FIS AWARDS - MARINE HARVEST

Page 1

Contractors Awards Interior Fit-Out: Up to ÂŁ1M

From start to finish ...



Marine Harvest is one of the largest seafood companies in the world and the world’s largest producer of Atlantic salmon. The company employs 11,700 people and is represented in 24 countries. They supply healthy, delicious and sustainably farmed salmon and processed seafood to more than 70 markets worldwide. The company is present and trusted in all major salmon farming regions in the world. In 2015 harvest volumes of salmon was 420,000 tonnes.* The building works consisted of: the reconfiguration of the ground floor office plans, erecting a new demountable partitioning formation ( some glazed with Sektor 25 & 128), BDACS air conditioning, ventilation, floor box, fire & intruder alarms, ceilings, all mechanical and engineering systems, joinery works, walnut doors, signage, feature graphics and manifestations, carpeting and Karndean flooring as well as furniture. *Marine Harvest UK Website




FIRE DOOR WITH PUSH BAR

PLANT ROOM OFFICE 23 OFFICE 25

OFFICE 22

OFFICE 19

OFFICE 21

OFFICE 18

OFFICE 20

OFFICE 24

OFFICE 17

OFFICE 16

STORE

OFFICE 26

CONFERENCE ROOM COMMS ROOM

FOOD PREP AREA

A/C

OFFICE 15 ARCHIVE OPEN PLAN OFFICE AREA TALL FRIDGES SVP

LADIES

SHOWER

SHOWER

DISH WASHERS

OFFICE 14

UNDER BOILING WATER

OFFICE 13

STAFF CANTEEN

CLEANER

SVP

ER DD RE SH

ER

OFFICE 12

PR IN

TE

R

INTERNAL BREAKOUT

NT

GENTS

PR I

HR. STORE

DISABLED

PRINT/COPY AREA

MEETING ROOM

MEETING ROOM

STATIONARY

BREAKOUT

OFFICE 11 RECEPTION OFFICE 1

OFFICE 2

OFFICE 3

OFFICE 5

OFFICE 4

OFFICE 6

OFFICE 7

OFFICE 9

OFFICE 8

OFFICE 10

FIRE DOOR WITH PUSH BAR

Kilmarnock Manchester Edinburgh First Floor Bank Street Kilmarnock East Ayrshire KA1 1ER 01563 535511

The Courtyard Royal Mills Ancoats Manchester M4 5BA 0161 554 5882

Princes House 5 Shandwick Place Midlothian Edinburgh EH2 4RG 0131 228 6145

PROJECT TITLE

CLIENT

Marine Harvest- Office Formation- Fort William

Marine Harvest

LAYOUT-ELEVATION MH- 07 SCALE 1:100

SIZE A2

DATE 03/03/2015

JOB NO J159

DRAWN BY LM-WORKSMART


Drywall Partitions

Kilmarnock Manchester Edinburgh The Courtyard Royal Mills Ancoats Manchester M4 5BA 0161 554 5882

Princes House 5 Shandwick Place Midlothian Edinburgh EH2 4RG 0131 228 6145

Glazed Partitions

Floor Boxes

KEY

First Floor Bank Street Kilmarnock East Ayrshire KA1 1ER 01563 535511

High Level Data Outlets

PROJECT TITLE

CLIENT

Marine Harvest- Office Formation- Fort William

Marine Harvest

LAYOUT- DATA FLOOR BOXES MH- 03 SCALE 1:100

SIZE A2

DATE 03/03/2015

JOB NO J159

DRAWN BY LM-WORKSMART


FIRE DOOR WITH PUSH BAR

PLANT ROOM OFFICE 23

OFFICE 26 OFFICE 25

OFFICE 22

OFFICE 19

OFFICE 21

OFFICE 18

OFFICE 20

OFFICE 24

OFFICE 17

OFFICE 16

STORE

A/C

OFFICE 15 FOOD PREP AREA

CONFERENCE ROOM COMMS ROOM

ARCHIVE

TALL FRIDGE

SVP

LADIES

SHOWER

SHOWER

OFFICE 14

UNDER DISH WASHER BOILING WATER

OFFICE 13

STAFF CANTEEN

CLEANER

BREAKOUT

MEETING ROOM

SVP

INTERNAL BREAKOUT

MEETING ROOM

PRINT/COPY AREA

DISABLED

GENTS

HR. STORE

926

OPEN PLAN OFFICE AREA

OFFICE 12

OFFICE 11 RECEPTION OFFICE 2

OFFICE 1

OFFICE 3

OFFICE 5

OFFICE 4

OFFICE 6

OFFICE 7

OFFICE 9

OFFICE 8

OFFICE 10

FIRE DOOR WITH PUSH BAR 896

Drywall Partitions

Kilmarnock Manchester Edinburgh The Courtyard Royal Mills Ancoats Manchester M4 5BA 0161 554 5882

