NCDMB: Highlights of Developed Capacities & Opportunities for Regional Integration

Page 1

Highlights of Developed Local Content Capacities & Opportunities for Regional Integration

Akintunde Adelana Director, Monitoring & Evaluation 1

10 JUNE 2020


Outline 1

Introduction

2

Our Vision

3

NCDMB Capacity Building Strategies

4

Egina Project: An Example of A High Impact Capacity Building Project

5

June 7, 2020

Local Content Capacity Building Achievements

www.ncdmb.gov.ng


Introduction THE NEED FOR LOCAL CONTENT

BACKGROUND ON NIGERIAN RESOURCES

YEAR 2010

Reserves: ~ 37.06 billion

NIGERIAN OIL & GAS INDUSTRY CONTENT DEVELOPMENT (NOGICD) ACT (2010)

barrels Global Reserve Position: 11th

The NOGICD Act of 2010 establishes NCDMB as the sole

Global Production: 13th

OIL

agency of the Federal Government that is responsible for

Daily Production: Avg ~ 2.08mbpd ~1.99mbpd in Feb 2019

driving Nigerian Content in the oil and gas industry

MANDATE

3

Reserves: ~ 193 Trillion cubic ft

1

Develop local Capacities and Capabilities

2

Monitor compliance and enforce provisions

Global Deposit Position: 8th

GAS June 7, 2020

Daily Production: Avg ~ 8163mcf

www.ncdmb.gov.ng

3


Our Vision: 10-Year Strategic Blueprint 2010

NOGICD Enactment

2027

2017 7 Years Later

Upstream

MidMidStream Stream

DownDownStream Stream

10 Years From Now?

Sectorial Sectorial Linkages Linkages

Nigerian Content Journey

70%

<5% Of spend retained

56%

70%

26% Of spend retained

Of spend retained

26%

300,000 jobs

5% 2017

$14 Bn out of $20 Bn retained

2027

Target: Over 300,000 direct jobs June 7, 2020

www.ncdmb.gov.ng

Shipyards Manufacturing

4


NCDMB Capacity Building Strategies

► Implementation of major projects are very important in the development of incountry capacities and capabilities ► Capacity Development Initiatives (CDIs) are very important tools in closing identified capacity gaps ► Project Based Trainings are important element of Human Capacity Development ► Continuous and well sequenced FID on major projects are important to sustain established capacities and attract additional 5

June 7, 2020

www.ncdmb.gov.ng


Egina Project: An Example of A High Impact Capacity Building Project ● Employment: 24 million man-hours worked in Nigeria equivalent to a workforce of 3,000 persons on average for 5 years;

High Impact: Infrastructure; Fab yards; HCD; etc

● Training: over 560,000 man-hours of HCD training ● Infrastructure: construction of several large-scale new Fab yards , including Africa’s first FPSO integration quay, ● Production: Addition of 200,000bpd into Nigeria’s production ● Skills Transfer: On facilities integration & commissioning June 7, 2020

6 www.ncdmb.gov.ng

EGINA FPSO


â?‘ Pause for a moment and imagine if Egina was executed without local content regulations???

â?‘ What would have been the fate of all the youth engaged on the project?

8 June 7, 2020

www.ncdmb.gov.ng


NOGaPS –Nigerian Oil & Gas Parks Scheme • NCDMB is establishing Oil and Gas parks that will serve as manufacturing hubs in each of the Oil producing States in Nigeria • The parks are located close to gas corridors, power plants, water ways etc. and will be operated on a shared services model which will enable low cost of operations • Two (2) of the parks located in Emeyal-1 (Bayelsa) and Odukpani (Cross River) have reached advanced stages of development • 25 megawatts independent power plant (IPP) is being constructed in partnership with the Nigerian Agip Oil Company (NAOC) to supply electricity to the park in Emeyal-1

June 7, 2020

www.ncdmb.gov.ng

9


R&D EFFORTS MADE BY THE BOARD

R&D Implementation Framework Inauguration of R&D Council Establishment of R&D Fund R&D Fair (c) Copyright of NCDMB

