22122022

Drawing Layout

A

27042023

Plans, Elevations, and Diagram Layout

B

19052023

Plans, Elevations, and Building Layout structure amendment

C

08082023

Addition of Slides and Swings - Drawing amendment

C-01

C-26

Slide Structure layout - connected to main structure of EBP. situated 2.5meters abouve ground level.

秋千结构平面-连接结构柱间的钢梁--距离地 面2.5米高

C-25 C-23

C-21

C-02

C-24

C-22

R-02 C-03

C-20

UP

C11

The Entrance Viewing Platform functions as a structure at the entrance to view the site.

C-05

1374-EBP-04-300 ---

1374-EBP-04-300 ---

UP

R-07

C-06

C-19 R-10

R-03

White Stag

UP

C-18 R-06

甲方 WINRUN GROUP - 万润集团 Project: 工程名称

C-07

Client:

White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇 C-17 C-08 C-16

R-05

Drawing Title:

C-09

R-04

图纸标题

Entrance Building Platform - Ground Floor Plan 入口观景平台 - 一层平面

C-15 C-14

issued for:

C-13

drawn by/ update by:

COORDINATION

C-10

C-11

Created:

checked by:

MS

图纸号 374-EBP-04-100 Drawing Number:

C-12

Rev.

DF

White Stag

C-04

R-08

版本

C

创建日期

Scale:

08/08/2023

比例 (@ A1)

1 : 100

ZEDfactory ZEDfactory, 21 Sandmartin Way, London SM6 7DF

A1

Ground Floor Plan

374-EBP-04-300 2

1

Entrance Building Platform Ground Floor Plan - 入口观景平台 - 一层平面 1 : 100

C Copyright ZEDfactory 2023

374-EBP-04-300 2

N

R-01

C-01

T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com

Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

版本 日期 Rev

Date

设计变更内容 Amendments

X

22122022

Drawing Layout

A

27042023

Plans, Elevations, and Diagram Layout

B

19052023

Plans, Elevations, and Building Layout structure amendment

C

08082023

Addition of Slides and Swings - Drawing amendment

C-26

Slide Structure layout - connected to main structure of EBP. situated 2.5meters abouve ground level.

秋千结构平面-连接结构柱间的钢梁--距离地 面2.5米高 C-25 C-23

C-02

C-24

R-03

C-22

C-21

C11

R-02 C-03

C-20

UP

7.00 m

C-04

UP

C11 7.00 m

It is a connecting point for users to cross from the tent side to the lake area.

7.00 m

C-05 R-08 C18 1 374-EBP-04-300

1 374-EBP-04-300

UP

R-07 C-06

R-10

UP

7.00 m

UP

C-19

1600

C-18

7.00 m

50 17

R-05

UP

900

R-07

R-06

甲方 WINRUN GROUP - 万润集团 Project: 工程名称

C-07

Client:

2100

White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇

2550

C-17 C-08 Drawing Title:

C-16

R-05

C-09

R-04

图纸标题

Entrance Building Platform - First Level Floor Plan 入口观景平台 - 二层平面

C-15

issued for:

C-14

drawn by/ update by:

COORDINATION C-10

C-13

checked by:

MS

Drawing Number: 图纸号 374-EBP-04-102

Rev.

DF

版本

C

C-12 Created:

创建日期

Scale:

08/08/2023

C-11

比例 (@ A1)

1 : 100

ZEDfactory

A1

First Floor Plan

374-EBP-04-300 2

Entrance Building Platform Level 1 - 入口观景平台 - 二层平面 1 : 100

C Copyright ZEDfactory 2023

N 374-EBP-04-300 2

Plans

ZEDfactory, 21 Sandmartin Way, London SM6 7DF

1

R-01

C-01

T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com

Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

版本 日期 Rev

Date

设计变更内容

X

22122022

Drawing Layout

A

Amendments

27042023

Plans, Elevations, and Diagram Layout

B

19052023

Plans, Elevations, and Building Layout structure amendment

C

08082023

Addition of Slides and Swings - Drawing amendment

C-26

Slide Structure layout - connected to main structure of EBP. situated 2.5meters abouve ground level.

秋千结构平面-连接结构柱间的钢梁--距离地 面2.5米高 C-25 C-23

C-21

C-02

C-24

R-03

C-22 R-02

C-03 C-20

11.48 m

C-04

UP

C11

2810

11.48 m

C-05 UP 1 374-EBP-04-300

1 374-EBP-04-300

R-07 C-06

C-19

11.48 m

UP

R-03

C-18

11.48 m

R-07

甲方 WINRUN GROUP - 万润集团 Project: 工程名称

C-07

Client:

The viewing platform has activities such as swinging, sliding, planting, and seating for users of all ages.

White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇 C-17 C-08 Drawing Title:

C-16

R-05

C-09

R-04

图纸标题

Entrance Building Platform - Second Level Floor Plan 入口观景平台 - 三层平面

C-15

issued for:

C-14

drawn by/ update by:

COORDINATION C-10

C-13

checked by:

MS

图纸号 374-EBP-04-103 Drawing Number:

Rev.

DF

版本

C

C-12 Created:

创建日期

Scale:

08/08/2023

C-11

比例 (@ A1)

1 : 100

ZEDfactory

A1

374-EBP-04-300 2

ZEDfactory, 21 Sandmartin Way, London SM6 7DF

1

Entrance Building Platform Level 2 入口观景平台 - 三层平面

Second Floor Plan

1 : 100

C Copyright ZEDfactory 2023

374-EBP-04-300 2

N

R-01

C-01

T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com

Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

版本 日期 Rev

Date

设计变更内容 Amendments

X

22122022

Drawing Layout

A

27042023

Plans, Elevations, and Diagram Layout

B

19052023

Plans, Elevations, and Building Layout structure amendment

C

08082023

Addition of Slides and Swings - Drawing amendment

C-26

C-25 C-23

C-21

C-02

C-24

R-03

C-22 R-02

C-03 C-20 15.96 m

C11

C-04 15.96 m

C-05

Consists of three levels above the ground.

R-08 1 374-EBP-04-300

1 374-EBP-04-300

R-07 C-06

C-19 15.96 m

C-18 10 10 0

C-07

甲方 WINRUN GROUP - 万润集团 Project: 工程名称 Client:

White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇 C-17 C-08 Drawing Title:

C-16

R-05

C-09

R-04

C-15

图纸标题

Entrance Building Platform - Third Level Floor Plan 入口观景平台 - 四层平面 issued for:

C-14

COORDINATION C-10

C-13

Drawing Number: 图纸号 374-EBP-04-104

drawn by/ update by:

checked by:

MS

Rev.

DF

版本

C

C-12 Created:

创建日期

08/08/2023

C-11

Scale:

比例 (@ A1)

1 : 100

ZEDfactory

1 A1

44

1 : 100

C Copyright ZEDfactory 2023

374-EBP-04-300 2

ZEDfactory, 21 Sandmartin Way, London SM6 7DF

Entrance Building Platform Level 3 入口观景平台 - 四层平面

Third Floor Plan

T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com

Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

45


+

Portfolio 2024 Top of Rail FFL: +17.16m

1200

Top of Rail FFL: +17.16m

Elevations

Third Level FFL: +15.96m

4480

Third Level FFL: +15.96m

Second Level FFL: +11.48m

Top of Rail FFL: +17.16m

Top of Rail FFL: +17.16m

Third Level FFL: +15.96m

Third Level FFL: +15.96m

structure amendment

08082023

Addition of Slides and Swings - Drawing amendment

版本 日期 Rev

Date

设计变更内容

+ A. Mahdi Safieddine

Amendments

NW

X

22122022

Drawing Layout

A

27042023

Plans, Elevations, and Diagram Layout

B

19052023

Plans, Elevations, and Building Layout structure amendment

C

08082023

Addition of Slides and Swings - Drawing amendment

NE NW

Second Level FFL: +11.48m

Staircase Landing FFL: +3.5m

White Stag

4480

NE

First Level FFL: +7.0m

Ground Floor FFL: +0.0m

3500

First Level FFL: +7.0m Ground Floor FFL: +0.0m

White Stag

17160

4480 Second Level FFL: +11.48m

Staircase Landing FFL: +3.5m

3500

17160

17160

19052023

C

First Level FFL: +7.0m

First Level FFL: +7.0m

3500

4480

17160

1200

Second Level FFL: +11.48m

B

Staircase Landing FFL: +3.5m

Staircase Landing FFL: +3.5m

EBP North East Elevation 东北立面图 4

3500

1 : 100 Ground Floor FFL: +0.0m

Ground Floor FFL: +0.0m

North East Elevation EBP North East Elevation 东北立面图 4

Top of Rail FFL: +17.16m

Top of Rail FFL: +17.16m

Third Level FFL: +15.96m

Third Level FFL: +15.96m

4480

1200

1 : 100

甲方 WINRUN GROUP - 万润集团 Project: 工程名称

Second Level FFL: +11.48m

Top of Rail FFL: +17.16m

Top of Rail FFL: +17.16m

Third Level FFL: +15.96m

Third Level FFL: +15.96m

White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇

4480

1200

Second Level FFL: +11.48m

甲方图纸标题

Drawing Title: Client:

First Level FFL: +7.0m

Entrance Building Platform - North East - North West WINRUN GROUP - 万润集团 Elevations 东北和西北立面图 Project: issued for:

Second Level FFL: +11.48m

Staircase Landing FFL: +3.5m

Staircase Landing FFL: +3.5m

First Level FFL: +7.0m

First Level FFL: +7.0m

Ground Floor FFL: +0.0m

Ground Floor FFL: +0.0m

图纸号 374-EBP-04-200

版本

Third Level FFL: +15.96m

Sections

C

X

22122022

Drawing Layout

A

Plans, Elevations, and Diagram 27042023 ZEDfactory, 21Layout Sandmartin Way, London SM6 7DF

Second Level FFL: +11.48m

Second Level FFL: +11.48m

Plans, Elevations, and Building Layout 19052023 T 020 8404 1380 F amendment 020 8404 2039 structure

Top of Rail FFL: +17.16m

Top of Rail FFL: +17.16m

Top of Rail FFL: +17.16m

Third Level FFL: +15.96m

EBPThirdNorth West Elevation 西北立面图 Level FFL: +15.96m

Third Level FFL: +15.96m

First Level FFL: +7.0m

First Level FFL: +7.0m

As indicated

ZEDfactory

B SW C

E mail@zedfactory.com Addition of Slides and Swings - Drawing www.zedfactory.com 08082023 amendment

Third Level FFL: +15.96m

1 : 100 First Level FFL: +7.0m

Second Level FFL: +11.48m

Second Level FFL: +11.48m

Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

SE

Staircase Landing FFL: +3.5m

17160

3500 4480

3500 4480

Ground Floor FFL: +0.0m First Level FFL: +7.0m

Second Level FFL: +11.48m

Second Level FFL: +11.48m

Staircase Landing FFL: +3.5m

Staircase Landing FFL: +3.5m

5450

3500

3500

1550

4480

First Level FFL: +7.0m

44801200

Second Level FFL: +11.48m

4480

Amendments

SW 17160

Top of Rail FFL: +17.16m

Rev08/08/2023 Date undertaken

Ground Floor FFL: +0.0m

staircase Landing FFL: +3.5m

17160

Top of Rail FFL: +17.16m Third Level FFL: +15.96m

17160

4480 3500 4480 1200

17160

T 020 8404 1380 F 020 8404 2039 08082023 amendment E mail@zedfactory.com www.zedfactory.com Drawing Number: Rev.

Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and

Top of Rail FFL: +17.16m

17160

COORDINATION MS DF Addition of Slides and Swings - Drawing

C

approved will be required from the Trade 版本 日期assembly 设计变更内容 Created: Scale: 比例 (@ A1) 创建日期drawings Contractor prior to any work and /or procurement being

Ground Floor FFL: +0.0m

C Copyright ZEDfactory 2023

ZEDfactory

issued for: drawnand by/Building checked Plans, Elevations, Layout - by: 19052023 update structure amendment ZEDfactory, 21 Sandmartin Way, by: London SM6 7DF

B

1 : 100

Second Level FFL: +11.48m

A1

X08/08/2023 22122022 Drawing Layout Entrance Building Platform - North - North West As East indicated

Plans, Elevations, and Diagram 东北和西北立面图 A Elevations 27042023 Layout

Top of Rail FFL: +17.16m

C Copyright ZEDfactory 2023

2

checked by:

Drawing Number: 图纸号 Rev. 版本 C 374-EBP-04-200 版本 日期 设计变更内容 Rev Date Amendments Drawing Title: 图纸标题 Created: 创建日期 Scale: 比例 (@ A1)

Third Level FFL: +15.96m Staircase Landing FFL: +3.5m

Third Level FFL: +15.96m Staircase Landing FFL: +3.5m

EBP North West Elevation 西北立面图

2 A1

North West Elevation

drawn by/

17160

1200

8200

3500

Top of Rail FFL: +17.16m

工程名称

update by: White Deer Village at Southern Taihang Mountain COORDINATION MS DF - 南太行白鹿零碳小镇

4480

3500

17160

4480

8200 4480

3500

Second Level FFL: +11.48m

1200

First Level FFL: +7.0m

17160

4480

4480

17160

4480

4480

Client:

First Level FFL: +7.0m Ground Floor FFL: +0.0m

First Level FFL: +7.0m Ground Floor FFL: +0.0m

3500

3500

1550

Ground Floor FFL: +0.0m First Level FFL: +7.0m

SE

EBP South East Elevation 东南立面图 staircase Landing FFL: +3.5m

Staircase Landing FFL: +3.5m

Staircase Landing FFL: +3.5m

Staircase Landing FFL: +3.5m

EBP Section AA 剖面 AA

3500

1

5450

1 : 100

3500

1

1 : 100

Ground Floor FFL: +0.0m

South East Elevation

Section A-A

Top of Rail FFL: +17.16m

Top of Rail FFL: +17.16m

Third Level FFL: +15.96m

Third Level FFL: +15.96m

First Level FFL: +7.0m

First Level FFL: +7.0m

Second Level FFL: +11.48m

Second Level FFL: +11.48m

Top of Rail FFL: +17.16m

Top of Rail FFL: +17.16m

Third Level FFL: +15.96m

Third Level FFL: +15.96m

17160

4480

First Level FFL: +7.0m

First Level FFL: +7.0m

8960

3500

WINRUN GROUPdrawn - 万润集团 by/ checked by:

Second Level FFL: +11.48m

Second Level FFL: +11.48m

Staircase Landing FFL: +3.5m

Staircase Landing FFL: +3.5m

374-EBP-04-201

C

创建日期

Scale:

比例 (@ A1)

First Level FFL: +7.0m Ground Floor FFL: +0.0m

As indicated

Entrance Building Platform - South East - South West ZEDfactory Elevations 东南和西南立面图 ZEDfactory, 21 Sandmartin Way, London SM6 7DF issued for: drawn by/ checked by: T 020 8404 1380 F 020 8404by: 2039 update

Staircase Landing FFL: +3.5m

E mail@zedfactory.com MS COORDINATION www.zedfactory.com

DF

First Level FFL: +7.0m Ground Floor FFL: +0.0m

Section B-B

3500

South West Elevation Staircase Landing FFL: +3.5m

3500 4480

update by:

1000

First Level FFL: +7.0m Ground Floor FFL: +0.0m

08/08/2023 Drawing Title: 图纸标题

8200

Project: 工程名称 COORDINATION MS DF White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇 Drawing Number: 图纸号 Rev. 版本

4280 3700

Staircase Landing FFL: +3.5m

3500

Staircase Landing FFL: +3.5m

Staircase Landing FFL: +3.5m

EBP Drawing Number: Rev. 版本 BB 剖面 BB 图纸号 Section 2 1 : 100 C 374-EBP-04-201

3700

Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken C Copyright ZEDfactory 2023 Created: Scale: (@ A1)

创建日期

C Copyright ZEDfactory 2023 Ground Floor FFL: +0.0m

Ground Floor FFL: +0.0m

08/08/2023 A1

3500

8200

Third Level FFL: +15.96m

issued for:

Second Level FFL: +11.46m

Staircase Landing FFL: +3.5m

Created:

1 : 100

图纸标题

17160

3500

8960 8200 17160

A1

Drawing Title:

Second Level FFL: +11.48m

EBP South West Elevation 西南立面图

46

White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇

Entrance Building Platform - South East - South West Client: 甲方 Elevations 东南和西南立面图

4480

17160

1200 4280

8960

Client:

First Level FFL: +7.0m Ground Floor FFL: +0.0m

2

甲方 WINRUN GROUP - 万润集团 Project: 工程名称

Top of Rail FFL: +17.16m

Third Level FFL: +15.96m

1000

Second Level FFL: +11.46m

44801200

Second Level FFL: +11.48m

8200

1200

Third Level FFL: +15.96m

4480

Third Level FFL: +15.96m

1 : 100

1200

1 Top of Rail FFL: +17.16m

Top of Rail FFL: +17.16m

EBP Section AA 剖面 AA Top of Rail FFL: +17.16m

4480

1 : 100

8960

EBP South East Elevation 东南立面图 1

Ground Floor FFL: +0.0m

Ground Floor FFL: +0.0m

Ground Floor FFL: +0.0m

比例

As indicated

ZEDfactory ZEDfactory, 21 Sandmartin Way, London SM6 7DF

Ground Floor FFL: +0.0m

Ground Floor FFL: +0.0m

47


+

Portfolio 2024

+ A. Mahdi Safieddine

Lake Building

Ground Floor

Multi-purpose rooms Music rooms Core + Service Classrooms

Second Floor

Conference Hall Restaurant Core + Service Bar + Dining

Indoor Stage VIP Area Changing Lounge

Mezzanine Floor

Third Floor

BIPV Roof MEP Room Core + Service Storage

Open Exhibition Art Display Core + Service Seating

First Floor

White Stag

White Stag

Theatre Stage Restaurant Core + Service Corridors

Building Roof

The Lake Centre Building is the main attraction point of the site that functions as a social hub for all users and visitors. Functioning as a theatre and a conference center with exhibition spaces, its multi-functional and educational spaces also help attract users of all ages. Split Levels

Adjustment

Reduction

Structure

Its spiral form and structure help in projecting its orientation to all the main views of the site, making it look as if emerging from the sea. The BIPVs on the roof allow to make the building eco-friendly and rely on renewable sources.

Slope

BIPV Panels

Subtract

Orient

Using the main stage for multi-functions followed by the spectacular mountain view. Addition

48

Surroundings

Views + Orientation

Final Form

49


+

Portfolio 2024

Energy Strategy

+ A. Mahdi Safieddine

Air intake to reversible heat pump is in non-habitable portion of the roof. The heat pump is on vibration mounts to reduce noise and also in an insulated noise enclosure allowing the roof to be used around it.

Heat is extracted from the heat pump units through PV canopy at the tallest point in structure Electricity produced from the PV panels is used directly for lighting and appliances

Water from canopy and roofs are stored under the usable roof so that water can be gravity fed for WCs

The thin plan depth allows cross ventilation in spring and autumn to reduce cooling load

The refrigerant is transported water efficiently around the building. Being in a central location the pump energy is minimised.

Gaps between the building allow ventilation to the parking level. Large air intake to parking level ensures good ventilation driven by wind pressure

White Stag

Fan coil units are placed at the facade to condition the building where heat and coolth losses are greatest

White Stag

On stand alone blocks (not under canopy) the plant room roofs are clad with solar thermal tubes to feed the heat pump. Each space is fed by refrigerant to deliver conditioned demand driven air. Units only work when windows for natural ventilation are closed

2000

Roof FFL: +25.5m

Parapet FFL: +22.5m

Roof FFL: +22.5m

Roof FFL: +21.5m

Roof FFL: +21.5m

Third Floor FFL: +18.0m

Third Floor FFL: +18.0m

Second Floor FFL: +13.5m

Second Floor FFL: +13.5m

First Floor FFL: +9.0m

First Floor FFL: +9.0m

Mezzanine Floor FFL: +3.0m

Mezzanine Floor FFL: +3.0m

版本 日期

设计变更内容

Rev

Date

X

31032022

Amendments

6400

4500 4500

FFL: +25.5m

3600

3000

A heat recovery ventilation system using displacement ventilation are used in units to conserve heat. Thermally massive structure help stores heat and coolness in the structure

6000

25500 4500 6000

Ground Floor FFL: +0.0m

Ground Floor FFL: +0.0m

South East Elevation

South East Elevation 东南立面图 FFL: +25.5m

2000

FFL: +19.5m

Parapet FFL: +23.5m

Parapet FFL: +19.5m

Roof FFL: +22.5m

Roof FFL: +19.5m

Third Floor FFL: +18.0m

Third Floor FFL: +15.0m

Second Floor FFL: +13.5m

Second Floor FFL: +10.5m

First Floor FFL: +9.0m

First Floor FFL: +6.0m

甲方 WINRUN GROUP - 万润集团 Project: 工程名称

3600

Client:

White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇

25500 4500

2600

900

4500

900

4500

3000

1 : 100

5500

1

SE

3000

3000

Elevations

3600

900

SW

Drawing Title:

图纸标题

Theatre Conference Centre - South East - South West Elevations 东南和西南立面图 issued for:

drawn by/ update by:

4000

COORDINATION

6000

Created:

6000

Checker

Rev.

版本

X

创建日期

Scale:

21/10/2022 Mezzanine Floor FFL: +3.0m

checked by:

Author

图纸号 374-B1-201 Drawing Number:

比例 (@ A1)

As indicated

Mezzanine Floor FFL: +3.0m

ZEDfactory

3000

ZEDfactory, 21 Sandmartin Way, London SM6 7DF

Ground Floor FFL: +0.0m

Ground Floor FFL: +0.0m

South West Elevation

South West Elevation 西南立面图 2

1 : 100

C Copyright ZEDfactory 2022

FFL: +25.5m

FFL: +25.5m

Parapet FFL: +23.5m

Parapet FFL: +23.5m

Roof FFL: +22.5m

Roof FFL: +22.5m

Third Floor FFL: +18.0m

Third Floor FFL: +18.0m

Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

版本 日期

设计变更内容

Rev

Date

X

31032022

Amendments

A

B

3600

B

Second Floor FFL: +13.5m

First Floor FFL: +9.0m

First Floor FFL: +9.0m

Mezzanine Floor FFL: +3.0m

Mezzanine Floor FFL: +3.0m

25500

900

Second Floor FFL: +13.5m

2600

4500

26700

4500

4500

4500

3000

A1

T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com

3000

Sections

6000

6000

4000

A

Ground Floor FFL: +0.0m

1200

Ground Floor FFL: +0.0m Pool Floor: -1.0m

Parapet FFL: +25.5m

FFL: +25.5m

Parapet FFL: +23.5m

Parapet FFL: +23.5m

Roof FFL: +22.5m

Roof FFL: +22.5m

3600

7500

1900

1000

1 : 100 2000

1

Lake Floor: -1.2m

Section A-A

Section AA 剖面AA

Third Floor FFL: +18.0m

Third Floor FFL: +18.0m

3600

4500

900

甲方 WINRUN GROUP - 万润集团 Project: 工程名称 Client:

Second Floor FFL: +13.5m

Drawing Title:

2550 1000

4500

3600

25500

900

Second Floor FFL: +13.5m

White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇

First Floor FFL: +9.0m

图纸标题

Theatre Conference Centre - Sections AA BB 剖面AA和BB First Floor FFL: +9.0m

issued for:

COORDINATION

图纸号 374-B1-300

6000

6000

3560

Drawing Number:

Created:

创建日期

21/10/2022

2150 Mezzanine Floor FFL: +3.0m

Mezzanine Floor FFL: +3.0m

drawn by/ update by:

checked by:

Author

Checker

Rev.

版本

X Scale:

比例 (@ A1)

As indicated

ZEDfactory T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com

2110

3000

3000

ZEDfactory, 21 Sandmartin Way, London SM6 7DF

Ground Floor FFL: +0.0m

Ground Floor FFL: +0.0m

Section BB 剖面BB 2 A1

50

Lake Floor: -1.2m

1 : 100

C Copyright ZEDfactory 2022

Section B-B

Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

51


Portfolio 2024

+ A. Mahdi Safieddine N

Service Building

B3-A

B3-B

B3-C

B3-D

B3-E

B3-F

B3-H

B3-G

B3-I

版本 日期 Rev

Date

设计变更内容 Amendments

X

22122022

Drawing Layout

A

27042023

Plans, Elevations, and Diagram Layout

B

19052023

B3-J

41650 34800 3600

3600

3600

3600

5200

3600

3600

3

2

374-B3-04-300

374-B3-04-300

3600

3600

B3-6 1100

B3-6

AHU

16

02

14

06

3200

05

13

HWC UP

13490

The first floor is an open plan kitchen area for all families and campers. And finally the third floor are accommodations split to two types, single bedrooms and family bedrooms.

15 0.00 m

B3-4

17

18

3200

13940

11800

11

12

19

B3-4

17 04 08 10 04

White Stag

B3-3

UP

3200

B3-3

10

01

B3-2

09

1100

03

03

07

B3-2

01

1

B3-1

B3-1

374-B3-04-300

甲方 WINRUN GROUP - 万润集团 Project: 工程名称 Client:

01- Locker Room

B3-A

B3-B

B3-C

B3-D

B3-E

B3-F

B3-G

B3-I

B3-H

存储柜 02- Shower + Changing 带更衣室的洗澡间 03- Changing Room 更衣室 04- Female Toilets 女卫生间 05- Fire Control Room 消防控制室 06- AHU Room 空调机房 07- Baby chnging room 母婴室 08- Cleaning Supply Room 清洁工具储藏室 09- Disabled Toilet 残疾人卫生间 10- Male Toilets 男卫生间 11- Staff Toilet 员工卫生间 12- Fire Lobby 消防ӹ室 13- Entrance Lobby 入口大厅 14- Reception Room 门卫 15- Storage 贮存 16- LV Room 低压机房

B3-J

White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇

Drawing Title:

Ground Floor Plan

01 Service Centre Ground Floor 首层平面图 -公共卫生间/更衣室/营地办公室 1 : 75

C Copyright ZEDfactory 2023

-公共卫生间/更衣室/营地办公室 issued for:

B3-C

B3-D

B3-E

B3-F

B3-G

B3-H

B3-I

drawn by/ update by:

COORDINATION

Created:

checked by:

MS

Drawing Number: 图纸号 374-B3-04-100

DF

Rev.