Princes House 5 Shandwick Place Midlothian Edinburgh EH2 4RG 0131 228 6145

Floor Boxes

KEY

First Floor Bank Street Kilmarnock East Ayrshire KA1 1ER 01563 535511

Glazed Partitions

High Level Data Outlets

PROJECT TITLE

CLIENT

Marine Harvest- Office Formation- Fort William

Marine Harvest

LAYOUT- FLOOR BOXES MH- 03A SCALE 1:100

SIZE A2

DATE 03/03/2015

JOB NO J159

DRAWN BY LM-WORKSMART


FIRE DOOR

B WITH PUSH BAR

PLANT ROOM S

S

S

S

S

OFFICE 22

OFFICE 23 OFFICE 25

S

S

S

S

S

S

S

OFFICE 19

OFFICE 21

OFFICE 18

OFFICE 20

OFFICE 24

OFFICE 17

OFFICE 16

FD30

STORE

OFFICE 26

S

S

19784

S

14421

A/C

OFFICE 15 CONFERENCE ROOM S

COMMS ROOM

S

S S

ARCHIVE

S

OPEN PLAN OFFICE AREA

S

DISH WASHERS

TALL FRIDGES

SHOWER

STAFF CANTEEN

CLEANER S

H

H

FD30

MEETING ROOM

SVP

RECEPTION

ER DD RE SH R

OFFICE 12

PR

IN

TE

R

INTERNAL BREAKOUT

S

TE

S

IN

S

S

PR

S

S

BREAKOUT

MEETING ROOM HR. STORE

DISABLED

GENTS

Fire Panel

OFFICE 13

PRINT/COPY AREA

LADIES

SHOWER

STATIONARY

SVP

OFFICE 14

UNDER BOILING WATER

S

S

OFFICE 11

S

21188

S

7826

FD30

S

OFFICE 1

OFFICE 2

OFFICE 3

OFFICE 5

OFFICE 4

OFFICE 6

OFFICE 7

OFFICE 9

OFFICE 8

OFFICE 10

B S

S

S

S

S

S

S

S

S

S

FIRE DOOR

B WITH PUSH BAR

FIRE ALARM Illuminated emergency exit sign on maintained circuit

Kilmarnock Manchester Edinburgh First Floor Bank Street Kilmarnock East Ayrshire KA1 1ER 01563 535511

The Courtyard Royal Mills Ancoats Manchester M4 5BA 0161 554 5882

B

Break glass call point unit

S

Ceiling mounted smoke detector

Princes House 5 Shandwick Place Midlothian Edinburgh EH2 4RG 0131 228 6145

Sounder unit Smoke Detector Route

A new fire alarm detection system type L3 to be fitted throughout the premises comprising of manual call points with automatic smoke and heat detection and sounders New ceiling mounted smoke detectors, sounders, call points and and emergency lighting should be installed to all newly formed cellular spaces as per plan in accordance with BS 5839 All cabling to the fire alarm system shall be wired in fire rated cable of the soft skin type

Fire Exit routes throughout Building The fire alarm control panel is located at the entrance foyer Fire Distances-main routes (mm) FD30

H

30 Minute Fire Door Ceiling Mounted Heat Detector

The fire detection and alarm system shall be installed throughout the building in accordance with BS5839: Part 1: 2002 so that in the event of an outbreak of fire an audible warning will be given to all occupants

