Majorwaves Energy Report August 2020

Page 43

www.majorwavesenergyreport.com

INFRASTRUCTURE

‘N43.24bn Ibadan Dry Ports Project Goes To FEC Soon’ By Esther Mordi

T

he Full Business Case Compliance of the Ibadan Dry Port (IDP), estimated to cost $94m (about N43.24bn), will soon be developed for approval by the Infrastructure Concession and Regulatory Commission (ICRC) and the Federal Executive Council (FEC). Rakiya Zubairu, the Head, Public Relations, the Nigerian Shippers’ Council (NSC) said this in a statement recently.. The statement said this is the next phase of the Public-Private Project (PPP) that is being guaranteed by the NSC. The 80,000 TEU capacity dry port is to be built on the basis of a Public-Private Partnership basis. On completion, the facility is expected to contribute to addressing the problem of port congestion and gridlock in Apapa as it will be designated a port of destination where cargos will be consolidated for import and export, especially in the South-Western part of Nigeria. Among other uses, the dry port

will provide a competitive cargo sorting centre, bulk breaking as well as cargo-tracking and truck management services. The LagosKano standard gauge railway currently under construction is aligned to the proposed dry port, making it easy to convey cargo from the seaports in Lagos and to all destinations along the route. Already the first phase of the negotiation had established the economic viability of the project as well as the utilisation of local content at each stage of development and operation of the facility. The statement said: “Having concluded this stage, an Updated Full Business Case Compliance report will be produced. “A draft agreement will be presented to the Federal Ministry of Justice and sent to the Infrastructure Concession Regulatory Commission, ICRC, for vetting, after which the Minister of Transportation will present the agreement to the Federal Executive

Council. “The concessionaire will then be taken to the site for sodturning. “It is expected that construction will commence immediately after the ceremony “The time-line for completion is twelve months.” She said, that was the conclusion of another round of negotiation with the concessionaire. The preferred bidder for the project is the CRCC who was led by its deputy managing director, Jacques Liao, during the negotiation. The negotiation was moderated by the Federal Ministry of Transportation led by the acting Permanent Secretary, Dr Hussani Adamu and the Director, Maritime Services, Auwalu Suleiman, the Director-General of Infrastructure Concession Regulatory Commission, ICRC, Engr. Chidi Izuwa. Amb. Jummai Katagum who represented the Federal Ministry of Finance was also part of the 4-day negotiation.

Majorwaves Energy Report AUGUST 2020, Vol 3 No 8

43


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Nigeria to Deliver 5GW Of Electricity By 2022 – NNPC

3min
page 50

Azura Power Deal: Nigeria Not Liable To Pay $1.2bn – Presidential Aide

4min
page 49

Maritime Agencies Adopt Modalities To Address Overlapping Functions

1min
page 48

NIMASA, Customs Collaborate To Plug TIP Loopholes

4min
page 47

NPA Halts Licences Renewal For Shipping Firms Over Holding Bay Crisis

3min
page 46

Samsung To Employ ICT Tools To Improve Shipbuilding In Nigeria

1min
page 45

USTDA Provides Support For New LNG Infrastructure In Nigeria

1min
page 44

Majorwaves Energy Report August 2020

2min
page 43

NNPC, First E&P Announce Arrival of FPSO To Nigeria

2min
page 42

Majorwaves Energy Report August 2020

20min
pages 36-41

More than a glimmer of hope for Jobs, Poverty Eradication

23min
pages 24-32

COVID 19: Oilserv Donates Medical Supplies To Enugu State Government

1min
page 23

Majorwaves Energy Report August 2020

3min
page 22

NCDMB in Equity Investments Agreements With Nigerian Based Firms

1min
page 21

Azikel Modular Refinery In Bayelsa Progresses

3min
pages 20-21

Oilserv, IVM Create Pedestal For Proliferation Of Locally Manufactured Vehicles

5min
pages 18-19

North/East Intervention: NCDMB Receives Report from Aisha Buhari Foundation

3min
page 17

President Buhari Inaugurates Nigerian Content Tower, Pledges More Spend on Job Creation, Infrastructure

4min
pages 15-16

 NNPC Averts $125m Fraud Targeted at FG by Syndicate By Ikenna Omeje

3min
page 13

Shell Trumps Spill Response And Prevention Record In The Niger Delta By Ikenna Omeje

7min
pages 11-12

Shell Trumps Spill Response And Prevention Record In The Niger Delta By Ikenna Omeje

2min
page 11

OPEC+ Plan to Increase Oil Production by August Could Backfire –Rystad By Ikenna Omeje

3min
page 10

NNPC Inks $1.5bn Oil Prepayment Deal With Vitol, Matri

1min
page 9

 DPR boss Charges Nigerian Lubricant Producers to Target Export Market

1min
page 9

Eni Takes Steps to Cut Operation Costs by 1.4bn Euros in 2020 By Jerome Onoja

3min
page 8

Aveon Offshore Successfully Loads-out 300-tonne Topside Module for Anyala West Conductor Supported Platform

1min
page 7

Sylva, Kyari, Wabote hail SEPLAT as pride of indigenous operators, gas revolution strides

3min
pages 6-7

OPEC+ Plan to Increase Oil Production by August Could Backfire –Rystad

16min
pages 10-14

N43.24bn Ibadan Dry Ports Project Goes To FEC Soon

2min
page 43

NIMASA Boss Celebrates Berth Of Largest Container Vessel In Nigeria, Lauds NPA MD

21min
pages 44-52

President Buhari Inaugurates Nigerian Content Tower, Pledges More Spend on Job Creation, Infrastructure

21min
pages 15-22

COVID 19: Oilserv Donates Medical Supplies To Enugu State Government

22min
pages 23-31

Eni Takes Steps to Cut Operation Costs by 1.4bn Euros in 2020

7min
pages 8-9
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.