www.majorwavesenergyreport.com
INDUSTRY NEWS “We have grown our operations, our reserves and became the first company to be listed on both the Nigeria and London Stock Exchange” Dr. Orjiako stated.
commitment to the highest standards of corporate governance standards as well as an unwavering focus on sustainable value creation for stakeholders.
future sustainable energy system in Africa. He also expressed optimism at the future prospects of Seplat despite prevailing challenges in the operating environment, adding that:
The Founding and outgoing SEPLAT CEO, Mr. Austin Avuru recalled the company’s journey from inception and how the company successfully surmounted the various challenges to become Nigeria’s leading independent. Avuru attributed the company’s success to its passionate
“We are very strong on corporate gove r n a n ce , s t r u c t u re a n d zerotolerance for unethical practices” Avuru affirmed. SEPLAT’s new CEO, Mr. Roger Brown described the summit as crucial platform to debate challenges and solutions for the transition to a
“We are still a company that is looking forward to very big strides and we are looking to the future to becoming an energy company delivering best practices globally as well as delivering value to our customers and all our stakeholders.”
Aveon Offshore Successfully Loads-out 300-tonne Topside Module for Anyala West Conductor Supported Platform By Margaret Nongo-Okojokwu
A
veon Offshore Limited has announced the successful loading-out of a 300-tonne topside production module for the Anyala West Conductor Supported Platform from its fabrication yard in Port Harcourt, Rivers State. The project, which is for the Nigerian National Petroleum Corporation and FIRST Exploration & Production Development Company Joint Venture (NNPC/ FIRST E&P JV), is the first of twoconductor supported platforms currently under construction by NNPC/FIRST E&P JV for Anyala and Madu fields in OML 83 AND 85.
“We are yet again proud of this milestone. The 300-tonne topside production module was successfully loaded-out for the Anyala West Conductor Supported Platform from our fabrication yard in Port Harcourt. “It has been transported to OML 83, offshore Nigeria, to be lifted onto the preinstalled drilling deck using a heavy lift vessel, after which the final hook-up and commissioning of the platform will be performed with first oil production commencing shortly thereafter. “This project is a NNPC/FIRST E&P Joint Venture. This is the first of two-conductor supported plat forms currently under
construction by NNPC/FIRST E&P JV for Anyala and Madu fields in OML 83 AND 85,” Aveon stated on its LinkedIn account. The company expressed gratitude to its clients for trusting it with the project and also appreciated its team and contractors for making the project a reality. Anyala Drilling Platform 1 (ANDP1) IS A Conductor Supported Platform, located in approximately 55m of water in OML 83, offshore Nigeria. The platform has been fabricated on Aveon yard over a period of about 18 months.
Majorwaves Energy Report AUGUST 2020, Vol 3 No 8
7