版本

B

创建日期

Scale:

05/19/2023

1 : 75

比例 (@ A1)

Accommodation

ZEDfactory ZEDfactory, 21 Sandmartin Way, London SM6 7DF

带݅衣间的‫ڈ؟‬䃷 浴隔间 18- Security Room 安保监控室 19- Linens Storage 服务于三层酒店房间的)床单等储藏室

N B3-B

B3-A

图纸标题

Service Centre - Ground Floor Plan 首层平面图

T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com

17- Family shower + changing

A1

Plans, Elevations, and Diagram Layout Building Boundary Amendment

B3-5

B3-5

1

The Service building is divided into 2 main attributes; public and private. Split over three floors, the ground floor serves as showers, toilets, changing facilities and receptions.

B3-J

Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

版本 日期 Rev

Date

设计变更内容 Amendments

X

22122022

Drawing Layout

A

27042023

Plans, Elevations, and Diagram Layout

B

19052023

Plans, Elevations, and Diagram Layout Building Boundary Amendment

Open Kitchen

34800 34000 3600

3600

3600

3600

5200

3600

3

2-

374-B3-04-300

374-B3-04-300 ---

3600

3600

White Stag

+

3600

Toilet Facilities

B3-6 1100

B3-6

B3-5

3200

B3-5

04

01

UP

01

Plans

B3-4

F

F

F

F

F

F

4.00 m

3200

13000

11800

B3-4

F

02

02

03

05 F

3200

B3-3

F

F

F

01

UP

F

B3-3

Double Rooms

01

B3-2 1100

B3-2 -

B3-1

B3-1

---

甲方 WINRUN GROUP - 万润集团 Project: 工程名称 Client:

White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇

Drawing Title:

Single Rooms

图纸标题

Service Centre - First Floor Plan 二层平面图 -共享厨房 issued for:

drawn by/ update by:

COORDINATION B3-A

B3-C

B3-B

B3-D

B3-E

B3-F

B3-G

B3-H

B3-I

B3-J

图纸号 374-B3-04-101 Drawing Number:

Created:

First Floor Plan

02 Service Centre First Floor 二层平面图 -共享厨房 1 A1

餐厅 02- Kitchen and Food Preperation 共享厨房 03- Lobby 门厅 04- Core Lobby 消防前室 05- Fire Escape Staircase 消防ࠡࠐ

1 : 75

C Copyright ZEDfactory 2023

B3-A

B3-B

B3-C

B3-D

B3-F

B3-E

B3-G

B3-H

B3-I

版本

B Scale:

1 : 75

比例 (@ A1)

ZEDfactory ZEDfactory, 21 Sandmartin Way, London SM6 7DF T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com

Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

版本 日期

N

DF

Rev.

创建日期

05/19/2023 01- Dinning Hall

checked by:

MS

Rev

Date

X

设计变更内容 Amendments

22122022

Drawing Layout

A

27042023

Plans, Elevations, and Diagram Layout

B

19052023

Plans, Elevations, and Diagram Layout Building Boundary Amendment

Family Room Layout

B3-J

41650 34600 3600

3600

3600

3600

5200

3

2-

374-B3-04-300

374-B3-04-300 ---

3600

3600

3600

3600

B3-6 1100

B3-6

B3-5

B3-5

3200

UP

01

01

02

04

02

02

02

01

01 B3-4

3200

13940

11800

B3-4

8.00 m

05 B3-3

B3-3

01

3200

DN

01

02

02

03

02

02

01

01

Kids Bedroom

B3-2 1100

B3-2 -

B3-1

B3-1

甲方 WINRUN GROUP - 万润集团 Project: 工程名称

---

Client:

White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇

Drawing Title:

Bedroom 2

图纸标题

Service Centre - Second Floor Plan 三层平面图

Corridor

-酒店房间

图纸号 374-B3-04-102

Rev.

创建日期

Scale:

Created:

B

01- Large En-suite Bedroom

Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

X

B3-1

11800

B3-D

B3-E

B3-F

B3-G

B3-H

B3-I

B3-J

B3 Section CC 剖面CC

1 : 100

3600

3600

3600

3600

5200

3600

3

3600 1 : 100

3600

3600

3600

B3-E

3600

B3-F

5200

B3-G

3600

B3-H

3600

B3-I

3600

B3-J

3600

and Mezzanine FFL: +12.00m White Deer VillageMEP at Southern Taihang Mountain - 南太行白鹿零碳小镇

MEP and Mezzanine FFL: +12.00m Second Floor FFL: +8.00m

甲方 WINRUN GROUP - 万润集团 Project: 工程名称 图纸标题

B3 Section AA 剖面AA FFL: +0.00m 1Ground Floor 1 : 100

52

A1

2700

Section A-A

COORDINATION

drawn by/ update by:

4000

checked by:

MS

DF

图纸标题Second Floor FFL: +8.00m First Floor Drawing Number: Rev. Service Centre -图纸号 Sections AAFFL: - BB+4.00m - CC版本 剖面AA BB B 374-B3-04-300 CC Drawing Title:

issued for:

Created: 创建日期 COORDINATION 05/19/2023

drawn by/ update by: Scale:

MS

2700 1000 1000 2000 27001000 1000

B3-D

3600

3600

B3-C

B3-E

B3-F

3600

3600

B3-D

3600

5200

B3-E

B3-G

3600

B3-F

B3-H

3600

B3-G

B3-I

3600

B3-H

First Floor FFL: +4.00m Ground Floor FFL: +0.00m

First Floor FFL: +4.00m Rev. Ground Floor FFL: +0.00m

创建日期

T 020 8404 1380 F 020 8404 2039 Created: Scale: E mail@zedfactory.com

05/19/2023 www.zedfactory.com

比例 (@ A1)

1 : 100

B3 South West Elevation 和西

Do not scale, use figured dimensions only. Unless stated Ground Floor FFL: +0.00m otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade 1 :ZEDfactory, 100 21 Sandmartin Way, London SM6 7DF Contractor prior to any work and /or procurement being T 020 8404 1380 F 020 8404 2039 undertaken C Copyright ZEDfactoryE2023 mail@zedfactory.com www.zedfactory.com

2

Ground Floor FFL: +0.00m

A1

ZEDfactory

B3 South West Elevation 和西

Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken C Copyright ZEDfactory 2023

2

1 : 100

C Copyright ZEDfactory 2023

A1

First Floor FFL: +4.00m Ground Floor FFL: +0.00m

Ground Floor FFL: +0.00m

B3-J

3600

5200

3600

3600

3600

B3-I

3600

1 : 100

Top Of Roof: +18.00m

B3-J

3600

checked by:

比例 DF(@ A1)

1 : 100

图纸号 版本 ZEDfactory B 374-B3-04-300 ZEDfactory, 21 Sandmartin Way, London SM6 7DF Drawing Number:

C Copyright ZEDfactory 2023

1

B3-C

3600

B3-B

- 南太行白鹿零碳小镇 Service Centre - Sections AA - BB - CC 剖面AA BB CC

B3 Section AA 剖面AA A1

18000

and Mezzanine FFL: +12.00m White Title: Deer VillageMEP at Southern Taihang Mountain Drawing Second Floor FFL: +8.00m

Second Floor FFL: +8.00m First Floor FFL: +4.00m

Second Floor FFL: +8.00m First Floor FFL: +4.00m

2000

MEP and Mezzanine FFL: +12.00m

1000 1000 2000 27001000 1000

4000 4000 4000

7700

First Floor FFL: +4.00m Ground Floor FFL: +0.00m

18000

Top Of Roof: +18.00m 甲方 WINRUN GROUP - 万润集团 Project: 工程名称 Client:

issued for:

Transfer Beam

B3-B

3600

B3-A

Top Of Roof: +18.00m

2000

4000 4000

18000 7700

Second Floor FFL: +8.00m First Floor FFL: +4.00m

B3-A

Top Of Roof: +18.00m

Transfer Beam

Detail 1

MEP and Mezzanine FFL: +1 Second Floor FFL: +8.00m

1 : 100

Client:

Detail 1

MEP and Mezzanine FFL: +1

South East Elevation

1 : 100

B3 South East Elevation 东南 1

4000

18000 10300

MEP and Mezzanine FFL: +12.00m Second Floor FFL: +8.00m

18000

4000 4000 4000 Ground Floor FFL: +0.00m

6000

MEP and Mezzanine FFL: +12.00m

1100 Top Of Roof: +18.00m

B3 South East Elevation 东南 1

11300

3600

B3-D

3200

8000

First Floor FFL: +4.00m Ground Floor FFL: +0.00m

11300

6000

3600

B3-C

10300

Top Of Roof: +18.00m

B3-B

3200

8000

Second Floor FFL: +8.00m First Floor FFL: +4.00m

Top Of Roof: +18.00m

B3-A

3200

Top Of Roof: +18.00m

10000

B3-C

B3 Section BB 剖面BB Top Of Roof: +18.00m

1100

6000

B3-B

1 : 100

MEP and Mezzanine FFL: +12.00m Second Floor FFL: +8.00m

Elevations

B3-A

Section C-C

B3 Section CC 剖面CC 3

4000

4000 Ground Floor FFL: +0.00m

Section B-B

1 : 100

18000

12000 4000 4000 2000 4000

1500

First Floor FFL: +4.00m Ground Floor FFL: +0.00m

2500

4000

Top Of Roof: +18.00m

B3-1

11800

MEP and Mezzanine FFL: +12.00m

4000 4000

2000 4000

2500 2000

Detail 2

B3 Section BB 剖面BB

2

Plans, Elevations, and Diagram Layout Building Boundary Amendment

4000

17930

2000 1500 2000

Second Floor FFL: +8.00m First Floor FFL: +4.00m

Ground Floor FFL: +0.00m

2

19052023

18000

17930

2000

18000 4000 4000 4000 4000

Sections

MEP and Mezzanine FFL: +12.00m Second Floor FFL: +8.00m

Detail 2

First Floor FFL: +4.00m Ground Floor FFL: +0.00m

27042023

B

6000

12000

MEP and Mezzanine FFL: +12.00m

10000

4000 Second Floor FFL: +8.00m First Floor FFL: +4.00m

18000

MEP and Mezzanine FFL: +12.00m Second Floor FFL: +8.00m

Top Of Roof: +18.00m

A 1100

6000

MEP and Mezzanine FFL: +12.00m

B3-1

1100

B3-2

10000

3200

B3-2

3200

B3-3

MEP and Mezzanine FFL:

MEP and Mezzanine FFL: Second Floor FFL: +8.00m

1300

3200

Top Of Roof: +18.00m

10000

Top Of Roof: +18.00m

3200

B3-3

3200

B3-4

2700

1100

3200

B3-5

Second Floor FFL: +8.00m First Floor FFL: +4.00m

1300 1500

1100

6000

3200

B3-4

11800

6000

3200

6000

3200

B3-5

1100

B3-6

Plans, Elevations, and Diagram Layout

2700 2500

11800 1100

B3-6

Plans, Elevations, and Diagram Layout

X

First Floor FFL: +4.00m Ground Floor FFL: +0.00m

1500

B3-2

South West Elevation

2500

B3-3

66°

B3-4

66°

B3-5

66°

B3-6

66°

B3-6

66°

B3-5

Amendments

66°

B3-4 13940

Top Of Roof: +18.00m 22122022 Drawing Layout

66°

B3-3

Plans, Elevations, and Diagram Layout -

Building Boundary Amendment 设计变更内容

Date

66°

B3-2

Drawing Layout

27042023

Rev

66°

B3-1

22122022

B 日期 19052023 版本

60 °

B3-1

1100

60 °

B3-2

3200

66°

B3-3

3200

66°

B3-4

3200

66°

B3-5

1100 Top Of Roof: +18.00m

66°

B3-6

1100

66°

B3-6

A

3200

66°

B3-5

11800

3200

Amendments

6000

B3-4 13940 11800

Top Of Roof: +18.00m

设计变更内容

Date

10000

B3-3

3200

Rev

10000

B3-2

1100

版本 日期

4000 4000

B3-1

T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com

10300

1 : 75

C Copyright ZEDfactory 2023

ZEDfactory, 21 Sandmartin Way, London SM6 7DF

18000

1 A1

Bedroom 2 Ladder Access to Mezzanine

比例 (@ A1)

ZEDfactory

大套间 02- Single En-suite Bedroom 小套间 03- Lounge 酒店前厅 04- Core Lobby 消防前室 05- Fire Escape Staircase 消防ࠡࠐ

66°

Second Floor Plan

03 Service Centre Second Floor 三层平面图 -酒店房间

1 : 75

B3-J

6000

B3-I

10300

B3-H

4000 4000

B3-G

B3-F

7700

B3-E

4000 4000

B3-D

7700

B3-C

4000

B3-B

版本

Drawing Number:

05/19/2023 B3-A

checked by:

DF

11300

drawn by/ update by:

MS

11300

issued for:

COORDINATION

Ground Floor FFL: +0.00m

53


+

Portfolio 2024

+ A. Mahdi Safieddine GH-A

GH-B

GH-C

GH-D

GH-E

GH-F

GH-G

GH-H

版本 日期 Rev

Date

设计变更内容

A

21072023

Updated Drawing Layout

Amendments

77600 12200

43400 18900

3400

16000

2400

6000

6000

28800

6000

6000

374-GH-04-300 B-B

6000

GH-1

Storage

仓储

9500

3000

13450

8600

5900

+8.00m

6000

22100

6000

374-GH-04-300 C-C

Greenhouse Area

2000 6000

Stair to Basement

厕所

通往地下室的楼梯

Kitchen

厨房 6000

14470

Toilets

5000

GH-2

Bride/Groom Dressing Room

新人更衣间

Reception

2100

2250

+6.60m

21800

GH-3

6000

6000

室外礼台

A-A 374-GH-04-300

6000

Outdoor Stage

30400

+7.20m

18000

礼台

17060

Stage

9000

+6.60m

UP

A-A 374-GH-04-300

3000

8660

18000

28000

49400

Plans

+6.60m

+8.00m

Wedding Hall

婚礼及活动主厅

GH-7

9000

Multi-purpose hall

多功能厅

9800

9800

20370

GH-6

2000

9500

3900 374-GH-04-300 C-C

GH-C

GH-D

Drawing Title:

issued for:

冷柜

冷库

Dry Stock

干货间

12200

2900

2900

+5.20m

8700

25600

12200

9100 6000

Scale:

比例 (@ A1)

1 : 150

Ground Floor Plan

16000

ZEDfactory

77600

3450

DF

版本

A

25/07/2023

22000

43400

GH-3 3250

Rev.