PROJECT TITLE

CLIENT

Marine Harvest- Office Formation- Fort William

Marine Harvest

LAYOUT-FIRE/TRAVEL DISTANCES MH- 08 SCALE 1:100

SIZE A2

DATE 03/03/2015

JOB NO J159

DRAWN BY LM-WORKSMART


FIRE DOOR WITH PUSH BAR

PLANT ROOM OFFICE 23 OFFICE 25

OFFICE 22

OFFICE 19

OFFICE 21

OFFICE 18

OFFICE 20

OFFICE 24

OFFICE 17

OFFICE 16

STORE

OFFICE 26

A/C

OFFICE 15 CONFERENCE ROOM COMMS ROOM

ARCHIVE

TALL FRIDGES

SVP

LADIES

SHOWER

SHOWER

DISH WASHERS

OFFICE 14

UNDER BOILING WATER

OFFICE 13

STAFF CANTEEN

CLEANER

BREAKOUT

HR. STORE

DISABLED

GENTS SVP

INTERNAL BREAKOUT

PRINT/COPY AREA

MEETING ROOM

MEETING ROOM

OPEN PLAN OFFICE AREA

OFFICE 12

OFFICE 11 RECEPTION OFFICE 2

OFFICE 1

OFFICE 3

OFFICE 4

OFFICE 5

OFFICE 6

OFFICE 7

OFFICE 9

OFFICE 8

OFFICE 10

B

FIRE DOOR WITH PUSH BAR

Kilmarnock Manchester Edinburgh First Floor Bank Street Kilmarnock East Ayrshire KA1 1ER 01563 535511

The Courtyard Royal Mills Ancoats Manchester M4 5BA 0161 554 5882

Princes House 5 Shandwick Place Midlothian Edinburgh EH2 4RG 0131 228 6145

PROJECT TITLE

CLIENT

Marine Harvest- Office Formation- Fort William

Marine Harvest

LAYOUT-LIGHTING MH- 010 SCALE 1:100

SIZE A2

DATE 03/03/2015

JOB NO J159

Kilmarnock Manchester

DRAWN BY LM-WORKSMART BO-SCRIBDLE

First Floor Bank Street Kilmarnock East Ayrshire KA1 1ER 01563 535511

The Courtyard Royal Mills Ancoats Manchester M4 5BA 0161 554 5882


FIRE DOOR WITH PUSH BAR

PLANT ROOM OFFICE 23 OFFICE 25

OFFICE 22

OFFICE 19

OFFICE 21

OFFICE 18

OFFICE 20

OFFICE 24

OFFICE 17

OFFICE 16

STORE

OFFICE 26

A/C

OFFICE 15 CONFERENCE ROOM COMMS ROOM

TALL FRIDGES SVP

LADIES

OPEN PLAN OFFICE AREA

ARCHIVE

SHOWER

DISH WASHERS

SHOWER

OFFICE 14

UNDER BOILING WATER

OFFICE 13 Plumbing & Drainage

CLEANER

STAFF CANTEEN

Shower surround to be impervious to water

All pipework from new sink, dishwasher and hot water boiler to be in 50mm PVC and should be individually trapped New pipework to route below existing raised

Shower room door to be fitted with a privacy lock with an emergency release operable from the exterior with

access floor and to tie into existing vented drainage system

All pipework from new shower trays to be individually trapped

BREAKOUT

an alternative means of removal

HR. STORE

DISABLED

MEETING ROOM

GENTS SVP

INTERNAL BREAKOUT

All new drainage to be constructed and installed in

PRINT/COPY AREA

MEETING ROOM

accordance with BS EN 12056-2 2000 A thermostatic mixer and anti-scald valve will be fitted to showers to comply with BS EN 1287:1999 and should be fitted as close to point of delivery as possible

OFFICE 12

OFFICE 11 RECEPTION OFFICE 1

OFFICE 2

OFFICE 3

OFFICE 5

OFFICE 4

OFFICE 6

OFFICE 7

OFFICE 9

OFFICE 8

OFFICE 10

FIRE DOOR WITH PUSH BAR

Number of sanitary facilities required for 54 staff;

wc whb urinal

Kilmarnock Manchester Edinburgh First Floor Bank Street Kilmarnock East Ayrshire KA1 1ER 01563 535511