June 7, 2020

www.ncdmb.gov.ng

www.ncdmb.gov.ng

6/19/20

9


Local Content Capacity Building Achievements SAIPEM AVEON NIGERDOCK EWT NESTOIL SHI-MCI (LADOL) COLEMAN NEXANS

>8mln

420 MTa

(over 7,000 trainees)

including 2 World Class mills in Abuja & Lagos

training man-hours

Pipe Mills

SCC YULONG SOLEWANT PIPECOATERS AFRICOAT FMC CAMERON BHGE

NOGIC JQS 8,879 171,679 Individual Service accounts company accounts

Engineerin g Design

28% Average NC Level

62 Operator portal accounts

60k MT Fab Capacity

Barite Processin g

LV / HV Cables

$200

Million Funding

Pipe Coatin g

FPSO

Integration

10 June 7, 2020

40% of marine vessels

www.ncdmb.gov.ng


LC Achievements (Strategic Pillars & Enablers) Compliance & Enforcement

Technical Capability Development • International certification for 20 Marine personnel • Completed R&D Roadmap • Support of Project 100 Beneficiaries • Human Capacity Development (HCD) – Project based & Direct interventions

• Commencement of 3rd Party Monitoring • Revised Statutory Reporting Templates • Extended framework to capture Midstream and Downstream

Funding • Launched $200m NCIFund • Achieved financial autonomy of the Board • Forensic audit of NCDF remittance

Organizational Capability • Completed HR Process Review • Revised Organization Structure • Progressed completion of the new HQ Building • Developed internal Service Level Agreements (SLAs)

Regulatory Environment 11 • Launched Operational Guidelines • Completed Judges Workshop on NOGICD Act • Secured Fiat from MoJ/AGF

Enabling Business Environment • Set up and Operationalize Servicom and Efficiency units • NCDMB Investment Policy Approved • Signed SLA with NLNG, OPTS, and IPPG. • Held 2 Opportunity Fairs (NOGOF)

Sectorial / Regional Market Linkage • Inputs into Mambilla Power Supply Project • LC support for other African countries – Uganda, Kenya, etc • Signed SLA with NLNG, OPTS, and IPPG.

Stakeholders Engagement

Research and Statistics

• Engaged the EFCC, Nigeria Customs Service and Nigeria Immigration Service, FAAN, FMI, National Bureau of Statistics etc

• Established collaborative framework with the National Bureau of Statistics • Develop quarterly industry data analytics

11 June 7, 2020

www.ncdmb.gov.ng


PICTURE PICTURE SPEAK SPEAK (1 of 2)

OES Respect Swamp Rig

Cameron Valves

TPSNL OCTG Facility

T&G Mega Machine Shop

Aveon Duplex Steel Shop

6/19/20

PEM Offshore Simulation

www.ncdmb.gov.ng

FMC Subsea Tree Assembly

EWT Heavy Fabrication Yard

SCC Pipe Mill 12


PICTURE SPEAK

RIG Maintenance at LADOL Yard

MV African Vision

Nigerdock’s Shipyard Division: 25,000DWT graving dry dock, a 3,500DWT floating dock, quayside facilities and weather proof multipurpose workshops

Petrolog vessel 6/19/20

www.ncdmb.gov.ng

13


PICTURE SPEAK

1st full fabrication of complete wellhead platforms on ExxonMobil Nigeria SFD Project in 2012

6/19/20

www.ncdmb.gov.ng

OFON Phase II Living Quarters Fabricated at Nigerdock

14


PICTURE SPEAK

LADOL Fabrication Yard Equipped with FPSO Fabrication Capacity 6/19/20

www.ncdmb.gov.ng

15


We Are Set-Up to Achieve More – (NCDMB Hq)

June 7, 2020

www.ncdmb.gov.ng

16


Thank You for Listening Contact us info@ncdmb.gov.ng

@officialncdmb @officialncdmb www.facebook.com/officialncdmb officialncdmb 070000ncdmb 17

June 7, 2020

www.ncdmb.gov.ng


18

June 7, 2020

www.ncdmb.gov.ng


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.