创建日期

Created:

checked by:

MS

图纸号 374-GH-04-100 Drawing Number:

9700

2000

UP

3400

drawn by/ update by:

COORDINATION

Chiller

6800

4800

Walk-in Freezer

GH-2

ZEDfactory, 21 Sandmartin Way, London SM6 7DF

374-GH-04-300 C-C

T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com

Green House Basement 主体建筑地下室 2

A1

图纸标题

Greenhouse - Ground Floor Plan 主体建筑地面层

10100

GH-1

Main Hall

甲方 WINRUN GROUP - 万润集团 Project: 工程名称 Client:

White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇

374-GH-04-300 B-B

3900

2000

GH-8

White Stag

6000

GH-5

374-GH-04-300 C-C

White Stag

GH-4

Green House Ground Floor Plan 主体建筑地面层 1

1 : 150

1 : 150

C Copyright ZEDfactory 2023

GH-H

GH-G

GH-F

GH-E

GH-D

GH-C

GH-B

42000 6000

6000

GH-H

6000

GH-G

6000

GH-F

6000

GH-E

6000

GH-D

版本 日期

设计变更内容

A 日期 版本 Rev

Date

设计变更内容

A

21072023

Updated Drawing Layout

Rev Date Amendments Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken21072023 Updated Drawing Layout Amendments

GH-A

6000

GH-C

GH-B

GH-A

42000 6000

6000

6000

6000

6000

6000

6000

2200

Top of Greenhouse: +20.60m

2200

Top of Structure: +18.40m Top of Greenhouse: +20.60m

6050

13400

6050

Top of Structure: +18.40m

4550

13400

Facade: +12.35m

Facade: +12.35m

600 4550

Water Pool Level: +7.20m Ground Level: +6.60m

North Elevation

Water Pool Level: +7.20m

600

Ground Level: +6.60m

Greenhouse North Elevation 北立面 1

1 : 100

Greenhouse North Elevation 北立面 1

GH-A

1 : 100

GH-B

GH-C

GH-D

GH-E

GH-F

GH-G

GH-H

42000 6000

6000

GH-A

6000

GH-B

6000

GH-C

6000

GH-D

6000

GH-E

6000

GH-F

GH-G

GH-H

42000

Top of Greenhouse: +20.60m

6000

6000

6000

6000

6000

6000

2200

6000

2200

Top of Structure: +18.40m Top of Greenhouse: +20.60m

甲方 WINRUN GROUP - 万润集团 Project: 工程名称 Client:

6050

Top of Structure: +18.40m

WINRUN GROUP - 万润集团 Project: 工程名称

White Deer Village at Southern Taihang Mountain

4550

13400

Elevations

6050

13400

White Deer Village at Southern Taihang Mountain Client: 甲方 - 南太行白鹿零碳小镇 Facade: +12.35m

版本 日期 图纸标题 设计变更内容 - 南太行白鹿零碳小镇

Drawing Title: Rev Date

Facade: +12.35m

South Elevation A

21072023 issued for: Drawing Title:

4550 600

Water Pool Level: +7.20m Ground Level: +6.60m

GH-8

GH-7

GH-6

GH-5

GH-4

GH-3

GH-2

3000

6000

6000

6000

6000

6000

Updated Drawing Layout drawn by/ checked by: update by:

图纸号 版本 日期 设计变更内容 drawn by/ A 374-GH-04-200 update by: Amendments Drawing Number: issued for: Rev Date

36000 Ground Level: +6.60m

图纸标题

COORDINATION MS ElevationsDF Greenhouse - North and South 主体建筑南北立面

GH-1

Water Pool Level: +7.20m

600

Amendments

Greenhouse - North and South Elevations 主体建筑南北立面

Rev.

COORDINATION

3000

版本

checked by:

MS

DF

Scale: 比例 (@ A1) 创建日期 Rev. 版本 1 : 100 A 21072023 Updated Drawing Layout A 374-GH-04-200 ZEDfactory ZEDfactory, London Created: (@ 7DF A1) 创建日期 21 Sandmartin Way,Scale: 比例SM6

Created:

25/07/2023 Drawing Number: 图纸号

2200

Top of Greenhouse: +20.60m

GH-8

GH-7

GH-6

GH-5

GH-4

GH-3

GH-2

GH-1

Top of Structure: +18.40m

25/07/2023 : 100 T 020 8404 1380 F 020 8404 1 2039

36000 3000

6000

6000

6000

6000

6000

E mail@zedfactory.com www.zedfactory.com

3000

ZEDfactory

Greenhouse South Elevation 南立面

A1

2

Top of Structure: +18.40m

1 : 100

Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

Facade: +12.35m

C Copyright ZEDfactory 2023

13400

4550 6050

The greenhouse area consists of agricultural activities, cafe, classrooms for children, and a main wedding and multi-purpose area. In addition to a vast landscape.

Greenhouse South Elevation 南立面 13400

A1

ZEDfactory, 21 Sandmartin Londonstated SM6 7DF Do not scale, use figured dimensionsWay, only. Unless otherwise, these8404 drawings design intent only and T 020 1380 represent F 020 8404 2039 approved drawings will be required from the Trade E assembly mail@zedfactory.com Contractor prior to any work and /or procurement being www.zedfactory.com undertaken

Top of Greenhouse: +20.60m

1 : 100

2200 6050

2

C Copyright ZEDfactory 2023

Facade: +12.35m Ground Level: +6.60m

4550

600

Water Pool Level: +7.2m

East Elevation

Greenhouse East Elevation 东立面 Water Pool Level: +7.2m

1 : 100

Ground Level: +6.60m

600

1

Greenhouse East Elevation 东立面 1

GH-1

1 : 100

GH-2

GH-3

GH-4

GH-5

GH-6

GH-7

GH-8

36000 3000

6000

6000

6000

6000

6000

3000

2200

Top of Greenhouse: +20.60m

GH-1

GH-2

GH-3

GH-4

GH-5

GH-6

GH-7

GH-8

Top of Structure: +18.40m

36000 3000

6000

6000

6000

6000

6000

甲方 WINRUN GROUP - 万润集团 Project: 工程名称 Client:

3000

2200 6050

13400

Top of Greenhouse: +20.60m

White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇 Top of Structure: +18.40m

甲方 图纸标题 WINRUN GROUP - 万润集团

Facade: +12.35m

Client:

Drawing Title:

13400

4550 6050

Greenhouse - East and West Elevations Project: 工程名称 主体建筑东西立面 White Deer Village at Southern Taihang Mountain for: drawn by/ -issued 南太行白鹿零碳小镇

600

Water Pool Level: +7.20m

update by:

MS

Drawing Number: 图纸号 图纸标题 374-GH-04-201

Facade: +12.35m Ground Level: +6.60m

Rev.

4550

Greenhouse - East and West Elevations Created: 创建日期 Scale: 比例 (@ A1) 主体建筑东西立面 25/07/2023 1 : 100 issued for:

600

Ground Level: +6.60m

GH-A

GH-B

GH-C

GH-D

GH-E

GH-F

GH-G

1 : 100 6000

6000

6000

6000

6000

6000

21072023 Updated Drawing Layout Created: Scale: (@ A1) Do not scale, use figured dimensions only. Unless stated 25/07/2023 otherwise, these drawings represent design 1 :intent 100 only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

2200

ZEDfactory

ZEDfactory, 21 Sandmartin Way, London SM6 7DF Top of Structure: +18.40m

Greenhouse West Elevation 西立面

T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com

1 : 100

Do not scale, use figured dimensions only. Unless stated otherwise, these drawings B Crepresent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

6050

2

比例

创建日期

A

6000

Top of Greenhouse: +20.60m

C Copyright ZEDfactory 2023

13400

A1

checked by:

ZEDfactory, 21 Sandmartin Way, London SM6 7DF Rev Date AmendmentsRev. Drawing Number: T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com

GH-H

42000

C Copyright ZEDfactory 2023

drawn by/ update by:

COORDINATION DF ZEDfactory MS 版本 日期 设计变更内容 图纸号 版本 A 374-GH-04-201

Water Pool Level: +7.20m

Greenhouse West Elevation 西立面

A1

DF

版本

A

Drawing Title:

2

checked by:

West Elevation COORDINATION

A

A

4550

Facade: +12.35m

B C

Water Pool Level: +7.20m

600

Ground Level: +6.60m

Greenhouse Section A-A 剖面AA A-A 1 : 100

GH-1

GH-3

GH-4

GH-5

GH-6

GH-7

Section A-A

GH-8

36000 6000

6000

6000

6000

6000

3000

2200

Sections

GH-2

3000

Top of Greenhouse: +20.60m

13400

6050

Top of Structure: +18.40m

4550

Facade: +12.35m

Water Pool Level: +7.20m

600

Ground Level: +6.60m

Greenhouse Section B-B 剖面 BB B-B 1 : 100

+6.60m

Section B-B 甲方 WINRUN GROUP - 万润集团 Project: 工程名称 Client:

GH-1

GH-2

GH-3

GH-4

GH-5

GH-6

GH-7

GH-8

36000 6000

6000

6000

6000

6000

White Deer Village at Southern Taihang Mountain - 南太行白鹿零碳小镇

3000

2200

3000

2200

Top of Greenhouse: +20.60m

Top of Structure: +18.40m

Drawing Title:

图纸标题

6050

6050

Greenhouse - Sections AA BB CC 剖面AA BB CC issued for:

13400

COORDINATION 16400

Facade: +12.35m

图纸号 374-GH-04-300 Drawing Number:

Created:

创建日期

5150

4550

25/07/2023

drawn by/ update by:

checked by:

MS

Rev.

DF

版本

A Scale:

比例 (@ A1)

As indicated

ZEDfactory ZEDfactory, 21 Sandmartin Way, London SM6 7DF

Greenhouse Section C-C 剖面 CC C-C 1 : 100 A1

54

C Copyright ZEDfactory 2023

T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com

Ground Level: +6.60m

3000

600

Water Pool Level: +8.00m

Basement Level: +3.6m

Section C-C Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

55


+

Portfolio 2024

+ A. Mahdi Safieddine PRODUCED BY AN AUTODESK STUDENT VERSION

Detailed Plan

below : GF Plan

N

下图:地面平面

2

7800

2600 1300

设计变更内容

Amendments

2600

6

1300

Date

4

2600

5

1300

3

日期

Rev

1300

7

1300

750

1300

2900

SEC A-A PT103-4-111

4150

SEC B-B PT103-4-112

Lake Cabins

1

版本

Detail 01 PT103-4-113

D

310

Detail 02 PT103-4-113

1575 705 ED 01

Note: - Any errors or inconsistencies found on the approved drawings or changes made to the approved drawings relating to information issued by the architects on these sheets must be reported to the Architect before work is carried out. - It is the responsibility of the recipient to ensure the drawings are printed to the correct scale.

The lake cabins were the first set of building to be constructed on the site.

ALL DIMENSIONS AND SPECIFICATIONS SHOULD BE VERIFIED BY the CONTRACTOR BEFORE ACTUAL CONSTRUCTION BEGINS.

2560

150

3250 X

Detail 04 PT103-4-114

ID 06

3480

6350

B

3100

C

1200

EW 02

Detail 03 PT103-4-114

Client: 甲方

UK DIT

Project: 工程名称

1550

Henan Cabin Detail 05 PT103-4-114

Detail 06 PT103-4-114

SW 02

310

SW 01

Drawing Title: 图纸标题

A

All the technical and detail drawings have been made to ZEDfactory achieve this result, exterior and interior design was made and executed to meet the requirements.

