ASSEMBLY INSTRUCTION SOMBRERO CANOPY ALUMINUM 10X12

Page 1

ASSEMBLY INSTRUCTION SOMBRERO CANOPY ALUMINUM 10' x 12' NOTES : FOR EASY INSTALLATION, 4 PERSON REQUIRED ESTIMATED INSTALLATION DURATION : 180 minutes


PARTS COLUMN

A

1x

COLUMN

B

1x

PART

PART

A

COLUMN

C

1x

PART

page | 1

B

C

COLUMN

D

1x

PART

D


PARTS TOP FRAME (SIDE) 2x

E PART

E

TOP FRAME (BACK) 1x

F PART

F

TOP FRAME (FRONT) 1x

G PART

page | 2

G


PARTS BACK WALL (RIGHT) 1x

H

BACK WALL (CENTER) 1x

PART

H

BACK WALL (LEFT)

I

J

1x PART

I

PART

BASE

K

4x

J PART

K

PLATE

L

4x PART

L

page | 3


PARTS ROOF

M

1x

PART

M

ROOF (CENTER)

N

1x

PART

N

ROOF

O

1x

PART

page | 4

O


PARTS CURTAIN BAR 1x

P

PART

P

CURTAIN BAR

Q

2x PART

CURTAIN 1x

page | 5

R

Q

CURTAIN 2x

S


FITTINGS

1

2

28x

18x

NYLON RING M8 SS RING M8 - EP SPRING RING M8 - EP SOCKET SCREW M8x40 mm-EP

NYLON RING M6 SS RING M6 - EP SPRING RING M6 - EP SOCKET SCREW M6x30 mm-EP

3

4

8x

2x

NYLON RING M8 SS RING M8 - EP SPRING RING M8 - EP JCBC M8x70 mm-EP

SS RING M8 JCBC M8x15mm - EP

5

6

8x

6x

DOUBLE HEAD M8 - EP NYLON RING M10 NYLON RING M8 JCBC M8x50mm - EP

NYLON RING M6 JCBC M6x50mm - EP

7

8

8x

3x

NYLON RING M6 JCBC M6x35mm - EP

NYLON RING M6 JCBC M6x40mm - EP

9

ALLEN KEY 6mm 1x

10

6x

NYLON RING M6 JCBC M6x20mm - EP

ALLEN KEY 5mm 1x

page | 6

11

ALLEN KEY 4mm 1x

12


FITTINGS DYNABOLT SS M10x100mm EP 55BAHX010 10x

LOCTITE ANTISEIZE LB8009 2x

PLATE SUPPORT 2x

13

15

WRENCH 13 55FTKH006 1x

SS PINS 3x

17

TOOLS REQUIRED ( NOT INCLUDED ) HAMMER DRILL

page | 7

DRILLING BIT 38"

14

16


BASE INSTALLATION

!

Attention: Accuracy in diagonal dimensions are crucial to ensure the proper aligment of cabana.

DIM A

DIM B

DI

M

C

* Mark from edge locations for each column and their diagonal dimensions. Using the chalk line (not included), trace the line from center of each mark.

page | 8

DIM A

DIM B

DIM C

137''

113''

177,5''


BASE INSTALLATION * Using a pencil, trace the base and holes from each anchor fitting base

page | 9


BASE INSTALLATION PART

K

13

14

page | 10


BREAKDOWN PART

PART

F

PART

PART PART

E PART

PART

G

C

D PART

PART

PART

15

page | 11

E

B

A

K

* ALWAYS USE LOCTITE ANTISEIZE LB8009 FOR EASY ASSEMBLY AND TO REDUCE ABRASIVE FRICTION


FRAME INSTALLATION c c c c

d

b

d

b

d d

b a a

b

a

a

FR O

NT

PART

PART

VIE

W

D

E

PART

a

A 12 3

d match all label

10

! page | 12

DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION

1


FRAME INSTALLATION c c c c

d

b

d

b

d d

b a a

b

a

a

FR O

NT

PART

PART

VIE

W

B

E

PART

c

C 12 3

b match all label

10

! page | 13

DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION

1


FRAME INSTALLATION

! PART

PART

DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION

E

D PART

A

1

10

page | 14


FRAME INSTALLATION

PART

PART

F PART

E

G PART

C PART

B

10 1

d match all label

page | 15


!

DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION

c match all label

10 1

1

10


BACK WALL INSTALLATION match all label

match all label

match all label

e

c

f d

PART

PART

I PART

page | 16

H

J


BACK WALL INSTALLATION Step 1 : Mount wall to the beam, do not tighten fully to make it easier to fasten side bolts to the leg column

Step 2 : Mount the wall to the leg column, make sure all hole on straight with the column hole's

12

6

7 12

Step 3 back view

10 11

! page | 17

DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION

5


DYNABOLT INSTALLATION

back view

DRILL

4

11 17

14

page | 18

13


ROOF INSTALLATION DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION

!

11

2

f e

PART

PART

PART

page | 19

M

N

O


PLATE INSTALLATION Step 1 : Remove bolt that previously installed

10 *REMOVE THE BOLT

1

PART

L Step 2 : Put reinforced plate (PART L) reinstall all bolts & tightened all

page | 20


PIN BAR INSTALLATION

16

page | 21

p


CURTAIN INSTALLATION CAUTION IN CASE OF STRONG WINDS OR STORMS MAKE SURE ALL CURTAINS ARE IN A SECURED OPEN POSITION TIGHTEN TO THE MAIN STRUCTURES

PART

S

Step 1 : insert the curtain to the curtain bar

page | 22

PART

R


CURTAIN BAR INSTALLATION Step 2 : install the curtain bars to the bracket

8

9 12

PART

12

PART

Q

P

PART

page | 23

Q




mamagreen_official mamagreenfurniture mamagreen_furniture info@mamagreen.com www.mamagreen.com

scan to download assemmbly instruction

MAMAGREEN LLC 222 Merchandise Mart Showroom 1586 Chicago, IL 60654 Tel: +1 312 877 5155


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.