The Courtyard Royal Mills Ancoats Manchester M4 5BA 0161 554 5882

Princes House 5 Shandwick Place Midlothian Edinburgh EH2 4RG 0131 228 6145

PROJECT TITLE

CLIENT

Marine Harvest- Office Formation- Fort William

Marine Harvest

LAYOUT-PLUMBING & DRAINAGE MH- 09 SCALE 1:100

SIZE A2

DATE 03/03/2015

Male staff - 27

Female staff - 27

1 2 2

3 3 -


2 10 2 15

2 No. PURY-P250YJM-A heat recovery units

2 14

2 13

2 12

2 11

2 09

2 08

2 07

2 06

2 05

OUTDOOR CONDENSER UNITS

OFFICE 26

PLANT ROOM

20

OFFICE 21

20

20

20 25

OFFICE 23

OFFICE 24

OFFICE 25

20

32

20

OFFICE 22

20

OFFICE 20

20

OFFICE 19

2 04

20

OFFICE 17

OFFICE 18

OFFICE 16

42

OFFICE 15

STORE

A/C

A/C EXISTING

COMMS ROOM

OFFICE 14

FOOD PREP AREA

TREATMENT

A/C

A/C

ARCHIVE

ARCHIVE

A/C

EXISTING

EXISTING

2 03

(To be relocated) 20

A/C

EXISTING

SHOWER LADIES

OFFICE 13

(Relocated position)

SHOWER

CLEANER

2 02

STAFF CANTEEN EXISTING

A/C

CONFERENCE ROOM

1 05

20

OPEN PLAN OFFICE AREA

(Relocated position)

1 06

OFFICE 12

MEETING ROOM

GENTS

SVP

EXISTING

A/C

MEETING ROOM

20

PRINTER

DISABLED

HR. STORE

2 01

A/C

EXISTING

A/C

EXISTING

(To be relocated)

EXISTING

A/C RECEPTION

1 13 32 20

20

25

OFFICE 3 OFFICE 1

OFFICE 4

20

OFFICE 5

20

OFFICE 6

20

OFFICE 7

20

OFFICE 8

20

OFFICE 9

OFFICE 11 OFFICE 10

OFFICE 2

1 01

B-DACS Air Conditioning Services 31 Lonmay Drive Panorama Business Village Glasgow G33 4EP T: 0141 773 3355 W: www.bdacs.com

20

20

1 02

1 03

PROPOSED AIR-CONDITIONING PLAN Notes : 1 No. Wall mounted unit 28 No. Cassettes in total (13 No. & 15 No.) 6 No. Existing (some relocated)

Notes : 20

System duty

1 04

1 07

Project:

1 08

Project no:

1 09

1 10

1 11

Scale:

B14/2910-01 1:100@A2 MARINE HARVEST STOB BAN HOUSE GLEN NEVIS BUSINESS PARK FORT WILLIAM PH33 6RX

Drawn:

Date:

J.G.

05-02-15

Checked:

Drawing no:

Rev:

BD-01

'A'

Customer Approval:

1 12


OFFICE 26

PLANT ROOM

OFFICE 21

OFFICE 24

OFFICE 25

OFFICE 23

OFFICE 22

OFFICE 20

OFFICE 19

OFFICE 17

OFFICE 18

OFFICE 16 OFFICE 15

CONFERENCE ROOM 2

TREATMENT COMMS ROOM

SHOWER SHOWER LADIES

OFFICE 14

FOOD PREP AREA

A/C

STORE

ARCHIVE

ARCHIVE

OFFICE 13

SHOWER SHOWER

CLEANER

STAFF CANTEEN OPEN PLAN OFFICE AREA CONFERENCE ROOM

TREATMENT ROOM

SVP

MEETING ROOM

¼

STORE MAIL ROOM

MEETING ROOM

OFFICE 12

PRINTER

DISABLED GENTS

HR. STORE

OPEN PLAN OFFICE AREA

OFFICE 11

RECEPTION

OFFICE 10

OFFICE 1

B-DACS Air Conditioning Services 31 Lonmay Drive Panorama Business Village Glasgow G33 4EP T: 0141 773 3355 W: www.bdacs.com

OFFICE 2

OFFICE 3

PROPOSED VENTILATION PLAN Notes : 1. Existing ventilation main routes as existing 2. Balance off's to each office 150Ø 3. Balance damper fitted at each balance

OFFICE 4

OFFICE 6

OFFICE 5

Project:

Project no:

OFFICE 7

OFFICE 8

Scale:

B14/2910-01 1:100@A2 MARINE HARVEST STOB BAN HOUSE GLEN NEVIS BUSINESS PARK FORT WILLIAM PH33 6RX

Drawn:

Date:

J.G.

05-02-15

Checked:

Drawing no:

Rev:

BD-02

'A'

Customer Approval:

OFFICE 9







Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.