GF Plan 地面平面

3300

Construction

SEC B-B PT103-4-112

SEC A-A PT103-4-111

issued for:

1200

1400

1200

MS

DF

Rev. 版本

X

Created: 创建日期

Scale: 比例

15/07/2022

700

checked by:

drawn by/ updated by:

Drawing Number: 图纸号

PT103/4/110

PRODUCED BY AN AUTODESK STUDENT VERSION

1:20@A1 & 1:40@A3

ZEDfactory, 21 Sandmartin Way, London SM6 7DF T 020 8404 1380 F 020 8404 2039 日期 设计变更内容 E mail@zedfactory.com Rev Date Amendments www.zedfactory.com

Detailed Section

版本

below : Section AA

Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

下图:AA 剖面 图片

C Copyright ZEDfactory 2019

D

C

B

A

PRODUCED BY AN AUTODESK STUDENT VERSION

A1

White Stag

WD 05

2560

PRODUCED BY AN AUTODESK STUDENT VERSION

White Stag

Y

PRODUCED BY AN AUTODESK STUDENT VERSION

3100

1550

NW 04

6350

3100

150

3100

Detail 13 PT103-4-115

Interiors

Detail 10 PT103-4-115

Initial Design

Detail 12 PT103-4-115

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

Detail 08 PT103-4-115

Note: - Any errors or inconsistencies found on the approved drawings or changes made to the approved drawings relating to information issued by the architects on these sheets must be reported to the Architect before work is carried out. - It is the responsibility of the recipient to ensure the drawings are printed to the correct scale.

Technical Design

Steel Structure Layout

ALL DIMENSIONS AND SPECIFICATIONS SHOULD BE VERIFIED BY the CONTRACTOR BEFORE ACTUAL CONSTRUCTION BEGINS.

Client: 甲方

UK DIT

Project: 工程名称 Detail 07 PT103-4-115

Henan Cabin

Detail 09 PT103-4-115

Detail 11 PT103-4-115

Drawing Title: 图纸标题

Section AA / AA 剖面 图片 issued for:

Construction Drawing Number: 图纸号

Well Insulated

checked by:

drawn by/ updated by:

MS

DF

Rev. 版本

PT103/4/111

X

Created: 创建日期

Scale: 比例

15/07/2022

1:10@A1 & 1:20@A3

ZEDfactory ZEDfactory, 21 Sandmartin Way, London SM6 7DF T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com

PRODUCED BY AN AUTODESK STUDENT VERSION

Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

C Copyright ZEDfactory 2019

below : Detail 08

below : Detail 10

版本

日期

Rev

Date

设计变更内容

Amendments

Different Layouts

PRODUCED BY AN AUTODESK STUDENT VERSION

A1

下图:节点08

下图:节点10

Details

Hot- dip galvanised steel 热浸镀锌钢 1.5mmEPDM tanking Water Proof Membrane (roof) 1.5mm厚EPDM橡胶防水卷材 8mm Mgo Board 8mm玻镁板 30mm Cavity Ventilation Void 30mm 立面通风层 50mm Soft Rockwool Insulation Fixings between the steel stud 50mm厚软岩棉保温层塞满钢结构龙骨间空隙 50mm Timber stud 50mm 木龙骨 ATL Wraptite external air tightness barrier

Metal flashing to spec 金属片参见规格

PV roof to spec: 光伏屋面参见规 Metal flashing to spec 金属片参见规格

单向汽密膜

1.5mmEPDM tanking Water Proof Membrane (roof) 1.5mm厚EPDM橡胶防水卷材 100x100mm Steel Beam 100X100mm热镀锌方钢

100x100mm Steel Column 100X100mm热镀锌方钢

8mm Mgo Board

Zero-energy

8mm玻镁板

50mm Rockwool Insulation 50mm厚岩棉保温层 Spruce timber wall finish 云杉木墙完成面

1.5mmEPDM tanking Water Proof Membrane (roof) 1.5mm厚EPDM橡胶防水卷材

50mm Timber stud

50mm 木龙骨

50x50mm Steel Column 50X50mm热镀锌方钢

ATL Wraptite external air tightness barrier 单向汽密膜 RHEINZINK black matt cladding 黑色亚光莱茵辛克镀锌板

Spruce timber wall finish 云杉木墙完成面 100mm Rockwool Insulation 100mm 厚岩棉保温层 8mm Mgo Board

8mm玻镁板

ATL Wraptite external air tightness barrier 单向汽密膜 50mm Soft Rockwool Insulation Fixings between the steel stud 50mm厚软岩棉保温层塞满钢结构龙骨间空隙

PRODUCED BY AN AUTODESK STUDENT VERSION

Outside 外

Water Proof Membrane 防水卷 RHEINZINK black matt cladding 黑色亚光莱茵辛克镀锌板 Inside 内

below : Detail 07

Expanding Foam Insulation around Door/ window opening 延门窗洞口周围的膨胀保温发泡胶

10mm玻镁板

Water Proof Membrane 防水卷 Insect mesh

Spruce timber floor finish 云杉木地板

10mm Mgo Board

10mm玻镁板

50mm Rockwool Insulation 50mm厚岩棉保温层 10mm Mgo Board

10mm玻镁板

ATL Wraptite external air tightness barrier 单向汽密膜 50mm Soft Rockwool Insulation Fixings between the studs 50mm厚软岩棉保温层塞满钢结构龙骨间空隙 10mm Cavity Ventilation Void 10mm 立面通风层 10mm Mgo Board

10mm玻镁板

Water Proof Membrane 防水卷 C Copyright ZEDfactory 2019

Note: - Any errors or inconsistencies found on the approved drawings or changes made to the approved drawings relating to information issued by the architects on these sheets must be reported to the Architect before work is carried out. - It is the responsibility of the recipient to ensure the drawings are printed to the correct scale. ALL DIMENSIONS AND SPECIFICATIONS SHOULD BE VERIFIED BY the CONTRACTOR BEFORE ACTUAL CONSTRUCTION BEGINS.

50x50mm Steel Column 50X50mm热镀锌方钢 Spruce timber wall finish 云杉木墙完成面

Client: 甲方

UK DIT

100mm Rockwool Insulation 100mm 厚岩棉保温层

Project: 工程名称

50mm Timber stud

Henan Cabin

8mm Mgo Board

50mm 木龙骨 8mm玻镁板

ATL Wraptite external air tightness barrier 单向汽密膜

防虫网

Paving support spacers (to hold up spruce timber floor finish) 支撑云杉木地板的垫块

RHEINZINK black matt cladding 黑色亚光莱茵辛克镀锌板

Outside 外

10mm Mgo Board 10mm玻镁板 50mm Rockwool Insulation 50mm厚岩棉保温层 ATL Wraptite external air tightness barrier 单向汽密膜

Water Proof Membrane 防水卷

Inside 内

Spruce timber floor finish 云杉木地板 Paving support spacers (to hold up spruce timber floor finish) 支撑云杉木地板的垫块

50mm Soft Rockwool Insulation Fixings between the steel stud 50mm厚软岩棉保温层塞满钢结构龙骨间空隙 10mm Cavity Ventilation Void 10mm 立面通风层 10mm Mgo Board 10mm玻镁板

100x200mm Steel Beam 100X200mm热镀锌方钢

Outside 外

下图:节点09 Inside 内

10mm Mgo Board

ATL Wraptite external air tightness barrier 单向汽密膜

Inside 内

below : Detail 09

下图:节点07

Outside 外

Can me built and moved PRODUCED BY AN AUTODESK STUDENT VERSION

Expanding Foam Insulation around Door/ window opening 延门窗洞口周围的膨胀保温发泡胶

Insect mesh

防虫网

50mm Soft Rockwool Insulation Fixings between the steel stud 50mm厚软岩棉保温层塞满钢结构龙骨间空隙 Water Proof Membrane 防水卷 RHEINZINK black matt cladding 黑色亚光莱茵辛克镀锌板

Drawing Title: 图纸标题

Details 7-8-9-10 节点7-8-9-10 issued for:

Construction Drawing Number: 图纸号

drawn by/ updated by:

checked by:

MS

DF

Rev. 版本

PT103/4/115

X

Created: 创建日期

Scale: 比例

15/07/2022

1:5@A1 & 1:10@A3

ZEDfactory ZEDfactory, 21 Sandmartin Way, London SM6 7DF T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

A1

PRODUCED BY AN AUTODESK STUDENT VERSION

56

57


+

Portfolio 2024 1

N 1530

2600

2600

1300 300

400

400

300

300

400

1300 400

Rev

2600

1300 400

400

400

1530

1300 400

300

300

400

1300 400

400

400

400

TCAR100x5

设计变更内容

Date

Amendments

A

11.05.21

Amended from one to double cabin units

B

18.05.21

Amended floor beams

300

100

175

1300 400

TREC200x100x10

100 50 100

D

400

+ A. Mahdi Safieddine 版本 日期

2

CAE50x5

CAE50x5

CAE50x5

1550

550

0 4x5

3000

CAE50x5

3100

FL

TCAR100x5

TCAR100x5

0 4x5

TCAR100x5

CAE50x5

TCAR100x5

FL

FL

550 50 50

550

0

600

4x5

0

0

TREC100x50x3.2

FL

4x5

4x5

600

FL

FL

TREC100x50x3.2

4x 50

50

1550

600

TREC100x50x3.2

150

150

6450

50 100 100

1550

TREC100x50x3.2

350

TCAR100x5

TCAR100x5

3100

CAE50x5

TREC100x50x3.2

TREC100x50x3.2

TREC100x50x3.2

TREC100x50x3.2

TREC100x50x3.2

TREC100x50x3.2

TREC100x50x3.2

TREC100x50x3.2

TREC100x50x3.2

TREC100x50x3.2

TREC100x50x3.2

TREC100x50x3.2

TREC100x50x3.2

TREC100x50x3.2

TREC100x50x3.2

CAE50x5

TREC200x100x10 CAE50x5

3000

150

CAE50x5

CAE50x5

TREC200x100x10

50 550

6350

CAE50x5

TREC100x50x3.2

TREC100x50x3.2

50

600

B

550

600

TREC100x50x3.2

C

TREC100x50x3.2

TREC100x50x3.2

550

600

50

1550

TREC100x50x3.2

600

4x 50

TREC100x50x3.2

600

550

600

TREC100x50x3.2

350

TREC100x50x3.2

TREC100x50x3.2

TCAR100x5

100 225 50 100

350

50

350

1225

1580

50

350 50

50

350

50 1225

350

50 225 100 225 50 100

350

50 1225

350

50

350 50

50

350

50

350

50 225 100 225 50

1225

100

350

50

350

50

1225

350 50

50

350

50

350

1225

50 250 50 100

1430

7800

甲方 UK DIT Pproject: 工程名称 Client:

100

TREC100x50x3.2

TREC100x50x3.2

TREC100x50x3.2

TREC100x50x3.2

TREC100x50x3.2

TREC100x50x3.2

TREC100x50x3.2

CAE50x5

CAE50x5 TREC200x100x10

TCAR100x5

1430

TREC100x50x3.2

CAE50x5

TREC100x50x3.2

100

TREC100x50x3.2

TREC100x50x3.2

TREC100x50x3.2

TREC100x50x3.2

TREC100x50x3.2

TREC100x50x3.2

550

TREC100x50x3.2

TREC100x50x3.2

600

50

1550 600 175

100 100 50

A

TREC100x50x3.2

TREC100x50x3.2

100

Tianjing Exhibtion

1580

10960

Drawing Title:

Structure Framing Schedule Count

1 A1

Excavation

Details

Structural Framing _ Floor Plan-地板钢架结构平面 1 : 20

C Copyright ZEDfactory 2019

Type

CAE50x5 24 CAE50x5 4 CAE50x5 FL 4x50 12 FL 4x50 4 FL 4x50 TCAR50x5 41 TCAR50x5 14 TCAR50x5 15 TCAR50x5 8 TCAR50x5 18 TCAR50x5 18 TCAR50x5 TCAR100x5 10 TCAR100x5

Cut Length

Structural Material

2500 3000

Metal - Steel - 345 MPa Metal - Steel - 345 MPa

4000 8226

Structural Steel - S235 Structural Steel - S235

1225 1425 1430 2095 3012 3290

Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa

1468

Metal - Steel - 345 MPa

Structure Framing Schedule Count

Type

9 TCAR100x5 5 TCAR100x5 6 TCAR100x5 1 TCAR100x5 5 TCAR100x5 TREC100x50x3.2 16 TREC100x50x3.2 36 TREC100x50x3.2 TREC200x100x10 4 TREC200x100x10 250

Cut Length

White Stag

TREC100x50x3.2

TREC100x50x3.2

White Stag

600

TCAR100x5

CAE50x5

TCAR100x5

FL

TCAR100x5

TCAR100x5

FL

FL

CAE50x5

TCAR100x5

4x 50

4x 50

1550

550 50 550

600

0 4x5

50

FL

0 4x5

0 4x5

TREC100x50x3.2

FL

FL

600

TREC100x50x3.2

Structural Material

3000 3174 3288 6450 7700

Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa

1430 3000

Metal - Steel - 345 MPa Metal - Steel - 345 MPa

7700

Metal - Steel - 345 MPa

图纸标题

Structural Framing _ Floor Plan-地板钢架结构平面 issued for:

Coordination Drawing Number: 图纸号 PT103/6/100 Created:

创建日期

09/08/2022

drawn by/ update by:

checked by:

MS

Rev.

