ASSEMBLY INSTRUCTION SOMBRERO CANOPY ALUMINUM 20X10

Page 1

ASSEMBLY INSTRUCTION SOMBRERO CANOPY ALUMINUM 20' x 10' NOTES : FOR EASY INSTALLATION, 4 PERSON REQUIRED ESTIMATED INSTALLATION DURATION : 240 minutes


PARTS COLUMN

A

1x

COLUMN

B

1x

PART

PART

A

COLUMN

page | 1

D

COLUMN

E

1x

C

PART

B

D

1x

PART

COLUMN 1x

COLUMN

F

1x

PART

PART

E

C

F


PARTS TOP FRAME 2x

G PART

G

TOP FRAME 2x

H PART

H

TOP FRAME 2x

I PART

I

TOP FRAME 1x

J PART

page | 2

J


PARTS BACK WALL

K

1x PART

BACK WALL

page | 3

PART

K

M

1x PART

BACK WALL

M

L

1x

L

BACK WALL

N

1x PART

N


PARTS SIDE WALL

O

1x PART

SIDE WALL

page | 4

PART

O

Q

1x PART

SIDE WALL

Q

P

1x

P

SIDE WALL

R

1x PART

R


PARTS ROOF

S

1x

PART

S

ROOF

T

1x

PART

T

ROOF

U

1x

PART

page | 5

U


PARTS ROOF

V

1x

PART

PLAT L

W

4x

PART

X

2x

PART

W

BASE

X

Y

6x

PART

Y

page | 6

PLAT T

V


FITTINGS SOCKET SCREW M8x40mm-EP 55BAHS028 46x

RING SPRING M8 - EP 55RING002 46x

RING PLATE SS M8 - EP 55RING006 46x

RING NYLON M8 55RING003 46x

DYNABOLT SS M10x100mm EP 55BAHX010 12x

JCBC M6x40mm - EP 55JCBC016 40x

page | 7

1

SOCKET SCREW M6x30mm-EP 55BAHS029 36x

3

RING SPRING M6 - EP

5

RING PLATE SS M6 - EP

7

RING NYLON M6

9

JCBC M6x50mm EP

11

55RING005 36x

55RING004 36x

55RING052 94x

55JCBC020 18x

DOUBLE HEAD M6 - EP 55BADH001 18x

2

4

6

8

10

12


FITTINGS RING NYLON M10 18x

ALLEN KEY 6 55FTKH011

ALLEN KEY 4 55FTKH009

13

15

17

WRENCH 13 55FTKH006 1x

ALLEN KEY 5 55FTKH010

LOCTITE ANTISEIZE LB809 55CHEM080 2x

TOOLS REQUIRED ( NOT INCLUDED ) HAMMER DRILL

page | 8

DRILLING BIT 38"

14

16

18


BASE INSTALLATION

!

Attention: Accuracy in diagonal dimensions are crucial to ensure the proper aligment of cabana.

DIM A

DIM A

D

IM

C

DIM B

D DIM

* Mark from edge locations for each column and their diagonal dimensions. Using the chalk line (not included), trace the line from center of each mark.

page | 9

DIM A

DIM B

DIM C

DIM D

113''

113''

159 13 16''

225 13 16''


BASE INSTALLATION * Using a pencil, trace the base and holes from each anchor fitting base

page | 10


BASE INSTALLATION PART

Y

9

14

page | 11


BREAKDOWN PART PART

H PART

I PART

H

PART PART

G

J

PART

G

PART

D

PART

I

PART

E

PART

C

PART

F PART

B PART

A

18

page | 12

* ALWAYS USE LOCTITE ANTISEIZE LB8009 FOR EASY ASSEMBLY AND TO REDUCE ABRASIVE FRICTION

PART

Y


FRAME INSTALLATION d d d e

e

d c

e

e

f

c c

e

f

b

b

b

f

c

b f

a a

a

b

a

FR

ON

TV

PART

PART

IEW

F

I

PART

a

f match all label

! page | 13

DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION

15

1

7

A


FRAME INSTALLATION d d d e

e

d c

e

e

f

c c

e

f

b

b

b

f

c

b f

a a

a

b

a

FR

ON

TV

PART

PART

IEW

E

J

PART

b

e match all label

15

! page | 14

DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION

1

7

B


FRAME INSTALLATION d d d e

e

d c

e

e

f

c c

e

f

b

b

b

f

c

b f

a a

a

b

a

FR

ON

TV

PART

PART

IEW

C

I

PART

d

c match all label

! page | 15

DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION

15

1

7

D


FRAME INSTALLATION

! PART

PART

DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION

I

F PART

A

7

5 3 1

15

page | 16


FRAME INSTALLATION

!

DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION

PART

H

PART

J e match all label

PART

15

G

1 7

PART

E PART

B

15 1 7

7

5 3 1

15

f match all label

page | 17


FRAME INSTALLATION PART

H

PART

PART

15

E PART

7

DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION

match all label PART

1

! d

G

15

J

1 7

B

7

5 3 1

15

e match all label

page | 18


BACK WALL INSTALLATION

match all label

d match all label

h

g

f

PART

PART

PART

L PART

K

page | 19

M

N


BACK WALL INSTALLATION 8 11 17

Step 1 : Mount wall to the beam, do not tighten f ully to make it easier to fasten side bolts to the leg column

16

BOTTOM VIEW

17

12 10 13

8 Step 3

page | 20

17 Step 2 : Mount the wall to the leg column, make sure all hole on straight with the column hole's .

10 8


SIDE WALL INSTALLATION match all label

match all label

d

i

PART

c

O PART

P

page | 21


SIDE WALL INSTALLATION

8 11

17 Step 1 : Mount wall to the beam, do not tighten fully to make it easier to fasten side bolts to the leg column

Step 3 Step 2 : Mount the wall to the leg column, make sure all hole on straight with the column hole's .

13 12

17 17

10 16

10 8 page | 22

8


SIDE WALL INSTALLATION match all label

j

f

match all label

a PART

Q PART

R page | 23


SIDE WALL INSTALLATION DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION

!

8 11 17

Step 1 : Mount wall to the beam, do not tighten f ully to make it easier to fasten side bolts to the leg column

Step 2 : Mount the wall to the leg column, make sure all hole on straight with the column hole's .

Step 3

13 12

17

17 10 10

8 16

page | 24

8


ROOF INSTALLATION 8

DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION

!

17

10

l

PART

V

k 16 12

13 PART

PART

U

S PART

T 16 2 4 6 8

page | 25


ROOF INSTALLATION Step 1 : Remove bolt that previously installed

REMOVE THE BOLT

1 1

*REMOVE THE BOLT

15

3 5

7

7

PART

W

PART

W

PART

X

PART

W

Step 2 : Put reinforced plate (PART X / PART W) reinstall all bolts with completed ring needed & tightened all

15

PART

X PART

W

1 3 5 7

page | 26


mamagreen_official mamagreenfurniture mamagreen_furniture info@mamagreen.com www.mamagreen.com

scan to download assemmbly instruction

MAMAGREEN LLC 222 Merchandise Mart Showroom 1586 Chicago, IL 60654 Tel: +1 312 877 5155


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.