ASSEMBLY INSTRUCTION SOMBRERO CANOPY ALUMINUM 10X10

Page 1

ASSEMBLY INSTRUCTION SOMBRERO CANOPY ALUMINUM 10' x 10' NOTES : FOR EASY INSTALLATION, 4 PERSON REQUIRED ESTIMATED INSTALLATION DURATION : 120 minutes


PARTS COLUMN 1x

PART

A

A

COLUMN

B

1x

PART

B

COLUMN

C

1x

PART

COLUMN

D

1x

PART

C

TOP FRAME 1x

D

E PART

E

TOP FRAME 1x

F PART

page | 1

F


PARTS TOP FRAME 2x

G PART

G

PLATE

H

4x

PART

WALL PART

page | 2

J

I

4x

PART

H

J

1x

BASE

I

WALL

K

1x PART

K


PARTS WALL

L

1x PART

WALL

N

page | 3

N

M PART

L

1x PART

WALL 1x

M

WALL

O

1x PART

O


PARTS ROOF

P

1x

PART

P

ROOF

Q

1x

PART

page | 4

Q


FITTINGS SOCKET SCREW M8x40mm-EP 55BAHS028 28x

RING SPRING M8 - EP 55RING002 28x

RING PLATE SS M8 - EP 55RING006 28x

RING NYLON M8 55RING003 28x

DYNABOLT SS M10x100mm EP 55BAHX010 8x

JCBC M6x40mm - EP 55JCBC016 30x

page | 5

1

3

5

SOCKET SCREW M6x30mm-EP 55BAHS029 18x

RING SPRING M6 - EP 55RING005 18x

RING PLATE SS M6 - EP 55RING004 18x

7

RING NYLON M6

9

JCBC M6x50mm EP

11

55RING052 60x

55JCBC020 12x

DOUBLE HEAD M6 - EP 55BADH001 12x

2

4

6

8

10

12


FITTINGS RING NYLON M10 12x

ALLEN KEY 6 55FTKH011

ALLEN KEY 4 55FTKH009

13

15

17

WRENCH 13 55FTKH006 1x

ALLEN KEY 5 55FTKH010

LOCTITE ANTISEIZE LB809 55CHEM080 2x

TOOLS REQUIRED ( NOT INCLUDED ) HAMMER DRILL

page | 6

DRILLING BIT 38"

14

16

18


BASE INSTALLATION

!

Attention: Accuracy in diagonal dimensions are crucial to ensure the proper aligment of cabana.

DIM A

DIM B

DIM C

113''

113''

159 13 16''

DIM B

C

D IM

C

IM D DIM A

* Mark from edge locations for each column and their diagonal dimensions. Using the chalk line (not included), trace the line from center of each mark.

page | 7


BASE INSTALLATION * Using a pencil, trace the base and holes from each anchor fitting base

page | 8


BASE INSTALLATION

I

9

14

page | 9


BREAKDOWN PART PART

G

PART

E PART

F

PART

C PART

PART

G PART

B

D PART

A

FRO

PART

18

page | 10

NT V

IEW

I

* ALWAYS USE LOCTITE ANTISEIZE LB8009 FOR EASY ASSEMBLY AND TO REDUCE ABRASIVE FRICTION


FRAME INSTALLATION c c

c c

b b

d b

d d

b d

a a

a

a

FRO NT V PART

PART

C

E

PART

d

c match all label

1

! page | 11

DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION

15

7

D

IEW


FRAME INSTALLATION c c

c c

b b

d b

d d

b d

a a

a

a

FRO NT V PART

PART

A

F

PART

b

a match all label

1 15

page | 12

7

B

IEW


FRAME INSTALLATION

!

DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION

FRO N

T VIE W

BAC K VI

EW

7 5 3 1

15

page | 13


FRAME INSTALLATION DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION

!

c PART

c

c

G

c b b d b

d d

b a

d

a PART

a

G a

to match all label

a

15

FRO

NT V

IEW

7

5 3

1

1

7

15

page | 14


BACK WALL INSTALLATION

match all label

match all label

e PART

K

c PART

J

d

FRO N

page | 15

T VIE

W


BACK WALL INSTALLATION

!

DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION

8 11

Step 1 : Mount wall to the beam, do not tighten f ully to make it easier to fasten side bolts to the leg column

17

BOTTOM VIEW

16

17 17

10 8 12

10 8

page | 16

Step 3

13

Step 2 : Mount the wall to the leg column, make sure all hole on straight with the column hole's .


SIDE WALL INSTALLATION

match all label

match all label

PART

c

L f PART

M

b

FRO NT V

page | 17

IEW


SIDE WALL INSTALLATION

!

DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION

8 11

Step 1 : Mount wall to the beam, do not tighten f ully to make it easier to fasten side bolts to the leg column

17

BOTTOM VIEW

16 17 10

17

8 Step 2 : Mount the wall to the leg column, make sure all hole on straight with the column hole's .

page | 18

Step 3

12 13

10 8


SIDE WALL INSTALLATION

to match all label

to match all label

g

a

d

PART

FRO N

N

T VIE

PART

page | 19

O

W


SIDE WALL INSTALLATION

! 8 11

DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION

Step 1 : Mount wall to the beam, do not tighten f ully to make it easier to fasten side bolts to the leg column

17

BOTTOM VIEW

16 17 10

17

8

Step 2 : Mount the wall to the leg column, make sure all hole on straight with the column hole's . page | 20

Step 3

12 13

10 8


ROOF INSTALLATION 8 10

16 17

2 4 6 8

16 12

h

PART

P

page | 21

13 PART

Q


PLATE INSTALLATION

1 *REMOVE THE BOLT

15

3 5 7

PART

H

page | 22


mamagreen_official mamagreenfurniture mamagreen_furniture info@mamagreen.com www.mamagreen.com

scan to download assemmbly instruction

MAMAGREEN LLC 222 Merchandise Mart Showroom 1586 Chicago, IL 60654 Tel: +1 312 877 5155


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.