DF

版本

B

比例

Scale: 1:20@A1 & 1:40@A3

ZEDfactory ZEDfactory, 21 Sandmartin Way, London SM6 7DF T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com

Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

Steel Structure detail drawings with specifications and quantities.

Construction Process of the Lake Cabins

Constructed Cabin

Cladding

Insulation

Lake Cabins 58

Exterior

Interior

59


+

Portfolio 2024

+ A. Mahdi Safieddine

+ 06 Urban Design of Wugang Yungu Metropolis Ring

Time Capsule

[Professional Experience - Atelier Lei Guo]

+ Brief 2023

Location: Wuhan, China Stage: RIBA 1-3 The site is located in the core area of Future Sci-Tech City in Yuhang District, Hangzhou. It is the strategic intersection of ‘Corridor, Axis’, where Chengxi Sci-Tech Innovation Corridor meets Millennium Development Axis of Yuhang, and the important new function center in the main urban area. The layout of emerging industries should feature headquarters economy, sci-tech R&D and “double innovation (cultural innovation and scientific innovation)”, and coordinate functional formats, industrial development, planning layout, transportation organization, landscape environment and other factors. In the design, consideration to production, life and ecology should be given while highlighting creativity and implementation. And a functional diversified, harmonious and symbiotic demonstration area for transformation and upgrading will be built.

+ Design Proposal With limited time to complete the requirements, the main idea was to create a centered metropolis in the industrial area, keeping a little bit of heritage of whats existing and transforming whats there to modern units, a social hub for all users to get together and experience the lifted gardens, enjoy the activities and networks all surrounded by commercial structure. Clusters are created within the master plan, the Oval shape is main feature and around it are the residential units, offices, hotels and commercial spaces.

+ 60

Super Service Hub 61


+

Portfolio 2024

Original Layout

+ A. Mahdi Safieddine

Birds-eye Masterplan

The main urban site is located next to Wuhan Railway station, a main point for user access. The area is covered with old industrial factories that need to be turned into a social hub for users and in the surrounding area a mixture of social, economical, and living facilities. Some recently built units need preservation and are a main factor to keep on the site. The figure above shows the distribution of the urban layout.

The birds-eye render above is the urban design proposal for the site (figure on the left shows the existing condition of the site). A huge oval structure will cage the industrial area creating a green social hub for users, with commercial units, activity facilities, and kiosks surrounding the area.

Internal Use

Some of the existing facilities that need preserving, following the same structural design.

The design process, development, and the making of this project was made within 1 week, my contribution was creating the 3D model, producing all necessary drawings and generating the 3D renders of the entire project.

62

63


+

Portfolio 2024

+ A. Mahdi Safieddine

+ 171 BIPV Panels (300 kWp each) Generating a total of 290.2 MWh annually.

07 ZED Quba Mosque

Zero energy Masjid and Education center

Mosque

Mosque

[Professional Experience - ZEDPower]

Outdoor prayer area viewing the city.

Web Welding Steel Structures.

+ Brief

Accessible green roof.

2023-2024

Learning children can see the lecture below and prayers.

Location: Hayes, London, UK. Stage: RIBA 1-4

Void to allow natural ventilation to cross between levels.

Quba Masjid & Education Centre is an Islamic organization that focuses on educational, religious, and social activities. The number of weekly visitors to the mosque has increased especially those attending the Friday prayers. An extension to the mosque is needed with a requirement that the building would become zero-energy and focuses on renewable sources to decrease the carbon footprint. Extra facilities horizontally and vertically were required.

Double height space for open conferences or lectures.

Birds-eye View

+ Design Proposal The initial mosque building was an industrial factory, later transformed to a mosque and education center. So the main structure and slabs were designed and constructed by another practice, we had the freedom to remove partitions and extend the spaces to achieve our design. The main focus was achieving our design with the least amount of damage and cost. By adding skylights and double height spaces, we can achieve natural lighting and ventilation, in addition to the connectivity of the spaces where young learners can watch the adults attending the prayers and lectures. Additional fire escapes and access points which makes it easier of male and female visitors.

Naturally lighted area for the Imam and the people praying.

Extra facilities for washing, storage, and escapes.

Main Prayer hall, can be turned into smaller facilities.

Multipurpose hall for praying, celebrations, lectures, and more.

By applying a BIPV Canopy over the roof connected to the main existing structure and applying the same construction method we achieve a building that generates energy and additional spaces.

+ 64

Exploded Layout 65


+

Portfolio 2024

+ A. Mahdi Safieddine

Final Outcome

Drawings

Interiors and Common Spaces

A

B

C

D

E

F

G

REV.

H

I

J

K

DATE

AMENDMENTS

L

36695 3300

4000

4000

4000

4000

3750

1500

2700

4000

3500

1945

01 1500

01

02 1290

02

03

04

6210

16890

04

Mosque

Mosque

3140

03

05

4750

05

Client:

QUBA Masjid

06

06

Project:

ZED_QUBA Masjid

Drawing Title:

ZEDquba_masjid_set1 drawn by/ updated by:

issued for:

INFORMATION B

D

C

E

F

H

G

I

J

K

L

BD

Rev.

ZC / 2 / 022

A

Created: 08/11/2023

Scale: 1:150 @ A3

ZEDpower

Ground Floor Plan

Ground Floor Plan 1:150

checked by:

MS

Drawing Number: REV. DATE AMENDMENTS

A

ZEDpower, 21 Sandmartin Way, London SM6 7DF T 020 8404 1380 F 020 8404 2039 E mail@zed-power.com www.zed-power.com Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

A

B

D

C

E

F

H

G

I

J

K

L

36695 3300

4000

4000

4000

4000

3750

1500

2700

4000

3500

1945

01 1500

01

02

1290

REFUGE

02

03

3140

03

REFUGE

04

6210

16890

04

05

4750

REFUGE

05

Client:

QUBA Masjid

06

06

Project:

ZED_QUBA Masjid

Drawing Title:

REV.

DATE

AMENDMENTS

ZEDquba_masjid_set1

drawn by/ updated by:

issued for:

INFORMATION A

B

D

C

E

F

H

G

I

J

K

L

First Floor Plan

Sections

DO NOT SCALE FROM DRAWING WORK TO FIGURED DIMENSIONS ONLY ALL EXISTING DIMENSIONS TO BE CHECKED ON SITE DRAWN ON AUTOCAD LT LAYERS ON THIS DRAWING COMPLY WITH BS 1192

Details

checked by:

MS

BD

Drawing Number:

Rev.

ZC / 2 / 022

A

Created: 08/11/2023

Scale: 1:150 @ A3

ZEDpower

ZEDpower, 21 Sandmartin Way, London SM6 7DF T 020 8404 1380 F 020 8404 2039 E mail@zed-power.com www.zed-power.com

First Floor Plan 1:150

Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

A

B

C

D

E

F

G

H

I

J

K

L

36695 3300

4000

4000

4000

4000

3750

1500

2700

4000

3500

1945

DO NOT SCALE FROM DRAWING WORK TO FIGURED DIMENSIONS ONLY ALL EXISTING DIMENSIONS TO BE CHECKED ON SITE DRAWN ON AUTOCAD LT LAYERS ON THIS DRAWING COMPLY WITH BS 1192

01 1500

01

02

1290

REFUGE

02

03

REFUGE

3140

03

04

6210

16890

04

C

C

D

D

05

05

REFUGE

B

B

4750

A

A

Client:

QUBA Masjid

06

06

Project:

ZED_QUBA Masjid

Drawing Title:

REV.

DATE

AMENDMENTS

ZEDquba_masjid_set1 issued for:

INFORMATION Drawing Number:

A

B

D

C

E

F

H

G

I

J

K

L

Second Floor Plan

drawn by/ updated by:

checked by:

MS

BD

Rev.

ZC / 2 / 022

A

Created: 08/11/2023

Scale: 1:150 @ A3

ZEDpower

ZEDpower, 21 Sandmartin Way, London SM6 7DF T 020 8404 1380 F 020 8404 2039 E mail@zed-power.com www.zed-power.com

Second Floor Plan 1:150

Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

A

D

C

E

F

H

G

I

J

K

L

36695 4000

4000

4000

4000

3750

1500

2700

4000

3500

1945

178

60

30

25

1500

01

02

Rev

Date

02 1290

178

207

60

102

60

60

01

40

40

40

134

60

207

207

60

134

60

134

457

40

40

60

207

B

3300

40

40

30

60

30

Slab Details

25

60

40

40

30

60

207

60

30

30

207

30

40

30

03

Author / Ckd

Notes

03

BURKE RICKHARDS 91 North Hill Plymouth PL4 8JT T (01752) 266111 www.burkerickhards.co.uk

Quba Islamic and Education Trust

CLIENT

REFUGE

102

3140

134

191

04

04

Quba Islamic and Education Centre Structural plans. Details CT NOV 2014 -

AUTHOR DATE CHKD Chartered Architects

Leisure Consultants

Rev

REV

-

SCALE

1:10 @ A1

Project Managers

Date

Author / Ckd

Notes

BUILDING REGS

BURKE RICKHARDS

2116/355 Cost Consultants

16890

JOB REF

DETAIL

6210

134

91 North Hill Plymouth PL4 8JT T (01752) 266111 www.burkerickhards.co.uk

191 CLIENT

Quba Islamic and Education Trust

JOB REF

Quba Islamic and Education Centre

DETAIL

Structural plans. Details

AUTHOR DATE CHKD Chartered Architects

CT NOV 2014 Leisure Consultants

REFUGE

05 REV

-

SCALE

1:10 @ A1

Project Managers

05

2116/355 4750

134

457

BUILDING REGS

Cost Consultants

Client:

Beam Details

QUBA Masjid

06

06

Project:

ZED_QUBA Masjid

Drawing Title:

ZEDquba_masjid_set1 issued for:

INFORMATION Drawing Number:

A

B

C

D

E

F

G

H

I

J

K

L

Roof Plan

drawn by/ updated by:

checked by:

MS

BD

Rev.

ZC / 2 / 022

A

Created: 08/11/2023

Scale: 1:150 @ A3

ZEDpower

ZEDpower, 21 Sandmartin Way, London SM6 7DF

66

T 020 8404 1380 F 020 8404 2039 E mail@zed-power.com www.zed-power.com

Third Floor Plan 1:150

67

Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken


+

+ A. Mahdi Safieddine

Mosque

Portfolio 2024

Perspectives

Elevations

West Elevation

East Elevation

South Elevation

68

North Elevation

69


+

Portfolio 2024

+ A. Mahdi Safieddine

+ 08 Living Water: Educational and Research Center Living Water

[MArch II Design Thesis Project - Urbanism Unit: Healthy Cities]

Living Water

Contaminations, Viruses, and Wellbeing

+ Brief

2020-2021

Our Design Studio was invited to discuss the key concepts of health and the city during the final year of the MArch program. As a group, a master plan was developed and the key health and well-being issues were focused throughout. Health was assessed in the physical, social, and mental spheres. We thought a healthier city could be tackled and based on it. In my project, I chose to concentrate on social and mental health in a certain part of the city and physical health to look at our unhealthy relationship and lack of virus awareness. The virus is regarded as a taboo issue, something to fear or to avoid, a simple example is that of a “hospital,” a place to be healed, but the place to visit is most feared, but why? The design for viruses, reserve buildings, or platitudes has been expressed in this.

+ Design Proposal Arriving at this location in the Old Market district, a water research center for viruses and contaminations in based there next to the stream of river. But, not just offering research facilities and enclosed spaces, but rather open public spaces for all the users to come, socialize, meditate, and get informed of whats new concerning infections, new discoveries in the water they drink and basic knowledge. The building offers activities and facilities for everyone, acting as a social hub in the public area, education spaces in the semi public spaces, and the in depth sampling and researching in the private research facilities. As a random user visiting the site, it is an eye catching place to relax, it offers a journey with no dead ends within it, going up and down, left and right, discovering materials, textures, and culture. Be one with nature, and know about nature. Surely when someone hears “Virus research” it is directly translated to fear, here in this project it is the opposite, it invites people to engage, and know more. A person might be at greater risk of catching something (virus, infection...) if he is an ignorant.

+ 70

Site Layout 71


+

Portfolio 2024

+ A. Mahdi Safieddine

Playing with sound. Site analysis and developing the site with regards to sound waves.

Living Water

4

Living Water

+

Analysis

5 1

Dissecting the site As seen how each body has more than 4 sides, a random shape, but unique.

