ASSEMBLY INSTRUCTION SOMBRERO CANOPY ALUMINUM 20' x 10' NOTES : FOR EASY INSTALLATION, 4 PERSON REQUIRED ESTIMATED INSTALLATION DURATION : 240 minutes
PARTS COLUMN
A
1x
COLUMN
B
1x
PART
PART
A
COLUMN
page | 1
D
COLUMN
E
1x
C
PART
B
D
1x
PART
COLUMN 1x
COLUMN
F
1x
PART
PART
E
C
F
PARTS TOP FRAME 2x
G PART
G
TOP FRAME 2x
H PART
H
TOP FRAME 2x
I PART
I
TOP FRAME 1x
J PART
page | 2
J
PARTS BACK WALL
K
1x PART
BACK WALL
page | 3
PART
K
M
1x PART
BACK WALL
M
L
1x
L
BACK WALL
N
1x PART
N
PARTS SIDE WALL
O
1x PART
SIDE WALL
page | 4
PART
O
Q
1x PART
SIDE WALL
Q
P
1x
P
SIDE WALL
R
1x PART
R
PARTS ROOF
S
1x
PART
S
ROOF
T
1x
PART
T
ROOF
U
1x
PART
page | 5
U
PARTS ROOF
V
1x
PART
PLAT L
W
4x
PART
X
2x
PART
W
BASE
X
Y
6x
PART
Y
page | 6
PLAT T
V
FITTINGS SOCKET SCREW M8x40mm-EP 55BAHS028 46x
RING SPRING M8 - EP 55RING002 46x
RING PLATE SS M8 - EP 55RING006 46x
RING NYLON M8 55RING003 46x
DYNABOLT SS M10x100mm EP 55BAHX010 12x
JCBC M6x40mm - EP 55JCBC016 40x
page | 7
1
SOCKET SCREW M6x30mm-EP 55BAHS029 36x
3
RING SPRING M6 - EP
5
RING PLATE SS M6 - EP
7
RING NYLON M6
9
JCBC M6x50mm EP
11
55RING005 36x
55RING004 36x
55RING052 94x
55JCBC020 18x
DOUBLE HEAD M6 - EP 55BADH001 18x
2
4
6
8
10
12
FITTINGS RING NYLON M10 18x
ALLEN KEY 6 55FTKH011
ALLEN KEY 4 55FTKH009
13
15
17
WRENCH 13 55FTKH006 1x
ALLEN KEY 5 55FTKH010
LOCTITE ANTISEIZE LB809 55CHEM080 2x
TOOLS REQUIRED ( NOT INCLUDED ) HAMMER DRILL
page | 8
DRILLING BIT 38"
14
16
18
BASE INSTALLATION
!
Attention: Accuracy in diagonal dimensions are crucial to ensure the proper aligment of cabana.
DIM A
DIM A
D
IM
C
DIM B
D DIM
* Mark from edge locations for each column and their diagonal dimensions. Using the chalk line (not included), trace the line from center of each mark.
page | 9
DIM A
DIM B
DIM C
DIM D
113''
113''
159 13 16''
225 13 16''
BASE INSTALLATION * Using a pencil, trace the base and holes from each anchor fitting base
page | 10
BASE INSTALLATION PART
Y
9
14
page | 11
BREAKDOWN PART PART
H PART
I PART
H
PART PART
G
J
PART
G
PART
D
PART
I
PART
E
PART
C
PART
F PART
B PART
A
18
page | 12
* ALWAYS USE LOCTITE ANTISEIZE LB8009 FOR EASY ASSEMBLY AND TO REDUCE ABRASIVE FRICTION
PART
Y
FRAME INSTALLATION d d d e
e
d c
e
e
f
c c
e
f
b
b
b
f
c
b f
a a
a
b
a
FR
ON
TV
PART
PART
IEW
F
I
PART
a
f match all label
! page | 13
DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION
15
1
7
A
FRAME INSTALLATION d d d e
e
d c
e
e
f
c c
e
f
b
b
b
f
c
b f
a a
a
b
a
FR
ON
TV
PART
PART
IEW
E
J
PART
b
e match all label
15
! page | 14
DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION
1
7
B
FRAME INSTALLATION d d d e
e
d c
e
e
f
c c
e
f
b
b
b
f
c
b f
a a
a
b
a
FR
ON
TV
PART
PART
IEW
C
I
PART
d
c match all label
! page | 15
DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION
15
1
7
D
FRAME INSTALLATION
! PART
PART
DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION
I
F PART
A
7
5 3 1
15
page | 16
FRAME INSTALLATION
!
DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION
PART
H
PART
J e match all label
PART
15
G
1 7
PART
E PART
B
15 1 7
7
5 3 1
15
f match all label
page | 17
FRAME INSTALLATION PART
H
PART
PART
15
E PART
7
DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION
match all label PART
1
! d
G
15
J
1 7
B
7
5 3 1
15
e match all label
page | 18
BACK WALL INSTALLATION
match all label
d match all label
h
g
f
PART
PART
PART
L PART
K
page | 19
M
N
BACK WALL INSTALLATION 8 11 17
Step 1 : Mount wall to the beam, do not tighten f ully to make it easier to fasten side bolts to the leg column
16
BOTTOM VIEW
17
12 10 13
8 Step 3
page | 20
17 Step 2 : Mount the wall to the leg column, make sure all hole on straight with the column hole's .
10 8
SIDE WALL INSTALLATION match all label
match all label
d
i
PART
c
O PART
P
page | 21
SIDE WALL INSTALLATION
8 11
17 Step 1 : Mount wall to the beam, do not tighten fully to make it easier to fasten side bolts to the leg column
Step 3 Step 2 : Mount the wall to the leg column, make sure all hole on straight with the column hole's .
13 12
17 17
10 16
10 8 page | 22
8
SIDE WALL INSTALLATION match all label
j
f
match all label
a PART
Q PART
R page | 23
SIDE WALL INSTALLATION DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION
!
8 11 17
Step 1 : Mount wall to the beam, do not tighten f ully to make it easier to fasten side bolts to the leg column
Step 2 : Mount the wall to the leg column, make sure all hole on straight with the column hole's .
Step 3
13 12
17
17 10 10
8 16
page | 24
8
ROOF INSTALLATION 8
DO NOT FULLY TIGHTEN HARDWARE UNTIL THE END OF INSTALLATION
!
17
10
l
PART
V
k 16 12
13 PART
PART
U
S PART
T 16 2 4 6 8
page | 25
ROOF INSTALLATION Step 1 : Remove bolt that previously installed
REMOVE THE BOLT
1 1
*REMOVE THE BOLT
15
3 5
7
7
PART
W
PART
W
PART
X
PART
W
Step 2 : Put reinforced plate (PART X / PART W) reinstall all bolts with completed ring needed & tightened all
15
PART
X PART
W
1 3 5 7
page | 26
mamagreen_official mamagreenfurniture mamagreen_furniture info@mamagreen.com www.mamagreen.com
scan to download assemmbly instruction
MAMAGREEN LLC 222 Merchandise Mart Showroom 1586 Chicago, IL 60654 Tel: +1 312 877 5155