Understanding the focus area

Fig 38 Fig 36 Human Tears of Sadness

Fig 37 Human Eye Nerves

Human Bone Injury

Study area: Research Centers

6

Fig 41 Fig 39 Mitosis

Fig 40 Tobacco Mosaic Virus

Human Tears of Pain

Fig 44 Fig 42 Human Muscle Cells

2 3

Fig 43 Human Eye Nerves

SARS Virus

Patterns under the Lens

Man-made and Nature

+ 72

73


+

Portfolio 2024

+ A. Mahdi Safieddine

Plans

1

6

7

9 8

3

Living Water

1- Waiting area 2- Lounge 3- Terrace 4- Lobby 5- Offices 6- Showers 7- Exchange 8- Reception 9- Core 10- Stairs 11- Elec/mech room 12- Storage 13- Head Offices 14- Observatory 15- Laboratory 16- Research testing 17- Decontamination 18- Wash 19- Fire Escape 20- Terrace 21- WC facilities 22- Storages

5

2

10 11

12

4

17 13

16 18 15

14

22 20 19

21

10

+

11

4 5 3 6 12

8

7

2

13

14

9 1

16

15 17

Key: 1- Entrance Lobby 2- Auditorium 3- Stage 4- Eating/seating 5- Cafe 6- Exhibition space 7- Indoor garden 8- Canopy 9- Core 10- Storage 11- Loading 12- Exterior Canopy 13- Kiosks 14- Library 15- Foyer 16- Offices 17- WC 18- Control 19- Multi-purpose 20- Outdoor Exhibition

+

13 11 12

14

17

15

18 16

20

21

Key:

Living Water

+

Key: 1- Lecture hall 2- Lab workshop 3- Reception 4- Sanitization 5- Elec/mech room 6- Lab offices 7- Terrace 8- Research Lab 9- Wash 10- Lounge 11- Decontamination 12- Change 13- Fire escape 14- Work space 15- Staircase 16- Chemical testing 17- Water store 18- Equipment 19- Cleaning facility 20- Hallway 21- Store 22- Water Sampling

19

18 22

20 19

74

75


+

Portfolio 2024

+ A. Mahdi Safieddine

76

Living Water

Living Water

Details

77


+

Portfolio 2024

+ A. Mahdi Safieddine

+ 09 The Living Time Capsule Time Capsule

[MArch II Design Studio A - Bristol Archipelago: water-lines and fluid grounds]

+ Brief

Time Capsule

Reviving the Treasure

2019-2020

We were asked to study and survey, first in groups and then individually, a series of urban and suburban archipelagos, that is cluster of sites that present individual, local characteristics but are recognized as parts of, and connected to, the wider urban context by means of their relationship to a body of water. Considering how these areas define conditions of insularity and connectivity, which register across both natural and man-made situations and how they might propose new ways for understanding the urban landscape in its social, programmatic, environmental and/or formal dimension. This project will pro-ject, that is, it will constitute itself a positioning towards the city: its formal, social and environmental systems and the exchanges that take place between them.

+ Design Proposal The initial design response focuses initially on the creation of a hub that connects several sectors together, where the public is invited to experience and witness a new journey, while at the same time educate the ones who are curious to know more. By separating the building functions into three main hubs, starting with the main block, where it acts as the main access and attraction point where it connects to all the other facilities. It would be the start of the story, the journey within the site, the other connections would be activity spaces, exhibitions, working studios, and most importantly research facilities. Within the other spaces circulate the concepts of what a research center might offer, Initially the main target is health and wellbeing, the focus on the research and testing, and at the same time, in a more indirect way through the visitors. However, Work places are part of the initial idea and they would be located close to private spaces, since their respective users would benefit from them.

+ 78

Site Layout 79


+

Portfolio 2024

+ A. Mahdi Safieddine

Time Capsule

Time Capsule

Analysis

Creation of space through mapping. By placing the map of the area from different generations and picking out the solid and the void spaces, this helped in achieving what is occupied and what is not for a longer duration. All these led to the shape and size of the final proposed building.

Installation

Using model making through different materials and texture to extrude the site, by the help of abstract elements and objects reflecting our groups ideas of how each and every one of us viewed the site and its boundaries.

Journey Abstraction of spaces and their distribution, the journey throughout different levels and stages.

80

81


+

Portfolio 2024

+ A. Mahdi Safieddine

Plans

10

1- Multipurpose hall 2- Lecture hall 3- Storage 4- Documentary Hall 5- WC 6- Offices 7- Reception desk 8- Head office 9- Indoor gallery 10- Outdoor open space 11- Outdoor gallery

4

6

1

Time Capsule

7 8 9

5

Time Capsule

Key:

3

2

6

7

11

8 8

9

7

5

6

9

5

Continuing the journey from the main block, comes the workshop buildings on the ground floor level, the exterior is split into semi covered spaces and open spaces, however the open corridor in the middle is covered with a narrow bridge, scaffolding units, and dangling vines, however the interior spaces are protected due to the fact that the first floor slab is extruded from each side, covering the ground floor. The block on the left is a multi purpose hall for the workshops, for events and ceremonies.

1

3

7

4

8

11

5 6

9 12

14

20 10

13

15 16

17

18

19

4

Key:

2

1- Recycling Deck 2- Loading Deck 3- Lobby 4- Hallway 5- Bridge 6- Food kiosks 7- Electro/Mech room 8- Security 9- Storage/service 10- Exterior link 11- Core 12- Lounge 13- Outdoor seating 14- Juice bar 15- Security 16- Storage/service 17- Core 18- Seating area 19- Outdoor lounge 20- Indoor resting hut

Key: 123456789-

3

2

4

Core Services Elec/mech room Gathering Spaces Housing Pod Type 1 Single Housing Pod Type 1 Double Housing Pod Type 2 Single Housing Pod Type 2 Double Cluster Neighborhood

1 9

4

4

3 7

The main block at the ground level serves as the main attraction point for visitors, as it is the hub the connects to all other functions. Entering from the north face, the first thing to see would be the open plaza in the middle, with the several voids in the ceiling, surrounded by the food huts, kiosks, and souvenir shops, on the sides are the cores for the residential towers, where only residents can access, and proceeding the journey would lead to either one of the cafes, or taking a trip over the bridges or proceeding directly into the workshop buildings.

2 4

6 1

4

On this level of the residential block appears to have a cocoon hanging, this cluster of pods together form a type of neighborhood, enclosing on these units, it has its own social spaces and connections, however, other residential users can access it. This feature would create an enclosure within an enclosure, making each set of pods unique, with its own special characteristics, that its own user can benefit from.

8

5

82

83


+

Portfolio 2024

+ A. Mahdi Safieddine

Capsules

Layers

Single Residential Pod Unit 12.0m x 4.2m x 4.0m Heat Resistant, and Fully Insulated

Time Capsule

Time Capsule

Honeycomb Aluminum Panels

Triple glazed low E windows, preventing radiation from entering.

Aluminum Frames to hold glass and outer panels 0.1m x 0.1m Aluminum Panels, attached to steel pipes, as a shell for the pod

+ Wall Layers

84

85


+

Portfolio 2024

+ A. Mahdi Safieddine

+ 10 Solar Tree

Solar Tree

[Professional Experience (Exhibition) - ZEDFactory]

Solar Tree

Energy Tree Providing Shade

+ Brief

2021-2022

Solar Tree 1

ZED Solar trees provide shade, shelter and charging for ZEDelectric vehicles and electronics. It incorporates ZEDpower Lithium batteries. The solar-tree is a robust, freestanding, PV panel mounting system with a 3kWp self supporting solar charging structure that requires no foundations to be built. The solar tree has been designed to sit in streetscapes, parks and public spaces. It has been engineered to be robust, and both steel and recycled wood structures and toughened glass PV panels are very resilient to vandalism. It functions as street furniture, providing a bench, bike storage, planter and shelter.

+ Design Proposal

The first Solar tree is a combination of CNC cut boards, made as a series so that the pieces would fit together creating a wave form that would function as a bench, a stand, and a bike rack. In addition to PV panels on the top to charge the batteries. However, Solar tree 2 is made of recycled steel pipes. It acts as a bench, storage and for shading.

+ 86

Each Component is made of a repetitive set in order not to have so many pieces, it would be easy to construct. Construction planning was made through design development, an implementation strategy, processing, manufacturing,and finally assembling everything together. 87


+

Portfolio 2024

+ A. Mahdi Safieddine

Solar Tree

Solar Tree

Solar Tree 2

Initial design proposal 版本

N

日期

设计变更内容

Rev

Date

Amendments

A

11.05.21

Amended from one to double cabin units

B

18.05.21

Amended floor beams

5010.0

版本

5010.0

设计变更内容

Date

Amendments

A

11.05.21

Amended from one to double cabin units

B

18.05.21

Amended floor beams

1

6.0

1545.0

167

Final Product in use.

日期

Rev

.0 676

8.0

502

N

6.0

1545.0

N

5600.0 3580.0

3580.0

4840.1

5600.0

167

C:\Users\MSI\OneDrive\Desktop\20220809 construction drawings\PT103_Cabin_STR_OR_20220708(1)-Logoforstationary-15-792181.png

C:\Users\MSI\OneDrive\Desktop\20220809 construction drawings\PT103_Cabin_STR_OR_20220708(1)-Logoforstationary-15-792181.png

Client: 甲方

UK DIT

Client: 甲方

UK DIT

Pproject: 工程名称

Pproject: 工程名称

Tianjing Exhibtion

Count

3400.0

1 A1

Structural Framing _ Floor Plan- 地板钢架结构平面 1 : 20

Cut Length

Type

CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 TCAR100x5 10 TCAR100x5

C Copyright ZEDfactory 2019

A1

5100 1300 5100 1300 5100 1300 5100 1300 5100 1300 5100 1300

1

1468

Structural Material

Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235

Structure Framing Schedule Count

Type

9 TCAR100x5 5 TCAR100x5 6 TCAR100x5 1 TCAR100x5 5 TCAR100x5 TREC100x50x3.2 16 TREC100x50x3.2 36 TREC100x50x3.2 TREC200x100x10 4 TREC200x100x10 250

Cut Length

Structural Material

3000 3174 3288 6450 7700

Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa

1430 3000

Metal - Steel - 345 MPa Metal - Steel - 345 MPa

7700

Metal - Steel - 345 MPa

drawn by/ update by:

Coordination

Structure Framing Schedule

checked by:

MS

PT103/6/100 Created: 创建日期

DF

Count

Rev. 版本

B

N

Scale: 比例 1:20@A1 & 1:40@A3

09/08/2022

ZEDfactory

ZEDfactory, 21 Sandmartin Way, London SM6 7DF

T 020 8404 1380 F 020 8404 2039 E mail@zedfactory.com www.zedfactory.com Do not scale, use figured dimensions only. Unless stated otherwise, these drawings represent design intent only and approved assembly drawings will be required from the Trade Contractor prior to any work and /or procurement being undertaken

1

C Copyright ZEDfactory 2019

A1

N

Tianjing Exhibtion

475.0

issued for:

Drawing Number: 图纸号

Technical Drawings

Structural Framing _ Floor Plan- 地板钢架结构平面 Metal - Steel - 345 MPa 1 : 20

Structural Framing _ Floor Plan- 地板钢架结构平面

版本

Type

CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 TCAR100x5 1 : 20 10 TCAR100x5

Cut Length

Structural Material

5100 1300 5100 1300 5100 1300 5100 1300 5100 1300 5100 1300

Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235

1468

Metal - Steel - 345 MPa

Structure Framing Schedule Count

Structural Framing _ Floor Plan- 地板钢架结构平面

C Copyright ZEDfactory 2019

日期

设计变更内容

Rev

Date

Amendments

A

11.05.21

Amended from one to double cabin units

B

18.05.21

Amended floor beams

Type

9 TCAR100x5 5 TCAR100x5 6 TCAR100x5 1 TCAR100x5 5 TCAR100x5 TREC100x50x3.2 16 TREC100x50x3.2 36 TREC100x50x3.2 TREC200x100x10 4 TREC200x100x10 250

Cut Length

Structural Material

3000 3174 3288 6450 7700

Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa Metal - Steel - 345 MPa

1430 3000

Metal - Steel - 345 MPa Metal - Steel - 345 MPa

7700

Metal - Steel - 345 MPa

475.0

Structure Framing Schedule

Drawing Title: 图纸标题

Drawing Title: 图纸标题

Structure Framing Schedule

Structural Framing _ Floor Plan- 地板钢架结构平面 issued for:

Coordination

drawn by/

update by: Count MS

checked by:

DFType

ID=40 Drawing Number: 图纸号CHS OD=50 Rev. 版本

CHS OD=50 ID=40 PT103/6/100 24 BCHS OD=50 ID=40 4 CHS OD=50 ID=40 Created: 创建日期 Scale: 比例 2 CHS OD=50 ID=40 1:20@A1 & 1:40@A3 09/08/2022 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 4 CHS OD=50 ID=40 ZEDfactory ZEDfactory, 21 Sandmartin Way, CHS LondonOD=50 SM6 7DF 2 ID=40 T 020 8404 13804 F 020 8404 2039 CHS OD=50 ID=40 E mail@zedfactory.com 2 CHS OD=50 ID=40 www.zedfactory.com 4 CHS OD=50 ID=40 2 CHS OD=50 ID=40 Do not scale, use figured dimensions only. Unless stated otherwise, these drawingsTCAR100x5 represent design intent only and approved assembly drawings will be required from the Trade 10 TCAR100x5 Contractor prior to any work and /or procurement being

Cut Length

Structural Material

5100 1300 5100 1300 5100 1300 5100 1300 5100 1300 5100 1300

Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235 Structural Steel - S235

1468

Metal - Steel - 345 MPa

Structure Framing Schedu Count

Cut Length

Type

9 TCAR100x5 5 TCAR100x5 6 TCAR100x5 1 TCAR100x5 5 TCAR100x5 TREC100x50x3.2 16 TREC100x50x3.2 36 TREC100x50x3.2 TREC200x100x10 4 TREC200x100x10 250

Struc Mate

3000 日期 3174 Date 3288 A 6450 11.05.21 7700

Metal - Steel 设计变更内容 Metal - Steel Amendments Metal - Steel Amended from on Metal - Steel Metal - Steel -

1430 3000

Metal - Steel Metal - Steel -

7700

Metal - Steel -

版本

Rev

B

18.05.21

Amended floor be

undertaken

C:\Users\MSI\OneDrive\Desktop\20220809 construction drawings\PT103_Cabin_STR_OR_202207

Client: 甲方

UK DIT Pproject: 工程名称

Tianjing Exhibtion

Drawing Title: 图纸标题

Structural Framing _ Floor Plan- 地板钢 issued for:

Coordination

Detail Drawings 1

A1

Structural Framing _ Floor Plan- 地板钢架结构平面 1 : 20

C Copyright ZEDfactory 2019

Client: 甲方

UK DIT Pproject: 工程名称

Tianjing Exhibtion

MS

R

Created: 创建日期

S 1:2

09/08/2022

B

ZEDfactory

ZEDfactory, 21 Sandmartin Way,

T 020 8404 1380 F 020 8404 2 E mail@zedfactory.com www.zedfactory.com

Do not scale, use figured dimensions only. otherwise, these drawings represent desig approved assembly drawings will be requir Contractor prior to any work and /or procur undertaken

C:\Users\MSI\OneDrive\Desktop\20220809 construction drawings\PT103_Cabin_STR_OR_20220708(1)-Logoforstationary-15-792181.png

88

drawn by update b

Drawing Number: 图纸号

PT103/6/100

89


+

Portfolio 2024

+ A. Mahdi Safieddine

+ 11 2019 eVolo Skyscraper Competition Skyscraper

[Competition Participant]

Skyscraper

New Vision Skyscraper

+ Design Proposal 2018-2019

Tariq el Jdideh, Beirut, Lebanon is a well known city hub, a very populated area within the Lebanese Capital. Building a skyscraper that both respects sustainability factors as well as is innovative and solution driven for the citizens was not an easy task to accomplish. Our design comes as a vital answer to an urgent need for the area for development as well as flourishing. The construction of this one of a kind Vertical Farm Tower with other functions to fulfill needs in response to crafting the first generation of farming centers in Lebanon that are more viable while maintaining a residential amenity for a sustainably-minded clientele. The main objective behind this project was to bring this green revolution to the urban people, and make of Tariq el Jdideh a better place for living. Reports done by UNICEF found that almost 24% of the population are unemployed while the other major needs are shelter, food, and education.

+ 90

91


Portfolio 2024

+ A. Mahdi Safieddine

For sustainable reasons and in order to maximize the green initiative that we had in mind, we opted first of all to use gray waters (polluted waters) and apply the Bio-Remediation techniques. This technique uses safe bacteria to break down wastes and digest them leading to clean water; it’s better than using chemicals that will end up in what we are seeding. Furthermore, all of the vertical farm workers will be living within the skyscraper’s premises in modular elements that are easy to construct, deconstruct, transport and can grow to fit its resident’s number, this modular capsule can be extended to increase its capacity and understand more users. By making these farmers live in the skyscraper itself, we will decrease the use of cars of them coming, and decrease traffic jams that the area is familiar with.

Skyscraper

+

As for materials and solutions provided; the use of “Litracon” that is a combination of optical fibers and fine concrete, produced as prefabricated concrete blocks for a translucent glass-like look with a powerful strength (translucent concrete). Also the nanotechnology used in the building; on glass and concrete (self-cleaning technique). This design will hopefully be a breath of fresh air for Lebanon and its capital, making Tariq el Jdideh a better place, and set an example for future projects to respect sustainability values and try and create a world that is less polluted, and more productive while respecting the environment we live in and answering the peoples’ and regions’ specific needs. In the near future it will solve not only pollution issues, but hunger and labor issues, thus feeding the whole world.

92

93


+

Portfolio 2024

+ A. Mahdi Safieddine

+ 12 Epoch Collage

Bizarre, out of this world photo composition

Collage

Collage

[Personal Work - Graphic Art]

+ Brief - Seeking Adventure -

- New Red Dot -

- Solo Walks -

- Inner Thoughts -

A selection of some of my personal and collaborative graphic work. The following prints are “postcards from the future” that have emotions and nostalgia attached to each one of them.

- Roller coaster of Emotions -

- The Lost Astronaut 94

- Bubblegum Giraffes -

- Bloom Out III -

- Soft and Hard -

- Twilight -

- Where we Belong 95


+

Collage

+ A. Mahdi Safieddine

Collage

Portfolio 2024

- Return to the Future -

- Maybe One Day 96

-RETRO-

- Self Portrait -

- Brainwashed Society -

- Boat Race -

- I got your back -

- All About the Journey-

- It used to be Crowded There -

- Bloom Out-

- Where’s the Vibe at? 97


+

Portfolio 2024

+ A. Mahdi Safieddine

Freelance

Freelance

Site Visits

Model Making V01

V02

V03

V04

V05

V06

V07

V08

Y01

V09

V01

3625 720

380

220

360

360

360

V02

600

V04

360

V05

360

V06

V07

4485

X05

720

360

480

0 60

sliding window double glazed 200x220cm

V03

480

wooden pergola lightweight structure 10x10cm cross section

Y02

0

65

570

200 330

65

65

65

65

200 340

65

0 21 5 38 0 66 0

5 34

0

0 30

15 12 93

0 720

0 5 34

3885

0 46

5 30

5 58

330

360

35

5

375

345 330

1245

720

0

27

0 34 1633

345

345

345

5 64

115

B01

480 D01

246 FL:+0.45m CL:+0.35m

1060

D03

W01

01

D03

D02

Clinic 2 GF 11

Clinic 3 GF 12

Clinic 4 GF 13

345

330

345

W01

W01

W01

FL:+0.45m CL:+0.35m

FL:+0.45m CL:+0.35m

03 04 05 06 07 08 09

215

B02

W03

H01

Y05 240

240

135

360

105

240

120

720

0

60

360

24 23 125 22 21 20 19 18 17

FL:+0.45m CL:+0.35m

curtain wall double glazed

X04

R6

00

45°

R9

00

X03 H02

10 11 12 13 14 15 16

FL:+1.80m CL:+1.65m

FL:+0.45m CL:+0.35m

360

460

0

125 02

1065

330

72

H03

Cafe GF 14

480

FL:+0.45m CL:+0.35m

Y04

480

A01

°

450

480

Clinic 1 GF 10

240

360

D02 W02

W03

X05

R750

D02

FL:+0.45m CL:+0.35m

135

WC GF 09

1560

650

260

H03

D01

1920 375

CW1

A02

360

330

45°

520

H04

2370

260

240

D02

480

FL:+0.45m CL:+0.35m

480

360 360

Terrace GF 15

1545

120

303030

45

30 60 240

360 3885

450 720 240

90°

440

0

0

585

8° 10

1780 372 380

340

46

01 03

02

240 360

2550

1680

690

660

1060 1410

65

20 0 45

0 20 60

0

360

360 270

270 2130

65 200 330 65 65 200 340 65 65 200 340

00

480

445

445

840

165 240

225

303030303030303030303030

345

360 240 360

70

2550

5

13

360

0

0

600

60

24

360

0

360

12

Office 3 GF 08

W01

915

Y01

0

24

360

5

375

12

H02

360

11

360

0

220

D03

21 0

FL:+0.45m CL:+0.35m

45°

380

wooden pergola lightweight structure

CL:+0.35m

280

0

360

720

24

FL:+0.45m CL:+0.35m

Y03

X01

W02

FL:+0.45m CL:+0.35m

D03

Office 2 GF 07

CW1

H05

FL:+0.45m CL:+0.35m

Storage GF 16

45

Y02

H01

X02

480

FL:+/-0.00m

H06

Clinic 5 GF 17

D02

5

15x3cm stone coping

X04

FL:+0.45m CL:+0.35m

85

22

D02

3625

V01

5

FL:+0.45m CL:+0.35m

W01

530

X03

480

18°

360

W01

850

03 02 01

480

13

Y01

H02

W01

W01

FL:+0.45m CL:+0.35m

72

450

Administration GF 04

WC GF 06

H03

0

141

FL:+0.45m CL:+0.35m

FL:+0.45m CL:+0.35m

440

Y02

25

1920

D02

5

460

Administration GF 17

530

W01

70

10

330

FL:+0.45m CL:+0.35m

planting pods

D02

D03

FL:+0.45m CL:+0.35m

0

200

30cm cavity wall

Office GF 02

265 WC GF 05

42

160

H05

H04

FL:+0.45m CL:+0.35m 460

Y06

FL:+0.45m CL:+0.35m

5

planting pods

0

Y01

Pharmacy GF 15

FL:+0.45m CL:+0.35m

Clinic 6 GF 18

D03

37

0

200

H04

Office GF 16

D01

330

160

FL:+0.45m CL:+0.35m

60

330

FL:+0.45m CL:+0.35m

220

33 0

FL:+0.45m CL:+0.35m

285

Office 1 GF 03

33

Y02

D02

D02

W01

D02

505

W01

°

FL:+0.45m CL:+0.35m

D01

FL:+/-0.00m

D02

FL:+0.45m CL:+0.35m

FL:+0.45m CL:+0.35m

FL:+0.45m CL:+0.35m

H06

72

D02

H01

2295

Clinic 7 GF 19

FL:+0.45m CL:+0.35m

5

480

480

Entrance Lobby GF 01

D02

lounge GF 02

H05

485

03 02 01

FL:+0.45m CL:+0.35m

D03

X02

D02

220

34 5

planting pods

70

X01

Entrance Lobby GF 01

5

470

Y03

570

Cafe GF 14

FL:+0.45m CL:+0.35m

360

FL:+0.45m CL:+0.35m

W01

W01

0

250

Clinic 1 GF 03

Y03

D01 D02

360

3565

D02

480

Y05

W01

36

X04 345

1320

X03

Clinic 2 GF 04

W01

Clinic 8 GF 20

5

470

FL:+0.45m CL:+0.35m

560

0

5

1115

350

H02

D03

230

Clinic 3 GF 05

350

W01

D01

185

72

D03

73 FL:+0.45m CL:+0.35m

34

630

FL:+0.45m CL:+0.35m

5

485

Clinic 9 GF 21

D02

FL:+/-0.00m

H06

265

W01

34

170

200

D01

560

planting pods

D01

X01 W01

105

0

955

D04

2135

Y04 24

935

FL:+0.45m CL:+0.35m

72

0

FL:+0.45m CL:+0.35m

X02

H07

350

W01

H03

1085

CL:+0.35m

0

315 WC GF 09

W02

H04

Terrace GF 13

D05

12

D05

0

D05

0

33

170

1050

W02 12 13 14 15 16 17 18 19 20 21 22 23 24

34

30

5

5

FL:+0.45m CL:+0.35m

455

Y03

13

W01

0 45 Clinic 10 GF 22

0

460 WC GF 06

36

56

W02

350

FL:+0.45m CL:+0.35m

FL:+0.45m CL:+0.35m

4

690

510

0

X03

24

Clinic 8 GF 12

17

H06

FL:+0.45m CL:+0.35m

90

2cm plaster 10cm solid wall 5cm cavity 15cm solid wall 3cm stone cladding

Clinic 7 GF 11

190

FL:+2.25m CL:+2.15m

11 10 09 08 07 06 01 05 04 03 02 01

FL:+0.45m CL:+0.35m

37

410

D02

Clinic 6 GF 10

455

W03

690

D02

W01

planting pods

24 0

15x3cm stone coping

rc staircase

W03

FL:+0.45m CL:+0.35m

340

Clinic 5 GF 08

FL:+0.45m CL:+0.35m

15x3cm stone coping

H05

H08

715

60

465

Clinic 4 GF 07

48

X04

FL:+/-0.00m

W01

200 340

84

W01

W01

68

32

200 335

30

480

planting pods

H07

68

300

68

03 02 01

200 335

0 42

68

0 10

W01

W01

H08

465

240

X02

550

360

H01

480 4485

V02

V03

V04

V05

V06

V07

V08

V09

V01

V02

V03

V04

V05 Y06

V06

V07 X01

Freelance Projects

Freelance 3D Rendering

Album Covers 98

99


+

Portfolio 2024

+

+ +

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

A. Mahdi Safieddine

+

+

+

+

+

+

+

+

Contact:

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+44 7383404122 + msafieddine97@gmail.com

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

Thank You

[2024] 100


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.